Page 1
CITY OF DOVER, DELAWARE
PLANNING COMMISSION
Monday, July 21, 2025 at 7:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
Written comments are accepted via mail to City of Dover – Planning Commission, P.O. Box 475 Dover
DE 19903 and via email at CompPlan@dover.de.us.
IN-PERSON and VIRTUAL MEETING NOTICE
The Planning Commission Meeting for July 21, 2025 will be held at City Hall in City Council Chambers
at 7:00 PM and as a Virtual Meeting using Webex, an audio/video conferencing system as an electronic
means of communication. The public is welcome to attend. See participation information below to join by
phone or computer.
PUBLIC PARTICIPATION INFORMATION
City of Dover Planning Commission Meeting of Monday, July 21, 2025
Join By Phone: Dial +1-650-479-3208
Access Code: 253 556 38996
Password from Phones: 3683772
Join Online: https://bit.ly/PCMeeting07212025
Webinar Number: 2535 563 8996
Webinar Password: Dover PC
If you are new to Webex, get the app now at https://www.webex.com/ to be ready when the meeting
starts. For problems accessing the meeting, please call the Planning Office at (302) 736-7196.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
ADOPTION OF AGENDA
APPROVAL OF MINUTES
1. Adoptions of Minutes of June 16, 2025
1
Page 2
PLANNING COMMISSION - July 21, 2025 PAGE 2
COMMUNICATIONS & REPORTS
Meeting Reminder: The next Planning Commission regular meeting date is August 18, 2025 at 7:00
PM.
Update on City Council Actions
Department of Planning & Inspections Updates
2. Department of Parks & Recreation Alerts on Silver Lake Drawdown with Silver Lake Dam
valve opening scheduled for October 6 - 17, 2025
OPENING REMARKS CONCERNING MEETING PROCEDURES FOR APPLICATIONS
OLD BUSINESS
Requests for Extension of Planning Commission Approval
NEW APPLICATIONS
3. S-25-10 Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane – Public Hearing and
Review of a Site Development Plan Application for the Phase 2 construction of two Warehouse
Buildings: Building B of 45,000 SF and Building C of 133,000 SF (totaling 178,000 SF for
Phase 2) with site improvements. Phase 1 of the project consists of Multi-Tenant Flex
Warehouse Building A of 54,000 SF. The property is zoned M (Manufacturing Zone) and is
subject to the AEOZ (Airport Environs Overlay Zone): Accident Potential Zones I & II. The
property consists of 19.74 acres. The property is located on the north side of Lafferty Lane,
approximately one-quarter mile west of Horsepond Road. The owner of record is Dover
Industrial, LLC. Property Address: 350 Lafferty Lane. Tax Parcel Number: ED-05-077.16-02-
05.00-000. Council District 2. PLUS Review #2024-08-08. For Consideration: Performance
Standards Review Application and Tree Mitigation Plan. Phase 1 of this project was approved
with Site Plan S-24-13 Flex Use Facilities Commercial Warehouse.
NEW BUSINESS
4. Annual Meeting of the Planning Commission (Nomination and Election of Officers and
Appointments to Subcommittees)
ADJOURN
Posted Agenda: July 11, 2025
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO
29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION
OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE
TIME OF THE MEETING
2
Page 3
Item 1.
CITY OF DOVER PLANNING COMMISSION
June 16, 2025
The Meeting of the City of Dover Planning Commission was held on Monday, June 16, 2025, at
7:00 PM as an In-Person Meeting and also using the phone/videoconferencing system Webex.
The Meeting Session was conducted with Chair Mr. Witham presiding. Members present were
Mr. Michael Lewis, Mr. Roach (arrived virtual at 7:08PM), Mrs. Denney, Mrs. Maucher, Mr.
Baldwin, Dr. Jones, Mr. Reaves (virtual), Mrs. Welsh, and Mr. Witham.
Staff members present were Mrs. Dawn Melson-Williams, Mr. Christopher Salzano, and Mrs.
Kristen Mullaney.
APPROVAL OF AGENDA
Mrs. Maucher moved to approve the Agenda as submitted, seconded by Dr. Jones and the motion
was carried 8-0 with Mr. Roach absent.
APPROVAL OF MEETING MINUTES OF MAY 19, 2025
Mrs. Welsh moved to approve the Planning Commission Meeting Minutes of May 19, 2025,
seconded by Mrs. Maucher and the motion was carried 8-0 with Mr. Roach absent.
Mr. Roach arrived to meeting virtually at 7:08PM.
COMMUNICATIONS & REPORTS
Mrs. Melson-Williams stated that the next Planning Commission regular meeting is scheduled
for Monday, July 21, 2025, at 7 PM. We do have an application that was just filed to be heard
that evening.
Mrs. Melson-Williams provided an update on the regular City Council and various Committee
meetings held on June 9 & 10, 2025.
Mrs. Melson-Williams stated that as noted, we are processing a number of Event Permits tied to
festivals. She believes this coming weekend would be the African American Festival and then
we will be into the Fourth of July soon after. There is an update on the Kenton Road project if
your travels take you to that part of the City. There was a Public Advisory that was issued today.
They are still in Phase 2 where the southbound of Kenton Road between College Road and Route
8 is closed. Hopefully that will be transitioning later this month but for more detailed information
about their phasing for this project, it is recommended that you visit the website that they have
up which is www.Kentonroadimprovements.com. It lays out all of the phases; it gives aerial
shots of current conditions in the corridor. Their phasing plan takes them through June 2026 at
this point. It looks like they may have to pause a little bit over the winter depending on what type
of activity they are going to be in. That corridor from Route 8 to Maple Dale Road is going to
have various versions of closures over the next year.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Melson-Williams presented the audience information on policies and procedures for the In-
Person Meeting and Virtual Meeting using the Webex system.
1
3
Page 4
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
OLD BUSINESS
Requests for Extensions of Planning Commission Approval: None
NEW BUSINESS
Presentation on Dover's Downtown Development District (DDD) Program Relaunch
Visit https://www.cityofdover.com/departments/Planning/dovers-downtown-development-
district-210248
Representative: Mrs. Ann Marie Townshend, Rossi Group
Mrs. Melson-Williams stated that our first presentation this evening is a presentation on Dover’s
Downtown Development District Program. We call it the DDD. It is a relaunch, and we have
Mrs. Ann Marie Townshend from the Rossi Group and also Mr. Chris Salzano from the Planning
Office who will be giving this presentation this evening.
Mrs. Townshend stated that for those of you who may not be as familiar with the history of the
Downtown Development District Program, in 2014 the General Assembly passed the Downtown
Development District Act. The purpose of the Act was to spur capital investments, stimulate job
growth, help build a stable community of long-term residents by improving housing
opportunities, and assist municipalities basically in strengthening the Downtowns. There was an
application period. The City of Dover submitted an application along with a District Plan and we
were one of the first three designated in that first round. There was one from each County. It was
Wilmington, Dover and Seaford. The way that the program works is that the designation is good
for ten years and then after the 10 years, the designated municipalities are eligible for up to two,
five-year extensions. As of today, there are twelve designated Downtown Development Districts
and three came up on the first window of renewal; again, Wilmington, Seaford and Dover. We
submitted last year; Rossi Group worked with the City to develop the District Plan, do the
program assessment, and complete the application. That was done and it went to the Cabinet
Committee on State Planning Issues and then last summer, the City got a letter from the
Governor letting us know that we were extended for an additional five years. So, that extension
began on February 1, 2025, and will go through January 30, 2030. The bulk of the program
success in Dover really has been the housing. There has been really some transformational
change in neighborhoods. When we did the application in 2014, we used two different planning
documents as kind of the direction for the plan. They were kind of the heart of the plan. One of
those was “Restoring Central Dover” which NCALL, now NeighborGood Partners, was the lead.
There still is a lot of collaboration through “Restoring Central Dover” on improving the housing
stock, providing homeownership opportunities really for people who are low to moderate
income. One of the big fears when you get into revitalization is, are you going to displace the
people who live there to bring in new people with more money and then you end up with
gentrification. Through Restoring Central Dover, there has really been an effort to balance
everything. More than 65 homes have been built between Habitat for Humanity, NeighborGood
Partners, Milford Housing Development Corporation, and then a few built by private for-profit
builders. That was really transformational. You can see North Kirkwood Street just entirely
2
4
Page 5
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
transformed and if you drive around Downtown, you can really see the difference. There have
been some very successful commercial investments as well. Janaid’s on Loockerman Street was
one of the first two or three projects in Dover to actually get through the program and get the
rebate. He is doing very well, and he is now looking at doing residential on the upstairs of his
properties, which again, is one of the priorities of all of the Downtown planning. Rail Haus is
another example of a large commercial success. Stonerail Market is another example. The
commercial success hasn’t been as transformational as we were hoping. She thinks COVID
didn’t help us with that. But certainly, she thinks the winds are shifting and things are getting
stronger in that area.
There are a variety of incentives. The big incentive with the State’s Downtown Development
District Program is a rebate of up to 20% of the capital cost of construction, renovation or
whatever of the project. She can’t think of one property owner or business owner who has taken
advantage of this that we talked to, that didn’t say that this was the difference that made it viable.
Without this 20% rebate, the numbers just wouldn’t work. The other thing is that the State wants
to see that the local governments also have some skin in the game. The City has a variety of
incentives. There is a waiver of the City’s portion of the water and wastewater impact fees, a
waiver of the Building Permit fees, and a waiver of the Business License fees for new
businesses. You still have to get your license, just for three years it doesn’t have a fee. Then, here
is a 10-year property tax abatement where basically the taxes come in over time. There is also a
transfer tax rebate after a project is complete. The last one is the Historic Tax Credit which the
City has had for quite some time but that is one of the tools in the toolbox. The Downtown Dover
Partnership also has some incentives. For many years, they have had a very successful Façade
Grant Program. When we started the Downtown Development District in 2015, they started
offering architectural assistance so that if people were doing renovations, it would help to pay for
those architectural costs. When we did this back in 2014/2015, we thought about what the
challenges that they were finding. There were a lot of people wanting to do renovations on
commercial buildings, but they did not have the funds to pay for an architect; so, that was an
incentive that really helped people do it the right way, which is what we want. In more recent
years, the Downtown Dover Partnership has funding for what is called a Critical Improvement
Program. Under that program, they help with the cost of life safety, ADA accessibility,
commercial kitchens, and upstairs residential. One of the things that people don’t like to do, and
she certainly understands, is when you get to a certain level of renovation and your space is a
certain size, it has to be sprinklered. It’s expensive; this helps to make that cost bearable because
the Downtown Dover Partnership, in some cases has provided up to $300,000 in support to make
some of these things happen. For the first ten years or so of the program, Kent County also had a
rebate that they would do up to $10,000 and that is unfortunately, no longer part of the puzzle.
As part of the Renewal Application, we did an evaluation and we did focus groups. We really
talked to the people who did the projects, found out what worked and what didn’t. The numbers
are between 2015 and 2023 as that was the data that they had when we did this. The State
Rebates totaled $1.6 million. The value of the City’s Incentives was $73,000 and the private
investment leverage of $13.2 million. That’s the goal of the program; it’s to replicate that type of
success.
The application to update the District Plan was done last spring. City Council approved it in May
2024. The letter from the Governor came in August 2024 and then in February 2025, City
3
5
Page 6
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
Council approved an Ordinance that amended the boundary. With the initial program, we were
more confined in how much land we could have. She thinks it was 225 acres to start and now its
275 acres. We really worked to figure out where was the need. Where are the places that if you
expand that boundary, it could really make a difference? Most of that was on the west side. Also
in a prior expansion, the boundary on the east side on Loockerman Street was taken to Mirror
Lake because you have the old Post Office and you have Treadway Towers; there is opportunity
there. That Ordinance was adopted in February and now we get into the relaunch. They have
been working on the materials associated with the program and this is where she is going to turn
it over to Mr. Salzano to explain.
Mr. Salzano stated that as part of the Downtown Development District Relaunch, we developed a
variety of different forms as well as a new website with our consultants at Rossi Group. The first
thing (shown on the screen) is our updated website. It is simpler, sleeker and easier for the
general public to navigate to get any information they need. Through some talks with our
partners at the State, we learned that Dover is one of three Downtown Development Districts that
the State still hosts a website for. Since we are now able to maintain our web presence, it would
beneficial for us to really fully take over for our DDD website to be the premier location to find
all of that information on Dover’s District. Part of this Relaunch and in the next couple of
months, we will be updating and integrating the information from the State’s page as well as
tweaking some things from their page that they liked and we think could benefit people who are
looking to take advantage of Dover’s Downtown Development District. It’s to just help guide
people to easy information, the people to contact, and help find any information that they may
need or helpful links. Mrs. Townshend mentioned the updated boundary and this is one of the
various sheets that they worked on developing with Rossi. The sheet on the screen shows the
whole of the Downtown Development District and specifically that DDD Area. They have been
divided into that DDD and a Target Area; and this is specifically showing people that this is the
Downtown Development District proper. This is where you can leverage all of the City’s
incentives, the State’s incentives, and everything that is really at your disposal for improvement
in Downtown Dover. The next slide shows that expanded Target Area. It shows you that this is
still an area that you can leverage some incentives but not necessarily all of those same
incentives as you can within the Downtown Development District itself. Both of these forms as
well as the next few forms have been simplified and streamlined as well as turned into fillable
PDF forms for ease of digital navigation and filling out. As part of the DDD Program and as far
as the State Historic Preservation Incentives and the City’s Historic Preservation Incentives, we
developed a form that is showing the various Historic Districts within Dover itself as well as the
Dover Historic District proper. This form shows the incentives that you could leverage if you
purchase a historic property as well as where the National Registered Districts are in comparison
to where the Dover’s Historic District is considered. Dover’s is that large orange district labeled
as the City of Dover Historic Zone. Within that zone, he is sure that we are all aware that there
are some additional regulations on what you can and cannot do, but there is also some great
incentives including tax incentives for purchasing and renovating a property within that zone.
Finally, this is the Downtown Homeownership Incentives Form. Again, we are showing you the
overall DDD Area and this form goes over what the Homeownership Incentives are for the
Downtown Area, including those Tax Rebates and the Transfer Rebates. This is simplicity and
again, making sure the general public can easily access and go through these forms without
having too many questions before they come into the Planning Office and start talking about
4
6
Page 7
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
moving forward with a project. Finally, talking about having incentives, we have our new
Incentive Application Form. This form, also streamlined by our partners at Rossi Group and
what they have done here is turned it into a fillable form so that it can be easily transferred to the
City via email. You can fill it out, give it to a Planner or to the Front Desk and we can evaluate it
before you even have to come into City Hall which will definitely help save some people some
time if they have any questions. It’s just generally make getting DDD applications in and
processed easier for everyone involved.
Mrs. Townshend stated that with the boundary change, one of the things that we did was worked
with Public Works to put signage at the new locations where you enter the District. It was
brought up at the meeting when we were with the Council Committee of the Whole last week
about doing something with the Kent Economic Partnership, then Central Delaware Chamber,
and the Downtown Dover Partnership to really work together to promote that. That was
something that we discussed in the Plan and in the program evaluation. We actually have a
meeting next week with them to talk about how we can really work together to really promote
the program and promote the incentives. With that, once that meeting is done they will have a
press release that will kind of give that public push to hopefully get some more traction on it and
get it in people’s news feeds.
Mr. Lewis asked if they had any data or knowledge of how Dover’s progress compares to the
other communities that are involved. Responding to Mr. Lewis, Mrs. Townshend stated that she
is going to ask Mr. David Edgehill to answer but every town seems to have a different type of
success. Milford has had a lot of business success and they have also had housing. Seaford had
that huge large project. Our real success was that transformational change in the neighborhoods.
The non-profits that were part of that leveraged other State funds through Strong Neighborhoods.
She is not sure that it is easier to say that Dover is more successful or less successful because the
way that the program has played out has just been very different.
Mr. Edgehill stated that one of the things that they do in their office is administer the Downtown
Development District Program. He was on the team 11-12 years ago that came up with the
Downtown Development District Program with Governor Markell and his team. So, your
question is how does Dover compare to the other districts and he thinks Mrs. Townshend
answered it quite well. Every district has got their own sort of trajectory and their own type of
success. He would say that you can’t compare any of the districts to Wilmington because
Wilmington has a larger type of development. If you look at the metrics, they have really
absorbed a majority of the funding. If we look at apples to apples, but it’s really not the same
thing, because Dover has been extremely successful with the neighborhoods and with the
housing. Whereas, he thinks one of the things that they learned through the renewal process and
the application that Dover put together with Rossi’s help was really the desire to sort of shift that
momentum to more mixed use and larger projects. There are two types of projects in the
program. There are Small Projects under $250,000. They are small businesses and homeowners.
Large Projects are anything over that and that requires a reservation. But typically, they are
larger projects and Dover has had probably not as many of those as we had probably hoped, but
as you know, they are poised to see more of those in the coming years which is why the Renewal
was very important to Dover and to us. Again, for the other Districts, we have some that are on
the lower tier of not having as many projects as we had hoped but most of them are doing quite
5
7
Page 8
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
well. The three Renewal Districts that had the full ten years to operate the program, all saw
transformational change in their Downtowns and were poised. Part of it is having to make the
pitch, “well, we aren’t done yet; we have more to do.” In Dover’s case, it was the commercial
mixed-use side of things. In Seaford’s case, they had a tremendous success with their Downtown
called High Street with an almost 0% vacancy rate with large residential projects. They shifted
their success to the neighborhood’s gateway into the Downtown that they hadn’t seen as much
activity in. Wilmington, believe it or not they have had great success in their Market Street
Corridor with multi-story mixed use buildings, condos, apartments, restaurants, so on and so
forth. But they really haven’t done as well with housing. They have got a lot of issues in their
neighborhoods on either side of their district and they struggle to shift the focus there. That is
just a quick overview but he thinks Dover is doing great. He is really happy that you got the
program and that you got the five year renewal now to make some more progress.
Dr. Jones stated that following up on the previous question, is there concerted efforts or stepped
up efforts to try to increase the business side of that? Responding to Dr. Jones, Mrs. Townshend
stated yes, this is her speaking as someone who has just been around for a long time; we are
finally in a position that we are getting significant funds from the State. She knows when she was
with the City, she used to say “all the money goes to Wilmington. We need Wilmington money
to make a huge dent.” And for the first time, we have that. 25 million dollars from the State
through ARPA and other sources and that is going to push the Mobility Center and the multi-
story Mixed Use Building at the former Acme site to reality. Sometimes it’s just really hard to
get the numbers to work even with that 20% and that funding from the State is going to help
push it over and then there are people who are kind of poised to kind of follow suit once that
momentum gets going.
Dr. Jones asked if there is a residency requirement for the housing. Responding to Dr. Jones,
Mrs. Townshend stated that there isn’t. For the Homeownership Incentives, yes it has to be a
primary residence. If for instance you are getting Dover First Start money, one it has to be
income qualified. She thinks it has to be under a certain percentage of Area Median Income. You
have to qualify per HUD. For the Tax Abatement for owner occupied residential, it has to be
your primary residence so it can’t be an investment property. But the 20% rebate, it doesn’t
matter.
Dr. Jones asked if the applicant has to be a resident of the State of Delaware. Responding to Dr.
Jones, Mrs. Townshend stated that she didn’t believe so.
Dr. Jones asked if there was a requirement for the new homeowner to remain in that home for
any period of time. Responding to Dr. Jones, Mrs. Townshend stated that there is not with the
DDD Program itself. But the other funding that was leveraged to build all of these new homes,
again it was primarily led by NeighborGood Partners and Habitat, and Habitat holds the
mortgage. So, they have that mechanism. Typically, the other subsidy that goes into the house,
what happens is, it gets placed as a lien like a forgivable loan; and it gets forgivable
incrementally over time. Depending on the funding sources, that horizon service is usually five
or ten years. If you do sell before that, you have to pay back.
Mr. Witham stated that he noticed that they issued press releases and his question is that there is
6
8
Page 9
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
a lot going on Downtown with the Downtown Development projects but he doesn’t see high
visibility on what has happened and what it’s doing. Are you trying to count your successes with
these projects on other advertising platforms to really get the word out, not just to the Dover
community, but to the outside world? Like using YouTube or going to get something on WDOV
on television. It’s advertising all of this activity to get the word out, not just issuing a press
release. The only people who read a press release are the press. Responding to Mr. Witham, Mrs.
Townshend stated that’s the plan for the meeting that we are having next week; to really among
those non-governmental entities that are promoting Dover to really start to develop that method
and that strategy. That is the goal for next week for the meeting that they are having with the
Chamber, the Kent Economic Partnership, and the Downtown Dover Partnership.
Mr. Witham stated that one thing that he has noticed over the years is that improvements are
slowly and incrementally coming to Dover but the fact is that we have a lack of really nice
Downtown restaurants. People have tried very hard to build those nice restaurants, though some
have failed and some have done better than others. There was a time in which Downtown Dover
had a plethora of restaurants and that seemed to attract a lot of people coming Downtown. He
knows that we have a situation where did the chicken come first or did the egg come first in
attracting people and businesses Downtown, but we still have a high degree of vacancy of
buildings Downtown which is problem. Responding to Mr. Witham, Mrs. Townshend stated that
is where the Downtown Dover Partnership with their Critical Improvement Program has
identified priorities being restaurants and residential above business. That is where they have
said these are the things that we are going to find. It is very costly to install a commercial kitchen
so that is where they are trying to get the money into people’s hands that way to help them pay
for those improvements. Part of the challenge with a restaurant is once you pay for the
commercial kitchen and everything, you are so leveraged before you even open the door that it’s
really hard, which is why you see a high failure rate. The idea is that if the Partnership can help
get some of the commercial kitchens underway, that will take the burden off of business owners.
Mrs. Denney stated that for many years she managed medical practices and also did some things
for the hospital and one of our major issues was recruiting physicians. Obviously Bayhealth has
grown; it was a very small rural hospital. She could follow the doctors through the residencies
and their fellowships and bring them down and entertain them. Everything was great, but the
wife did not spend her life driving around in her little Volkswagen Bug trying to get her husband
through med school and residency and followship. So first, the doctors come, and everything is
great and then they come back with the wife. The hospital meets with the doctor again and she
takes the wife on tours of schools, churches, and housing. It was very difficult to get them to
want to live in Dover. Boscov’s was not their idea of shopping. They hadn’t waited all of these
years to shop there; they wanted to be in Nordstroms. It was very difficult, and it was interesting
because she would take them out to dinner and she would tell them about when she lived in
Camden. Getting up on Saturday morning for a cup of coffee and she would say lets go to the
Metropolitan Museum of Art, or the beach or lets go to the Smithsonian because it totally
surrounds you if you think about it; it’s just not right here. Which is how she ended up getting on
the board that was trying to develop the Schwartz Center because she felt like that was at least
something. It did help and they did have a lot of things going on there that seemed to have faded
away, but she honestly thinks we are headed in the right direction, but we need fine dining. It’s
not just doctors that you have to recruit; it’s doctors’ wives, it’s accountants, lawyers, etc.
7
9
Page 10
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
Responding to Mrs. Denney, Mrs. Townshend stated that when they were working on the plan
update and we were talking to Delaware State University who had just acquired the Wesley
Campus, one of the things that they said is that students who are at the Downtown Campus,
when families come to visit they go to the highway. We need to get to where they go somewhere
nice Downtown; that it’s not just the highway. She thinks that we are really on the cusp of that
happening. She is going to be honest, and again, she feels like she uses this as a reason for so
many things that haven’t gone according to plan and personally, she thinks COVID really hurt
us. We had 33 West that was packed all of the time and closed. She really feels like we had
momentum going into that.
Mrs. Denney stated that Mrs. Townshend is right on target. We have to remember that we had
that hiccup of COVID that set everybody behind. All of the prices got higher, and the economy
was shrinking, and it was very difficult. The other thing is that many years ago when she
managed the Town of Camden, she wrote an article for Delaware Today Magazine. It was about
the castles, the palaces, and the playground. She described Kent County as being the mote in
between and she felt that. Anything that was happening, if it was in the Delaware Today
Magazine or the papers or anything, we were always on the last page of the book. She wrote a
letter to the editor about that, and they printed it on the inside back cover of the book. She thinks
that it’s interesting because she is finally feeling like some of that is slowly changing; especially
post COVID. We have a lot of things going on such as the Amish Bike Tour. We always have
great Dover Days. Responding to Mrs. Denney, Mrs. Townshend stated that Dover Con has
become a huge thing.
Mrs. Denney stated that it is huge and people travel. Back then, we had the races and things were
really beginning, and she feels like we got pushed back. She feels like things are hopeful again
and she tends to refer to Dover as the Capital City of the State that started this Nation. We should
be using that to attract people who want to understand history. It’s right here. Her hope is that
things are beginning to turn.
Mr. Lewis stated that just for the record, the races are still here on July 18-20, 2025.
Dovermotorspeedway.com for ticket information.
Dr. Jones stated that we have had such an influx of people coming to Delaware, coming to Kent
County for reasons that we all know and many of them come with financial resources from
pensions and homes. You hear them say “I have to go here to do this and that.” She won’t repeat
anything that has been said but that is something to think about. Her question is, in the planning
and the brainstorming, how has transportation or lack of come into play or been discussed or has
it? Responding to Dr. Jones, Mrs. Townshend stated that it has. In the Capital City 2030 Plan
which is the heart of the Downtown Development District Plan for the next five years, we wrote
the plan around that. They identified activity centers. You have the State Complex, Delaware
State University, Bayhealth, and the Air Base. They identified these different activity centers and
a lot of the plan was how do you tie together those activity centers and transportation is part of
that. They didn’t get great detail on transportation in the Capital City 2030 Plan but coming out
that, the Downtown Dover Partnership and the Dover/Kent MPO put together a consultant and
put together the “Pathways Plan” that really looked at how when you look at these activity
centers and these activity nodes, how do you connect them through multi-modal whether it’s
8
10
Page 11
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
transit, scooters, micro-mobility, bikes, or improving sidewalks. That plan was finalized at the
end of last year. The other component of that is that they added on a streetscape for Loockerman
Street because she thinks everybody knows that sometime next year, everything is going to be
dug up to improve the water/sewer, stormwater, and everything underground. Then, when they
build back what they want, they took that opportunity and developed a streetscape that would
activate the sidewalks to make wider sidewalks in some areas. Yes, it’s definitely part of the
equation and it has gotten some definite planning around it. She thinks that our transit system
here is more of a regional transit, not a local transit and that is a challenge. But if we can
continue to improve the opportunity for people to get around on bike or on foot, she thinks that
will definitely help some. One of her colleague’s, his son just moved to Philly and he gets around
by electric scooter. It takes less time than driving and it’s easier than walking because it’s also
less time. So, places are doing it. Obviously, we are not Philly but right now she doesn’t think
that you could really take a scooter on a lot of our sidewalks.
Dr. Jones stated that not only that, but we would have to take a look at our demographics. Those
people moving in are not riding bikes. Responding to Dr. Jones, Mrs. Townshend stated that
what is interesting is that you talk about bikes, when she was in Lewes, one of their residents
who was a very involved Dover resident and now is a very involved Lewes resident who is in his
80’s. She would see him out on his e-bike. E-bikes have made cycling more accessible regardless
of age. So, it’s changing but we still need to be careful.
Presentation by Delaware Office of State Planning Coordination (OSPC)
Visit https://stateplanning.delaware.gov/
Representatives: Mr. David Edgehill, Delaware Office of State Planning Coordination; Mr. Josh
Thomas, Delaware Office of State Planning Coordination
Mrs. Melson-Williams stated that this presentation is by the Delaware Office of State Planning
Coordination. We have Mr. David Edgehill and Mr. Josh Thomas who have a variety of things to
share with us tonight.
Mr. Edgehill stated that he is the Director of the Delaware Office of State Planning Coordination
and he is also a Dover resident. He lives right across the street from Mrs. Denney. We have been
neighbors since 1997. It is great living in Dover and being here with you tonight. With him
tonight is Mr. Josh Thomas. He has a presentation for you tonight. He is going to tell you all
about our office and what we do and how we interact with our local governments including City
of Dover. You already know about the Downtown Development Districts and he just wanted to
follow up with Mr. Lewis. He actually found some information about how Dover is doing
compared to the rest. Mr. Thomas is going to tell you a little more about the program, although
he thinks we know an awful lot about Downtown Development District now so we can maybe
skip through that. He mentioned Wilmington which is kind of a different category. In terms of
total updated figures as of the end of 2024, total private investment in Dover is up to $18.8
million with $2.1 million of State Rebate associated with that. That puts Dover in terms of total
investments, fourth among the twelve (12) districts. The others are Wilmington, Milford, and
Seaford but Dover is actually the third highest in the number of the five large projects. Dover is
doing great, holding your on and making great prides with that program with much more to go.
9
11
Page 12
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
Our office has a very small staff, a really dedicated team that does a lot of things together but we
do specialize and are organized around three circuit rider planners. We have one Principal
Planner assigned to each County. Mr. Thomas is the Principal Planner assigned to Kent County;
so, he is the person who works closely with Dover.
Mr. Thomas stated that they really just wanted to give you an overview of our Office and kind of
our roles and responsibilities and how we work with the City of Dover Staff and some of the
ways we engage with the City currently and some of the things we can do going forward. Also,
we’ll just touch on a few of the current things that we are working on. As you can see on the
screen, our Mission Statement and a lot of times in planning you talk about the three C’s. It is
right in our name; the biggest thing is coordination for us and they are trying to bring the
different levels of government together to make really smart and efficient land use decisions. The
first thing that he really wants to touch on is new for 2025; we just launched our email
newsletter. We are really excited about this and we have actually only had one. We anticipate our
second one going out tomorrow so you have an opportunity to be an earlier subscriber. If you
want to be in the know about things we are working on, give us your email address before we
leave and we will make sure you hopefully get the email tomorrow morning. The pdf that we
provided to Staff does have some links in there. Obviously, if you don’t do it immediately, we
can still get you connected. That newsletter is going to have helpful information about things that
are happening and he is going to touch on some of those a little later in the presentation. Starting
at the high level, one of the most common ways that we interact with our local government
partners is through the comprehensive planning process. You see a couple examples on the
screen. Dover is in the middle. It is hard to believe that we are at the five year mark already; we
are at the halfway point. We was actually talking to Staff recently about the fact that we are at
the five-year review time. It is very encouraging to see that the next item on the agenda is
looking at the Comprehensive Plan. We work with Dover and all of the other local governments
during the drafting process to provide guidance during that process and then of course to take it
through the administrative approval process, ultimately leading to the certification. Really, once
we get the Comprehensive Plan certified, we really try to provide some technical assistance and
work with local governments to implement the plan. One of the ways that we have done that
successfully is through master planning efforts throughout the years. We are here to provide
technical assistance to local governments in any ways that we need to implement the plan. One
of the other ways that we will interface directly with local governments a lot is through the
Preliminary Land Use Service (PLUS). Some of you may be familiar with the process, but we
are going to go through what PLUS is and what it’s not. Applicants who are working on projects
come through PLUS but also local governments do come through PLUS as well when there is an
amendment to a plan or something like that. That is another way that we work with Dover or
other local governments. For what PLUS is and what it’s not; it is a review of major projects. It
is a State level review of major land use proposals. We are coordinating with State agencies and
property owners or developers about important things about the project before the local land use
and approval process. We try to use that to look for alignment with the Strategies for State
Policies and Spending which is another thing that he is going to talk about. It can provide some
high level information about permitting requirements for State agencies that applicants may not
have known about. Really, it is trying to provide some early information to hopefully help
applicants navigate the process in a smoother fashion. It is important to note that it is not an
approval or denial process for project. It does not replace the local land use decision making
10
12
Page 13
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
process and it is not a permitting application. It is just important to lay that out, especially for
members of the public who may be listening as well. Why do applications have to go through
PLUS and which ones? Previously, he mentioned that it exists to encourage that alignment
between different levels of government and also it is required in Delaware Code for certain
projects, mainly because of the benefits that it provides in that early coordination across the
agencies. There is a base set of criteria in State Code, but a majority of our local governments
actually do have separate arrangements with our office that changes the criteria just a little bit.
You can see on the screen that Dover does have a Memorandum of Understanding with our
office and that provides the criteria in terms of what types of projects have to go through the
PLUS process. You are seeing residential projects that have 125 or more dwelling units come
through PLUS. The base number in State Code is actually 50 units. You can see that when we
have local government partners who are very familiar with the planning process and PLUS and
the types of things that might be brought to light in PLUS, we can sometimes raise those
thresholds. For non-residential projects, you are looking at 75,000 SF or greater. It is also
important to note that one of the other requirements for PLUS is for any type of Rezoning or
Comprehensive Plan Amendment. There are times when you have to amend your
Comprehensive Plan and that may require a PLUS review but there also may be times when
there is a Rezoning or a change to a property that is inconsistent with the Plan and that will kind
of force an amendment to happen. So that is another way that we would have to go through the
PLUS process. The next slide shows some real brief stats from PLUS so that you can kind of get
a sense of the number of applications and it shows by type. Last fiscal year, they had a total of 97
PLUS applications. This gives you a sense of the number of land use reviews going on around
the State. It is not a huge number but those are the larger projects. The graph on the slide gives
you a breakdown. You can see that the majority of them were Subdivision Plans or Site Plans.
But as he mentioned, there were 13 different Comprehensive Plan amendments. Our website has
a wealth of information that hopefully you can get in there and navigate around. The PLUS
process does have a Dashboard if you ever want to see a map based interface showing current
projects or previous projects, check out the Dashboard and explore that. You can link to all the
applications, plans, and comment letters. The PLUS stats kind of hinted at this, but every year
the Cabinet Committee on State Planning Issues works with our office to prepare an Annual
Report on State Planning Issues. That is an advisory document to the Governor’s Office and the
General Assembly. There is a link in the pdf but also he just wanted to show you some brief
screen shots and kind of promote this Report as a resource for you. We do publish that every
October so we will be working on the 2025 Report very soon. That Report always starts with
development trends. We are very grateful that City of Dover annually provides our office with
the Building Permit stats and development application stats that they can then use to compile
with all of the other local governments around the State to produce some summary information
about how we are growing. This is really kind of a plug for the Report. You can see how we try
to break it down by looking at five year timeframes, looking at where the development is
happening and at what State strategy levels. The next slide shows a screenshot of our
Development Trends Dashboard. This is another resource on our website and this is a way more
interactive version of what he just showed you. The Annual Report will give you those high-
level stats but then the Dashboard allows you to go in and look at individual applications on a
map. You get a sense of the distribution of the development and you can see how we are
growing. You can look at Building Permits, Development Applications, and you are also looking
at PLUS Applications. This is a really helpful resource that we encourage you to use when you
11
13
Page 14
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
want to get some of that information about our development trends. We also work with local
governments on Municipal Annexations. That is primarily through the Plan of Services Process.
When a local government has a proposal for Annexation, the local government works with our
office to submit a Plan of Services approval request, potentially documenting that the local
government has worked with the property owners and all of the providers of infrastructure and
services to document that that property can be served by town resources. Once that Plan of
Services Application is approved by our office, then the local government can proceed with
Annexation process. The Annual Report just gives you some quick numbers. Last year, they had
29 Plan of Services Applications for roughly 1,000 acres 21 of those actually did get adopted so
that meant that 644 acres have been formally annexed. Of course that number does fluctuate. We
also try to coordinate a wealth of demographic information. We do have the Census State Data
Center responsibilities in our Office; so we do provide coordination with the Delaware
Population Consortium and also the Census data and our website has a lot of that information as
well. The last presentation by Mrs. Townshend and Mr. Salzano did a great job of talking about
DDD’s so we don’t need to spend a lot of time on it. We practically covered everything but the
only thing that he will say is just a reminder that really the Office of State Planning is your
partner when it comes to administering the designation process. We were very proud that Dover
was the first District to get approved by the State for renewal. Rossi Group and City Staff were
fantastic to work with on that process. So, that is our role in the process but then we also have the
State Housing Authority who is administering the rebate program and working through those
details. One of the other roles that we have is GIS coordination. Essentially, that is our
Geographic Information Systems data and our office has a GIS Coordinator named Jason Vogl;
and he participates with stakeholders and public throughout the State and a lot of local
government Staff members to essentially make sure that all of the data that you need to make
decisions on land use and planning and administrative decisions is available. A lot of that comes
through the First Map Portal. That is just a fancy name for the platform that kind of serves all of
the data.
Last but not least, he wants to spend a little time talking about the Strategies for State Policies
and Spending. As he mentioned, he tried to give an overview as a refresher about the roles of our
office and what we provide the local governments, but this topic here is a little more timely
because we are working on the five-year update of this policy document. So, he just wants to
spend a lot time going through State Strategies and he is talking about where we are in the
current update process. We started off the presentation talking about how important coordination
is and really the purpose of the Strategies for State Policy and Spending; we commonly shorten
that to State Strategies. The purpose is to coordinate the land use decisions that happen at the
local government level with the provision of infrastructure services at the State level. As you
probably know, there are not that many states where the State government provides the bulk of
the infrastructure and services. So, we need to coordinate that because if we do not coordinate
them, then we have land use policies that could cause wasteful spending on infrastructure, lack
of coordination where we are really not developing efficiently and we could be doing better. If
we don’t have that coordination between infrastructure and local decisions, then programs like
the DDD that we just talked about and all of the benefits of those programs will not be as
successful. This slide shows the Delaware Code requirement. You can see the highlighted
portions of text that talk about this as the State’s primary policy guide. The point is to support the
most efficient use of State resources. We have to update it every five years. On the screen, you
12
14
Page 15
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
have a snapshot of the current Strategies and then he is going to go through briefly and talk about
the different levels before we get into the update. He just wants to remind everyone that even
though we are working on the 2025 Strategies, until that is officially adopted and implemented
through an executive board by Governor Meyer’s Office, the 2020 Strategies are still in effect
and that is important to note. The map from 2020 Strategies is shown on the screen but it just
provides an overview and a little zoom into Kent County. Take a mental snapshot of the colors
and how they interact with the way you know the State looks in terms of its distribution along
Route 1 and Route 13. The five different levels are Levels 1-4 and Out of Play and are
represented on that map in a series of colors. What we are doing this year is we’ve produced
what they are calling “level profiles” and we are going to have versions of this information in the
document like you are seeing on the slide. It tries to break it down as simple as possible of what
the land uses look like in the different investment levels. Level 1 that is where we are right now.
It’s you urban centers, your downtowns, and your municipalities. You have a wide range of uses.
As we talked about with DDD, you are trying to encourage a lot of infill and redevelopment and
downtown revitalization so that should be very familiar to what Level 1 looks like. Level 2 areas
are the areas that are going to surround your downtowns. That is your suburban areas. They are
pretty close to your city centers and your urban centers. They are rapidly growing. You are going
to have a broader mix of housing and commercial options; but probably something more of the
corridor style of development. But it is important to note that you are still going to have access to
a lot of the infrastructure and services that you need. The policy focus at this level is where the
State and local governments still want to invest in growth and make those infrastructure
investments. Level 3 is where you are going to start going out, if you can imagine kind of a
concentric ring mindset. This is where you start to get out beyond the growth areas but these
growth areas are still part of certified comprehensive plans; they just might be a little out further
in the future. You are going to have some environmentally sections of land, you are going to
have some agricultural lands and you are going to have more of a leap frog development style
where you have some growth happening but you still have a lot of open space. Really the
infrastructure investments there might not be the highest priority. They are in the long term
growth plans but money could probably be better spent elsewhere. Level 4 is where you are
really going to see your primary focus being on natural lands and agricultural lands. This is
mostly your unincorporated areas. You are going to have small developments or disconnected
homes along rural routes. The policy focus here is on preservation, open space, really limiting
development, and keeping that growth for agricultural and environmental uses. Out of Play
Lands are a little bit easier to think about because they are legally protected lands for
conservation or preservation; so it’s just not available for development. That is essentially your
parks, your wildlife refuges, any agriculture land or forest land that has been protected. When we
do the mapping exercise, those just get subtracted out on the map. They are going to show up in
a gray color. By all means, this is all available and is going to be available throughout the State
Strategies development process, so he doesn’t want you to think that you have to absorb all of
that today. This is just an overview, but as we go through this process and you will have
opportunities to comment as the City of Dover. We really want to encourage you to go in and
read more about how Dover’s investments levels interact with the surrounding areas. Just some
important considerations is that the maps are not parcel based and that’s really important to
remember. It is a data driven process and the resulting maps are not confined or clipped into
individual plots of land. You might have a large piece of ag land that could have three different
levels on it depending on what type of environmental features are there, like streams or wetlands.
13
15
Page 16
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
It is also important to note that there may be circumstances where the State and local
governments sometimes have to make investments in Level 3 and Level 4 areas for health,
safety, and welfare reasons. One easy example is that DelDOT may have to make infrastructure
improvements if there is a dangerous intersection even though it may not be in the priority area
for investments.
He is going to end today with talking about the 2025 Update. As he mentioned, they are required
to do it every five years. The reason being is that we talked about Comprehensive Plans. For any
plans that have been certified since the last five-year cycle, we need to incorporate their Comp
Plans, all of their data into the Strategies Update. We also might have changes in State agency
data and there may be new data layers that were not available to us last time. We have to kind of
work and recompile all of that information to produce new maps every five years. This year, the
State had a process known as the Data Analysis Work Group. They did that so hopefully you
were able to attend or at least find those resources. But essentially, that was a coordination
process they did throughout the State just to provide more insight on the data that goes into these
maps. The next screen shows the timeline. Governor Meyer’s Cabinet Committee on State
Planning Issues approved this update timeline last month and this is essentially going to take us
through December which is when we will hopefully have our Executive Order to adopt the
Strategies. Where we are now is that this month we are releasing what we call the Data Story
Map. That allows anybody who is interested to go in and look at all of the different data layers
that comprise the Strategies. You can look at what kind of information feeds into the model and
you can see how the data in the Dover area is feeding into the Strategies Maps. We released that
story map and he is going to talk more about it on the next slide but you can see here that really
the next two months are critical. Next month, we will be working on the draft maps and the
actual Strategies document of which the Cabinet Committee would essentially review that before
it goes out to the public at their August meeting. The Cabinet meeting is on August 11th but the
hope there is that the Cabinet Committee would approve the release of the Strategies Maps at
that time and then we would open a public comment period. Then we start working towards
some public workshops in the early fall. That just gives you an idea of where we are going to be
over the next couple of months and how the City of Dover will have an opportunity to participate
in the process. There is a public workshop coming up in ten days which will really go through
some of that story map that he just mentioned; so if any of that seems a little murky, we
encourage you to tune in. We are going to have it at DelDOT in their big conference room but
there is going to be a hybrid style so you can attend virtually. That will allow our audience to see
the different layers that he described that make up the story map and give a tutorial of how to use
it. Then you can provide us any comments after you have a chance to go interact with the
website. He definitely encourages everyone to attend that and hopefully they can get these slides
to you. This should also be going out in the newsletter tomorrow; so, hopefully we can get
everyone signed up for that as well. We are anticipating that the survey on the website would
close on July 10, 2025.
Mr. Roach thanked them for the information. You have given us a lot but it is definitely
informative and he appreciates all of your hard work and diligence. Responding to Mr. Roach,
Mr. Thomas stated that means that they did their job right. They wanted to give you and
overview and remind you of the things that we offer. Reach out to us with any questions at all
and as Mr. Edgehill mentioned, he is the Kent County representative so we can help you work
14
16
Page 17
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
through anything that we need to work through.
Mrs. Maucher asked who was on the Cabinet Committee. Is it other State agencies that are on it?
Responding to Mrs. Maucher, Mr. Thomas stated that it is DelDOT, DNREC, Housing, Division
of Small Business, Secretary of State, Department of Agriculture, and it is chaired by the
Governor’s Office. The membership is actually in the State Code and it spells out the offices that
participate. It’s not all State agencies but any of the agencies that have some type of role in the
way the built environment is developed and land use. Cabinet Committee meetings are open to
the public. So, if you ever want to find out what is talked about, you can certainly tune in. We
usually try to keep them to an hour or hour and a half.
Mr. Reaves stated it was a great presentation and thank you for the information. He would like to
be added to the newsletter.
Mr. Witham stated that when he graduated from high school and went to the University of
Delaware for undergraduate school, he worked his summers with the State Planning Office. One
of the jobs that himself and another gentleman who was also going to college, was to drive
around in a car and count houses. Does that ring a bell? Responding to Mr. Witham, Mr. Thomas
stated that they don’t do that anymore.
Mr. Edgehill stated that they have the GIS data and the maps and the pictures that we can figure
that out with.
Mrs. Melson-Williams stated that we did get their presentation as a pdf this afternoon and they
will push that out to you so that you can have all of the great links. If there is no objection, we
will also provide the State Planning Office with everyone’s emails so that everyone can join their
newsletter. You have probably heard us talk about PLUS. If there is an application that went
through PLUS Review, we try to put that in your Development Advisory Committee review
process report so some of that should have been vaguely familiar to you.
Progress on Implementation of 2019 Comprehensive Plan
Mrs. Melson-Williams stated that they are kind of at the five year timeframe where there is
actually a statement in Delaware Code that says that we should be reviewing our Comprehensive
Plan to see if there is any items that need to be updated or if there has been substantial changes
in an area. Tonight is a baby step in that direction. We have our consultation working on the
annual report piece of the Comprehensive Plan. There are a couple of strategies that we have
taken this year that she thinks will help us in the long run. Our 2019 Comprehensive Plan was
actually adopted by City Council in January 2020. Through all of our process, it was the 2019
Plan. As part of that Comprehensive Plan, there have been a number of things that we have done
over the years. A couple of the things that she included in the packet is Table 1-2 which was the
Chapter goals. If you remember with the Comprehensive Plan, there are a series of topic chapters
in the document and each of those ends with a series of goals and then a series of
recommendations with some action items associated with those. This is not just for the Planning
Office to implement; it is for the City and its many departments and City Council to implement
as we go about doing the work of the City. She included that but didn’t really anticipate any
15
17
Page 18
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
kind of discussion about goals. These are fairly broad and if you have a project, you can
probably work it into one of these goals anyway. What she also included in the packet is Chapter
15. Chapter 15 is the Implementation Plan for the Comprehensive Plan. It talks about what we
should be doing from the adoption process for the Comprehensive Plan through the timeframe
for the next one that we will have to do. The Comprehensive Plan for the City of Dover was
done in-house by Staff which is probably a little different than the images that you saw in the
State Planning’s presentation where some of the other have made use of consultants. This was
done by Planning Staff. They had a full contingent of Staff at the time and we all kind of each
tackled a chapter. The document itself is a series of chapters and then of course a series of maps.
Immediate actions with a Comprehensive Plan is adoption and she mentioned that formally
happened and was officially certified. Tat dated to that transition in late 2019 and then City
Council did its final adoption in January 2020. The next step with a Comprehensive Plan is that
your Zoning Map needs to match your Comprehensive Plan. So, the Comprehensive Plan has a
Land Development Plan Map which is the vision for where you want certain land uses to happen
in the City; that is Map 12-1. What we did in 2021 was actually do that comparison of our
Zoning Map versus that Land Development Plan Map. What that identified was a process that we
went through and this body was involved in; it was the Comprehensive Rezoning 2021 Project.
With that, there were about 160 parcels in the City that were rezoned at that time. There was also
a series of amendments done to Map 12-1 as we delved into greater detail or in some cases, the
zoning was changed to something that they needed to match up the land use category with. That
process was completed in 2021. The rest of Chapter 15 goes through and breaks it up into
activities that are just generally ongoing in the various topic areas. Then it tries to put the
projects and studies into some form of implementation. This is where in what we are having our
consultant work on this year is really developing a spreadsheet to see how we are doing with this
various items; because they are not all planning. Certainly our Planning Office has had our hands
in a number of these things but we haven’t gotten to everything of course. There is a number of
studies that weren’t even on this list that have happened. We want to do a check-in as to where
we are. Her initial thought of Comprehensive Plan and having to do the five year review, it
seems daunting but she is not sure that there is really much in our Plan that is that far off where
we need to go back into it. She thinks that they did pretty well. They still have annexation areas;
they have picked of a few things here and there. Most of our anticipated development especially
here in the Downtown was envisioned for mixed use and we are starting to see that strategy
come into play with projects. Certainly, our zoning is set up in some instances for that. We have
done over the years a number of Ordinance changes. We have done a number of things to update
parts of our Zoning Ordinance. Are there more to do? Yes, but she doesn’t know that they are
that far off from what they had identified in the Comprehensive Plan. This Chapter 15 also talks
about how you do Comprehensive Plan Amendments. We have actually had three rounds of
Amendments over the years since we adopted this Plan where individual property owners came
forward seeking a change to the Map. Some of them were successful in getting the Land
Development Map changed; others were not. We had one of those that was not successful just
last year. This was to push this back in front of you. If you have particular questions or after
hearing the State’s presentation on what they do and knowing what we do here in the Planning
Office, if there is any questions that you have or a direction that you think we should be moving
to now that we are starting to have Staff onboard again. We may be able to get into some of this
long range planning efforts. She knows that they have identified a number of things specifically
related to the Active Recreation Area requirements and housing which they think is going to be
16
18
Page 19
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
something that we are going to have to go into. Some of it may be dictated by the State when it
comes to affordable housing and accessory dwelling units. We will see how the legislature plays
out on that. At this point, she would be happy to take any questions or concerns that you may
have about the Comprehensive Plan and how it’s been going the last five-ish years.
Mr. Witham asked what the next step was in the process for the Planning Commission.
Responding to Mr. Witham, Mrs. Melson-Williams stated that there is not real detail about how
you go about doing the renewal or the five year review even in the State Code process. At this
point, she wanted to refresh your mind about this. They have a deadline coming up in July where
we have to submit our Annual Report to the State Planning Office. She would like to bring that
back to the Commission after they submit it but that is going to give us a sense of where we are
on some of this. Certainly, if you think over your time here on the Commission, especially over
the last year, if there have been things that didn’t seem to quite fit right or topic areas that we
may need to look at more closely, she would like to hear those. She thinks this is going to be a
little bit of a work in progress as to what a five year review for the City of Dover is going to be.
Mrs. Denney asked if they will have workshops or is that typically just done in-house with the
Planning Office. Responding to Mrs. Denney, Mrs. Melson-Williams stated that there was one
five year review that was really almost like rewriting the Comprehensive Plan a number of years
ago. She doesn’t see that for this time around. We have not really talked about how that review
transpires. It could be as simple as a discussion at a couple of Planning Commission meetings
that are public meetings but we haven’t gotten that far.
Mr. Reaves stated that he is just trying to understand how they may be able to facilitate this.
When we have a project that is affecting a common interest in the community, is it possible that
we can have the notice to go out to more than just a residential property that is within 250 feet of
the project? Sometimes projects affect the entire community and not just one home in the
community. That may be a little bit off topic but if we can try to understand how to incorporate
something like that. Responding to Mr. Reaves, Mrs. Melson-Williams stated that the public
notice requirement for applications that must appear before this body, our Historic District
Commission and the Board of Adjustment Committee by Code, have that 200 feet distance and
then direct mailing. The other ways of public notice are the legal ads in the public newspaper and
then for both the Planning Commission and the Historic District Commission, the physical
posting of the property which is the bright yellow sign. That was added to our Code a number of
years ago to cover that broader community because you are always going to be just a foot away
from somebody else in doing a mailed notice. If it is something of concern, it would be
something that Staff would look at. She knows in the past, there have been ideas of making it
bigger than 200 feet. That is fairly consistent in most jurisdictions. The problem is that 200 feet
in some areas gets you to a list that is very short but in other areas like Downtown, you could
have ones that have over 50-100 properties within that distance. It is somewhat of a balancing act
when it comes to that public notice. They can certainly note that as anything process-wise that
they may need to look into to see what our options are.
These were all information presentations to the Commission. Your agenda does include an
opportunity for Planning Commissioner comments if there is anyone who had additional
17
19
Page 20
CITY OF DOVER PLANNING COMMISSION JUNE 16, 2025
Item 1.
comments, questions, or concerns.
Mrs. Denney stated that she thought this was a great workshop, especially the stuff from the
State Planning Office. It was very informative. She has a position both with the City and also
with the County and she often refers to what the Office of State Planning thinks. She thinks it is
very helpful.
Dr. Jones stated that she would like to thank Mrs. Melson-Williams and the State Planning
Office because she too has probably mentioned the workshops in the past and the lunch hour
workshops that we used to have. This has been very informative.
Mr. Witham stated thank you to all of the presenters tonight. It is important for us to hear these
reports. It helps us in terms of performing our public duty and it is certainly very informative for
the public. He thanks the Planning Commission for their hard work in making this possible for
us.
Meeting adjourned at 8:56 PM.
Sincerely,
Kristen Mullaney
Secretary
18
20
Page 22
Item 2.
IMPORTANT THINGS TO KNOW!
Silver Lake adds to Dover’s historical and natural charm. As property owners near this local treasure, knowing and
understanding the rules that govern the lake will ensure everyone’s safety and the lake’s continued protection!
WHAT CAN I DO TO MY PROPERTY/DOCK WHILE THE DAM VALVE IS OPEN?
IF YOU WANT TO REPAIR OR CHANGE YOUR DOCK AND/OR SHORELINE STABILIZATION:
First, if you want to make any repairs or changes to any docks, shoreline stabilization structures, or any
other structures that are usually below or near the regular water level line, then you will need to obtain a
permit from the Delaware Department of Natural Resources and Environmental Control’s Wetlands and
Waterways Section before any work is initiated. To contact DNREC’s Wetlands and Waterways Section
please call 302-739-9943 or visit:
https://dnrec.delaware.gov/water/wetlands/
IF YOU WANT TO REMOVE DEAD OR FALLEN TREES:
You will also want to speak with someone from DNREC’s Wetlands and Waterways
Section if you would like to remove any fallen trees or tree limbs that are on or near
the shoreline. To contact DNREC’s Wetlands and Waterways Section please call
302-739-9943 or visit
https://dnrec.delaware.gov/water/wetlands/
IF YOU WANT TO REMOVE WEEDS OR OTHER GRASSES:
Make sure what you are removing is actually a weed!! Some native plants and grasses may look “weedy”
but are actually beneficial to the lake and local wildlife. Having native grasses and plants on your property
will actually help you keep the REAL weeds off your property.
IF YOU WANT TO REMOVE LITTER AND TRASH:
Please feel free to remove any litter, trash, garbage, or any other refuse that has no business being in a lake!
Examples are: glass bottles, anything made of plastic (such as bags and bottles), paper litter, and old tires.
Just make sure to properly dispose or recycle the refuse.
WHY DO I NEED A PERMIT TO REPAIR OR REMOVE SOMETHING THAT IS ON MY PROPERTY?
The State of Delaware protects certain areas that are critical natural resources and habitats, such as rivers, lakes, and
wetlands; Silver Lake is one of those protected places. The Lake is a place where many wildlife species (such as
birds, fish, reptiles, and amphibians) can nest and feed. Therefore, any changes in Silver Lake can cause
disturbances to wildlife habitats and water quality. For example, that old rotting tree that fell over 5 years ago may
be home to fish and provide your property with erosion protection!
The DNREC Wetlands and Waterways Section authorizes activities in Delaware’s tidal wetlands, bays, rivers,
streams, lakes, ponds and other waterways. Types of activities that could require permits include constructing,
repairing, or changing docks and/or placing objects in or near the water to stabilize the shoreline. Please contact
the Wetlands and Waterways Section before you perform any modifications to your property.
STILL HAVE QUESTIONS?
Contact Andy Howard, Division of Watershed Stewardship at 302-739-9939 or by email at
Andrew.Howard@delaware.gov.
22
Page 24
Item 3.
City of Dover
DATA SHEET FOR SITE DEVELOPMENT PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF July 9, 2025
PLANNING COMMISSION MEETING of July 21, 2025
Plan Title: Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane, S-25-10
Associated Plan: Flex Use Facilities Commercial Warehouse (Business Park), S-24-13
Plan Type: Site Development Plan
Location: North side of Lafferty Lane approximately one quarter mile west of
Horsepond Road
Address: 350 Lafferty Lane
Tax Parcel: ED-05-077.16-02-05.00-000
Owner: Dover Industrial, LLC.
Site Area: Phase 1 11.1 +/- acres
Phase 2 8.65 +/- acres
Total ~19.74 acres +/-
Zoning: M (Manufacturing Zone)
AEOZ (Airport Environs Overlay Zone): Accident Potential Zones I & II
Noise Zone A (Area of 225 SF)
Current Use: Phase 1: Flex Warehouse Building under construction and Vacant Land
(Agricultural Land and Woodland)
Proposed Use: Flex Warehouses (total of 232,000 SF)
Phase 1 Building A: 54,000 SF
Phase 2 Building B: 45,000 Sf
Building C: 133,000 SF
Parking: Overall Required: 290 Overall Proposed: 290
Phase 1 Under Construction: 93 parking spaces
Phase 2 Proposed: 197 parking spaces
Water and Sewer: City of Dover
For Consideration: Performance Standards Review Application
Tree Mitigation Plan
P. O. Box 475 Dover, DE 19903 24
Community Excellence Through Quality Service
Page 25
City of Item 3.
Dover
CITY OF DOVER Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: July 9, 2025
APPLICATION: Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane
FILE #: S-25-10 REVIEWING AGENCY: City of Dover Planning Office
CONTACT PERSON: Dawn Melson-Williams, AICP PHONE #: 302.736.7196
I. PLAN SUMMARY
This is a Site Development Plan for the Phase 2 construction of Dover Industrial with two
Warehouse Buildings: Building B of 45,000 SF and Building C of 133,000 SF (totalizing 178,00
SF for Phase 2 with Site Improvements. Phase 1 of the project consists of Multi-Tenant Flex
Warehouse Building A of 54,00 SF. The property is zoned M (Manufacturing Zone) and is
subject to the AEOZ (Airport Environs Overlay Zone): Accident Potential Zones I & II. The
property consists of 19.74 acres. The property is located on the north side of Lafferty Lane
approximately one quarter mile west of Horsepond Road. The owner of record is Dover
Industrial, LLC. Property Address: 350 Lafferty Lane. Tax Parcel Number: ED-05-077.16-02-
05.00-000. Council District 2.
Preliminary Land Use Services Review (PLUS)
An application (PLUS Review #2024-08-0) related to this project was reviewed by the State’s
Preliminary Land Use Services, as required by the City of Dover’s Memorandum of
Understanding (MOU). It was reviewed by the State at the meeting on August 28, 2024. This
MOU requires that non-residential developments of over 75,000 square feet complete the PLUS
Review process prior to application submission. The PLUS Review comments were issued in
2024; the applicant must provide a copy of the written response.
II. PROJECT DESCRIPTION
The Site Development Plan proposes the construction of two Warehouse Buildings: Building B
of 45,000 SF and Building C of 133,000 SF (totalizing 178,00 SF for Phase 2 with Site
Improvements. Phase 1 of the project consists of Multi-Tenant Flex Warehouse Building A of
54,000 SF that was approved under Site Plan Application S-24-13 Flex Use Facilities
Commercial Warehouse; see previous applications description.
The Phase 2 project area with two warehouses buildings located to the north of Phase 1 include a
series of truck dock bays on one side of each building. A parking lot is proposed between
Building B and Building C. The northern portion and northwest portion of the property include
areas of woodlands with wetlands. And the eastern portion of the site focuses on stormwater
management areas with the expansion of the existing stormwater pond. The site will be subject to a
Performance Standards Review Application to ensure the proposed uses comply with Zoning Regulations.
25
Page 26
Item 3.
S-25-10 Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane, Dover DE
DAC Report of July 9, 2025
Page 3 of 12
Previous Applications:
In March 2022, the original tract of land property appeared before the Planning Commission for
a Site Development Plan and Subdivision. The result was the 22.86-acre property divided into a
2.99 +/- parcel (Lot 2) and a 19.74 +/-acre parcel (Lot 1) that is the subject of this application.
The smaller parcel was developed into a warehouse and distribution center for Frito Lay
(Application S-22-02).
For the subject site at 350 Lafferty Lane, Phase 1 was considered with Site Development Plan S-
24-13 Flex Use Facilities Commercial Warehouse (Business Park) at 350 Lafferty Lane. While
Plan originally proposed the construction of a 54,000 SF Flex Warehouse, a 42,000 SF Flex
Warehouse, and a 123,750 SF Flex Warehouse (a total of 219,750 SF) with site improvements in
a Phased Development Plan, it was refined to just focus on Phase 1 for Building A of 54,000 SF.
The Planning Commission granted conditional approval in September 2024 and Final Plan
approval in Spring 2025. The site and building construction for Phase 1 has commenced.
Surrounding Land Uses
The surrounding properties are primarily in the M (Manufacturing Zone) except for two small
properties to the immediate west that contain two houses in the R-10 (One Family Residence
Zone). To the east is the Frito Lay Distribution Center at 300 Lafferty Lane and then the George
& Lynch Administration Building and Contractors Yard. To the north is the right-of-way for
State Route 1 and the Puncheon Run Connector on-ramp to State Route 1. To the west is other
land owned by the State of Delaware which contains a stormwater management facility.
III. ZONING REVIEW
M (Manufacturing Zone)
This property is zoned as M (Manufacturing Zone) and is described in Zoning Ordinance, Article
3, Section 19. The M (Manufacturing Zone) Zoning District in the City of Dover permits the
following: Manufacturing, assembling, converting, altering, finishing, cleaning, cooking, baking
or any other type of manufacturing or industrial processing of any goods, materials, products,
instruments, appliances and devices, provided that the fuel used shall be oil, gas or electricity;
Research, design and development laboratories; Wholesale storage and warehousing,
transshipment and distribution, logistics support; Building contractors' yards; Public utilities
uses; Ministorage facilities, subject to regulations; Railroad yards, sidings, and storage facilities;
and Marijuana cultivation facilities, marijuana manufacturing facilities, and marijuana testing
facilities, subject to requirements outlined in Article 5, Section 24. – Marijuana Related
Businesses. There are a number of Accessory uses and Conditional Uses in the M zone, which
require approval by the Planning Commission.
Additionally in the M zone, there are uses that at specifically prohibited; see the code excerpt
below.
Article 3 Section 19
19.2 Uses prohibited. The following uses are specifically prohibited:
19.21 Residences.
19.22 Manufacturing uses involving primary production of the following products from raw
materials: asphalt, cement, charcoal, and fuel briquettes; chemicals: aniline dyes,
ammonia, carbide, caustic soda, cellulose, chlorine, carbon black and bone black,
creosote, hydrogen and oxygen, industrial alcohol, nitrates (manufactured and natural) of
an explosive nature, potash, plastic materials and synthetic resins, pyroxylin, rayon yarn,
and hydrochloric, nitric, phosphoric, picric, and sulphuric acids; coal, coke and tar
26
Page 27
Item 3.
S-25-10 Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane, Dover DE
DAC Report of July 9, 2025
Page 4 of 12
products, including gas manufacturing; explosives; fertilizers; gelatin, glue and size
(animal); linoleum and oil cloth; matches; paint, varnishes and turpentine; rubber (natural
and synthetic); soaps, including fat rendering; [and] starch.
19.23 The following processes: nitrating of cotton or other materials; milling or processing of
flour, food, or grain; magnesium foundry; reduction, refining, smelting, and alloying of
metal or metal ores; refining secondary aluminum; refining petroleum products, such as
gasoline, kerosene, naphtha, [and] lubricating oil; distillation of wood or bones; [and]
reduction and processing of wood pulp and fiber, including papermill operations.
19.24 Operations involving stock yards and slaughter houses, grain elevators, and slag piles.
19.25 Storage of explosives and bulk or wholesale storage of gasoline above the ground.
19.26 Dumps, except those owned and operated by the city.
19.27 Quarries, stone crushers, screening plants, and storage of quarry screenings,
accessory to such uses.
19.28 Junkyards, automobile dismantling plants or storage of used parts of automobiles or
other machines or vehicles or of dismantled or junked automobiles.
Bulk Standards for the M (Manufacturing Zone) are outlined in Zoning Ordinance, Article 4
Section 4.16. The maximum lot coverage for this zone is 85% and the height limit is 60 feet. The
proposed impervious lot coverage for the total project is estimated at 56%.
Airport Environs Overlay Zone (AEOZ)
This property is also subject to the requirements of the Airport Environs Overlay Zone (AEOZ)
as outlined in Zoning Ordinance Article 3 § 22. This property is within Accident Potential Zones
I & II (APZ I and APZ II) of the AEOZ. The Accident Potential Zones I & II allows for most
uses permitted within the M (Manufacturing Zone) zoning district and calls for an interior noise
level reduction of thirty (30) decibels. APZ I & II also prohibit structures from exceeding sixty
(60) feet in height. Additionally, items that could generate smoke or light (such as solar panels)
are not allowed. The list of prohibited uses in the APZ are found in Zoning Ordinance, Article 3
Section 22.8:
Article 3 Section 22
22.8 Prohibited uses. In addition to uses prohibited by subsection 22.6, land use compatibility
table, the following activities are prohibited within the CZ, APZ I and APZ II zones of the AEOZ,
including, but not limited to:
(a) Storage of explosives;
(b) Hazardous or toxic materials/waste;
(c) Aboveground transmission lines;
(d) Uses that release into the air any substance which would impair visibility or
otherwise interfere with the operation of aircraft (dust, smoke, etc.);
(e) Uses that produce light emission, direct or indirect, which would interfere with pilot
vision;
(f) And uses that attract birds or water fowl, such as, but not limited to, landfills,
wastewater treatment facilities, and associated settling ponds, artificial marshes,
dredge spoil materials, sand and gravel dredging operations and open fish farming.
It is noted that the proposed development parcel has roughly 225 SF on the southeast corner
within Noise Zone A (65dB-69dB) of the AEOZ. This area is shown to the side of the
stormwater management area with no proposed buildings
27
Page 28
Item 3.
S-25-10 Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane, Dover DE
DAC Report of July 9, 2025
Page 5 of 12
As each specific tenant is identified, the use must be reviewed through a Permit Review process
for compliance with the M Zone and the AEOZ. The proposed land use for each building (and
tenants within each building) must comply with the permitted uses of the M (Manufacturing
Zone) (Zoning Ordinance Article 3 § 19) and the Land Use Compatibility Table of the AEOZ
(Zoning Ordinance, Article 3 § 22.6).
The Dover Air Force Base has provided additional information in their agency comments
relating to FAA Bird Mitigation for properties in the flight path for the Air Base, population
density suggestions in the APZ I & II zones, as well as submission to DelDOT for the State
Office of Aeronautics requirements. Please see comments in the attachments from the Dover Air
Force Base for details.
IV. PARKING SUMMARY
The parking requirement in the M zoning district is one space per 800 S.F. of floor area or one
space per employee of the largest shift. The floor area of 232,000 S.F. for the total facility would
require a minimum of 290 parking spaces. The plan shows two parking lot areas to serve all three
buildings resulting in a total of 290 parking spaces including handicapped parking spaces.
Loading Berths
Article 6, Section 4.27 of the Zoning Ordinance states that for manufacturing, wholesale, or
storage uses in the M zone, the project must provide sufficient off-street loading berths. Loading
berth minimum size requirement is 12 feet by 60 feet. The plan shows an overall loading dock
area on one side of each Building B and C but does not mark individual spaces. No interior walls
are shown, but there is potential for separating tenant spaces. From Planning Staff review it
appears the project provides enough loading spaces, but they may want to look at options for
parking of trucks awaiting unloading opportunities or resting space.
Bicycle Parking
The site is required to provide bicycle parking. The bicycle parking calculation is one for every
twenty parking spaces. Based on the number of parking spaces, fifteen (15) bicycle parking
spaces are required. The Plan shows a bicycle rack at each building consisting of five spaces
each.
V. BUILDING ARCHITECTURE
The Dover Industrial facility Buildings B and C are buildings with a tall one-story section as
warehousing for multiple tenants. The representative architectural renderings show a low-pitched
roof warehouse with front doors to tenant spaces as certain points of the front façade and with
overhead garage doors on the rear of the building. The roof is also a metal system. The entry
points include a vertical wall feature and storefront door and window systems with a canopy
/awning element. The entry points on the architectural elevations do not seem to match the site
plan. These building elevations appear similar to the Building A in Phase 1. The applicant has
indicated that the architectural renderings are the general concept proposed for the construction
of Buildings B and C.
The facility must comply with the maximum height limitations of the M and AEOZ zoning
districts. For these zoning districts, the maximum height is limited to 60 feet. From the building
elevation submitted, the example building is estimated to be 24 feet in heigh (based on the scale
given on the drawing); this must be confirmed for each building.
28
Page 29
Item 3.
S-25-10 Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane, Dover DE
DAC Report of July 9, 2025
Page 6 of 12
VI. SITE CONSIDERATIONS
Access
The access to this property is through the adjacent property at 300 Lafferty Lane. Lafferty Lane
is a state-maintained road. The DelDOT DAC Report Comments from S-22-02 noted planning
for the opportunity to access the residual lot (350 Lafferty Lane) through the entrance at 300
Lafferty Lane. The development of this parcel which began with Phase 1 confirmed that the
entrance as constructed is adequate to serve the build out of both parcels. The Entrance is the
subject of DelDOT Entrance Permit KC-0004-25CN issued March 19, 2025.
Sidewalks
A sidewalk is proposed to be constructed along Lafferty Lane as part of Phase 1. In addition,
sidewalks are shown connecting from the street frontage sidewalk into the site to Building A and
for pedestrian access from parking areas to building entrances. Additionally, there are 5-foot
sidewalks along the front side of each building and connections to each building through the
landscaped parking islands between Building B and Building C. The sidewalk connection from
Building A to Building B must be clarified.
Dumpsters
The new dumpster regulations adopted in 2024 for non-residential buildings require two (2)
dumpsters per property. Two Dumpster units are planned for each building. The Plan show
Dumpster enclosures for multiple units in several location: Dumpster (set of 4 units) at the west
of end of Buildings A and B and a set of two units to the north of Building C.
Lighting
The lighting internal to the site is shown with the placement of wall mounted units on all sides of
each building to illuminate the parking lots and the loading areas.
Curbing
The Zoning Ordinance, Article 6 §3.6(b) requires upright curbing for all parking areas and access
drives. The plan appears to only show minor curb breaks associated with catch basin placements.
The City Planner finds this acceptable as they are related to drainage related to stormwater
management.
VII. TREE PLANTING AND LANDSCAPE PLAN
Zoning Ordinance, Article 5 Section 16.5 outlines the woodland preservation requirements. Only
a maximum of 50% of the existing woodland on the parcel may be cleared for development. The
overall site includes 316,353 SF of woodland. For the project, a total of 156,789 SF of woodland
is proposed for removal. A total of 159,564 SF of woodland will be preserved; this just complies
with the woodland clearing limitation.
The tree planting requirement of the Zoning Ordinance is based on the development area with
one (1) tree required per 3000 SF of development area. The Development Area is the remaining
non-woodland area of the property consisting of 707,074 SF. A total of 234 trees are required.
Some trees were planned to be planted with Phase 1 of the project; its Landscape Plan identified
a planting of 33 trees. The Landscape Plan shows a concept for planting 27 trees in Phase 2 for a
total of 60 trees on the property. The applicant is seeking the use of a Tree Mitigation Plan for
the balance of the required trees; the property is deficient of 174 trees.
29
Page 30
Item 3.
S-25-10 Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane, Dover DE
DAC Report of July 9, 2025
Page 7 of 12
Tree Mitigation Plan
A Tree Mitigation Plan must be provided for consideration by the Planning Commission at a rate
of 1 tree per 1 deficit tree as per Article 5, Section 16 of the Zoning Ordinance; see below. The
Narrative Letter for the project submitted states they are seeking a waiver for the number of trees
not provided on-site to work with the City of Dover for plantings of the remaining 174 trees; a
formal agreement with the City is still pending.
Article 5 Section 16
16.9 Tree mitigation.
16.91 Planning commission waiver. The planning commission may waive the provisions of
subsections 16.52, 16.53, and 16.62, and require replacement planting for mitigation
purposes should the planning commission determine, after demonstration by the
applicant, that due to physical limitations of the land which would otherwise prohibit the
reasonable use of the land, or for purposes of preserving, protecting and promoting the
interest of public health, safety, welfare and/or public convenience. All tree mitigation
plantings must occur within the corporate limits of the City of Dover. Tree mitigation may
occur off-site in accordance with the provisions listed below in this ordinance:
(a) If a waiver is sought from the provisions of subsection 16.62, new tree plantings
are required at a rate of 1:1. All new tree plantings shall meet the minimum size at
planting requirements of the City of Dover table of trees.
(b) If a waiver is sought from the provisions of subsection 16.52 and/or subsection
16.53, then mitigation must be in the form of newly created woodland areas. New
woodlands shall be created at a rate of 1.25 times the amount of woodlands to be
removed. A woodland mitigation plan shall be prepared by a licensed forester,
landscape architect, or certified nursery professional, for the consideration of the
planning commission.
(c) All tree mitigation must occur on-site unless an off-site location is specifically
approved by the planning commission. When considering off-site locations for tree
mitigation, the commission shall consider:
1) A physical hardship related to the land which would otherwise prohibit
compliance on the subject site;
2) Whether the mitigation plan proposed by the applicant is superior in terms of
environmental benefits, tree quantity, or aesthetic qualities compared to strict
compliance with the ordinance on-site.
Opaque Barrier Requirement
Zoning Ordinance, Article 5 Section 7 requires an opaque barrier between non-residential and
residential uses. This situation occurs along a portion of the west property line within the Phase I
area. The opaque barrier must consist of an opaque fence, wall, or berm (barrier component) and
a landscaping component. In the southwest corner of the property, the Plan shows the location of
the fence and a series of four tree plantings along the shared property line with the adjacent
residential property. It appears to rely on existing vegetation. More information is needed to
confirm the type of existing vegetation and if it satisfies the continuous evergreen planted screen
or hedge with evergreen trees.
Wetland Areas/ Waterbodies
The Zoning Ordinance, Article 5 §11.22 prescribes provisions related to wetland areas. There are
setback requirements from wetland areas that are over 0.25 acres in size. From these wetland
areas, a 100-foot setback is required; however, this can be reduced to 50 feet with
implementation of a Riparian Buffer or reduced to 30 feet with bank stabilization. The project
site layout reduces the buffer to 30 feet and in these areas the existing vegetation appears to be
30
Page 31
Item 3.
S-25-10 Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane, Dover DE
DAC Report of July 9, 2025
Page 8 of 12
maintained. The augmentation of the Riparian Buffer and bank stabilization practice should be
identified for the wetlands area along the west property line.
VIII. PERFORMANCE STANDARDS REVIEW
Uses in the M (Manufacturing Zone) are subject to the performance standards summarized in
Zoning Ordinance, Article 5 §8.1 and as more specifically outlined in Article 5 §8.5.
Article 5 §8.1 Dangerous and objectionable elements. No land or building in any zone shall
be used or occupied in any manner so as to cause any one or more of the following
conditions to exist and to be dangerous, injurious, noxious or offensive beyond the
boundaries of such premises in such a manner or in such amount as to adversely affect the
reasonable use of the surrounding area or adjoining premises: Fire, explosive or other
hazard; noise, or vibration; smoke, dust, odor or other form of air pollution; heat, cold,
dampness or electromagnetic disturbance; glare, liquid or solid refuse or waste; traffic
congestion causing roadways or intersections in the surrounding highway network to fall
below acceptable levels of comfort and convenience; or other substance, condition or
element (referred to hereinafter as "dangerous or objectionable elements"), provided that any
use permitted or not expressly prohibited by this ordinance may be undertaken and
maintained if it conforms to the regulations of this section limiting dangerous and
objectionable elements at the point of the determination of their existence.
The project’s compliance with a series of performance standards for the “dangerous and
objectionable elements” are to be considered by the Planning Commission. The “dangerous and
objectionable elements” are as follows:
• Fire and explosion hazards (activities with and storage of)
• Radioactivity or electromagnetic disturbance
• Noise (sound pressure level)
• Vibration
• Smoke
• Odors (Odorous gases or odorous matter)
• Fly ash, dust, fumes, vapors, gases, and other forms of air pollution
• Glare (from lighting or high temperature processes)
• Liquid or solid wastes
• Traffic congestion (Level of Service E)
The project cannot cause the above conditions to exist so that they adversely affect the
surrounding areas or adjoining properties. The specific limits of each performance standard are
described in the Zoning Ordinance. Where the performance standards conflict with regulations
established by other state or local agencies such as the Delaware Department of Natural
Resources and Environmental Control (DNREC), the more restrictive regulations apply.
As part of this procedure, a Performance Standard Review Application is required to accompany
this Plan submission for review and approval. The Applicant submitted a Letter describing the
project and indicating how the proposed construction activities would restrict the emission of
dangerous and objectionable elements detailed in Article 5, Section 8.5. A description of how the
development’s buildings and uses intend to comply with these provisions must be submitted.
31
Page 32
Item 3.
S-25-10 Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane, Dover DE
DAC Report of July 9, 2025
Page 9 of 12
VIII. CITY AND STATE CODE REQUIREMENTS:
The subject proposal has been reviewed for code compliance, plan conformity, and completeness
in accordance with the agency’s authority and area of expertise. The following items have been
identified as elements which need to be addressed by the applicant:
1) Review and Approval of the Performance Standards Review Application is required for the
property development in accordance with Zoning Ordinance, Article 5 §8. The applicant
submitted a Performance Standard Review Application Letter indicating how the proposed
construction activities would restrict the emission of dangerous and objectionable elements
detailed in Zoning Ordinance, Article 5, Section 8.5. Additional information should be
submitted on how the development’s building and uses will also comply with these
provisions.
2) The project needs to submit a copy of the applicant’s PLUS Review response to the PLUS
comments issued previously. The Planning Office does not appear to have this document on
file. Please submit this document.
3) Upright curbing must be provided around all parking areas and circulation drives unless a
waiver is granted by the City Planner. The City Planner is accepting the small breaks in the
curb line as related to stormwater catch basins.
4) Sheet G110 – Cover Sheet:
a) Site Data Column:
i) List total lot coverage in square feet and as a percentage.
ii) List Floor Area Ratio (FAR) of project.
iii) List proposed building heights.
iv) Update contact phone number for the Kent Conservation District.
v) For the Agreement include and references if these agreements are recorded.
vi) Add reference to source of wetlands information.
b) Add note that all building uses and tenant uses must comply with the provisions of the M
(Manufacturing Zone) and AEOZ (airport Environs Overlay Zone).
c) Add note to reference the Site Plan for Phase 1 as approved with S-24-13.
d) List action taken on the Waiver Requests.
5) Sheet C101 – Existing Conditions Plan:
a) Clarify is the Permanent Easement (PE) along Lafferty Lane is changing location. If so,
then a Record Plan Sheet for recording must be added to the plan.
b) Use darker linework to depict the building and site improvements of Phase 1.
6) Sheet C102 – Phasing Key Plan and other Site Plan Sheets:
a) In Phase tabulations table, add percentage calculations for woodland
clearing/preservation and total lot coverage.
b) Show line of the AEOZ boundary.
c) Add location of handicapped parking signage.
d) Identify roof drainage system and its connections to the onsite stormwater management
system.
e) Identify connecting sidewalk between Building A and Building B so that there is a
pedestrian route from the street frontage sidewalk into the site to reach all buildings.
32
Page 33
Item 3.
S-25-10 Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane, Dover DE
DAC Report of July 9, 2025
Page 10 of 12
f) Clarify that the parking lot and drive aisles include upright curbing.
g) Ensure accessible ramps are provided from handicapped spaces onto sidewalk system and
at intersection with the parking lot.
7) Sheets L101 and L102 Landscape Plans:
a) The project must comply with the tree planting requirements based on the development
area. A Tree Mitigation Plan request has been submitted for the trees required and not
provided. Any agreements and notes on the conditions of the Tree Mitigation Plan will
need to be added to the plan.
b) Landscape Plans must be certified by a Design Professional as per Article 5 Section 16 of
the Zoning Ordinance.
c) Provide Details on how you will establish the Riparian Buffer and Bank Stabilizations
associated with the western Weland Areas must be provided. It is not clear where the
Wetland planting mix is being utilized.
d) Opaque Barrier: More information is needed to confirm compliance of the Opaque
Barrier in the Phase 1 area and the type of existing vegetation and if it satisfies the
continuous evergreen planted screen or hedge with evergreen trees.
e) Phase 2 Plantings: The 4 PC trees on the drawing are not in the Plat list chart. Update and
update planting tallies.
8) The Opaque Barrier must also include the required landscape component. Provide
information on the existing vegetation in the area of the opaque barrier fence as only four
evergreen tree plantings are shown at the south end of this area.
9) Clarify the proposed building height and which building the architectural elevations are
intended to represent.
10) The Site Plan set will need to be updated with any changes recommended or approvals
including information on any waivers granted by the Planning Commission.
11) Details: When the Check Print Plan/Final Plans are submitted, the details for curbing,
dumpster enclosure, bike rack, curbing, and other site elements must be included.
12) Consideration should be given to addressing the multiple buildings on this site to more
clearly identify each building by an address number (then suite numbers). This can be
proposed in coordination with the City’s Tax Office and GIS Section.
13) Any Sediment & Stormwater Management Plans granted approval by the Kent Conservation
District must reflect the Site Plan layout and design conditionally approved by the Planning
Commission for this Phase 2 and be in compliance with the Zoning Ordinance and technical
review requirements of other agencies.
IX. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET
CODE OBJECTIVES:
In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in
considering and acting upon Site Development Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the
public in general, and the residents of the immediate neighborhood in particular shall be taken
33
Page 34
Item 3.
S-25-10 Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane, Dover DE
DAC Report of July 9, 2025
Page 11 of 12
into consideration. These safeguards may to the maximum extent possible further the expressed
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed
in subsections 2.21 to 2.28.
1) Recommendation on Waiver Requests:
a. Tree Mitigation Plan: The Planning Staff notes that the project can be considered
for a Tree Mitigation Plan for the required tree plantings at off-site location. The
applicant has reached out to the City for tree planting locations. City Staff is
currently evaluating potential locations for plantings on City owned properties;
the applicant will have to enter into an agreement with the City regarding the
planting of these trees. However, it is concerning that the overall project will be
planting only 60 trees of the 234 required trees on their property. This results in
174 trees that must be planted elsewhere through a Tree Mitigation Plan. While
compliant with the limitations of woodland clearing, the loss of existing tree
canopy cover on the property with the clearing of existing woodland for
development is also noted. The applicant should consider project scope or project
design revisions to retain more woodland areas and/or to be able to plant more of
the required trees on their own property.
2) Consideration of Performance Standards Review Application: Planning Staff has
reviewed the Performance Standards Review Letter. Additional information about the
project uses is needed to confirm the project demonstrates the intent to comply with the
restrictions as provided in Zoning Ordinance, Article 5 Section 8.1 and 8.2.
3) Loading Spaces: From Planning Staff review, it appears the project provides enough
loading spaces, but they may want to look at options for parking of trucks awaiting
unloading opportunities or resting space.
Other agencies may recommend additional considerations to meet code objectives in accordance
with their areas of expertise. Action on all considerations identified in this section is at the
discretion of the Planning Commission.
ADVISORY COMMENTS TO THE APPLICANT:
1) The Planning Commission should act upon the request for waivers as part of any motion
regarding this project application, or as a separate motion as necessary. Note: All waivers
are at the discretion of the Planning Commission. The Commission may approve or deny
waiver requests.
2) In the event, that major changes and revisions to the Site Development Plan occur in the
finalization of the Plan contact the Planning Office. Examples include reorientation of
the complex/building, relocation of site components like stormwater management areas,
and increases in floor area count. These changes may require resubmittal for review by
the Development Advisory Committee, Planning Commission, or other agencies and
commissions making recommendations in regards to the plan.
3) Following Planning Commission approval of the Site Plan, the Plan must be revised to
meet all conditions of approval from the Development Advisory Committee or as
otherwise noted. A Check Print must be submitted for review by Planning Office Staff
34
Page 35
Item 3.
S-25-10 Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane, Dover DE
DAC Report of July 9, 2025
Page 12 of 12
and submitted directly to the other commenting agencies. Upon determination that the
Plan is complete and all agency approvals have been received, copies of the Plan may be
submitted for final endorsement (Final Plan Approval).
4) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
5) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate site inspections, Pre-Construction meeting and permits/licenses
are required.
6) Construction may have an effect on adjacent areas of the subject property and the shared
entrance access with the adjacent property. Any work requiring the closing or rerouting
of visitors to these areas should be coordinated as to offer the least amount of
inconvenience.
7) For building new construction, the requirements of the building code and the fire code
must be complied with. Consult with the Chief Building Inspector and City of Dover Fire
Marshal for these requirements. The resolution of these items may impact the site design
including such items as building dimensions and height, building openings, and fire
protection needs, etc.
8) The applicant shall be aware that Site Plan approval does not represent a Sign Permit, nor
does it convey permission to place any sign on the premises. Any proposed site or
building identification sign shall require a Sign Permit from the City of Dover prior to
placement of any such sign. It is recommended that the applicant discuss the sign
regulation requirements with the Planning Staff prior to applying for a Sign Permit.
9) The applicant shall be aware that Site Plan approval does not represent a Building Permit
and associated construction activity permits. A separate application process is required
for issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
35
Page 36
Item 3.
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JULY 2, 2024
APPLICATION: Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane
FILE #: S-25-10
REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater
CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services
CONTACT PHONE #: 302-736-7025
CONTACT EMAIL: jlyon@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
SANITATION
1. Every commercial customer shall provide such premises with a sufficient number of solid waste containers to provide adequate
capacity for the solid waste placed out for collection without overloading the capacity of the containers. The City of Dover shall
provide commercial customers with a maximum of two (2), 90-gallon trash containers and two (2), 90-gallong recycling
containers.
2. Trash collection site shall be oriented for side-loading pick-up if customer is utilizing City of Dover sanitation services.
3. Any commercial customer requiring more containers, or larger containers, than provided above, must utilize private service.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from
Kent Conservation District is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert
elevations must be labeled on all stormwater structures.
STREETS
1. Final site plan approval will not be granted until a letter of no objection, signed by DelDOT is submitted to our office.
2. Please add the following notes to the plans:
a. Standard City of Dover sidewalk, as per chapter 98, article IV of the Dover Code of Ordinances, shall be required to be
installed along the entire public street frontage of a property. Where frontage sidewalk exists but does not meet the
standards of chapter 98, article IV, the sidewalk shall be re-laid to meet the standards. Sidewalk shall include barrier-free
access ramping at points of intersection with street crossings and at other locations so as to afford reasonable barrier-free
pedestrian movement and site access.
b. In accordance to Appendix A, Article VI, Section B.3, all sidewalks shall ascend from the curbstone to the building line at the
ratio of one-quarter of an inch to the foot. Nothing in this section shall be construed to affect any pavement previously laid
by order of the city council, until it is taken up and relaid.
36
Page 37
Item 3.
Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane
File #: S-25-10
July 2, 2025
Page 2 of 4
WATER
1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010.
Please contact our office for more information.
2. The following notes must be added to the plans:
a. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the project.
b. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance
with the City of Dover Department of Water & Wastewater specifications and requirements.
c. The site contractor shall contact the City of Dover Department of Water & Wastewater Construction Manager at (302) 736-
7025 prior to the start of construction. A representative from the City of Dover Department of Water & Wastewater must
observe and approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted in the field
due to conditions of the existing main. Possible conditions that would require tapping relocation include proximity to pipe
joints, other taps, concrete encasements, conflict with other utilities, and the like. Test holes must be performed by the
contractor to determine the best tapping location. The City of Dover will not be held responsible for field conditions requiring
adjustment of the tapping location or for any work required by the contractor to make an appropriate and lawful connection.
3. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan. Please be advised that
effective May 1, 2022, water mains can now be constructed using DR 18 PVC.
4. Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine the size of
the domestic and irrigation (if applicable) water meter for the proposed buildings. These projections must be submitted prior to
approval so the meter size can be placed on the final site plan. The proposed water meters must be installed in a pit per City of
Dover requirements and manufacturer’s recommendations. Also, a dual check valve is required downstream of the meter.
5. The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be installed at the
tee to isolate combined fire and domestic water service to the building from the water loop. Typically, this valve is installed at
the tee or an acceptable distance from the building. A valve must be provided on the domestic water service, which must be
tapped off of the combined eight-inch (8”) fire/domestic service outside of the building. The domestic water tap and valve should
be as close to the building as possible. Typically, the domestic tap and valve are located within five feet (5’) to ten feet (10’) of
the building. A blow up detail of this layout is recommended.
6. Provide a construction detail for the proposed restraining system for the fire main located within the buildings. The Department
of Public Works will test and inspect all fire mains to a blind flange located inside the buildings. The blind flange with tap is used
for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must be restrained in the direction of
the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall be restrained with rods through the wall. A
pipe entering vertically through a slab shall be restrained through the floor to the ninety degree (90°) bend and thrust block. All
rods shall be a minimum of ¾” all thread. All pipes through walls and slabs must be Class 52 cement lined ductile iron pipe.
Confirm particulars to meet this requirement with mechanical designer.
7. Water services shall be either type K copper or SDR-9.
8. On October 24, 2022, City of Dover Council approved the new Cross Connection Control Program. This program requires certain
backflow prevention assemblies on water service connections to the city’s distribution system. Please provide a specific
description of the activities in each building.
9. All water infrastructure on the property will be owned and maintained by the property owner.
WASTEWATER
37
Page 38
Item 3.
Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane
File #: S-25-10
July 2, 2025
Page 3 of 4
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall discharge or cause
to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff, subsurface drainage,
uncontaminated noncontact cooling water or unpolluted industrial process waters to any sanitary sewer”, this shall include
condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as “…any system used for conveying rain water,
surface water, condensate, cooling water or similar liquid wastes, exclusive of sewage.” The contractor, developer, owner
and designers shall ensure during construction that no illegal discharges to the sanitary sewer system are created with the
site improvements.
3. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines. Rim and invert
elevations must be labeled on all sanitary structures.
4. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the right-of-way
and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty cast iron frame and
cover to prevent damage to the cleanout and lateral.
5. Sizing (flow) calculations must be submitted for all sanitary sewer mains showing that velocity and all other requirements are met.
6. The minimum size of all sanitary sewer laterals shall be six-inch (6”).
7. If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County ordinance
requirements, must be provided. A construction detail for the proposed grease trap, as well as the proposed location, must be
provided on the plan.
8. All wastewater infrastructure on the property will be owned and maintained by the property owner.
9. Depending on the effluent flow, the downstream pump station may need to be evaluated by the developer / engineer to verify
it can handle the additional flow.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This must
be included as a note on the plan.
2. No trees may be planted within ten feet (10’) of utility infrastructure.
3. No structure may be installed within ten feet (10’) of utility infrastructure, please depict all underground utilities and structures
on the utility plan sheet to confirm compliance.
4. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2018 (.dwg format).
b. Adobe Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
SANITATION / STORMWATER / STREETS / WATER / WASTEWATER / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
WATER
38
Page 39
Item 3.
Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane
File #: S-25-10
July 2, 2025
Page 4 of 4
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with extending and
providing service to the proposed development.
2. Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking Water for
review and approval. The owner/developer will be responsible for providing all completed forms and plan sets to the City of
Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the Office of Drinking Water until
review has been completed by our office.
3. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of Water &
Wastewater directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the site.
4. Water impact fees will be required to be paid prior to Certificate of Occupancy for this project.
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated with extending
and providing service and capacity to the proposed development.
2. Prior to plan approval, it may be required to submit the sanitary sewer system plans to the DNREC, Division of Water Resources,
Surface Water Discharges Section for review and approval. The owner/developer is responsible for providing all application fees,
completed forms and plan sets directly to DNREC.
3. Profiles of the sanitary sewer main must be provided with the construction plans. All water, sanitary sewer and storm sewer
crossings must be shown on the profiles.
4. Wastewater impact fees will be required to be paid prior to Certificate of Occupancy for this project.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be abandoned,
flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan
set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission Checklist,
which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
SANITATION / STORMWATER / STREETS
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE
P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
39
Page 40
Item 3.
CITY OF DOVER ELECTRIC
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JUL 02, 2025
APPLICATION: Dover Industrial Phase 2: Warehouse at 350 Lafferty Lane
FILE #: S-25-10
REVIEWING AGENCY: City of Dover Electric Department
CONTACT PERSON: Shawn Burgett, Engineering Services & System Ops Superintendent
CONTACT PHONE #: 302-674-7568
CONTACT EMAIL #: sburgett@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all existing underground electric, communications and water facilities.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric
Department. Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to
construction. Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
40
Page 41
Item 3.
Dover Industrial Phase 2: Warehouse at 350 Lafferty Lane
File #: S-25-10
Jul 02, 2025
Page 2 of 2
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months’ notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook
is now available on the website at the following link: https://evogov.s3.amazonaws.com/media/27/media/13108.pdf.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. Provide load sheets as soon as possible for proper sizing of transformers and creation of primary fee estimates.
Current load sheets can be found at the following link:
https://www.cityofdover.com/media/Electric%20Department/COD%20Electric%20Load%20Sheet.pdf.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON
AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
41
Page 42
C F
S-25-10 I IItem 3.
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 07/02/25 D S
O H
V A
E L
APPLICATION: Dover Industrial Phase 2 Warehouses at 350 Lafferty Ln
R
FILE #: S-25-10 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
josika@dover.de.us
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed occupancy classification is warehouse/storage.
2. Building Access shall be no further than 50 feet from a primary entrance.
Where buildings are provided with an automatic sprinkler system installed in accordance with
NFPA 13, access shall be no further than 100 feet from the primary entrance.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.4)
3. Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times
the width of the door(s) or for 10 feet, whichever is greater.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
4. Perimeter access shall be 50% and clearly shown on the plans.
Perimeter Access minimum width shall be10 feet for one-story buildings and 15 feet for buildings
of two or more stories, measured from the face of the building at grade with a maximum slope of
ten percent (10%). Plantings and utility services (includes condenser units, transformers, etc.)
shall be permitted within the perimeter access, and shall not interfere with emergency services
fire ground operations.
If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building
perimeter shall not be included in the calculation of Percent of Perimeter Access.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5)
Where parking is located between the building and perimeter access area, parking shall not be
located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior
wall for building of two or more stories.
5. Fire lanes shall cover 25% of the proposed building.
42
Page 43
Item 3.
Fire lanes are required to be 24 feet wide and run along the front of the building as determined by
the primary entrance(s). In cases where there is more than one primary entrance(s), each shall be
served by a fire lane even if this exceeds the percentage as required.
The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and
the closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one
or two stories in height; 40 feet if three or four stories in height, or 30 feet if over four stories in
height.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5)
6. Where parking is located between the building and the fire lane, parking shall not be located
closer than 15 feet to the exterior wall.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.4.1)
Where parking is located between the building and the perimeter access area, parking shall not be located
closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall for building of
two or more stories. 2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5.2
7. All Fire Lanes shall be marked as follows:
both the inner and outer edges of the fire lane shall be marked, where curbs are present, the top
and face of the curb shall be painted yellow, where no curbs are present, a four inch (4”) solid
yellow demarcation line shall mark the edge(s) of the fire lane.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
8. The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware
Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be
suitable for street surfaces
9. Fire lane signs shall be located as follows:
see Figure 5-16 – Approved Sign For Marking Fire Lanes, fire lane signs shall be spaced at 150
foot intervals maximum, all fire lane signs shall be located no less than six feet (6’) and no higher
than eight feet (8’) above the pavement, signs shall be placed at each end of the fire lane, and
signs shall face all oncoming traffic.
Where parking is not restricted roadway markings shall utilize the words "FIRE" and "LANE" in
lieu of fire lane signs and shall conform to the specifications of 7.6.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
10. Where overhangs, canopies, balconies, or any other building or site features must project over
any fire lane, an unobstructed vertical clearance of not less than 13’-6” above the fire lane shall be
provided and the portion of the building perimeter which contains overhangs, canopies,
balconies, or any other building features shall not apply towards the fire lane accessibility
requirements of Section 4.0, Table 5-1 in this chapter.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.8)
11. All access roadways shall be paved and be a minimum of 20 feet clear width for two-way traffic and 14 feet
clear width for one-way traffic. The paved width of access roadway shall be measured from edge of parking
spaces, or face of curb for vertical curb and back of curb for mountable curb, or edge of pavement if there is
no curbing.(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 5.2)
12. Multiple Access Roads shall be provided when a fire department access road (fire lane) is
determined by the Fire Marshal to be impaired by vehicle congestion, condition of terrain,
43
Page 44
Item 3.
climatic conditions, or other factors that could limit access such as placement of fire hose from
fire equipment.
13. Street width shall be in accordance with City of Dover Code of Ordinances, Appendix A, Article
VII, Section A. 13,
Residential areas
24 feet wide with no parking,
30 feet wide with parking on one side, or
36 feet wide with parking on both sides
Commercial areas
26 feet wide with no parking,
32 feet wide with parking on one side, or
38 feet wide with parking on both sides
Alley
12 feet wide
14. Any dead-end road more than 300 feet in length shall be provided with a turnaround or cul-de-
sac as outlined in the 2021 Delaware State Fire Prevention Regulations 705, chapter 5, 2.3.
15. Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in
reference to this process.
16. Gated Areas: Fire Department access shall be provided to the property through the use of a
system or device approved by the Fire Marshal. The system or device required shall be located in
an area accessible to the fire department and approved by the Fire Marshal. All gates shall be
either automatic or manual.
An automated system shall consist of one manual and one automated means to open the gate.
The owner or their representative shall meet with the Fire Marshal prior to submission to agree
on the system. A letter of agreement shall be created and signed by both parties. The letter shall
include a detailed description of both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their
representative shall meet with the Fire Marshal prior to submission to agree on the means to
open. A letter of agreement shall be created and signed by both parties. The letter shall include a
detailed description of the manual means to open.
To be considered accessible for fire department apparatus the actual clear openings shall be not
less than 14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate
shall be setback from the perpendicular street by at least 50 feet.
Please contact this office to discuss options available to comply with this requirement.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)
17. Fire hydrants shall be installed per the requirements of City of Dover Public Utilities
Water/Wastewater Handbook, NFPA requirements, and Delaware State Fire Prevention
Regulations. City Ordinance Sec 46-9 (f).
5.1.1 Hydrant spacing as shown in the Fire Flow Tables shall be used as a general rule. Hydrants
shall be located at the direction of the State Fire Marshal so as to minimize friction in fire hose.
All hydrant spacing shall be located along available roads or at the direction of the State Fire
Marshal. This measurement shall be calculated by way of accessible thoroughfare(s) from the
building to be protected to the hydrant and may not necessarily be a radius. 5.1.3 Additional
hydrants shall be provided when the State Fire Marshal deems it necessary based on the
44
Page 45
Item 3.
configuration of the site, building(s), exposures, construction, occupancy, and/or specific
hazard(s).
Fire Flow table 2, hydrant spacing shall be 800 feet on center for one and two family detached
dwellings, other residential, rowhouses and townhouses, assembly, health care, business,
education, storage, industrial, mercantile, and mini storage. (702, Chapter 6)
NFPA 1
18.5.2 detached one- and two-family dwellings, fire hydrants shall be provided for detached one-
and two-family dwellings in accordance with both of the following: 1. the maximum distance to a
fire hydrant from the closest point on the building shall not exceed 600 feet 2. the maximum
distance between fire hydrants shall not exceed 800 feet.
18.5.3 buildings other than detached one- and two-family dwellings, fire hydrants shall be
provided for buildings other than detached one- and two-family dwellings in accordance with
both of the following 1. The maximum distance to a fire hydrant from the closet point on the
building shall not exceed 400 feet 2. The maximum distance between fire hydrants shall not
exceed 500 feet
18. All fire hydrants shall be marked as prescribed within the appropriate section of this regulation
and as illustrated by the appropriate figures of this regulation.
All fire hydrants shall have minimum of four-inch (4") solid yellow demarcation lines to define
specific areas, where fire hydrants are located along a curb line with permitted parking, the area
between the fire hydrant and the street or fire lane shall be stenciled with four inch (4")
demarcation lines and the words "NO PARKING", demarcation lines shall be measured from the
center line of the fire hydrant and extend for a distance 15 feet on both sides.
Where fire hydrants are located in parking lots or other areas susceptible to blockage by parked
vehicles they shall be treated as follows: fire hydrants shall be protected in all directions for a
distance of seven feet (7') with barriers or curbing, Minimum four-inch (4") diameter steel
bollards filled with concrete and marked yellow shall be installed at the outermost corners of the
fire hydrant demarcation area. The minimum height of the bollard shall be 36 inches above the
finished grade of the adjacent surface, and the steamer connection of all fire hydrants shall be
positioned so as to be facing the edge of the street, or traffic lane.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2)
The owner is responsible if the hydrant is private.
19. Hydrant barrels shall be provided with reflective material, such as paint, durable for
highway/roadway markings or a reflective tape of a minimum of 2” in width around the barrel
under the top flange, hydrant bonnets shall be color coded based on the following criteria: class
AA 1500 GPM - painted light blue, class A 1,000 GPM -1499 GPM - painted green, class B 500 -
999 GPM - painted orange, class C 250 - 499 GPM - painted red, class D under 250 GPM -
painted black.
(2021 Delaware State Fire Prevention Regulations 703, Chapter 3. 4)
The owner is responsible if the hydrant is private.
20. Hydrants are to be Darling Co. B-62-B Breakaway https://american-usa.com/products/valves-and-
hydrants/fire-hydrants/5-1-4-american-darling-b-62-b-5
21. NFPA 72 compliant Fire Alarm System required per occupancy code requirements.
Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an
occupancy determined to be a place of assembly by the fire marshal and is capable of receiving an
45
Page 46
Item 3.
occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with
NFPA codes governing the installation of fire alarms and the National Electrical Code.
Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined
to be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50
percent of the assessed value of the building and is capable of receiving an occupant load 75
persons or greater or is being enlarged to receive an occupant load of 75 persons or greater, shall
be required to install a complete fire alarm system in accordance with NFPA codes governing the
installation of fire alarms and the National Electrical Code.
Public mode audible requirements. To ensure that audible public mode signals are clearly heard by
occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average
ambient sound level or five decibels (dB) above the maximum sound level having a duration of at
least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area
required to be served by the system using the A-weighted scale dBA. In the event the stated
requirement cannot be met a shunt trip relay/switches shall be the approved method of meeting
the intent of this section of the Code.
(City Code of Ordinances 46-171)
22. Sprinkler system required. System is to be monitored by an approved Fire Alarm System.
This chapter shall apply to all buildings, structures, marine vessels, premises, and
conditions which are modified by more than 50% after the effective date of these
Regulations. The 50% figure shall be calculated utilizing the gross square footage of the
building, structure, marine vessel, premises and conditions as to arrive at the correct
application.
Any proposal that is presented to the Office of the State Fire Marshal for review and
approval for a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of
the gross square footage of a non-sprinklered building, may not have another such project for the
same building submitted for review and approval any sooner than three (3) years after the date of
the final inspection unless sprinkler projection is provided throughout the entire building.
In all buildings exceeding 10,000 square feet of aggregate, gross floor area.
In all buildings in excess of 40 feet in height or more than four (4) stories in height.
In all buildings or areas thereof used for the storage, fabricating, assembling,
manufacturing, processing, display or sale of combustible goods, wares, merchandise, products,
or materials when more than two (2) stories or 25 feet in height.
In all basement areas exceeding 2,500 square feet floor area.
In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and
exceeding two (2) stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or
Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment
buildings storage areas except individual unit closets that are located within individual
residential living units.
In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA
101, as adopted and/or modified by these Regulations. In all buildings or areas classified as "high
hazard" under the Life Safety Code, NFPA 101, or "extra hazard" under the Standard for the
Installation of Sprinkler Systems, NFPA 13, as adopted and/or modified by these Regulations.
All buildings used as dormitories, in whole or in part, to house students at a public or
private school or public or private institution of higher education. (16 Del.C. Ch. 88) This applies
to all such dormitories regardless if new or existing.
(2015 State of Delaware fire Prevention Regulations, 702, Chapter 4)
Places of assembly shall be sprinklered throughout in accordance with the most recently
adopted edition of NFPA 13 when the following apply:
46
Page 47
Item 3.
All new indoor places of assembly with an occupant load of 150 persons or greater.
Any interior renovations of 50 percent or more to an existing place of assembly with an
occupant load greater than 150 persons.
Any additions or increase in interior size to an existing place of assembly that would
create an occupant load of 150 persons or greater.
Places of assembly where alcohol is served for consumption on the premises shall be
sprinklered throughout in accordance with the most recently adopted edition of NFPA 13
when the following apply:
All new indoor places of assembly with an occupant load of 100 persons or greater and
where alcohol will be served for consumption on the premises.
Any interior renovation of 50 percent or more to an existing place of assembly with an
occupant load greater than 100 persons and where alcohol will be served for consumption
on the premises.
Any additions or increase in interior size to an existing place of assembly which would
create an occupant load of 100 persons or greater and where alcohol will be served for
consumption on the premises.
New educational occupancies of 5,000 square feet or greater shall be sprinklered
throughout in accordance with the most recently adopted edition of NFPA 13.
(City of Dover Code of Ordinances 46-162)
NFPA 101, 12.3.5.1 The following assembly occupancies shall be protected throughout by
an approved, supervised automatic sprinkler system in accordance with 9.7.1.1(1): 1.
Dance Halls 2. Discotheques 3. Nightclubs 4. Bars 5. Restaurants 6. Assembly
occupancies with festival seating
23. Fire Department Connection is to be a 5-inch stortz connection on a 30-degree elbow
located within 50 feet of main entrance. Access to the Fire Department Connection must
be clear unobstructed access as defined by the AHJ.
Fire department connections. Unless otherwise approved by the fire marshal, fire department
connections shall be on the street side of the building and shall be located and arranged so that
hose lines can be readily and conveniently attached to without interference from any nearby
obstructions as defined by the fire marshal's office. Fire department connections shall be a five-
inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover
Fire Hydrant and within 50 feet of the main entrance of the structure it serves. All fire
department connections shall be not less than three feet nor more than five feet in height above
finished grade. The fire marshal shall have the authority to require more stringent
requirements when deemed necessary. (City of Dover Code of Ordinances 46-162)
24. Parking and/or obstructions shall be prohibited in front of fire department connections
for a distance measuring from the center line and extending four feet on both sides.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
47
Page 48
Item 3.
25. Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose
would come off the fire equipment.
26. If there is any type of rack storage, the following will be required: 1) a diagram showing
the layout and type of rack system 2) a list and quantity of items being stored 3) a letter
from an authorized/licensed fire suppression contractor stating that in rack sprinklers
are or are not needed. If in rack sprinklers are not needed, a letter may be requested from
an authorized/licensed fire suppression contractor to ensure that the sprinkler system is
adequate for the storage presented.
27. All standpipe and sprinkler connections shall be marked as prescribed within the appropriate
section of this regulation and as illustrated by the appropriate figures of this regulation. All
standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow
demarcation lines to define specific areas, Solid yellow demarcation lines shall be measured from
the center line of the connection and extend for a distance of four feet (4') on both sides, and
where parking is allow between the building and the street or fire lane the solid yellow
demarcation lines shall extend from the end of the sidewalk surface to the street or fire lane
(Markings shall not be required on the sidewalk surface).
All fire department connections (standpipe and sprinkler) shall have a minimum 12" x 18" sign
that reads FIRE DEPT. CONNECTION, sign lettering shall be a minimum of 3 inches (3") in
height with red scotchlite letters on white scotchlite background. The sign shall be clearly visible
from the fire lane or roadway, and signs using NFPA international symbols shall be an acceptable
alternative. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)
28. Standpipes shall be provided in all areas and buildings as required in the codes and standards
listed in Regulation 701 as well as the following areas or buildings:
In all Class A and Class B places of assembly and institutional occupancies two (2) stories or 25
feet in height or over,
In any building over three (3) stories, In any building over 35 feet in height,
In any building that has a floor above the first floor over 10,000 square feet gross floor area,
In all buildings where the 1st floor exceeds 60,000 gross square feet,
a Class I horizontal standpipe system installed in accordance with the applicable codes and
standards listed in Regulation 701 of these Regulations shall be provided. All standpipe systems
shall be installed in accordance with the applicable codes and standards listed in Regulation 701.
The standpipe system shall be carried up with each floor and shall be installed and ready for use
as each floor progresses.
Standpipes shall not be more than one floor below the highest forms of staging,
The 2½-inch of hose connections on Class I systems shall be provided in the following locations,
At the highest intermediate landing between floor levels in every required exit stairway,
Where intermediate landing is not provided, hose connections shall be permitted to be located at
the main floor landings in exit stairways when approved by the authority having jurisdiction,
Where the local fire department has the capability of providing the required pressure,
hydraulically designed standpipe systems in fully sprinklered, non-high-rise buildings shall be
designed to provide the required waterflow rate.
48
Page 49
Item 3.
A sign shall be provided at each landing, in all interior stairways, designating the floor level.
(2021 Delaware State Fire Prevention Regulations 702, Chapter 4, 2)
29. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be
protected from impact damage by impact protection. Natural gas and LP gas meters, regulators,
and valves located inside structures shall have impact protection, except when located in
separate protected utility rooms.
Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The
bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in
concrete at a minimum of 18 inches surrounding the bollard. The bollards must be a least 48
inches (four ft.) in height above the finish grade elevation. Any deviation of the stated
requirements must be approved by the fire marshal and/or chief building inspector. The above
dimensions shall serve as the requirement for installation; however, the fire marshal and/or chief
building inspector shall have the authority to require more stringent dimensions to fit the needs
of devices warranting impact protection.
Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors
shall be of fluorescent or have a reflective coating. Any deviation of the stated requirements must
be approved by the fire marshal and/chief building inspector.
(City of Dover Code of Ordinances, 46-4)
30. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley,
shall have displayed on that wall, in legible, easily read characters which are of contrasting color
to the background, the proper street number for such house, building, or structure in accordance
with the following:
One-family and two-family residential structures, height, the number shall measure a minimum of four
inches in height, location, the number shall be placed on the house above or to the left or right of
the front entrance, color, the number shall be contrasting to the background color, Arabic numerals,
all numbers shall be Arabic numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when
identifying individual apartments with exterior doors, and 12 inches when identifying buildings
with apartment complexes where there are two or more buildings not assigned street addresses.
Individual buildings with street addresses shall have numbers measuring six inches, location,
numbers shall be placed either in the center of the building or on the street end of the building so
as to be visible from either the public or private street or from the parking lot, color, numbers shall
be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic
numerals.
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in
height, location generally, numbers shall be placed either in the center of the building or on the
street end of the building so as to be visible from either the public or private street or from the
parking lot,
property line or driveway, should the building be located far enough from a public or private road so
that the numbers are not clearly visible from the street, then the street address shall also be
posted on the property at or near the property line or driveway to said building,
49
Page 50
Item 3.
color; each building, numbers shall be contrasting to the background color and shall be placed on
each building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite
number affixed to the front of the tenant space and on the outside of the rear door which
corresponds with that tenant space. Numbers shall measure six inches in height.
(City of Dover Code of Ordinances, 98-344)
31. A lock box (Knox) containing any and all means necessary for fire department access shall be
provided at the following occupancies: any occupancy that contains a fire alarm signaling system
that is monitored off-site, or any occupancy that contains an automatic sprinkler system.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
Secured key systems. When required; exemption. A secured key system shall be required for
any new or existing building where a fire alarm or sprinkler system is being
installed. It shall be the responsibility of the owner or occupant to keep a set of keys
in the secured key box that are current to the locks of the protected occupancy.
Buildings with 24-hour staffing or guard service shall be exempt from this
subsection.
Location. The secured key system shall be located as close to the main entrance as
possible. Should the building design not allow the secured key system to be located
by the main entrance, the fire marshal and fire chief shall come to an agreement as to
an alternate location for the key box. A secured key system, once installed, shall not
be obstructed from view or obstructed by any means that would delay the fire
department access to the box.
Required keys. Keys to be secured in the key box shall include keys to all points of
ingress or egress, whether on the interior or exterior of the building, and keys to
locked mechanical rooms, electrical rooms, elevator rooms, fire alarm and sprinkler
controls and any area protected by automatic fire detection. Keys to individual
residential apartment units are not required.
Ordering responsibility. It shall be the responsibility of the general contractor to order
the key box for new buildings. It shall be the responsibility of the owner or tenant to
order the key box for existing buildings.
Installation before testing. No acceptance test for sprinklers or fire alarms shall be
conducted before the installation of a key box.
(City Code of Ordinances 46-127)
Knox Box to be mounted 6 feet above ground level
32. All required means of egress shall have an exit discharge consisting of a non-slip surface and
leading to and terminating at a public way. NFPA 101
33. All new passenger elevators in a building shall be provided with a car sized to accommodate an
ambulance cot 24 inches (609 mm) by 84 inches (2133 mm) in its horizontal open position.
Where two or more new passenger elevators are located in a single hoist way and serve all or the
50
Page 51
Item 3.
same portion of the building, only one elevator car that provides a car sized to accommodate an
ambulance cot 24 inches by 84 inches in its horizontal position for each hoist way shall be
required. Elevator cars required to comply with 15.1 or 15.2 shall be identified by the international
symbol for emergency medical services (star of life). The symbol shall be not less than 3 inches
(76 mm) in height and shall be placed inside on both sides of the hoist way door frame.
Firefighter recall keys shall be provided in a manner acceptable to the local fire department.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 1, 15)
34. Buildings over 25,000 Sq. Ft are to have radio performance testing done prior to Final CO. This
must be scheduled in advance with an authorized vendor.
35. Project to be completed per approved Site Plan.
36. Full building and fire plan review is required.
37. Separate building permits/plans submission will be required for each building and/or tenant fit
out. If the permit submission is for a “shell” a Certificate of Occupancy will not be issued.
Separate plans and permits submissions will be required for each “tenant fit out” at which time a
Certificate of Occupancy will be issued upon compliance/completion of each “tenant fit out”.
Each “shell” will require a fire permit for sprinkler and fire alarm if applicable. Those systems (for
the “shell”) must be accepted into service prior to any “tenant fit out” fire permits being issued.
38. Construction or renovations cannot be started until building plans are approved.
39. Fire alarm systems, fire suppression systems, hoods, exhaust ducts, and hood suppression
systems require a fire permit from the Fire Marshal’s Office. This work cannot be started until
the permit is approved.
40. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
41. The following is City Ordinance, Appendix B-Zoning, Article 8 Enforcement and Penalties:
Section 1. - Building permits.
No building or structure in any district shall be erected or structurally altered without a building permit
duly issued upon application to the building inspector. No building permit shall be issued unless the
proposed construction or use is in full conformity with all the provisions of this ordinance. Any building
permit issued in violation of the provisions of this ordinance shall be null and void and of no effect,
without the necessity for any proceedings for revocations or nullification thereof, and any work
undertaken or use established pursuant to any such permit shall be unlawful (see section 4 for
penalties).
1.1 No building permit shall be issued for the construction or alteration of any building upon a
lot without frontage upon, or legal permanent access to, a public street improved to the
satisfaction of the planning commission, or without access to a public sewer.
1.2 No building permit shall be issued for any building where the site development plan of
such building is subject to approval by the planning commission, except upon approval of such
plans approved by the said commission.
1.21 No building permit shall be issued for any building in a subdivision unless the subdivision
plot has been approved by the planning commission.
1.3 No building permit shall be issued for a building to be used for any conditional use in any
zone where such use is allowed only with approval of the planning commission, unless and
until such approval has been duly granted by the said commission.
(Ord. of 7-12-1993, § 3)
51
Page 52
Item 3.
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. Building C is considered a large area building, please see additional comments listed
below
2. Building C shows two FDC’s, we will need to discuss the same
3. Need to discuss a hydrant at the rear of building C and confirm that they are every
800’ as outlined in item # 17 listed above
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2021 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
“Large Area Building” Any building that exceeds one-hundred thousand (100,000) square feet gross floor
area on any one floor.
Chapter 5 Mid Rise, High Rise and Large Area Buildings
4.0 Large Area Buildings.
4.1 Application. The application of this Chapter pertains to any building exceeding one-hundred
thousand (100,000) square feet gross floor area on any one floor. This Chapter does not apply to Strip
Shopping/Office Center with no individual tenant exceeding 100,000 sq. ft.
4.1.1 If any one individual tenant in a Strip Shopping/Office Center exceeds 100,000 sq. ft. per
floor, these requirements shall apply only to those tenants.
4.2 Horizontal Standpipes.
4.2.1 Horizontal Standpipes shall be required in accordance with Regulation 702, Chapter 4 of
these Regulations
4.3 Emergency Voice/Alarm Communications and Detection System.
4.3.1 Large area buildings shall be equipped with a voice alarm, communication and detection
system which shall be installed in accordance with the applicable codes and standards listed in Regulation
701 of these Regulations; and approved by the Office of the State Fire Marshal
52
Page 53
Item 3.
4.4 Fire Command Station.
4.4.1 Large area buildings containing Health Care Occupancies, Ambulatory Health Care and
Detention and Correction Occupancies shall contain a fire command center for fire department operations
in a location reviewed by the responsible Fire Chief and approved by the Office of the State Fire Marshal.
The Office of the State Fire Marshal may require a Fire Command Center for other Large Area Buildings.
4.4.2 The fire command center shall contain the following:
4.4.2.1 Voice alarm and public address panels
4.4.2.2 Fire department communications panel
4.4.2.3 Fire detection and alarm system annunciator panels and smoke management panels
4.4.2.4 Status indicator for elevator and annunciator indicating which elevators are
operational
4.4.2.5 Status indicators and controls for air handling systems
4.4.2.6 Controls for unlocking all fire exit stairway doors simultaneously
4.4.2.7 Emergency power, light and system controls; and status indicators
4.4.2.8 Telephone and internet access for fire department use
4.4.2.9 Emergency and standby power status indicators
4.4.2.10 Generator supervision devices and manual start and transfer features
4.4.2.11 Public address system, where specifically required by other sections of this Code
4.4.2.12 Controls required for smoke control
4.4.2.13 Important keys to include
4.4.2.13.1 Elevator machine room
4.4.2.13.2 Elevator hoistway door access key
4.4.2.13.3 Side access door elevator car key
4.4.2.13.4 Electric room keys
4.4.2.13.5 Fire pump room keys
4.4.2.13.6 Mechanical room keys
4.4.2.13.7 Any master key
4.4.2.14 As built drawings. Specific types and format of drawings to be determined by the
Office of the State Fire Marshal at time of plan review.
4.4.3 The fire command center shall be separated from the remainder of the building by one-hour
construction and equipped with a heating, ventilating and air conditioning system that will prevent smoke
laden air from entering the space.
4.4.4 It is not the intent of this section to require a room dedicated for this purpose, but the area
provided must be available for immediate use in case of emergency.
4.4.5 The room shall be a minimum of 96 square feet with a minimum dimension of 8 feet.
4.4.6 The fire command room door shall be clearly identified for use by the fire department.
4.5 Smoke Management Systems
4.5.1 Large area buildings shall be equipped with a smoke management system approved by the
Office of the State Fire Marshal, designed in accordance with §4.5.2 or §4.5.3, and shall be capable of
being operated by the fire department.
4.5.2 This smoke control system shall, at a minimum, consist of manually operated smoke vents
installed in accordance with the Standard for Smoke and Heat Venting, NFPA 204 with the following criteria:
4.5.2.1 One, 100 sq. ft. vent per 25,000 sq. ft. of floor area.
4.5.2.2 Each vent shall be centrally located within the 25,000 sq. ft. protected area.
53
Page 54
Item 3.
4.5.3 Large Area buildings using mechanical means of smoke management shall be installed in
accordance with NFPA 92A, NFPA 92B and approved by the Office of the State Fire Marshal. Such system
shall provide the following:
4.5.3.1 Egress Stair Tower Pressurization if stairs are more than three (3) communicating
floor levels
4.5.3.2 Area of Refuge Pressurization
4.5.3.3 Horizontal Exit Passageway Pressurization
4.5.3.4 Fire Floor or Fire Area Smoke Exhaust
4.5.3.5 Other Criteria as deemed necessary by the Office of the State Fire Marshal for
Unusual Spaces
4.5.4 Smoke management system operation/actuation shall be approved by the Office of the State
Fire Marshal.
Note: As per NFPA 92A and NFPA 92B, the smoke management system shall be provided with a graphic
annunciator and manual override panel to be located in the fire command center. The design and
operation of the graphic annunciator shall be approved by the Office of the State Fire Marshal.
4.6 Standby Power, Light, and Emergency Systems.
4.6.1 Large area buildings shall be equipped with standby power, light, smoke management system
and emergency systems which shall comply with the provisions of the Standard for Emergency and Standby
Power Systems, NFPA 110, as adopted and/or modified by these Regulations.
Exception: If the occupancy is such that “standard” battery operated emergency systems (emergency
lighting, exit signs, fire alarm signaling system backup power, etc.), are deemed to be adequate by the
State Fire Marshal.
13 DE Reg. 629 (11/01/09)
19 DE Reg. 843 (03/01/16)
54
Page 55
Item 3.
KENT CONSERVATION DISTRICT
1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG
CITY OF DOVER
ADMINISTRATIVE SITE PLAN REVIEW
JULY 2025
APPLICATION: Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane
FILE #: S-25-10
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: Cullen Baker
PHONE: (302) 608 - 5370
EMAIL: stormwater@kentcd.org
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY
AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF
EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO
BE ADDRESSED BY THE APPLICANT:
Source: 2019 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. As the disturbance for this site will exceed 5,000 square feet, a sediment and stormwater management plan
must be reviewed and approved by the District prior to any land disturbing activity (i.e. clearing, grubbing,
filling, grading, etc.) taking place. The review fee and a completed application is due at the time of plan
submittal to the District’s office.
2. The following notes must appear on the record plan:
a. The Kent Conservation District reserves the right to enter private property for purposes of periodic site
inspection.
b. The Kent Conservation District reserves the right to add, modify, or delete any erosion or sediment
control measure, as it deems necessary.
c. A clear statement of defined maintenance responsibility for stormwater management facilities must be
provided on the Record Plan.
ADVISORY COMMENTS TO THE APPLICANT:
1. There is an existing pond being expanded under the approved phase 1 plan. We will require that the pond
construction under phase 1 is completed and as built approved prior to the start of construction of the phase
2 plan.
2. Replace the proposed curb cuts with storm drains. We do not want riprap protection spanning across the
stormwater easement, and all stormwater must be sent to a pre-treatment forebay.
3. Please note the Kent Conservation District will not review an application more than three times. If after the
third review the plan is still not found to be approvable, the application will be denied, and a new application
with review fees are to be re-submitted to continue a detailed plan review.
4. A letter of no objection to recordation will be provided upon approval of the Sediment and Stormwater
Management Plan.
55
Page 56
Item 3.
CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
ADVISORY BRIEF Planning
D.A.C. MEETING DATE: 7/9/2025 Organization
S-25-10 Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane
FILE # S-25-10 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030
Attached, please find comments submitted by Dover Kent MPO for each of the current City of Dover Development
Advisory Committee (DAC) applications. These comments are a part of the MPO’s ongoing goals of promoting
transportation safety and connectivity within the region. They are submitted in accordance with the support given by
the MPO Council on November 6, 2024.
Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or
eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The
MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be
waived.
City of Dover Planning Commission
Site Development Plan Review
S-25-10 Dover Industrial Phase 2: Warehouses at 350 Lafferty Lane
As discussed in Dover Kent MPO’s recommendations for Phase 1 of the site development,1 the
addition of truck parking spaces would be very beneficial for this location. Parking and staging
availability has been an ongoing challenge for the City of Dover, and it is common for trucks and
trailers to be left in “undesignated” parking areas. Given the volume of trucks that will be
visiting the property, there may be times when there are not enough loading docks available.
Drivers may also need to leave their vehicles at a safe, designated location overnight.
The urgent need for designated truck parking in Dover is highlighted in the 2025 Dover Freight
Plan, which recommends that truck parking and staging be incorporated into all freight-related
site development within the City.2 These should be added in addition to the loading docks
already planned for the site. The paved space behind Building C may be suitable for this purpose.
1
City of Dover, Delaware Planning Commission (Meeting Packet, September 16, 2024). City of Dover (2024).
https://evogov.s3.us-west-2.amazonaws.com/meetings/27/attachments/17485.pdf#page=143.
2
Dover Freight Plan. Dover/Kent County MPO (2025). https://doverkentmpo.delaware.gov/files/2025/04/2025-
04_Dover-Freight-Plan_FINAL.pdf#page=40.
56
Page 57
Item 3.
The Dover Freight Plan also includes a checklist of various freight considerations, which can
help in avoiding land use conflicts and ensuring drivers are provided with adequate parking
space. Please reach out to the City of Dover planning staff or Dover Kent MPO for more
information on this topic.
The site plan should show exactly where the loading docks will be located along the two new
buildings and how far from the buildings the loading areas will extend, similar to what was used
in the Phase 1 designs. The applicant should also ensure there will be adequate space for large
vehicles to navigate and turn safely. Within the site plan, measurements in between Building A
and Building B should demonstrate the total available width when trucks are docked on either
side. The same should be done in between Building B and Building C, specifically where the
landscape islands will be located.
Bicycle racks, pedestrian walkways, and accessible parking spaces are planned for the property,
and sidewalks are being added to the property’s frontage as part of Phase 1. These improvements
will have a positive impact on bicycle and pedestrian connectivity and on the property’s
accessibility.
In 2021 the MPO completed the Dover Air Cargo Freight Access Study, which recommends
transportation improvements that will support economic growth in between Dover Air Force
Base and White Oak Road. While the study does not specifically address this property, it does
recommend improvements to Lafferty Lane, including improvements to the intersection with
Horsepond Road and to the intersection with S. Bay Road.3 These improvements, if completed,
would facilitate truck traffic coming to and from the property. They are considered a high
priority for the City of Dover and are included in the project list of Innovations 2050, the MPO’s
Metropolitan Transportation Plan (MTP).4
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
3
Dover Air Cargo Freight Access Study - Planning and Environmental Linkage (PEL) Report. Dover/Kent County
MPO (2021). https://doverkentmpo.delaware.gov/files/2021/09/Dover-Air-Cargo-Freight-Study-
PEL_final.pdf#page=16.
4
Innovations 2050. Dover/Kent County MPO (2025).
https://doverkentmpo.delaware.gov/files/2025/01/Innovations-2050-FINAL-1-8-2025-compressed-with-
cover.pdf#page=139.
57
Page 60
Item 3.
DoDI 4165.57, December 13, 2020
Table 1. Land Use Compatibility in APZs, Continued
Land use Name and SLUCM Category Clear Zone APZ-I APZ-II Maximum Density
Trade use group (SLUCM Category 50)
Maximum FAR of 0.28 in
Wholesale trade N Y Y
APZ I and .56 in APZ II
Maximum FAR of 0.20 in
Retail trade – building materials N Y Y
APZ-I and 0.40 in APZ-II
Retail trade – hardware, paint, and farm equipment Maximum FAR of 0.14 in
N Y Y
stores APZ I and 0.28 in APZ II
Maximum FAR of 0.16 in
Retail trade – including neighborhood centric shops N N Y
APZ II
Mass retailing, super stores, strip malls, shopping
centers5, discount clubs, home improvement stores, N N N
eating and drinking establishments, etc.
Retail trade – food such as groceries, bakeries,
Maximum FAR of 0.24 in
confectionaries, meat markets, and fast food N N Y
APZ II
establishments
Retail trade – automotive, marine craft, aircraft, Maximum FAR of 0.14 in
N Y Y
and accessories APZ I and 0.28 in APZ II
Retail trade – apparel and accessories, furniture, Maximum FAR of 0.28 in
N N Y
home, furnishings and equipment APZ II
Maximum FAR of 0.16 in
Other retail trade N N Y
APZ II
Services use group (SLUCM Category 60)
Finance, insurance, real estate, personal,
Maximum FAR of 0.22 in
professional and miscellaneous services (office N N Y
APZ II
uses only)
Cemeteries N Y6 Y6
Maximum FAR of 1.0 in
Warehousing and storage services N Y Y
APZ I; 2.0 in APZ II
Maximum FAR of 0.11
Repair services and contract construction N Y Y
APZ I; 0.22 in APZ II
Hospitals, nursing homes, and other medical
facilities; educational services, childcare services, N N N
child development centers, and nurseries
Maximum FAR of 0.24 in
Government services N N Y
APZ II
Cultural, entertainment, and recreational use group (SLUCM Category 70)
Nature exhibits N Y7 Y7
Cultural activities, auditoriums, concert halls,
places of worship; outdoor music shells, museums,
outdoor displays, amphitheaters, sports arenas, N N N
spectator sports, resorts and group camps, or other
places of assembly
Amusements (e.g., fairgrounds, miniature golf, 50 people per acre
N N Y11
driving ranges; amusement parks.)
Recreational activities (including golf courses, Maximum FAR of 0.11 in
N Y7 Y7
riding stables, water recreation), parks APZ I; 0.22 in APZ II
APPENDIX 3B: RECOMMENDED LAND USE COMPATIBILITY IN APZS 15 60
Page 61
Item 3.
DoDI 4165.57, December 13, 2020
Table 1. Land Use Compatibility in APZs, Continued
Land use Name and SLUCM Category Clear Zone APZ-I APZ-II Maximum Density
Other cultural, entertainment and recreation N Y6 Y6
Resource production and extraction use group (SLUCM Category 80)
Agriculture and livestock farming, including
Y8 Y8 Y8
grazing and feedlots
Maximum FAR of 0.28 in
Agriculture related activities N Y Y
APZ I; 0.56 in APZ II
Maximum FAR of 0.28 in
Forestry activities9 N Y Y
APZ I; 0.56 in APZ II
Maximum FAR of 0.28 in
Fishing activities N10 Y Y
APZ I; 0.56 in APZ II
Maximum FAR of 0.28 in
Mining activities N Y Y
APZ I; 0.56 in APZ II
Maximum FAR of 0.28 in
Other resource production or extraction N Y Y
APZ I; 0.56 in APZ II
Other use group (SLUCM Category 90)
Undeveloped land Y Y Y
Water areas N N N
Key to Table 1 – Land use compatibility in APZs
Land use recommendations:
Y (Yes) – Land use and related structures compatible without restrictions.
N (No) – Land use and related structures are not compatible and should be prohibited.
Yx – Yes with restrictions. The land use and related structures generally are compatible. However, see note(s)
indicated by the superscript.
Nx – No with exceptions. The land use and related structures are generally incompatible. However, see note(s)
indicated by the superscript.
Notes for Table 1 – Land Use Compatibility in APZs
General notes for all uses:
a. The suggested maximum occupancy for commercial, service, or industrial buildings or structures in APZ I is
25 people per acre, and 50 people per acre in APZ II. Outside events should normally be limited to assemblies
of not more than 25 people an acre in APZ I, and maximum assemblies of 50 people an acre in APZ II.
b. Recommended FARs are calculated using standard parking generation rates for various land uses, vehicle
occupancy rates, and desired density in APZ I or II. For APZ I, the formula is FAR equals 25 people an acre
divided by (Average vehicle occupancy times Average parking rate times (43560÷1000)). The formula for APZ
II is FAR equals 50 divided by (Average vehicle occupancy times Average parking rate times (43560÷1000)).
c. No structures (except airfield lighting and navigational aids necessary for the safe operation of the airfield
when there are no other siting options), buildings, or above ground utility and communications lines should
normally be located in clear zone areas on or off the air installation. For pilot and public safety, the clear zone
is subject to the most severe restrictions.
d. Safety of flight should be considered when evaluating development that includes explosive potential;
generates smoke, steam, or dust; creates electronic interference; lighting or glare; or tall structures.
e. Development of renewable energy resources, including solar and geothermal facilities and wind turbines,
may impact military operations through hazards to flight or electromagnetic interference. Each new
development should be analyzed for compatibility on a case-by-case basis that considers both the proposal and
potentially affected mission.
APPENDIX 3B: RECOMMENDED LAND USE COMPATIBILITY IN APZS 16 61
Page 62
CUI Item 3.
Dover Industrial
Phase 2 Concept APZ
Plan
Site Location Map
¯
City of Dover, Delaware, Delaware FirstMap, New Jersey Office of GIS, VGIN, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, EPA, NPS, USDA, USFWS
Legend
Delaware_State_Parcels
APZ
0 10,000 20,000
Feet
Controlled by: OUSD(I&S)
Controlled by: CL&S INFOSEC
CUI Category(ies): NNPI
Limited Dissemination Controls: NOFORN
POC: Simon Lowe, 302-677-6455
Date: 6/26/2025
Email: 436CES.CENME.Eng@us.af.mil
Map Request Tool: <LINK>https://maps.af.mil/ers/
</LINK>
¯ Created By: execution support
Path: L:\GIS\Specialty maps\CES\CEN\CENPL\Dover Phase 2 Concept Plan\Dover Phase 2 Concept Plan.aprx
62
Page 63
Item 3.
U.S. Department Advisory
of Transportation
Federal Aviation
Administration
Circular
Subject: Hazardous Wildlife Attractants on or Date: 02/21/2020 AC No: 150/5200-33C
near Airports Initiated By: AAS-300 Change:
1 Purpose.
This Advisory Circular (AC) provides guidance on certain land uses that have the
potential to attract hazardous wildlife on or near public-use airports. It also discusses
airport development projects (including airport construction, expansion, and
renovation) affecting aircraft movement near hazardous wildlife attractants. Appendix 1
provides definitions of terms used in this AC.
2 Cancellation.
This AC cancels AC 150/5200-33B, Hazardous Wildlife Attractants on or near
Airports, dated August 28, 2007.
3 Application.
The Federal Aviation Administration recommends the guidance in this AC for land
uses that have the potential to attract hazardous wildlife on or near public-use airports.
This AC does not constitute a regulation, is not mandatory, and is not legally binding in
its own right. It will not be relied upon as a separate basis by the FAA for affirmative
enforcement action or other administrative penalty. Conformity with this AC is
voluntary, and nonconformity will not affect rights and obligations under existing
statutes and regulations, except as follows:
1. Airports that hold Airport Operating Certificates issued under Title 14, Code of
Federal Regulations (CFR), Part 139, Certification of Airports, Subpart D, may use
the standards, practices and recommendations contained in this AC as one, but not
the only, acceptable means of compliance with the wildlife hazard management
requirements of Part 139.
2. The FAA recommends the guidance in this AC for airports that receive funding
under Federal grant assistance programs, including the Airport Improvement
Program. See Grant Assurance #34.
63
Page 64
Item 3.
2/21/2020 AC 150/5200-33C
3. The FAA recommends the guidance in this AC for projects funded by the Passenger
Facility Charge program. See PFC Assurance #9.
4. The FAA recommends the guidance in this AC for land-use planners and developers
of projects, facilities, and activities on or near airports.
4 Principal Changes.
Changes are marked with vertical bars in the margin. Change in this AC include:
1. Clarification by the FAA that non-certificated airports are recommended to conduct
a Wildlife Hazard Assessment (Assessment) or a Wildlife Hazard Site Visit (Site
Visit);
2. Table 1, Ranking of Hazardous Species, has been moved to Advisory Circular
150/5200-32, Reporting Wildlife Aircraft Strikes (5/31/2013);
3. Consolidation and reorganization of discussion on land uses of concern; and
updated procedures for evaluation and mitigation. Discussion addresses off-airport
hazardous wildlife attractants, followed by discussion of on-airport attractants. It
also clarifies language regarding the applicability of the AC.
5 Background.
1. Information about the risks posed to aircraft by certain wildlife species has
increased a great deal in recent years. Improved reporting, studies, documentation,
and statistics clearly show that aircraft collisions with birds and other wildlife are a
serious economic and public safety problem. While many species of wildlife can
pose a risk1 to aircraft safety, they are not equally hazardous2. These hazard
rankings can help focus hazardous wildlife management efforts on those species or
groups that represent the greatest risk to safe air and ground operations in the airport
environment. Used in conjunction with a site-specific Assessment that will
determine the relative abundance and use patterns of wildlife species, these rankings
combined with a systematic risk analysis can help airport operators better
understand the general threat level (and consequences) of certain wildlife species.
Also, the rankings can assist with the creation of a “high risk” list of hazardous
species that warrant immediate attention.
2. Most public-use airports have large tracts of open, undeveloped land that provide
added margins of safety and noise mitigation. These areas can also present potential
hazards to aviation if they encourage wildlife to enter an airport’s approach or
departure airspace or aircraft operations area. Constructed or natural areas— such as
1
Risk is the relationship between the severity and probability of a threat. It is the product of hazard level and
abundance in the critical airspace, and is thus defined as the probability of a damaging strike with a given species.
2
Hazardous wildlife are species of wildlife (birds, mammals, reptiles), including feral and domesticated animals, not
under control that may pose a direct hazard to aviation (i.e., strike risk to aircraft) or an indirect hazard such as an
attractant to other wildlife that pose a strike hazard or are causing structural damage to airport facilities (e.g.,
burrowing, nesting, perching).
ii
64
Page 65
Item 3.
2/21/2020 AC 150/5200-33C
poorly drained locations, detention/retention ponds, roosting habitats on buildings,
landscaping, odor-causing rotting organic matter (putrescible waste) disposal
operations, wastewater treatment plants, agricultural or aquaculture activities,
surface mining, wetlands, or some conservation-based land uses — can provide
wildlife with ideal locations for feeding, loafing, reproduction, and escape. Even
small facilities, such as fast food restaurants, taxicab staging areas, rental car
facilities, aircraft viewing areas, and public parks, can produce substantial
attractions for hazardous wildlife.
3. During the past century, wildlife-aircraft strikes have resulted in the loss of
hundreds of lives worldwide, as well as billions of dollars in aircraft damage.
Hazardous wildlife attractants on and near airports can jeopardize future airport
expansion, making proper community land-use planning essential. This AC
provides airport operators and those parties with whom they cooperate with the
guidance they need to assess and address potentially hazardous wildlife attractants
when locating new facilities and implementing certain land-use practices on or near
public-use airports.
6 Memorandum of Agreement Between Federal Resource Agencies.
The FAA, the U.S. Air Force, the U.S. Army Corps of Engineers, the U.S.
Environmental Protection Agency, the U.S. Fish and Wildlife Service, and the U.S.
Department of Agriculture - Wildlife Services signed a Memorandum of Agreement
(MOA) to acknowledge their respective missions in protecting aviation from wildlife
hazards. Through the MOA, the agencies established procedures necessary to
coordinate their missions to address more effectively existing and future environmental
conditions contributing to collisions between wildlife and aircraft (wildlife strikes)
throughout the United States. These efforts are intended to minimize wildlife risks to
aviation and human safety while protecting the Nation’s valuable environmental
resources.
7 Feedback on this AC.
If you have suggestions for improving this AC, you may use the Advisory Circular
Feedback form at the end of this AC.
John R. Dermody
Director of Airport Safety and Standards
iii
65
Page 66
Item 3.
2/21/2020 AC 150/5200-33C
CONTENTS
Paragraph Page
Chapter 1. General Separation Criteria for Hazardous Wildlife Attractants on or
Near Airports ......................................................................................................... 1-1
1.1 Introduction. ................................................................................................................ 1-1
1.2 Airports Serving Piston-Powered Aircraft. .............................................................. 1-1
1.3 Airports Serving Turbine-Powered Aircraft............................................................ 1-2
1.4 Protection of Approach, Departure, and Circling Airspace. .................................. 1-2
Chapter 2. Land-Use Practices on or Near Airports that Potentially Attract
Hazardous Wildlife ................................................................................................ 2-1
2.1 General. ........................................................................................................................ 2-1
2.2 Waste Disposal Operations. ....................................................................................... 2-2
2.3 Water Management Facilities. ................................................................................... 2-4
2.4 Wetlands. ..................................................................................................................... 2-8
2.5 Dredge Spoil Containment Areas. ........................................................................... 2-10
2.6 Agricultural Activities. ............................................................................................. 2-10
2.7 Aquaculture. .............................................................................................................. 2-12
2.8 Golf Courses, Landscaping, Structures and Other Land-Use Considerations. .. 2-14
2.9 Habitat for State and Federally-Listed Species on Airports. ................................ 2-16
2.10 Synergistic Effects of Surrounding Land Uses. ...................................................... 2-17
Chapter 3. Procedures for Wildlife Hazard Management by Operators of Public-
Use Airports and Conditions for Non-Certificated Airports to Conduct Wildlife
Hazard Assessments and Wildlife Hazard Site Visits ........................................ 3-1
3.1 Introduction. ................................................................................................................ 3-1
3.2 Coordination with Qualified Airport Wildlife Biologists. ....................................... 3-1
3.3 Wildlife Hazard Management at Airports: A Manual For Airport Personnel. .... 3-1
3.4 Wildlife Hazard Site Visits and Wildlife Hazard Assessments. .............................. 3-2
3.5 Wildlife Hazard Management Plan. .......................................................................... 3-2
3.6 Local Coordination. .................................................................................................... 3-3
3.7 Operational Notifications of Wildlife Hazards......................................................... 3-3
3.8 Federal and State Depredation Permits. ................................................................... 3-4
iv
66
Page 67
Item 3.
2/21/2020 AC 150/5200-33C
Chapter 4. Recommended Procedures for the FAA, Airport Operators and Other
Government Entities Regarding Off-Airport Attractants ................................... 4-1
4.1 FAA Notification and Review of Proposed Land-Use Practice Changes in the
Vicinity of Public-Use Airports.................................................................................. 4-1
4.2 Waste Management Facilities. ................................................................................... 4-2
4.3 Other Land-Use Practice Changes. ........................................................................... 4-3
4.4 Coordination to Prevent Creation of New Off-Airport Hazardous Wildlife
Attractants. .................................................................................................................. 4-4
4.5 Coordination on Existing Off-Airport Hazardous Wildlife Attractants. .............. 4-5
4.6 Prompt Remedial Action. ........................................................................................... 4-5
4.7 FAA Assistance............................................................................................................ 4-5
Appendix A. Definitions of Terms Used in this Advisory Circular ........................ A-1
Appendix B. Additional Resources.......................................................................... B-1
v
67
Page 68
Item 3.
Dover Air Force Base – Compatible Use Plan
In cooperation with Delaware Department of Transportation
Prepared by:
June 2023
68
Page 69
Item 3.
Acknowledgements Dover Air Force Base – Compatible Use Plan
The Dover Air Force Base Compatible Use Plan was developed
through a collaborative partnership pulling from the knowledge and Policy Committee
expertise from key stakeholders throughout the project area. The
core project team was supported by a Policy Committee and a Dawn Melson-Williams
Technical Committee. These two committees provided the insight Principal Planner - City of Dover – Department of Planning
and knowledge that guided the study and the process from initial and Inspections
project kick off to the final report. The efforts of the following
Michael Petit de Mange
individuals and their commitment to the project is acknowledged
and appreciated. Former Kent County Administrator - Kent County
Project Team Michael DuRoss
Assistant Director of Planning - DelDOT
Delaware Department of Transportation (DelDOT)
Humaira Nabeela – Project Manager Lisa Borin-Ogden
Beth Hermansader – Project Administration Deputy Secretary – Department of Natural Resources and
Environmental Control (DNREC)
Department of Defense (DoD)
Jennifer Hirsch – OLDCC Project Manager Jimmy Kroon
Dover Air Force Base (DAFB) Administrator - Department of Agriculture
Matthew Jordan – DAFB Community Planner Kimberly Chandler
University of Delaware (UD) Deputy Secretary - Department of Safety and Homeland
Jennifer Reitz – Project Coordinator Security
Troy Mix – Project Support David Edgell
Sean O’Neill - Project Support Director - Office of State Planning Coordination
Century Engineering, LLC A Kleinfelder Company Marilyn Smith
Sonia Marichic-Goudy – Project Lead Executive Director - Dover/Kent County MPO
Drew Boyce – Project Support
Colonel Shanon Anderson
Ted Foglietta – Project Support
Vice Commander - Dover Air Force Base
Airport Design Consultants (ADCI)
Eileen Sien – Technical Consultant
Page i
69
Page 70
Item 3.
Acknowledgements Dover Air Force Base – Compatible Use Plan
Technical Committee James Frazier
Dawn Melson-Williams Mayor - Town of Magnolia
Principal Planner - City of Dover – Department of Planning Sarah Cahall/Harold Scott
and Inspections Town Clerk / Town Manager - Town of Camden
Sarah Keifer Steve Bilbrough
Director, Division of Planning Services - Kent County Levy Mayor - Town of Wyoming
Court
Ada Puzzo
Jim Galvin Mayor - Town of Bowers
Principal Planner Dover/Kent County MPO
Ben Clendaniel
Josh Thomas Assistant Airports Director - Delaware River and Bay
Kent County Planner – Office of State Planning Coordination Authority
Elena Stewart Linda Parkowski
Land Preservation Specialist - DNREC Director - Kent Economic Partnership
Kimberly Chandler Sam Sherman
Deputy Secretary Department of Safety and Homeland Aeronautics Coordinator – DelDOT (former)
Security
Jimmy Kroon
This plan was prepared under contract with the Delaware
Administrator - Department of Agriculture Department of Transportation, with financial support from the
Emily Whaley Office of Local Defense Community Cooperation, Department of
Defense. The content reflects the views of the Delaware
Architectural Historian - State Historic Preservation Office Department of Transportation key committee partners and does
Matthew Jordan not necessarily reflect the views of the Office of Local Defense
Community Cooperation.
Community Planner - Dover Air Force Base
Ed Strouse
Councilperson - Town of Little Creek
Page ii
70
Page 71
Item 3.
Executive Summary Dover Air Force Base – Compatible Use Plan
DAFB is a strategic asset for the United States Military. DAFB is statistical analysis of past DoD aircraft accidents. The policy provides
home to the DoD's largest aerial port and approximately 10,000 champions for these processes to provide guidance to federal, state,
Airmen, joint service members, civilians and families. Its personnel and local agencies to implement the policies. The policy also
are responsible for global airlift aboard assigned C-5M Super Galaxy provides avenues for coordination and support so that the local
and C-17 Globemaster III aircraft. Additionally, the 436th Airlift municipalities and lands surrounding the Base can also continue to
Wing hosts key partners, such as the Air Force Reserve's 512th be viable into the future. Finally, the plan provides a process for
Airlift Wing, Air Force Mortuary Affairs Operations (AFMAO), the monitoring the surrounding land uses and policy implementation to
Armed Forces Medical Examiner System (AFMES) and the Joint determine weaknesses or avenues for improvement to continue
Personal Effects Depot (JPED), jointly responsible for the dignified implementing the plan well into the future of DAFB.
return of fallen American service members. DAFB missions provide
DAFB is located within the City of Dover, DE. The Base property
an extensive economic impact. In 2018 the DelDOT Office of
generally follows the municipal boundary. The City of Dover has the
Aeronautics found that DAFB has an annual economic impact of
land use control to the north of DAFB. The other three sides of DAFB
$564 million. Total employment at the Base is approximately 6,076
are surrounded by the unincorporated areas of Kent County. There
and is responsible for the employment of more than 10% of Kent
are several other smaller municipalities within the study area but
County’s total jobs according to the American Communities Survey
none are adjacent to DAFB. Several jurisdictions, communities, and
(2013-2017).
airports are within the study area and/or affect the airport’s
The Dover Air Force Base (DAFB) Compatible Use Plan (CUP) is a operations. Information on these communities, jurisdictions, and
cooperative planning initiative with the intent to develop a tool for airports provide groundwork for compatible uses for DAFB.
surrounding communities and the installation to understand land
The study area, shown on the following page is a circle with a radius
use planning and develop strategy and implementation actions that
of five miles created around DAFB. The study area includes Port
support the community goals and the installation’s mission. The
Mahon which is a recreational area in Kent County, Delaware that
initiative addresses land use compatibility planning around the
also assists DAFB in maintaining services. Maintaining the viability of
installation to support the installation’s mission and operations,
Port Mahon Road and the jet fuel delivery infrastructure is vital to
while balancing sustainability, viability, and safety of both the Base
the operations and sustainability of DAFB. The area of this circle
itself and the surrounding communities. The policy ensures that
includes all key Federal Aviation Regulation (FAR) Part 77 airspace,
civilian actions that encroach or constrain military operations are
Noise Contours, and Air Installations Compatible Use Zones.
limited with processes in place to proactively minimize these
actions. Three basic types of constraints can affect or result from Collaboration and joint planning between DAFB, local jurisdictions,
flight operations noise zones based on noise contours showing the state agencies, federal agencies, stakeholders, and the surrounding
noise levels generated by aircraft operations, height limitations, and communities protects the long-term viability of DAFB while assisting
Clear Zone (CZ) and Accident Potential Zones (APZ) based on DAFB maintain healthy partnerships to protect the long-term
Page iii
71
Page 72
Item 3.
Executive Summary Dover Air Force Base – Compatible Use Plan
and Environmental Control (DNREC), Department of Safety and
Homeland Security, Department of Agriculture, State Historic
Preservation Office, Towns of Little Creek, Magnolia, Camden,
Wyoming, Bowers, Delaware River and Bay Authority (DRBA), Kent
Economic Partnership, and Department of Transportation (DelDOT).
The individuals representing the numerous interests, agencies,
businesses, and personnel ensure a varied cross-section of opinions
and priorities resulting in feasible, practical solutions that marry the
ultimate goals of protecting the safety, security, and long-term
viability of both DAFB and the surrounding communities.
Agencies and agency representatives were distributed into two
committees. The Technical Committee consisted of representatives
from departments, organizations, or agencies who could assist in
supporting the analysis. The Technical Committee provided critical
data necessary to inform the process and build the GIS database
that served as a tool for issue identification. The Policy Committee
consisted of Stakeholder/agency representatives who compromised
the decision-making body of the CUP. This group provided overall
policy direction and approved study recommendations and
implementation measures.
The CUP is both a technical and a guidance document. It seeks to
identify conflicts between various land use dynamics surrounding
DAFB and propose specific and achievable mitigation strategies to
protect and enhance not only DAFB but the surrounding
communities. The CUP recommendations are the foundation for
future action by all of the project stakeholders as they relate to
viability of the same entities they depend upon to support the base. compatible land use. The intent of this plan is to provide a guide to
Stakeholders and agencies represented in this study include DAFB, decision makers in promoting decisions, policies, and
City of Dover, Dover/Kent County MPO, Kent County Levy Court, recommendations that ensure the viability of DAFB long into the
Office of State Planning (OSPC), Department of Natural Resources future.
Page iv
72
Page 73
Item 3.
Executive Summary Dover Air Force Base – Compatible Use Plan
Local jurisdictions recognize the importance of maintaining the seeking ways to reduce operational impacts on adjacent public and
capability of DAFB by protecting it from urban encroachment and private lands.
have developed a strong working relationship with DAFB in matters
The data collection for this study included the most recent
of development planning. Kent County and the City of Dover have
information available between the dates of September 2021 to
taken steps to support the mission of DAFB by adopting land use
August 2022. The data gathering efforts consisted of a technical
plans and zoning controls that limit encroachment into the flight
and policy evaluation of local, state, and federal guidelines,
paths and operations of the airfield. Continued maintenance of the
regulations, and conditions guided by the Policy and Technical
land use and zoning restrictions currently in place will ensure the
Committees, as well as a robust public involvement process. Central
viability of DAFB while helping to provide valuable information to
to the data collection efforts is the collection of regional GIS data for
the owners and potential owners of impacted properties.
the entire study area. The data sets were categorized and are
The plan’s policies and recommendations intend to improve included in a web map, located on the project website hosted by
collaboration between all stakeholders by encouraging cooperative DelDOT, that can be used by stakeholders and resource agencies to
land use and resource planning between DAFB and area coordinate and collaborate uses within the study area. Included in
stakeholders so that future development is compatible with the the data gathering phase was a DAFB installation tour held on April
training and operational missions at DAFB while, at the same time, 25, 2022, which included a visit to Port Mahon.
Twenty-two stakeholder interviews were conducted to determine
concerns, issues, and possible mitigation strategies. The
stakeholder interviews identified common themes pertaining to
land use codes, communication, land preservation processes, and
the importance of Port Mahon.
The CUP process has placed a heavy emphasis on public and
stakeholder participation to build consensus across varied interests
officials, business owners, municipalities, County, City, and State
officials. Significant public outreach results in greater community
support and input into the planning process and the future for the
section of opinions and priorities resulting in feasible, practical
solutions that marry the ultimate goals of protecting the safety,
security, and long-term viability of both DAFB and the surrounding
communities. A public engagement strategy was developed and
Page v
73
Page 74
Item 3.
Executive Summary Dover Air Force Base – Compatible Use Plan
adopted by the Technical Committee at the onset of the CUP Study. mitigation strategies to gather feedback. Public input was also
The goals for public outreach on this project include: solicited through two interactive planning sessions for the existing
Borrow Pit located at 1800 S. Bay Road, Dover, Delaware 19901.
1. Provide opportunities to include the public in the planning
The Two interactive planning sessions were held to discuss the
process
potential future uses of the Borrow Pits should the borrow pits ever
2. Increase the accessibility and transparency of information
available to the public decide to redevelop or sell the property, including the feasibility of
3. Increase the efficiency of the public outreach process future uses, as well as potential maintenance and management
4. Provide the public opportunities to be heard in the process entities who could maintain the potential changes.
5. Final decisions should meet the needs of stakeholders
As part of the DAFB CUP compatibility issues were identified and
6. Adhere to the applicable federal and state requirements
recommendations were developed, see Chapter 5. The
including the Americans with Disabilities Act of 1990 and Title VI
7. Ensure that all have equal access to information, meeting recommendations include strategies and tools designed to address
locations, input opportunities and a voice during the these compatibility issues including implementation strategies,
development of the plan agencies who will champion the implementation, and timelines for
Numerous methods were utilized to inform the surrounding implementation.
communities of DAFB CUP. Flyers, e-mail notifications, and web
The CUP planning process is intended to protect and preserve
page and social media notices were used to advertise the military readiness and defense capabilities while supporting
workshops. DelDOT, the project sponsor, created a website housing continued community economic development. The process is based
all of the data gathered, maps of the project area showing existing on data collection and an analysis of that data. The CUP planning
conditions, videos and written summaries of all meetings, and process includes an Implementation Plan, see
advertisements for upcoming events and meetings related to this Chapter 6, with monitoring responsibilities identified, to ensure the
Study. The City of Dover, Dover / Kent County MPO, elected recommendations advanced in the CUP are realized. The
officials, and others also assisted in promoting the meetings and Implementation Plan includes a list of specific public and private
community workshops. Elected officials were briefed ahead of all actions for each study participant organized by their scheduled
community workshops so that they were in a good position to execution date:
answer questions should a constituent approach them about this • Short Term (1-3 years)
Study. • Medium-Term (4-10 years)
• Long-Term (11-20 years)
Stakeholder and agency coordination through stakeholder Each listed action assigns responsibility for the task and includes an
interviews, as well as the Technical and Policy Committees were estimate of costs and funding sources. These recommended actions
open to the public. In addition, two hybrid public workshops include smart land use planning principles and practices to achieve a
preceded by public officials briefings were held to inform the public balance between potentially conflicting interests. The Compatible
of the data gathered, CUP process, concerns, potential conflicts, and Use Plan is the culmination of strategies developed through the
Page vi
74
Page 75
Item 3.
Executive Summary Dover Air Force Base – Compatible Use Plan
stakeholder process and provides recommendations for future would prepare a yearly summary report documenting the
implementation. In addition to preparing mitigation strategies the implementation of the toolkit in addition to documenting the steps
plan also includes community-based methods for informing citizens taken through the Monitoring Committee to implement the toolkit
of the reasoning behind the mitigation strategies. as well.
The strategies developed were designed to address the issues
identified during DAFB CUP. The purpose of each strategy is to
accomplish the following:
1. Avoid future actions, operations, or approvals that would
cause a compatibility issue; and
2. Eliminate existing compatibility issues where possible; and
3. Facilitate enhanced, ongoing communication and
collaboration as mechanisms for effective compatibility
planning and avoidance of future encroachment.
For ease of use, these strategies are presented in a table format
showing the issues and strategies and information on how each
strategy should be completed. The strategies are identified based
on categories to better help the user know what type of approach is
needed.
Upon completion of the DAFB CUP Study, agencies first task will be
to afford funding, review policies, and identify strategies for
implementing this CUP. It is also suggested that DAFB and DelDOT
create a Monitoring Committee. The Monitoring Committee would
serve as a facilitator and agent of the Plan. The Monitoring
Committee would attend meetings, request updates, and monitor
the task implementation. The Monitoring Committee would also
hold quarterly meetings with members of the CUP Study’s Police
and Technical Committees to keep this Policy in the forefront.
Additionally, the Monitoring Committee would prepare a yearly
community workshop to summarize efforts to implement this
toolkit on a yearly basis. In addition, the Monitoring Committee
Page vii
75
Page 76
Item 3.
ENGINEERING – SURVEY – HYDROGRAPHIC
53 ATLANTIC AVENUE – SUITE#3 OCEAN VIEW,
DE 19970
PH: (302) 537-1919
6/5/2025
City of Dover, Department of Planning and Inspections
Attention: Dawn Melson-Williams
15 Loockerman Plaza, Dover, DE
RE: 350 LAFFERTY LANE, DOVER INDUSTRIAL PHASE 2 - NARRATIVE
Introduction
Phase 2 of Dover Industrial is an extension of the approved final plan for Phase 1 of the Dover Industrial
project, located at 350 Lafferty Lane, which was approved by the City of Dover on 5/25/2025. This
phase of the project is located to the rear of Phase 1, behind building A and will include two warehouse-
style buildings for light industrial use.
Existing Conditions
A portion of the existing land has been cleared from phase 1. The remaining area contains wooded
acreage and non-tidal wetlands to the rearmost parts of the parcel. The existing entrance onto the
property is shared from the adjacent Frito Lay Distribution Center to the southwest corner of the parcel.
There are no on-site entrances directly to Lafferty Lane. Existing stormwater is present in the form of a
stormwater pond to the East which was approved for the entire site with the phase 1 project. The soils
are comprised of mostly “C” rated soils and the existing zoning of this parcel is listed as “M”
(Manufacturing Zone). The property is also in two different airport overlay zones (AEOZ), accident
potential zone 1 (APZ1) and accident potential zone 2 (APZ2).
Proposed Design
Phase 2 of this project provides 2 warehouse style buildings with 8” fire suppression lines, paved
parking, and paved drive aisles for access to the buildings. The total building footprint for this phase is
178,000 square feet, asphalt and concrete coverage is 137,881 square feet, which yields a total proposed
impervious area of 315,881 square feet of coverage.
The buildings are intended to accommodate multiple end-users. The uses will conform to the
performance standards set forth in Article 5 section 8 of the Zoning Ordinance of Dover and section 19.1
specified as the Manufacturing Zone Uses permitted. End users must also conform to the regulations
listed in Section 22 – Airport Environs Overlay Zone.
Stormwater
Stormwater on the East side of building C will flow into the stormwater pond approved in phase 1 via
curb-cuts. The remaining stormwater will be collected from inlets throughout phase 2 parking and
carried by pipes to utilize the same pond.
Utilities
Trash pickup will be managed privately as there are screened dumpsters proposed on-site for each
building. Water and sewer service will be provided by the City of Dover and will be a continuation of 76
the phase 1 design. The onsite sewer lateral is proposed as a 6” pipe to continue to the phase 1 cleanout
Page 77
Item 3.
and manhole then out through an 8” gravity main. Two fire hydrants are proposed with this phase and
each building has been designed with a fire department connection as an auxiliary feed for the fire
suppression systems. The 8” fire suppression lines entering each building are fed by the phase 1 pump
house.
Parking
Parking will meet the Manufacturing Zone code standards which is 1 space per 800 square feet of floor
space. The entire project will require 290 spaces based on this calculation. This phase proposes 197
spaces (which includes 4 ADA van accessible spaces). With the phase 1 subtotal of 93 from phase 1, the
total parking proposed is 290 spaces.
Trees & Landscape
Phase 2 of this project proposes 27 trees to be planted on-site. The total undeveloped lot included
316,353 square feet of wooded area. The total preserved wooded area is equal to 159,564 square feet
which is greater than 50% of the original wooded area and as such, woodland mitigation will not be
necessary. The undeveloped non-woodland area of the site is 701,074 square feet. The entire project is
required to have 234 trees (as calculated from 701,074/3,000) to offset the development of the site. In
total, the two phases together propose 60 trees to be planted onsite. The remaining 174 trees are to be
planted offsite as per the agreement with the City of Dover.
Performance Standards
The site will be subject to the performance standards as per article 5 section 8 of the City of Dover
Zoning Ordinance and as such will be subject to the performance standards review. All construction
equipment will be inspected by authorized personnel deemed suitable by the contractor and will be
powered by modern diesel engines with unaltered factory emission controls installed as per the
manufacturer. No explosives will be used in the construction of this project. Daily operations will keep
dust to a minimum with on-site water tank trucks as needed. Erosion and sediment control devices
including and not limited to silt fence and inlet protection will be in place during the entire construction
process.
Summary
We are respectfully seeking preliminary site concept approval for the phase 2 design of Dover Industrial
which includes 2 warehouse buildings similar in architecture to the building proposed in phase 1. There
will be ample parking which includes ADA van accessibility and bicycle parking. Screened dumpsters,
utilities, and stormwater management are also proposed for this project. We are excited to be working
with the City of Dover and look forward to the upcoming reviews and approval.
We thank you for your time and consideration.
Sincerely,
ERNEST A. LEMP, JR. PLITKO
ENGINEERING
53 Atlantic Ave., Suite#3
Ocean View, DE 19970
Phone: 302-537-1919
Email: ernie@plitko.com
77
Page 78
Item 3.
6/6/2025 8:02:57 AM
PLAN DATA EXISTING CONDITIONS LEGEND
DOVER INDUSTRIAL
1 TAX MAP ID 2-05-07716-02-0500-00001 EXISTING PROPERTY LINES
2 DEED / PLAT REFERENCE DB 13202 PG.201 / PB 149 PG.22 EXISTING RIGHT OF WAY
350 LAFFERTY LANE ADJOINING PROPERTY LINES
3 ADDRESS
DOVER, DE 19901
EXISTING 1 FOOT CONTOUR
PROJECT SITE ENTRANCE IS LOCATED 1568'+/- WEST
EXISTING 5 FOOT CONTOUR
4 LOCATION OF THE INTERSECTION OF LAFFERTY LANE
PHASE 2 CONCEPT PLAN
AND HORSEPOND RD IN DOVER, DE. EXISTING NON-TIDAL WETLANDS LINE
SITE LATITUDE: N: 39.149638° EXISTING 30' WETLANDS BUFFER LINE
5
SITE LONGITUDE: W: -75.492169°
CONCRETE MONUMENT FOUND SOUTHEAST
PE EXISTING DELDOT PERMANENT EASMENT
REVISIONS
6 SITE BENCHMARK CORNER OF BOUNDARY AT ROW AS SHOWN
ELEV=20.01 (DATUM NAVD88) 350 LAFFERTY LANE BSL
EXISTING EASEMENT
BUILDING SETBACK LINE
7 EXISTING PARCEL AREA (LOT 1)
PHASE 2
860,637.99 SQ.FT / 19.74 ± ACRES
LITTLE CREEK WATERSHED, EAST DOVER HUNDRED EXISTING AIRPORT HAZARD ZONE LINE
EXISTING NOISE ZONE LINE
8 8.65 ± AC
LIMIT OF DISTURBANCE
CITY OF DOVER, DELAWARE EXISTING BOTTOM OF DITCH
EXISTING TOP OF BANK
M (MANUFACTURING ZONE) CITY OF DOVER
9 EXISTING/PROPOSED ZONING AEOZ: ACCIDENT POTENTIAL ZONES I & II
NOISE ZONE A (225 SF) T.M. # 2-05-07716-02-0500-00001 SD
EX.SS
SD EXISTING STORM CULVERT
EXISTING SANITARY SEWER PIPE
EX.W EXISTING WATERLINE
FRONT: 40'
PROPOSED SIDE YARD: 20' S EXISTING SANITARY SEWER MH
10
SETBACKS REAR YARD: 20'
SIDE OR REAR ADJ. RESIDENTIAL: 50' EXISTING SANITARY SEWER CLEANOUT
VACANT LOT (AGRICULTURAL AND WOODLAND) EXISTING HYDRANT
11 PRESENT LAND USE:
PLITKO
12 PROPOSED LAND USE INDUSTRIAL WAREHOUSE EXISTING UTILITY POLE
ENGINEERING
STATE OF DELAWARE
PANEL # 10001C0188J (PANEL 188 OF 435), DATED 52
EXISTING GAS VALVE
FEMA 202
13 7/7/2014, AS BEING IN FLOOD ZONES "X", AREA OF 95
EXISTING LIGHT POLE
FLOOD ZONE 41 48
MINIMAL FLOOD HAZARD. WILMINGTON
2
EXISTING STREET SIGN
14 PROPOSED SEWER PUBLIC WORKS WASTEWATER DIVISION 95
15
40 CMF CONCRETE MONUMENT FOUND
PROPOSED WATER PUBLIC WORKS WATER DIVISION
71
13 IPF IRON PIN FOUND
CONTACT DATA 301
299 ODESSA
BOUNDARY POINT ENGINEER - SURVEY - HYDROGRAPHIC
MIDDLETOWN
DOVER INDUSTRIAL, LLC TP-# SOIL BORING LOCATION
34752 DELAWARE AVE, UNIT 6 NEW
CASTLE
EXISTING PAVEMENT
53 ATLANTIC AVE., STE 3
COUNTY
OWNER/ FRANKFORD, DE 19945
1 SMYRNA OCEAN VIEW, DE 19970
DEVELOPER ATTN: TRAVIS MARTIN SITE EXISTING CONCRETE
302-245-9323 300 13 Phone (302)-537-1919
tmartin@coastaltradesupply.com EXISTING RIPRAP
8 DEL
A
RE B
DOVER
PLITKO ENGINEERING, L.L.C. MD. EXISTING CROSS ACCESS EASEMENT
AWA
53 ATLANTIC AVE., STE 3
2 DESIGNER OCEAN VIEW, DE 19970 SITE 113 Y
EXISTING STORMWATER EASEMENT
DELAWARE
SITE KENT 13
302-537-1919 COUNTY FE
RR
rplitko@plitko.com AY
Y EXISTING NON-TIDAL WETLANDS AREA
MILFORD M
E
AP
-C
3 DELDOT SUBDIVISION BRANCH - 302-760-2260
1 W
LE
ES
MuA SOIL MAP UNIT SYMBOL
113
404
4 KENT CONSERVATION DISTRICT - 302-741-2600 BRIDGEVILLE 9 SOIL BOUNDARY LINE
REHOBOTH BEACH
18
GEORGETOWN
ATLANT
13
9
PROPOSED CONDITIONS LEGEND
IC OCEAN
OUTLINE OF AGREEMENTS LAUREL PROPOSED EDGE OF PAVEMENT
KENT COUNTY
SUSSEX COUNTY
1
113 12 PROPOSED 1 FOOT CONTOUR
STORMWATER AGREEMENT WITH ADJACENT PARCEL OWNER
1 1/23/2025
PHASE 2 CONCEPT PLAN
DEVRECO, LLC 10 PROPOSED 5 FOOT CONTOUR
PROPOSED BUILDING
DOVER INDUSTRIAL
1 3/19/2025
SHARED ENTRANCE AGREEMENT WITH ADJACENT PARCEL
OWNER DEVRECO, LLC
LOCATION MAP 1"=400' LOCATION MAP 1"=2000' LOCATION MAP NO SCALE PROPOSED CURB
PROPOSED STORMWATER EASEMENT
PR.W
PR.W PROPOSED DOMESTIC WATERLINE
PR.8''FW PROPOSED FIRE WATERLINE
EAST DOVER HUNDRED
PR.6''SS PROPOSED SANITARY SEWER PIPE
PR.2''FM PROPOSED SANITARY FORCE MAIN
PROPOSED STORM PIPE
PROPOSED STORM SEWER INLET
S PROPOSED SANITARY MANHOLE
SHEET INDEX
LAFFERTY LANE
PS PROPOSED PUMP STATION
SHEET # DESCRIPTION
PROPOSED SIGN
G100 COVER SHEET AND GENERAL NOTES
C101 EXISTING CONDITIONS PLAN PROPOSED CONCRETE MONUMENT
C102 PHASING KEY PLAN
PROPOSED TREELINE
C103 PHASE 2 SITE PLAN
L101 PHASE 2 LANDSCAPE & LIGHTING PLAN PROPOSED CONCRETE
L102 LANDSCAPE MITIGATION PLAN
PROJECT NOTES PROPOSED HEAVY DUTY CONCRETE
PROPOSED DELDOT CONCRETE
1. TOPOGRAPHIC SURVEY:
DOVER
A. FIELD GENERATED TOPO BY PLITKO L.L.C. IN NOVEMBER 2024.
B. SITE BENCHMARK IS A CONCRETE MONUMENT FOUND AT THE EASTERN
OWNER / DEVELOPER CERTIFICATION
PROPERTY CORNER ALONG LAFFERTY LANE, AS SHOWN ON PLAN: ELEVATION:
20.01' NAVD 88. I, THE UNDERSIGNED, HEREBY CERTIFY THAT I AM THE OWNER / DEVELOPER OF THE
PROPERTY AS DESCRIBED AND SHOWN ON THIS PLAN, THAT THE PLAN WAS MADE AT MY
2. BOUNDARY SURVEY PERFORMED BY PARKER AND ASSOCIATES PER RECORD PLAN IN DIRECTION, AND THAT I ACKNOWLEDGE THE SAME TO BE MY ACT AND DESIRE THAT THE
PLOT BOOK PAGE 149-22, DATED DECEMBER 8, 2022. PLAN BE DEVELOPED AS SHOWN AND IN ACCORDANCE WITH ALL APPLICABLE LAWS AND
SITE BOUNDARY BASED ON DEED OF RECORD FOR SUBJECT AND ADJACENT PARCELS. REGULATIONS.
3. EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS, INCLUDING TELEPHONE,
ELECTRIC, CABLE TV, GAS, WATER, SEWER, FORCE MAINS AND STORM DRAINAGE ARE
PLAN PURPOSE
BASED ON THE BEST AVAILABLE INFORMATION AND ARE SHOWN FOR CONVENIENCE
OF THE CONTRACTOR ONLY. NO GUARANTEE IS MADE OR IMPLIED REGARDING DOVER INDUSTRIAL, LLC DATE
ACCURACY OR COMPLETENESS THEREOF. CONTRACTOR IS RESPONSIBLE FOR THE THE PURPOSE OF THIS PLAN IS FOR THE CONSTRUCTION OF COMMERCIAL 34752 DELAWARE AVE, UNIT 6
VERIFICATION OF THE LOCATION, DEPTH, SIZE AND MATERIAL OF ALL UNDERGROUND BUILDINGS, ACCESS ROAD AND PARKING AREA FOR A PROPOSED WAREHOUSE FRANKFORD, DE 19945
UTILITIES TO HIS OWN SATISFACTION BEFORE BEGINNING ANY EXCAVATION OR PIPE COMPLEX WITH ASSOCIATED STORMWATER MANAGEMENT.
TMARTIN@COASTALTRADESUPPLY.COM
LAYING. THE CITY, OWNER, AND ENGINEER DISCLAIM ANY RESPONSIBILITY FOR THE
ACCURACY OR COMPLETENESS OF SAID INFORMATION. IF THE CONTRACTOR RELIES ATTN: TRAVIS MARTIN
ON SAID INFORMATION, HE/SHE DOES SO AT HIS/HER OWN RISK. THE PROVISION OF
THE INFORMATION ON THE PLANS WILL NOT RELIEVE THE CONTRACTOR OF HIS/HER
OBLIGATIONS TO SUPPORT AND PROTECT ALL SHOWN NOT SHOWN EXISTING UTILITIES SITE DESIGNER CERTIFICATION
AND APPURTENANCES. SHOULD ANY EXISTING UTILITIES BE DAMAGED BY THE
CONTRACTOR, THEN THE CONTRACTOR SHALL REPAIR THE DAMAGE CAUSED TO THE
CITY'S SATISFACTION, AT THE CONTRACTOR'S EXPENSE.. THE CONTRACTOR SHALL I, ROB PLITKO, HEREBY CERTIFY THAT I AM A REGISTERED ENGINEER IN THE STATE OF
MAKE HIS OWN INVESTIGATION AND TEST PIT EXISTING UTILITIES AS REQUIRED. DELAWARE, THAT THE INFORMATION SHOWN HERON HAS BEEN PREPARED UNDER MY
SUPERVISION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF REPRESENTS GOOD
4. THE CONTRACTOR SHALL PROVIDE STAKEOUT SURVEY NECESSARY FOR THE ENGINEERING PRACTICES AS REQUIRED BY THE APPLICABLE LAWS OF THE STATE OF
BUILDING CONSTRUCTION, PARKING LOT CONSTRUCTION, THE INSTALLATION OF DELAWARE.
UTILITY WORK AND APPURTENANCES, AND DETERMINATION OF RIGHT-OF-WAY.
5. CONTRACTOR SHALL EXERCISE CAUTION AND TAKE MEASURES NECESSARY TO
PROTECT TREES SLATED TO REMAIN DURING CONSTRUCTION ACTIVITIES. DAMAGE TO ROB PLITKO P.E. LIC. NO. 14093 DATE
TREES TO BE REPLACED, IN KIND, AT THE CONTRACTOR'S EXPENSE.
6. DEBRIS DISPOSAL: NO DEBRIS WILL BE BURIED OR DISPOSED OF ON THIS SITE.
CITY OF DOVER APPROVAL BLOCK
7. NON-TIDAL WETLANDS ARE PRESENT ON THE SITE AS SHOWN.
8. USGS QUAD MAP SHOW THAT THERE ARE NO BLUE LINE STREAMS ON THIS SITE.
9. DRAINAGE, EROSION AND SEDIMENT CONTROL, AND STORMWATER MANAGEMENT
PROJECT DATUM
SHALL BE PROVIDED IN ACCORDANCE WITH THE DELAWARE SEDIMENT AND
HORIZONTAL: DE NAD 1983
STORMWATER REGULATIONS AND THE KENT CONSERVATION DISTRICT CODE.
VERTICAL: NAVD 1988
10. ALL STORMWATER MANAGEMENT FACILITIES ARE TO BE OWNED AND MAINTAINED BY
THE OWNER.
11. ALL SIGNS SHALL BE INSTALLED ON BREAKAWAY POSTS.
DOVER PH2 CONCEPT PLAN.dwg
12. THE ROADS, PARKING, AND OTHER PAVED OR STONE AREAS WILL BE PRIVATELY
MAINTAINED AND ARE NOT INTENDED FOR DEDICATION.
SHEET
COVER SHEET & GENERAL NOTES G100
78
Page 79
Item 3.
EXISTING CONDITIONS LEGEND
FgcA
EX.8''W
HSG C
EXISTING PROPERTY LINES
EXISTING RIGHT OF WAY
ADJOINING PROPERTY LINES
EXISTING 1 FOOT CONTOUR
EX.8''SS
>
EXISTING 5 FOOT CONTOUR
EX.8''W
EXISTING NON-TIDAL WETLANDS LINE REVISIONS
SWM POND EXISTING 30' WETLANDS BUFFER LINE
PE EXISTING DELDOT PERMANENT EASMENT
EXISTING CMF
INLET EX.24''FM
EXISTING EASEMENT
RIM:19.00'
EX.24''FM
EX.8''SS
INV IN=16.50' UE BSL BUILDING SETBACK LINE
UE
INV OUT=16.50' EX.24''FM UE
EX.8''W
UE
NT EX.24''FM UE EXISTING AIRPORT HAZARD ZONE LINE
N/F EASEME
SEWER UE
LAFFERTY LANE PROPERTIES LLC NITARY EX.24''FM UE
DRAINAGE & 10' WIDE SA EXISTING NOISE ZONE LINE
EXISTING UE
ID #2-05-07716-02-0600-00001 MAINTENANCE EX.24''FM UE
ZONED MANUFACTURING PROPERTY UE PE
EX.24''FM EXISTING BOTTOM OF DITCH
WV
EASEMENT UE
LINE UE EXISTING
10' WIDE SANITARY (PB 149 PG.22) EX.24''FM UE
EX.24''FM
SEWER EASEMENT UE EXISTING 12" HDPE EXISTING TOP OF BANK
EX.24''FM UE
(PB 149 PG.22) S38°11'46"E 534.23 UE
UE EXISTING
20 15" HDPE SD 65'
EX.24''FM FES
EX.8''SS
UE SD SD SD EXISTING STORM CULVERT
EX.24''FM
UE INV OUT=16.00' SD SD
19
EX.8''W
UE SD EX.SS EXISTING SANITARY SEWER PIPE
22 UE
EX.24''FM UE
EXISTING SWM EASEMENT 20 UE 18
2121 EXISTING PE
EX.24''FM UE EXISTING EX.W EXISTING WATERLINE
21 UE 17 CONCRETE
EX.24''FM UE WAREHOUSE
8 20 UE EXISTING SD TYPICAL S EXISTING SANITARY SEWER MH
6"E 329.5 16
PLITKO
EX.24''FM UE
S38°16'4 19UE
20 PARKING
ENGINEERING
EX.24''FM
UE 15 EXISTING SANITARY SEWER CLEANOUT
EX 30'' FM UE 15 EXISTING
IPF UE 18 19 16 EXISTING
8''SS
N51°41'46"E 48.74 M CONCRETE EXISTING HYDRANT
EX 30''UF UE EXISTING
EX.8''SS
UE E 17 INLET
UE UE 17 GABION WALL SIDEWALK
S60°22'56"W 301.36
RIM:18.50'
EX.8''W
M
UE
UE EX 30'' F UE 18 SD (TYP) EXISTING UTILITY POLE
UE UE 17 SD 19 INV OUT=16.80' EXISTING
M
UE EX 30'' F
UE
UE 18 SD PIPE EXISTING GAS VALVE
M UE SD 19
EX 30'' F UE
IPF 19 EXISTING 16 N/F EXISTING CROSS SD EXISTING LIGHT POLE
SD
3 19 SWM POND EXISTING 19
DEVRECO, LLC ACCESS EASEMENT
EXISTING EXISTING STREET SIGN
214.8 18 DB 1138 PG.198 EXISTING (PB 149 PG.22)
7'50"E SAN SEWER
D
GABION WALL ENGINEER - SURVEY - HYDROGRAPHIC
S43°3 BSL 16
17 ID#2-05-07716-02-0501-00001 EOP PIPE CMF CONCRETE MONUMENT FOUND
17
EX.8''SS
ZONED MANUFACTURING (TYPICAL)
18
EX.8''W
BSL 15 LAND USE: INDUSTRIAL EXISTING PE SD
IPF IRON PIN FOUND 53 ATLANTIC AVE., STE 3
BSL WAREHOUSING SDMH EXISTING
EXISTING BOUNDARY POINT OCEAN VIEW, DE 19970
21 17 ENTRANCE
SD
BSL 22 PAVEMENT EXISTING
15
16 17 18
20
EXISTING
18 CURB TP-# SOIL BORING LOCATION Phone (302)-537-1919
19
EXISTING CABLE RIP RAP (TYP) 16
LOT 2 (TYPICAL)
BS BUILDING FOR FIBER 2.99 +/- AC EXISTING PAVEMENT
L 19 BENCHMARK #1
30' NON-TIDAL OPTIC LINES PB 149 PG.22 20
EXISTING ELEV:20.01' EXISTING CONCRETE
WETLANDS SD
19 PE NAVD 88
DELAWARE
SD PIPE
EX.8''SS
BUFFER (NTWB)
2EX.8''W
L1 BS 23 EXISTING PUMP HOUSE 20 CONC MON FND EXISTING RIPRAP
0
4 L 23 CMF
FOR FIRE LINES N: 418270.33
22 SD 1 EXISTING CROSS ACCESS EASEMENT
18 S34°48'23"E 421.7 E: 635240.85
20
BS 21 17 EXISTING STORMWATER EASEMENT
L D BSL BSL
EX.24''FM
PR.18''S
20 17 18
BSL BSL
BSL
19 EXISTING NON-TIDAL WETLANDS AREA
19 BSL BSL
BSL
L BS AE
BSL
EXISTING FIRE HYDRANT BSL
L1 O MuA SOIL MAP UNIT SYMBOL
AE Z MA EX.8''W EX.8''SS
3
EX.15''SD
EX.8''SS EX.8''SS EX.8''SS EX.8''SS PE
EXISTING CO S
EX.6''SS S
19
EX.15''SD
OZ PE
P
KENT COUNTY
MA -AC
BS TREELINE 22 EX.8''W EX.8''W EX.8''W EX.8''W SOIL BOUNDARY LINE
EX.8''FW EX.8''FW EX.8''FW
L (TYPICAL)
P-A CID
EXISTING SEWER S
21
WM
WM
''S 19
BSL
.8 20
CC ENT
L1 19
20 CLEANOUT PH 1 PR 19
2
EX.24''FM
NON-TIDAL
PHASE 2 CONCEPT PLAN
BS 18 IDE P
END EXISTING 8"
NT OTE
WETLANDS WATER PH 1 EXISTING FIRE HYDRANT
LINE TABLE
L
AREA=0.1770 AC 17
N
DOVER INDUSTRIAL
PO
S
PE
TE TIAL
EX.8''W
LINE# LENGTH BEARING
EX.8''W
(KCR 347 - MINOR COLLECTOR)
L1 FIRE
EX.15''SD
NT BSL
IAL ZONE
PE
1 BS
PyA EX.15''SD
EXISTING SEWER LATERAL
PR.18''SD
LAFFERTY LANE
EX.8''SS
L LANE L1 11.320 N33° 20' 28.00"E
AND MANHOLE FOR SITE
EX.8''SS
HSG C
ZO I
21
NE I L2 14.680 N33° 02' 24.00"E
L
BS I 20
L3 53.760 N31° 45' 18.00"E
EX.24''FM
PyB BSL PE
EAST DOVER HUNDRED
L1 0 L4 28.200 N32° 03' 52.00"E
HSG C
EXISTING EASEMENT
EX.8''W EX.8''W
19 L5 27.680 N27° 59' 06.00"E
S58°53'12"W 597.09
L
BS FOR PUBLIC USE TO BE MOVED
L6 53.220 N27° 18' 27.00"E
PU 20 PE
NC W BSL 22
EX.15''SD
L7 138.780 N24° 30' 04.00"E
EE BS
L 18
EX.15''SD
PE
FR 1
L8 124.770 N20° 08' 42.00"E
N PR.15''SD EX.24''FM
LAFFERTY LANE
E L9 41.650 N17° 12' 37.00"E
RU UT A )
FIRE
L9 19 FgcA BSL
EX.8''W
L
EX.8''W
L10 68.940 N15° 32' 47.00"E
N 0
O RO R 15
BS HSG C LANE
EX.8''SS
17 18
HE US (KC
L8 17 L11 67.330 N13° 20' 20.00"E
PE
17 17 EXISTING FIRE HYDRANT PE
EX.15''SD
L12 39.780 N11° 09' 22.00"E
AY L TO REMAIN
EX.15''SD
BS
BSL 23
L13 82.760 N10° 15' 49.00"E
EX.24''FM
WV
18 L14 132.080 N06° 44' 35.00"E
EXISTING SEWER LATERAL
EXISTING TO BE ABANDONED
EX.8''W EX.8''W
L 18
BS PER CITY STANDARDS
224 BUILDING A
DOVER
2232
EX.8''SS
24 21
BSL
2223
192021
0 PE
PHASE 1
PE
20
54,000 SF EXISTING
L 18 FIRE PROPERTY
BS
L7
21 LINE
LANE
FgcA
EX.24''FM
SOILS INFORMATION
HSG C
22 BSL
EX.8''W EX.8''W
EX.15''SD
L PE HYDROLOGIC
EXISTING BS SOIL
24 SOIL DESCRIPTION SOIL GROUP
PyA
EX.8''SS
PROPERTY TYPE
EXISTING WV
RATING
LINE 23 PE
HSG C
TREELINE
L (TYPICAL) BSL PINEYNECK LOAM, 0 TO 2
BS END EXISTING 8" PyA C
WATER PH 1 PERCENT SLOPES
L6
EX.24''FM
EX.8''W PE
18
EX.8''W
EX.15''SD
18 PINEYNECK LOAM, 2 TO 5
BSL
L PyB C
BS 18 8
1 EXISTING DUMPSTER
FIRE PERCENT SLOPES
EX.8''SS
L5 18
18 PAD ENCLOSED LANE
PE
EXISTING
L4 EOP FALLSINGTON LOAMS, 0
L
19 19 (TYPICAL) TO 2 PERCENT SLOPES,
BS BSL BSL BSL BSL PE FgcA
MID-ATLANTIC COASTAL
C/D
19 0 BSL 23
EX.24''FM
18 2
23
21 24 25 PLAIN
1 22 EXISTING FIRE HYDRANT
EX.8''W
212
23
24
20 5''SD
L3 20
PR.1
19 24
L
BSL 18 19
BSL 20 BSL BSL PR.15''SD
ZEKIAH SANDY LOAM,
BS BSL
EX.8''SS
BSL BSL BSL BSL 19
19
20
Za B/D
BSL BSL BSL BSL FREQUENTLY FLOODED
BSL
L2 18 N32°21'54"W 74.45
N32°26'46"W 112.21
L1 N32°20'34"W 568.21
N32°15'42"W 124.20 CMF NON-TIDAL EXISTING N/F
30' NON-TIDAL EXISTING NON-TIDAL WETLANDS OPAQUE DORIS SUMMERS
WETLANDS PROPERTY WETLANDS BARRIER ID #2-05-07700-01-2300-00001
EX.8''W
LINE 0 60 90 120
BUFFER (NTWB) LINE AREA=0.5396 AC ZONED R20
LAND USE: ONE FAMILY
RESIDENCE ZONE
EX.8''SS
N/F
DELAWARE, STATE OF GRAPHIC SCALE
ID#2-05-07700-01-2300-00001 1 inch = 60 feet
ZONED MANUFACTURING N/F
LAND USE: AGRICULTURAL ROBERT K. GARRISON PROJECT DATUM
ID#2-05-07700-01-2300-00001 HORIZONTAL: DE NAD 1983
ZONED R20 VERTICAL: NAVD 1988
LAND USE: ONE FAMILY
RESIDENCE ZONE
TP
DOVER PH2 CONCEPT PLAN.dwg
SHEET
EXISTING CONDITIONS PLAN C101
79
Page 80
Item 3.
6/6/2025 8:03:04 AM
UE EX.24''FM
EX.24''FM UE WV
UE
EX.24''FM UE
UE
UE
EX.24''FM UE
6"E 534.2
3 UE SD 65'
EX.8''W
S38°11'4 EX.24''FM
UE SD PE
EX.8''SS
UE
UE SD
EX.24''FM UE SD
UE SD
EX.24''FM UE SD
UE
EX.24''FM
EX.24''FM UE
UE
EX.24''FM UE
UE
EX.24''FM UE SD EXISTING
S38°16'4
6 "E 329.58
UE
EX.24''FM UE
UE WAREHOUSE PE REVISIONS
EX.8''W
M
EX 30'' F UE UE
EX.8''SS
IPF M UE
EX 3E0'' F UE
8''SS
U
M
EX 30'' F UE UE EXISTING STORMWATER FACILITY
EX.24''FM
UE TO BE EXPANDED AS PART OF
S60°22'56"W 301.36
PHASE 1 CONSTRUCTION SD
SD
SD N/F
PE
EX.8''W
IPF DEVRECO, LLC SD
SD
DB 1138 PG.198
SWM POND
EX.8''SS
ID#2-05-07716-02-0501-00001
ZONED MANUFACTURING D
LAND USE: INDUSTRIAL
BSL WAREHOUSING
8''SS
PE SD
EX.24''FM
EX.8''W
LOT 2 SD
EXISTING CABLE 2.99 +/- AC
EX.8''SS
BUILDING FOR FIBER PB 149 PG.22
PLITKO
OPTIC LINES
FIRE FIRE
ENGINEERING
SD
LANE EXISTING PUMP HOUSE BENCHMARK #1
LANE
FOR FIRE LINES ELEV:20.01'
PE NAVD 88
PROPOSED FIRE HYDRANT TO BE CONC MON FND
SD
CMF
EX.8''W
CONSTRUCTED DURING PHASE 2 N: 418270.33
SD E: 635240.85
1
S34°48'23"E 421.7
BSL EX.8''SS EX.24''FM
D BSL
PR.18''S
BSL
SD
BSL BSL
BSL BSL ENGINEER - SURVEY - HYDROGRAPHIC
BSL BSL
BSL BSL PE
AE EXISTING FIRE HYDRANT
PE 53 ATLANTIC AVE., STE 3
EX.8''W
O CONSTRUCTED DURING PHASE 1
BSL SD
AE Z MA PR.48''SD
8'' OCEAN VIEW, DE 19970
BS R.1
CO PR.6''SS CO EX.6''SS EX.6''SS S EX.8''SS EX.8''SS EX.8''SS EX.8''SS EX.8''SS S
P
L
OZ P EX.15''SD
Phone (302)-537-1919
MA -AC EX.15''SD EX.8''SS EX.24''FM
WM
PR.2''W EX.8''W EX.8''W EX.8''W EX.8''W EX.8''W EX.8''W
PR.8''FW EX.8''FW EX.8''FW EX.8''FW EX.8''FW EX.8''FW
P-A CID
WM
WM
'SS
L 8'
BS PROPOSED 10 X 20 ENCLOSED
CC ENT
.
L1 DUMPSTER PAD FOR PHASE 2
PHASE 2 PROPOSED BSL PR
2 FIRE DEPT CONNECTION
IDE PE
DELAWARE
P PE
NT OTE
FIRE FIRE EXISTING FIRE HYDRANT
EX.8''W
BS LANE LANE CONSTRUCTED DURING PHASE 1
PO N
S
L
PR.24''SD TE TIAL PR.48''SD EX.8''W
EX.15''SD BSL
L1 PROPOSED BICYCLE FIRE
EX.24''FM
NT
IAL ZON EX.8''SS
(KCR 347 - MINOR COLLECTOR)
EX.15''SD
1
PR.18''SD
L PARKING SUITABLE
BS
LAFFERTY LANE
FOR 5 BIKES
ZO E II
LANE
EXISTING BICYCLE PE
NE PARKING SUITABLE
BUILDING C
I FOR 5 BIKES
L
BS BSL PE
EX.8''W
PHASE 2 PROPOSED BICYCLE
KENT COUNTY
133,000 SF PARKING SUITABLE
PR.24''SD EX.8''W
L1 0 FF=24.00' FOR 5 BIKES
PR.24''SD EX.24''FM
L
EX.8''SS
BS
PHASE 2 CONCEPT PLAN
PE
EXISTING
BSL
S58°53'12"W 597.09
EX.15''SD BUILDING A
EX.15''SD
DOVER INDUSTRIAL
PU L PHASE 2 PROPOSED PHASE 1
W BS FIRE DEPT CONNECTION
EE
54,000 SF PE
EX.8''W
FF=24.00'
FR
PR.24''SD EX.8''W
BUILDING B BSL
N E1
PR.15''SD
PE
RU UT A)
L PHASE 2
PR.24''SD
BS
EX.8''SS EX.24''FM
45,000 SF FIRE
N 0
L9 O RO R 15 FF=24.00'
EX.15''SD
EAST DOVER HUNDRED
HE US (KC EX.15''SD LANE
NC BSL
L
L8
BS PHASE 2 PHASE 1
EX.8''W
AY PE
PE
L EX.8''W
BS
PR.24''SD
BSL
EX.24''FM
PHASE 2 PROPOSED
EX.8''SS
WV
EX.15''SD
FIRE DEPT CONNECTION
LAFFERTY LANE
EX.15''SD
EXISTING FIRE DEPT
L CONNECTION
BS
PE
EX.8''W
PE
BSL
EX.8''W
L
BS
EX.24''FM
FIRE
EX.8''SS
FIRE FIRE
L7 LANE LANE
EX.15''SD
D
15''S
LANE BSL PE
L
BS PROPOSED 5' PR.
EX.8''W
DOVER
SIDEWALK (TYP)
PE
EX.8''W
BS
L BSL WV
PROPOSED FIRE HYDRANT TO BE
EX.8''SS EX.24''FM
CONSTRUCTED DURING PHASE 2 PE
EX.15''SD
D
15''S EXISTING 5'
L PR.
SIDEWALK (TYP)
BS BSL
EX.8''W
L6
EX.8''W
PR.8''W PR.8''W
PE
L FIRE PE
BS
EX.24''FM
L5
EX.8''SS
PR.15''SD PR.15''SD
LANE BSL
EX.15''SD EXISTING FIRE HYDRANT TO BE
L4
EX.8''W
L CONSTRUCTED DURING PHASE 1
BS
BSL BSL BSL BSL PE
BSL BSL
PE
EXISTING 10 X 40 ENCLOSED
DUMPSTER PAD FROM PHASE 1 PR.1
L3 L 5''SD
EX.8''SS EX.24''FM
BS
BSL BSL BSL BSL PR.15''SD PR.15''SD
BSL BSL BSL BSL
PHASE TABULATIONS BSL BSL BSL BSL
BSL BSL BSL BSL
BSL
L2 N32°26'46"W 112.21 N32°21'54"W 74.45 EX.8''W
PHASE 1 PHASE 2 TOTALS
N32°20'34"W 568.21 N/F
LOD 11.1 AC 8.65 AC 19.75 AC (WITH PHASE OVERLAP) L1
N32°15'42"W 124.20 CMF DORIS SUMMERS
N/F ID #2-05-07700-01-2300-00001
EXISTING WOODED AREA PROPOSED REMOVAL PROPOSED REMOVAL PROPOSED REMOVAL
DELAWARE, STATE OF ZONED R20
± 7.26 AC ± 0.54 AC ± 3.06 AC ± 3.6 AC
ID#2-05-07700-01-2300-00001
EX.8''SS
LAND USE: ONE FAMILY
ZONED MANUFACTURING RESIDENCE ZONE
1 WAREHOUSE BUILDING AT 45,000 SF LAND USE: AGRICULTURAL
PROPOSED BUILDINGS 1 WAREHOUSE BUILDING AT 54,000 SF 1 WAREHOUSE BUILDING AT 133,000 SF 232,000 SF (±5.33 AC) 0 50 75 100
TOTAL: 178,000 EX.8''W
PROPOSED PAVING 103,918 SF 130,076 SF 233,994 SF (±5.37 AC) N/F GRAPHIC SCALE
ROBERT K. GARRISON 1 inch = 50 feet
ID#2-05-07700-01-2300-00001
ZONED R20 PROJECT DATUM
EX.8''SS
CONCRETE (CURB & SIDEWALK) 8,486 SF 7,805 SF 16,291 SF
HORIZONTAL: DE NAD 1983
VERTICAL: NAVD 1988
PARKING REQUIREMENT
54,000 / 800 178,000 / 800 232,000 / 800
1 PER 800 SF OF FLOOR SPACE
67.5 REQUIRED 222.5 REQUIRED 290 REQUIRED
290 REQUIRED TOTAL
PARKING PROVIDED
DOVER PH2 CONCEPT PLAN.dwg
93 (INCLUDING 2 ADA VAN ACCESSIBLE) 197 (INCLUDING 4 ADA VAN ACCESSIBLE) 290 (INCLUDING 6 ADA VAN ACCESSIBLE)
290
BIKE PARKING (1 PER 20 CARS)
5 PROVIDED OF 5 REQUIRED 10 PROVIDED OF 10 REQUIRED 15 PROVIDED OF 15 REQUIRED
TOTAL PROVIDED: 15 SHEET
TOTAL AMOUNT OF IMPERVIOUS
AREA / LOT COVERAGE
166,404 SF 315,881 SF 482,285 SF
PHASING KEY PLAN C102
80
Page 81
Item 3.
6/6/2025 8:03:03 AM LOT 2
R60
' FIRE FIRE R6
2.99 +/- AC
30' 0'
LANE LANE PB 149 PG.22
0'
R3
EXISTING R3
0
'
PROPOSED FIRE HYDRANT TO BE
5'
SWM POND CONSTRUCTED DURING PHASE 2
SD
48
PROPOSED SEWER
275' ''S CONNECTION PH 2
PR
.
D
SD
REVISIONS
SD
BSL BSL
BSL BSL
BSL BSL
BSL
'
5 BSL
R1
EX.15''SD
SD
4''
.2
PR.48''SD
EX.15''SD
PR R60
EX.8''W
'
EX.8''FW
30'
CO PR.6''SS PR.6''SS CO EX.6''SS EX.6''SS EX.6''SS S EX.8''SS EX.8''SS EX.8''SS EX.8''SS
'
EXISTING SEWER CONNECTION FOR BUILDING B R3
0
WM PR.2''W EX.8''W EX.8''W EX.8''W EX.8''W EX.8''W EX.8''W
PR.8''FW PR.8''FW PR.8''FW EX.8''FW EX.8''FW EX.8''FW EX.8''FW EX.8''FW
PROPOSED 10 X 20 ENCLOSED EX.15''SD
WM
DUMPSTER PAD FOR PHASE 2
EX.15''SD
PR.24''SD PR.48''SD
120'
PLITKO
PHASE 2 PROPOSED PROPOSED WATER
ENGINEERING
FIRE DEPT CONNECTION CONNECTION PH 2 EXISTING
EXISTING WATER METER
FIRE FIRE FIRE WATER
CONNECTION PIT AND BUILDING
CONNECTION
LANE LANE
9' EX.15''SD
EX.15''SD
PR.24''SD
PR.48''SD
ENGINEER - SURVEY - HYDROGRAPHIC
PROPOSED BICYCLE
PARKING SUITABLE
PROPOSED BICYCLE 53 ATLANTIC AVE., STE 3
EX.15''SD
FOR 5 BIKES
PARKING SUITABLE
PH 2 PAVING FOR 5 BIKES EX.15''SD
OCEAN VIEW, DE 19970
PR.24''SD
24' Phone (302)-537-1919
PR.24''SD
DELAWARE
EX.15''SD
PR.24''SD
PHASE 2 PROPOSED
120' EX.15''SD
FIRE DEPT CONNECTION
L 18'
BS
PR.24''SD
9'
L 485'
BS
KENT COUNTY
EX.15''SD
PR.24''SD
EX.15''SD
PHASE 2 CONCEPT PLAN
L
BS BUILDING C
PHASE 2
DOVER INDUSTRIAL
PR.24''SD
133,000 SF 5'
L
BS
BUILDING B PROPOSED EDGE EX.15''SD
375'
PR.24''SD
PHASE 2
EX.15''SD
OF PAVEMENT (TYP)
24' 45,000 SF
L
BS
EAST DOVER HUNDRED
L8
L PHASE 2 PROPOSED PR.24''SD
BS 18'
FIRE DEPT CONNECTION
EX.15''SD
EX.15''SD
L
BS
LAFFERTY LANE
0'
R6
PR.24''SD
PROPOSED CONDITIONS LEGEND 5'
L
PROPOSED EDGE OF PAVEMENT BS
EX.15''SD
PROPOSED 5'
SIDEWALK (TYP)
EX.15''SD
12 PROPOSED 1 FOOT CONTOUR
10 PROPOSED 5 FOOT CONTOUR L
BS
PROPOSED BUILDING
PROPOSED CURB
DOVER
L 5'
PROPOSED STORMWATER EASEMENT BS D
15'
15''S
PR.W
PR.W PROPOSED DOMESTIC WATERLINE PR. 18'
FIRE FIRE
EX.15''SD
PR.8''FW PROPOSED FIRE WATERLINE
L7 L
BS LANE LANE
PR.6''SS PROPOSED SANITARY SEWER PIPE
PR.2''FM PROPOSED SANITARY FORCE MAIN 15' 18'
L D
9'
PROPOSED STORM PIPE
BS PR.
15''S
PROPOSED STORM SEWER INLET
EX.15''SD
S PROPOSED SANITARY MANHOLE
L
PS PROPOSED PUMP STATION BS
PROPOSED SIGN
''SD PROPOSED FIRE HYDRANT TO BE
PROPOSED CONCRETE MONUMENT L 27'
BS PR. CONSTRUCTED DURING PHASE 2
15
PROPOSED TREELINE
EX.15''SD
PROPOSED CONCRETE 17'
' R1
40 5' 5' PROPOSED WATER
L R1 ' 5'
PROPOSED HEAVY DUTY CONCRETE BS 0' 15 R1 CONNECTION PH 2
L6 R5 R
PROPOSED DELDOT CONCRETE
R320'
PR.8''W PR.8''W PR.8''W EX.8''W EX.8''W
' 24' D
15''S
PROPOSED ASPHALT PAVEMENT 54
R300'
PROPOSED STORM 24'
PR.
L PIPE (TYP)
PROPOSED BMP MAINTENANCE EASE BS
9'
EX.15''SD
SOILS INFORMATION 18'
R30'
SITE PLAN NOTES L5 L
BS PR.15''SD PR.15''SD PR.15''SD PR.15''SD
HYDROLOGIC PROPOSED WATER
SOIL 0 30 45 60
SOIL DESCRIPTION SOIL GROUP · STANDARD CITY OF DOVER SIDEWALK, AS PER CHAPTER 98, (TYP)
TYPE
RATING ARTICLE IV OF THE DOVER CODE OF ORDINANCES, SHALL BE
REQUIRED TO BE INSTALLED ALONG THE ENTIRE PUBLIC PROPOSED INLET
L
EX.15''SD
(TYP)
PyA PINEYNECK LOAM, 0 TO 2
C
STREET FRONTAGE OF A PROPERTY. WHERE FRONTAGE L4 BS GRAPHIC SCALE
1 inch = 30 feet
PERCENT SLOPES SIDEWALK EXISTS BUT DOES NOT MEET THE STANDARDS OF
CHAPTER 98, ARTICLE IV, THE SIDEWALK SHALL BE RE-LAID TO PROJECT DATUM
MEET THE STANDARDS. SIDEWALK SHALL INCLUDE HORIZONTAL: DE NAD 1983
PINEYNECK LOAM, 2 TO 5 L
PyB
PERCENT SLOPES
C BARRIER-FREE ACCESS RAMPING AT POINTS OF BS VERTICAL: NAVD 1988
INTERSECTION WITH STREET CROSSINGS AND AT OTHER
LOCATIONS SO AS TO AFFORD REASONABLE BARRIER-FREE
PEDESTRIAN MOVEMENT AND SITE ACCESS.
FALLSINGTON LOAMS, 0
TO 2 PERCENT SLOPES, · IN ACCORDANCE TO APPENDIX A, ARTICLE VI, SECTION B.3,
L3 L
BS
DOVER PH2 CONCEPT PLAN.dwg
FgcA C/D
MID-ATLANTIC COASTAL ALL SIDEWALKS SHALL ASCEND FROM THE CURBSTONE TO
PLAIN
THE BUILDING LINE AT THE RATIO OF ONE-QUARTER OF AN
INCH TO THE FOOT. NOTHING IN THIS SECTION SHALL BE SHEET
CONSTRUED TO AFFECT ANY PAVEMENT PREVIOUSLY LAID BY
Za
ZEKIAH SANDY LOAM,
FREQUENTLY FLOODED
B/D ORDER OF THE CITY COUNCIL, UNTIL IT IS TAKEN UP AND
RELAID. PHASE 2 SITE PLAN C103
81
Page 82
Item 3.
6/5/2025 12:30:40 PM
EX.24''FM UE
UE PE WV
REVISIONS
UE
LAFFERTY LANE
EX.24''FM UE
EX.24''FM
UE
EX.24''FM UE
UE SD
EX.24''FM
UE
EX.8''SS
UE SD
EX.24''FM
UE SD SD
EX.8''W
UE SD
UE
EX.24''FM UE
UE PE
EX.24''FM UE
UE
EX.24''FM UE
UE SD
EX.24''FM UE
UE
EX.24''FM
M UE UE
EX 30'' F
UE
8''SS
M
EX 30''UF UE
EX.8''SS
UE E
UE UE
EX.8''W
M
UE
UE EX 30'' F UE SD
UE M
UE SD
UE EX 30'' F
UE
UE
M UE SD
EX 30'' F
UE
SD
SD
EXISTING D
PLITKO
BSL SWM POND
EX.8''SS
ENGINEERING
EX.8''W
BSL PE SD
BSL
SD
BSL
L BS FIRE FIRE
BENCHMARK #1
LANE LANE ELEV:20.01'
9 LIN SD
PE NAVD 88
EX.8''W EX.8''SS
L1 L BS CONC MON FND
4 ENGINEER - SURVEY - HYDROGRAPHIC
N: 418270.33
SD E: 635240.85
BS 1 QP 53 ATLANTIC AVE., STE 3
L BSL BSL
PR.18''S
OCEAN VIEW, DE 19970
EX.24''FM
SD
BSL BSL D
BSL BSL
BSL BSL Phone (302)-537-1919
LBS BSL BSL
DRIP LINE L1
EX.8''W EX.8''SS
3
EX.15''SD
CO EX.8''SS EX.8''SS EX.8''SS EX.8''SS S PE
CO PR.6''SS EX.6''SS S
EX.15''SD
PE
BS EX.8''W EX.8''W EX.8''W EX.8''W
DELAWARE
WM
PR.8''FW EX.8''FW EX.8''FW EX.8''FW
L 3 LIN WM
S
''S
PR.48''SD
WM
BSL
.8
L1 PR
EX.24''FM
2
4'
PR.24''SD
L BS FIRE FIRE
LANE LANE S
6 LIN PE
EX.8''W EX.8''W
L1 PROPOSED FIRE
EX.8''SS
EX.15''SD BSL
PE
1 TREELINE 2 PC
BS
EX.15''SD PR.18''SD
(TYP)
FALCON SAFETY NET L
(KCR 347 - MINOR COLLECTOR)
LANE
OR EQUAL
LAFFERTY LANE
WALL PACK PHASE 1
KENT COUNTY
2"X4" WOODEN STAKES L
BS LIGHT TYP.
EX.24''FM
BSL
PR.24''SD
2 LIN
PE
TREE PROTECTION N.T.S. L1 0
WALL PACK
PHASE 2 CONCEPT PLAN
LIGHT TYP.
EX.8''W EX.8''W
L
BS PLAN DATA
EX.8''SS
DOVER INDUSTRIAL
BUILDING C
PR.24''SD
WALL PACK PE
BSL
W 133,000 SF LIGHT TYP. 1 TAX PARCEL ED-05-077.16-02-05.00-000
EE
FR EX.15''SD 2 DEED / PLAT REFERENCE DB 13202 PG.201 / PB 149 PG.22
EX.15''SD
L
N E1 BS PE
RU UT A)
PR.15''SD EX.24''FM
350 LAFFERTY LANE
PR.24''SD
N 0 3 ADDRESS
O RO R 15 BUILDING B FIRE
DOVER, DE 19901
L9 HE US (KC 45,000 SF
NC BSL
EX.8''W
L
EX.8''W
BS PROJECT SITE ENTRANCE IS LOCATED 1568'+/- WEST
PU LANE
EAST DOVER HUNDRED
EX.8''SS
AY 4 LOCATION OF THE INTERSECTION OF LAFFERTY LANE
L8
PR.24''SD
PRUNE 1/3 OF TOP (SEE SPEC.) AND HORSEPOND RD IN DOVER, DE.
PE
PE
RUBBER HOSE EX.15''SD
L
EX.15''SD
BS SITE LATITUDE: N: 39.149638°
5
GALVANIZED #10 GAUGE TWISTED WIRE SITE LONGITUDE: BSL W: -75.492169°
EX.24''FM
2 PC WV
TREE WRAP (TIE EVERY 2' O.C. WITH CONCRETE MONUMENT FOUND SOUTHEAST
EX.8''W
6 SITE BENCHMARK CORNER OF BOUNDARY AT ROW AS SHOWN
EX.8''W
STRING) L
BS
LAFFERTY LANE
NOTE: STAKING ELEV=10.01 (DATUM NAVD88)
EX.8''SS
SURVEYORS FLAGGING
BSL
TECHNIQUE @ PE
2 LIN
CONTRACTORS 7 EXISTING PARCEL AREA (LOT 1) PE
860,637.99 SQ.FT / 19.74 ± ACRES
OPTION PULL BACK BURLAP (REMOVE ALL STRINGS & L
WIRES) BS FIRE FIRE FIRE
PHASE 1
L7 LANE PR. LANE 8 11.1 ± AC
15''S LIMIT OF DISTURBANCE LANE
EX.24''FM
1/8 OF ROOT BALL SAUCER
D
TO BE LEFT ABOVE BSL
EX.8''W
EXISTING GRADE
EX.8''W
EX.15''SD
MULCH 2" MIN - 3" MAX. L M (MANUFACTURING ZONE) CITY OF DOVER
PE
BS AEOZ: ACCIDENT POTENTIAL ZONES I & II
9 EXISTING/PROPOSED ZONING
EX.8''SS
NOISE ZONE A (225 SF) WV
EXISTING GRADE PE
DOVER
L 2 AR D BSL FRONT: 40'
BS 15''S PROPOSED SIDE YARD: 20'
SOIL MIX & AMENDMENTS (TAMPED) 10
L6
EX.24''FM
PR. SETBACKS REAR YARD: 20'
2 QP PR.8''W EX.8''W PE
PROPOSED SIDE OR REAR ADJ. RESIDENTIAL: 50'
EX.8''W
2" X 2" X 24" (MIN.) STAKE TREELINE
EX.15''SD
(TYP)
BSL
L
BS 11 PRESENT LAND USE: VACANT LOT (AGRICULTURAL AND WOODLAND)
FIRE
EX.8''SS
L5 PR.15''SD PR.15''SD 12 PROPOSED LAND USE LANE INDUSTRIAL WAREHOUSE
PE
PANEL # 10001C0188J (PANEL 188 OF 435), DATED
L4 FEMA
L 13 7/7/2014, AS BEING IN FLOOD ZONES "X", AREA OF
BS FLOOD ZONE
BSL BSL BSL PE
MINIMAL FLOOD HAZARD.
BSL BSL
14 PROPOSED SEWER PUBLIC WORKS WASTEWATER DIVISION EX.24''FM
EX.8''W
SD PR.1
L3 5''
15 PROPOSED WATER PUBLIC WORKS WATER DIVISION
TREE PLANTING DETAIL N.T.S. PLAN VIEW OF BRACING
L
BS BSL BSL BSL BSL BSL PR.15''SD
EX.8''SS
BSL BSL BSL BSL
BSL BSL BSL BSL
BSL
L2 CONTACT DATA
L1
DOVER INDUSTRIAL, LLC
34752 DELAWARE AVE, UNIT 6
OWNER/ FRANKFORD, DE 19945
1
DEVELOPER ATTN: TRAVIS MARTIN
302-245-9323
tmartin@ocprops.com
PLITKO, L.L.C.
53 ATLANTIC AVE., STE 3
2 DESIGNER OCEAN VIEW, DE 19970
302-537-1919
rplitko@plitko.com
PROPOSED CONDITIONS LEGEND
LANDSCAPE NOTES 0 60 90 120
EXISTING PARCEL BOUNDARY PHASE 2 DEVELOPMENT AREA OF ±8.65 ACRES REQUIRES 162 TREES TO BE PLANTED. LANDSCAPE
EXISTING NON-TIDAL WETLANDS PLAN SHOWS 27 TREES PLANTED AS PART OF PHASE 2. THE REMAINING 135 TREES TO BE PLANTED
OFFSITE PER THE AGREEMENT BETWEEN THE DEVELOPER AND THE CITY OF DOVER.
EXISTING STORMWATER EASEMENT GRAPHIC SCALE
NO TREES ARE TO BE PLANTED WITHIN 10' OF ANY UTILITY PIPE OR STRUCTURE. 1 inch = 60 feet
PROPOSED BUILDING
PROPOSED 30' WETLANDS BUFFER PROJECT DATUM
LIGHTING NOTES HORIZONTAL: DE NAD 1983
PROPOSED TREELINE PHASE 2 FREE-STANDING LIGHTING FIXTURES TO MATCH EXISTING FIXTURES FROM PHASE 1/ VERTICAL: NAVD 1988
PROPOSED CONCRETE ADJACENT PROPERTY. BUILDING-MOUNTED LIGHTING FIXTURES T.B.D.
PROPOSED HEAVY DUTY CONCRETE
PROPOSED ASPHALT PAVEMENT
PROPOSED STORMWATER EASEMENT
LS & Lighting Plan Phase 2.dwg
PROPOSED LIGHT POLE
PROPOSED WALL PACK LIGHT SEE SHEET L102 FOR LANDSCAPE MITIGATION TREE-PLANTING REQUIREMENTS. PHASE 2 LANDSCAPE & SHEET
LIGHTING PLAN L101
82
Page 83
Item 3.
6/5/2025 12:34:48 PM
LANDSCAPE MITIGATION LEGEND PROPOSED CONDITIONS LEGEND
EXISTING WOODED AREA TO BE PRESERVED EXISTING PARCEL BOUNDARY
EXISTING WOODED AREA TO BE CLEARED EXISTING NON-TIDAL WETLANDS
EXISTING STORMWATER EASEMENT
TREE DENSITY WORKSHEET
PROPOSED BUILDING
PROPOSED 30' WETLANDS BUFFER
REVISIONS
TOTAL LOT AREA: 860,638 SQ.FT.
PROPOSED TREELINE
TOTAL AREA OF WOODLANDS ON SITE 316,353 SQ.FT.
TOTAL AREA OF WOODLANDS TO BE PRESERVED: 159,564 SQ.FT. PROPOSED CONCRETE
NON-WOODLAND SITE AREA: 701,074 SQ.FT.
PROPOSED HEAVY DUTY CONCRETE
NEW TREE PLANTINGS REQUIRED*: 234
PHASE 1 TREE PLANTINGS: 33 PROPOSED ASPHALT PAVEMENT
PHASE 2 TREE PLANTINGS: 27
PROPOSED STORMWATER EASEMENT
TOTAL TREE PLANTINGS: 60
OFFSITE TREE PLANING REQUIREMENT**: 174 PROPOSED LIGHT POLE
* 1 TREE PER 3,000 SQ.FT. OF NON-WOODLAND AREA ON SITE. PROPOSED WALL PACK LIGHT
** IS THE DIFFERENCE BETWEEN NEW TREE PLANTINGS
REQUIRED AND TOTAL TREE PLANTINGS ON SITE.
PLITKO ENGINEERING
EX.24''FM UE EX.8''SS
EX.8''W
UE
MENT EX.24''FM UE
ER EASE UE
SANIT ARY SEW M EX.24''F UE
10' WIDE UE
EX.24''FM UE
UE PE
EX.24''FM
WV
UE
UE
EX.24''FM UE
EX.24''FM
UE
EX.24''FM UE
UE SD ENGINEER - SURVEY - HYDROGRAPHIC
EX.24''FM
UE
EX.8''SS
UE SD
EX.24''FM
UE SD SD
EX.8''W
UE
EX.24''FM UE
UE SD 53 ATLANTIC AVE., STE 3
EX.24''FM UE
UE PE OCEAN VIEW, DE 19970
UE
EX.24''FM
UE
UE
SD Phone (302)-537-1919
EX.24''FM UE
UE
EX.24''FM
UE
EX 30'' FM UE
UE
8''SS
M
EX 30''UF UE
EX.8''SS
UE E
DELAWARE
UE UE
M
EX.8''W
UE
UE EX 30'' F UE SD
UE UE SD
M
UE EX 30'' F
UE
UE
M UE SD
EX 30'' F
UE
SD
SD
D
BSL
EX.8''SS
EX.8''W
BSL PE SD
BSL
KENT COUNTY
SD
BSL
WOODED AREA TO BE PRESERVED
PHASE 2 CONCEPT PLAN
L BS FIRE FIRE
159,564 SF BENCHMARK #1
LANE LANE ELEV:20.01'
DOVER INDUSTRIAL
SD
PE NAVD 88
EX.8''W EX.8''SS
L1 L BS CONC MON FND
4
N: 418270.33
SD E: 635240.85
L BS
PR.18''S BSL BSL
EX.24''FM
SD
BSL BSL D
BSL BSL
BSL
EAST DOVER HUNDRED
BSL
LBS BSL BSL
L1
EX.8''W EX.8''SS
3
EX.15''SD
CO EX.8''SS EX.8''SS EX.8''SS EX.8''SS S PE
CO PR.6''SS EX.6''SS S
EX.15''SD
PE
LBS
WM
PR.8''FW
EX.8''W EX.8''W
EX.8''FW EX.8''FW EX.8''FW
EX.8''W EX.8''W
WM
S
''S
PR.48''SD
WM
BSL
.8
L1 PR
EX.24''FM
2
PR.24''SD
LBS FIRE FIRE
LAFFERTY LANE
LANE LANE S
PE
EX.8''W EX.8''W
L1 FIRE
EX.8''SS
EX.15''SD BSL
PE
1 L
EX.15''SD
BS
PR.18''SD
(KCR 347 - MINOR COLLECTOR)
LANE
LAFFERTY LANE
L
BS
EX.24''FM
BSL
PR.24''SD
0 PE
L1
EX.8''W EX.8''W
L
BS
EX.8''SS
DOVER
PR.24''SD
PE
BSL
L9
PU
W EX.15''SD
EX.15''SD
L
EE BS PE
FR
PR.15''SD EX.24''FM
N E1
PR.24''SD
RU UT A) FIRE
N 0
O RO R 15
HE US (KC BSL
EX.8''W
L
EX.8''W
BS
NC LANE
EX.8''SS
AY L8
PR.24''SD
PE
PE
L EX.15''SD
EX.15''SD
BS
BSL
EX.24''FM
WV
EX.8''W EX.8''W
L
BS WOODED AREA TO BE CLEARED
BSL EX.8''SS
156,789 SF PE
PE
L FIRE
BS FIRE D FIRE
L7 LANE 15''S LANE LANE
EX.24''FM
PR.
BSL
EX.8''W EX.8''W
EX.15''SD
L PE
BS
EX.8''SS
WV
PE
L D BSL
BS 15''S
L6
EX.24''FM
PR.
PR.8''W EX.8''W PE
EX.8''W
EX.15''SD
0 60 90 120
BSL
L
BS FIRE
EX.8''SS
L5 PR.15''SD PR.15''SD
LANE
PE
GRAPHIC SCALE
L4 1 inch = 60 feet
L
BS BSL BSL BSL BSL PE
BSL
EX.24''FM
PROJECT DATUM
HORIZONTAL: DE NAD 1983
EX.8''W
L3
5''SD
PR.1
VERTICAL: NAVD 1988
L
BSL BSL BSL BSL PR.15''SD
BS BSL
EX.8''SS
BSL BSL BSL BSL
BSL BSL BSL BSL
BSL
L2
LS & Lighting Plan Phase 2.dwg
L1
SHEET
LANDSCAPE MITIGATION PLAN L102
83
Page 85
Item 4.
By-Laws of the Planning Commission
of the City of Dover
Objectives
Section 1 The objectives and purposes of the Planning Commission of the City of Dover, Delaware, are
those set forth in Chapter 7, Title 22 of the Delaware Code annotated, and amendments, supplements,
thereto, and those powers and duties delegated to the Planning Commission by the City Council of the
City of Dover pursuant to state statute.
Powers, Duties and Procedures
Section 2 The duties, powers and procedures of the Planning Commission be as set forth in the following
documents:
(a) The resolution of the City Council establishing such Planning Commission;
(b) The Building Zone Ordinance as to matters relating to amendments to site plan approval;
(c) The Subdivision Regulations as to the review and approval of subdivision plats;
(d) As to the regulations set forth herein for all other matters for which the Commission has the
responsibility.
Officers
Section 3.1 The officers of the Planning Commission shall consist of a Chairman and Vice-Chairman.
Section 3.2 The Chairman shall preside at the meetings and hearings of the Planning Commission and
shall have the duties usually conferred upon a presiding officer. He shall continue to exercise the
prerogatives of an individual member of the Commission while performing the duties of presiding
officer.
Section 3.3 The Vice Chairman shall be the presiding officer in the absence of the Chairman.
Recording and Corresponding Secretary
Section 4 The Commission shall appoint a Secretary who shall not be a member of the Commission or an
officer, and shall have the following duties and responsibilities:
(a) Prepare agenda for all meetings with the Chairman and provide notice of meetings to
Commission members.
(b) Keep minutes of all meetings, and record of the Commission.
(c) Act as agent for the Commission in receiving submissions, applications, correspondence, etc.
(d) Act as agent for the Commission in arranging for notice of public hearings and notifying
interested parties of Commission actions as authorized by the Commission.
Official Records
85
Page 86
Item 4.
Section 5 The City Clerk shall be the official custodian of the records of the Commission and shall make
them available to the public as provided by law. He may designate the office of the Secretary of the
Commission or the Planning Office as the place where such records shall be kept.
Elections of Officers
Section 6.1 The officers shall be elected by the Commission at the annual organization meeting which
shall be the regular scheduled meeting in July of each year. Election of officers shall be held by secret
ballot.
Section 6.2 A candidate receiving a majority vote of the entire membership of the Planning Commission
shall be declared elected and shall serve for one year or until his or her successor shall take office.
Section 6.3 Vacancies in offices shall be filled by the Commission at any scheduled or special meeting.
Section 6.4 The Chairman and Vice Chairman shall be limited to four consecutive one-year terms. A
former Chairman or Vice Chairman who has held four consecutive terms in such position may be elected
to that position after vacating the position for a period of one year.
Meetings
Section 7.1 The Commission shall hold one public meeting during each calendar month.
Section 7.2 The monthly meeting date for the coming year shall be established by a majority of the
Commission at its organization meeting of the year. The date of the public meeting can be changed
during the year by a majority of the Commission
Section 7.3 The Commission will receive all applications concerning matters within its jurisdiction only at
its public meetings. All times to be submitted for consideration at any public meeting shall be submitted
in complete and final form for Commission consideration not less than thirty days prior to said meeting.
No items submitted subsequent to this time shall be placed upon the Agenda except by a majority vote
of the Commission members present at such meeting. The official date of receipt of any matter
presented to the Commission shall be the date of the first public meeting at which such matter is
received for consideration. Any maximum time periods established by the Zoning Ordinance or other
local laws limiting the time for consideration of any matter by the Planning Commission shall commence
on such date of the receipt.
Section 7.4 A majority of the membership of the Commission shall constitute a quorum. The Commission
may act on any matter by a majority vote of such quorum.
Section 7.5 All formal votes to record the decision of the Commission on any matter referred to it shall
be taken only by a quorum at a public meeting. By a majority vote of those members present the
Commission may convene in executive session. However, all formal votes to record the Commission’s
decision shall only be taken during periods in which such meetings are open to the public.
86
Page 87
Item 4.
Section 7.6 Special meeting may be called by the Chairman or by a majority of the Commission,
providing that not less than 24 hours notice by writing or telephone is given to each member of the
Commission. Such meetings shall be executive sessions at which no formal votes shall be taken.
Section 7.7 All public and special meetings shall be held in City Hall or other public facility with proper
public notification.
Agenda
Section 8 The Secretary shall prepare the proposed Agenda for each public meeting, with the Chairman
not less than ten days prior to the date of such meeting, and shall transmit a copy of the Agenda to each
Commission member on such date of preparation. No items will appear on such proposed Agenda
except those for which applications or written requests have been received not less than thirty days
prior to the date of the public monthly meeting as set forth in Section 7 above. The Commission may
amend the proposed Agenda by a majority vote of those members present.
Section 9.1 The order of business at public meetings shall be as follows:
(a) Roll Call.
(b) Adoption of Minutes of previous meetings.
(c) Approval of Agenda
(d) Communications
(e) Report of Officers and Committees
(f) Old Business
(g) New Business
(h) Referrals, Administrative Reviews, Petitions, Applications and Other Matters presented by the
public.
Section 9.2 The order of business at special meetings shall be as determined by the Commission.
Section 9.3 At all meetings and hearings attended by the public, the Chairman shall make a brief
statement indicating the nature of each item on the Agenda, except that in the case of petitions,
applications and other matters presented by the public, such statement shall be made by the person
introducing the matter.
Section 9.4 Minutes of all public and special meetings of the Commission shall form part of the records
of the Commission and shall be available to the public when duly adopted by the Commission.
Committees
Section 10.1 There may be a Subdivision Committee appointed by the Chairman with the approval of the
Commission at the annual organization meeting. It shall consist of three members who shall serve until
the next annual meeting. The Chairman may make appointments to bring the committee to full strength
in the event of temporary absence of committee members.
Section 10.2 Other Committees may be appointed by the Chairman from time to time with the approval
of the Commission.
87
Page 88
Item 4.
Public Hearings
Section 11.1 The Commission shall hold public hearings as required by statute and applicable ordinances
of the City. In addition to those required by law, the Commission may at its discretion hold public
hearing when it considers that such hearings will be in the public interest.
Amendments
Section 12 These By-Laws may be amended at any time by a majority vote of the entire membership of
the Commission.
Adopted September 15, 1959
Amended November 17, 1975
Amended March 16, 1981
Amended March 19, 1981
Amended June 17, 1991
Amended January 25, 1995
Amended April 26, 1995
Amended August 16, 2010
Amended August 20, 2018
88
Page 89
Item 4.
Appointment of the Architectural Review Oversight Subcommittee of
Planning Commission
As part of the Annual Meeting of the Planning Commission, one of the responsibilities of the
Planning Commission is to appoint the Architectural Review Oversight Subcommittee. The
following excerpt from the Zoning Ordinance is provided.
Appendix B: Zoning Ordinance, Article 10 Section 2. Site development plan approval.
2.28 Consideration shall be given to the physical orientation and architectural characteristics of
proposed buildings, the relationship of proposed buildings to existing buildings and to other proposed
buildings, and their contributions to the overall image of the immediate vicinity by considering the
building and architectural design guidelines as set forth in article 5, section 19. Design characteristics
of proposed buildings and building additions shall not detract or devalue existing buildings in the
immediate vicinity.
(A) If the planning commission determines that the proposed physical orientation and
architectural characteristics of the proposed buildings do not meet the intent and objectives of
this section, then the planning commission shall refer the proposal to the architectural review
oversight subcommittee for review and comment.
(B) The subcommittee shall meet and review the proposal with the applicant, and return its
comments to the planning commission by the next regularly scheduled meeting.
(C) The architectural review oversight subcommittee shall be appointed by the commission at its
annual meeting, and membership shall consist of two planning commission members, and
two design professionals with experience in construction, and the mayor or the mayor's
designee. Two alternate design professionals with experience in construction shall also be
appointed.
At the August 19, 2024 Meeting of the Planning Commission, the following individuals were
appointed to the Architectural Review Oversight Subcommittee of Planning Commission. (This
had been deferred from the July 15, 2024 Meeting as appointments of members to the Planning
Commission were still pending at that time.)
o Kathleen Welsh, Planning Commission member
o Kenneth Roach, Planning Commission member
o Mayor or Mayor’s designee
The Planning Commission at their August 19, 2024 Meeting also considered the appointment of
two Design Professional members to the Subcommittee pending confirmation of their
availability. Planning Staff reported back to the Planning Commission regarding their
availability. At the September 16, 2024 Meeting, the Planning Commission heard the status of
the following Design Professionals to serve on the Subcommittee. No other Design Professionals
as Alternates were offered.
o Dr. R.J. Chandler, Faculty member of Architecture program at DelTech Community
College, Design Professional (availability confirmed; approved to serve)
o Ms. Sarah Keifer, Director of Planning Services for Kent County, Design Professional
(awaiting availability to serve)
The Planning Commission as part of their Annual Meeting must act to appoint the
membership of the Architectural Review Oversight Subcommittee.
Selection for Architectural Review Oversight Subcommittee of the Planning Commission Summary for 7-2025 89