Page 1
UTILITY COMMITTEE
AGENDA
OCTOBER 27, 2014 - 5:15 P.M.
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA
DOVER, DELAWARE
Public comments are welcomed on any item and will be permitted at appropriate times.
When possible, please notify the City Clerk (736-7008 or e-mail at CityClerk@dover.de.us)
should you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. DISPOSITION OF PUBLIC INFRASTRUCTURE TO KENT COUNTY - CENTRAL TRANSMISSION BYPASS
NORTH
(Staff recommends disposal of the referenced public infrastructure, and all easements necessary
for the perpetual maintenance thereof, associated with the County's Central Transmission Bypass
North project, to Kent County. The estimated replacement value of the referenced infrastructure
is $770,000)
2. DEDICATION OF PRIVATE WALKWAY AS A PUBLIC WALKWAY - VILLAGE OF WESTOVER - MIFFLIN
ROAD TO TRAFALGAR DRIVE
(Staff recommends acceptance of the dedication of the existing concrete walkway and authorizing
the City Manager to execute any documents necessary to ensure public funds can be used for
future maintenance on the dedicated walkway)
3. ADJOURNMENT BY 5:55 P.M.
/tm
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Agendas\2014\10-27-2014 UTILITY.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO
INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 2
ACTION FORM
PROCEEDING: Utility Committee AGENDA ITEM:
DEPARTMENT OF ORIGIN: Public Works DATE SUBMITTED: 10/17/14
PREPARED BY: Sharon J. Duca, P.E., Public Works Director / City Engineer
SUBJECT: Disposition of Public Infrastructure to Kent County – Central Transmission Bypass North
REFERENCE: N/A
RELATED PROJECT: N/A
APPROVALS: City Manager
EXHIBITS: Attachment A – List of Public Infrastructure to be disposed of by the City of Dover
Attachment B – Map
EXPENDITURE REQUIRED: $ N/A AMOUNT BUDGETED: $ N/A
FUNDING SOURCE (Dept./Page in CIP & Budget): N/A
TIME TABLE: All referenced public infrastructure will be disposed of by the City of Dover upon action by City
Council and become the responsibility of Kent County.
RECOMMENDED ACTION: Disposal of the referenced public infrastructure, and all easements necessary for
the perpetual maintenance thereof, associated with the County’s Central Transmission Bypass North project,
to Kent County. The estimated replacement value of the referenced infrastructure is $770,000.
BACKGROUND AND ANALYSIS
In accordance with information received from the Kent County Department of Public Works, a failure in the
twenty-four inch (24”) concrete sewer force main (Kent County Central Transmission Main) surfaced causing a
sanitary sewer overflow in the center of Route 13 in front of C.F. Schwartz on July 16, 2014. The root cause
was corrosion of the pipe crown due to high hydrogen sulfide concentrations in the wastewater. Due to the
thinned pipe wall, a slight pressure increase realized during a routine re-routing procedure resulted in
triggering the failure. This occurred on one (1) of the few remaining sections of the Kent County transmission
system, from Smyrna to the wastewater treatment plant in Frederica, that does not have a redundant pipeline
or bypass capability.
The above referenced failure is currently only temporarily repaired. In order to complete a permanent repair
the flow must be rerouted to allow for the installation of a pipe liner. As a result there is an urgent need for a
functioning bypass system. The proposed bypass is to be developed as depicted on the attached map. The
project has been authorized by Levy Court and is currently being fast tracked due to the related urgency. As
part of the project, portions of the City’s existing infrastructure, and all associated easements, must be
disposed of by the City with ownership transferred to the County. The infrastructure to be transferred is
provided in Attachment A. The County will assume ownership and maintenance responsibility of the new
bypass force main from County Pump Station No. 2 to Crawford Carroll Avenue.
Due to the above, the City of Dover Department of Public Works requests that the public infrastructure
improvements referenced in Attachment A, and all associated easements, be disposed of with ownership and
maintenance responsibilities transferred to Kent County.
Page 3
DISPOSITION OF PUBLIC INFRASTRUCTURE
CENTRAL TRANSMISSION BYPASS - NORTH
ATTACHMENT A
The following is a list of all public infrastructure improvements which are to be disposed of by the City of
Dover:
Sewer Utility Infrastructure:
16” Ductile Iron Force Main and appurtenances and easements - 2,260 l.f.
from Mudstone Branch project, located within easements along
Dennys Road from KC PS #2 to Dover Products Site
16” Ductile Iron Force Main and appurtenances - 915 l.f.
from Route 13 Interceptor project
8” Force Main (various materials) and appurtenances - 2,175 l.f.
Originally from Kent County’s Sub-regional Sewer System project
for the Delaware State College Area
Located within easements on the lands of Sam’s Club and the
Delaware Civic Center Corp/Frazier Pit
Force main will be abandoned with the construction of the new
sixteen-inch (16”) bypass force main
The estimated replacement value of the above referenced infrastructure is
$770,000.
Page 4
RD
H
O UG
OR
ARB
SC
555 Bay Road (302) 744-2430
Dover, DE 19901
RD
Y S )
"
ENN
D
KC PS #2 W
.
13
"
)
"
Kent County Central Transmission Bypass - North
EX 16" MCKEE PS
FM TO BE "
)
TRANSFERRED TO
THE COUNTY
(APPROX 2200')
RD
Kent County Public Works Department
EX FORCEMAIN
Dover Area - August 21, 2014
TO BE ABANDONED UG H
BOR
O EX KC 24"
CONCRETE
SCA FORCEMAIN
R
Engineering Division
N
D
U
PO
N
T
H
W
CONNECTION Y
TO EX FORCEMAIN REPAIR SITE
COD -
DELTECH "
)
PS
"
)
Feet
1,000
EX COD -
MCKEE PS LN
FORCEMAIN ST
IC
RU
W
500
PROPOSED FORCEMAIN
CONNECTION
BY-PASS TO EX FORCEMAIN
EX 16" RUSTIC LANE
FORCEMAIN TO BE
TRANSFERRED TO
THE COUNTY 0
(APPROX 900')
COD GRAVITY LINE
TO ROUTE 13 PS
EX COD -
F
DELSTATE PS
FORCEMAIN
Page 5
ACTION FORM
PROCEEDING: Utility Committee
DEPARTMENT OF ORIGIN: City Manager’s Office DATE SUBMITTED: October 22, 2014
PREPARED BY: Scott D. Koenig, P.E., City Manager
SUBJECT: Dedication of Private Walkway as a Public Walkway – Village of Westover – Mifflin Road to
Trafalgar Drive
REFERENCE: N/A
RELATED PROJECT: N/A
REVIEWED BY: Scott D. Koenig, P.E., City Manager
EXHIBITS: Attachment A – Letter from Representative Scott; Attachment B – Map of the walkway area.
EXPENDITURE REQUIRED: $0 AMOUNT BUDGETED: $0
FUNDING SOURCE (Dept./Page in CIP & Budget): N/A
TIME TIMETABLE: Upon Council Approval.
RECOMMENDED ACTION: Accept the dedication of the existing concrete walkway and authorize the City
Manager to execute any documents necessary to ensure public funds can be used for future maintenance on the
dedicated walkway.
BACKGROUND AND ANALYSIS
As part of the approved subdivision plan for the Village of Westover, the City of Dover required the
construction of a private sidewalk connection from Trafalgar Drive to Mifflin Road to guarantee the pedestrian
interconnection of the existing developments in this area and the newly constructed Village of Westover
Subdivision. Prior to the construction of the new Dover High School, this sidewalk connection primarily served
as a connection for the residents of the Village of Westover and the Village of Cannon Mill to access local
businesses in the vicinity of Route 8. The Village of Westover Homeowner’s Association has inquired for a
number of years about dedicating this walkway for public maintenance; however, staff had previously not
favored such a dedication.
With the construction of the new Dover High School, the pedestrian patterns have changed. This walkway now
represents a safe path to the new Dover High School and related facilities so the “public” interest with respect to
this walkway has changed. Attached (see Attachment A) is a written request from Representative Darryl Scott
requesting consideration of the public dedication of this walkway. Each of the points outlined in Representative
Scott’s correspondence support the City Manager’s reconsideration of this request. Based upon the current and
projected use of the walkway, the City Manager has no objections to the dedication of the walkway as public
walkway. The estimated maintenance cost of the walkway is $1,000 per year which would include costs
associated with winter maintenance.
The existing private walkway is approximately 770 linear feet long and six (6’) feet in width. Therefore, the
estimate value of the dedication is $23,100.00 (770 l.f. x 6 ft. x $5.00 per square feet). Attachment B is a map
of the proposed dedication.
Page 7
ATTACHMENT B
Sidewalk to be Dedicated
From Trafalgar Drive to Mifflin Road
ffl in
Mi
Rd
Tr
af alg
a rD
r
0 45 90 180 Feet
Legend
¯
Date Printed; October 21, 2014
File: m:\gis_data\projects\tech_mxds
\sidewalk_trafalgar_to_mifflin Dover Parcels
Department: Public Works GIS
City of Dover, Delaware Sidewalk to be Dedicated