CITY OF DOVER, DELAWARE
COUNCIL COMMITTEE OF THE WHOLE MEETING
Tuesday, September 09, 2025 at 6:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
Public comments are welcomed on any item and will be permitted at the appropriate time. When possible,
please notify the City Clerk (302-736-7008 or email at cityclerk@dover.de.us) should you wish to be
recognized.
VIRTUAL MEETING NOTICE
This meeting will be held in City Hall Council Chambers with electronic access via WebEx. Public
participation information is as follows:
Dial: 1-650-479-3208
Link: https://rb.gy/tt2yzg
Event number: 2530 458 3225
Event password: DOVER (if needed)
If you are new to WebEx, get the app now at https://www.webex.com/ to be ready when the meeting
starts.
CALL COUNCIL COMMITTEE OF THE WHOLE MEETING TO ORDER
ADOPTION OF AGENDA
COUNCIL REPORTS - AUGUST 2025
1. First District
2. Second District
3. Third District
4. Fourth District
5. At-Large
6. Council President Neil
1
Page 2
COUNCIL COMMITTEE OF THE WHOLE MEETING - September 09, 2025 PAGE 2
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE
ADOPTION OF THE AGENDA
1. First State Aquatic Project (Courtney Ford, Head Coach, First State Masters Swimming)
(Committee Action Not Required)
2. Review of Active Recreation Plan - The Governor: Mixed Use Building at 120 S. Governors
Avenue (Located at 120 S. Governors Avenue and associated parcels at 105, 111, and 115 S.
New Street: Site Plan/Architectural Review Certification S-25-11/ HI-25-02) (Dawn Melson-
Williams, Principal Planner)
(Staff Recommendation: Approval of the Active Recreation Area Plan for the project,
subject to the conditions outlined in the Active Recreation Review Report)
ADJOURNMENT OF THE PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
ADOPTION OF THE AGENDA
1. Investment Portfolio Presentation (Patricia Marney, Controller/Treasurer, Martin
Hammond, Managing Director, PFM Asset Management, and Jeff Fasino, Senior
Managing Consultant, PFM Asset Management)
(Committee Action Not Required)
2. Change Order - Meeting House Branch Drainage Improvement Project (Jason Lyon,
Water & Wastewater Director)
(Staff Recommendation: Approval from City Council of the proposed amendments to the
engineering design scope by the consulting firms to complete the design of this project.)
3. County and Municipal General Pension Plan Update (Naomi Poole, Human Resources
Director, Patricia Marney, Controller/Treasurer, and David S. Hugg, III, City Manager)
(Committee Action Not Required)
4. Small Local Cybersecurity Grant Program (SLCGP) Grant Approval for FY26
Information Technology Projects (Joseph Simmons, Information Technology Director)
(Staff Recommendation: Recommend approval of the following Small Local Cybersecurity
Grant Program (SLCGP) grants totaling $316,000 through the Cybersecurity and
Infrastructure Security Agency (CISA): SLCGP-23-1157, SLCGP-23-1158, SLCGP-23-
1159, SLCGP-23-1160, and SLCGP-23-1161, and to authorize the City Manager to perform
the necessary budget amendments based upon the awarded)
2
Page 3
COUNCIL COMMITTEE OF THE WHOLE MEETING - September 09, 2025 PAGE 3
5. Non-Bargaining Step Proposal Discussion (David S. Hugg, III, City Manager)
(Staff Recommendation: Discussion and direction for staff)
6. Review of Application for the Economic Development Fund (David S. Hugg, III, City
Manager)
(Staff Recommendation: Review, revise as needed, and approve)
ADJOURNMENT OF THE LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING
ADJOURNMENT OF THE COUNCIL COMMITTEE OF THE WHOLE
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO
29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION
OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE
TIME OF THE MEETING
3
Page 4
Item 1.
First State
AQUATIC
CENTER
Transforming Delaware into a premier
sports tourism destination
The First State Aquatic Center (FSAC) represents a transformative opportunity to drive economic growth, boost local
tourism, and provide essential aquatic facilities to the community. Featuring:
10-lane Olympic/Long course pool Recreational Ninja Cross (obstacle course attraction)
8-lane short course pool Outdoor Water Feature
Zero-depth entry multi-use pool Spectator Seating 1,500+
The FSAC is designed to attract elite swimmers from the Mid-Atlantic region and beyond. With its strategic location,
experienced leadership, and strong community backing, the FSAC is poised to become a key player in the sports
tourism landscape while addressing a critical gap in the community: indoor, year-round swimming pools essential for
health, wellness, and water safety in a state surrounded by water. Your investment will help turn this vision into a
thriving reality for Delaware.
Letters of Support Secure Site and
Non-Profit Board Developer
Co-Founder, CEO; Community;
Courtney Ford, Owner First State Masters Swimming Home of the Delaware Swim Potential Sites:
Team; South DAFB, DE Turf, Dover Mall,
Co-Founder, Board President; Kitts Hummock/City of Dover
Julie Gorman, Owner Edelman Spine & Orthopaedic Capitol School District
Planning & Strategy Committee; Caesar Rodney School District
Jenn Holmes, Joel Loftus, ReferralNeeded:
John Van Gorp, Strohm Edwards State Rep; Services $20-$44mil
Resource Development Committee; Kerri Evelyn Harris (pending)
Knolan Rawlins, Laurie Judy, John Cribbin 60,-90,000 sq. ft
Community Engagement Committee; 5-10 acres
Janie Warren, Nanette Holmes, Sean Saxton
STEPS IN CURRENT PHASE
The FSAC has progressed from the "initiative" phase to a formalized board structure. With
governance now in place, the board is actively fundraising to complete the feasibility and
AUG 2025
design study. These efforts will provide critical insights into site selection, programming,
and long-term sustainability. The project continues to engage stakeholders—including
local government officials, community leaders, and potential partners—as it moves closer
to realizing its vision.
Follow us on social media | @1stMasters
Watch our FSAC presentation on YouTube | @1stMastersDE
CONNECT Sign the petition | tinyurl.com/ynxrkx3k
Email us | FirstStateMastersSwimming@gmail.com
4
Empowering adults to improve their lives through swimming
Page 5
MODEL FACILITES Item 1.
Prince George’s County Sports and Learning Complex
Features;
50 meter indoor; community/fitness pool; indoor gymnastics;
indoor track; outdoor sport fields as well; classrooms
Year; 2000
Size; 240,000 sq. ft
Cost; $31 Million
Nova Aquatics, VA
Features;
Macy’s Mall rebuild. An eight-lane 50-meter pool and two
three-lane 25-yard pools. locker rooms, dry-land training
area, administrative areas, and the Virginia Swim Shop
Year; 2018
Size; 50,000 sq. ft
Cost; $18 Million
Virginia Military Institute
Features;
Indoor 50-meter swimming pool which holds 800,000 gallons
of water. It has two 1-meter springboards, two 3-meter
springboards, and a 5-meter dive platform, plus seating for 570
spectators. The pool is large enough to be divided into three
sections, making diving, water polo, and competitive swimming
possible simultaneously.
Year built; 2020
Size; 58,000 sq. ft
Cost; $44 Million
Rockville Swim and Fitness Center, MD
Features;
New construction consists of 3 bodies of water: a free-form
shaped activity pool with beach entries and interactive play
features, a rectangular shaped wellness pool to serve a variety
of uses and a water slide structure. Dryland installation of play
features, deck areas, shade structures.
Year built; 2024
Size; 53,000 sq. ft
Cost; $13 Million
5
Page 6
First State Item 1.
AQUATIC P: 928-242-2586
CENTER
E: FirstStateMastersSwimming@gmail.com
@1stMasters @1stMastersDE
Dear Supporter of the FSAC initiative, July 15, 2025
A place to swim, heal, train, and belong — that’s the vision behind the First State Aquatic Center
(FSAC). A year-round aquatic and wellness facility designed to meet critical needs in Central
Delaware and the Mid-Atlantic region. Despite being a state surrounded by water, Delaware
currently lacks an indoor 50-meter pool and has few facilities that are fully accessible to veterans,
seniors, families, and athletes all in one place. FSAC will change that.
The proposed facility includes:
Board of A 10-lane, 50-meter competition pool with seating for 1,500+
Directors An 8-lane short-course pool for lessons, rehab, and fitness
A zero-depth entry warm therapy and teaching pool
Community Outdoor water feature
Engagement
Fitness facilities, classrooms, and meeting space
Nanette Holmes Dedicated access for teams, masters swimmers, and community use
Sean Saxton
Janie Warren
FSAC will be more than a pool. It will be a community anchor, public health resource,
and economic driver — hosting local and regional meets, creating jobs, and delivering
Planning
and Strategy life-saving swim instruction.
Strohm Edwards
Your support will help us:
Jennifer Holmes
Fund the feasibility study
Maj. Joel Loftus
John Van Gorp Complete design and engineering plans
Begin site work and permitting
Resource
Development Whether you give $50 or $5,000, your donation directly supports this bold and vital
John Cribbin project. Make a secure, tax-deductible gift at donorbox.org/fund-the-feasibility-study,
Laurie Judy scan the QR code below, or contact us to explore sponsorship and other giving options.
Knolan Rawlins Together, we can build something transformative for Delaware.
With appreciation,
Courtney Ford Julia Gorman
Courtney Ford Julia Gorman
Co-founder & Executive Director Co-founder & Board President 6
Page 7
City of Dover
Item 2.
DATA SHEET FOR RECREATION PLAN REVIEW
Review of Active Recreation Area Plan
PARKS, RECREATION AND COMMUNITY ENHANCEMENT COMMITTEE
MEETING OF September 9, 2025
Planning Commission Meeting of September 15, 2025
Plan Title: The Governor: Mixed-Use Building at 120 S. Governors Avenue, S-25-11
Plan Type: Site Development Plan: Active Recreation Area Plan
Location: On the west side of South Governors Avenue and halfway between Reed Street
and West Loockerman Street in Dover, DE
Addresses: 120 S. Governors Avenue and 105, 111, and 115 S. New Street
Tax Parcel: ED-05-077.09-01-144.00-000
(Related Properties) ED-05-077.09-01-37.00-000, ED-05-077.09-01-42.00-000, ED-05-077.09-
01-43.00-000
Owner: Downtown Dover Development Corporation c/o Downtown Dover
Partnership and the City of Dover (Parcels at 105 and 115 S. New Street)
Property Area: 1.7622 acres +/- (main parcel)
1.9813 acres +/- (total of all parcels)
Proposed Use: Mixed-Use Commercial (Grocery, retail, restaurant, child day care center)
and Multi-family Housing (Apartments – 120 units) and associated
parking
Zoning: C-2 (Central Commercial Zone)
H (Historic District Zone)
I. Project Summary
The Governor: Mixed-Use Building at 120 S. Governors Avenue project will be reviewed as a
Site Development Plan and for Architectural Review Certification by the Planning Commission.
The Plan proposes construction of a mixed-use commercial and multi-family (apartment)
building in Downtown Dover, to be located between South Governors Avenue and South New
Street, midway between Reed Street and West Loockerman Street. The 1.7622+/- acre property
is a vacant lot that was formerly an auto parts retail store and daycare center. The proposal
includes a four-story, 139,306 SF mixed-use structure that includes space for retail, child day
care, 120 residential apartments, and a roof-top courtyard, with 13 vehicle parking spaces and
associated site improvements
P. O. Box 475 Dover, DE 19903 7
Community Excellence Through Quality Service
Page 8
S-25-11 The Governor: Mixed-Use Building at 120 S. Governors Avenue Item 2.
Summary Report of Active Recreation Component
Parks, Recreation & Community Enhancement Committee Meeting on September 9, 2025
Page 2 of 5
II. Active Recreation Area Plan Summary:
As part of the Plan review process for this project, the applicant is required to provide open space
and Active Recreation Area in accordance with the Zoning Ordinance, Article 5, Section 10.
Dover Code of Ordinances, Appendix B – Zoning, Article 5 – Supplementary Regulations,
Section 10 – Open Space, Recreation and Other Public Facilities (select excerpts).
Article 5 Section 10
Section 10. - Open space, recreation, and other public facilities.
The City of Dover shall require the reservation of open space, recreation, and other public facilities in
accordance with the provisions of this section as a condition of approval for all one-family dwelling,
two-family dwelling and multiple-family dwelling residential developments requiring conditional use
approval, site development plan approval, or land subdivision approval by the City of Dover Planning
Commission.
10.1 Recreation areas.
10.11 Purpose. The purpose of this section is to ensure that active recreation areas are
provided as an integral design element within residential developments and that such facilities are
of an adequate scale in relation to the size of the residential development and which provide
residents with a variety of active recreational pursuits.
10.12 Dedication required. The commission shall require the dedication or reservation of
recreation areas, and the subsequent construction of recreation facilities of a character, extent
and location suitable to the needs created by a development for recreation facilities as defined
and in accordance with the design guidelines set forth.
10.13 Definition. The following are illustrative of the types of recreation areas and subsequent
facilities that shall be deemed to serve active recreational needs and therefore to count toward
satisfaction of the recreation area requirements of this section: tennis courts, handball courts,
racquetball courts, swimming pools, saunas and exercise rooms, meeting or activity rooms within
clubhouses, baseball and soccer fields, basketball courts, volleyball courts, swings, slides and
play apparatus, and developed walking, jogging or biking trails.
Because the project is located within the Downtown Redevelopment Target Area, it qualifies for
an exemption under Article 5, §10.515 Residential developments located within the Downtown
Redevelopment Target Area as defined in Appendix C. Under this provision, the applicant must
provide 75 square feet of active recreation per dwelling unit with a minimum of 2,500 square
feet provided on site. See code excerpt:
Article 5 §10.5 Exemption to recreation area and open space dedication.
10.51 Exemptions for small developments.
10.515 Residential developments located within the Downtown Redevelopment Target
Area as defined in Appendix C. These developments shall be exempt from the area
requirements set forth in section 10.16, but shall be required to provide 75 square feet
of active recreation area per dwelling unit with a minimum of 2,500 square feet
provided on site. If the commission determines that the construction of the entirety of
the required active recreation area is not practical or desirable, the commission shall
require a cash in lieu donation for the active recreation area determined as not practical
or desirable. Cash in lieu shall be calculated in accordance with subsection 10.173 of
this article.
The plan identifies a proposed 11,090 SF park area located on the three additional parcels along
South New Street, to the northwest of the proposed building. This park would feature a dog park,
playground area, and pollinator garden along with a variety of trees and shrubs. Although this
8
Page 9
S-25-11 The Governor: Mixed-Use Building at 120 S. Governors Avenue Item 2.
Summary Report of Active Recreation Component
Parks, Recreation & Community Enhancement Committee Meeting on September 9, 2025
Page 3 of 5
already exceeds the required active recreation square footage (9,000 SF), the plan also proposes a
courtyard/wellness area (5,729 SF); fitness center (2,054 SF); and community space (2,995 SF)
on the first floor of the building. In addition to first floor amenities, a rooftop courtyard is
proposed on the second floor measuring 7,225 SF. The total proposed area of active recreation
space for the proposed project is 29,093 SF.
This Active Recreation component must be reviewed by the Parks, Recreation, and Community
Enhancement Committee for a recommendation prior to consideration of the Site Plan by
Planning Commission.
The following table provides information from the submitted Plans and drawings for The
Governor: Mixed-Use Building at 120 S. Governors Avenue project showing the Active
Recreation Area plan. This focuses on the amenities specifically being developed with this
project:
Required Provided on Plan
Active Recreation Area 75 SF per dwelling unit or 5,729 SF Courtyard/Wellness Area
(Article 5 §10.515) 2,500 SF, greater thereof
120 DU = 9,000 SF 11,090 SF Park Area of playground area,
Requires 9,000 SF dog run, connection walkway
2,054 SF Fitness Center
2,995 SF Community Space
7,225 SF Rooftop Courtyard
20 Interior Bicycle Parking Spaces
20 External Bicycle Parking Spaces
Total: 29,093 SF
Active Recreation Accessible Elevators are provided on each floor to
Amenities access the rooftop courtyard. First floor
(Article 5 §10.15) active recreation amenities are accessible
via a network of sidewalks with ramps to
enter the building
Active Recreation Age Oriented to Amenities can be used by a variety of age
Amenities development groups.
(Article 5 §10.15)
Parking The entire site has 13 parking spaces to
serve the residents with other parking
nearby.
Setbacks for equipment and Most amenities are within or associated
game courts: 30 feet from with the building and comply.
residential lots and 25 feet The distance of the playground equipment
from right-of-way for street from the street must be shown and
placement may need to be adjusted for
compliance.
Landscaping The Landscape Plan shows a variety of
trees, shrubs, lawn spaces, and a pollinator
garden.
9
Page 10
S-25-11 The Governor: Mixed-Use Building at 120 S. Governors Avenue Item 2.
Summary Report of Active Recreation Component
Parks, Recreation & Community Enhancement Committee Meeting on September 9, 2025
Page 4 of 5
III. STAFF RECOMMENDATIONS:
The following are comments and recommendations from Staff of the Department of Planning &
Inspections and the Parks & Recreation Department following review of the Active Recreation
Area proposed for The Governor: Mixed-Use Building at 120 S. Governors Avenue project.
1. The project plan is required to provide 9,000 SF of Active Recreation Area. The Plan
shows a total of 29,093 SF of Active Recreation Area including a 5,729 SF
Courtyard/Wellness Area; 2,054 SF Fitness Center; 2,995 SF Community Space; 11,090
SF Park with playground and dog run; and 7,225 SF Rooftop Courtyard.
a. Additionally, there is an indoor bike storage area that can store 20 bicycles and
20 exterior bicycle parking spaces.
2. Staff recommends approval of the proposed Active Recreation Area amenities, subject to
review of the Active Recreation Plan sheet to confirm details. Staff also notes that this
location in the Downtown is in a walkable area where the sidewalk system leads to open
space areas like Mirror Lake Park, Silver Lake Park, the Legislative Mall area, and The
Green, and to the Capital City Trail system.
3. The following items related to the recreation amenities:
a. For playground area provide the distance of equipment from the street right-of-
way to ensure compliance with the setback requirements.
b. It is recommended that rules for usage of the dog-run area be posted along with
any trash/waste disposal equipment.
c. Identify if the playground usage will be limited by operations of the child day care
center.
d. Identify height and materials of the proposed fencing.
4. The applicant is reminded of the requirements for construction phasing of the recreation
area associated with the development of the residential units. With all residential units in
one building, the recreation amenities will have to be completed in conjunction with the
building’s construction and prior to issuance of a Final Certificate of Occupancy.
Article 5 §10.6 Construction Phasing. The recreation and open space areas shall be
completed in a proportion equal to or greater than the proportion of residential dwelling
units completed, except that one hundred (100) percent of the recreation and open space
areas shall be completed prior to issuing building permits for the final twenty (20) percent
of the dwelling units proposed. Building permits shall not be issued for dwelling units
unless the requirements of this section are met.
5. There shall be provisions which ensure that the common open space land (including
active recreation area) shall continue as such and be properly managed and maintained.
The developer shall either retain ownership and responsibility for maintenance of such
open land; or provide for and establish one (1) or more organizations for the ownership
and maintenance of all common open space i.e. a Homeowners Association. The
organization shall be responsible for maintenance, insurance and taxes on the common
open space.
10
Page 11
S-25-11 The Governor: Mixed-Use Building at 120 S. Governors Avenue Item 2.
Summary Report of Active Recreation Component
Parks, Recreation & Community Enhancement Committee Meeting on September 9, 2025
Page 5 of 5
IV. ADVISORY COMMENTS
1. In the event that major changes and revisions to the Site Plan occur in the finalization of the
Site Plan, contact the Department of Planning and Inspections. Examples include
reorientation of buildings, relocation of site components, and increases in building floor area.
These changes may require resubmittal for review by the Development Advisory Committee,
Historic District Commission, Planning Commission, or other agencies and commissions
making recommendations in regard to the plan.
2. Clarify the status of ownership status of the parcels at 105 and 115 S. New Street as these is a
specific process for the disposal of City owned properties.
3. The Parks, Recreation, and Community Enhancement Committee shall submit to the
Planning Commission a report detailing the recommendations as to the Recreation Area Plan.
Attachments:
• Select Pages from S-25-11 Plan Set:
o Cover Sheet and Overall Site Plan (C-001), Active Recreation Plan (C-202), and
Landscape Plan Sheet (Z-100) dated August 2025
• Select Floor Plans from the Planning Board Presentation: Ground Floor Plan, Second
Floor Plan
• Select Building Renderings for view of site from S. Governors Avenue and S. New Street
Note: This review Report was initially prepared by Staff of the Rossi Group (under a Planning
Services contract with the City of Dover). The Report was completed with additional review and
editing by the City’s Planning Office.
11
Page 12
24x36 24x36
Item 8.
WWW.beckermorgan.com
GENERAL NOTES :
24x36 24x36
1. BOUNDARY AND TOPOGRAPHIC SURVEY DATA SHOWN HEREON WAS TAKEN FROM A PLAN ENTITLED "120 SOUTH GOVERNORS SITE
AVENUE, PARCEL ED-05-077.09-01-44.00-000 - BOUNDARY & TOPOGRAPHIC SURVEY AS PREPARED BY SHAHEED A. SMITH
GEOSPATIAL, LLC, 2005 S. EASTON ROAD, SUITE 207, DOYLESTOWN, PA 18901 DATED 04-04-24 AND UPDATED ON 03-14-25.
S. G
24x36
2. PROPERTY SHOWN HEREON IS SUBJECT TO ANY RIGHT-OF-WAY, EASEMENTS, RESTRICTIONS, ETC. AS MAY BE SHOWN .
24x36
D ST
OR NOTED IN ANY RECORD, PUBLIC OR OTHERWISE, OR ANY REQUIREMENT OR REGULATION OF ANY PUBLIC AGENCY. REE
OV E
RS
3. THE EXISTING UTILITIES SHOWN WERE TAKEN FROM THE BEST AVAILABLE RECORDS. ADDITIONALLY, A UTILITY MARK-OUT
RNO
RNO
24x36
WAS PROVIDED BY CENTURY ENGINEERING IN SEPTEMBER 2017. THE CONTRACTOR SHALL CONTACT MISS UTILITY OF
OVE
24x36
DELMARVA (1-800-282-8555) AND ENGAGE A PRIVATE UTILITY LOCATOR TO VERIFY THEIR EXACT LOCATION PRIOR TO THE S. N
RS A
S. G
START OF ANY CONSTRUCTION. ANY DAMAGE INCURRED TO ANY UTILITIES SHALL BE REPAIRED IMMEDIATELY AT THE
EW EW
S. N
CONTRACTORS EXPENSE. IF THE CONTRACTOR RELIES ON THE UTILITY LOCATIONS SHOWN HEREON, HE DOES SO AT HIS
VE.
24x36
OWN RISK AND WILL NOT BE ENTITLED TO ADDITIONAL COMPENSATION DUE TO TIME DELAYS FROM SAID RELIANCE. S T. SITE ARCH I T E C TURE 24x36
. ST.
4. FLOODPLAIN: PARCEL IS LOCATED WITHIN ZONE "X", AREA OF MINIMAL FLOODING HAZARD, BASED ON FEMA FIRM MAP AVE N ST. ENG I NE E R I NG
10001C0167H EFFECTIVE MAY 5TH, 2003. OCK ERMA
W. LO T.
MAN S Delaware
B ECKER M ORGAN G ROUP ARCHITECTURE - ENGINEERING DELAWARE - MARYLAND - NORTH CAROLINA
5. ALL ROADS, PARKING AND OTHER PAVED AREAS WILL BE PRIVATELY OWNED AND MAINTAINED AND ARE NOT INTENDED OCKER
24x36
FOR DEDICATION. W. LO 24x36
Dover
6. DELAWARE REGULATIONS PROHIBIT THE BURIAL OF CONSTRUCTION DEMOLITION DEBRIS, INCLUDING TREES AND STUMPS REED STREET 302.734.7950
ON CONSTRUCTION SITES. ANY SOLID WASTE FOUND DURING EXCAVATION MUST BE REMOVED AND PROPERLY DISCARDED. RIGHT OF WAY WIDTH 25' Newark
24x36
7. ALL HANDICAPPED PARKING DEMARCATION, STALLS, AND BUILDING ACCESSIBLE ROUTES SHALL COMPLY WITH THE LOCAL ROAD 302.369.3700 24x36
"AMERICAN WITH DISABILITIES ACT" AND ANSI ICC A117.1 - 2017 " ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES"
Maryland
8. THIS DRAWING DOES NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. ALL CONSTRUCTION MUST BE
DONE IN COMPLIANCE WITH THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 AND ALL RULES AND REGULATIONS Salisbury
24x36
THERETO APPURTENANT. 410.546.9100 24x36
9. BEFORE THE CONTRACTOR CAN BEGIN CONSTRUCTION HE MUST OBTAIN THE PROPER PERMITS AND/OR APPROVALS FROM KENT COUNTY TAX ASSESSMENT MAP KENT COUNTY TAX ASSESSMENT MAP
North Carolina
THE CITY OF DOVER (C.O.D.), DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL (DNREC), DELAWARE LANDS N/F Charlotte
24x36
DEPARTMENT OF TRANSPORTATION (DELDOT) , KENT CONSERVATION DISTRICT (KCD) AND ALL APPROPRIATE STATE AND UNION AMERICAN METHODIST
2-05-077.09-01-36.01-000 G.M. VICINITY MAP SCALE : 1" = 1,200' LOCATION MAP SCALE : 1" = 400' 980.270.9100
24x36
COUNTY AGENCIES. D.B. 26, PG. 301 X
ZONING: C2 Raleigh
10. ALL CONSTRUCTION METHODS AND MATERIALS SHALL BE ACCORDING TO THE CITY OF DOVER WATER & WASTEWATER
919.243.1332
24x36
DEPARTMENT AND THE STATE OF DELAWARE (DELDOT) STANDARDS AND CONSTRUCTION SPECIFICATIONS. X LANDS N/F
THE CITY OF DOVER SITE DATA Wilmington 24x36
2-05-077.09-01-36.00-000
11. ALL FIRE LANE DEMARCATION AND FIRE LANE SIGNS SHALL BE IN ACCORDANCE WITH ALL STATE FIRE PREVENTION N 73° 52' 06" E 111.17' D.B. 9182, PG. 28
ZONING: C2 1. OWNER OF RECORD: DOWNTOWN DOVER DEVELOPMENT CORPORATION 910.341.7600
REGULATIONS. X
101 W LOOCKERMAN ST, SUITE 2B
12. ALL WORK WITHIN CITY/DELDOT MAINTAINED ROAD RIGHT-OF-WAYS SHALL MEET THE REQUIREMENTS AS SET FORTH IN THE DOVER, DE, 19904 www.beckermorgan.com
24x36
CURRENT REVISION OF THE STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION, BY THE DELAWARE X (302) 678-2940 - EMAIL: diane@downtowndoverpartnership.com
24x36
DEPARTMENT OF TRANSPORTATION AND ALL CITY OF DOVER REQUIREMENTS. S 16° 49' 03" E
2. ENGINEER / SURVEYOR: BECKER MORGAN GROUP INC.
LANDS N/F 40.00'
13. TRAFFIC AND SAFETY CONTROL SHALL BE MAINTAINED DURING CONSTRUCTION IN CONFORMANCE WITH THE CURRENT N 16° 27' 55" W THE CITY OF DOVER
2-05-077.09-01-37.00-000
X 309 SOUTH GOVERNORS AVE.
24x36
VERSION OF THE DELAWARE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. 40.00' D.B. 7920, PG. 212 DOVER, DE. 19904
24x36
ZONING: C2 (302) 734-7950 - EMAIL: mhenry@beckermorgan.com
14. STORMWATER MANAGEMENT AND SEDIMENT / EROSION CONTROL SHALL BE IN ACCORDANCE WITH THE CURRENT VERSION X N 73° 52' 05" E
DELAWARE SEDIMENT AND STORMWATER REGULATIONS BY THE DELAWARE DEPARTMENT OF NATURAL RESOURCES AND 3. PROPERTY MAP NUMBERS: 2-05-07709-01-4400-00001
7.67' X X X X X X X X X X X X X
(ADDITIONAL PROJECT PARCELS) 2-05-07709-01-4300-00001
ENVIRONMENTAL CONTROL. X X X X X X
24x36
2-05-07709-01-4200-00001 24x36
15. CONTRACTOR SHALL REFER TO ARCHITECTURAL/STRUCTURAL DRAWINGS OF PROPOSED STRUCTURES FOR ALL DIMENSIONS LANDS N/F 2-05-07709-01-3700-00001
OF BUILDINGS AND FOUNDATIONS. PROPOSED BUILDING FOOTPRINTS, AS SHOWN ON SITE PLAN, SHOULD ONLY BE USED AS N 16° 27' 55" W DOWNTOWN DOVER
X
PARTNERSHIP CORPORATION 4. PROPERTY ADDRESS: PARCEL 44.00 120 S. GOVERNORS AVE, DOVER, DE 19904
A REFERENCE TO THE ABOVE MENTIONED PLANS. 26.50' 2-05-077.09-01-42.00-000
D.B. 7943, PG. 126 S 16° 07' 55" E (ADDITIONAL PROJECT PARCELS) PARCEL 43.00 115 S. NEW ST, DOVER, DE 19904
24x36
16. HYDRANT CONNECTIONS BY THE CONTRACTOR ARE PROHIBITED. THIS METHOD MAY NOT BE UTILIZED DURING ANY PHASE OF ZONING: C2 X 34.00' PARCEL 42.00 111 S. NEW ST, DOVER, DE 19904 24x36
THE PROJECT. PARCEL 37.00 105 S. NEW ST, DOVER, DE 19904
LANDS N/F
FAMILY LEGACY, LLC 5. PROPERTY LOCATION: LATITUDE N39° 09' 32.26" - NAD83 (2011)
17. ALL EXISTING SANITARY SEWER LINES, STORM DRAINS, AND WATER LINES NOT USED FOR THE PROPOSED FACILITY X 2-05-077.09-01-41.00-000
MUST BE PROPERLY ABANDONED AT THE MAINS IN ACCORDANCE WITH THE CITY OF DOVER WATER & WASTEWATER D.B. 9216, PG. 46 LONGITUDE W75° 31' 39.25" - NAD83 (2011)
ZONING: C2
24x36
DEPARTMENT REQUIREMENTS PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. 6. ZONING CLASSIFICATION: EXISTING: C-2 - CENTRAL COMMERCIAL, HISTORIC DISTRICT
24x36
X S 16° 07' 55" E
18. PART II, CHAPTER 180, ARTICLE III, SECTION 180-10 OF THE CODE OF KENT COUNTY REQUIRES THAT "NO PERSON SHALL 26.00' PROPOSED: C-2 - CENTRAL COMMERCIAL, HISTORIC DISTRICT
LANDS N/F
DISCHARGE OR CAUSE TO BE DISCHARGED ANY STORMWATER, SURFACE WATER, UNCONTAMINATED GROUNDWATER, ROOF N 16° 27' 55" W THE CITY OF DOVER 7. DEED REFERENCE : DEED BOOK: D 4620/342 (PARCEL 44.00)
2-05-077.09-01-43.00-000 X
RUNOFF, SUBSURFACE DRAINAGE, UNCONTAMINATED NONCONTACT COOLING WATER, CONDENSATE, OR UNPOLLUTED (ADDITIONAL PROJECT PARCELS) DEED BOOK: D 7920/215 (PARCEL 43.00)
24x36
INDUSTRIAL PROCESS WATERS TO ANY SANITARY SEWER". THE CONTRACTOR/DEVELOPER SHALL ENSURE DURING 33.50' D.B. 7920, PG. 215
ZONING: C2
NORTHING 422,107.4710
EASTING 624,718.1040 DEED BOOK: D 7943/126 (PARCEL 42.00)
24x36
CONSTRUCTION THAT NO ILLEGAL DISCHARGES TO THE SANITARY SEWER SYSTEM ARE CREATED WITH THE SITE N 73° 52' 05" E 302.07'
DEED BOOK: D 7920/212 (PARCEL 37.00)
IMPROVEMENTS. 5' B.R.L.
8. PRESENT USE: PARKING LOT (FORMERLY PARKING LOT, RETAIL, DAYCARE)
24x36 19. THE SITE CONTRACTOR SHALL NOTIFY THE CITY OF DOVER DEPARTMENT OF WATER AND WASTEWATER CONSTRUCTION PROPOSED USE: RETAIL, DAYCARE, RESIDENTIAL APARTMENTS 24x36
MANAGER AT 302-736-7025 PRIOR TO THE START OF CONSTRUCTION. A REPRESENTATIVE FROM THE CITY OF DOVER 9. PROPERTY AREA: PARCEL 44.00 76,762 S.F. (1.7622 ACRES)
DSP
S 16° 13' 26" E
UPPER LEVEL WALL
253.77'
DEPARTMENT OF WATER AND WASTEWATER MUST OBSERVE ALL CITY OWNED WATER AND SANITARY SEWER FLOORS 2 - ROOF 10. PROJECT AREA: PARCEL 44.00 76,762 S.F. (1.7622 ACRES)
INTERCONNECTIONS AND TESTING. ALL WATER TAPS MUST BE PERFORMED BY A CITY OF DOVER APPROVED CONTRACTOR.
(ADDITIONAL PROJECT PARCELS) PARCEL 43.00 3,562 S.F. (0.0818 ACRES)
24x36
THE PROPOSED LOCATION FOR THE WATER TAP MAY NEED TO BE ADJUSTED IN THE FIELD DUE TO CONDITIONS OF THE
PARCEL 42.00 3,653 S.F. (0.0838 ACRES) 24x36
EXISTING MAIN. POSSIBLE CONDITIONS THAT WOULD REQUIRE TAPPING RELOCATION INCLUDE PROXIMITY TO PIPE JOINTS,
PARCEL 37.00 2,330 S.F. (0.0535 ACRES)
OTHER TAPS, CONCRETE ENCASEMENTS, CONFLICT WITH OTHER UTILITIES, AND THE LIKE. TEST HOLES MUST BE PERFORMED
SOUTH GOVERNORS AVE.
PROJECT AREA TOTAL: 86,307 S.F. (1.9813 ACRES)
24x36
BY THE CONTRACTOR TO DETERMINE THE BEST TAPPING LOCATION. THE CITY OF DOVER WILL NOT BE HELD RESPONSIBLE
FOR FIELD CONDITIONS REQUIRING ADJUSTMENT OF THE TAPPING LOCATION OR FOR ANY WORK REQUIRED BY THE DAY CARE
11. IMPERVIOUS (LOT) COVERAGE: MAXIMUM ALLOWED: 100% N 24x36
CONTRACTOR TO MAKE AN APPROPRIATE AND LAWFUL CONNECTION. EXISTING: 74,661 S.F.
RIGHT OF WAY WIDTH 60'
PROPOSED: 69,402 S.F. = 78.6%
20. IF THE APPROVED PLAN NEEDS TO MODIFIED DUE TO ERRORS OR OMISSIONS OR FIELD CONDITIONS, ADDITIONAL SEDIMENT 12. BULK STANDARDS: C-2 - CENTRAL COMMERCIAL REQUIRED PROVIDED
AND STORM WATER CONTROL MEASURES MAY BE REQUIRED AS DEEMED NECESSARY BY THE KENT CONSERVATION LOT AREA (MIN.): N/A 1.7622 AC. (PARCEL 44)
24x36
DISTRICT (KCD). LOT WIDTH (MIN.): N/A 255.38 FT.
24x36
LOT DEPTH (MIN.): 70 FT. 302.07 FT.
MINOR ARTERIAL
21. THE KENT CONSERVATION DISTRICT (KCD) RESERVES THE RIGHT TO ENTER PRIVATE PROPERTY FOR PURPOSES OF
PERIODIC SITE INSPECTION. FRONT SETBACK: 0 FT. 6.16’(GOVERNORS), 52.27’(NEW)
BALCONY SIDE SETBACK: 0 FT. 10.9' (N) - 21.7' (S)
24x36
22. ALL WATER AND WASTEWATER UTILITY COMPONENTS MUST MEET THE REQUIREMENTS OF THE CITY OF DOVER WATER FLOOR 2 24x36
REAR SETBACK: 5 FT. N/A
& WASTEWATER DEPARTMENT SPECIFICATIONS. UPPER LEVEL WALL X SIDE/REAR ADJ RESIDENTIAL: 15 FT. N/A
FLOORS 2 - ROOF
23. ALL EXISTING UTILITIES SHALL BE ADJUSTED TO FINAL GRADE IN ACCORDANCE WITH CURRENT CITY OF DOVER 13. BUILDINGS: EXISTING: 0 S.F.
24x36
REQUIREMENTS AND PRACTICES. PROPOSED: 40,735 S.F. (1ST FLOOR) 24x36
32,857 S.F. (2ND FLOOR) PROJECT TITLE
24. PRIOR TO THE START OF CONSTRUCTION OR ORDERING OF MATERIALS, THE CONTRACTOR SHALL ENGAGE A PRIVATE
SOUTH NEW STREET
32,857 S.F. (3RD FLOOR)
UTILITY LOCATOR TO VERIFY LOCATIONS OF ALL EXISTING UTILITIES WITHIN THE PROJECT EXTENTS AS WELL AS VERIFYING PROPOSED BUILDING 32,857 S.F. (4TH FLOOR)
24x36
25.
ELEVATIONS OF ALL UTILITIES TO BE CROSSED WITH NEW IMPROVEMENTS. CONTRACTOR SHALL REPORT
CONFLICTS/ISSUES TO THE ENGINEER.
ALL SUBSURFACE UTILITIES SHOWN HEREON ARE BASED ON SURFACE EVIDENCE COLLECTED FROM THE FIELD RIGHT OF WAY WIDTH 60'
FOUR STORY
40,750 S.F. FOOTPRINT
F.F. EL.: 32.75' BALCONY
TOTAL S.F. AT COMPLETION:
HEIGHT:
139,306 S.F.
125 FT. (MAX.) 54'-3" DOWNTOWN 24x36
26.
TOPOGRAPHIC SURVEY AND THE BEST AVAILABLE RECORDS.
AT IT'S MEETING ON MM/DD/YYYY, THE CITY OF DOVER PLANNING COMMISSION GRANTED CONDITIONAL APPROVAL
FLOOR 2 STORIES:
FLOOR AREA RATIO:
NFPA CONSTRUCTION TYPE:
10 (MAX.)
5.0 (MAX.)
TYPE II
4
1.81
DOVER
LOCAL ROAD DEVELOPMENT
24x36
OF SITE DEVELOPMENT PLAN APPLICATION #X-XX-XX. DWELLING UNITS 120 24x36
14. UTILITIES: WATER: CITY OF DOVER
24x36 BALCONY
FLOOR 2
SEWER:
GAS:
ELECTRIC:
CITY OF DOVER
CHESAPEAKE UTILITIES
CITY OF DOVER CORPORATION 24x36
'THE GOVERNO
UPPER LEVEL WALL
FLOORS 2 - ROOF 15. PARKING CALCULATIONS : C-2 ZONING (NO REQUIREMENT)
REQUIRED: 0
24x36 PROVIDED: 13 (SEE PARKING STATEMENT) 24x36
7 6
HANDICAPPED PARKING REQUIRED : 1
HANDICAPPED PARKING PROVIDED : 1 ( VAN ACCESSIBLE)
BICYCLE PARKING REQUIRED : 1
EXISTING BUILDING
24x36
BICYCLE PARKING PROVIDED : 20 EXTERNAL, 20 INTERNAL (BIKE STORAGE ROOM) 24x36
BALCONY TOTAL PROVIDED : 40
FLOOR 2
16. LOADING CALCULATIONS : LOADING BERTHS REQUIRED : 2 120 S. GOVERNORS AVE.
24x36
17. DUMPSTER CALCULATIONS :
LOADING BERTHS PROVIDED :
DUMPSTERS REQUIRED :
2
7
CITY OF DOVER 24x36
DUMPSTERS PROVIDED : 2 EXTERNAL, 7 INTERNAL (TRASH ROOMS) KENT COUNTY, DELAWARE
18. TREE PRESERVATION : EX. WOODLAND AREA: 0 S.F.
SHEET TITLE
WOODLANDS TO BE CLEARED: 0 S.F. (0%)
24x36
TOTAL WOODLANDS REMAINING: 0 S.F. (0%) 24x36
N 16° 27' 55" W
TOTAL NON-WOODLAND PROJECT AREA:
86,307 S.F. / 3,000 S.F. / TREE = 28.8 = 29
86,307 S.F.
29 TREES REQUIRED
COVER SHEET
24x36
EXISTING TREES TO BE RETAINED:
PROPOSED TREES:
7
28 .AND OVERALL 24x36
255.38'
TOTAL TREES: 35
19. SIGNAGE : FUTURE PERMIT SUBMISSION .SITE PLAN
LOADING ZONE LOADING ZONE
20. OUTDOOR LIGHTING : LIGHTING SHALL BE 1.5 FOOT CANDLES (MINIMUM) AT GRADE
24x36
5' B.R.L.
21. SURVEY DATUM: NGS MONUMENT: . 24x36
VERTICAL: NAVD88
HORIZONTAL: NAD 83 (2011 DSP) -
301.01' S 74° 10' 34" W
24x36
NOTE: X
22. MONUMENTATION: 3 FOUND / 0 SET 24x36
23. SOILS ON SITE: HkB - HAMBROOK-URBAN LAND COMPLEX, 0 TO 5 PERCENT SLOPES (ENTIRE SITE)
PRIOR TO THE START OF CONSTRUCTION OR ORDERING OF 24. WETLAND AREA: 0.00 ACRES
24x36
MATERIALS, THE CONTRACTOR SHALL ENGAGE A PRIVATE UTILITY X
24x36
LOCATOR TO VERIFY LOCATIONS OF ALL EXISTING UTILITIES WITHIN LANDS N/F LANDS N/F
0 15 30 60
LOOCKERMAN SUITES, LLC 1999 PULASKI PROPERTY LLC
24x36 THE PROJECT EXTENTS AS WELL AS VERIFYING ELEVATIONS OF ALL 2-05-077.09-01-45.00-000
D.B. 9489, PG. 104
2-05-077.09-01-45.00-000
D.B. 13300, PG. 303
24x36
ZONING: C2 ZONING: C2
UTILITIES TO BE CROSSED WITH NEW IMPROVEMENTS. CONTRACTOR Do Not Explode - Select Scale
SCALE: 1" = 30'
24x36
SHALL REPORT CONFLICTS/ISSUES TO THE ENGINEER. 24x36
ISSUE BLOCK
LEGEND C-1-Notes-Legend-Landscape
24x36
ITEM EXISTING PROPOSED ITEM EXISTING PROPOSED 24x36
CONCRETE CURB & GUTTER SANITARY GRAVITY SEWER LINE (S) EX. 10"S 10" S
SIZE & FLOW DIRECTION
CONCRETE SIDEWALK, SLAB / PAVING
24x36
SANITARY SEWER FORCE MAIN (F.M.) EX. 10" F.M. 12" F.M. 24x36
IMPERVIOUS SURFACED ROAD, DRIVE SIZE & FLOW DIRECTION
OR PARKING LOT
SANITARY SEWER MANHOLE (S.S.M.H.)
INDIVIDUAL TREE OR BUSH
EVERGREEN DECIDUOUS
N/A OWNERS CERTIFICATION
SANITARY SEWER CLEANOUT (C.O.)
24x36
WIRE FENCE X X X X X X 24x36
WATER MAIN & SIZE EX. 10" W 12" W WE, DOWNTOWN DOVER PARTNERSHIP, HEREBY CERTIFY THAT WE ARE THE OWNER OF THE PROPERTY DESCRIBED AND
CHAINLINK FENCE
SHOWN ON THIS PLAN, THAT THE PLAN WAS MADE AT OUR DIRECTION, AND THAT WE ACKNOWLEDGE THE SAME TO BE OUR ACT
STOCKADE FENCE FIRE HYDRANT (F.H.) F.H. F.H. AND DESIRE THE PLAN TO BE DEVELOPED AS SHOWN IN ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS. .
. . .
24x36
WATER VALVE (W.V.) OR METER (W.M.) 24x36
STRUCTURE (CONCRETE, WOOD, MARK DATE DESCRIPTION
METAL, ETC.)
W.M. W.V. W.M. W.V.
LAYER STATE: C-001
STORM DRAIN MANHOLE (S.D.M.H.)
DRAINAGE DITCH OR SWALE DOWNTOWN DOVER DEVELOPMENT CORPORATION DATE PROJECT NO.: 2025041.00
24x36
STORM DRAIN LINE (CMP, RCP, HDPE) 24x36
WETLAND BOUNDARY LINE N/A
V V V
ENGINEERS CERTIFICATION DATE: 8-1-25
CONTOUR 49 55 CATCH BASIN (C.B.) SHEET INDEX
ELEVATION SPOT SHOT 43.55 25.50 T.C. UTILITY POLE W/ OVERHEAD SERVICE C-001 COVER SHEET AND OVERALL SITE PLAN I, J. MICHAEL RIEMANN, P.E., HEREBY CERTIFY THAT I AM A REGISTERED ENGINEER IN THE STATE OF DELAWARE, THAT THE
SCALE: 1" = 30'
25.15
24x36
BENCH MARK
25.00 B.C. (TELEPHONE (O.T.), ELECTRIC (O.E.) C-101 EXISTING CONDITIONS AND DEMOLITION PLAN INFORMATION SHOWN HEREON HAS BEEN PREPARED UNDER MY SUPERVISION AND TO MY BEST OF MY KNOWLEDGE AND DRAWN BY: M.J.H. PROJ. MGR.: M.J.H. 24x36
N/A UNDERGROUND ELECTRIC (U.E.) C-201 SITE, UTILITY & GRADING PLAN BELIEF REPRESENTS GOOD ENGINEERING PRACTICES AS REQUIRED BY THE APPLICABLE LAWS OF THE STATE OF DELAWARE.
U.E. U.E.
PROPERTY OR RIGHT-OF-WAY LINE SHEET
UNDERGROUND TELEPHONE (U.T.) U.T. U.T.
C-202 ACTIVE RECREATION PLAN
Z-100 LANDSCAPE PLAN
C-001
24x36
CENTERLINE 24x36
UNDERGROUND GAS MAIN (G) EX. 2" G 2" G
LIGHT POLE J. MICHAEL RIEMANN, P.E DATE
COPYRIGHT 2025
12
F:\Projects\2025\202504100\10_Civil\DWG\2025041-SITE-C3D21.dwg, Aug 01, 2025 - 10:57am
.PDF
24x36 24x36
2025-08-01
Page 13
24x36 24x36
Item 8.
24x36 24x36
24x36 24x36
24x36 24x36
24x36
ARCH I T E C TURE 24x36
ENG I NE E R I NG
T Delaware
EX. SIDEWALK
24x36 24x36
PARCEL ED-05-077.09-01-36.01-000 Dover
302.734.7950
Newark
24x36
302.369.3700 24x36
Maryland
Salisbury
24x36
410.546.9100 24x36
PARCEL ED-05-077.09-01-37.00-000 PARK / PLAYGROUND
North Carolina
24x36
Charlotte 24x36
980.270.9100
Raleigh
PARCEL ED-05-077.09-01-42.00-000 919.243.1332
24x36
Wilmington 24x36
910.341.7600
www.beckermorgan.com
EX. SIDEWALK
24x36 24x36
PARCEL ED-05-077.09-01-43.00-000
24x36 24x36
5' B.R.L.
24x36 24x36
REF.
24x36 24x36
REF. REF.
REF.
UTILITIES /
REF. REF.
REF. REF.
REF.
WASTE REF. REF.
24x36 24x36
ENCLOSURE FITNESS
AREA
REF. REF. REF.
CENTER
REF. REF.
24x36
REF. REF. REF. 24x36
REF.
24x36
COMMUNITY 24x36
SPACE
COMMUNITY DSP
EX. SIDEWALK
REF. REF.
24x36
SPACE
24x36
COURTYARD / N
24x36
WELLNESS AREA 24x36
24x36 24x36
REF. REF.
REF. REF.
S. GOVERNORS AVE.
24x36 24x36
S. NEW STREET
ROOFTOP AMENITY COURTYARD
7,225 SF
24x36 24x36
PROJECT TITLE
7 6
EX. SIDEWALK DOWNTOWN
24x36
REF. REF. 24x36
REF.
DOVER
REF.
DEVELOPMENT
24x36 24x36
REF.
REF. REF. REF. REF.
REF.
A.2
24x36
REF.
REF.
REF. CORPORATION 24x36
24x36
'THE GOVERNO 24x36
LOADING ZONE LOADING ZONE
24x36 24x36
MINOR ST (PAPER)
120 S. GOVERNORS AVE.
5' B.R.L.
B V CITY OF DOVER
24x36 24x36
EX. SIDEWALK
KENT COUNTY, DELAWARE
EX. SIDEWALK
SHEET TITLE
24x36 24x36
ACTIVE
24x36 RECREATION PLAN 24x36
1ST FLOOR SITE PLAN SECOND FLOOR PLAN .
24x36
1 SCALE: 1" = 30'-0" 2 SCALE: 1" = 30'-0" . 24x36
0' 15' 30' 60' 0' 15' 30' 60'
24x36 24x36
24x36 24x36
0 15 30 60
24x36 24x36
120 SOUTH GOVERNORS AVENUE Do Not Explode - Select Scale
ACTIVE RECREATION TABULATIONS (SQUARE FEET) SCALE: 1" = 30'
24x36 24x36
ISSUE BLOCK
FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR PERCENTAGE TOTAL (SF)
24x36 24x36
COURTYARD/WELLNESS AREA 5,729 - - - 19.7% 5,729
FITNESS CENTER 2,054 - - - 7.1% 2,054
24x36 24x36
COMMUNITY SPACE 2,995 - - - 10.3% 2,995
24x36
PARK 11,090 - - - 38.1% 11,090 24x36
ROOFTOP COURTYARD - 7,225 - - 24.8% 7,225
.
. . .
24x36 24x36
TOTAL ACTIVE RECREATION SQUARE FOOTAGE REQUIRED (75 SF PER UNIT - TOTAL UNITS = 120) 9,000 MARK DATE DESCRIPTION
LAYER STATE: Rec Plan
TOTAL ACTIVE RECREATION SQUARE FOOTAGE PROVIDED 29,093
PROJECT NO.: 2025041.00
24x36 24x36
DATE: 8-1-25
SCALE: 1" = 30'
DRAWN BY: CS PROJ. MGR.: M.J.H.
24x36 24x36
SHEET
24x36
DRAWING BY CORE STATES GROUP
C-202
COPYRIGHT 2025
24x36
13
F:\Projects\2025\202504100\10_Civil\DWG\2025041-REC PLANS-C3D21.dwg, Aug 01, 2025 - 9:57am
.PDF
24x36 24x36
2025-08-01
Page 14
34 8.26' Item 8.
MATERIALS LEGEND PLANTING LEGEND TREE PROTECTION LEGEND
6' WOODEN FENCE
LP STORM INLET 56.49' 20.97' CONC. PAVEMENT, LAWN TREE PROTECTION
GRT=33.36
INV.=28.11 (18"RCP)
PEDESTRIAN FENCE, NON-MOVEABLE
MATERIALS SCHEDULE
34.14'
X
36.99'
G.M. CONC. PAVEMENT, CANOPY TREE TREE PROTECTION
CONC. CURB
X
VEHICULAR - SEE CIVIL FENCE, MOVEABLE
T DOG WASTE BIN.
12" CIP
X UNIT PAVEMENT, TRUNK PROTECTION
8' PEDESTRIAN
5'-0" 77.68' EXISTING TREES STIPULATION FOR REUSE
MIN. CO X
QC TO REMAIN (6) THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC
UNIT PAVEMENT, UNDERSTORY TREE, SITE, AND IS NOT SUITABLE FOR USE ON A DIFFERENT
DEP. CURB
OVERHEAD WIRE X 1 PROJECT SITE OR LATER TIME. USE OF THIS DRAWING
FUTURE DOG HT=12.8' VEHICULAR - SEE CIVIL MULTI-STEM FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT
CO STUB CC REQUIRES THE SERVICES OF PROPERLY LICENSED
PARK & NATURE X LANDSCAPE ARCHITECTS AND ENGINEERS. PRODUCTION
PLAYSCAPE PB 1
ASPHALT PAVEMENT, UNDERSTORY TREE, OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS
DOG PARK SINGLE-STEM NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.
AR OVERHEAD WIRE X
QR VEHICULAR - SEE CIVIL
HT=13.2'
34 1 PROJECT TEAM
4 PARCEL ED-05-077.09-01-37.00-000 X
OVERHEAD WIRE CARPENTRY SHRUB
HT=13.8'
EXISTING FENCE PAVEMENT OWNER OF RECORD:
X
TO REMAIN DOWNTOWN DOVER DEVELOPMENT
CORPORATION
CC 6' WOODEN FENCE PERMEABLE
X
X X X X X X X X X X 101 W LOOCKERMAN STREET
X X X X
X X 1 X X X X X X X X X X X X ENGINEERED WOOD SUITE 2B
UP 17234
34 FIBER SAFETY SURFACE DOVER, DE, 19904
X HEDGE FOR
AG DEVELOPER:
SCREENING, PB PLANTING BED
1 PARCEL ED-05-077.09-01-42.00-000 MOSAIC DEVELOPMENT PARTNERS JV
33 X 3' MIN. HT.
3002 CECIL B. MOORE AVENUE
SUITE 202
X
PHILADELPHIA, PA 19121
34 PROJECT INFORMATION TREE PRESERVATION 215-921-8107
X
DEP. STUB NATURE PB
CURB PO PB · PROJECT NAME: MIXED-USE BUILDING AT 120 S · EXISTING WOODLAND AREA: 0 SF LANDSCAPE ARCHITECT:
OVERHEAD WIRE
PLAYSCAPE 35.43
1 HT=14.2'
X CONC. RETAINING GOVERNORS AVENUE, HI-25-02 · WOODLANDS TO BE CLEARED: 0 SF (0%) STUDIO SUSTENA
35 · ZONING CLASSIFICATION: · TOTAL WOODLANDS REMAINING: 0 SF (0%)
OVERHEAD WIRE WALL 4537 WAYNE AVENUE
HT=14.2' 33 EXISTING TREE EXISTING: C-2 - CENTRAL COMMERCIAL, HISTORIC DISTRICT · TOTAL NON-WOODLAND PROJECT AREA: 86,307 SF
X 35.11 34 SUITE 201
PARCEL ED-05-077.09-01-43.00-000 TO REMAIN (1) 4'-HIGH PRIVACY PROPOSED: C-2 - CENTRAL COMMERCIAL, HISTORIC · 86,307 SF / 3,000 SF / TREE = 28.8 = 29: 29 TREES
35 35 PHILADELPHIA, PA 19144
AG X
FENCE, MOUNT DISTRICT REQUIRED 215-247-8784 | STUDIO-SUSTENA.COM
OVERHEAD WIRE
POLLINATOR TO TOP OF WALL · PARCEL NUMBERS: · EXISTING TREES TO BE RETAINED: 7
1 HT=14.5'
GARDEN UP NO WIRES X
DEP. ED-05-077.09-01-44.00-000 (MAIN PARCEL) · PROPOSED TREES: 28 ARCHITECT:
TRENCH DRAIN - 5'-0" 32 CURB
STUB IRON PIPE 33 35 5'-0" ED-05-077.09-01-43.00-000 · TOTAL TREES: 35 (ALL TREES SHALL HAVE A 1-YEAR CORE STATES GROUP
UP 34 SEE CIVIL MIN. ED-05-077.09-01-42.00-000 REPLACEMENT GUARANTEE) 1315 WALNUT STREET
FOUND & HELD
34 PB ED-05-077.09-01-37.00-000 SUITE 600
CONC. CURB
5' B.R.L.
LS 33 · TOTAL ACREAGE: PHILADELPHIA, PA 19107
ED-05-077.09-01-44.00-000: 1.7622 ACRES (MAIN PARCEL) TREE PROTECTION 215-609-4609
3 OVERHEAD CO ED-05-077.09-01-43.00-000: 0.0818 ACRES
WIRE
NC
. · LOTS IN NON-WOODLAND AREAS EXPECTED TO RETAIN
QR HT=27.1' IRON PIPE ED-05-077.09-01-42.00-000: 0.0838 ACRES CIVIL ENGINEER:
RB EXISTING TREES TO MEET TREE DENSITY
FOUND & HELD CU ED-05-077.09-01-37.00-000: 0.0535 ACRES BECKER MORGAN GROUP, INC.
1 OVERHEAD WIRE WALK-OFF STRIP, REQUIREMENTS:
PB PROJECT AREA TOTAL: 1.9813 ACRES 309 S. GOVERNORS AVENUE
HT=26.1' TYP. ED-05-077.09-01-43.00-000
DOVER, DE 19904
ED-05-077.09-01-37.00-000
302-734-7950
· TREE PROTECTION SHALL BE INSTALLED AROUND
AG OVERHEAD WIRE DEP. SETBACKS & YARD AREAS EACH INDIVIDUAL OR GROUP OF PROXIMATE TREES TO
HT=26.3' CURB
1 REQUIRED ACHIEVED BE PROTECTED.
· TREE PROTECTION AREAS SHALL BE PROTECTED BY
FRONT SETBACK 0' 5.8' FENCING AND SILT SOCKS SITUATED TO COINCIDE
MV
PB DEP. WITH THE DRIPLINES OF THE TREE OR GROUP OF
1 CURB
SIDE YARD NONE REQUIRED 10' ON THE NORTH TREES TO BE PRESERVED.
DUMPSTER/ BUT 5' MIN. IF 22' ON THE SOUTH · PROTECTION MEASURES SHALL BE ERECTED PRIOR
TRANSFORMER PROVIDED TO CONSTRUCTION AND MUST REMAIN UNTIL THE
34
CONC. CURB
ENCLOSURE PB FINAL LANDSCAPE IS INSTALLED.
REAR YARD 20' ABOVE GROUND 37' GROUND FLOOR · TEMPORARILY MOVEABLE SECTIONS OF FENCING MAY
FLOOR. AT GROUND 54' ABOVE GROUND BE CONSIDERED FOR LIMITED AREAS WHERE
32 FLOOR 5' REQUIRED FLOOR LANDSCAPE CONSTRUCTION MAY OCCUR, SUCH AS
GT PAVEMENT IN A FILL CONDITION. NO EXCAVATION
CAFE TABLE AND SHALL OCCUR IN THESE AREAS.
1
CHAIRS, TYP. SENSITIVE HABITAT INFORMATION
· SURVEY PREPARED BY SHAHEED A. SMITH EROSION & SEDIMENTATION CONTROL
PB PB LS
·
GEOSPATIAL, LLC ON 4/4/25
WETLANDS PRESENT ON SURVEY: NONE · TREE PROTECTION FENCING AND SILT SOCKS SHALL
MIXED-USE
HEDGE FOR
SCREENING,
3' MIN. HT.
3
· WOODLANDS PRESENT ON SURVEY: NONE BE INSTALLED TO AVOID SEDIMENTATION INTRUSIONS
AND EROSION IN TREE PROTECTION AREAS. BUILDING
NS · SEE CIVIL FOR ADDITIONAL E&S INFORMATION. 120 S GOVERNORS AVE.
PB PB
1 DOVER, DE 19904
METAL WALL, TYP. CONC. CURB
GT CC
WATER FEATURE
3 2
CHAIRS PB
SEAL:
DEP. CURB
33
STORM INLET
GRT=31.73
INV.=27.54(12" RCP)
PARCEL ED-05-077.09-01-44.00-000 PB
PB 7 6 PB
CONC. CURB
ISSUE BLOCK:
PB
31
32
BENCH, TYP.
DEP.
CURB
DEP. CURB
HEDGE FOR
SCREENING,
3' MIN. HT.
DEP.
CURB
STORM INLET
GRT=31.75
INV.A=29.88(8" PVC)
INV.B=29.50(12" RCP)
MV
LOADING LOADING
1
ZONE ZONE CONC. CURB CONC. CURB
19'-0" MIN. GROCERY B
PB A
CONC. CURB
TRUCK ACCESS LOADING ZONE
5' B.R.L.
CONC. CURB
6.4'
E
X 32
CHECKED BY: LM
X
PIPE FOUND DRAWN BY: XW/LM
33 (DISTURBED)
31 CO 0.25' NW OFF LINE
SCALE: AS NOTED
33
SHEET NAME:
DEP. CURB
8' CHAIN LINK FENCE
X
32 99.28'
X LANDSCAPE PLAN
32.4
40.36' 24.60'
32.14 TC
31.76 BC
SHEET NUMBER:
0' 20' 40' 60'
SCALE: 1" = 20'-0"
Z-100 14
Page 15
Item 2.
120 S GOVERNORS AVENUE MIXED USE
DOVER, KENT COUNTY, DELAWARE
PLANNING BOARD PRESENTATION
PLANNING BOARD PRESENTATION | 1 AUGUST 2025
DOWNTOWN DOVER PARTNERSHIP | MOSAIC DEVELOPMENT PARTNERS JV + COLONIAL PARKING
15
Page 16
S 09°06'07" E 48.20'
N 08°44'17" W 48.59'
L02- RESIDENTIAL FLOOR 32,387
S 09°05'49" E 48.31'
RESIDENTIAL
L03 - RESIDENTIAL FLOOR 32,387
12" CIP
EX. SIDEWALK
PARCEL ED-05-077.09-01-36.01-000
77.68'
S 81°30'37" W 81.64'
T
L04 - RESIDENTIAL FLOOR
L05 - RESIDENTIAL FLOOR
GROUND FLOOR PLAN 32,387
32,387
Item 8.
129,548
OVERHEAD WIRE
N 81°30'37" E 111.64' S 81°30'20" W 30.00'
HT=12.8'
N 08°44'12" W 40.00' S 09°15'08" E 40.00'
OVERHEAD WIRE
HT=13.2'
Total Building Area in SF: 169,080
OVERHEAD WIRE
HT=13.8'
PARCEL ED-05-077.09-01-37.00-000
Total Development Site Area from assemblage below: 85,377
120 S. Governors Ave | Parcel ID: ED05-077.09-01-44.00 74,052
S 81°30'31" W 112.00' 115 S. New Street | Parcel ID: ED05-077.09-01-43.00 3,484
S 08°29'27" E 34.00'
N 08°29'29" W 33.50' N 08°29'29" W 26.50'
111 S. New Street | Parcel ID: ED05-077.09-01-42.00 3,485
PARCEL ED-05-077.09-01-42.00-000
S 08°29'29" E 7.50' 105 S. New Street | Parcel ID: ED05-077.09-01-37.00 4,356
N 81°30'31" E 60.50'
C-2 Allowable FAR per DRAFT Proposed Ordinance 2024-01 C-2 Zone Revisions 5.0
S 08°55'29" E 60.00'
N 81°30'31" E 60.50'
EX. SIDEWALK
OVERHEAD WIRE
Proposed FAR 2.0
S 08°29'29" E 26.00'
HT=14.2'
OVERHEAD WIRE
HT=14.2'
PARCEL ED-05-077.09-01-43.00-000
OVERHEAD WIRE
HT=14.5'
302.07'(SURVEY)
N 81°30'31" E 304.33'(DEED)
5' B.R.L.
CAFE BOH
STAIR 1 COFFEE SHOP
ELEC. BIKE PACKAGE REST. REST.
OVERHEAD WIRE
HT=26.3'
BOH CORR.
UTILITIES / DAYCARE FITNESS CORR.
WASTE
ENCLOSURE MAIL AREA
AREA BUILDING STOR.
MECH.
/MAINT.
ELEV 1/2
WATER
253.77' COMMUNITY SPACE COMMUNITY SPACE 255.38'
A (15 NSF/UNIT) KIT. B (15 NSF/UNIT)
EX. SIDEWALK
FCC
LOBBY
SOUTH BRADFORD STREET
COURTYARD / WELLNESS AREA LEASING OFC
WEST VEST.
S. GOVERNORS AVE.
NEW ST. ENTRY GOVERNOR ST.
S. NEW STREET
ENTRY
S 08°35'00" E
SHOPPING CART RETURN
BREAKROOM
TEMPORARY
0 1
BENCHMARK
2 2.3
7 6
3
MAG NAIL
EX. SIDEWALK
ELEV.=32.20
4
GROCERY RETAIL 5
N 08°49'29" W
FLOOR
RETAIL BAY 3
6 6.6 7 7.1
A
GROCERY TRASH
RETAIL CORR. RETAIL BAY 2
A.2
BATHROOM
GROCERY GROCERY FREIGHT
RECEIVING AREA / REFRIGERATION RETAIL BAY 1
LOADING
STOCK ROOM AREA
STAIR 2
LOADING ZONE MINOR ST (PAPER)
5' B.R.L.
LOADING ZONE
B
6.4'
N 81°49'00" E 127.14' V
S 81°49'00" W 301.01'(SURVEY) P.O.B.
S 08°11'00"
EX.ESIDEWALK
22.00'
303.60'(DEED)
EX. SIDEWALK
N 08°11'00" W 45.00' 251.00' TIE TO
S 08°11'57" E 24.32'
S 82°29'14" W 112.15'
99.28'
40.36' 24.60'
LOOCKERMAN STREET
B.8
S 81°49'00" W 15.00'
C
CORE STATES GROUP | 1 AUGUST 2025
120 S GOV ERNORS AV ENUE MIX ED US E
D OW N TOW N DOV E R PA RT NE R SHIP | MO SAIC DE VE LO P ME N T PARTN ERS J V + COLON IAL PARK IN G 516
Page 17
FLOOR PLAN INFORMATION
THE SET CONTAINS DRAWINGS AT DIFFERENT SCALES. IT IS THE INTENT OF THE
DRAWINGS THAT CERTAIN INFORMATION IS GIVEN SPECIFICALLY ON EACH SERIES OF
DRAWINGS AS FOLLOWS:
OVERALL DRAWINGS - A-100 SERIES (1/16" = 1'-0")
SECOND FLOOR PLAN
Item 2.
• OVERALL BUILDING PLAN LAYOUT
• BUILDING ELEVATION, BUILDING SECTION AND WALL SECTION MARKERS
• OVERALL BUILDING DIMENSIONS (TO FINISH FACE)
• MATCHLINE DESIGNATION FOR SECTOR DRAWINGS
SECTOR PLANS - A-110 SERIES (1/8" = 1'-0")
The Philadelphia Building
• PLAN LAYOUT PER SECTOR
1315 Walnut Street
• DIMENSIONING
Suite 600
• PARTITION TYPES Philadelphia, PA 19107
• KEYS TO ENLARGEMENTS (STAIRS/ELEVATORS/AMENITY SPACES)
LEVELS L01 L02 L03 L04 TOTAL MIX
215.609.4609
• DOOR TAGS
STAIR
• DETAIL KEYS www.core-states.com
BETA ALPHA DELTA DELTA ALPHA DELTA DELTA BETA DELTA ALPHA • PRIMARY FURNITURE AND EQUIPMENT
UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT DELTA 0 11 11 11 33 28%
ALPHA FLOOR PLAN 0 LEGEND21 21 21 63 53%
BETA 0
FIRE EXTINGUISHER
FE
7 7 7 21 18%
GAMMA FIRE 0
EXTINGUISHER CABINET
FEC
1 1 1 3 3%
ALPHA SUBTOTALS 0
TWO WAY COMMUNICATION
TWC
40 40 40 120 100%
UNIT CHANGE IN FLOOR ELEVATION. SEE FLOOR PLAN FOR LOCATIONS OF
OFFSET.
BUILDING
SERVICES
BETA ALPHA DELTA DELTA BETA DELTA DELTA BETA NOT IN SCOPE
PROGRESS PRINT
UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT ELEV NOT FOR
OVERALL FLOOR PLAN GENERAL CONSTRUCTION
ALPHA NOTES 6/10/2025 1:17:26 PM
ELEV
UNIT 1. UNITS SHOWN FOR REFERENCE ONLY, REFER TO THE UNIT PLANS FOR ADDITIONAL
INFORMATION.
2. REFER TO PARTITION TYPES FOR PARTITION THICKNESS AND DETAILS, CONTRACTOR
TO COORDINATE FINAL WALL THICKNESS DIMENSIONS WITH SHEAR WALL LOCATIONS.
REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
3. PROVIDE MOISTURE-RESISTANCE GYPSUM WALL BOARD AT ALL WET WALLS.
4. PARTITION DEPTH AT FIRE EXTINGUISHER CABINET LOCATIONS SHALL ACCOMMODATE
FULL CONCEALMENT OF CABINETS AS SPECIFIED BY THE MANUFACTURER.
5. REFER TO PLUMBING DRAWINGS FOR ALL FLOOR DRAIN LOCATIONS.
6. UNLESS NOTED OTHERWISE, ALL DIMENSIONS ARE THE ROUGH MATERIAL (FACE OF
FRAMING, MASONRY, AND/OR CONCRETE.)
ALPHA ALPHA 7. UNLESS NOTED OTHERWISE, DIMENSIONS TO WINDOWS AND DOORS ARE TO
MASONRY OPENINGS IN CMU AND/OR CONCRETE AND CENTERLINE OF OPENING IN
UNIT UNIT FRAMED WALLS. PARTITIONS ABOVE OPENINGS SHALL BE THE SAME AS THE
PARTITIONS BESIDE THE OPENING. COORDINATE WALL CONSTRUCTION WITH PARTITION
TYPES.
8. ALL HINGED DOORS SHALL BE SET FROM HINGE SIDE 6" FROM THE NEAREST
PERPENDICULAR PARTITION, AND 4" FROM THE NEAREST PERPENDICULAR PARTITION
WITHIN A RESIDENTIAL UNIT, UNO.
9. CONSTRUCTION OF FIRE-RATED PARTITIONS, INCLUDING TAPING A FINISHING OF
GYPSUM WALLBOARD FOR FULL HEIGHT TO STRUCTURE ABOVE, SHALL BE IN
ACCORDANCE WITH UL SPECIFICATIONS TO ACHIEVE RATING INDICATED. CONSTRUCT
HIGHER RATED PARTITIONS FIRST, THEN PROCEED TO LOWER RATED PARITIONS, SEE
ALPHA ALPHA PARTITION TYPES FOR ADDITIONAL INFORMATION.
10. ACOUSTICAL (SOUND-ISOLATION) PARTITIONS SHALL BE SEALED FOR FULL HEIGHT TO
UNIT UNIT PREVENT PASSAGE OF AIRBORNE SOUND. TAPE AND FINISH ALL GYPSUM
WALLBOARD JOINTS AND FASTENERS (INCLUDING ABOVE CEILING). CAULK AT
PERIMETER AND SEAL AT PENETRATIONS.
11. PROVIDE APPROVED FIRESTOPPING MATERIAL AT PENETRATIONS OF FIRE RATED
PARTITIONS.
12. SEE INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION.
13. DIMENSION TO WINDOW CENTER LINE, WINDOWS ARE VERTICALLY ALIGNED UNLESS
NOTED OTHERWISE.
14. REFERENCE BUILDING ELEVATIONS FOR WALL TYPE FINISHES. Project:
ALPHA ALPHA 15. REFERENCE ID SHEETS TO NOTE ALL MILLWORK AND POTENTIAL HALF WALLS.
16. PER UL DESIGN ALTERNATE FRAMING FOR SOFFITS OR DROPPED CEILINGS BELOW NEW MIXED-USE
UNIT UNIT THE FLOOR TRUSSES WITHOUT CREATING A SECONDARY CONCEALED SPACE IS
ALLOWED.
DEVELOPMENT
120 GOVERNORS AVENUE
ROOF COURTYARD 120 Governors Avenue
Dover, DE 19904
FLOOR PLAN KEYNOTES
ALPHA ALPHA 1 NOTE
UNIT UNIT
2 NOTE
ALPHA ALPHA BETA DELTA BUILDING
UNIT UNIT UNIT UNIT ALPHA SERVICES ALPHA
UNIT UNIT Owner:
MOSAIC DEVELOPMENT
PARTNERS
3002 CECIL B. MOORE
BUILDING
AVENUE
SERVICES PHILADELPHIA, PA 19121
TRASH
Autodesk Docs://2391.00-24 120 South Governors Avenue/2391_00-24 120 South Governors Avenue_4 Story.rvt
ROOM
ALPHA ALPHA BETA DELTA ALPHA GAMMA Issue/Revision:
UNIT UNIT UNIT UNIT ELEV
UNIT UNIT
STAIR
Drawn: Author
Reviewed: K. SKINNER
Contact: M. MCCLOSKEY
Project Number: 2391.00-24
Sheet Title:
SECOND FLOOR PLAN
6/10/2025 1:17:26 PM
SECOND FLOOR - BLOCK PLAN Sheet Number:
120 S GOV ERNORS AV ENUE MIX
1
CORE STATES GROUP | 1 AUGUST 2025
ED US E
A-102
0' 4' 8' 16'
SCALE: 3/32" = 1'-0"
D OW N TOW N DOV E R PA RT NE R SHIP | MO SAIC DE VE LO P ME N T PARTN ERS J V + COLON IAL PARK IN G 717
Page 18
PERSPECTIVE VIEW - S GOVERNORS AVE
Item 2.
2: VIEW FACING SOUTH WEST FROM S GOVERNORS AVENUE
CORE STATES GROUP | 1 AUGUST 2025
120 S GOV ERNORS AV ENUE MIX ED US E
D OW N TOW N DOV E R PA RT NE R SHIP | MO SAIC DE VE LO P ME N T PARTN ERS J V + COLON IAL PARK IN G 1518
Page 19
PERSPECTIVE VIEW - S NEW STREET
Item 2.
3: VIEW FACING EAST FROM S NEW STREET
CORE STATES GROUP | 1 AUGUST 2025
120 S GOV ERNORS AV ENUE MIX ED US E
D OW N TOW N DOV E R PA RT NE R SHIP | MO SAIC DE VE LO P ME N T PARTN ERS J V + COLON IAL PARK IN G 1619
Page 20
PERSPECTIVE VIEW - S NEW STREET
Item 2.
4: VIEW FACING NORTH EAST FROM S NEW STREET
CORE STATES GROUP | 1 AUGUST 2025
120 S GOV ERNORS AV ENUE MIX ED US E
D OW N TOW N DOV E R PA RT NE R SHIP | MO SAIC DE VE LO P ME N T PARTN ERS J V + COLON IAL PARK IN G 1720
Page 21
Item 1.
CITY OF DOVER
Investment Performance Review
For the Quarter Ended June 30, 2025
PFM Asset Management
Client Management Team A division of U.S. Bancorp Asset Management, Inc
Marty Hammond, Managing Director 200 Princeton South Corporate 213 Market Street
Robert Cheddar, CFA, Managing Director Center, Suite 270A Harrisburg, PA 17101-2141
Jeffrey Fasino, Institutional Sales and Relationship Manager Ewing, NJ 08628 717-232-2723
Alessandra Demsko, Institutional Sales and Relationship Manager 609-452-0263
NOT FDIC INSURED : NO BANK GUARANTEE : MAY LOSE VALUE 21
For Institutional Investor or Investment Professional Use Only - This material is not for inspection by, distribution to, or quotation to the general public
Page 22
Item 1.
• Market Summary
• Portfolio Review
22
PFM Asset Management | pfmam.com Page 2 of 21
Page 23
Item 1.
Market Summary
23
PFM Asset Management | pfmam.com Page 3 of 21
Page 24
For the Quarter Ended June 30, 2025
DOVER, CITY OF Market Item
Summary
1.
Summary future growth. However, consumer spending slowed notably, which may foreshadow
decreased spending and investment due to declining confidence going forward.
• The second quarter of 2025 was characterized by growing uncertainty as markets
reacted to the volatile rollout of tariffs that were larger than expected. Markets Interest Rates
reacted negatively during the first two weeks of the quarter and experienced the
• The U.S. Treasury yield curve steepened over the quarter. The front end of the yield curve
largest declines since the onset of the COVID pandemic. The rest of the quarter was
moved lower amid expectations for Fed rate cuts while longer-dated tenors rose on
marked by equity and bond markets recovering to pre-tariff levels on constructive
concerns regarding the longer-term impacts of the proposed federal reconciliation bill.
trade negotiations and stable economic data.
• The 3-month Treasury was relatively unchanged given no rate cuts from the Fed
• Inflation remained relatively benign but is expected to increase in the second half
while 2- and 5-year Treasuries fell by 15-16 bps to 3.72% and 3.80% respectively.
of the year as tariff-related cost pressures begin to emerge. The timing, extent, and
In addition, the 2-year traded over a wide 60 basis point range during the quarter,
duration of these pressures are unknown.
highlighting the elevated volatility. The 10-year Treasury increased by 2 bps to
• The labor market remained healthy though early signs of cooling are emerging, such 4.23% while the 30-year Treasury increased by 16 basis points to 4.78% as
as rising initial jobless claims. Continuing claims have also increased, and a slower investors demanded more yield to make investments further out the curve.
hiring rate may mean any acceleration in layoffs could result in unemployed workers
• Short- and intermediate-duration U.S. Treasury indices generated positive total
remaining without a job for longer. Federal job cuts are beginning to flow through the
returns for the quarter. The ICE BofA 2-, 5-, and 10-year U.S. Treasury indices
data, but severance packages and deferred resignations have delayed the impact on
returned 1.11%, 1.66%, and 0.98% for the quarter, while the shorter-duration ICE
claims data. However, the reduced pace of population growth, particularly among
BofA 3-month U.S. Treasury index returned 1.04%.
foreign-born workers, may suggest the economy needs fewer new jobs to keep the
unemployment rate stable. Sector Performance
• Consumer sentiment remains subdued due to expectations for higher prices and • Excess returns were strong across investment grade sectors as the spread widening
weaker labor market conditions as tariffs weigh on the pace of economic growth. experienced in April reversed following trade news and resilient economic data.
However, there has been modest improvement from the April lows due to progress
on tariff negotiations. A sharp labor market downturn remains the biggest threat to • Federal Agency & supranational spreads remained low throughout Q2. Both sectors
consumer spending. produced slightly positive excess returns for the quarter. Issuance remained light and
the incremental income from the sectors is near zero.
• The Federal Reserve (Fed) left the overnight policy rate unchanged at 4.25% - 4.50%.
The Federal Open Market Committee’s (FOMC) “dot plot” continues to suggest 50 • Investment-grade (IG) corporate bond spreads spiked early in the quarter on tariff
basis points (bps) in rate cuts by the end of 2025, although there is a divergence of announcements, but as external stressors eased much of the widening retraced.
views as eight members are calling for two rate cuts in 2025 and seven are calling for Demand for new issuance remains strong while net issuance is predicted to decrease
none. Fed Chair Powell noted the Fed would likely be in a position to begin cutting over the balance of the year. Lower-quality issuers outperformed as did banks and
rates again were it not for the unknown impact of tariffs, but the resilient economic other financials.
data supports the Fed’s wait-and-see approach. • Asset-backed securities (ABS) spreads retraced over quarter, but to a lesser degree
than most other sectors. ABS showed the impact of the slower decrease in spreads
Economic Snapshot by posting more modest excess returns over the quarter. We expect the sector to
• U.S. inflation moved marginally closer to the Fed’s 2% target, but tariff-driven price continue generating value from carry going forward.
pressures may emerge as excess inventories built up before tariffs are depleted. Fed
• Mortgage-backed securities (MBS) performance was strong across all structures
Chair Powell said that he expects tariffs to impact inflation, but the size, duration,
and coupons as rate volatility moderated over the quarter. Likewise, Agency-backed
and time of tariff effects are highly uncertain. The year-over-year change in the
commercial MBS (CMBS) also posted strong performance for the quarter and saw
consumer price index (CPI) stood at 2.4% while core CPI, which excludes the volatile
positive excess returns.
food and energy components, moved marginally lower but rounded to an unchanged
2.8%. • Short-term credit (commercial paper and negotiable bank CDs) yields on the front
end of the yield curve rose slightly in response to the approaching Treasury “X-Date”
• U.S. real GDP turned negative in Q1 2025 mainly on the one-off effect of the trade
(estimated date for Treasury to exhaust funds under the debt ceiling) while yields fell
deficit expanding to the highest level on record as businesses increased imports in
modestly on the long end as demand shifted into longer-term Treasury notes. Yield
advance of tariffs. Strong inventories and higher fixed investment served as a bit
spreads tightened over the quarter in response to moderated issuance and strong
of an offset, and a decline in the trade deficit is expected to reverse and support
demand.
24
PFM Asset Management | pfmam.com Page 4 of 21
Page 25
For the Quarter Ended June 30, 2025
DOVER, CITY OF Market Item
Summary
1.
Economic Snapshot
Labor M arket Latest M ar '25 Jun '24
Unemployment Rate Jun'25 4.1% 4.2% 4.1% Unemployment Rate (left) vs. Change in Nonfarm Payrolls (right)
Change In Non-Farm Payrolls Unemployment Rate
5.0% 800K
Change In Non-Farm Payrolls Jun'25 147,000 120,000 87,000 4.0%
600K
3.0%
Average Hourly Earnings (YoY) Jun'25 3.7% 3.9% 3.9% 400K
2.0%
200K
Personal Income (YoY) M ay'25 4.5% 4.7% 5.4% 1.0%
0.0% 0
Initial Jobless Claims (week) 6/ 28/ 25 233,000 219,000 238,000 Jun '22 Dec '22 Jun '23 Dec '23 Jun '24 Dec '24 Jun '25
Growth
1 2
Real GDP (QoQ SAAR) 2025Q1 -0.5% 2.4% 1.6% Real GDP (QoQ)
5%
1 2 4%
GDP Personal Consumption (QoQ SAAR) 2025Q1 0.5% 4.0% 1.9%
3%
2%
Retail Sales (YoY) M ay'25 3.3% 5.1% 2.0% 1%
0%
ISM M anufacturing Survey (month) Jun'25 49.0 49.0 48.3 -1%
-2%
Existing Home Sales SAAR (month) M ay'25 4.03 mil. 4.02 mil. 3.93 mil. Mar '22 Sep '22 Mar '23 Sep '23 Mar '24 Sep '24 Mar '25
Inflation / Prices
Consumer Price Index
Personal Consumption Expenditures (YoY) M ay'25 2.3% 2.3% 2.4%
CPI (YoY) Core CPI (YoY)
10%
Consumer Price Index (YoY) M ay'25 2.4% 2.4% 3.0% 9%
8%
7%
6%
Consumer Price Index Core (YoY) M ay'25 2.8% 2.8% 3.3% 5%
4%
3%
Crude Oil Futures (WTI, per barrel) Jun 30 $65.11 $71.48 $81.54 2%
1%
0%
Jun '22 Dec '22 Jun '23 Dec '23 Jun '24 Dec '24
Gold Futures (oz.) Jun 30 $3,308 $3,123 $2,340
1. Data as of Fourth Quarter 2024.
2. Data as of First Quarter 2024.
Note: YoY = year-over-year, QoQ = quarter-over-quarter, SAAR = seasonally adjusted annual rate, WTI = West Texas Intermediate crude oil.
Source: Bloomberg Financial L.P.
25
PFM Asset Management | pfmam.com Page 5 of 21
Page 26
For the Quarter Ended June 30, 2025
DOVER, CITY OF Market Item
Summary
1.
Interest Rate Overview
U.S. Treasury Note Yields U.S. Treasury Yield Curve
6.0%
6%
5.0% 5%
4%
4.0%
3%
Yield
3.0% Yield 2%
1%
2.0%
0%
1.0%
3-yr
2-yr
1-yr 5-yr 7-yr 10-yr 20-yr 30-yr
0.0% 3-mo
6/30/24 9/30/24 12/31/24 3/31/25 6/30/25 Maturity
2-Year 5-Year 10-Year March 31, 2025
June 30, 2025 June 30, 2024
U.S. Treasury Yields Yield Curves as of June 30, 2025
Change over Change over 6%
Maturity Jun '25 Mar '25 Jun '24
Quarter Year
5%
3-Month 4.30% 4.30% 0.00% 5.36% (1.06%)
4%
1-Year 3.97% 4.03% (0.06%) 5.12% (1.15%)
3%
2-Year 3.72% 3.89% (0.17%) 4.76% (1.04%) Yield 2%
5-Year 3.80% 3.95% (0.15%) 4.38% (0.58%) 1%
0%
10-Year 4.23% 4.21% 0.02% 4.40% (0.17%)
10-yr 25-yr 30-yr
3-yr
2-yr 5-yr 7-yr
30-Year 4.78% 4.57% 0.21% 4.56% 0.22% 1-yr
3-mo Maturity
U.S. Treasury Federal Agency Corporates, A Rated
Source: Bloomberg Financial L.P.
26
PFM Asset Management | pfmam.com Page 6 of 21
Page 27
For the Quarter Ended June 30, 2025
DOVER, CITY OF Market Item
Summary
1.
ICE BofA Index Returns
As of 06/30/2025 Returns for Periods ended 06/30/2025
June 30, 2025 Duration Yield 3 Month 1 Year 3 Years
1-3 Year Indices
U.S. Treasury 1.83 3.79% 1.18% 5.67% 3.41%
Federal Agency 1.45 3.85% 1.12% 5.43% 3.53%
U.S. Corporates, A-AAA rated 1.84 4.33% 1.40% 6.48% 4.45%
Agency MBS (0 to 3 years) 1.91 4.45% 1.25% 5.84% 3.64%
Taxable Municipals 1.86 4.14% 1.40% 6.07% 3.82%
1-5 Year Indices
U.S. Treasury 2.55 3.77% 1.36% 6.07% 3.23%
Federal Agency 2.07 3.83% 1.27% 5.72% 3.42%
U.S. Corporates, A-AAA rated 2.64 4.38% 1.69% 7.06% 4.63%
Agency MBS (0 to 5 years) 3.07 4.51% 1.67% 7.18% 3.69%
Taxable Municipals 2.41 4.28% 1.50% 6.19% 3.65%
Master Indices (Maturities 1 Year or Greater)
U.S. Treasury 6.10 4.06% 0.76% 5.18% 1.31%
Federal Agency 3.33 3.96% 1.30% 5.78% 3.08%
U.S. Corporates, A-AAA rated 6.67 4.86% 1.65% 6.64% 3.67%
Agency MBS (0 to 30 years) 5.79 4.97% 1.13% 6.42% 2.28%
Taxable Municipals 8.81 5.24% 0.72% 4.82% 2.17%
Returns for periods greater than one year are annualized.
Source: ICE BofA Indices.
27
PFM Asset Management | pfmam.com Page 7 of 21
Page 28
For the Quarter Ended June 30, 2025
DOVER, CITY OF Market Item
Summary
1.
Disclosures
Indices shown are not available for investment. The index data reference herein is the property of the index provider and/or its licensors. The index provider assumes no
liability in connections with its use and does not sponsor, endorse or recommend the products or services contained herein. Index returns do not reflect payment of any
sales charges or fees an investor would pay to purchase the securities they represent. The imposition of these fees and charges would cause investment performance to be
lower than the performance shown.
The views expressed within this material constitute the perspective and judgment of U.S. Bancorp Asset Management, Inc. at the time of distribution and are subject to
change. Any forecast, projection, or prediction of the market, the economy, economic trends, and equity or fixed-income markets are based upon current opinion as of the
date of issue and are also subject to change. Opinions and data presented are not necessarily indicative of future events or expected performance. Information contained
herein is based on data obtained from recognized statistical services, issuer reports or communications, or other sources, believed to be reliable. No representation is
made as to its accuracy or completeness.
PFM Asset Management serves clients in the public sector and is a division of U.S. Bancorp Asset Management, Inc., which is the legal entity providing investment
advisory services. U.S. Bancorp Asset Management, Inc. is a registered investment adviser, a direct subsidiary of U.S. Bank N.A. and an indirect subsidiary of U.S.
Bancorp. U.S. Bank
N.A. is not responsible for and does not guarantee the products, services, or performance of U.S. Bancorp Asset Management, Inc.
NOT FDIC INSURED : NO BANK GUARANTEE : MAY LOSE VALUE
Further distribution is not permitted without prior written consent.
28
PFM Asset Management | pfmam.com Page 8 of 21
Page 29
Item 1.
Portfolio Review:
DOVER POOLED INVESTMENT ACCOUNT
29
PFM Asset Management | pfmam.com Page 9 of 21
Page 30
For the Quarter Ended June 30, 2025
Item 1.
DOVER, CITY OF Portfolio Snapshot
Portfolio Snapshot - DOVER POOLED INVESTMENT ACCOUNT¹
Portfolio Statistics Sector Allocation
Total Market Value $113,085,929.43
Securities Sub-Total $112,227,266.41
U.S. Treasury | 43%
Accrued Interest $784,725.16 Corporate | 40%
Agency CMBS | 7%
Cash $73,937.86 Supranational | 2%
ABS | 2%
Portfolio Effective Duration 2.06 years
Commercial Paper | 2%
Benchmark Effective Duration 2.05 years Municipal | 1%
Federal Agency | 1%
Yield At Cost 4.14% Agency MBS Pass Through | 1%
Negotiable CD | 1%
Yield At Market 4.20% Agency CMO | <1%
Portfolio Credit Quality AA
Credit Quality - S&P Duration Distribution
Portf olio Benchmark
AAA | 4%
AA+ | 51%
30% 27%
25%
27%
AA | 2% 24%
25% 23% 22%
AA- | 5%
A-1+ | 4% 18%
20% 15%
A+ | 9%
A | 9% 15% 11%
A- | 10% 10% 8%
A-1 | 1%
BBB+ | 4% 5%
Not Rated | 2% 0%
0-1 Yr 1-2 Yrs 2-3 Yrs 3-4 Yrs 4-5 Yrs
1. Yield and duration calculations exclude cash and cash equivalents. Sector allocation includes market values and accrued interest.
The portfolio’s benchmark is the ICE BofA 0-5 Year U.S. Treasury Index. Source: Bloomberg Financial LP.
An average of each security’s credit rating was assigned a numeric value and adjusted for its relative weighting in the portfolio.
2. Percentages may not equal 100% due to rounding.
30
PFM Asset Management | pfmam.com Page 10 of 21
Page 31
For the Quarter Ended June 30, 2025
Item 1.
DOVER, CITY OF Portfolio Summary
Issuer Diversification
Security Type / Issuer Market Value (%) S&P / Moody's / Fitch Security Type / Issuer Market Value (%) S&P / Moody's / Fitch
U.S. Treasury 43.2% Corporate 40.4%
United States Treasury 43.2% AA / Aa / AA Analog Devices Inc 0.7% A/A/A
Federal Agency 1.2% AstraZeneca PLC 0.8% A/A/A
Federal Home Loan Banks 0.7% AA / Aa / NR Bank of America Corp 1.9% A / A / AA
Federal Home Loan Mortgage Corp 0.5% AA / Aa / AA Bank of Montreal 0.7% A / A / AA
Agency CMBS 6.6% Bank of New York Mellon Corp 0.8% A / Aa / AA
Bank of Nova Scotia 0.5% A / A / AA
Federal Home Loan Mortgage Corp 6.6% AA / Aa / AA
Bayerische Motoren Werke AG 0.7% A / A / NR
Agency CMO 0.3%
BlackRock Inc 0.7% AA / Aa / NR
Federal National Mortgage Association 0.3% AA / Aa / AA
Bristol-Myers Squibb Co 0.5% A / A / NR
Agency MBS Pass Through 0.8%
Canadian Imperial Bank of Commerce 0.6% A / A / AA
Federal Home Loan Mortgage Corp 0.2% AA / Aa / AA Charles Schwab Corp 0.4% A/A/A
Federal National Mortgage Association 0.5% AA / Aa / AA Cintas Corp 0.3% A / A / NR
Supranational 2.3% Cisco Systems Inc 1.5% AA / A / NR
Asian Development Bank 2.3% AAA / Aaa / AAA Citigroup Inc 2.1% A/A/A
Municipal 1.4% Confederation Nationale du Credit Mutue 0.5% A / A / AA
Los Angeles Unified School District/CA 0.2% NR / Aa / AAA Credit Agricole Group 0.5% A / A / AA
New York State Dormitory Authority 0.5% AA / NR / AA Cummins Inc 0.0% A / A / NR
State Board of Administration Finance C 0.6% AA / Aa / AA Depository Trust & Clearing Corp 1.5% AA / Aa / NR
Negotiable CD 0.7% Eli Lilly & Co 0.8% A / Aa / NR
Goldman Sachs Group Inc 1.7% A/A/A
Groupe BPCE 0.7% A/A/A
Groupe BPCE 0.7% A/A/A
Commercial Paper 1.5%
Hershey Co 0.4% A / A / NR
Bank of America Corp 1.5% A / NR / AA
Honda Motor Co Ltd 0.7% A / A / NR
Corporate 40.4%
HSBC Holdings PLC 0.7% A/A/A
Accenture PLC 0.3% AA / Aa / A Johnson & Johnson 1.5% AAA / Aaa / NR
American Express Co 0.5% A/A/A JPMorgan Chase & Co 1.7% A / A / AA
Ratings shown are calculated by assigning a numeral value to each security rating, then calculating a weighted average rating for each security type / issuer category using all available security ratings,
excluding Not-Rated (NR) ratings. For security type / issuer categories where a rating from the applicable NRSRO is not available, a rating of NR is assigned. Includes accrued interest and excludes balances
invested in overnight funds.
31
PFM Asset Management | pfmam.com Page 11 of 21
Page 32
For the Quarter Ended June 30, 2025
Item 1.
DOVER, CITY OF Portfolio Summary
Issuer Diversification
Security Type / Issuer Market Value (%) S&P / Moody's / Fitch Security Type / Issuer Market Value (%) S&P / Moody's / Fitch
Corporate 40.4% ABS 1.6%
Kenvue Inc 0.6% A / A / NR Bank of America Corp 0.2% NR / Aaa / AAA
Mars Inc 0.4% A / A / NR BMW Vehicle Lease Trust 0.3% AAA / NR / AAA
Mercedes-Benz Group AG 0.7% A / A / NR Kubota Credit Owner Trust 0.1% NR / Aaa / AAA
Mitsubishi UFJ Financial Group Inc 0.5% A/A/A Porsche Innovative Lease Owner 0.2% AAA / NR / AAA
Morgan Stanley 2.4% A / Aa / AA Verizon Master Trust 0.7% NR / Aaa / AAA
National Bank of Canada 0.7% BBB / A / A Total 100.0%
National Rural Utilities Cooperative Fi 0.8% A/A/A
NatWest Group PLC 0.4% A / A / AA
Roche Holding AG 0.6% AA / Aa / AA
Sanofi SA 0.7% AA / Aa / NR
Siemens AG 0.7% AA / Aa / NR
Skandinaviska Enskilda Banken AB 0.5% A / Aa / AA
State Street Corp 1.5% A / Aa / AA
Sumitomo Mitsui Trust Holdings Inc 0.7% A / A / NR
Svenska Handelsbanken AB 0.7% AA / Aa / AA
Swedbank AB 1.5% A / Aa / AA
Target Corp 0.1% A/A/A
Toronto-Dominion Bank 0.8% A / A / AA
Toyota Motor Corp 0.3% A/A/A
Truist Financial Corp 0.2% A / Baa / A
UBS Group AG 0.2% A / Aa / A
United Parcel Service Inc 0.3% A / A / NR
United Services Automobile Association 0.3% AA / Aa / NR
Wells Fargo & Co 0.1% BBB / A / A
Westpac Banking Corp 0.7% AA / A / NR
Ratings shown are calculated by assigning a numeral value to each security rating, then calculating a weighted average rating for each security type / issuer category using all available security ratings,
excluding Not-Rated (NR) ratings. For security type / issuer categories where a rating from the applicable NRSRO is not available, a rating of NR is assigned. Includes accrued interest and excludes balances
invested in overnight funds.
32
PFM Asset Management | pfmam.com Page 12 of 21
Page 33
For the Quarter Ended June 30, 2025
Item 1.
DOVER, CITY OF Portfolio Characteristics
Sector Allocation Review - DOVER POOLED INVESTMENT ACCOUNT
Security Type Sep-24 % of Total Dec-24 % of Total Mar-25 % of Total Jun-25 % of Total
U.S. Treasury $36.4 33.4% $42.3 39.0% $45.7 41.7% $48.6 43.2%
Federal Agency $8.1 7.4% $6.1 5.7% $6.2 5.7% $1.4 1.2%
Agency CMBS $8.0 7.3% $7.5 7.0% $7.5 6.9% $7.5 6.7%
Agency CMO $0.4 0.3% $0.3 0.3% $0.3 0.3% $0.3 0.3%
Agency MBS Pass Through $1.0 0.9% $0.9 0.9% $0.9 0.8% $0.9 0.8%
Supranational $0.0 0.0% $2.6 2.4% $2.6 2.4% $2.6 2.4%
Municipal $2.4 2.3% $2.5 2.3% $1.2 1.1% $1.5 1.4%
Negotiable CD $0.8 0.7% $0.8 0.7% $0.8 0.7% $0.8 0.7%
Commercial Paper $6.5 6.0% $6.5 6.1% $3.3 3.0% $1.7 1.5%
Corporate $45.3 41.7% $38.5 35.6% $39.9 36.6% $45.3 40.2%
ABS $0.0 0.0% $0.0 0.0% $0.8 0.8% $1.8 1.6%
Total $108.8 100.0% $108.1 100.0% $109.3 100.0% $112.2 100.0%
U.S. Treasury Agency CMBS Agency MBS Pass Through Municipal Negotiable CD Commercial Paper Corporate ABS
Federal Agency Agency CMO Supranational
$120.0 $120.0 $120.0 $120.0
$96.0 $96.0 $96.0 $96.0
$72.0 $72.0 $72.0 $72.0
Millions $48.0 Millions $48.0 Millions $48.0 Millions $48.0
$24.0 $24.0 $24.0 $24.0
$0.0 $0.0 $0.0 $0.0
September 2024 December 2024 March 2025 June 2025
Market values, excluding accrued interest. Only includes fixed-income securities held within the separately managed account(s) and LGIPs managed by PFMAM. Detail may not add to total due to rounding.
33
PFM Asset Management | pfmam.com Page 13 of 21
Page 34
For the Quarter Ended June 30, 2025
Item 1.
DOVER, CITY OF Portfolio Characteristics
Historical Sector Allocation - DOVER POOLED INVESTMENT ACCOUNT
1% 2%
37%
40%
3%
1% 1% 2%
1% 2% 1% 1%
1% 2%
7%
7%
6% 1%
42% 43%
Mar-25 Jun-25
Only includes fixed-income securities held within the separately managed account(s) and LGIPs managed by PFMAM.
34
PFM Asset Management | pfmam.com Page 14 of 21
Page 35
For the Quarter Ended June 30, 2025
Item 1.
DOVER, CITY OF Portfolio Activity
Portfolio Activity - DOVER POOLED INVESTMENT ACCOUNT
Net Activity by Sector
($ millions)
Sector Net Activity
Corporate Corporate Corporate $4,938,194
U.S. Treasury $2,538,152
U.S. Treasury U.S. Treasury
ABS $934,956
ABS ABS Municipal $265,000
Agency CMO ($11,464)
Municipal Municipal
Agency CMBS ($32,980)
Agency CMO Agency CMO
Agency MBS Pass Through ($50,189)
Agency CMBS Agency CMBS Commercial Paper ($1,675,000)
Federal Agency ($4,825,000)
Agency MBS Pass
Agency MBS Pass Through
Through
Total Net Activity $2,081,671
Commercial Paper Commercial Paper
Federal Agency Federal Agency
($10.0) ($5.0) $0.0 $5.0 $10.0 $15.0
Sales/Maturities Purchases
Based on total proceeds (principal and accrued interest) of buys, sells, maturities, and principal paydowns. Detail may not add to total due to rounding.
35
PFM Asset Management | pfmam.com Page 15 of 21
Page 36
For the Quarter Ended June 30, 2025
Item 1.
DOVER, CITY OF Portfolio Performance
Portfolio Performance
Portfolio Benchmark
8.0%
6.0%
Return
4.0%
2.0%
0.0%
3 Months 1 Year 3 Years 5 Years 10 Years
Total Return² 3 Months 1 Year 3 Years 5 Years 10 Years¹
Portfolio 1.52% 6.47% 4.20% 1.81% 2.11%
Benchmark³ 1.28% 5.80% 3.53% 1.31% 1.71%
Difference 0.24% 0.67% 0.67% 0.50% 0.40%
1. The lesser of 10 years or since inception is shown. Since inception returns for periods one year or less are not shown. Performance inception date is September 30, 2011.
2. Returns for periods one year or less are presented on a periodic basis. Returns for periods greater than one year are presented on an annualized basis.
3. The portfolio’s benchmark is the ICE BofA 0-5 Year U.S. Treasury Index. Source: Bloomberg Financial LP.
36
PFM Asset Management | pfmam.com Page 16 of 21
Page 37
For the Quarter Ended June 30, 2025
Item 1.
DOVER, CITY OF 2013 DSRF
Dover’s Debt Service Reserve Funds
• The City’s 2013 debt service reserve portfolio is invested in U.S. Treasury and Federal Agency Notes.
Effective Duration
Q2 2025 Market Value Yield at Cost
(years)
2013 Debt Service Reserve Fund $1,323,397 2.17 3.44%
Effective Duration
Q1 2025 Market Value Yield at Cost
(years)
2013 Debt Service Reserve Fund $1,322,686 2.38 3.44%
Data as of March 31, 2025 and June 30, 2025.
Market value includes accrued interest.
Market value excludes cash balance.
37
PFM Asset Management | pfmam.com Page 17 of 21
Page 38
For the Quarter Ended June 30, 2025
Item 1.
DOVER, CITY OF Appendix
Important Disclosures
This material is for general information purposes only and is not intended to provide specific advice or a specific recommendation, as it was prepared without regard
to any specific objectives or financial circumstances.
PFMAM professionals have exercised reasonable professional care in the preparation of this performance report. Information in this report is obtained from sources
external to PFMAM and is generally believed to be reliable and available to the public; however, we cannot guarantee its accuracy, completeness or suitability. We
rely on the client's custodian for security holdings and market values. Transaction dates reported by the custodian may differ from money manager statements.
While efforts are made to ensure the data contained herein is accurate and complete, we disclaim all responsibility for any errors that may occur. References to
particular issuers are for illustrative purposes only and are not intended to be recommendations or advice regarding such issuers. Fixed income manager and index
characteristics are gathered from external sources. When average credit quality is not available, it is estimated by taking the market value weights of individual credit
tiers on the portion of the strategy rated by a NRSRO.
It is not possible to invest directly in an index. The index returns shown throughout this material do not represent the results of actual trading of investor assets.
Third-party providers maintain the indices shown and calculate the index levels and performance shown or discussed. Index returns do not reflect payment of any
sales charges or fees an investor would pay to purchase the securities they represent. The imposition of these fees and charges would cause investment
performance to be lower than the performance shown.
The views expressed within this material constitute the perspective and judgment of PFMAM at the time of distribution and are subject to change. Any forecast,
projection, or prediction of the market, the economy, economic trends, and equity or fixed-income markets are based upon certain assumptions and current opinion
as of the date of issue and are also subject to change. Some, but not all assumptions are noted in the report. Assumptions may or may not be proven correct as
actual events occur, and results may depend on events outside of your or our control. Changes in assumptions may have a material effect on results. Opinions and
data presented are not necessarily indicative of future events or expected performance.
PFM Asset Management serves clients in the public sector and is a division of U.S. Bancorp Asset Management, Inc., which is the legal entity providing investment
advisory services. U.S. Bancorp Asset Management, Inc. is a registered investment adviser, a direct subsidiary of U.S. Bank N.A. and an indirect subsidiary of U.S.
Bancorp. U.S. Bank N.A. is not responsible for and does not guarantee the products, services, or performance of U.S. Bancorp Asset Management, Inc. The
information contained is not an offer to purchase or sell any securities. Additional applicable regulatory information is available upon request.
For more information regarding PFMAM's services or entities, please visit www.pfmam.com.
Further distribution is not permitted without prior written consent.
38
PFM Asset Management | pfmam.com Page 18 of 21
Page 39
For the Quarter Ended June 30, 2025
Item 1.
DOVER, CITY OF Appendix
Important Disclosures
Generally, PFMAM’s market prices are derived from closing bid prices as of the last business day of the month as supplied by ICE Data Services. There may be
differences in the values shown for investments due to accrued but uncollected income and the use of differing valuation sources and methods. Non-negotiable
FDIC-insured bank certificates of deposit are priced at par. Although PFMAM believes the prices to be reliable, the values of the securities may not represent the
prices at which the securities could have been bought or sold. Explanation of the valuation methods for a registered investment company or local government
investment program is contained in the appropriate fund offering documentation or information statement.
In accordance with generally accepted accounting principles, information is presented on a trade date basis; forward settling purchases are included in the monthly
balances, and forward settling sales are excluded.
Performance is presented in accordance with the CFA Institute's Global Investment Performance Standards (GIPS). Unless otherwise noted, performance is shown
gross of fees. Quarterly returns are presented on an unannualized basis. Returns for periods greater than one year are presented on an annualized basis. Past
performance is not indicative of future returns.
ICE Bank of America Indices provided by Bloomberg Financial Markets.
Money market fund/cash balances are included in performance and duration computations.
Standard & Poor's is the source of the credit ratings. Distribution of credit rating is exclusive of money market fund/LGIP holdings.
Callable securities in the portfolio are included in the maturity distribution analysis to their stated maturity date, although, they may be called prior to maturity.
MBS maturities are represented by expected average life.
39
PFM Asset Management | pfmam.com Page 19 of 21
Page 40
For the Quarter Ended June 30, 2025
Item 1.
DOVER, CITY OF Appendix
Glossary
Accrued Interest: Interest that is due on a bond or other fixed income security since the last interest payment was made.
Agencies: Federal agency securities and/or Government-sponsored enterprises.
Amortized Cost: The original cost of the principal of the security is adjusted for the amount of the periodic reduction of any discount or premium from the purchase
date until the date of the report. Discount or premium with respect to short-term securities (those with less than one year to maturity at time of issuance) is amortized
on a straight line basis. Such discount or premium with respect to longer-term securities is amortized using the constant yield basis.
Asset-Backed Security: A financial instrument collateralized by an underlying pool of assets – usually ones that generate a cash flow from debt, such as loans,
leases, credit card balances, and receivables.
Bankers’ Acceptance: A draft or bill or exchange accepted by a bank or trust company. The accepting institution guarantees payment of the bill as well as the insurer.
Commercial Paper: An unsecured obligation issued by a corporation or bank to finance its short-term credit needs, such as accounts receivable and inventory.
Contribution to Total Return: The weight of each individual security multiplied by its return, then summed for each sector to determine how much each sector added
or subtracted from the overall portfolio performance.
Effective Duration: A measure of the sensitivity of a security’s price to a change in interest rates, stated in years.
Effective Yield: The total yield an investor receives in relation to the nominal yield or coupon of a bond. Effective yield takes into account the power of compounding
on investment returns, while nominal yield does not.
FDIC: Federal Deposit Insurance Corporation. A federal agency that insures bank deposits to a specified amount.
Interest Rate: Interest per year divided by principal amount and expressed as a percentage.
Market Value: The value that would be received or paid for an investment in an orderly transaction between market participants at the measurement date.
Maturity: The date upon which the principal or stated value of an investment becomes due and payable.
Negotiable Certificates of Deposit: A CD with a very large denomination, usually $1 million or more, that can be traded in secondary markets.
Par Value: The nominal dollar face amount of a security.
Pass-through Security: A security representing pooled debt obligations that passes income from debtors to its shareholders. The most common type is the
mortgage-backed security.
40
PFM Asset Management | pfmam.com Page 20 of 21
Page 41
For the Quarter Ended June 30, 2025
Item 1.
DOVER, CITY OF Appendix
Glossary
Repurchase Agreements: A holder of securities sells these securities to an investor with an agreement to repurchase them at a fixed price on a fixed date.
Settle Date: The date on which the transaction is settled and monies/securities are exchanged. If the settle date of the transaction (i.e., coupon payments and
maturity proceeds) occurs on a non-business day, the funds are exchanged on the next business day.
Supranational: A multinational union or association in which member countries cede authority and sovereignty on at least some internal matters to the group, whose
decisions are binding on its members.
Trade Date: The date on which the transaction occurred; however, the final consummation of the security transaction and payment has not yet taken place.
Unsettled Trade: A trade which has been executed; however, the final consummation of the security transaction and payment has not yet taken place.
U.S. Treasury: The department of the U.S. government that issues Treasury securities.
Yield: The rate of return based on the current market value, the annual interest receipts, maturity value, and the time period remaining until maturity, stated as a
percentage on an annualized basis.
YTM at Cost: The yield to maturity at cost is the expected rate of return based on the original cost, the annual interest receipts, maturity value, and the time period
from purchase date to maturity, stated as a percentage on an annualized basis.
YTM at Market: The yield to maturity at market is the rate of return based on the current market value, the annual interest receipts, maturity value, and the time
period remaining until maturity, stated as a percentage on an annualized basis.
41
PFM Asset Management | pfmam.com Page 21 of 21
Page 42
Item 2.
CITY OF DOVER, DELAWARE
ACTION FORM
PROCEEDING: Council Committee of the Whole (Leg & Fin)
DEPARTMENT OF ORIGIN: Water & Wastewater SUBMITTED ON: August 29, 2025
PREPARED BY: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services
REVIEWED BY: David S. Hugg, III, City Manager and Patricia M. Marney, Controller / Treasurer
SUBJECT: Change Order – Meeting House Branch Drainage Improvements
TIMETABLE: Notice to proceed to be issued within seven (7) days of Council approval.
RELATED PROJECT: X
REFERENCE: X
EXPENDITURE REQUIRED: $151,180.00
AVAILABLE BUDGET: $40,276.27
FUNDING SOURCE (Dept./Page in CIP & Budget): Department of Public Works – Streets –
Meeting House Branch Improvements, Project
No. ST2003, Account No.: 101-12-18-35-000-
54030. Shortfall to be covered by SW2502 –
Meeting House Branch Drainage Improvements,
Project No. SW2502, Account No.: 101-12-18-
60-000-54031
STAFF RECOMMENDATION:
Approval from City Council of the proposed amendments to the engineering design scope by the
consulting firms to complete design of this project.
BACKGROUND AND ANALYSIS:
In the summer of 2022, AECOM was awarded a contract to complete engineering design work for the
Meeting House Branch Drainage Improvement Project. As this design was moving forward, various
unforeseen items came up to complicate the project. This included the potential of creating a park on the
property, which required a closed pipe design (instead of the originally designed open channel).
Additionally, the city worked with Bayhealth to assure their future master plan did not conflict with our
design. A third item was the requirement of wetland jurisdiction from DNREC. A fourth item included
our consultant unsuccessfully locating a critical underground pipe that must be precisely designed to avoid
any issues during construction. Finally, our environmental consultant, Compliance Environmental,
provided a proposal to finalize the required DNREC feasibility study and provide additional support
during excavation.
42
Page 43
Item 2.
Change Total Cumulative Change
Date Description Order Project Order % against
Amount Budget Original Budget
7/25/22 AECOM Contract Approved n/a $250,000 n/a
2/7/23 Agreement Amendment #1 – Hydraulic $7,000 $257,000 2.8%
Model
5/22/23 Agreement Amendment #2 – Bayhealth $12,000 $269,000 7.6%
Evaluation
5/22/23 Agreement Amendment #3 – Cost $1,500 $270,500 8.2%
Comparison
6/2/23 Agreement Amendment #4 – Design of $9,000 $279,500 11.8%
Culvert
10/18/24 Agreement Amendment #6 – $20,000 $299,500 19.8%
Geotechnical Investigation
n/a Proposed - Agreement Amendment #7 – $10,500 $310,000 24.0%
Wetland Jurisdiction
n/a Proposed - Compliance Environmental $99,980 $409,980 63.9%
Inc. – Feasibility Study et. al.
n/a Propossed – AECOM Subconsultant - $40,700 $450,680 80.2%
Level A – Geophysical Services
The shortfall will be covered by the following breakdown:
Funding Description Current Spent / Savings / Requested Proposed
Source Budget Encumbered Remaining Change Budget
Remaining
General ST2003 $266,000 $225,723.73 $40,276.27 $110,903.73 $74,000
Meeting
House Branch
Improvements
General SW2502 $1,250,000 $0 $1,250,000 ($110,903.73) $1,139,096.27
Meeting
House
Drainage
Improvements
City staff recommend the authorization of the proposed amendments to complete the design of the Meeting
House Branch Drainage Improvement Project.
43
Page 44
ACTION FORM
Item 4.
PROCEEDING: City Council Approval
DEPARTMENT OF ORIGIN: Information Technology DATE SUBMITTED: 8/25/2025
PREPARED BY: Joseph Simmons. Information Technology Director
SUBJECT: SLCGP Cybersecurity Grants – Budget Amendment Request
REFERENCE:
RELATED PROJECT:
REVIEWED BY: David S. Hugg, III, City Manager and Patricia M. Marney, Controller / Treasurer
EXHIBITS:
EXPENDITURE REQUIRED: $316,000.00 AMOUNT BUDGETED: $0
FUNDING SOURCE (Dept./Page in CIP & Budget): IT Budget
TIMETABLE: Completion by 2027
STAFF RECOMMENDATION: Recommend approval of the following grants that total $316,000 through
the Cybersecurity and Infrastructure Security Agency: SLCGP-23-1157, SLCGP-23-1158, SLCGP-23-1159,
SLCGP-23-1160, and SLCGP-23-1161. The work performed by these grants will aid us in upgrading our
infrastructure to better protect our system and network by enhancing security, and to update plans for best
practices and Continuity of Operations.
BACKGROUND AND ANALYSIS
The State of Delaware, through the Cybersecurity and Infrastructure Security Agency (CISA), has made available
funds to improve the cybersecurity posture of municipalities, counties, and state agencies through a grant program.
The city has been approved, and funding is available for a series of projects that were submitted. There is no cost
share needed for these grants.
These projects have been reviewed and approved by a State and Local Cybersecurity Grant committee, DEMA,
CISA, and FEMA. They address areas that have been identified as improvements in various parts of our IT
infrastructure. The plans are:
SLCGP-23-1157-S: Cyber Resilience and Business Continuity Project ($170,000) The purpose of this project is
to establish a framework and system that allows the City of Dover to continue critical operations in the face of
disruptions, whether due to cyberattacks, phishing and social engineering attacks, ransomware infections,
distributed denial-of-service (DDoS) attacks, advanced persistent threats, or other incidents. This project aims to
reduce the amount of time the City of Dover's operations are affected by incidents, particularly those that threaten
digital infrastructure, while safeguarding the city's data against threats that may compromise its confidentiality,
integrity, and availability, ensuring that it can be accessed and used when needed. The scope of the project is to
procure an on-site and cloud-based system for providing regular data backups, secure storage of backups (both
on-site and off-site), and redundant hardware to ensure data can be restored quickly after an incident. In particular,
to address failures in critical hardware systems (servers, networking equipment), inadequate backup storage
capacity that can disrupt business continuity that could result in service disruptions and data loss.
SLCGP-23-1158-S: ($29,000) Security, Compliance, and Identity Training ($20,000). Effective cybersecurity is
the foundation for managing and securing an organization's identities, devices, apps, data, and infrastructure.
Learn by doing hands-on exercises, training courses, and live classes that provide foundational and advanced-
level knowledge on security, compliance, and identity concepts and related cloud-based and on-site security tools
44
Page 45
and solutions. The purpose is to train the City of Dover IT staff on Microsoft and other security, compliance, and
Item 4.
identity solutions to provide a holistic and end-to-end security solution in the solution Microsoft 365 environment.
This training will include the basic concepts of security, compliance, and identity of Microsoft identity and access
management solutions, along with identifying and implementing compliance capabilities in Microsoft AD, and it
connected identity technologies. This training includes identity content for enterprise application registration,
conditional access, identity governance, and other identity tools.
SLCGP-23-1159-S: Transition domain to .GOV from DOVER.DE.US ($20,000). Our current Dover.DE.US
domain name is outdated, and since technically owned by the State of Delaware, getting certificates requires
authorization from the state and causes delays in the certificate renewal process. Email and identity phishing
campaigns are becoming more prevalent and are increasingly more elaborate. However, it can be difficult to know
whether someone communicating via email is who they say they are, or that they really represent their purported
government entity. The .gov is identified as a secure domain name that shows government websites and emails
for the City of Dover adhere to the highest standards in data protection.
SLCGP-23-1160-S: IT-OT Network Security ($87,000). Our Public Works and Electrical Departments'
Operational Technology (OT) Infrastructure is the backbone of services provided to our communities, but it lags
behind in software and hardware upgrades, needing to support modern cybersecurity tools and solutions. Critical
infrastructure is targeted as one of the core areas for funding, addressing these shortcomings to protect against
cybersecurity attacks. The importance of a secure infrastructure system within our OT network, like scanning and
monitoring tools, updated hardware, and proper communication and network segregation, will help in protecting
these critical assets.
SLCGP-23-1161-S Cybersecurity Incident Plan Update - Phase 2 ($19,000). This project is phase two of the
previous year's award grant (SLCGP-22-0976: Cybersecurity Incident Plan Update ($20,000)). This grant will
complete the review and update our existing plans and policies, and detail a comprehensive and best practice
guideline-compliant document.
45
Page 46
Item 5.
ACTION FORM
PROCEEDING: Council Committee of the Whole - Legislative, Finance and Admin. Committee
DEPARTMENT OF ORIGIN: City Manager and HR DATE SUBMITTED: 9/3/2025
PREPARED BY: David S. Hugg III
SUBJECT: Non-bargaining Step Proposal Discussion
REFERENCE:
RELATED PROJECT:
REVIEWED BY: City Manager and HR Director
EXHIBITS: #1 - Discussion Paper, #2 - Examples of Compression and #3 - HR Director Wage
Compression Recommendation
EXPENDITURE REQUIRED: n/a AMOUNT BUDGETED: n/a
FUNDING SOURCE (Dept./Page in CIP & Budget): n/a
TIMETABLE:
STAFF RECOMMENDATION: Discussion and Direction for staff
BACKGROUND AND ANALYSIS
Non-bargaining employees (those not represented by a union) traditionally receive a flat annual adjustment to
their compensation as part of the budget preparation action. In recent years that increase was 3% and most
recently set at 4%. This is significantly below the increases built into the various union scales as a result of both
an annual adjustment of the pay scale and the award of an annual step in grade. These increases were around
7% depending on the union contract.
This disparity results in what is known as “wage compression”, as discussed in the attached exhibits. Wage
compression can result in reduced morale and retention, and difficulty filling managerial jobs. Staff wish to
address this issue during the current Fiscal Year and as we go forward into the subsequent budget cycle which
will commence this fall.
There are two documents attached for committee consideration: a discussion paper drafted by the City Manager
and a response with different options prepared by the HR Director. Input from the Council and Committee is
desired so that the proposal can be more fully developed and possibly implemented as early as January 2026.
46
Page 47
Item 5.
Exhibit #1
DRAFT
Discussion Paper for consideration by the
Legislative, Finance and Administration Committee
Wage Compression- A Significant and Growing Concern for Dover
Salaried and hourly (union represented) experience two different compensation
structures. Salaried employment provides a fixed, predictable income, while hourly paid
employment fluctuates based on hours worked, potentially including overtime. Salaried
positions often come with benefits like health insurance and paid time off, while hourly
employees may have more ability to earn overtime pay.
Wage (or pay compression) occurs when there is little difference in pay between
employees with varying levels of experience, skills, or seniority. This often happens when
new hires are brought in at salaries close to or higher than those of long-tenured
employees, or when the pay for lower-level positions approaches that of higher-level ones,
especially when the differences between levels are too small to be meaningful. It also
happens where there are union contract scales and steps that vary significantly compared
to a non-union formula. It may occur when two otherwise comparable jobs are treated
differently due to eligibility for union coverage (as a result of differing access to confidential
records, for example).
In some cases, this can even result in wage inversion , whereby new employees
earn more than older, more experienced ones or when contracted increases move up faster
over time than budgeted ones.
Wage inversion opens up the door for a discrimination claim, especially if the individual
earning less than the new hire is part of a protected class of worker based on gender, race,
sexual orientation, age, or other underrepresented group. The employee has an opportunity
to claim pay discrimination.
Wage compression can be the result of external factors like minimum wage increases or a
tight labor market or internal issues, such as a failure to keep pace with fair market pay.
The negative impacts of Wage Compression hurt culture and employee morale, promoting
a sense of unfairness at work, which may lead to an a decision to leave the city, or view the
pay discrepancy as discriminatory. It encourages turnover and affects human capital,
leading an enterprise to lose long-standing employees, who are often some of their best
employees, and as noted above create grounds for litigation.
47
Page 48
Item 5.
Exhibit #1
Often employees represented by unions benefit as a result of a fixed automatic
compensation increase, often combining a general wage increase for all positions (maybe
inflation adjusted) plus an advancement (step-increase) in grade as a function of tenure.
Salaried employees typically don’t get both.
In Dover, in recent years union contract combined increases have averaged near 7%. In this
same period, non-bargaining increases have ranged between 2% and 4% (current budget
year is 4%) with no step or longevity increases. Benefits and other forms of added
compensation are essentially the same for all employees except for the opportunity to work
overtime.
In many instances union employees may reach or exceed the compensation of a non-
bargaining manager or supervisor where skills or education do not support the outcome. In
some instances, employees tend to decline promotion to a managerial level because of the
small difference in compensation, the benefits of a contract scale, and the ability to earn
more with the benefit of overtime or special duty pay (1.5 to 2.0 x regular rate).
Union representation provides many desired benefits such as predictability, job protection,
added compensation, stronger grievance provisions, and built-in pay increases. But the
desire for representation shouldn’t be to the detriment of those not represented, at least as
it relates to fair compensation.
EXAMPLES* - The following examples (See table) demonstrate the impact of wage
compression or inversion, projected two years in the future.
First example – equal positions but unequal compensation due to union contracted scale.
Non-bargaining budgeted increases do not keep pace. The difference in current
compensation is probably due to longevity. Because non-bargaining employees in this
class have access to sensitive data, they are not union eligible.
Second, third and fourth examples -reflects the cumulative effect of different percentages
– plays out in subsequent years. They also demonstrate the manager/supervisor to
employee relationship where employee closes in or exceeds manager’s compensation. The
impact is exacerbated in future years.
Fifth and sixth examples – these are examples of supervision of employees with specialized
skills or credentials; the delta grows disproportionately (constantly widening spread)
leading toa form of wage inversion. It's pretty common for technically skilled employees to
make more than their managers in many industries. A skilled employee is typically
compensated based on their specific, valuable skills, certification and knowledge, while a
manager's compensation includes pay for taking on responsibilities, accountability, and
leadership. Salary is about market value theoretically. If a manager is managing someone
48
Page 49
Item 5.
Exhibit #1
who’s highly technical with a rare skill set, then the manager should expect the employee’s
salary to be independent of theirs.
Prior to the consideration of the FY26 budget, Naomi Poole, HR Director, raised this
concern in June in response to a compensation adjustment in the Police Department. Her
original proposal**:
What other Non-Bargaining Positions are involved? The 9% spread for the Chief and the
Major do not impact the other non-bargaining employees. It is my assessment that pay
equity amongst all non-bargaining employees should be comparable if not better than the
other negotiated union contracts so that we can limit the impact of pay compression.
Maintaining a 4% increase will continue to create a huge lag in pay equity and will increase
the probability of union employees’ ability to make more than the non-bargaining
employees that supervise them. My suggestion by no means is a permanent resolve, as
that will take more resources and discussion, but merely a recommendation to keep non-
bargaining pay scales above water.
What would this cost to implement? With the help of my HR team, and Trish, we created
a FY26 non-bargaining pay scale to include the average percentage that union employees
are set to receive FY26. The average increase is 7%, and the non-bargaining scale reflects
just that. The total additional cost added to the approved 4% non-bargaining increase will
be approximately $130,448.35. I have included a spreadsheet with a full breakdown of how
we arrived at the estimated amount.
How soon can we act on the recommendations? My recommendations are certainly a
change from what was already projected and approved for FY26. The changes would need
approval, and once approved, my team and I can implement those changes for the July 1st
increase as planned. Time is of the essence because HR would need an appropriate
amount of time to build the new scale in Tyler.
**Note: These recommendations were not deemed timely enough to become part of the
FY26 budget. However, the Council President and the Chair of the Legislative, Finance and
Administration Committee requested that the issue be discussed further, with the
possibility a mid-year correction.
RECOMMENDATIONS:
Any additional compensation during FY26 would require analysis to identify additional
funding. Assuming that some additional funding is available, a short-term solution is to
49
Page 50
Item 5.
Exhibit #1
increase non-bargaining compensation by approximately 3% for the second half of the
fiscal year (at a projected added cost of about $65,000 – this needs to be confirmed).
Longer term considerations include creating a two-part salary adjustment for non-
bargaining positions with a fixed base adjustment (4%-5%) and a second part based on
some index (perhaps CPI) .
Simply mirroring the average percentage increase granted to unionized civilian employees
each year putting all employees on a level basis.
Additionally, schedule a regular wage study for non-bargaining positions no less often that
every 3- 5 year to reflect fair market conditions. Make necessary adjustments to base
compensation.
Finally, carefully identify those circumstances where an employee’s credentials, special
skills, training, certifications/licensing, etc. support a wage exceeding the regular
compensation structure and for those determine a market scale separate from practice.
DSH Revised 8/30
(See also additional comments from HR Director Poole – separate document/email)
50
Page 51
Item 5.
Exhibit #2
Examples of compression:
Assumptions:
• Non-bargaining employees receive an additional 4% each year.
• Union employees* (second number in each case) receive the increase assumed by
contract of an additional 7% each year (average for illustration).
• Does not adjust for longevity or maximum range.
• Difference is non-bargaining amoumt over or below union (annualized).
• Illustrative only.
Now +Year 1 +Year 2
Admin, Assistant (NB) +4% $42,494 $44,194 $45,962
Admin. Assistant* +7% $45,739 $48,941 $52,367
Difference ($3,245) ($4,747) ($6,405)
Assist Library Director (NB) +4% $79,518 $82,698 $86,007
Librarian II* +7% $75,296 $80,566 $86,206
Difference $4,222 $2,132 ($199)
Code Enforcement, Mgr.(NB )+4% $69,364 $72,034 $74,915
Code Inspector II* +7% $67,392 $72,109 $77,156
Difference $1,972 ($75) ($2,241)
P&R Director (NB) +4% $87.454 $90,952 $94,580
Recreation Specialist* +7% $82,492 $88,266 $94,445
Difference $4,620 $2,686 $135
Facilities Manager (NB) +4% $82,547 $85,849 $89,283
Electrician II* +7% $87,922 $94,087 $100,673
Difference ($5.375) ($8,238) ($11,390)
Electric Director (NB) +4% $137,363 $142,857 $148,571
Engineer* +7% $138,424 $148,114 $158,482
Difference ($1,061) ($5,527) ($9,911)
*Note: these examples are based on actual conditions, however some of the comparisons
could be distorted because of longevity. They are intended to demonstrate the impacts of
wage compression if extrapolated two years into the future at the 4% and 7% rates.
51
Page 52
Item 5.
Exhibit #3
Wage Compression Recommendation:
There has been no radical change in positions and the job market that would otherwise
require a market study. However, following the last civilian wage study, a comparable non-
bargaining pay scale should have been implemented. Current compression issues are
internal and largely due to inequities between unionized and non-unionized positions.
Recommendation
1. Adjustment to Pay Increases
o Instead of applying a 3% increase, non-bargaining employees should receive
a total 6% increase to account for FY25 and FY26.
o This mirrors increases granted to civilian unionized employees and places
non-bargaining employees on a level playing field.
o It also provides an opportunity to incorporate a new non-bargaining scale
moving forward.
2. Cost of Living and Step Scale
o A combined adjustment totaling 7% should be considered (4% cost of living
+ 3% step increase).
o With each civilian negotiation cycle, the non-bargaining scale should be
recalibrated to accommodate percentage changes, ensuring fairness and
consistency.
3. Compression and Equity
o Implementing a scale consistent with unionized employees will help reduce
inequities and address compression concerns.
o Supervisory positions, though smaller in number per the report I shared with
you, should also be reviewed to ensure alignment.
This recommendation should be fully costed by Finance. The non-bargaining pay scale
must be rebuilt to reflect these changes so that the FY26 structure incorporates the
adjustments that should have been made if a FY25 scale had originally been established
for non-bargaining employees.
To achieve equity, mitigate compression, and align with unionized pay practices, it is
recommended that the City implement a 6% increase (spanning FY25 and FY26) for non-
bargaining employees. Finance should rebuild the pay scale accordingly to ensure long-
term alignment.
This approach will at minimum bring civilian non-bargaining employees into parity with
their unionized counterparts while providing a sustainable framework for future
adjustments.
52
Page 53
Item 6.
ACTION FORM
PROCEEDING: Council Committee of the Whole – Legislative, Finance and Admin. Committee
DEPARTMENT OF ORIGIN: City Manager DATE SUBMITTED: 9/3/2025
PREPARED BY: David Hugg
SUBJECT: Review of Application for the Economic Development Fund
REFERENCE:
RELATED PROJECT:
REVIEWED BY: David Hugg
EXHIBITS: Draft Application
EXPENDITURE REQUIRED: n/a AMOUNT BUDGETED: n/a
FUNDING SOURCE (Dept./Page in CIP & Budget): n/a
TIMETABLE:
STAFF RECOMMENDATION: Review and revise as needed and approve.
BACKGROUND AND ANALYSIS
The City established an Economic Development Fund to promote projects that enhance the city’s economy. The
Resolution creating the fund reads”:
“The Mayor and City Council seek to set aside funds for economic development and community development
projects to include opportunities to improve the city’s economy and quality of life. An economic development
project will constitute a program or activity having the primary purpose of encouraging the establishment and
growth of business in the city, including the creation and retention of jobs (Res. 2024-15, adopted October 29,
2024).
The purpose of the Economic and Community Development funds will be for the use of programs, policies, or
activities that seek to improve the economic well-being and quality of life for the residents of the City of Dover.
Funds may be used for land or building acquisition, building renovation, matching funds for related grants,
incentives associated with new or expanded businesses, workforce training and development, upfront and
administrative costs associated with the issuance of conduit or TIF bonds, blight removal, or other purposes
consistent with the economic development fund purposes.”
As grants from this fund will benefit qualifying private parties, a rigorous application process is desired to ensure
that the use of such funds has a high probability for success in its goals and has a lasting impact on achievement
of the city’s economic development strategies and plans.
The action requested is further discussion and input on the application process and requirements.
53
Page 54
Item 6.
APPLICATION FOR ECONOMIC DEVELOPMENT FUND GRANT
Version 8/26/2025
Purpose Statement:
The “Mayor and City Council seek to set aside funds for economic development and community
development projects to include opportunities to improve the city’s economy and quality of life.
An economic development project will constitute a program or activity having the primary purpose
of encouraging the establishment and growth of business in the city, including the creation and
retention of jobs (Res. 2024-15, adopted October 29, 2024).
The purpose of the Economic Development Fund will be for the use of programs, policies, or
activities that seek to improve the economic well-being and quality of life for the residents of the
City of Dover.
Funds may be used for land or building acquisition, building renovation, matching funds for related
grants, incentives associated with new or expanded businesses, workforce training and
development, upfront and administrative costs associated with the issuance of conduit or TIF
bonds, blight removal, or other purposes consistent with the economic development fund
purposes.
Grant cycle: applications may be submitted at any time and are subject to the availability of
funds.
Only 1 (one) grant will be awarded to the same applicant in any 12-month period.
All applications must be sponsored by a councilmember and meet the criteria listed below:
Applicant:
Date of application_____________________ Received by City Clerk____________________
Applicant name ________________________________EIN #__________________________
Project Title:__________________________________________________________________
Project physical address (in the City of Dover)________________________________________
A project located outside city limits may be considered but must demonstrate a primary
benefit to Dover residents.
Council Sponsor (signature)______________________________________________________
Designation of Program/project Manager: include contact individual’s
Name ___________________________________________________________________________
Address __________________________________________________________________________,
54
Page 55
Item 6.
Title _____________________________________________________
Phone number___________________________________________
Email ___________________________________________________
Proof of authority to submit application on behalf of applicant (attachment – must be
submitted by an authorized representative
of the applicant)
Proof of non-profit status- (501c) or other non-profit status (attachment – must include latest
IRS determination)
Proof of operation for 2 ( two) years or more (attachment – annual reports, grant award letters,
audits or similar documents)
Joint Ventures:
An applicant may be part of a joint venture with a for-profit entity who will not be eligible to
receive Community Development Fund dollars. The same information must be provided as
required of the applicant.
Project description (500 words maximum)
o Location map and street address of project
o Zoning confirmation obtained from city Planning Department
o Need demonstrating impact and value to City of Dover residents
o Beneficiaries (immediate and long term)
o Permission to use private property, if applicable
o Statistics, photos, documents, supporting need
The timeline for completion, a project must be completed not more than one year after
application approval; an extension of up to one additional year may be granted at the discretion
of the Parks, Recreation and Community Enhancement Committee.
Project budget (explain all amounts):
o Personnel costs__________________________
o Materials and supplies___________________
o Other funds (and source)_________________
o Miscellaneous___________________________
o Amount requested_______________________ (not to exceed $20,000)
• Total_______________________
Sources and amounts of other funding __________________________________________
Dispersal and Reimbursement of Funds: Reporting; Audit; Clawback:
55
Page 56
Item 6.
(a) Invoicing for reimbursement:
o Reimbursements require a written progress report and an invoice requesting
reimbursement to be sent to the Department of Finance.
o Receipts are required for all purchases or expenditures of more than $50,
regardless of the method of payment of amount.
o Timesheets or similar records are required with each personnel request.
o Reimbursement will be no more often than once every two months (60days).
o Reimbursement requires approval by the Controller/Treasurer and City Manager.
o Payment will be by City check payable within 30 days to the applicant’s business
account or by direct deposit.
(b) Closeout and Final Reporting:
o A final report including a financial statement is required within 60 days of the
completion or termination of the project.
o Twenty (20%) percent of the award will be held pending acceptance of the final
report.
o The city reserves the right to request a return of all or part of the funds if there is
any evidence of fraud or misuse of any portion of the funds, and to disqualify the
applicant with further funding.
o Expenditures shall be subject to audit by the city at any time.
Other Provisions and Restrictions:
o Funds provided through this grant may be used as a local contribution or match
regardless of source, provided such a match is authorized in writing by other
funding sources.
o Employees, elected officials, and others having direct financial dealings with the
city are prohibited from benefitting from this fund.
o Letters of support from community leaders and others who have knowledge of the
applicant may be submitted (maximum of 4).
Applications must be made on such forms and in accordance with such instructions as are
prescribed by the City and include all forms and questionnaires as may be applicable to the
specific proposed activity.
A staff report will be prepared on each application that will at a minimum include the following:
a certification that the application/applicant has met all applicable threshold requirements;
certification that the proposed budget represents a realistic/ reasonable budget; conformance of
the proposed activities to the goals and objectives of the Fund’s purpose; and an evaluation of the
applicant’s capacity, and past performance, if relevant.
All applications and the staff report will be considered by the Parks, Recreation and Community
56
Page 57
Item 6.
Enhancement Committee at a regularly scheduled meeting during which a public workshop will
be conducted. An oral presentation by the applicant to the Committee is a factor in the final
decision.
Date and location of scheduled meeting and required public workshop (set by the City
Clerk)_________________________________________________
Submit applications to:
Attention: City Clerk, City of Dover
P.O. Box 475
Dover, DE 19904
One signed original copy shall be submitted to the City Clerk’s Office electronically: two
printed copies shall also be submitted.
Signature of Authorized Applicant_ ___________________ Date ______________________