CITY OF DOVER PLANNING COMMISSION
June 16, 2025
The Meeting of the City of Dover Planning Commission was held on Monday, June 16, 2025, at
7:00 PM as an In-Person Meeting and also using the phone/videoconferencing system Webex.
The Meeting Session was conducted with Chair Mr. Witham presiding. Members present were
Mr. Michael Lewis, Mr. Roach (arrived virtual at 7:08PM), Mrs. Denney, Mrs. Maucher, Mr.
Baldwin, Dr. Jones, Mr. Reaves (virtual), Mrs. Welsh, and Mr. Witham.
Staff members present were Mrs. Dawn Melson-Williams, Mr. Christopher Salzano, and Mrs.
Kristen Mullaney.
APPROVAL OF AGENDA
Mrs. Maucher moved to approve the Agenda as submitted, seconded by Dr. Jones and the motion
was carried 8-0 with Mr. Roach absent.
APPROVAL OF MEETING MINUTES OF MAY 19, 2025
Mrs. Welsh moved to approve the Planning Commission Meeting Minutes of May 19, 2025,
seconded by Mrs. Maucher and the motion was carried 8-0 with Mr. Roach absent.
Mr. Roach arrived to meeting virtually at 7:08PM.
COMMUNICATIONS & REPORTS
Mrs. Melson-Williams stated that the next Planning Commission regular meeting is scheduled
for Monday, July 21, 2025, at 7 PM. We do have an application that was just filed to be heard
that evening.
Mrs. Melson-Williams provided an update on the regular City Council and various Committee
meetings held on June 9 & 10, 2025.
Mrs. Melson-Williams stated that as noted, we are processing a number of Event Permits tied to
festivals. She believes this coming weekend would be the African American Festival and then
we will be into the Fourth of July soon after. There is an update on the Kenton Road project if
your travels take you to that part of the City. There was a Public Advisory that was issued today.
They are still in Phase 2 where the southbound of Kenton Road between College Road and Route
8 is closed. Hopefully that will be transitioning later this month but for more detailed information
about their phasing for this project, it is recommended that you visit the website that they have
up which is www.Kentonroadimprovements.com. It lays out all of the phases; it gives aerial
shots of current conditions in the corridor. Their phasing plan takes them through June 2026 at
this point. It looks like they may have to pause a little bit over the winter depending on what type
of activity they are going to be in. That corridor from Route 8 to Maple Dale Road is going to
have various versions of closures over the next year.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Melson-Williams presented the audience information on policies and procedures for the In-
Person Meeting and Virtual Meeting using the Webex system.
1
Page 2
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
OLD BUSINESS
Requests for Extensions of Planning Commission Approval: None
NEW BUSINESS
Presentation on Dover's Downtown Development District (DDD) Program Relaunch
Visit https://www.cityofdover.com/departments/Planning/dovers-downtown-development-
district-210248
Representative: Mrs. Ann Marie Townshend, Rossi Group
Mrs. Melson-Williams stated that our first presentation this evening is a presentation on Dover’s
Downtown Development District Program. We call it the DDD. It is a relaunch, and we have
Mrs. Ann Marie Townshend from the Rossi Group and also Mr. Chris Salzano from the Planning
Office who will be giving this presentation this evening.
Mrs. Townshend stated that for those of you who may not be as familiar with the history of the
Downtown Development District Program, in 2014 the General Assembly passed the Downtown
Development District Act. The purpose of the Act was to spur capital investments, stimulate job
growth, help build a stable community of long-term residents by improving housing
opportunities, and assist municipalities basically in strengthening the Downtowns. There was an
application period. The City of Dover submitted an application along with a District Plan and we
were one of the first three designated in that first round. There was one from each County. It was
Wilmington, Dover and Seaford. The way that the program works is that the designation is good
for ten years and then after the 10 years, the designated municipalities are eligible for up to two,
five-year extensions. As of today, there are twelve designated Downtown Development Districts
and three came up on the first window of renewal; again, Wilmington, Seaford and Dover. We
submitted last year; Rossi Group worked with the City to develop the District Plan, do the
program assessment, and complete the application. That was done and it went to the Cabinet
Committee on State Planning Issues and then last summer, the City got a letter from the
Governor letting us know that we were extended for an additional five years. So, that extension
began on February 1, 2025, and will go through January 30, 2030. The bulk of the program
success in Dover really has been the housing. There has been really some transformational
change in neighborhoods. When we did the application in 2014, we used two different planning
documents as kind of the direction for the plan. They were kind of the heart of the plan. One of
those was “Restoring Central Dover” which NCALL, now NeighborGood Partners, was the lead.
There still is a lot of collaboration through “Restoring Central Dover” on improving the housing
stock, providing homeownership opportunities really for people who are low to moderate
income. One of the big fears when you get into revitalization is, are you going to displace the
people who live there to bring in new people with more money and then you end up with
gentrification. Through Restoring Central Dover, there has really been an effort to balance
everything. More than 65 homes have been built between Habitat for Humanity, NeighborGood
Partners, Milford Housing Development Corporation, and then a few built by private for-profit
builders. That was really transformational. You can see North Kirkwood Street just entirely
2
Page 3
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
transformed and if you drive around Downtown, you can really see the difference. There have
been some very successful commercial investments as well. Janaid’s on Loockerman Street was
one of the first two or three projects in Dover to actually get through the program and get the
rebate. He is doing very well, and he is now looking at doing residential on the upstairs of his
properties, which again, is one of the priorities of all of the Downtown planning. Rail Haus is
another example of a large commercial success. Stonerail Market is another example. The
commercial success hasn’t been as transformational as we were hoping. She thinks COVID
didn’t help us with that. But certainly, she thinks the winds are shifting and things are getting
stronger in that area.
There are a variety of incentives. The big incentive with the State’s Downtown Development
District Program is a rebate of up to 20% of the capital cost of construction, renovation or
whatever of the project. She can’t think of one property owner or business owner who has taken
advantage of this that we talked to, that didn’t say that this was the difference that made it viable.
Without this 20% rebate, the numbers just wouldn’t work. The other thing is that the State wants
to see that the local governments also have some skin in the game. The City has a variety of
incentives. There is a waiver of the City’s portion of the water and wastewater impact fees, a
waiver of the Building Permit fees, and a waiver of the Business License fees for new
businesses. You still have to get your license, just for three years it doesn’t have a fee. Then, here
is a 10-year property tax abatement where basically the taxes come in over time. There is also a
transfer tax rebate after a project is complete. The last one is the Historic Tax Credit which the
City has had for quite some time but that is one of the tools in the toolbox. The Downtown Dover
Partnership also has some incentives. For many years, they have had a very successful Façade
Grant Program. When we started the Downtown Development District in 2015, they started
offering architectural assistance so that if people were doing renovations, it would help to pay for
those architectural costs. When we did this back in 2014/2015, we thought about what the
challenges that they were finding. There were a lot of people wanting to do renovations on
commercial buildings, but they did not have the funds to pay for an architect; so, that was an
incentive that really helped people do it the right way, which is what we want. In more recent
years, the Downtown Dover Partnership has funding for what is called a Critical Improvement
Program. Under that program, they help with the cost of life safety, ADA accessibility,
commercial kitchens, and upstairs residential. One of the things that people don’t like to do, and
she certainly understands, is when you get to a certain level of renovation and your space is a
certain size, it has to be sprinklered. It’s expensive; this helps to make that cost bearable because
the Downtown Dover Partnership, in some cases has provided up to $300,000 in support to make
some of these things happen. For the first ten years or so of the program, Kent County also had a
rebate that they would do up to $10,000 and that is unfortunately, no longer part of the puzzle.
As part of the Renewal Application, we did an evaluation and we did focus groups. We really
talked to the people who did the projects, found out what worked and what didn’t. The numbers
are between 2015 and 2023 as that was the data that they had when we did this. The State
Rebates totaled $1.6 million. The value of the City’s Incentives was $73,000 and the private
investment leverage of $13.2 million. That’s the goal of the program; it’s to replicate that type of
success.
The application to update the District Plan was done last spring. City Council approved it in May
2024. The letter from the Governor came in August 2024 and then in February 2025, City
3
Page 4
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Council approved an Ordinance that amended the boundary. With the initial program, we were
more confined in how much land we could have. She thinks it was 225 acres to start and now its
275 acres. We really worked to figure out where was the need. Where are the places that if you
expand that boundary, it could really make a difference? Most of that was on the west side. Also
in a prior expansion, the boundary on the east side on Loockerman Street was taken to Mirror
Lake because you have the old Post Office and you have Treadway Towers; there is opportunity
there. That Ordinance was adopted in February and now we get into the relaunch. They have
been working on the materials associated with the program and this is where she is going to turn
it over to Mr. Salzano to explain.
Mr. Salzano stated that as part of the Downtown Development District Relaunch, we developed a
variety of different forms as well as a new website with our consultants at Rossi Group. The first
thing (shown on the screen) is our updated website. It is simpler, sleeker and easier for the
general public to navigate to get any information they need. Through some talks with our
partners at the State, we learned that Dover is one of three Downtown Development Districts that
the State still hosts a website for. Since we are now able to maintain our web presence, it would
beneficial for us to really fully take over for our DDD website to be the premier location to find
all of that information on Dover’s District. Part of this Relaunch and in the next couple of
months, we will be updating and integrating the information from the State’s page as well as
tweaking some things from their page that they liked and we think could benefit people who are
looking to take advantage of Dover’s Downtown Development District. It’s to just help guide
people to easy information, the people to contact, and help find any information that they may
need or helpful links. Mrs. Townshend mentioned the updated boundary and this is one of the
various sheets that they worked on developing with Rossi. The sheet on the screen shows the
whole of the Downtown Development District and specifically that DDD Area. They have been
divided into that DDD and a Target Area; and this is specifically showing people that this is the
Downtown Development District proper. This is where you can leverage all of the City’s
incentives, the State’s incentives, and everything that is really at your disposal for improvement
in Downtown Dover. The next slide shows that expanded Target Area. It shows you that this is
still an area that you can leverage some incentives but not necessarily all of those same
incentives as you can within the Downtown Development District itself. Both of these forms as
well as the next few forms have been simplified and streamlined as well as turned into fillable
PDF forms for ease of digital navigation and filling out. As part of the DDD Program and as far
as the State Historic Preservation Incentives and the City’s Historic Preservation Incentives, we
developed a form that is showing the various Historic Districts within Dover itself as well as the
Dover Historic District proper. This form shows the incentives that you could leverage if you
purchase a historic property as well as where the National Registered Districts are in comparison
to where the Dover’s Historic District is considered. Dover’s is that large orange district labeled
as the City of Dover Historic Zone. Within that zone, he is sure that we are all aware that there
are some additional regulations on what you can and cannot do, but there is also some great
incentives including tax incentives for purchasing and renovating a property within that zone.
Finally, this is the Downtown Homeownership Incentives Form. Again, we are showing you the
overall DDD Area and this form goes over what the Homeownership Incentives are for the
Downtown Area, including those Tax Rebates and the Transfer Rebates. This is simplicity and
again, making sure the general public can easily access and go through these forms without
having too many questions before they come into the Planning Office and start talking about
4
Page 5
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
moving forward with a project. Finally, talking about having incentives, we have our new
Incentive Application Form. This form, also streamlined by our partners at Rossi Group and
what they have done here is turned it into a fillable form so that it can be easily transferred to the
City via email. You can fill it out, give it to a Planner or to the Front Desk and we can evaluate it
before you even have to come into City Hall which will definitely help save some people some
time if they have any questions. It’s just generally make getting DDD applications in and
processed easier for everyone involved.
Mrs. Townshend stated that with the boundary change, one of the things that we did was worked
with Public Works to put signage at the new locations where you enter the District. It was
brought up at the meeting when we were with the Council Committee of the Whole last week
about doing something with the Kent Economic Partnership, then Central Delaware Chamber,
and the Downtown Dover Partnership to really work together to promote that. That was
something that we discussed in the Plan and in the program evaluation. We actually have a
meeting next week with them to talk about how we can really work together to really promote
the program and promote the incentives. With that, once that meeting is done they will have a
press release that will kind of give that public push to hopefully get some more traction on it and
get it in people’s news feeds.
Mr. Lewis asked if they had any data or knowledge of how Dover’s progress compares to the
other communities that are involved. Responding to Mr. Lewis, Mrs. Townshend stated that she
is going to ask Mr. David Edgehill to answer but every town seems to have a different type of
success. Milford has had a lot of business success and they have also had housing. Seaford had
that huge large project. Our real success was that transformational change in the neighborhoods.
The non-profits that were part of that leveraged other State funds through Strong Neighborhoods.
She is not sure that it is easier to say that Dover is more successful or less successful because the
way that the program has played out has just been very different.
Mr. Edgehill stated that one of the things that they do in their office is administer the Downtown
Development District Program. He was on the team 11-12 years ago that came up with the
Downtown Development District Program with Governor Markell and his team. So, your
question is how does Dover compare to the other districts and he thinks Mrs. Townshend
answered it quite well. Every district has got their own sort of trajectory and their own type of
success. He would say that you can’t compare any of the districts to Wilmington because
Wilmington has a larger type of development. If you look at the metrics, they have really
absorbed a majority of the funding. If we look at apples to apples, but it’s really not the same
thing, because Dover has been extremely successful with the neighborhoods and with the
housing. Whereas, he thinks one of the things that they learned through the renewal process and
the application that Dover put together with Rossi’s help was really the desire to sort of shift that
momentum to more mixed use and larger projects. There are two types of projects in the
program. There are Small Projects under $250,000. They are small businesses and homeowners.
Large Projects are anything over that and that requires a reservation. But typically, they are
larger projects and Dover has had probably not as many of those as we had probably hoped, but
as you know, they are poised to see more of those in the coming years which is why the Renewal
was very important to Dover and to us. Again, for the other Districts, we have some that are on
the lower tier of not having as many projects as we had hoped but most of them are doing quite
5
Page 6
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
well. The three Renewal Districts that had the full ten years to operate the program, all saw
transformational change in their Downtowns and were poised. Part of it is having to make the
pitch, “well, we aren’t done yet; we have more to do.” In Dover’s case, it was the commercial
mixed-use side of things. In Seaford’s case, they had a tremendous success with their Downtown
called High Street with an almost 0% vacancy rate with large residential projects. They shifted
their success to the neighborhood’s gateway into the Downtown that they hadn’t seen as much
activity in. Wilmington, believe it or not they have had great success in their Market Street
Corridor with multi-story mixed use buildings, condos, apartments, restaurants, so on and so
forth. But they really haven’t done as well with housing. They have got a lot of issues in their
neighborhoods on either side of their district and they struggle to shift the focus there. That is
just a quick overview but he thinks Dover is doing great. He is really happy that you got the
program and that you got the five year renewal now to make some more progress.
Dr. Jones stated that following up on the previous question, is there concerted efforts or stepped
up efforts to try to increase the business side of that? Responding to Dr. Jones, Mrs. Townshend
stated yes, this is her speaking as someone who has just been around for a long time; we are
finally in a position that we are getting significant funds from the State. She knows when she was
with the City, she used to say “all the money goes to Wilmington. We need Wilmington money
to make a huge dent.” And for the first time, we have that. 25 million dollars from the State
through ARPA and other sources and that is going to push the Mobility Center and the multi-
story Mixed Use Building at the former Acme site to reality. Sometimes it’s just really hard to
get the numbers to work even with that 20% and that funding from the State is going to help
push it over and then there are people who are kind of poised to kind of follow suit once that
momentum gets going.
Dr. Jones asked if there is a residency requirement for the housing. Responding to Dr. Jones,
Mrs. Townshend stated that there isn’t. For the Homeownership Incentives, yes it has to be a
primary residence. If for instance you are getting Dover First Start money, one it has to be
income qualified. She thinks it has to be under a certain percentage of Area Median Income. You
have to qualify per HUD. For the Tax Abatement for owner occupied residential, it has to be
your primary residence so it can’t be an investment property. But the 20% rebate, it doesn’t
matter.
Dr. Jones asked if the applicant has to be a resident of the State of Delaware. Responding to Dr.
Jones, Mrs. Townshend stated that she didn’t believe so.
Dr. Jones asked if there was a requirement for the new homeowner to remain in that home for
any period of time. Responding to Dr. Jones, Mrs. Townshend stated that there is not with the
DDD Program itself. But the other funding that was leveraged to build all of these new homes,
again it was primarily led by NeighborGood Partners and Habitat, and Habitat holds the
mortgage. So, they have that mechanism. Typically, the other subsidy that goes into the house,
what happens is, it gets placed as a lien like a forgivable loan; and it gets forgivable
incrementally over time. Depending on the funding sources, that horizon service is usually five
or ten years. If you do sell before that, you have to pay back.
Mr. Witham stated that he noticed that they issued press releases and his question is that there is
6
Page 7
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
a lot going on Downtown with the Downtown Development projects but he doesn’t see high
visibility on what has happened and what it’s doing. Are you trying to count your successes with
these projects on other advertising platforms to really get the word out, not just to the Dover
community, but to the outside world? Like using YouTube or going to get something on WDOV
on television. It’s advertising all of this activity to get the word out, not just issuing a press
release. The only people who read a press release are the press. Responding to Mr. Witham, Mrs.
Townshend stated that’s the plan for the meeting that we are having next week; to really among
those non-governmental entities that are promoting Dover to really start to develop that method
and that strategy. That is the goal for next week for the meeting that they are having with the
Chamber, the Kent Economic Partnership, and the Downtown Dover Partnership.
Mr. Witham stated that one thing that he has noticed over the years is that improvements are
slowly and incrementally coming to Dover but the fact is that we have a lack of really nice
Downtown restaurants. People have tried very hard to build those nice restaurants, though some
have failed and some have done better than others. There was a time in which Downtown Dover
had a plethora of restaurants and that seemed to attract a lot of people coming Downtown. He
knows that we have a situation where did the chicken come first or did the egg come first in
attracting people and businesses Downtown, but we still have a high degree of vacancy of
buildings Downtown which is problem. Responding to Mr. Witham, Mrs. Townshend stated that
is where the Downtown Dover Partnership with their Critical Improvement Program has
identified priorities being restaurants and residential above business. That is where they have
said these are the things that we are going to find. It is very costly to install a commercial kitchen
so that is where they are trying to get the money into people’s hands that way to help them pay
for those improvements. Part of the challenge with a restaurant is once you pay for the
commercial kitchen and everything, you are so leveraged before you even open the door that it’s
really hard, which is why you see a high failure rate. The idea is that if the Partnership can help
get some of the commercial kitchens underway, that will take the burden off of business owners.
Mrs. Denney stated that for many years she managed medical practices and also did some things
for the hospital and one of our major issues was recruiting physicians. Obviously Bayhealth has
grown; it was a very small rural hospital. She could follow the doctors through the residencies
and their fellowships and bring them down and entertain them. Everything was great, but the
wife did not spend her life driving around in her little Volkswagen Bug trying to get her husband
through med school and residency and followship. So first, the doctors come, and everything is
great and then they come back with the wife. The hospital meets with the doctor again and she
takes the wife on tours of schools, churches, and housing. It was very difficult to get them to
want to live in Dover. Boscov’s was not their idea of shopping. They hadn’t waited all of these
years to shop there; they wanted to be in Nordstroms. It was very difficult, and it was interesting
because she would take them out to dinner and she would tell them about when she lived in
Camden. Getting up on Saturday morning for a cup of coffee and she would say lets go to the
Metropolitan Museum of Art, or the beach or lets go to the Smithsonian because it totally
surrounds you if you think about it; it’s just not right here. Which is how she ended up getting on
the board that was trying to develop the Schwartz Center because she felt like that was at least
something. It did help and they did have a lot of things going on there that seemed to have faded
away, but she honestly thinks we are headed in the right direction, but we need fine dining. It’s
not just doctors that you have to recruit; it’s doctors’ wives, it’s accountants, lawyers, etc.
7
Page 8
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Responding to Mrs. Denney, Mrs. Townshend stated that when they were working on the plan
update and we were talking to Delaware State University who had just acquired the Wesley
Campus, one of the things that they said is that students who are at the Downtown Campus,
when families come to visit they go to the highway. We need to get to where they go somewhere
nice Downtown; that it’s not just the highway. She thinks that we are really on the cusp of that
happening. She is going to be honest, and again, she feels like she uses this as a reason for so
many things that haven’t gone according to plan and personally, she thinks COVID really hurt
us. We had 33 West that was packed all of the time and closed. She really feels like we had
momentum going into that.
Mrs. Denney stated that Mrs. Townshend is right on target. We have to remember that we had
that hiccup of COVID that set everybody behind. All of the prices got higher, and the economy
was shrinking, and it was very difficult. The other thing is that many years ago when she
managed the Town of Camden, she wrote an article for Delaware Today Magazine. It was about
the castles, the palaces, and the playground. She described Kent County as being the mote in
between and she felt that. Anything that was happening, if it was in the Delaware Today
Magazine or the papers or anything, we were always on the last page of the book. She wrote a
letter to the editor about that, and they printed it on the inside back cover of the book. She thinks
that it’s interesting because she is finally feeling like some of that is slowly changing; especially
post COVID. We have a lot of things going on such as the Amish Bike Tour. We always have
great Dover Days. Responding to Mrs. Denney, Mrs. Townshend stated that Dover Con has
become a huge thing.
Mrs. Denney stated that it is huge and people travel. Back then, we had the races and things were
really beginning, and she feels like we got pushed back. She feels like things are hopeful again
and she tends to refer to Dover as the Capital City of the State that started this Nation. We should
be using that to attract people who want to understand history. It’s right here. Her hope is that
things are beginning to turn.
Mr. Lewis stated that just for the record, the races are still here on July 18-20, 2025.
Dovermotorspeedway.com for ticket information.
Dr. Jones stated that we have had such an influx of people coming to Delaware, coming to Kent
County for reasons that we all know and many of them come with financial resources from
pensions and homes. You hear them say “I have to go here to do this and that.” She won’t repeat
anything that has been said but that is something to think about. Her question is, in the planning
and the brainstorming, how has transportation or lack of come into play or been discussed or has
it? Responding to Dr. Jones, Mrs. Townshend stated that it has. In the Capital City 2030 Plan
which is the heart of the Downtown Development District Plan for the next five years, we wrote
the plan around that. They identified activity centers. You have the State Complex, Delaware
State University, Bayhealth, and the Air Base. They identified these different activity centers and
a lot of the plan was how do you tie together those activity centers and transportation is part of
that. They didn’t get great detail on transportation in the Capital City 2030 Plan but coming out
that, the Downtown Dover Partnership and the Dover/Kent MPO put together a consultant and
put together the “Pathways Plan” that really looked at how when you look at these activity
centers and these activity nodes, how do you connect them through multi-modal whether it’s
8
Page 9
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
transit, scooters, micro-mobility, bikes, or improving sidewalks. That plan was finalized at the
end of last year. The other component of that is that they added on a streetscape for Loockerman
Street because she thinks everybody knows that sometime next year, everything is going to be
dug up to improve the water/sewer, stormwater, and everything underground. Then, when they
build back what they want, they took that opportunity and developed a streetscape that would
activate the sidewalks to make wider sidewalks in some areas. Yes, it’s definitely part of the
equation and it has gotten some definite planning around it. She thinks that our transit system
here is more of a regional transit, not a local transit and that is a challenge. But if we can
continue to improve the opportunity for people to get around on bike or on foot, she thinks that
will definitely help some. One of her colleague’s, his son just moved to Philly and he gets around
by electric scooter. It takes less time than driving and it’s easier than walking because it’s also
less time. So, places are doing it. Obviously, we are not Philly but right now she doesn’t think
that you could really take a scooter on a lot of our sidewalks.
Dr. Jones stated that not only that, but we would have to take a look at our demographics. Those
people moving in are not riding bikes. Responding to Dr. Jones, Mrs. Townshend stated that
what is interesting is that you talk about bikes, when she was in Lewes, one of their residents
who was a very involved Dover resident and now is a very involved Lewes resident who is in his
80’s. She would see him out on his e-bike. E-bikes have made cycling more accessible regardless
of age. So, it’s changing but we still need to be careful.
Presentation by Delaware Office of State Planning Coordination (OSPC)
Visit https://stateplanning.delaware.gov/
Representatives: Mr. David Edgehill, Delaware Office of State Planning Coordination; Mr. Josh
Thomas, Delaware Office of State Planning Coordination
Mrs. Melson-Williams stated that this presentation is by the Delaware Office of State Planning
Coordination. We have Mr. David Edgehill and Mr. Josh Thomas who have a variety of things to
share with us tonight.
Mr. Edgehill stated that he is the Director of the Delaware Office of State Planning Coordination
and he is also a Dover resident. He lives right across the street from Mrs. Denney. We have been
neighbors since 1997. It is great living in Dover and being here with you tonight. With him
tonight is Mr. Josh Thomas. He has a presentation for you tonight. He is going to tell you all
about our office and what we do and how we interact with our local governments including City
of Dover. You already know about the Downtown Development Districts and he just wanted to
follow up with Mr. Lewis. He actually found some information about how Dover is doing
compared to the rest. Mr. Thomas is going to tell you a little more about the program, although
he thinks we know an awful lot about Downtown Development District now so we can maybe
skip through that. He mentioned Wilmington which is kind of a different category. In terms of
total updated figures as of the end of 2024, total private investment in Dover is up to $18.8
million with $2.1 million of State Rebate associated with that. That puts Dover in terms of total
investments, fourth among the twelve (12) districts. The others are Wilmington, Milford, and
Seaford but Dover is actually the third highest in the number of the five large projects. Dover is
doing great, holding your on and making great prides with that program with much more to go.
9
Page 10
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Our office has a very small staff, a really dedicated team that does a lot of things together but we
do specialize and are organized around three circuit rider planners. We have one Principal
Planner assigned to each County. Mr. Thomas is the Principal Planner assigned to Kent County;
so, he is the person who works closely with Dover.
Mr. Thomas stated that they really just wanted to give you an overview of our Office and kind of
our roles and responsibilities and how we work with the City of Dover Staff and some of the
ways we engage with the City currently and some of the things we can do going forward. Also,
we’ll just touch on a few of the current things that we are working on. As you can see on the
screen, our Mission Statement and a lot of times in planning you talk about the three C’s. It is
right in our name; the biggest thing is coordination for us and they are trying to bring the
different levels of government together to make really smart and efficient land use decisions. The
first thing that he really wants to touch on is new for 2025; we just launched our email
newsletter. We are really excited about this and we have actually only had one. We anticipate our
second one going out tomorrow so you have an opportunity to be an earlier subscriber. If you
want to be in the know about things we are working on, give us your email address before we
leave and we will make sure you hopefully get the email tomorrow morning. The pdf that we
provided to Staff does have some links in there. Obviously, if you don’t do it immediately, we
can still get you connected. That newsletter is going to have helpful information about things that
are happening and he is going to touch on some of those a little later in the presentation. Starting
at the high level, one of the most common ways that we interact with our local government
partners is through the comprehensive planning process. You see a couple examples on the
screen. Dover is in the middle. It is hard to believe that we are at the five year mark already; we
are at the halfway point. We was actually talking to Staff recently about the fact that we are at
the five-year review time. It is very encouraging to see that the next item on the agenda is
looking at the Comprehensive Plan. We work with Dover and all of the other local governments
during the drafting process to provide guidance during that process and then of course to take it
through the administrative approval process, ultimately leading to the certification. Really, once
we get the Comprehensive Plan certified, we really try to provide some technical assistance and
work with local governments to implement the plan. One of the ways that we have done that
successfully is through master planning efforts throughout the years. We are here to provide
technical assistance to local governments in any ways that we need to implement the plan. One
of the other ways that we will interface directly with local governments a lot is through the
Preliminary Land Use Service (PLUS). Some of you may be familiar with the process, but we
are going to go through what PLUS is and what it’s not. Applicants who are working on projects
come through PLUS but also local governments do come through PLUS as well when there is an
amendment to a plan or something like that. That is another way that we work with Dover or
other local governments. For what PLUS is and what it’s not; it is a review of major projects. It
is a State level review of major land use proposals. We are coordinating with State agencies and
property owners or developers about important things about the project before the local land use
and approval process. We try to use that to look for alignment with the Strategies for State
Policies and Spending which is another thing that he is going to talk about. It can provide some
high level information about permitting requirements for State agencies that applicants may not
have known about. Really, it is trying to provide some early information to hopefully help
applicants navigate the process in a smoother fashion. It is important to note that it is not an
approval or denial process for project. It does not replace the local land use decision making
10
Page 11
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
process and it is not a permitting application. It is just important to lay that out, especially for
members of the public who may be listening as well. Why do applications have to go through
PLUS and which ones? Previously, he mentioned that it exists to encourage that alignment
between different levels of government and also it is required in Delaware Code for certain
projects, mainly because of the benefits that it provides in that early coordination across the
agencies. There is a base set of criteria in State Code, but a majority of our local governments
actually do have separate arrangements with our office that changes the criteria just a little bit.
You can see on the screen that Dover does have a Memorandum of Understanding with our
office and that provides the criteria in terms of what types of projects have to go through the
PLUS process. You are seeing residential projects that have 125 or more dwelling units come
through PLUS. The base number in State Code is actually 50 units. You can see that when we
have local government partners who are very familiar with the planning process and PLUS and
the types of things that might be brought to light in PLUS, we can sometimes raise those
thresholds. For non-residential projects, you are looking at 75,000 SF or greater. It is also
important to note that one of the other requirements for PLUS is for any type of Rezoning or
Comprehensive Plan Amendment. There are times when you have to amend your
Comprehensive Plan and that may require a PLUS review but there also may be times when
there is a Rezoning or a change to a property that is inconsistent with the Plan and that will kind
of force an amendment to happen. So that is another way that we would have to go through the
PLUS process. The next slide shows some real brief stats from PLUS so that you can kind of get
a sense of the number of applications and it shows by type. Last fiscal year, they had a total of 97
PLUS applications. This gives you a sense of the number of land use reviews going on around
the State. It is not a huge number but those are the larger projects. The graph on the slide gives
you a breakdown. You can see that the majority of them were Subdivision Plans or Site Plans.
But as he mentioned, there were 13 different Comprehensive Plan amendments. Our website has
a wealth of information that hopefully you can get in there and navigate around. The PLUS
process does have a Dashboard if you ever want to see a map based interface showing current
projects or previous projects, check out the Dashboard and explore that. You can link to all the
applications, plans, and comment letters. The PLUS stats kind of hinted at this, but every year
the Cabinet Committee on State Planning Issues works with our office to prepare an Annual
Report on State Planning Issues. That is an advisory document to the Governor’s Office and the
General Assembly. There is a link in the pdf but also he just wanted to show you some brief
screen shots and kind of promote this Report as a resource for you. We do publish that every
October so we will be working on the 2025 Report very soon. That Report always starts with
development trends. We are very grateful that City of Dover annually provides our office with
the Building Permit stats and development application stats that they can then use to compile
with all of the other local governments around the State to produce some summary information
about how we are growing. This is really kind of a plug for the Report. You can see how we try
to break it down by looking at five year timeframes, looking at where the development is
happening and at what State strategy levels. The next slide shows a screenshot of our
Development Trends Dashboard. This is another resource on our website and this is a way more
interactive version of what he just showed you. The Annual Report will give you those high-
level stats but then the Dashboard allows you to go in and look at individual applications on a
map. You get a sense of the distribution of the development and you can see how we are
growing. You can look at Building Permits, Development Applications, and you are also looking
at PLUS Applications. This is a really helpful resource that we encourage you to use when you
11
Page 12
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
want to get some of that information about our development trends. We also work with local
governments on Municipal Annexations. That is primarily through the Plan of Services Process.
When a local government has a proposal for Annexation, the local government works with our
office to submit a Plan of Services approval request, potentially documenting that the local
government has worked with the property owners and all of the providers of infrastructure and
services to document that that property can be served by town resources. Once that Plan of
Services Application is approved by our office, then the local government can proceed with
Annexation process. The Annual Report just gives you some quick numbers. Last year, they had
29 Plan of Services Applications for roughly 1,000 acres 21 of those actually did get adopted so
that meant that 644 acres have been formally annexed. Of course that number does fluctuate. We
also try to coordinate a wealth of demographic information. We do have the Census State Data
Center responsibilities in our Office; so we do provide coordination with the Delaware
Population Consortium and also the Census data and our website has a lot of that information as
well. The last presentation by Mrs. Townshend and Mr. Salzano did a great job of talking about
DDD’s so we don’t need to spend a lot of time on it. We practically covered everything but the
only thing that he will say is just a reminder that really the Office of State Planning is your
partner when it comes to administering the designation process. We were very proud that Dover
was the first District to get approved by the State for renewal. Rossi Group and City Staff were
fantastic to work with on that process. So, that is our role in the process but then we also have the
State Housing Authority who is administering the rebate program and working through those
details. One of the other roles that we have is GIS coordination. Essentially, that is our
Geographic Information Systems data and our office has a GIS Coordinator named Jason Vogl;
and he participates with stakeholders and public throughout the State and a lot of local
government Staff members to essentially make sure that all of the data that you need to make
decisions on land use and planning and administrative decisions is available. A lot of that comes
through the First Map Portal. That is just a fancy name for the platform that kind of serves all of
the data.
Last but not least, he wants to spend a little time talking about the Strategies for State Policies
and Spending. As he mentioned, he tried to give an overview as a refresher about the roles of our
office and what we provide the local governments, but this topic here is a little more timely
because we are working on the five-year update of this policy document. So, he just wants to
spend a lot time going through State Strategies and he is talking about where we are in the
current update process. We started off the presentation talking about how important coordination
is and really the purpose of the Strategies for State Policy and Spending; we commonly shorten
that to State Strategies. The purpose is to coordinate the land use decisions that happen at the
local government level with the provision of infrastructure services at the State level. As you
probably know, there are not that many states where the State government provides the bulk of
the infrastructure and services. So, we need to coordinate that because if we do not coordinate
them, then we have land use policies that could cause wasteful spending on infrastructure, lack
of coordination where we are really not developing efficiently and we could be doing better. If
we don’t have that coordination between infrastructure and local decisions, then programs like
the DDD that we just talked about and all of the benefits of those programs will not be as
successful. This slide shows the Delaware Code requirement. You can see the highlighted
portions of text that talk about this as the State’s primary policy guide. The point is to support the
most efficient use of State resources. We have to update it every five years. On the screen, you
12
Page 13
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
have a snapshot of the current Strategies and then he is going to go through briefly and talk about
the different levels before we get into the update. He just wants to remind everyone that even
though we are working on the 2025 Strategies, until that is officially adopted and implemented
through an executive board by Governor Meyer’s Office, the 2020 Strategies are still in effect
and that is important to note. The map from 2020 Strategies is shown on the screen but it just
provides an overview and a little zoom into Kent County. Take a mental snapshot of the colors
and how they interact with the way you know the State looks in terms of its distribution along
Route 1 and Route 13. The five different levels are Levels 1-4 and Out of Play and are
represented on that map in a series of colors. What we are doing this year is we’ve produced
what they are calling “level profiles” and we are going to have versions of this information in the
document like you are seeing on the slide. It tries to break it down as simple as possible of what
the land uses look like in the different investment levels. Level 1 that is where we are right now.
It’s you urban centers, your downtowns, and your municipalities. You have a wide range of uses.
As we talked about with DDD, you are trying to encourage a lot of infill and redevelopment and
downtown revitalization so that should be very familiar to what Level 1 looks like. Level 2 areas
are the areas that are going to surround your downtowns. That is your suburban areas. They are
pretty close to your city centers and your urban centers. They are rapidly growing. You are going
to have a broader mix of housing and commercial options; but probably something more of the
corridor style of development. But it is important to note that you are still going to have access to
a lot of the infrastructure and services that you need. The policy focus at this level is where the
State and local governments still want to invest in growth and make those infrastructure
investments. Level 3 is where you are going to start going out, if you can imagine kind of a
concentric ring mindset. This is where you start to get out beyond the growth areas but these
growth areas are still part of certified comprehensive plans; they just might be a little out further
in the future. You are going to have some environmentally sections of land, you are going to
have some agricultural lands and you are going to have more of a leap frog development style
where you have some growth happening but you still have a lot of open space. Really the
infrastructure investments there might not be the highest priority. They are in the long term
growth plans but money could probably be better spent elsewhere. Level 4 is where you are
really going to see your primary focus being on natural lands and agricultural lands. This is
mostly your unincorporated areas. You are going to have small developments or disconnected
homes along rural routes. The policy focus here is on preservation, open space, really limiting
development, and keeping that growth for agricultural and environmental uses. Out of Play
Lands are a little bit easier to think about because they are legally protected lands for
conservation or preservation; so it’s just not available for development. That is essentially your
parks, your wildlife refuges, any agriculture land or forest land that has been protected. When we
do the mapping exercise, those just get subtracted out on the map. They are going to show up in
a gray color. By all means, this is all available and is going to be available throughout the State
Strategies development process, so he doesn’t want you to think that you have to absorb all of
that today. This is just an overview, but as we go through this process and you will have
opportunities to comment as the City of Dover. We really want to encourage you to go in and
read more about how Dover’s investments levels interact with the surrounding areas. Just some
important considerations is that the maps are not parcel based and that’s really important to
remember. It is a data driven process and the resulting maps are not confined or clipped into
individual plots of land. You might have a large piece of ag land that could have three different
levels on it depending on what type of environmental features are there, like streams or wetlands.
13
Page 14
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
It is also important to note that there may be circumstances where the State and local
governments sometimes have to make investments in Level 3 and Level 4 areas for health,
safety, and welfare reasons. One easy example is that DelDOT may have to make infrastructure
improvements if there is a dangerous intersection even though it may not be in the priority area
for investments.
He is going to end today with talking about the 2025 Update. As he mentioned, they are required
to do it every five years. The reason being is that we talked about Comprehensive Plans. For any
plans that have been certified since the last five-year cycle, we need to incorporate their Comp
Plans, all of their data into the Strategies Update. We also might have changes in State agency
data and there may be new data layers that were not available to us last time. We have to kind of
work and recompile all of that information to produce new maps every five years. This year, the
State had a process known as the Data Analysis Work Group. They did that so hopefully you
were able to attend or at least find those resources. But essentially, that was a coordination
process they did throughout the State just to provide more insight on the data that goes into these
maps. The next screen shows the timeline. Governor Meyer’s Cabinet Committee on State
Planning Issues approved this update timeline last month and this is essentially going to take us
through December which is when we will hopefully have our Executive Order to adopt the
Strategies. Where we are now is that this month we are releasing what we call the Data Story
Map. That allows anybody who is interested to go in and look at all of the different data layers
that comprise the Strategies. You can look at what kind of information feeds into the model and
you can see how the data in the Dover area is feeding into the Strategies Maps. We released that
story map and he is going to talk more about it on the next slide but you can see here that really
the next two months are critical. Next month, we will be working on the draft maps and the
actual Strategies document of which the Cabinet Committee would essentially review that before
it goes out to the public at their August meeting. The Cabinet meeting is on August 11th but the
hope there is that the Cabinet Committee would approve the release of the Strategies Maps at
that time and then we would open a public comment period. Then we start working towards
some public workshops in the early fall. That just gives you an idea of where we are going to be
over the next couple of months and how the City of Dover will have an opportunity to participate
in the process. There is a public workshop coming up in ten days which will really go through
some of that story map that he just mentioned; so if any of that seems a little murky, we
encourage you to tune in. We are going to have it at DelDOT in their big conference room but
there is going to be a hybrid style so you can attend virtually. That will allow our audience to see
the different layers that he described that make up the story map and give a tutorial of how to use
it. Then you can provide us any comments after you have a chance to go interact with the
website. He definitely encourages everyone to attend that and hopefully they can get these slides
to you. This should also be going out in the newsletter tomorrow; so, hopefully we can get
everyone signed up for that as well. We are anticipating that the survey on the website would
close on July 10, 2025.
Mr. Roach thanked them for the information. You have given us a lot but it is definitely
informative and he appreciates all of your hard work and diligence. Responding to Mr. Roach,
Mr. Thomas stated that means that they did their job right. They wanted to give you and
overview and remind you of the things that we offer. Reach out to us with any questions at all
and as Mr. Edgehill mentioned, he is the Kent County representative so we can help you work
14
Page 15
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
through anything that we need to work through.
Mrs. Maucher asked who was on the Cabinet Committee. Is it other State agencies that are on it?
Responding to Mrs. Maucher, Mr. Thomas stated that it is DelDOT, DNREC, Housing, Division
of Small Business, Secretary of State, Department of Agriculture, and it is chaired by the
Governor’s Office. The membership is actually in the State Code and it spells out the offices that
participate. It’s not all State agencies but any of the agencies that have some type of role in the
way the built environment is developed and land use. Cabinet Committee meetings are open to
the public. So, if you ever want to find out what is talked about, you can certainly tune in. We
usually try to keep them to an hour or hour and a half.
Mr. Reaves stated it was a great presentation and thank you for the information. He would like to
be added to the newsletter.
Mr. Witham stated that when he graduated from high school and went to the University of
Delaware for undergraduate school, he worked his summers with the State Planning Office. One
of the jobs that himself and another gentleman who was also going to college, was to drive
around in a car and count houses. Does that ring a bell? Responding to Mr. Witham, Mr. Thomas
stated that they don’t do that anymore.
Mr. Edgehill stated that they have the GIS data and the maps and the pictures that we can figure
that out with.
Mrs. Melson-Williams stated that we did get their presentation as a pdf this afternoon and they
will push that out to you so that you can have all of the great links. If there is no objection, we
will also provide the State Planning Office with everyone’s emails so that everyone can join their
newsletter. You have probably heard us talk about PLUS. If there is an application that went
through PLUS Review, we try to put that in your Development Advisory Committee review
process report so some of that should have been vaguely familiar to you.
Progress on Implementation of 2019 Comprehensive Plan
Mrs. Melson-Williams stated that they are kind of at the five year timeframe where there is
actually a statement in Delaware Code that says that we should be reviewing our Comprehensive
Plan to see if there is any items that need to be updated or if there has been substantial changes
in an area. Tonight is a baby step in that direction. We have our consultation working on the
annual report piece of the Comprehensive Plan. There are a couple of strategies that we have
taken this year that she thinks will help us in the long run. Our 2019 Comprehensive Plan was
actually adopted by City Council in January 2020. Through all of our process, it was the 2019
Plan. As part of that Comprehensive Plan, there have been a number of things that we have done
over the years. A couple of the things that she included in the packet is Table 1-2 which was the
Chapter goals. If you remember with the Comprehensive Plan, there are a series of topic chapters
in the document and each of those ends with a series of goals and then a series of
recommendations with some action items associated with those. This is not just for the Planning
Office to implement; it is for the City and its many departments and City Council to implement
as we go about doing the work of the City. She included that but didn’t really anticipate any
15
Page 16
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
kind of discussion about goals. These are fairly broad and if you have a project, you can
probably work it into one of these goals anyway. What she also included in the packet is Chapter
15. Chapter 15 is the Implementation Plan for the Comprehensive Plan. It talks about what we
should be doing from the adoption process for the Comprehensive Plan through the timeframe
for the next one that we will have to do. The Comprehensive Plan for the City of Dover was
done in-house by Staff which is probably a little different than the images that you saw in the
State Planning’s presentation where some of the other have made use of consultants. This was
done by Planning Staff. They had a full contingent of Staff at the time and we all kind of each
tackled a chapter. The document itself is a series of chapters and then of course a series of maps.
Immediate actions with a Comprehensive Plan is adoption and she mentioned that formally
happened and was officially certified. Tat dated to that transition in late 2019 and then City
Council did its final adoption in January 2020. The next step with a Comprehensive Plan is that
your Zoning Map needs to match your Comprehensive Plan. So, the Comprehensive Plan has a
Land Development Plan Map which is the vision for where you want certain land uses to happen
in the City; that is Map 12-1. What we did in 2021 was actually do that comparison of our
Zoning Map versus that Land Development Plan Map. What that identified was a process that we
went through and this body was involved in; it was the Comprehensive Rezoning 2021 Project.
With that, there were about 160 parcels in the City that were rezoned at that time. There was also
a series of amendments done to Map 12-1 as we delved into greater detail or in some cases, the
zoning was changed to something that they needed to match up the land use category with. That
process was completed in 2021. The rest of Chapter 15 goes through and breaks it up into
activities that are just generally ongoing in the various topic areas. Then it tries to put the
projects and studies into some form of implementation. This is where in what we are having our
consultant work on this year is really developing a spreadsheet to see how we are doing with this
various items; because they are not all planning. Certainly our Planning Office has had our hands
in a number of these things but we haven’t gotten to everything of course. There is a number of
studies that weren’t even on this list that have happened. We want to do a check-in as to where
we are. Her initial thought of Comprehensive Plan and having to do the five year review, it
seems daunting but she is not sure that there is really much in our Plan that is that far off where
we need to go back into it. She thinks that they did pretty well. They still have annexation areas;
they have picked of a few things here and there. Most of our anticipated development especially
here in the Downtown was envisioned for mixed use and we are starting to see that strategy
come into play with projects. Certainly, our zoning is set up in some instances for that. We have
done over the years a number of Ordinance changes. We have done a number of things to update
parts of our Zoning Ordinance. Are there more to do? Yes, but she doesn’t know that they are
that far off from what they had identified in the Comprehensive Plan. This Chapter 15 also talks
about how you do Comprehensive Plan Amendments. We have actually had three rounds of
Amendments over the years since we adopted this Plan where individual property owners came
forward seeking a change to the Map. Some of them were successful in getting the Land
Development Map changed; others were not. We had one of those that was not successful just
last year. This was to push this back in front of you. If you have particular questions or after
hearing the State’s presentation on what they do and knowing what we do here in the Planning
Office, if there is any questions that you have or a direction that you think we should be moving
to now that we are starting to have Staff onboard again. We may be able to get into some of this
long range planning efforts. She knows that they have identified a number of things specifically
related to the Active Recreation Area requirements and housing which they think is going to be
16
Page 17
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
something that we are going to have to go into. Some of it may be dictated by the State when it
comes to affordable housing and accessory dwelling units. We will see how the legislature plays
out on that. At this point, she would be happy to take any questions or concerns that you may
have about the Comprehensive Plan and how it’s been going the last five-ish years.
Mr. Witham asked what the next step was in the process for the Planning Commission.
Responding to Mr. Witham, Mrs. Melson-Williams stated that there is not real detail about how
you go about doing the renewal or the five year review even in the State Code process. At this
point, she wanted to refresh your mind about this. They have a deadline coming up in July where
we have to submit our Annual Report to the State Planning Office. She would like to bring that
back to the Commission after they submit it but that is going to give us a sense of where we are
on some of this. Certainly, if you think over your time here on the Commission, especially over
the last year, if there have been things that didn’t seem to quite fit right or topic areas that we
may need to look at more closely, she would like to hear those. She thinks this is going to be a
little bit of a work in progress as to what a five year review for the City of Dover is going to be.
Mrs. Denney asked if they will have workshops or is that typically just done in-house with the
Planning Office. Responding to Mrs. Denney, Mrs. Melson-Williams stated that there was one
five year review that was really almost like rewriting the Comprehensive Plan a number of years
ago. She doesn’t see that for this time around. We have not really talked about how that review
transpires. It could be as simple as a discussion at a couple of Planning Commission meetings
that are public meetings but we haven’t gotten that far.
Mr. Reaves stated that he is just trying to understand how they may be able to facilitate this.
When we have a project that is affecting a common interest in the community, is it possible that
we can have the notice to go out to more than just a residential property that is within 250 feet of
the project? Sometimes projects affect the entire community and not just one home in the
community. That may be a little bit off topic but if we can try to understand how to incorporate
something like that. Responding to Mr. Reaves, Mrs. Melson-Williams stated that the public
notice requirement for applications that must appear before this body, our Historic District
Commission and the Board of Adjustment Committee by Code, have that 200 feet distance and
then direct mailing. The other ways of public notice are the legal ads in the public newspaper and
then for both the Planning Commission and the Historic District Commission, the physical
posting of the property which is the bright yellow sign. That was added to our Code a number of
years ago to cover that broader community because you are always going to be just a foot away
from somebody else in doing a mailed notice. If it is something of concern, it would be
something that Staff would look at. She knows in the past, there have been ideas of making it
bigger than 200 feet. That is fairly consistent in most jurisdictions. The problem is that 200 feet
in some areas gets you to a list that is very short but in other areas like Downtown, you could
have ones that have over 50-100 properties within that distance. It is somewhat of a balancing act
when it comes to that public notice. They can certainly note that as anything process-wise that
they may need to look into to see what our options are.
These were all information presentations to the Commission. Your agenda does include an
opportunity for Planning Commissioner comments if there is anyone who had additional
17
Page 18
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
comments, questions, or concerns.
Mrs. Denney stated that she thought this was a great workshop, especially the stuff from the
State Planning Office. It was very informative. She has a position both with the City and also
with the County and she often refers to what the Office of State Planning thinks. She thinks it is
very helpful.
Dr. Jones stated that she would like to thank Mrs. Melson-Williams and the State Planning
Office because she too has probably mentioned the workshops in the past and the lunch hour
workshops that we used to have. This has been very informative.
Mr. Witham stated thank you to all of the presenters tonight. It is important for us to hear these
reports. It helps us in terms of performing our public duty and it is certainly very informative for
the public. He thanks the Planning Commission for their hard work in making this possible for
us.
Meeting adjourned at 8:56 PM.
Sincerely,
Kristen Mullaney
Secretary
18