Page 1
CITY OF DOVER, DELAWARE
PLANNING COMMISSION
Monday, June 17, 2024 at 7:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
Written comments are accepted via mail to City of Dover – Planning Commission, P.O. Box 475 Dover
DE 19903 and via email at CompPlan@dover.de.us.
IN-PERSON and VIRTUAL MEETING NOTICE
The Planning Commission Meeting for June 17, 2024, will be as an In-Person Meeting at City Hall in City
Council Chambers. The public is welcome to attend in person. The Meeting will also be provided as a
Virtual Meeting using Webex, an audio video conferencing system as an electronic means of
communication. See participation information below to join by phone or computer.
PUBLIC PARTICIPATION INFORMATION
City of Dover Planning Commission Meeting of June 17, 2024
Join by Phone: 1-650-479-3208
Access Code: 253 362 20101 (Password: 3683772)
Join Online: https://bit.ly/PCMeeting6172024
Webinar Number: 2533 622 0101
Webinar password: DoverPC
If you are new to Webex, get the app now at https://www.webex.com/ to be ready when the meeting
starts. For problems accessing the meeting, please call the Planning Office at (302) 736-7196.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
ADOPTION OF AGENDA
APPROVAL OF MINUTES
1. Adoption of Minutes of May 20, 2024
COMMUNICATIONS & REPORTS
1
Page 2
PLANNING COMMISSION - June 17, 2024 PAGE 2
Meeting Reminder: The next Planning Commission regular meeting date is July 15, 2024 at 7:00
PM.
Update on City Council Actions
Department of Planning & Inspections Updates
OPENING REMARKS CONCERNING MEETING PROCEDURES FOR APPLICATIONS
OLD BUSINESS
Request for Extension of Planning Commission Approval
NEW APPLICATIONS
2. C-24-01 Tower-Based Wireless Communications Facility at 640 Lafferty Lane (Rise Up
Towers, LLC) - Public Hearing and Review of a Conditional Use Site Plan application to
permit construction of a tower-based wireless communications facility (WCF) and associated
equipment compound in the northeastern area of the mini-storage facility property. The
proposed wireless support structure is a monopole of 124 feet with a lightning rod for a total
height of 129 feet. The 18.68-acre subject property is located on the north side of Lafferty
Lane, east of South Bay Road. The property is zoned IPM (Industrial Park Manufacturing
Zone). The owner of record (parcel) is Secure Storage, LLC and the applicant (WCF
developer/owner) is Rise Up Towers, LLC. Property Address: 640 Lafferty Lane. Tax Parcel:
ED05-077.00-01-25.00-000. Council District 2.
3. S-24-09 Procter & Gamble Warehouse Expansions & Parking Improvements - Public Hearing
and Review of a Site Development Plan Application to permit a phased construction of a
110,000 SF addition to JE Warehouse, a 20,000 SF addition to Warehouse 3, an expansion of
employee/visitor parking lot, an expansion and reconfiguration of contractor parking lot, and
expansion of truck drop Lots A & B with associated site improvements. The property of 84.10
acres ± is zoned IPM (Industrial Park Manufacturing Zone) and is subject to the SWPOZ
(Source Water Protection Overlay Zone): Tier 3 – Excellent Recharge Area. The property is
located on the south side of W. North Street/Hazlettville Road at the southeast corner of
Electric Avenue and Mifflin Road intersection with W. North Street. The owner of record is
The Dover Wipes Company and equitable owner Procter & Gamble. Property Address: 1340
W. North Street. Tax Parcel: ED-05-076.00-01-07.00-000. Council District 2. Waiver Requests:
Elimination of Upright Curbing, Partial Elimination of Sidewalks, and Consideration of
Performance Standards Review Application.
NEW BUSINESS
4. HI-24-02 Building at 148 S. Bradford Street: Demolition – Appeal to the Planning
Commission of the Historic District Commission Action to deny the Architectural Review
Certification for the Demolition of the existing 1 ½ story, stucco clad building. The parcel
consists of 0.13 +/- acres of land. The property is zoned C-2 (Central Commercial Zone) and
subject to H (Historic District Zone). The property is located on the west side of S. Bradford
Street and slightly north of Minor Street Alley. The owner of record is Russell and Dee Ann
Widder. The applicant is the Downtown Dover Partnership. Property Address: 148 S. Bradford
Street. Tax Parcel: ED-05-077.09-02-25.00-000. Council District 4.
2
Page 3
PLANNING COMMISSION - June 17, 2024 PAGE 3
5. HI-24-03 Building at 150 S. Bradford Street: Demolition – Appeal to the Planning
Commission of the Historic District Commission Action to deny the Architectural Review
Certification for the Demolition of the existing 2 ½ story, frame building. The parcel consists
of 0.17 +/- acres of land. The property is zoned C-2 (Central Commercial Zone) and subject to
H (Historic District Zone). The property is located on the west side of S. Bradford Street at the
corner with Minor Street Alley. The owner of record is CEI Properties, LLC. The applicant is
the Downtown Dover Partnership. Property Address: 150 S. Bradford Street. Tax Parcel: ED-
05-077.09-02-27.00-000. Council District 4.
ADJOURN
Posted Agenda: June 7, 2024.
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO
29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION
OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE
TIME OF THE MEETING.
3
Page 4
Item 1.
CITY OF DOVER PLANNING COMMISSION
MAY 20, 2024
The Meeting of the City of Dover Planning Commission was held on Monday, May 20, 2024 at
7:00 PM as an In-Person Meeting and also using the phone/videoconferencing system WebEx.
The Meeting Session was conducted with Chair Mrs. Maucher presiding. Members present were
Mr. Cooper, Mr. Roach (virtual), Mr. Witham, Mrs. Denney, Mr. Baldwin, Mrs. Welsh, and Mrs.
Maucher. Dr. Jones and Mr. Reaves were absent.
Staff members present were Mrs. Dawn Melson-Williams, Ms. Katherine Oehmke, Mr. Jason
Lyon (virtual), and Mrs. Kristen Mullaney.
APPROVAL OF AGENDA
Mrs. Maucher stated that application C-24-01 Tower-Based Wireless Communications Facility
at 640 Lafferty Lane (Rise Up Towers, LLC) will not be heard tonight due to incomplete public
notice.
Mrs. Welsh moved to approve the Agenda as submitted, seconded by Mr. Witham and the motion
was carried 7-0 with Dr. Jones and Mr. Reaves absent.
APPROVAL OF MEETING MINUTES OF APRIL 15, 2024
Mrs. Welsh moved to approve the Planning Commission Meeting Minutes of April 15, 2024,
seconded by Mr. Baldwin and the motion was carried 7-0 with Dr. Jones and Mr. Reaves absent.
COMMUNICATIONS & REPORTS
Mrs. Melson-Williams stated that the next Planning Commission regular meeting is scheduled
for Monday, June 17, 2024 at 7:00PM in the City Hall Council Chambers.
Mrs. Melson-Williams provided an update on the regular City Council and various Committee
meetings held on April 22 & 23, 2024 and May 13 & 14, 2024.
Mrs. Melson-Williams stated that she wanted to share for the benefit of the public that there is an
announcement that the City’s Customer Service Building located at 5 East Reed Street is going
to be closed as repairs are made to the HVAC system. That starts on Wednesday, May 22, 2024
and they are hoping the building will reopen to customers on June 10, 2024. There are other
ways to still make payments on your utilities bills. Those include the drive through at that
location which will remain open, the payment drop box, and of course there is an online
opportunity as well. For more information visit the City’s website at www.cityofdover.com for
any utility billing questions that you may have.
Mrs. Melson-Williams stated that the Downtown Dover Pathways Study last week had a design
charrette known at the Loockerman Street Design Charrette. It was Monday through Wednesday
of last week with a series of collaborative meetings, activities, discussions, and Open House
events held here focused on the portion of Loockerman Street between South State Street and the
split where it becomes Forest Street near the railroad tracks. There is an upcoming public utility
1
4
Page 5
Item 1.
CITY OF DOVER PLANNING COMMISSION MAY 20, 2024
project where water lines and sewer lines will be replaced, hence causing disturbance in the
roadway. This was an opportunity to gather design input for how that roadway and the associated
sidewalks, etc. go back. They gathered information and that Study will have a final report that
comes out this summer and hopefully lends some information to how that project will progress.
Our website on the Meeting Agenda includes the link for the Downtown Dover Pathways Project
website. It is one of the projects of the Dover/Kent County MPO.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Melson-Williams presented the audience information on policies and procedures for the In-
Person Meeting and Virtual Meeting using the WebEx system.
OLD BUSINESS
Requests for Extensions of Planning Commission Approval:
S-22-09 Dover Apartments at Leipsic Road (The Edge) – Request for One-Year Extension of the
Planning Commission conditional approval of June 21, 2022, for a Site Development
Application for the construction of six (6) 3-story, 46,800 GSF garden style apartment buildings
each containing thirty-six (36) units for a total of 216 apartment units. Also proposed are eleven
(11) garage buildings, a Clubhouse with Pool, Recreation Facilities, parking, and other site
improvements. The approval included a waiver to reduce the parking requirement and the Active
Recreation Area Plan with Partial Fee-in-lieu of Active Recreation Area Construction. The
property is zoned SC-2 (Community Shopping Center Development Zone) and partially subject
to the SWPOZ (Source Water Protection Overlay Zone) Tier 3: Excellent Recharge Area. The
property is located on the southeast side of Leipsic Road east of North DuPont Highway. The
owner of record is currently Metropolitan 8, LLC. Property is currently unaddressed. Tax Parcel:
ED-05-068.05-01-15.01-000. Council District 3.
Representative: Mr. James Taylor, Verdantas (virtual); Mr. Sam Guarnier, Verdantas
Mrs. Melson-Williams stated that the first application is S-22-09 Dover Apartments at Leipsic
Road (The Edge). Planning Commission originally saw this application back in June 2022. It is a
proposal for a series of six apartment buildings, some associated garage buildings to serve that, a
pool, a clubhouse and other recreation facilities on the site located on the south side of Leipsic
Road just to the east of DuPont Highway. It was a total of 216 apartment units. The project has
been moving through the review process to achieve agency approvals and they do have several
of them in hand including DelDOT, the Fire Marshal’s Office, and the Kent Conservation
District. The Planning Office actually received today their Final Plan submission of the Record
Plan and Site Plans; so, their Final Plan approval is imminent. They have filed a Site Work
Permit for the site and they anticipate a Building Permit Application to follow suit soon. Today,
they are seeking a one-year extension because with an action by Planning Commission in June
2022, they are coming up on their two-year initial approval. The Planning Commission has the
ability to grant an additional one-year extension. She does see the project engineer Mr. James
Taylor has joined us online.
2
5
Page 6
Item 1.
CITY OF DOVER PLANNING COMMISSION MAY 20, 2024
Mr. Taylor stated that he wanted to apologize for not being able to be there in person this
evening. Mrs. Melson-Williams did a great job at summarizing where we are at in the process
which is basically at the end of the approvals. The plans are ready to be submitted for the
Building Permits once the Planning Staff has approved the Final Plan.
Mrs. Denney moved to approve S-22-09 Dover Apartments at Leipsic Road (The Edge) for a
one-year extension as it appears that they have been doing due diligence but as we know,
sometimes these things take a little longer than necessary, seconded by Mrs. Welsh and the
motion was carried 7-0 by voice vote with Dr. Jones and Mr. Reaves absent.
SB-23-03 Revised Stonebrook East Planned Neighborhood Design at McKee Road and W.
Denneys Road - Request for a Extension of the Planning Commission conditional approval
granted December 18, 2023 for the Revised Subdivision Plan to increase the number of
townhouses from 87 to 103 townhouses (increase of 16 townhouse units) and to decrease the
number of garden apartment units from 168 to 138 garden apartment units (decrease of 30 units).
This development known as Stonebrook East Planned Neighborhood Design (PND) proposes
241 dwelling units, recreational areas, open space, and stormwater management areas. The
conditional approval included PND- Alternative Design Standards. The property is zoned RM-1
(Medium Density Residential Zone) and approved as a PND (Planned Neighborhood Design
Option). The site is on the northeast corner of McKee Road and W. Denneys Road. Property
Address: intersection of McKee Road and West Denneys Road. Property Owners: Hanae
Harmony Properties and Stonebrook East 168 LLC. Tax Parcels: ED-05-057.03-01-01.00-000 to
ED-05-057.03-01-92.00-000. Council District 1.
Representative: Mr. Sam Guarnier, Verdantas; Mr. James Taylor, Verdantas (virtual)
Mrs. Melson-Williams stated that this is a Request for Extension. There is a slightly different
timeframe with this one. This application was a combination of a Conditional Use Site Plan
Subdivision Application associated with Stonebrook East Planned Neighborhood Design on
West Denneys Road just east of McKee Road; kind of at that northeast corner. It was a project
that consists of a mix of townhouse units as well as apartment buildings for a total of 103
townhouses and 138 apartment units. With a Subdivision, they are actually only given six
months to be moving forward. Again, with this project they have been working on plan
submissions that they will be making in the near future to the regulatory agencies to satisfy those
requirements. The Planning Commission did review this application back in December 2023 and
six months have sped by since Christmas time. They are here tonight seeking a Request for
Extension. Again, we have Mr. James Taylor from Verdantas that has joined us online as well as
his colleague Mr. Sam Guarnier who is here this evening in person.
Mr. Guarnier stated that they have been working through some stormwater issues that have come
up on the site. They had to do some additional testing and they are working through finalizing
those plans looking to submit in the near future.
Mrs. Denney stated that we all know that Kent Conservation is inundated and it takes a little
longer. Is that the main hold up? Responding to Mrs. Denney, Mr. Guarnier stated yes, they had
to do some testing so it kind of pushed things back a little bit. That was the main hold up and we
3
6
Page 7
Item 1.
CITY OF DOVER PLANNING COMMISSION MAY 20, 2024
are getting ready to submit to them now. Everything else is more or less ready to submit.
Mr. Taylor stated that six months for a Subdivision approval is a very short timeframe to go
through to get the approvals from DelDOT. With this, we are trying to work through the aspects
related to getting the stormwater design to meet the regulations and like Mr. Guarnier said,
additional testing was required and that design is done at this point that they will be able to
submit in the near future.
Mrs. Welsh moved to approve SB-23-03 Revised Stonebrook East Planned Neighborhood Design
at McKee Road and W. Denneys Road for a one year extension, seconded by Mr. Witham and the
motion was carried 7-0 by voice vote with Dr. Jones and Mr. Reaves absent.
NEW APPLICATIONS
Z-24-05 Lands of Chiang & Sons Properties, LLC at 1241 College Park Drive: Rezoning C-PO
to IO - Public Hearing and Review for Recommendation to City Council of a Rezoning
application for a parcel of land consisting of 1.1024 acres +/-. The property is zoned C-PO
(Commercial and Professional Office Zone). The proposed zoning for the property is IO
(Institutional and Office Zone). The property is located on the east side of College Park Drive (a
private street) and north of State College Road. The owner of record is Chiang & Sons
Properties, LLC. Property Address: 1241 College Park Drive. Tax Parcel: ED-05-067.00-02-
12.08-000. Council District 4. Ordinance #2024-11. The First Reading of the Proposed
Ordinance was held on April 22, 2024 and Public Hearings scheduled for Planning Commission
on May 20, 2024 and City Council on June 10, 2024.
Representative: Mr. Nik Patel, Avi Consulting Group
Ms. Oehmke stated that the Rezoning for Mr. Chiang & Sons Properties, LLC at 1241 College
Park Drive is located on the east side of College Park Drive. It’s a private street north of State
College Road. It’s just over one acre. It is currently an office building. It is zoned C-PO
(Commercial and Professional Office Zone). This property has a little bit of history. There was a
storm that came through Dover and condemned the building. The property was purchased by
Chiang & Sons Properties, LLC in July 2022. In September 2022, they did try to put through a
Conditional Use Application that was heard by the Planning Commission. It was denied and in
January 2023, a Building Permit was approved for renovations. They speedily finished their
renovations and received their Certificate of Occupancy by December 2023. The screen shows a
rendering of what the building currently looks like. They did a lovely job fixing that up. This is
the Site Plan of the property with its parking and landscaping. The use comparison between the
C-PO (Commercial and Professional Office Zone) and the IO (Institutional and Office Zone) as
you can see on the screen, gives them quite a few more opportunities for tenants to use the space
within the building, including as places of public assembly and child care centers. For this
property, according to the Comprehensive Plan Land Use Category is Office and Office Parks.
This allows for mainly day time use and it’s tucked into a little office park as you can see here. If
there are any questions, we have Mr. Nik Patel, the real estate agent for the client here.
Mr. Patel stated that he is representing the client and the description from Ms. Oehmke was
4
7
Page 8
Item 1.
CITY OF DOVER PLANNING COMMISSION MAY 20, 2024
pretty thorough. Currently, the property is still vacant. It is for sale and lease; they just haven’t
had any activity. A lot of the requests that they are getting are for uses that are under IO
(Institutional and Office Zone) and not the C-PO (Commercial and Professional Office Zone).
They felt like this would be a good opportunity to get the building back up and running and
hopefully marketable for lease or for sale.
Mrs. Maucher opened the public hearing and after seeing no one wishing to speak, closed the
public hearing.
Mrs. Denney stated that she wants to note that within this there is an elimination for street
frontage sidewalk as well as the upright curbing and with the change of zoning. Responding to
Mrs. Denney, Mrs. Melson-Williams stated that she thinks that Mrs. Denney is mixing up
applications; this is a Rezoning application.
Mr. Witham stated that Staff does make a recommendation to the Commission that the proposed
zoning is consistent with the Comprehensive Plan. He should have asked this question to the
applicant earlier, but he was wondering how long this matter has been on the market for the
existing businesses under the current zoning? Responding to Mr. Witham, Mr. Patel stated that
it’s actually been on the market since prior to our completion of our Certificate of Occupancy.
So, it’s been over eight months.
Mr. Witham asked if there were any takers yet. Responding to Mr. Witham, Mr. Patel stated no.
Mrs. Welsh moved to recommend approval to City Council for application Z-24-05 Lands of
Chiang & Sons Properties, LLC at 1241 College Park Drive: Rezoning C-PO to IO, seconded by
Mr. Witham and the motion was carried 7-0 by roll call vote with Dr. Jones and Mr. Reaves
absent. Mrs. Welsh voting yes; as mentioned in the request for the Rezoning to IO (Institutional
and Office Zone), that provides a better opportunity for the parcel to be turned into a viable
business and to get rid of a vacant building that is just sitting there and that has been destroyed
at one point and now re-accomplished. Mr. Cooper voting yes; for reasons stated. Mr. Roach
voting yes; for reasons stated. They have been cooperative with the Planning Staff and it fits the
Comprehensive Plan. Mrs. Denney voting yes; she thinks after all of the time and not having any
interest in the zoning that exists that the change in zoning may help allow this building to have
useful tenants now. Mr. Witham voting yes; for the reasons set forth by his fellow Commissioners
and also to include the reasons set forth in the Staff recommendation and this Rezoning would be
consist with the Comprehensive Plan. Mr. Baldwin voting yes; for reasons stated. Mrs. Maucher
voting yes; for reasons stated.
S-24-05 Lands of Ken Barrett Builders for Office Building at 1413 New Burton Road – Public
Hearing and Review of a Site Development Plan Application to permit construction of a one-
story 3,026 SF office building and associated site improvements. The property is zoned C-1A
(Limited Commercial Zone) consisting of 0.41 acres. The property is located on the east side of
New Burton Road, north of Garton Lane. The owner of record is Ken Barrett Builders LLC.
Property Address: 1413 New Burton Road. Tax Parcel: ED-05-085.11-01-01.00-000. Council
District 2. Waiver Requests: Elimination of Upright Curbing and Elimination of Sidewalk.
5
8
Page 9
Item 1.
CITY OF DOVER PLANNING COMMISSION MAY 20, 2024
Representative: Mr. Kevin Minnich, Minnich Engineering
Ms. Oehmke stated that Application S-24-05 is an office building at 1413 New Burton Road. It’s
on the east side of New Burton, north of Webbs Lane. It is 0.41 acres and is zoned C-1A
(Limited Commercial Zone). It is going to be a one story, roughly 3,000 SF office building and
they have requested two waivers: one for the elimination of street frontage sidewalk and one for
an elimination of upright curbing. The rendering on the screen shows what the site looks like
now. It used to be a single family dwelling with a storage accessory structure in the rear. It has a
rather large parking lot already. The next rendering shows the proposed site. They have updated
this graphic. They have updated their parking to twelve spaces rather than the ten spaces. As you
can see, they have already provided for bike parking and dumpster requirements, handicap
parking, and they already have their DelDOT entrance for New Burton Road. As you can see
here, a view down the street shows that there are not currently sidewalks in this area or upright
curbing in either direction. Here are some renderings of what the rear and front of the building
will look like. The next rendering shows the side elevations. They have provided a floor plan for
us that is consistent with an office or a medical office and we have a Landscape Plan. It will have
an opaque barrier fence between the residential properties to the north and then you can see the
landscaping will cover the fence on the side of the office.
Mr. Minnich stated that he is representing the new owner, Mr. Ken Barrett. Mr. Bob Larimore (a
local land surveyor) was the owner of the property for a long time. He feels like he should ask
for a moment of silence since he is no longer with us and he was a good friend. They are trying
to redevelop the site and it’s a challenging site because it’s a small site. It is not a square site; it’s
a triangle so it places limitations on the site. We do have the DelDOT approval for a small
entrance and we do have Kent Conservation District’s approval. They still need to get the
approval from the Public Works Department and anything else that Planning Department
required. As far as the DAC Report, they are all good with that Report. The comments that were
in the DAC Report were minor and we can make any changes that were needed in the DAC
Report. The two main things are what Ms. Oehmke hinted on which was the sidewalk waiver and
the waiver for the curbing. He thinks some of that is tailored because of the type, size, and
configuration of the site.
Mrs. Denney stated that she really feels strongly when we start eliminating sidewalks in already
developed areas such as this. If we require sidewalk, it’s the beginning of what the next one will
have to have and then eventually we will have sidewalks. When you think about other businesses
and things that are there, it’s not a huge piece of property for the sidewalk. She really doesn’t
like to see eliminations of sidewalk. With the curbing requirement, she is retired from managing
an orthopedic surgery group and tripping over curbing blocks creates a whole lot of business.
That is not as important unless it keeps a car from going out into a street or into a building. To
her, that isn’t as great of a situation. She does like to see sidewalks. She thinks they have to start
somewhere with getting the sidewalks in or we will forever be without sidewalks. Especially
now in that area, we have the Recreation Center and things going on and have more pedestrian
traffic.
Mr. Minnich asked if the sidewalk waiver ever been approved by Planning Commission.
Responding to Mr. Minnich, Mrs. Melson-Williams stated that the Planning Commission has
6
9
Page 10
Item 1.
CITY OF DOVER PLANNING COMMISSION MAY 20, 2024
considered a number of sidewalk waivers throughout the City. There have been some that have
been granted because of future sidewalk projects that were eminent. There have also been others
where the configuration of the property or its topography limits the ability to install a sidewalk.
Certainly, this property is a strange shape. It is at grade with the adjacent roadway. She believes
that Staff had recommended approval of the request for elimination of the sidewalk noting that
there is actually shoulder in this area and she believes that as part of the DelDOT approval of
their small commercial entrance, they (DelDOT) were not requiring the improvement to include
the sidewalk provisions.
Mr. Minnich stated that he did get a follow up email from DelDOT saying that they forgot to say
that the applicant will need to pay the cash-in-lieu of the sidewalk. He told Mr. Will Mobley at
DelDOT to hold off until they have this meeting tonight because they don’t want to pay that until
they know whether or not they are going to get the Waiver for the sidewalk. They are aware of
that and obviously if they don’t get the Waiver, they will probably install the sidewalk because
DelDOT’s price will probably be a lot more expensive. He just wasn’t sure if the sidewalk
waivers were ever granted. He hasn’t had a lot of luck with that being done; he thinks this is a
candidate for a waiver in his opinion.
Mr. Witham stated that he assumes if this property is in grade level with the roadway, if the
sidewalk was installed it would be a raised sidewalk; therefore, it would be above the roadway.
Is that correct? Responding to Mr. Witham, Mr. Minnich stated probably yes.
Mr. Witham stated that if a person was riding a bicycle and they wanted to use the sidewalk for
the short distance that this property consists, they would have to shift their bike upwards on the
sidewalk which is a hazard in his view.
Mrs. Maucher asked if there was a map showing the other properties because she lives adjacent
to New Burton Road. Isn’t it residential next to it? So, there really is not going to be the
opportunity for extension. Responding to Mrs. Maucher, Mr. Minnich stated that there is
residential to the north of this site.
Mrs. Maucher asked if it was adjacent to residential. Responding to Mrs. Maucher, Mr. Minnich
stated yes, it is adjacent to residential.
Mrs. Maucher stated that she doesn’t like sidewalks to nowhere and putting a small segment in
when there is not going to be an opportunity to connect. How about on the other side the
property? Responding to Mrs. Maucher, Mr. Minnich stated no, on the other side, the person is
renovating the building on the south side. That is already paved parking in that area so there is no
sidewalk per say. There is no sidewalk all the way down to where Delaware State News used to
be. That is all shoulder all the way down. The nearest sidewalk is probably down by Puncheon
Run.
Mr. Cooper stated that he believes to the north it is the apartment complex and there is no access
to the road because there is a fence there. So, he doesn’t think that he has a problem with the
Waiver. He doesn’t see a reason to put it there.
7
10
Page 11
Item 1.
CITY OF DOVER PLANNING COMMISSION MAY 20, 2024
Mrs. Denney stated that also when you put a sidewalk in, it tends to create almost like an
ingress/egress point as opposed to the whole parking lot being ingress/egress across the width of
it. Again, just because the Rec Center, as she comes and goes and she goes to the Rec Center
quite a bit because she also drags her grandkids back and forth from there, there is a little more
pedestrian traffic. Some of them are kids and it just seems to her, that that kind of designates an
ingress/egress as opposed to just back onto New Burton Road. That troubles her, that there is no
ingress/egress and the sidewalk would create that.
Mrs. Maucher opened the public hearing and after seeing no one wishing to speak, closed the
public hearing.
Mrs. Melson-Williams stated that there is one individual who joined us online, Elizabeth D. She
doesn’t believe that she wishes to speak but she did note in the chat to the north of this site, there
is no sidewalk that concurs with the statement that Mr. Cooper was making. It is kind of the back
side of that adjacent apartment complex and there is a fence there with no access all the way up
to Kesselring Drive which is the next intersection to the north.
Mrs. Maucher closed the public hearing.
Mr. Cooper moved to approve S-24-05 Lands of Ken Barrett Builders for Office Building at 1413
New Burton Road to include both Waiver Requests for the elimination of upright curbing and the
elimination of sidewalk, seconded by Mrs. Welsh and the motion was carried 7-0 by roll call vote
with Dr. Jones and Mr. Reaves absent. Mr. Cooper voting yes; based on Staff recommendations
and the application as a whole. He thinks that the sidewalk discussion is the first time in his
entire life that he has ever disagreed with Mrs. Denney but he thinks that a sidewalk to nowhere
on that short little block doesn’t do much. Mr. Roach voting yes. Mrs. Denney voting yes;
because she thinks that the zoning change needs to happen there. Unfortunately, she is not
agreeing with the other part but as a whole she does think the zoning should be changed. Mr.
Witham voting yes; for the reasons set forth on the record tonight as well as what is set forth in
Staff recommendations. It appears that while the waiver on the sidewalks is somewhat unique
and may be the first time that we have done this, but it does seem to meet the requirements
according to Article 5, Section 18.5 as well as the requirements for the waiver of the upright
curbing in accordance with Article 6, Subparagraph 3.6B. Mr. Baldwin voting yes. Mrs. Welsh
voting yes; for the reasons previously stated. Mrs. Maucher voting yes; based on DAC comments
and Staff recommendations.
S-24-06 Revised Leander Lakes III Apartments – Public Hearing and Review of a Revision to
the Site Development Plan Application S-23-04 for the construction of eight (8) 3-story garden
style apartment buildings and 1 (one) 2-story 8 unit building for a total of two hundred (200)
units and Active Recreation Areas to be known as Leander Lakes III. The Revised Plan involves
the reconfiguration and relocation of the access drive connection to Forrest Avenue for the
apartment complex. The parcel with the Access Drive is zoned RM-2 (Medium Density
Residence Zone) and partially subject to the COZ-1 (Corridor Overlay Zone). The Apartment
Complex project area (future 25-acre parcel) is zoned RM-2 (Medium Density Residence Zone)
and partially subject to the COZ-1 (Corridor Overlay Zone) with the balance of this parcel zoned
R-10 (One Family Residence Zone) and partially subject to COZ-1 (Commercial Overlay Zone).
8
11
Page 12
Item 1.
CITY OF DOVER PLANNING COMMISSION MAY 20, 2024
The property is located on the south side of Forrest Avenue west of Dover High Drive. The
owners of record are Leander Lakes IV, LLC (previous owner: Jireh Christian Center) and
Calvary Baptist Church of Dover with equitable owner/developer as Leander Lakes III, LLC.
Property Addresses: 2161 Forrest Avenue and part of 2285 Forrest Avenue. Tax Parcels: ED-05-
075.00-01-05.00-000 and ED-05-075.00-01-06.00-000. Council District 1. Waiver Request:
Elimination of Curbing on Access Drive. This site was granted conditional approval for a 200-
unit apartment complex with Site Plan S-23-04 Leander Lakes III by the Planning Commission
on February 21, 2023. A Minor Subdivision Plan to create the 25-acre parcel for Leander Lakes
III has been approved.
Representative: Mr. LB Steele, Leander Lakes III, LLC; Mr. Jim Eriksen, Solutions IPEM
Mrs. Melson-Williams stated that application is a Site Development Plan. It likely looks familiar
to most because there was a previous application known as S-23-04 that was considered by the
body back in February 2023 for this apartment complex project. The apartment complex is a
series of buildings with a total of 200 units. What is shown on the screen is part of the previous
location. It was part of the property located at 2285 Forrest Avenue where the Calvary Baptist
Church is under construction. This project involved a Minor Subdivision that focused on 25
acres on the eastern portion of that property and it was proposed for development. Now for the
new site area, the subdivision to pull out that 25 acres has actually been completed in recent
weeks but their project has picked up an additional land mass and that is the property located at
2161 Forrest Avenue. Most people may know that as property being in the ownership of Jireh
Christian Church. It was the Destiny Christian Church property and with this additional area they
are looking to revise the site access for this apartment complex known as Leander Lakes III.
Originally, the proposal was to provide a linkage to Forrest Avenue by way of the narrow tract of
land that they owned along the Calvary Church eastern boundary and link into the Calvary
access point that will lead to Forrest Avenue. With this Revision, they are looking to create a
different access road that would travel across the church property moving north and then
interconnecting with what is the existing drive and its existing connection to Forrest Avenue.
There is kind of a meandering path or driveway that exists that goes to that Destiny Christian
Church property. Leander Lakes III is proposed that it would interconnect first off with Leander
Lakes I at two points of Isabelle Isle. That was always in the plan but what is changed is the
connection that travels north and in this case, would link to that Destiny Christian Church drive.
On the Plan itself, they have actually gone through and made a number of the updates to the plan
set that was previously identified back in 2023. There was an Active Recreation Area Plan at that
time that was reviewed for the apartments and makes a series of recreation areas, fitness areas,
game play for corn hole and horseshoes as part of a larger walking trail network for the project
site. To talk a little bit about the apartment complex itself, what you kind of see in the white ring
shown on the screen is the series of parking lot spaces. The buildings are the next inter-ring.
There is a walking trail system that links from the buildings and around their rear. In the center
are two areas that would be part of the stormwater management for the site. The property is bi-
sected by this stream corridor that they are working through the appropriate permits for crossing
of that stream corridor with the drive aisle that will exist for the apartment complex. The
apartment complex is required to have rear emergency access to the buildings and that is
achieved by what they call a “super sidewalk” because it would be a sidewalk area that is to the
rear of the building that is ten (10) feet in width and then has additional four (4) feet of grass
9
12
Page 13
Item 1.
CITY OF DOVER PLANNING COMMISSION MAY 20, 2024
pavers on either side for a total width of eighteen (18) feet that would allow for fire apparatus to
access the rear of these buildings. Something that you hope you never need; but in the meantime,
it will also serve as part of the walking trail system for the project site. The apartment complex is
proposing the adequate number of parking spaces at 450 parking spaces; that meets our Code
requirements. Likewise, their Plan includes lighting and dumpsters. The stream has a buffering
requirement from it because it is identified as wetland areas. They intend to maintain a 50 foot
riparian buffer through that area. Additionally, while there is some woodland removal for the
project, the overall site will have to plant additional tress as part of their development activity
and we are looking at well over 300 trees. The requirement would be 341 and their initial plan is
showing 367 trees. Part of the property is adjacent to Forrest Avenue when you take into account
this access drive. That portion of the property is subject to the Corridor Overlay Zone but most of
those provisions do not come into play other than some tree planting requirements because the
major area of development is not within the Corridor Overlay Zone. As part of the Development
Advisory Committee Report, Planning Staff has granted approval to their Waiver Request that
they have filed associated with this access drive and that is for the partial elimination of upright
curbing along that access drive. That is something that Staff has the ability to grant when it’s tied
to stormwater management practices. We see this access drive as its first rendition and future
development may be forthcoming on the parcel 2161 Forrest Avenue would likely change the
format of that access drive. In updating their plans, the plan is also indicating that they are
planning for EV charging and putting in place, the infrastructure that would allow for at least two
spaces for each building. The variety of comments that follow as part of the Development
Advisory Committee Report are from the regulatory agencies including the Department of
Water/Wastewater related to water services. None of the streets or access drives that they are
proposing would become City streets with this project. They are linking to roads that are State
maintained roads so DelDOT has had some comments and has worked with the applicant in that
regard. They continue to work with the Kent Conservation District related to stormwater
management planning and then the associated permits related to that stream crossing with the
appropriate agency components of DNREC.
Mr. Eriksen stated that as described by City Staff, this application is for 200 multiplex dwellings
as well as a Minor Subdivision for the parcel located at 2285 Forrest Avenue in Dover. This site
may look familiar to some of you as this site has already received preliminary conditional
approval for this exact use in February 2023. As Staff described, they are back today because
they would like to make an adjustment to the access road connecting to Forrest Avenue. The
access road previously interconnected to the Calvary Baptist Church entrance and they are
proposing to relocate that access road such that it utilizes the existing entrance just east of there,
which is in front of the future Leander Lakes IV Project. If you look at this next slide, you see
the previously approved Leander Lakes III Project. At the time of the previous presentation, the
developer owned the existing Leander Lakes parcels and he had a contract in place for this 25
acre piece of land known as Leander Lakes III. He did not own the adjoining parcel just east
along Forrest Avenue which is labeled as “future Leander Lakes IV” on the screen. Upon
development of Leander Lakes III, that parcel would have been surrounded by other Leander
Lakes project; it was the hole in the doughnut. At the time that Leander Lakes III was brought
before the Commission last year, they had limited options for any connection to Forrest Avenue.
Basically, the only option was to provide a connection to Forrest Avenue through Calvary
Baptist Church’s proposed entrance because of that “hole in the doughnut.” Shortly after the
10
13
Page 14
Item 1.
CITY OF DOVER PLANNING COMMISSION MAY 20, 2024
approval of Leander Lakes III, the developer was able to secure the future Leander Lakes IV
parcel. Leander Lakes IV was brought before the Commission for a Rezoning in April 2023 and
the developer has since fully purchased the Leander Lakes IV parcel. Now having a better
picture of the future, the developer has brought Leander Lakes III back to the Commission to
request for the access road to be relocated and connect to the existing entrance in front of the
Leander Lakes IV parcel rather than the future entrance in front of the Calvary Baptist Church.
The developer intends to eventually develop Leander Lakes IV but has anticipated moving
forward with that after Leander Lakes III. The next slide shows the proposed Leander Lakes III
Plan which shows the access road in the future Leander Lakes IV parcel. Due to size and shape
of the Leander Lakes IV parcel, whenever that would be developed, there would likely be a
roadway constructed that would parallel the original Leander Lakes III roadway for
approximately 809 LF. This redundant infrastructure would be very wasteful and therefore is
generally considered a poor land planning practice. It would increase construction costs as well
as maintenance while providing very little benefit. These costs would ultimately result in higher
rents for future tenants of these properties. With that in mind, the decision was made to adjust the
Leander Lakes III Plan to move the access road per the Plan that you see in front of you today.
At the time of that decision, we were diligently pursuing approval of the previous layout of
Leander Lakes III and they were just about to submit their onsite engineering drawings to the
City. They were nearing approval of our DelDOT Plans and had a round of review with Kent
Conservation District. They paused on these processes so that they could make a final
determination on a path forward. They had to meet with DelDOT and the City to verify general
feasibility and discuss anticipated impacts and ensure they had a clear path forward. It took some
time to get all of that actually squared away and figured out, but they are comfortable with their
path forward at this time and all be it. This is a minor revision. It did take some time to figure it
all out.
The next slide shows an updated traffic distribution exhibit for DelDOT. Obviously, there is a
considerable amount of analysis of the DelDOT impacts and DelDOT is in general agreement
with their traffic information and plan. To summarize and simplify, the DelDOT impacts for
Leander Lakes III project revisions, the trips that were previously anticipated to use the Calvary
Baptist Church shared entrance are now anticipated to utilize the entrance in front of the future
Leander Lakes IV project. Beyond that, the overall impacts on the roads are still very similar to
what was previously presented. Leander Lakes III will be subject to the Area Wide Study Fee
meaning that the trip generation is not significant enough to warrant a Traffic Impact Study.
Instead, DelDOT will identify any DelDOT projects in the area and the developer will be
responsible for contributions to those projects based on the site’s share of traffic. This project
would also be responsible for any additional improvements required at the existing Leander
Lakes IV entrance to provide an entrance in compliance with DelDOT regulations. Leander
Lakes III will still have multiple access points and residents will still have the ability to utilize
the traffic light at the Dover High Drive intersection which will allow for better turning
movements as well as limit impacts on Forrest Avenue. There are still interconnections and
shared entrances for Leander Lakes projects; however, this updated design ultimately gives
control of these entrances that are utilized by Leander Lakes entirely to the developer. The
developer does not have to have concerns with impacts in coordination with the Calvary Baptist
Church’s project but will still have the same range of options available to the future residents to
utilize the best option available to enter and exit the site which will allows for a better flow of
11
14
Page 15
Item 1.
CITY OF DOVER PLANNING COMMISSION MAY 20, 2024
traffic and less meaningful impacts on Forrest Avenue. It also allows for a range of options for
emergency service vehicle access in the event of a road closure or another emergency. He
believes that largely covers the actual revisions to the plans. The next slide shows that they are
back at the aerial exhibit. Beyond the access road revision, the rest of the Site Plan is generally in
accordance with the previous design which was presented to the Commission last year. Staff did
a very nice job of explaining that layout and all of the details of it. As noted by Staff, they did
update the Plan to address any kind of conditions or considerations that were requested by the
Commission. They are moving forward with the Plan in front of you. To avoid any more
redundancy, he is not going to go into details on those areas as they were previously approved.
He will just generally state that everything is largely the same from a big picture land planning
standpoint. The site is still in the same proper investment level areas. It complies with the
Comprehensive Plan. It’s a permitted use. There is adequate parking and it provides for
stormwater management and utilities in an identical matter as what was previously presented.
Mrs. Denney stated that ultimately everything is pretty much staying the same with the
additional piece of property, but the ingress/egress to Forrest Avenue is going to have a better
solution than going to Calvary Baptist Church. Responding to Mrs. Denney, Mr. Eriksen stated
that is correct. This is a better plan for the future development of Leander Lakes IV. It avoids
that redundant road. You would have two roads right next to each other like fifty feet apart.
Mrs. Denney asked if this eliminates that and just puts the one complete entrance out to Forrest
Avenue? Responding to Mrs. Denney, Mr. Eriksen stated yes.
Mrs. Welsh asked if the road that they are connecting to on the Revised Plan is an existing road.
Responding to Mrs. Welsh, Mr. Eriksen stated yes, it is existing.
Mrs. Welsh stated that she just wanted to make sure that it wasn’t planned for the Leander Lakes
IIII and it’s not really there yet. Responding to Mrs. Welsh, Mr. Eriksen stated that it’s there.
Mrs. Maucher opened the public hearing.
Mr. Miles Minear – 42 Paradise Lane Dover, DE 19904
Mr. Minear stated that he is a resident within two hundred (200) feet of this project. His question
is that at this point we are going to have two exits and entrance: one being with a traffic light and
the other not having a traffic light. Is that correct? Responding to Mr. Minear, Mrs. Maucher
stated no, she thinks the applicant can clarify.
Mr. Eriksen stated that they have two options off of Dover High Drive. Those two are through
the existing Leander Lakes Apartments that are out there. To utilize that to get off of Forrest
Avenue, you would utilize the traffic light at that intersection as well as the other entrance that
we have a more direct connection to that is the existing entrance to the existing Destiny Christian
Church. They would be making improvements to that entrance with this project.
Mr. Minear asked that as Leander Lakes IV comes into the picture, at that point you are going to
be requesting another ingress/egress? Responding to Mr. Minear, Mr. Eriksen stated that the
intention is to not add another entrance with Leander Lakes IV. There may additional
12
15
Page 16
Item 1.
CITY OF DOVER PLANNING COMMISSION MAY 20, 2024
improvements required with Leander Lakes IIII when you add the additional units.
Mr. Minear stated that at this point, there would only be two spots affected on Forrest Avenue;
the one with the light and the one without. Responding to Mr. Minear, Mr. Eriksen stated yes.
Mr. Steele stated that with the curb cut which is existing and the existing road by Destiny
Christian Church, what they are doing instead of bringing a road down their flagpole piece and
connecting to Calvary Baptist Church is omitting any connection to the Calvary property. They
are using what became their own property. They do not own this parcel (pointed at a parcel on
the screen) on the corner of this property. There will be two ingresses/egresses total. (Dover
Christian Church property at 1738 Forrest Avenue.)
Mr. Minear asked for Phase IV, where are they looking to egress? Responding to Mr. Minear,
Mr. Steele stated that they are going to use this road (pointed to road on screen) and something
will spit back out up to here (pointed to area on screen, of the same entrance drive to Destiny
Christian Church property). Truthfully, this has not been drawn yet. They’ve got some ideas, but
they haven’t finalized it. It’s probably going to be four buildings in a circle.
Mr. Minear asked if there was any potential connection (on Forrest Avenue). It is his
understanding that a roundabout is going in on Sharon Hill Road and Artis Drive in the future. Is
there any potential connection to that? Responding to Mr. Minear, Mr. Steele stated that they
don’t own anything to the west.
Mrs. Maucher closed the public hearing.
Mr. Witham moved to approve S-24-06 Revised Leander Lakes III Apartments as it does comport
with what Staff had recommended in comments and this seems to be a much more viable way to
resolve the connection for the applicant as opposed to what was apparently in the process before
and also inclusive of the waiver for the elimination of curbing on the access drive, seconded by
Mrs. Denney and the motion was carried 7-0 by roll call vote with Dr. Jones and Mr. Reaves
absent. Mr. Witham voting yes; this Plan is a very comprehensive plan that is a well thought out
plan with a number of already preapproved recommendations and does comport with what they
would like to see from all builders and developers. Mr. Baldwin voting yes; based on Staff
recommendations. Mrs. Welsh voting yes; it is a very frugal revision to the entrance of the
property. Mr. Cooper voting yes; for reasons stated. Mr. Roach voting yes; for reasons stated.
Mrs. Denney voting yes; she thinks that this change in the ingress/egress is like the finishing
touch and obviously the Plan was previously approved. She just wants to note that she really
appreciates the comments that they get from the State Planning Office with regard to these and
to her, that is like the finishing touch when you read everything that has been said. Also
appreciated is the addressing and sharing this ingress/egress instead of making multiple
entrances and exits out on Forrest Avenue. Mrs. Maucher voting yes; based on Staff
recommendations, DAC comments and our prior approval of the project as this is just a
modification to the entrance.
NEW BUSINESS
13
16
Page 17
Item 1.
CITY OF DOVER PLANNING COMMISSION MAY 20, 2024
Meeting adjourned at 8:27 PM.
Sincerely,
Kristen Mullaney
Secretary
14
17
Page 18
Item 2.
City of Dover
DATA SHEET FOR CONDITIONAL USE SITE DEVELOPMENT PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF May 8, 2024
PLANNING COMMISSION MEETING of June 17, 2024
Plan Title: Tower-Based Wireless Communications Facility at 640 Lafferty Lane (Rise
Up Towers, LLC)
C-24-01
Plan Type: Conditional Use Site Plan
Property Owner: Secure Storage, LLC
Applicant/Developer: Rise Up Towers, LLC
Location: North side of Lafferty Lane, east of South Bay Road
Address: 640 Lafferty Lane
Tax Parcel: ED-05-077.00-01-25.00-000
Site Area: 18.68 acres +/-
Project Area: Lease area of 50’x50’ associated with Compound Area
Zoning: IPM (Industrial Park Manufacturing Zone)
Present Use: Mini-Storage Facility with Boat & RV Storage and Associated Office
Proposed Use: Mini-Storage Facility with Boat & RV Storage and Associated Office
with Tower-Based Wireless Communication Facility (monopole)
Waivers Requested: None
Potential Waiver to be Requested for Staff Review: Partial Elimination of Upright Curbing
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service 18
Page 19
City of Item 2.
Dover
CITY OF DOVER Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: May 8, 2024
APPLICATION: Tower-Based Wireless Communications Facility at 640 Lafferty Lane (Rise Up
Towers, LLC)
FILE #: C-24-01 REVIEWING AGENCY: City of Dover Planning Office
CONTACT PERSON: Dawn Melson-Williams, AICP PHONE #: 302.736.7196
I. PLAN SUMMARY
This Application is review of a Conditional Use Site Plan application to permit construction of a
tower-based wireless communications facility (WCF) and associated equipment compound in the
northeastern area of the mini-storage facility property. The proposed wireless support structure is
a monopole of 124 feet with a lightning rod for a total height of 129 feet. The 18.68-acre subject
property is located on the north side of Lafferty Lane, east of South Bay Road. The property is
zoned IPM (Industrial Park Manufacturing Zone). The owner of record (parcel) is Secure
Storage, LLC, and the applicant (WCF developer/owner) is Rise Up Towers, LLC. Property
Address: 640 Lafferty Lane. Tax Parcel: ED05-077.00-01-25.00-000. Council District 2.
Note: this Application C-24-01 was originally filed in anticipation of consideration at the May 20, 2024
Planning Commission Meeting; however, incomplete Public Notice required rescheduling of the
application’s review to the June 17, 2024 Planning Commission Meeting.
Previous Applications
This site was partially developed under S-17-06 Secure Storage Revised Site Plan: Phases 2 and
3 for a mini-storage facility to consist of four (4) additional storage buildings in the Phases 2 & 3
area on a site already containing 14 storage buildings (Phase 1). The S-17-06 Plan was granted
conditional approval by the Planning Commission on March 20, 2017 with Final Plan approval
October 16, 2017 and an extension granted March 8, 2019. The Site Plan S-17-06 conditions of
approval set forth by the Planning Commission included acceptance of the Performance Standard
Review Application and approval of Waiver Requests for the partial elimination of curbing in
select areas and for the elimination of sidewalk along the property’s Lafferty Lane frontage.
However, the DelDOT Entrance Plan approval required implementation of a 10 ft.-wide multi-
modal sidewalk on the site frontage. It is noted that during its review process a design refinement
of the site building layout (occurring after the Planning Commission meeting) resulted in a
reduction from five buildings to four buildings. The Final Plan, as approved, consisted of
buildings totaling 90,000 S.F. and including associated site improvements including a designated
boat and RV parking area. Only one storage building (Building #15) was constructed in this
Phase 2 area.
19
Page 20
Item 2.
C-24-01 Tower-Based Wireless Communications Facility at 640 Lafferty Lane
DAC Report of May 8, 2024 (Scheduled for Planning Commission Meeting of June 17, 2024)
Page 3 of 12
The property was also part of a Unified Comprehensive Signage Plan US-03-01 Secure Storage
Complex that was reviewed May 19, 2003.The Planning Commission approval of the
Comprehensive Signage Plan consisted of monument signs and two (2) pylon signs (of 480 SF
each at heights of 45 feet and 60 feet) to serve the mini-storage facility and the adjacent future
development lots (three separate lots fronting on Lafferty Lane).
It is noted that portions of this property were previously subject to the requirements of the AEOZ
(Airport Environs Overlay Zone). However, amendments to the AEOZ zoning district boundary
(coverage area) in March 2013 (Ordinance #2013-01) removed the property from the AEOZ.
II. PROJECT DESCRIPTION
The Plan proposes the construction of Tower-based Wireless communications facility with a 124
foot monopole as the wireless support structure by Rise Up Towers, LLC. It is located in the
northeast portion of the overall property and separated from the existing (and proposed) mini-
storage buildings. It is topped with a lightning rod for a total height of 129 feet. The specific
carrier antenna sector (T-Mobile) is shown at the124 feet which is the top-most position. The
monopole includes a proposed whip antenna location at the 80 foot height (for potential
municipal /EMS usage) with three additional placement heights for collocations of other future
carrier antennas. These antenna heights are centered on 94 feet, 104 feet, and 114 feet. The WSS
is located within a fenced compound area of 50 feet by 50 feet enclosed with a 6-foot chain-link
fence and surrounded by evergreen trees. A paved access drive 12 feet in width with a
turnaround/parking space is proposed on the southeast side connecting to an existing
paved/gravel drive on the property that links to a driveway connection to Lafferty Lane.
The mini-storage facility is to remain on the property. It is a gated facility with an associated
office building for its management located at the property entrance from Lafferty Lane (near
Route 113/Bay Road). There is also a cemetery on a portion of the property.
Surrounding Properties
The property is flanked by the right-of-way for State Route 1 to the west. To the south, is a series
of three lots also owned by Secure Storage LLC and zoned IPM. To the east on the adjoining
property is a building materials supplier with several warehouse style buildings.
III. ZONING REVIEW
IPM (Industrial Park Manufacturing Zone)
Zoning Ordinance, Article 3 Section 20 lists the permitted uses, conditional uses, and other
provisions of the IPM (Industrial Park Manufacturing Zone). The existing mini-storage facility is
an allowable use and Tower-Based Wireless Communications Facilities are allowed in non-
residential zones through the Conditional Use process.
Conditional Use Application
With Conditional Use Plan applications, the Planning Commission reviews the proposed project
to determine whether or not the intended use is appropriate in type and scale for the immediate
neighborhood. The Commission must also consider whether or not the proposed use will have an
adverse impact on the future orderly development of the surrounding area. The following
sections of the Zoning Ordinance which relates to the role of the Commission in reviewing
Conditional Use Plan applications are particularly relevant when reviewing this application:
Article 10 §1.1 [Accessibility for fire and police protection.] That all proposed structures, equipment or
material shall be readily accessible for fire and police protection;
20
Page 21
Item 2.
C-24-01 Tower-Based Wireless Communications Facility at 640 Lafferty Lane
DAC Report of May 8, 2024 (Scheduled for Planning Commission Meeting of June 17, 2024)
Page 4 of 12
Article 10 §1.2 That the proposed use be of such location, size, and character that, in general, it will
be in harmony with the appropriate and orderly development of the zone in which it is proposed to be
situated and will not be detrimental to the orderly development of adjacent properties in accordance
with the zoning classification of such properties;
If the Planning Commission approves a Conditional Use Application, the use is granted as a
Conditional Use Permit. Such permits may be permanent, subject to limitations outlined in
Zoning Ordinance, Article 10 §1.41 or be required by the Commission to undergo periodic
renewal using the procedure described in Article 10 §1.42. Any Conditional Use Permit,
permanent or not, may be revoked using the procedure described in Article 10 §1.43 if the
conditions prescribed by the Commission in conjunction with the issuance of the Conditional
Use Permit have not been or are no longer being complied with.
IV. WIRELESS COMMUNICATION FACILITIES
The Ordinance #2020-13 on Wireless Communications Facilities (WCF) was adopted by Dover
City Council on November 9, 2020 which established the provisions for such facilities. As
adopted by the Ordinance, a copy of the WCF provisions as found in Zoning Ordinance, Article
5 §23 is attached.
The following are key Code excerpts pertaining to this application for a new Tower-Based
Wireless Communications Facility. It is allowed in IPM zone and subject to a series of criteria
and design standards. This project is considered a “new facility” as it is not a Small-WCF which
is limited to 50 feet in height. The height of the WCF is limited to a maximum of 150 feet and
also has setback (separation) distance from the property lines required to be 110% of the
structure’s height.
Here are some definitions of key terms as found in Article 5 §23.2:
Height of a tower-based WCF. The vertical distance measured from the ground level, including
any base pad, to the highest point on a tower-based WCF, including antennae mounted on the
tower and any other appurtenances.
Stealth technology. Camouflaging or screening methods applied to wireless communications
facilities and accessory equipment which render them more visually appealing or blend the
proposed facility into the existing structure or visual backdrop in a manner appropriate to the
site's context and surrounding environment. Such methods include, but are not limited to,
architecturally screened roof-mounted antennae, building-mounted antennae painted to match
the existing structure and facilities constructed to resemble trees, shrubs, and light poles.
Tower-based wireless communications facility (tower-based WCF). Any structure that is used
for the primary purpose of supporting one or more antennae, including, but not limited to, self -
supporting lattice towers, guy towers and monopoles. This definition excludes any installation
meeting the definition of a small wireless communications facility.
Wireless communications facility (WCF). An antenna facility or a wireless support structure that
is used for the provision of wireless service, whether such service is provided on a stand -alone
basis or commingled with other wireless communications services.
Wireless support structure. A freestanding structure, pole, tower, or other building, whether or
not it has an existing antenna facility, that is used or to be used to support the placement or
installation of a wireless communication facility for the provision of wireless service (w hether on
its own or comingled with other types of services).
21
Page 22
Item 2.
C-24-01 Tower-Based Wireless Communications Facility at 640 Lafferty Lane
DAC Report of May 8, 2024 (Scheduled for Planning Commission Meeting of June 17, 2024)
Page 5 of 12
The application procedures for a new Tower-based WCF are outlined in Zoning Ordinance,
Article 5 §23.5 and require Conditional Use approval from the Planning Commission and then
the WCF Permit process. The Application must demonstrate compliance with the WCF
provisions based on type including information related to equipment, compliance with aviation
safety laws and regulations, property owner authorization, and structural engineering
certification of the structure. The Application also has to demonstrate the following:
Article 5 §23.55(c)
v. An application for a new tower-based WCF shall demonstrate that the proposed tower-based
WCF cannot be accommodated on an existing or approved structure or building. The planning
commission may deny an application to construct a new tower-based WCF if the WCF
applicant has not made a good faith effort to mount the antenna(s) on an existing structure. The
WCF applicant shall address the viability of any existing wireless support structures within a
one quarter (¼) mile radius of the site proposed and demonstrate that such alternative
candidates are inferior with respect to technical feasibility, cost, or terms of use.
For Tower-Based WCFs, there are specific items for the Planning Commission to consider in
the review of the Conditional Use Application; see Article 5 §23.8(a). There are also standards
related to location, uses on the property, development regulations, and design standards; see
code excerpt below.
23.8 Tower-based wireless communication facilities (tower-based WCF). The following
regulations shall apply to all tower-based WCFs as defined by this Section 23 and that do not
meet the definition of a small WCF.
(a) Conditional uses. Tower-based WCF are permitted outside the public rights-of-way in
certain zoning districts upon conditional use approval of the planning commission in
accordance with the procedures and subject to the general conditions set forth in Article
10 Section 1 of this ordinance.
i. In approving the conditional use, the planning commission may take into consideration
the following:
a. The aesthetic impact of the proposed facility, including, but not limited to, whether its
decision upon the subject application will promote the harmonious and orderly
development of the zoning district involved;
b. Encourage compatibility with the character and type of development existing in the
area;
c. Prevent a negative impact on the aesthetic character of the community;
d. Preserve woodlands and trees existing at the site to the greatest possible extent;
and
e. Encourage sound engineering and land development design and construction
principles, practices and techniques.
ii. Additional antennae. As a condition of approval for all tower-based WCF, the WCF
applicant shall provide with a written commitment that it will allow a minimum of two other
service providers the opportunity to collocate antennae on tower-based WCF where
technically feasible.
(b) Location.
i. Tower-based WCF are conditionally permitted to locate in the nonresidential zones.
Nonresidential zones are defined in Article 12—Definitions of this ordinance.
ii. Exception. Tower-based WCF in the IPM3 (Industrial Park Manufacturing Zone—
Industrial Aviation and Aeronautics Center) zoning district are only allowed in support of
aviation, aeronautics, or related operation per Article 3, Section 20B of the ordinance.
22
Page 23
Item 2.
C-24-01 Tower-Based Wireless Communications Facility at 640 Lafferty Lane
DAC Report of May 8, 2024 (Scheduled for Planning Commission Meeting of June 17, 2024)
Page 6 of 12
iii. Tower-based WCF are subject to the application requirements of this Section 23.
iv. Tower-based WCF are subject to compliance with zoning ordinance provisions outlined
in Section 23.52.
v. Historic places. Tower-based WCF may be located within 100 feet of any building or
structure that is listed on the National Register of Historic Places if an approved
architectural review certification is obtained pursuant to Article 10, Section 3 of this
ordinance.
(c) Uses on property.
i. Principal use. A tower-based WCF shall be permitted as a sole principal use on a lot.
ii. Combined with another use. A tower-based WCF may be permitted on a property with an
existing use, or on a vacant parcel in combination with another permitted use.
iii. Existing uses. The existing use on the property may be any permitted use in the
applicable zoning district and need not be affiliated with the WCF.
iv. Ability to use. Where applicable, the WCF owner shall present documentation that the
property owner has granted an easement or other property right for the proposed facility.
(d) Development regulations.
i. Minimum lot area. The minimum lot area shall comply with the requirements for the
applicable zoning district and shall be the area needed to accommodate the tower -based
WCF and guy wires, the equipment building, security fence, and buffer planting.
ii. Height. Tower-based WCFs shall be designed and kept at the minimum functional height.
The maximum total height of a tower-based WCF shall not exceed the 150 feet. No WCF
applicant shall have the right under these regulations to erect a tower to the maximum
height specified in this section unless it proves the necessity for such height.
iii. Minimum setbacks. The minimum distance between the base of a tower-based WCF and
any property line or street right-of-way line shall equal 110 percent of the proposed height
of the tower-based WCF, unless the WCF applicant shows to the satisfaction of the
planning commission that the proposed tower-based WCF has been designed in such a
manner that a lesser setback will have no negative effects on public safety.
(e) Design standards.
i. Multiple antennae. Any proposed tower-based WCF shall be designed structurally to
accommodate both the WCF applicant's antennae and at least two comparable antennae
for future users.
ii. Security. Any tower-based WCF shall be equipped with an anti-climbing device, as
approved by the manufacturer.
iii. Lighting. No tower-based WCF shall be artificially lighted, except as required by law. If
lighting is required, the WCF applicant shall provide a detailed plan for sufficient lighting,
demonstrating as unobtrusive and inoffensive an effect as is permissible under state and
federal regulations.
iv. Surrounding environs. Existing vegetation, trees and shrubs located within proximity to
the tower-based WCF structure shall be preserved to the maximum extent possible.
23
Page 24
Item 2.
C-24-01 Tower-Based Wireless Communications Facility at 640 Lafferty Lane
DAC Report of May 8, 2024 (Scheduled for Planning Commission Meeting of June 17, 2024)
Page 7 of 12
v. Fences. A security fence having a minimum height of six feet and a maximum height of
eight feet shall surround any tower-based WCF, as well as guy wires, equipment compound
or housing WCF equipment.
vi. Screening. A screen of evergreen trees planted eight feet on center, each at least four
feet in height, shall surround the tower-based WCF and security fence. Existing vegetation
shall be preserved to the maximum extent possible and landscaping is not required wher e
landscaping already exists
vii. Accessory equipment. Where feasible, accessory equipment associated, or connected,
with a tower-based WCF shall be placed underground. Any above-ground accessory
equipment associated or connected with a tower-based WCF shall be screened from public
view using stealth technology. All ground-mounted accessory equipment, utility buildings
and accessory structures shall be architecturally designed to blend into the environment in
which they are situated.
viii. Accessory equipment buildings. If accessory equipment is to be located in a separate
building, the building shall comply with the minimum requirements for accessory structures
in the applicable zoning district.
ix. Accessory equipment. Accessory equipment not exceeding 500 square feet in area shall
be permitted for each unrelated company sharing space on the tower -based WCF.
x. Access road. Where necessary, an access road, turnaround space and parking shall be
provided to ensure adequate emergency and service access to tower-based WCF.
Maximum use of existing roads, whether public or private, shall be made to the extent
practicable. Road grades shall closely follow natural contours to assure minimal visual
disturbance and minimize soil erosion.
xi. Visual appearance. Tower-based WCF shall employ stealth technology which may
include painting or finish of the tower portion. All tower-based WCF and accessory
equipment shall be aesthetically and architecturally compatible with the surrounding
environment and shall maximize the use of a like facade to blend with the existing
surroundings and neighboring buildings to the greatest extent possible.
V. PARKING SUMMARY
The parking requirement in the IPM zoning district is one space per 800 S.F. of floor area or one
space per employee of the largest shift. This WCF is an unmanned facility with no building
proposed. The existing mini-storage facility has specific parking requirements that are met by the
parking spaces near the office and with designated parking areas near the storage buildings.
VI. SITE CONSIDERATIONS
The areas immediately surrounding the mini-storage facility are fenced and accessible by a
controlled gate system. The site has an existing access/egress point to Lafferty Lane via a shared
entrance with adjacent properties to the west. Within Phase 3 of the Secure Storage Project, there
is a proposed second access point at the north end of the site from a former road which leads to
Lafferty Lane (east of the S.G. Williams Facility). It appears that the WCF is planning to utilize
this point of access to reach its fenced compound area via an existing paved/gravel drive on the
property.
Dumpster
For non-residential uses, two Dumpsters are required. The mini-storage facility has identified
Dumpster location areas in its plan (S-17-06). For the WCF, the plan noted that no solid waste
24
Page 25
Item 2.
C-24-01 Tower-Based Wireless Communications Facility at 640 Lafferty Lane
DAC Report of May 8, 2024 (Scheduled for Planning Commission Meeting of June 17, 2024)
Page 8 of 12
receptacles (Dumpsters) will be provided. Under the Zoning Ordinance, Article 5 Section 6.3,
the Planning Office accepts this an alternative solution reducing the Dumpster requirement to
zero finding that the WCF is an unmanned facility and would likely use carry-in/carry-out
method during any maintenance visits.
Sidewalk
Sidewalk is required along all street frontages and within the site in accordance with Zoning
Ordinance, Article 5 §18. The plan does not indicate sidewalks along the frontage of Lafferty
Lane. With a previous application that began initial construction of the mini-storage facility, a
waiver request was granted to eliminate the sidewalk requirement finding that the site is remote
and unlikely to be accessed by pedestrians. Given the on-site location of the proposed WCF
facility, sidewalks will not be required.
Curbing
Potential Waiver Request for Partial Elimination of Curbing (for Staff Review)
The Zoning Ordinance, Article 6 §3.6(b) requires upright curbing for all parking areas and access
drives. The parking areas and access drives are required to be curbed (Zoning Ordinance, Article
6 §3.6). The WCF Plan does not appear to identify the use of upright curbing for the short
access drive segment from the existing gavel/paved drive that existing along the east side of the
property. A written waiver request must be submitted for Planning Staff’s consideration to allow
for the partial elimination of curbing in certain areas. With the Site Plan S-17-06, the Planning
Commission approved a waiver to eliminate the portions of the required upright curbing in
designated areas of the parking lot area and to utilize rolled curb along the perimeter area. The
request was related to proposed drainage and stormwater management practices at the site.
VII. TREE PLANTING AND LANDSCAPE PLAN
The tree planting requirement is based on the development area with one (1) tree required per
3000 SF of development area. The mini-storage facility development plan included a Landscape
Plan for the entire property; however, it has not been fully implemented. For this WCF project,
only the compound (2,500 SF) and the access drive to reach it will be considered as the
development area for the tree planting requirements. The total area will need to be provided. The
compound is surrounded by a series of 27 evergreen trees which would satisfy a development
area of 81,000 SF.
VIII. UNMARKED CEMETERY
Included within the area of this property, there is an existing unmarked cemetery. (Delaware
Cultural Resource Survey #K-6397, 7K-D-11) This cemetery was identified during the
evaluation of the impacts of the State Route 1 project and associated road reconstruction process.
A formal report of the findings of the archaeological investigations at this site were compiled in
the report Final Archaeological Investigations of the Lafferty Lane Cemetery 7K-D-11, State
Route 1 Relief Corridor, Dover, Kent County, Delaware. The report reveals the presence of an
unmarked private cemetery approximately one-quarter acre in size containing the remains of at
least 120 individuals. These investigations were conducted in the Fall of 1988. Research shows
that this cemetery was in use from 1760 to 1840. No headstones were found to be in existence,
therefore other archaeological techniques and primary source documents (deeds) were utilized to
analyze the site. In response to the discovery of this cemetery, the original re-alignment of
Lafferty Lane was shifted to avoid the cemetery.
25
Page 26
Item 2.
C-24-01 Tower-Based Wireless Communications Facility at 640 Lafferty Lane
DAC Report of May 8, 2024 (Scheduled for Planning Commission Meeting of June 17, 2024)
Page 9 of 12
The Secure Storage Plan delineates an area of approximately 130 ft. by 140 ft. for the cemetery
with a 30 foot buffer surrounding it. Other records show a thirty (30) foot access easement is
provided from Lafferty Lane to the cemetery location.
The WCF developer should take preventive measures to ensure construction activities do not
disturb this area. Construction activities include site utility and grading work, parking, material
storage, etc. The Plan indicates a fence dividing it from the mini-storage facility. If unmarked
human remains are discovered during the construction process, construction activity in that area
must stop and the process outlined in the Delaware Unmarked Human Remains Law followed.
IX. PERFORMANCE STANDARDS REVIEW –
Uses in the IPM (Industrial Park Manufacturing zone) are subject to the performance standards
summarized in Zoning Ordinance, Article 5 §8.1 and as more specifically outlined in Article 5
§8.5. The project’s compliance with a series of performance standards for the “dangerous and
objectionable elements” are to be considered by the Planning Commission. The overall
requirements for Tower-based WCFs address these elements.
Article 5 §8.1 Dangerous and objectionable elements. No land or building in any zone shall
be used or occupied in any manner so as to cause any one or more of the following
conditions to exist and to be dangerous, injurious, noxious or offensive beyond the
boundaries of such premises in such a manner or in such amount as to adversely affect the
reasonable use of the surrounding area or adjoining premises: Fire, explosive or other
hazard; noise, or vibration; smoke, dust, odor or other form of air pollution; heat, cold,
dampness or electromagnetic disturbance; glare, liquid or solid refuse or waste; traffic
congestion causing roadways or intersections in the surrounding highway network to fall
below acceptable levels of comfort and convenience; or other substance, condition or
element (referred to hereinafter as "dangerous or objectionable elements"), provided that any
use permitted or not expressly prohibited by this ordinance may be undertaken and
maintained if it conforms to the regulations of this section limiting dangerous and
objectionable elements at the point of the determination of their existence.
The project cannot cause the objectionable elements/conditions to exist so that they adversely
affect the surrounding areas or adjoining properties. The specific limits of each performance
standard are described in the Zoning Ordinance. Where the performance standards conflict with
regulations established by other state or local agencies such as the Delaware Department of
Natural Resources and Environmental Control (DNREC), the more restrictive regulations apply.
X. CITY AND STATE CODE REQUIREMENTS:
The subject proposal has been reviewed for code compliance, plan conformity, and completeness
in accordance with the agency’s authority and area of expertise. The following items have been
identified as elements which need to be addressed by the applicant:
1) Review and Approval of the Tower-Based Wireless Communications Facility is subject to
review of the Conditional Use application in accordance with the provisions of the Zoning
Ordinance, Article 5 Section 23.
2) Clarify the existing condition/construction of the access drive (existing drive and access
segment) to the compound. Upright curbing must be provided around all parking areas and
circulation drives unless a waiver is granted by the City Planner. A written waiver request
26
Page 27
Item 2.
C-24-01 Tower-Based Wireless Communications Facility at 640 Lafferty Lane
DAC Report of May 8, 2024 (Scheduled for Planning Commission Meeting of June 17, 2024)
Page 10 of 12
must be submitted for consideration by Planning Staff. The previous Site Plan S-17-06 was
granted relief of the upright curbing in certain areas of the mini-storage facility.
3) Sheet T-1, Title Sheet & Project Information:
a) Site Data Column:
i) Remove AEOZ (Airport Environs Overlay Zone) from the Zoning listing as it is not
subject to the AEOZ zoning district at this time.
ii) List overall height of the wireless support structure including appurtenances (as per
definition of height of Tower-based WCF). List height of monopole and also overall
height with the lightning road.
b) Update title of Delaware (City of Dover) Code Compliance. This location is subject to
the City of Dover, DE regulations not Kent County regulations.
i) Update listing as Building Code is 2009, NFPA 1 2021, and 2021 NFPA 101. The
National Electrical Code may also be a newer version as well.
4) Sheet Z-1, Site Plan:
a) Clarify construction status of the stormwater pond and associated ditch areas as aerial
mapping cannot confirm the presence of these items.
b) Clarify fencing and gates for the northeast access point to the property.
c) Identify the existing/proposed material of the existing access drive leading into the site
that appears to be used for WCF access.
d) Correct the label “existing billboard” as this is not a billboard but is an approved large
format pylon sign for the mini-storage facility.
e) Identify any existing sidewalks serving the property and/or associated permanent
easements for such improvements.
f) Identify the size of the development area (compound and access drive).
g) Bulk Requirements
i) Clarify listing of required maximum building height for WCF. And list the proposed
distances to the property lines from the WCF so to confirm compliance with the
maximum height of 110%.
5) Sheet Z-2. Compound Plan:
a) Identify surface material of 12 foot wide access drive and for area within the compound.
b) These specific species of evergreen tree plantings will need to be identified.
c) This Plan sheet can only be certified by an Architect, Landscape Architect, or Delaware
Certified Nursey Professional. Add Certification note and signature block.
d) Ensure there are no conflicts between utility service line and tree plantings.
e) Update any similar information presented on Sheet Z-3 Elevation.
f) Identify the location and content of the required maintenance information sign for the
WCF.
6) Sheet Z-3. Elevation: Clarify the location of the antenna sector for the known carrier and
provisions of the whip antenna.
7) The Site Plan set will need to be updated with any changes recommended or approvals
including information on any waivers granted by the Planning Commission.
27
Page 28
Item 2.
C-24-01 Tower-Based Wireless Communications Facility at 640 Lafferty Lane
DAC Report of May 8, 2024 (Scheduled for Planning Commission Meeting of June 17, 2024)
Page 11 of 12
8) Any Sediment & Stormwater Management Plans granted approval by the Kent Conservation
District must reflect the Site Plan layout and design conditionally approved by the Planning
Commission and be in compliance with the Zoning Ordinance and technical review
requirements of other agencies.
XI. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET
CODE OBJECTIVES:
In accordance with the Zoning Ordinance, Article 10 §1, the Planning Commission in
considering and acting upon Conditional Use Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the
public in general, and the residents of the immediate neighborhood in particular shall be taken
into consideration. These safeguards may to the maximum extent possible further the expressed
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed
in subsections 1.1 to 1.3. Additionally, as a Wireless Communications Facility (WCF), this
project is subject to the Zoning Ordinance, Article 5 Section 23.
1) Construction of Tower-Based WCF: Planning Staff finds that this proposal for the
Tower-Based WCF is generally in compliance with the WCF regulations found in the
Zoning Ordinance. This location is in a non-residential zone and in an industrial area
with limited visibility of the WCF location due to distance from nearby roadways,
adjacent buildings, and the elevation grades for the State Route 1 roadway. The
compound area includes the required screening and fencing at ground level.
Documentation of FAA review was received. The Wireless Support Structure also
includes the opportunity for three other carriers to collocate.
2) Consideration of Performance Standards Review Application: Planning Staff has deemed
that the Performance Standards Review Application process for uses in the IPM zone will
be satisfied by the Conditional Use review process and provisions for the Tower-Based
WCF. The documentation submitted for the WCF is found to sufficiently demonstrate the
intent to comply with the restrictions as provided in Zoning Ordinance, Article 5 Section
8.1 and 8.2 related to the objectionable elements.
Other agencies may recommend additional considerations to meet code objectives in accordance
with their areas of expertise. Action on all considerations identified in this section is at the
discretion of the Planning Commission.
XII. ADVISORY COMMENTS TO THE APPLICANT:
1) In the event that major changes and revisions to the Conditional Use Site Plan occur in
the finalization of the Plan contact the Planning Office. Examples include reorientation
of the complex/building, relocation of site components like stormwater management
areas, and increases in floor area count. These changes may require resubmittal for
review by the Development Advisory Committee, Planning Commission, or other
agencies and commissions making recommendations in regards to the plan.
2) Following Planning Commission approval of the Conditional Use Site Plan, the Plan
must be revised to meet all conditions of approval from the Development Advisory
Committee or as otherwise noted. A Check Print must be submitted for review by
28
Page 29
Item 2.
C-24-01 Tower-Based Wireless Communications Facility at 640 Lafferty Lane
DAC Report of May 8, 2024 (Scheduled for Planning Commission Meeting of June 17, 2024)
Page 12 of 12
Planning Office Staff and the other commenting agencies. Upon determination that the
Plan is complete and all agency approvals have been received, copies of the Plan may be
submitted for final endorsement (Final Plan Approval).
3) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
4) The project developer should be aware of the adjacent cemetery and take preventive
measures to ensure construction activities do not disturb this area; it is located a distance
away from the WCF project site. Construction activities include site utility and grading
work, parking, material storage, etc. The cemetery area is protected by fencing that
coincides with the known cemetery boundary.
a. If unmarked human remains are discovered during the construction process,
construction activity in that area must stop and the process outlined in the Delaware
Unmarked Human Remains Law followed.
5) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate site inspections, Pre-Construction meeting and permits/licenses
are required.
6) Construction may have an effect on the nearby properties. Any work requiring the
closing or rerouting of visitors to other properties served by this road should be
coordinated as to offer the least amount of inconvenience.
7) The applicant shall be aware that Conditional Site Plan approval does not represent a
Sign Permit, nor does it convey permission to place any sign on the premises. Any
proposed site or building identification sign shall require a Sign Permit from the City of
Dover prior to placement of any such sign. It is recommended that the applicant discuss
the sign regulation requirements with the Planning Staff prior to applying for a Sign
Permit.
8) The applicant shall be aware that Conditional Use Site Plan approval does not represent a
WCF Building Permit and associated construction activity permits. A separate
application process is required for the issuance of a WCF Building Permit from the City
of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
29
Page 30
Item 2.
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MAY 1, 2024
APPLICATION: Tower-Based Wireless Communications Facility at 640
Lafferty Lane (Rise Up Towers, LLC)
FILE #: C-24-01
REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater
CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services
CONTACT PHONE #: 302-736-7025
CONTACT EMAIL #: jlyon@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
SANITATION
1. Every commercial customer shall provide such premises with a sufficient number of solid waste containers to provide adequate
capacity for the solid waste placed out for collection without overloading the capacity of the containers. The City of Dover shall
provide commercial customers with a maximum of two (2), 90-gallon trash containers and two (2), 90-gallong recycling
containers.
2. Trash collection site shall be oriented for side-loading pick-up if customer is utilizing City of Dover sanitation services.
3. Any commercial customer requiring more containers, or larger containers, than provided above, must utilize private service.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from
Kent Conservation District is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert
elevations must be labeled on all stormwater structures.
3. Provide the stormwater management calculations that prove that the runoff created by this impervious area can be adequately
handled by the existing storm sewer system.
STREETS
1. Final site plan approval will not be granted until a copy of the approved entrance plan, signed by DelDOT is submitted to our
office.
2. Please add the following notes to the plans:
a. Standard City of Dover sidewalk, as per chapter 98, article IV of the Dover Code of Ordinances, shall be required to be
installed along the entire public street frontage of a property. Where frontage sidewalk exists but does not meet the
standards of chapter 98, article IV, the sidewalk shall be re-laid to meet the standards. Sidewalk shall include barrier-free
30
Page 31
Item 2.
Tower-Based Wireless Communications Facility at 640 Lafferty Lane
File #: C-24-01
May 1, 2024
Page 2 of 2
access ramping at points of intersection with street crossings and at other locations so as to afford reasonable barrier-free
pedestrian movement and site access.
b. In accordance to Appendix A, Article VI, Section B.3, all sidewalks shall ascend from the curbstone to the building line at the
ratio of one-quarter of an inch to the foot. Nothing in this section shall be construed to affect any pavement previously laid
by order of the city council, until it is taken up and relaid.
WATER / WASTEWATER
1. None
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This must
be included as a note on the plan.
2. No trees may be planted within ten feet (10’) of utility infrastructure.
3. No structure may be installed within ten feet (10’) of utility infrastructure, please depict all underground utilities and structures
on the utility plan sheet to confirm compliance.
4. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2018 (.dwg format).
b. Adobe Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
SANITATION / STORMWATER / STREETS / WATER / WASTEWATER / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
WATER / WASTEWATER
1. None
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be abandoned,
flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan
set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission Checklist,
which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
SANITATION / STORMWATER / STREETS
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE
P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
31
Page 32
Item 2.
CITY OF DOVER ELECTRIC
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MAY 1, 2024
APPLICATION: Tower-Based Wireless Communications Facility at 640
Lafferty Lane
FILE #: C-24-01
REVIEWING AGENCY: City of Dover Electric Department
CONTACT PERSON: Shawn Burgett, Engineering Services & System Operations Superintendent
CONTACT PHONE #: 302-674-7568
CONTACT EMAIL: sburgett@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. Any relocation or upgrade of existing electrical equipment will be engineered by the City of Dover Electric
Department. Developer may be required to perform a quantity of the relocation. Any work performed by the City of
Dover will be at the owner’s expense.
2. Owner is responsible for locating all existing underground facilities to include electric, water and gas.
3. Owner is responsible for site and/or street lighting.
4. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
5. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
6. All Engineering and design for Dover Electric will be engineered upon receipt of final approved plans. All Engineering
work will be furnished by the City’s Electric Engineering Department.
GENERAL
1. Final site plan must be submitted in a digital format compatible with AutoCAD 2010 (.dwg format) and Adobe Reader
(.pdf format), if applicable.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
1. Owner must give the City of Dover Electric Department three (3) months’ notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook
is now available on the website at the following link: https://evogov.s3.amazonaws.com/media/27/media/13108.pdf.
32
Page 33
Item 2.
Tower-Based Wireless Communications Facility at 640 Lafferty Lane
File #: C-24-01
May 1, 2024
Page 2 of 2
ADVISORY COMMENTS TO THE APPLICANT
1. Provide load sheets as soon as possible for proper sizing of transformers and creation of primary fee estimates.
Current load sheets can be found at the following link:
https://www.cityofdover.com/media/Electric%20Department/COD%20Electric%20Load%20Sheet.pdf.
2. Electric service is currently provided by the City.
3. If any upgrade to electric supply needs to be accomplished, customer will be responsible for all costs associated with
the project.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON
AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
33
Page 34
C F
C-24-01 I IItem 2.
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 05/01/24 D S
O H
V A
E L
APPLICATION: Tower Based Wireless Communications Facility at 640 Lafferty Ln
R
FILE #: C-24-01 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
josika@dover.de.us
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposal is a wireless communications facility
2. All access roadways shall be paved and be a minimum of 20 feet clear width for two-way traffic and
14 feet clear width for one-way traffic. The paved width of access roadway shall be measured from
edge of parking spaces, or face of curb for vertical curb and back of curb for mountable curb, or edge
of pavement if there is no curbing.(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5,
5.2)
3. Street width shall be in accordance with City of Dover Code of Ordinances, Appendix A, Article VII,
Section A. 13,
Residential areas
24 feet wide with no parking,
30 feet wide with parking on one side, or
36 feet wide with parking on both sides
Commercial areas
26 feet wide with no parking,
32 feet wide with parking on one side, or
38 feet wide with parking on both sides
Alley
12 feet wide
4. Any dead-end road more than 300 feet in length shall be provided with a turnaround or cul-de-sac as
outlined in the 2021 Delaware State Fire Prevention Regulations 705, chapter 5, 2.3.
5. Gated Areas: Fire Department access shall be provided to the property through the use of a system or
device approved by the Fire Marshal. The system or device required shall be located in an area
34
Page 35
Item 2.
accessible to the fire department and approved by the Fire Marshal. All gates shall be either
automatic or manual.
An automated system shall consist of one manual and one automated means to open the gate. The owner
or their representative shall meet with the Fire Marshal prior to submission to agree on the system. A
letter of agreement shall be created and signed by both parties. The letter shall include a detailed
description of both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their representative shall
meet with the Fire Marshal prior to submission to agree on the means to open. A letter of agreement
shall be created and signed by both parties. The letter shall include a detailed description of the
manual means to open.
To be considered accessible for fire department apparatus the actual clear openings shall be not less than
14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate shall be setback
from the perpendicular street by at least 50 feet.
Please contact this office to discuss options available to comply with this requirement.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)
6. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley, shall
have displayed on that wall, in legible, easily read characters which are of contrasting color to the
background, the proper street number for such house, building, or structure in accordance with the
following:
One-family and two-family residential structures, height, the number shall measure a minimum of four inches in
height, location, the number shall be placed on the house above or to the left or right of the front
entrance, color, the number shall be contrasting to the background color, Arabic numerals, all numbers
shall be Arabic numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when identifying
individual apartments with exterior doors, and 12 inches when identifying buildings with apartment
complexes where there are two or more buildings not assigned street addresses. Individual buildings
with street addresses shall have numbers measuring six inches, location, numbers shall be placed
either in the center of the building or on the street end of the building so as to be visible from either
the public or private street or from the parking lot, color, numbers shall be contrasting to the
background color, Arabic numerals, all numbers used shall be Arabic numerals.
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in height,
location generally, numbers shall be placed either in the center of the building or on the street end of the
building so as to be visible from either the public or private street or from the parking lot,
property line or driveway, should the building be located far enough from a public or private road so that the
numbers are not clearly visible from the street, then the street address shall also be posted on the
property at or near the property line or driveway to said building,
color; each building, numbers shall be contrasting to the background color and shall be placed on each
building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
35
Page 36
Item 2.
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite number
affixed to the front of the tenant space and on the outside of the rear door which corresponds with
that tenant space. Numbers shall measure six inches in height.
(City of Dover Code of Ordinances, 98-344)
7. A lock box (Knox) containing any and all means necessary for fire department access shall be
provided at the following occupancies: any occupancy that contains a fire alarm signaling system that
is monitored off-site, or any occupancy that contains an automatic sprinkler system.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
Secured key systems. When required; exemption. A secured key system shall be required for any new or existing
building where a fire alarm or sprinkler system is being installed. It shall be the responsibility of
the owner or occupant to keep a set of keys in the secured key box that are current to the locks of
the protected occupancy. Buildings with 24-hour staffing or guard service shall be exempt from
this subsection.
Location. The secured key system shall be located as close to the main entrance as possible. Should the
building design not allow the secured key system to be located by the main entrance, the fire
marshal and fire chief shall come to an agreement as to an alternate location for the key box. A
secured key system, once installed, shall not be obstructed from view or obstructed by any means
that would delay the fire department access to the box.
Required keys. Keys to be secured in the key box shall include keys to all points of ingress or egress,
whether on the interior or exterior of the building, and keys to locked mechanical rooms, electrical
rooms, elevator rooms, fire alarm and sprinkler controls and any area protected by automatic fire
detection. Keys to individual residential apartment units are not required.
Ordering responsibility. It shall be the responsibility of the general contractor to order the key box for new
buildings. It shall be the responsibility of the owner or tenant to order the key box for existing
buildings.
Installation before testing. No acceptance test for sprinklers or fire alarms shall be conducted before the
installation of a key box.
(City Code of Ordinances 46-127)
Knox Box to be mounted 6 feet above ground level
8. Project to be completed per approved Site Plan.
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. Please confirm that the drivable surfaces are engineered to hold the weight of fire
equipment, and other emergency response equipment in all types of weather such as the
following:
2. All subgrade emergency access lanes shall be constructed on a level subgrade
compacted to at least 2,000 pounds per square foot. The compacted subgrade shall be
overlaid with three to four inches of compacted crusher run (CR1-2.5″) underneath four
inches of compacted crusher run (CR6-1.5″) to form a compacted subbase. The
36
Page 37
Item 2.
compacted subbase shall be covered with at least four inches of topsoil and shall be
graded and seeded or sodded. (See figure 17.1.)
3. Where emergency services apparatus has to utilize access roadways to reach designated
fire lanes, such access roadways shall be constructed to meet the minimum engineering
specifications and/or requirements pursuant to the Delaware Department of
Transportation or local jurisdictions for paved roadways.
4. Please confirm the width of the drive aisle
5. If the drive aisle dead ends, please ensure a proper turn around is in place as outlined in
item # 4 listed above
6. Knox box required (can discuss current Knox Box or adding one at the gate)
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2021 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
37
Page 38
Item 2.
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
T
===============================================================
APPLICATION: Tower Based Wireless Communication Facility
FILE#: C-24-01 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Will Mobley PHONE#: 302-760-2141
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
No person, firm, corporation or the like shall construct, open, reconstruct, maintain, modify or use any
crossing or entrance onto a state-maintained highway, street or road, including any drainage modifications
leading into or carried by the highway drainage system, without first having complied with standards and
regulations adopted by the Department and having obtained a permit issued by the Department.
Please contact the Delaware Department of Transportation - Development Coordination section to begin
permit process.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
1. The developer will need a pre-submittal meeting to discuss the development with DelDOT.
38
Page 39
KENT CONSERVATION DISTRICT
Item 2.
1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
May 2024
APPLICATION: Rise Up Towers LLC, Tower Based Wireless Communications Facility at 640
Lafferty Lane
FILE #: C-24-01
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: Kate Owens
PHONE: (302) 608 – 5370
EMAIL: stormwater@kentcd.org
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY
AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS
ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
Source: 2019 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. Any changes or revisions to the approved site plan must be reviewed and approved by Kent
Conservation District prior to commencing construction.
2. A proposed project being managed with a regional stormwater facility with a limit of disturbance of less
than 1 acre may qualify for a Standard Plan Application for Non-Residential Construction. A pre-
application meeting will be required to be scheduled with KCD to discuss requirements for plan
approval.
ADVISORY COMMENTS TO THE APPLICANT:
1. Secure Storage Phases 2 & 3 project has an approved Sediment and Stormwater Management Plan
that expires August 11, 2027.
2. Proposed cell tower plans must be shown with the approved Secure Storage Phase 2 & Phase 3 site
plan. Stormwater Pond #3 has not been constructed and should be shown on the cell tower plans as
designed in the approved plans.
39
Page 40
Item 2.
CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
APPLICATION REVIEW COMMENTARY Planning
D.A.C. MEETING DATE: 5/8/2024 Organization
APPLICATION: C-24-01 Tower-Based Wireless Communications Facility at 640 Lafferty Lane
(Rise Up Towers, LLC)
FILE # C-24-01 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030
Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or
eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The
MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be
waived.
City of Dover Planning Commission
Conditional Use Site Plan Application Review
C-24-01 Tower-Based Wireless Communications Facility at 640 Lafferty Lane (Rise Up
Towers, LLC)
1) The MPO does not have any objections to the proposed conditional use site plan. The site is
unlikely to attract a great deal of traffic, which means transportation safety concerns will be
minimal.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
40
Page 50
THIS DRAWING IS PROPERTY OF EDGE FIBER & WIRELESS DEVELOPMENT. IT IS FOR THE EXCLUSIVE USE OF THIS PROJECT.
STRUCTURAL NOTE: Item 2.
EDGE FIBER & WIRELESS DEVELOPMENT IS NOT RESPONSIBLE FOR DESIGN OR
STRUCTURAL CERTIFICATION OF NEW ANTENNA MOUNTS REQUIRED FOR THE
INSTALLATION OF THE PROPOSED EQUIPMENT ASSOCIATED WITH THIS PROJECT.
PLEASE REFER TO THE STRUCTURAL ANALYSIS COMPLETED BY OTHERS FOR ALL
STRUCTURAL INFORMATION RELATED TO THE ANTENNA MOUNTS.
244 W SKIPPACK PIKE
AMBLER, PENNSYLVANIA 19002
Fiber & Wireless Development
Know what's below.
ANY RE-USE OF THIS DRAWING WITHOUT THE EXPRESSED WRITTEN CONSENT OF EDGE FIBER & WIRELESS DEVELOPMENT IS PROHIBITED.
343B South Potomac Street
Call before you dig. Waynesboro, Pennsylvania 17268
PROTECT YOURSELF, GIVE THREE
WORKING DAYS NOTICE
Phone: (717) 219-7501
THIS DRAWING DOES NOT INCLUDE NECESSARY
COMPONENTS FOR CONSTRUCTION SAFETY. ALL
CONSTRUCTION MUST BE DONE IN COMPLIANCE
WITH THE OCCUPATIONAL SAFETY AND HEALTH
ACT OF 1970 AND ALL RULES AND REGULATIONS
THERE TO APPURTENANT.
PLAN REVISIONS:
SITE INFORMATION: SITE NAME: NOTE TO GENERAL CONTRACTOR:
REV PER CLIENT
NO WORK IS TO BE PERFORMED ON THIS SITE WITHOUT REVIEW OF THE APPROVED 4 03/01/24 MTG
SITE NAME: DOVER DE - DE-001
DOVER DE - DE-001
COMMENTS
STRUCTURAL ANALYSIS. IF ANY DISCREPANCIES ARE FOUND THE GENERAL
REV PER CLIENT
CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING. AT NO TIME WILL ANY 3 02/09/24 MTG
SITE ADDRESS: 640 LAFFERTY LANE COMMENTS
CITY OF DOVER, DELAWARE 19901 ADDITIONAL ANTENNAS BE INSTALLED WITHOUT WRITTEN CONSENT FROM THE
REV PER CLIENT
TOWER ENGINEER. 2 02/05/24 MTG
COMMENTS
JURISDICTION: CITY OF DOVER SHEET INDEX: REV PER OWNER
KENT COUNTY, DELAWARE 1 02/03/24 MTG
ZONING: IPM (INDUSTRIAL PARK)
SITE ADDRESS: DRAWING SHEET: DRAWING TITLE:
0 02/01/24 MTG
COMMENTS
REV PER OWNER
COMMENTS
T-1 TITLE SHEET
AEOZ (AIRPORT ENVIRONS OVERLAY ZONE)
PARCEL ID: ED-05-077.00-01-25.00-00001
640 LAFFERTY LANE, CITY OF DOVER, DELAWARE, 19901 Z-1 SITE PLAN
A 01/24/24 MTG
ISSUED FOR 90%
REVIEW (ZDs)
REV
DATE DESIGNER DESCRIPTION
PARCEL SIZE: 18.68 ACRES Z-2 COMPOUND PLAN No
VICINITY MAP: LOCATION MAP: EDGE DESIGN INFO:
SITE COORDINATES: N 39°08'42.02" (39.145006) (NAD83) Z-3 ELEVATION
W 75°29'43.82" (-75.495506) (NAD83) DESIGNER: EDGE JOB No:
MTG RUT-003
GROUND ELEVATION: 25.00'± (NAVD 88)
DRAWING TITLE:
STRUCTURE TYPE: MONOPOLE SITE
TITLE SHEET & PROJECT
STRUCTURE HEIGHT: 124'-0"± AGL (TOP OF MONOPOLE)
INFORMATION
TOWER OWNER NAME: RISEUP TOWERS
DRAWING SHEET:
TOWER OWNER ADDRESS: 244 W SKIPPACK PIKE
SITE
T-1
AMBLER, PENNSYLVANIA 19002
GROUND OWNER NAME: SECURE STORAGE, LLC
GROUND OWNER ADDRESS: 640 LAFFERTY LANE SITE INFORMATION:
CITY OF DOVER, DELAWARE 19901 SITE NAME:
APPLICANT: RISEUP TOWERS DOVER DE - DE-001
244 W SKIPPACK PIKE SITE ADDRESS:
AMBLER, PENNSYLVANIA 19002
640 LAFFERTY LANE
CITY OF DOVER, DE 19901
JURISDICTION:
KENT COUNTY,
DELAWARE
ABBREVIATIONS: SHEET NUMBER:
ATS AUTOMATIC TRANSFER SWITCH MAX MAXIMUM 1 OF 4
AWG AMERICAN WIRE GAUGE MGB MASTER GROUND BAR PLAN APPROVALS:
ATTN ATTENTION MIN MINIMUM
THE FOLLOWING PARTIES HEREBY APPROVE AND ACCEPT THESE DOCUMENTS AND
BTS BASE TRANSMISSION SYSTEM MTS MANUAL TRANSFER SWITCH
AUTHORIZE THE CONTRACTOR TO PROCEED WITH THE CONSTRUCTION DESCRIBED
CONT CONTINUED NEC NATIONAL ELECTRICAL CODE
HEREIN. ALL DOCUMENTS ARE SUBJECT TO REVIEW BY THE LOCAL BUILDING
CU COPPER POB POINT OF BEGINNING
DEPARTMENT AND MAY IMPOSE CHANGES OR MODIFICATIONS.
DWG DRAWING POC POINT OF CONNECTION N N
EMT ELECTRICAL METALLIC TUBING POT POINT OF TERMINATION
GEN GENERATOR PPC POWER PROTECTION CABINET
K F K F R.F. ENGINEER: DATE:
GRD GROUND PVC POLYMERIZING VINYL CHLORIDE
IBC INTERNATIONAL BUILDING CODE RGS RIGID GALVANIZED STEEL
IFC INTERNATIONAL FIRE CODE RF RADIO FREQUENCY ZONING MGR: DATE:
LOD LIMIT OF DISTURBANCE TYP TYPICAL
DELAWARE (KENT CO) CODE COMPLIANCE: DRIVING DIRECTIONS: PROJECT DESCRIPTION: S.A. MGR: DATE:
ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN HEADING FROM BALTIMORE/WASHINGTON INTERNATIONAL AIRPORT: HEAD SOUTHEAST ON FRIENDSHIP RD. USE 1. PROPOSED 50'-0"x50'-0" FENCED COMMUNICATIONS COMPOUND TO BE INSTALLED WITHIN 50'-0"x50'-0" LEASE
ACCORDANCE WITH THE CURRENT EDITIONS OF THE FOLLOWING CODES AS THE 2ND FROM THE LEFT LANE TO CONTINUE ON SERVICE RD LOWER LEVEL. CONTINUE STRAIGHT TO STAY ON AREA.
ADOPTED BY THE LOCAL GOVERNING AUTHORITIES. NOTHING IN THESE PLANS IS SERVICE ROAD LOWER LEVEL. MERGE ONTO BWI ARRIVALS. KEEP RIGHT TO CONTINUE ON ELM RD. TURN RIGHT CONSTRUCTION MGR: DATE:
TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THE LATEST EDITIONS ONTO TERMINAL RD. TURN RIGHT ONTO MD-170 NORTH. CONTINUE ONTO MD-162 EAST. USE THE MIDDLE LANE TO 2. PROPOSED 124'-0" MONOPOLE WITH 5'-0" LIGHTNING ROD AND ANTI-CLIMBING DEVICE TO BE INSTALLED
OF THE FOLLOWING CODES: TURN LEFT ONTO CROMWELL PARK DR. USE THE RIGHT LANE TO TURN SLIGHTLY RIGHT TO STAY ON CROMWELL WITHIN FENCED COMPOUND.
BUILDING CODE: INTERNATIONAL BUILDING CODE 2012
PARK DR. MERGE ONTO I-97 SOUTH. USE THE RIGHT 2 LANES TO TAKE EXIT 10A FOR BENFIELD BLVD EAST TOWARD
VETERANS HIGHWAY. MERGE ONTO BENFIELD BVLD. TURN ONTO EVERGREEN RD. TURN RIGHT ONTO BALTIMORE
ANNAPOLIS BLVD. TURN LEFT TOWARD MD-2 SOUTH. TURN RIGHT ONTO MD-2 SOUTH. USE THE LEFT LANE TO
3. NEW ELECTRICAL SERVICE TO BE INSTALLED TO COMMUNICATIONS COMPOUND.
A&E MGR: DATE:
3/6/2024
MERGE ONTO US-301 NORTH. CONTINUE STRAIGHT ON US-301 NORTH. TAKE THE MD-304 EXIT TOWARD 4. NEW TELCO SERVICE TO BE INSTALLED TO COMMUNICATIONS COMPOUND. PROPERTY OWNER: DATE:
ELECTRICAL CODE: NATIONAL ELECTRICAL CODE 2014 CENTERVILLE. AT THE TRAFFIC CIRCLE, TAKE THE 1ST EXIT ONTO MD-304 EAST. TURN LEFT ONTO MD-312 NORTH.
TURN RIGHT ONTO MD-313 SOUTH. CONTINUE ONTO MD-287 EAST. CONTINUE ONTO DE-10 EAST. AT THE TRAFFIC
FIRE SAFETY CODE: NFPA 1 2009, 2012 NFPA 101 CIRCLE, TAKE THE 2ND EXIT AND STAY ON DE-10 EAST. TURN RIGHT ONTO E CAMDEN WYOMING AVE. CONTINUE
ONTO W LEBANON RD. TURN LEFT ONTO S BAY RD. TURN RIGHT ONTO LAFFERTY LN. THEN TURN LEFT INTO SECURE
DRAWING SCALE NOTES:
USE GROUP: U (UTILITY) STORAGE AND THE SITE WILL BE AT THE BACK. THESE DRAWINGS ARE FORMATTED TO BE FULL SIZE AT 22"x34". CONTRACTOR SHALL
VERIFY ALL PLANS & EXISTING DIMENSIONS & CONDITIONS ON THE JOB SITE & SHALL BRETT JOSEPH MAGARAM, PE
CONSTRUCTION TYPE: IIB IMMEDIATELY NOTIFY THE ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE DELAWARE PROFESSIONAL ENGINEER
PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME. LICENSE # 22861
50
Page 51
THIS DRAWING IS PROPERTY OF EDGE FIBER & WIRELESS DEVELOPMENT. IT IS FOR THE EXCLUSIVE USE OF THIS PROJECT.
GENERAL NOTES: Item 2.
P
EO
1. THIS PLAN WAS PREPARED USING AN APPROVED PLAN ENTITLED "REVISED
EXISTING FIRE
N 11°58'56" E EO
P
EO
P
HYDRANT N SITE PLAN PHASE 2 & 3" BY BECKER MORGAN GROUP, DATED 02/02/2017.
19.16' (500'± FROM NEW
2. THE PROPOSED FACILITY WILL CAUSE "DE MINIMUS" INCREASE IN
1 EO
P
P
EO
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
FENCED COMPOUND) EOP
K STORMWATER RUNOFF. THEREFORE, NO DRAINAGE STRUCTURES ARE
PROPOSED.
RO
UT
ER/
W P
EO
P
EO
N 57°35'23" E EOP EOP EOP EOP
P
EO
EOP EOP EOP EOP
F
)
E 3. NO NOISE, SMOKE, DUST, OR ODOR WILL RESULT FROM THIS FACILITY.
ST (V
AR
IA
EO
P 76.44 EOP
AT BL
EOP
EOP
E P
EO
4. THE FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION. (THERE IS NO
EXISTING STORM
EOP
P
EO
HANDICAP ACCESS REQUIRED.)
WATER POND EO
P
EXISTING 244 W SKIPPACK PIKE
P
EO
BUILDING 5. THE FACILITY IS UNMANNED AND DOES NOT REQUIRE POTABLE WATER OR AMBLER, PENNSYLVANIA 19002
EXISTING BILLBOARD 2' SANITARY SERVICE.
.1
S 31°11'49" E
P
7
277'-6
EO
80
"
P
EO
P EXISTING PROPOSED RISEUP TOWERS 50'-0"x50'-0" 6. ELEVATIONS REFER TO THE NORTH AMERICAN VERTICAL DATUM OF 1988
EO
EXISTING DITCH P
BUILDING FENCED COMPOUND WITHIN NEW (NAVD 1988).
EO
P
50'-0"x50'-0" LEASE AREA
EO
(SEE SHEET Z-2 FOR MORE DETAIL) 7. THE PROPOSED DEVELOPMENT DOES NOT INCLUDE STREET SIGNS OF ANY
P 136'-6" EOP
EO
TYPE.
P
EO EOP
15
P
EO 2'-0 X
EOP EOP EOP
8. THE PROPOSED DEVELOPMENT DOES NOT INCLUDE OUTDOOR STORAGE OR
" X
EO
P X
153'-2" EOP
ANY SOLID WASTE RECEPTACLES.
EOP
P
EO
X
9. ACCORDING TO THE F.I.R.M. COMMUNITY PANEL # 10001C0188J, DATED
EOP
EO
P
X X
P
EO
EXISTING ACCESS EOP
07/07/2014, THE PROPOSED SITE IS NOT IN A FLOODPLAIN.
EOP
EO EOP
EOP
EOP
EOP
EOP
EOP
EOP
PEO ROAD EOP
P
EOP
PROPOSED 12'-0" WIDE ACCESS EOP
EO
P
EOP
EOP BULK REQUIREMENTS:
208'-2"
EO
P
EO
P
DRIVE W/ PARKING SPACE/TURNAROUND
EOP
P
P
EO
EOP
FROM NEW COMPOUND TO EOP ZONING DISTRICT: IPM: INDUSTRIAL PARK MANUFACTURING Fiber & Wireless Development
EO
EO
EXISTING PARKING LOT EOP
ANY RE-USE OF THIS DRAWING WITHOUT THE EXPRESSED WRITTEN CONSENT OF EDGE FIBER & WIRELESS DEVELOPMENT IS PROHIBITED.
P
EOP
EO
P
P
EO
EOP
EOP
343B South Potomac Street
EO
P
PROPOSED 124'-0" MONOPOLE
P
EO EOP
EOP DESCRIPTION: REQUIRED: EXISTING: PROPOSED: Waynesboro, Pennsylvania 17268
EO
P
W/ 5'-0" LIGHTNING ROD EOP
P
EO
P EXISTING DITCH
EOP LAT = N 39°08'42.02" EOP
Phone: (717) 219-7501
MIN. LOT AREA: 2.50 AC 18.68 AC 18.68 AC
EO
40' B.R.L.
EOP
P
LONG = W 75°29'43.82"
EO
P EO EOP
EOP
MIN. LOT WIDTH: 200 FT 453.68 FT 453.68 FT
EO P
GROUND ELEV. = 25.0± EOP
MAX. BUILDING COVERAGE: 100% 38% 39%
P EOP
(SEE SHEET Z-3 FOR MORE DETAIL) EOP
EO
EO P EOP
EOP
P P
MIN. FRONT YARD: 60 FT 60 FT 60 FT
EO
EO
EOP
EOP
EOP
MIN. SIDE YARD: 40 FT 40 FT 40 FT
EO
P
EOP
PLAN REVISIONS:
EO
P
MIN. REAR YARD: 40 FT 40 FT 40 FT
EO
P
PROPOSED EOP
EOP
= TO DISTANCE ±40 FT 129 FT
EOP
EO
P
STORAGE EOP
MAX. BUILDING HEIGHT:
PROPOSED
EO EOP P
EO
P EO
BUILDING TO NEAREST
P
EOP
STORAGE
P
EOP
EO EO
P
EO .L . REV PER CLIENT
BUILDING LOT LINE
EOP
P
.R EOP 4 03/01/24 MTG
P 'B EOP
EOP
EOP COMMENTS
EO
MAX. BUILDING HEIGHT: 142 FT ±40 FT 136.6 FT
P P
EO EO
60
REV PER CLIENT
EXISTING
P
EO
(110%) 3 02/09/24 MTG
P
EO
EOP
COMMENTS
STORAGE
P EOP
EO
EXISTING 6'-0" HIGH
P
EO
BUILDING
P EOP
EOP REV PER CLIENT
EO EO
P
CHAIN LINK FENCE EOP 2 02/05/24 MTG
COMMENTS
P
EO
EOP
P
EO
TY LANE
EOP
EOP REV PER OWNER
1 02/03/24 MTG
P
EO EOP
P EOP
EOP
COMMENTS
FUTURE FIRE
EO
P
EO EOP
EOP EOP
R/W) REV PER OWNER
PROPOSED HYDRANT
EO
EXISTING
0 02/01/24 MTG
P
EOP
EO
EOP
P
(100'-0"
COMMENTS
"E
EXISTING
STORAGE
LAFFER
EOP
EXISTING (370'± FROM NEW
P
EOP EOP
P EO
21
EO
' STORAGE BUILDING EOP
EOP
ISSUED FOR 90%
8 FENCED COMPOUND)
P
EO
EOP
P
A 01/24/24 MTG
ILDING
°4
EO
EOP EOP
BUILDING REVIEW (ZDs)
4
STORAGE BU
ILDING
EOP
P
1
EO
EOP
STORAGE BU
EOP
P
EO
N EO
P
EXISTING EOP EOP
EOP
EOP
REV
DATE DESIGNER DESCRIPTION
STORAGE
EO
P
EO
P EOP No
EOP EOP
EXISTING BUILDING
EO
EOP EOP
P P
EO
EO
P
EO
P
STORAGE EOP
EOP
EDGE DESIGN INFO:
EOP
BUILDING
989.95'
EXISTING FIRE EO
P
EOP
N 21°
EO
P DESIGNER: EDGE JOB No:
HYDRANT
EOP
EO EOP
EO
P EO
P
P
MTG RUT-003
35'53" W
EOP
EOP EOP
EOP
EXISTING
EO
EXISTING
DRAWING TITLE:
P
EOP EOP
EXISTING
EXISTING
EOP
EOP EOP
EXISTING
EOP
EO
EXISTING EOP
'
233.63
P
EOP
ILDING
STORAGE EOP
ILDING
EOP EOP
ILDING
0'12" E
STORAGE BU
BUILDING
STORAGE BU
SITE PLAN
ILDING
N 48°5
EOP EOP
ILDING
STORAGE BU
EOP
STORAGE BU
P
EO EOP
EOP EOP
STORAGE BU
EOP EOP
EOP
EOP
EOP EOP
.L.
S 21°36'5
40' B.R
P
EO
EOP EO
P
EXISTING
EOP
EOP
DRAWING SHEET:
3" E
EOP
40' B.R.L.
EOP EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
CEMETERY EOP
EOP
EO EOP
EOP
Z-1
EOP
N 35°59'18"
EOP
154.10'
P
EOP EOP
EOP
681.81'
EOP
EOP
EOP
EOP EOP
40' B.R.L
EOP
EOP
EO EOP EOP
P EOP
EOP
EOP
EOP
EOP
EOP
.
EOP
97.78'
EOP
N 55°32'15" W
EOP
EOP
EOP
SITE INFORMATION:
EOP
EOP
EOP
"E
EOP
W
S 34°27'45
EOP EOP EOP
EOP
EOP EOP
EOP
SITE NAME:
EOP
EOP
DOVER DE - DE-001
N 38°49'2
EOP
EOP EOP
EOP
EOP
.L.
EOP
SITE ADDRESS:
. 113
EOP
EXISTING
40' B.R
EOP
EOP
EXISTING
EOP
EOP
" R/W)
EOP
EOP
640 LAFFERTY LANE
EO
US RT
P EOP
6" W
ILDING
(200'-0
EOP
EOP
ILDING
E
EOP
EOP
CITY OF DOVER, DE 19901
P
STORAGE BU
EO P
EO
STORAGE BU
EOP
.L.
EOP EOP
EOP .R P
EO
P
60 EO
RADIUS: 500.01'
534.60'
EOP
EOP 'B JURISDICTION:
EOP
EO
P
ARC LENGTH: 470.89'
EOP
EOP EOP
EO
P
EO
P
CHD. BRG: S 5°21'59" W KENT COUNTY,
EOP
EXISTING 60'-0" HIGH EOP
EO
P
EO
P CHD. LENGTH: 453.68' DELAWARE
EOP
60' B.R.L
EOP
EO
.
40' B.R.L.
"SECURE STORAGE" SIGN P
EOP
60' B.R.L
P
EOP EO EO
P
EOP
EOP
EOP
P
EO
EOP
SHEET NUMBER:
EOP
EO
P
EOP
.
EOP
EO
P
EOP
2 OF 4
S 68°23'07" W EOP
EO
P
346.86'
P
EO
EOP
65.00'
N 21°36
P
EO
EOP
EXISTING P
'53" W
EOP EO P
EO
EOP
BUILDING EOP EO
P
P
EO
484.00'
P
167.00'
EOP EO
EOP
P
EO
EOP P
EO
P EO EOP P
EO
EOP P
EO
EOP EOP
P
P EO
EO
EOP
P
EO
EOP
EOP
EOP
60' B.R.L. EOP EO
P
EOP EOP P
EOP
EOP EO
EXISTING FIRE
EOP EOP
EOP
P
EOP EO
EOP
EOP
EOP
HYDRANT EOP P
EOP EO
EOP
EOP
EOP
EOP
EOP EOP
EOP
EOP
EOP EOP
EOP
EOP
EO EOP EOP
EO EOP
P EOP
EOP
S 63°14'42" E
EOP
S 55°32'15" W
P EOP EOP
EOP EOP EOP
EOP EOP
EOP EOP
EOP
NE
LAFFERTY LA
EOP
34.99' P EOP
178.42'
EO EOP
EOP
EOP EOP
EOP
EOP
EOP EOP
EOP EOP
(100'-0" R/W)
EOP EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
P
EO
EOP
EOP EOP
EOP EOP
EOP
EOP
EOP P
EOP
EOP EO
EOP
EOP EOP
P
EO
EOP
EOP
EO
P
3/6/2024
EOP
EOP
SITE PLAN Know what's below.
1
Z-1 SCALE: 1" = 100'-0" Call before you dig.
PROTECT YOURSELF, GIVE THREE
WORKING DAYS NOTICE
100' 0' 50' 100' 200'
THIS DRAWING DOES NOT INCLUDE NECESSARY
22"x34" 1 INCH = 100 FEET COMPONENTS FOR CONSTRUCTION SAFETY. ALL
11"x17" 1 INCH = 200 FEET
CONSTRUCTION MUST BE DONE IN COMPLIANCE BRETT JOSEPH MAGARAM, PE
WITH THE OCCUPATIONAL SAFETY AND HEALTH
DELAWARE PROFESSIONAL ENGINEER
200' 0' 100' 200' 400' ACT OF 1970 AND ALL RULES AND REGULATIONS
THERE TO APPURTENANT. LICENSE # 22861
51
Page 52
THIS DRAWING IS PROPERTY OF EDGE FIBER & WIRELESS DEVELOPMENT. IT IS FOR THE EXCLUSIVE USE OF THIS PROJECT.
GENERAL NOTES: Item 2.
1. THE CONTRACTOR SHALL COMPLY WUTH ALL APPLICABLE CODES,
N ORDINANCES, LAWS AND REGULATIONS OF ALL MUNICIPALITIES, UTILITY
COMPANIES OR OTHER PUBLIC AUTHORITIES.
K 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND
50'-0" (FENCED / LEASE AREA) INSPECTIONS THAT MAY BE REQUIRED BY ANY FEDERAL, STATE, COUNTY OR
F MUNICIPAL AUTHORITIES.
CL
25'-0" 3'-6"
3. THE CONTRACTOR SHALL NOTIFY THE CONSTRUCTION MANAGER, IN WRITING,
OF ANY CONFLICTS, ERRORS OR OMISSIONS PRIOR TO THE SUBMISSION OF
BIDS OR PERFORMANCE OF WORK. MINOR OMISSIONS OR ERRORS IN THE BID
DOCUMENTS SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR
244 W SKIPPACK PIKE
THE OVERALL INTENT OF THESE DRAWINGS. AMBLER, PENNSYLVANIA 19002
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING
SITE IMPROVEMENTS PRIOR TO COMMENCING CONSTRUCTION. THE
CONTRACTOR SHALL REPAIR ANY DAMAGE CAUSED AS A RESULT OF
CONSTRUCTION OF THIS FACILITY.
5. THE SCOPE OF WORK FOR THIS PROJECT SHALL INCLUDE PROVIDING ALL
MATERIALS, EQUIPMENT AND LABOR REQUIRED TO COMPLETE THIS PROJECT.
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE
X
X MANUFACTURER'S RECOMMENDATIONS.
3'-0"
X
X
X
6. THE CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO SUBMITTING A BID
X
TO VERIFY THAT THE PROJECT CAN BE CONSTRUCTED IN ACCORDANCE WITH
X
X
THE CONTRACT DOCUMENTS.
X
X
X 7. THIS PLAN WAS PREPARED USING AN APPROVED PLAN ENTITLED "REVISED
X
SITE PLAN PHASE 2 & 3" BY BECKER MORGAN GROUP, DATED 02/02/2017. Fiber & Wireless Development
X
X
ANY RE-USE OF THIS DRAWING WITHOUT THE EXPRESSED WRITTEN CONSENT OF EDGE FIBER & WIRELESS DEVELOPMENT IS PROHIBITED.
X
X
8. THE PROPOSED FACILITY WILL CAUSE ONLY A "DE MINIMIS" INCREASE IN 343B South Potomac Street
X
X STORWATER RUNOFF. THEREFORE, NO DRAINAGE STRUCTURES ARE Waynesboro, Pennsylvania 17268
PROPOSED.
X
X
Phone: (717) 219-7501
FUTURE
X
X LEASE AREA 9. NO NOISE, SMOKE, DUST OR ODOR WILL RESULT FROM THIS FACILITY.
X
X
PROPOSED 4-GANG METER X 10. THE FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION (THERE IS NO
X
CENTER ON NEW 6'-0" HANDICAP ACCESS REQUIRED).
ELECTRICAL BACKBOARD
X
PLAN REVISIONS:
25'-0"
X
X
X 11. THE FACILITY IS UNMANNED AND DOES NOT REQUIRE POTABLE WATER OR
X
X SANITARY SERVICE.
REV PER CLIENT
X 4 03/01/24 MTG
X COMMENTS
X
12. POWER TO THE FACILITY WILL E MONITORED BY A SEPARATE METER.
X REV PER CLIENT
3 02/09/24 MTG
COMMENTS
X
X
13. CONTRACTOR SHALL VERIFY ANTENNA ELEVATION AND AZIMUTH WITH RF
X ENGINEER PRIOR TO INSTALLATION. REV PER CLIENT
X 2 02/05/24 MTG
FUTURE PROPOSED 12'-0" WIDE COMMENTS
X
X
LEASE AREA ACCESS GATE 14. MOUNTS AND ANTENNAS ARE DESIGNED TO MEET ANSI/TIA-222-G-1 AS PER IBC REV PER OWNER
1 02/03/24 MTG
X COMMENTS
X
2019 REQUIREMENTS.
X REV PER OWNER
X
0 02/01/24 MTG
X COMMENTS
X
15. ALL STRUCTURAL ELEMENTS SHALL BE HOT DIPPED GALVANIZED STEEL.
X
ISSUED FOR 90%
50'-0" (FENCED / LEASE AREA)
X A 01/24/24 MTG
X
16. CONTRACTOR SHALL MAKE A UTILITY "ONE CALL" TO LOCATE ALL UTILITIES REVIEW (ZDs)
X
PROPOSED 12'-0" WIDE
X
X PRIOR TO EXCAVATING.
REV
DATE DESIGNER DESCRIPTION
X X No
X
17. IF ANY PIPING EXISTS BENEATH THE SITE AREA, CONTRACTOR MUST LOCATE IT
AND CONTACT OWNERS REPRESENTATIVE. EDGE DESIGN INFO:
X
CL DESIGNER: EDGE JOB No:
X 18. CONSTRUCTION TO COMMENCE UPON COMPLETION OF A PASSING
ACCESS DRIVE
STRUCTURAL ANALYSIS. STRUCTURAL ANALYSIS TO BE PREFORMED BY MTG RUT-003
X
OTHERS.
X X DRAWING TITLE:
X
X
X
19. CONSTRUCTION TO COMMENCE UPON COMPLETION OF A PASSING MOUNT
ANALYSIS. MOUNT ANALYSIS TO BE PREFORMED BY OTHERS.
X
X
X
COMPOUND PLAN
X
PROPOSED EVERGREEN TREE X
X (TYPICAL OF 27) X
X (4'-0" MINIMUM AT TIME PROPOSED 124'-0" MONOPOLE DRAWING SHEET:
X
OF PLANTING) W/ 5'-0" LIGHTNING ROD
Z-2
X
X
(ANTI-CLIMBING DEVICE TO BE INSTALLED)
X
(SEE SHEET Z-3 FOR MORE DETAIL) X
X
X
X
X
SITE INFORMATION:
X
X
SITE NAME:
X
X
X
DOVER DE - DE-001
X
X
X
SITE ADDRESS:
X
X
640 LAFFERTY LANE
19'-0"
X
X FUTURE FUTURE
X
CITY OF DOVER, DE 19901
X
X
LEASE AREA LEASE AREA
X
JURISDICTION:
X
X
KENT COUNTY,
X
X
DELAWARE
X
X
X PROPOSED 6'-0" HIGH X
X
CHAIN LINK FENCE SHEET NUMBER:
3 OF 4
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
5'-0"
8'-0" (TYP) 12'-0"
1 CL CL CL
Z-3
3/6/2024
1 COMPOUND PLAN Know what's below.
Z-2 SCALE: 1/4" = 1'-0"
Call before you dig.
PROTECT YOURSELF, GIVE THREE
WORKING DAYS NOTICE
4' 0' 4' 8' 16'
THIS DRAWING DOES NOT INCLUDE NECESSARY
22"x34" 1/4 INCH = 1 FOOT COMPONENTS FOR CONSTRUCTION SAFETY. ALL
11"x17" 1/2 INCH = 1 FOOT
CONSTRUCTION MUST BE DONE IN COMPLIANCE BRETT JOSEPH MAGARAM, PE
WITH THE OCCUPATIONAL SAFETY AND HEALTH
DELAWARE PROFESSIONAL ENGINEER
8' 0' 8' 16' 32' ACT OF 1970 AND ALL RULES AND REGULATIONS
THERE TO APPURTENANT. LICENSE # 22861
52
Page 53
THIS DRAWING IS PROPERTY OF EDGE FIBER & WIRELESS DEVELOPMENT. IT IS FOR THE EXCLUSIVE USE OF THIS PROJECT.
Item 2.
PROPOSED 5'-0"
244 W SKIPPACK PIKE
LIGHTNING ROD AMBLER, PENNSYLVANIA 19002
TOP OF LIGHTNING ROD
129'-0"± AGL
TOP OF MONOPOLE
124'-0"± AGL
FUTURE CARRIER RAD CENTER
124'-0"± AGL
FUTURE CARRIER RAD CENTER
FUTURE CARRIER 114'-0"± AGL
ANTENNAS (TYP)
FUTURE CARRIER RAD CENTER Fiber & Wireless Development
104'-0"± AGL
ANY RE-USE OF THIS DRAWING WITHOUT THE EXPRESSED WRITTEN CONSENT OF EDGE FIBER & WIRELESS DEVELOPMENT IS PROHIBITED.
343B South Potomac Street
Waynesboro, Pennsylvania 17268
Phone: (717) 219-7501
FUTURE CARRIER RAD CENTER
94'-0"± AGL
PROPOSED WIP
PLAN REVISIONS:
ANTENNA
REV PER CLIENT
4 03/01/24 MTG
COMMENTS
PROPOSED WIP MOUNT
80'-0"± AGL REV PER CLIENT
3 02/09/24 MTG
129'-0" (OVERALL STRUCTURE HEIGHT)
COMMENTS
REV PER CLIENT
2 02/05/24 MTG
COMMENTS
REV PER OWNER
1 02/03/24 MTG
COMMENTS
REV PER OWNER
0 02/01/24 MTG
PROPOSED 124'-0" COMMENTS
MONOPOLE ISSUED FOR 90%
A 01/24/24 MTG
(ANTI-CLIMBING DEVICE REVIEW (ZDs)
124'-0"
TO BE INSTALLED)
REV
124'-0"
DATE DESIGNER DESCRIPTION
No
114'-0"
EDGE DESIGN INFO:
DESIGNER: EDGE JOB No:
104'-0"
MTG RUT-003
DRAWING TITLE:
94'-0"
ELEVATION
80'-0" DRAWING SHEET:
Z-3
SITE INFORMATION:
SITE NAME:
PROPOSED EVERGREEN TREE DOVER DE - DE-001
(TYPICAL OF 27) SITE ADDRESS:
(4'-0" MINIMUM AT TIME
OF PLANTING) 640 LAFFERTY LANE
CITY OF DOVER, DE 19901
PROPOSED 6'-0" HIGH
JURISDICTION:
CHAIN LINK FENCE
KENT COUNTY,
DELAWARE
SHEET NUMBER:
GRADE 4 OF 4
0'-0"± AGL
3/6/2024
1 ELEVATION
Z-3 SCALE: 1" = 10'-0"
10' 0' 5' 10' 20'
22"x34" 1 INCH = 10 FEET
11"x17" 1 INCH = 20 FEET
BRETT JOSEPH MAGARAM, PE
DELAWARE PROFESSIONAL ENGINEER
20' 0' 10' 20' 40'
LICENSE # 22861
53
Page 54
Item 2.
Zoning Ordinance
Article 5 – Supplementary Regulations
Section 23. Wireless communications facilities.
23.1 Purpose and intent. The purpose of this section is to establish uniform standards for the siting, design,
permitting, construction, maintenance, and use of wireless communications facilities (WCF) in the City
of Dover (referred to herein as the "city"). While the city recognizes the importance of wireless
communications facilities in providing high quality communications service to its residents, the city also
recognizes that it has an obligation to protect public safety and to minimize the adverse effects of such
facilities through the standards set forth in the following provisions and as referenced.
23.11 By enacting these provisions, the city intends to:
(a) Promote the deployment of wireless communications facilities in the city while regulating
their location and number to ensure the provision of necessary services;
(b) Provide for the managed development of wireless communications facilities in a manner
that enhances the benefits of wireless communication and accommodates the needs of
both city residents and wireless carriers in accordance with federal and state laws and
regulations;
(c) Address new wireless technologies, including, but not limited to, distributed antenna
systems, data collection units, small cells, cable Wi-Fi and other wireless communications
facilities;
(d) Establish procedures for the design, siting, construction, installation, maintenance and
removal of small wireless communications facilities, non-tower based wireless
communications facilities, and tower-based wireless communications facilities, in the city,
including facilities both inside and outside the public rights-of-way;
(e) Preserve the character of the city's neighborhoods and corridors;
(f) Minimize the adverse visual effects and the number of such facilities through proper
design, siting, screening, material, color and finish and by requiring that competing
providers of wireless communications services collocate their commercial communications
antennas and related facilities on existing wireless support structures where feasible;
(g) Promote the health, safety and welfare of the city's residents.
23.2 Definitions.
Accessory equipment. Any equipment serving or being used in conjunction with a wireless
communications facility or wireless support structure. The term "accessory equipment" includes but is
not limited to utility or transmission equipment, power supplies, generators, batteries, cables,
equipment buildings, cabinets and storage sheds, shelters or similar structures.
Antenna. An apparatus designed for the purpose of emitting radiofrequency (RF) radiation, to be
operated or operating from a fixed location pursuant to Federal Communications Commission
authorization, for the provision of wireless service and any commingled information services.
Changes in height. Changes in height is measured from the original wireless support structure in cases
where deployments are or will be separated horizontally, such as on buildings' rooftops; in other
circumstances, changes in height should be measured from the dimensions of the tower or base
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 1 of 15
54
Page 55
Item 2.
station, inclusive of originally approved appurtenances and any modifications that were approved prior
to the passage of the Spectrum Act (47 CFR §1.4001(b)(7)(i)(A)).
Collocation. The mounting of one or more WCFs, including antennae, on a pre-existing structure, or
modifying a structure for the purpose of mounting or installing a WCF on that structure.
Eligible facilities request. Any request for modification of an existing WCF that does not constitute a
substantial change. Such request may involve: (i) collocation of new transmission equipment; (ii)
removal of transmission equipment; or (iii) replacement of transmission equipment.
Emergency. A condition that (1) constitutes a clear and immediate danger to the health, welfare, or
safety of the public, or (2) has caused or is likely to cause facilities in the rights-of-way to be unusable
and result in loss of the services provided.
Equipment compound. An area surrounding or adjacent to a wireless support structure within which
base stations, power supplies, or accessory equipment are located.
FCC. Federal Communications Commission.
Height of a tower-based WCF. The vertical distance measured from the ground level, including any
base pad, to the highest point on a tower-based WCF, including antennae mounted on the tower and
any other appurtenances.
Modification or modify. The improvement, upgrade or expansion of existing wireless communications
facilities or base stations on an existing wireless support structure or the improvement, upgrade, or
expansion of the wireless communications facilities located within an existing equipment compound, if
the improvement, upgrade, expansion or replacement does not substantially change the physical
dimensions of the wireless support structure.
Non-tower wireless communications facility (non-tower WCF). A wireless communications facility
located or collocated on existing structures, such as, but not limited to, buildings, water towers,
electrical transmission towers, utility poles, light poles, traffic signal poles, flag poles and other similar
structures that do not require the installation of a new tower. This term includes the replacement of an
existing structure with a similar structure that is required to support the weight of the proposed WCF.
This definition excludes any installation constituting a small wireless communications facility.
Person. Individuals, corporations, companies, associations, joint stock companies, firms, partnerships,
limited liability companies, corporations and other entities established pursuant to statutes of the
State of Delaware, provided that "person" does not include or apply to the city, or to any department
or agency of the city.
Replacement. The replacement of existing wireless communications facilities on an existing wireless
support structure or within an existing equipment compound due to maintenance, repair or
technological advancement with equipment that does not result in increased wind or structural
loading, is substantially similar in size and weight as the wireless communications facilities initially
installed, and that does not substantially change the physical dimensions of the existing wireless
support structure.
Small wireless communications facility (small WCF). A wireless communications facility that meets the following
criteria:
(1) The structure on which antenna facilities are mounted
a) Is 50 feet or less in height; or
b) Is no more than ten percent taller than other adjacent structures; or
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 2 of 15
55
Page 56
Item 2.
c) Is not extended to a height of more than 50 feet or by more than ten percent
above its preexisting height as a result of the collocation of new antenna
facilities.
(2) Each antenna associated with the deployment (excluding the associated equipment) is no
more than three cubic feet in volume; and
(3) All antenna equipment associated with the facility (excluding antennas) are cumulatively
no more than 28 cubic feet in volume; and
(4) The facilities do not require antenna structure registration under 47 CFR Part 17; and
(5) The facilities are not located on Tribal lands, as defined under 36 CFR §800.16(x); and
(6) The facilities do not result in human exposure to radiofrequency radiation in excess of the
applicable safety standards specified in 47 CFR §1.1307(b).
Stealth technology. Camouflaging or screening methods applied to wireless communications facilities
and accessory equipment which render them more visually appealing or blend the proposed facility
into the existing structure or visual backdrop in a manner appropriate to the site's context and
surrounding environment. Such methods include, but are not limited to, architecturally screened roof-
mounted antennae, building-mounted antennae painted to match the existing structure and facilities
constructed to resemble trees, shrubs, and light poles.
Substantial change. A modification to an existing WCF substantially changes the physical dimensions of
a wireless support structure if it meets any of the criteria set forth in 47 CFR §1.6100, as amended.
Tower-based wireless communications facility (tower-based WCF). Any structure that is used for the
primary purpose of supporting one or more antennae, including, but not limited to, self-supporting
lattice towers, guy towers and monopoles. This definition excludes any installation meeting the
definition of a small wireless communications facility.
Wireless. Transmissions through the airwaves including, but not limited to, infrared line of sight,
cellular, PCS, microwave, satellite, or radio signals.
Wireless communications facility (WCF). An antenna facility or a wireless support structure that is used
for the provision of wireless service, whether such service is provided on a stand-alone basis or
commingled with other wireless communications services.
Wireless communications facility applicant (WCF Applicant). Any person that applies for a wireless
communications facility building permit, zoning/conditional use approval, and/or permission to use the
public right-of-way or other city owned land or property.
Wireless support structure. A freestanding structure, pole, tower, or other building, whether or not it
has an existing antenna facility, that is used or to be used to support the placement or installation of a
wireless communication facility for the provision of wireless service (whether on its own or comingled
with other types of services).
23.3 Applicability. The terms and provisions of this section shall apply to wireless communication facilities in
the city. As defined, each type of WCF has specific allowable locations, development regulations, and
design standards as follows:
(a) Small WCF described in Article 5, Section 23.6.
(b) Non-tower WCF described in Article 5, Section 23.7.
(c) Tower WCF described in Article 5, Section 23.8.
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 3 of 15
56
Page 57
Item 2.
23.31 Exceptions. The activities by city residents to utilize satellite dishes, citizen and/or band radios,
and antennae for the purpose of maintaining television, phone, and/or internet connections at
their residences for non-commercial activity shall be exempt from the regulations enumerated in
this Section 23.
23.32 Nonconforming uses. The following provisions shall apply to all buildings, support structures,
and uses as related to wireless communication facilities:
(a) All types of WCFs shall be permitted to collocate upon existing non-conforming WCFs,
wireless support structures, and other non-conforming structures subject to the provisions
of this Section 23.
(b) Collocation of antennae is permitted on non-conforming structures.
(c) Collocation of non-tower WCFs upon existing tower-based WCFs is encouraged even if the
tower-based WCF is non-conforming as to use within a zoning district.
(d) WCF which are hereafter damaged or destroyed due to any reason or cause may be
repaired and restored at their former location but must otherwise comply with the terms
and conditions of this Section 23.
23.4 Type of Activity determination. The following provisions outline the types of wireless communication
facility applications.
23.41 Eligible facilities request. The WCF application type is classified as an eligible facilities request if
the request for modification of an existing WCF that does not constitute a substantial change
under 47 CFR §1.6100, as amended. The request may involve: (i) collocation of new transmission
equipment; (ii) removal of transmission equipment; or (iii) replacement of transmission
equipment.
23.42 Substantial change activity. The WCF application type is classified as a substantial change
activity if the modification substantially changes the physical dimensions of a wireless support
structure by meeting any of the criteria set forth in 47 CFR §1.6100, as amended, relating to
height of the support structure or addition of new appurtenances or equipment cabinets.
23.43 New facility. The WCF application type is classified as a new facility if it involves the construction
and placement of a new wireless support structure and does not meet the definition of small
WCF.
23.44 Small WCF. The WCF application type is classified as a small WCF if the proposed antennas,
accessory equipment and support structure (whether an existing, replacement or new structure)
comply with the volume and height parameters set forth in the definition of small WCF.
23.5 Application procedures. The following provisions outline the procedures for wireless communication
facility applications, policies and procedures for the administration of the WCF permitting and review
process shall be developed by the city manager and city planner.
23.51 Location within public right-of-way. WCF applicants proposing a WCF to be located within the
public right-of-way, shall be required to obtain application approvals as follows:
(a) Pole attachment process. Compliance with the procedures found in Dover Code
Ordinances, Chapter 110—Utilities, Section 110-32—Pole Attachment, for a WCF proposed
for attachment to Dover Electric Department facilities.
(b) Master license agreement required. Any WCF applicant for a WCF proposed for attachment
to a utility pole owned or controlled by the City of Dover Electric Department shall first
enter into a valid master license agreement with the city authorizing such attachment. No
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 4 of 15
57
Page 58
Item 2.
WCF shall be permitted to be attached to such utility poles without proof a valid master
license agreement being provided as part of the permit application.
(c) Permit—Use of rights-of-way. Obtain a right-of-way use permit from the city in accordance
with permit policies and procedures pursuant to Dover Code of Ordinances, Chapter 98—
Streets, Sidewalks, Storm Sewers and Other Public Spaces, for a WCF proposed with city
rights-of-way.
(d) Permit. Obtain a WCF building permit from the city in accordance with applicable permit
policies and procedures pursuant to Appendix B, Article 8, Section 1—Building Permit of
the City of Dover Code.
(e) Documentation. WCF application shall also be accompanied by documentation
demonstrating that the proposed WCF complies with all applicable provisions of this
Section 23 for the type of WCF.
(f) Fee. Each application to be approved under this section shall be accompanied by fees as
provided for in Appendix F—Fees and Fines.
23.52 Compliance with zoning ordinance. The following section of the zoning ordinance shall be
adhered to, as applicable, in the approval of a WCF application:
(a) Architectural review certificate. WCF located within the Historic District (H) shall be
required to obtain an architectural review certificate pursuant to Article 3, Section 21 and
Article 10, Section 3 of this ordinance.
(b) Airport environs. Locations within the Airport Environs Overlay Zone (AEOZ) shall document
compliance pursuant to Article 3, Section 22 of this ordinance.
(c) Environmentally sensitive areas. Location shall document compliance with the
environmental protection measures for flood hazard areas and waterbodies and wetlands
pursuant to Article 5, Section 11 of this ordinance.
23.53 Eligible facilities request. WCF applicants proposing an eligible facilities request shall be required
to obtain application approvals as follows:
(a) Type. WCF Applicant shall designate in writing that the application constitutes an eligible
facilities request pursuant to 47 CFR §1.6100 and as defined by this Section 23.
(b) Permit. Obtain a WCF building permit from the city in accordance with applicable permit
policies and procedures pursuant to Appendix B, Article 8, Section 1—Building Permit of
the City of Dover Code.
(c) Documentation. WCF application shall also be accompanied by documentation
demonstrating that the proposed WCF complies with all applicable provisions of this
Section 23 for the type of WCF.
(d) Fee. Each application to be approved under this section shall be accompanied by fees as
provided for in Appendix F—Fees and Fines.
23.54 Substantial change activity. WCF applicants proposing a substantial change activity shall be
required to obtain application approvals as follows:
(a) Type. WCF Applicant shall designate in writing that the application constitutes a substantial
change activity as defined by this Section 23.
(b) Permit. Obtain a WCF building permit from the city in accordance with applicable permit
policies and procedures pursuant to Appendix B, Article 8, Section 1—Building Permit of
the City of Dover Code.
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 5 of 15
58
Page 59
Item 2.
(c) Documentation. WCF application shall also be accompanied by documentation
demonstrating that the proposed WCF complies with all applicable provisions of this
Section 23 based on the type of facility.
(d) Fee. Each application to be approved under this section shall be accompanied by fees as
provided for in Appendix F—Fees and Fines.
23.55 New facilities. WCF applicants proposing a new facility located in a public right-of-way shall be
subject to the provisions of Section 23.51. WCF applicants proposing a new facility meeting the
definition of tower-based WCF outside of a public right-of-way of shall be required to obtain
application approvals as follows:
(a) Conditional use authorization required. Any WCF applicant proposing the construction of a
new facility shall first obtain conditional use authorization pursuant to Appendix B, Article
10 Section 1 of the Dover Code.
(b) Documentation. The conditional use application shall demonstrate that the proposed WCF
complies with all applicable provisions of Section 23 based on the type of facility.
(c) Conditional use application requirements. The additional requirements for conditional use
applications shall include the following:
i. A description of the type and manufacturer of the proposed transmission/radio
equipment, the power in watts at which the WCF applicant transmits, and any
relevant related tests conducted by the WCF applicant in determining the need
for the proposed site and installation.
ii. Documentation demonstrating that the proposed tower-based WCF complies
with all applicable state and federal laws and regulations concerning aviation
safety.
iii. Evidence that the owner of the property on which the tower-based WCF is
proposed has granted authorization to construct and operate the tower-based
WCF.
iv. Written certification from a structural engineer licensed in the State of
Delaware that the proposed WCF's ability to meet the structural standards
offered by either the Electronic Industries Association or the
Telecommunication Industry Association and certify the proper construction of
the foundation and the erection of the structure.
v. An application for a new tower-based WCF shall demonstrate that the
proposed tower-based WCF cannot be accommodated on an existing or
approved structure or building. The planning commission may deny an
application to construct a new tower-based WCF if the WCF applicant has not
made a good faith effort to mount the antenna(s) on an existing structure. The
WCF applicant shall address the viability of any existing wireless support
structures within a one quarter (¼) mile radius of the site proposed and
demonstrate that such alternative candidates are inferior with respect to
technical feasibility, cost, or terms of use.
(d) Permit. Obtain a WCF building permit from the city in accordance with applicable permit
policies and procedures pursuant to Appendix B, Article 8, Section 1—Building Permit of
the City of Dover Code.
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 6 of 15
59
Page 60
Item 2.
(e) Documentation. WCF application shall also be accompanied by documentation
demonstrating that the proposed WCF complies with all applicable provisions of this
Section 23 based on the type of WCF.
(f) Fee. Each application to be approved under this section shall be accompanied by fees as
provided for in Appendix F—Fees and Fines.
23.56 New small WCF. WCF applicants proposing a new small WCF that does not qualify as an eligible
facilities request shall be required to obtain application approval as follows:
(a) Type. WCF applicant shall designate in writing that the application constitutes a small WCF
as defined by this Section 23.
(b) Permit. Obtain a WCF building permit from the city in accordance with applicable permit
policies and procedures pursuant to Appendix B, Article 8, Section 1—Building Permit of
the City of Dover Code.
(c) Documentation. WCF application shall also be accompanied by documentation
demonstrating that the proposed WCF complies with all applicable provisions of this
Section 23 based on the type of facility.
(d) Fee. Each application to be approved under this section shall be accompanied by fees as
provided for in Appendix F—Fees and Fines.
(e) New wireless support structures. An application involving installation of a new wireless
support structure shall demonstrate that the proposed small WCF cannot be reasonably
accommodated on an existing or approved structure or building within the right-of-way.
The WCF applicant shall address the viability of any existing wireless support structures
within 100 feet of the site proposed and demonstrate that such alternative candidates are
inferior with respect to technical feasibility, cost, or terms of use.
23.57 Timing of approvals. Each specific type of WCF is subject to specific approval timeframes. Such
timeframes shall be subject to the tolling procedures established by the FCC.
(a) Small WCF: Timing of approval for all small WCF facilities that do not meet the definition of
eligible facilities request. Once a WCF application is submitted these are the approval time
lines:
i. Notification of incomplete applications for small WCF. Within ten days of
receipt of an application for a small WCF, the city shall notify the WCF applicant
in writing of any additional information required to complete application.
ii. Approval timeframe—Collocation. Within 60 days of receipt of an application
for a collocation of a small WCF on a preexisting wireless support structure, the
city shall make a final decision on whether to approve the application and the
city shall notify the WCF applicant in writing of such decision.
iii. Approval timeframe—New facility. Within 90 days of receipt of an application
for a small WCF requiring the installation of a new wireless support structure,
the city planning department shall make a final decision on whether to approve
the application and shall notify the WCF applicant in writing of such decision.
(b) Non-tower WCF: Timing of approval for all non-tower WCF facilities that do not meet the
definition of eligible facilities request. Once a WCF application is submitted these are the
approval time lines:
i. Notification of incomplete applications for non-tower WCF. Within 30 days of
receipt of an application for a WCF on a preexisting wireless support structure,
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 7 of 15
60
Page 61
Item 2.
the city shall notify the WCF applicant in writing of any additional information
required to complete application.
ii. Approval timeframe—Substantial change. Within 90 days of receipt of an
application for a non-tower WCF on a preexisting wireless support structure
that substantially changes the wireless support structure to which it is
attached, the city shall make a final decision on whether to approve the
application and the city shall notify the WCF applicant in writing of such
decision.
iii. Approval timeframe—Not substantial change. Within 60 days of receipt of an
application for a non-tower WCF on a preexisting wireless support structure
that does not substantially change the wireless support structure to which it is
attached, the city planning department shall issue the required building permit
authorizing construction of WCF.
(c) Tower-based WCF: Timing of approval for all tower-based WCF facilities that do not meet
the definition of eligible facilities request. Once a WCF application is submitted these are
the approval time lines:
i. Notification of incomplete applications for tower-based WCF. Within 30 days of
receipt of an application for a tower-based WCF, the city shall notify the WCF
applicant in writing of any additional information required to complete
application.
ii. Approval timeframe. All applications for tower-based WCFs shall be acted upon
within 150 days of the receipt of a fully completed application for the approval
of such tower-based WCF and the city shall advise the WCF applicant in writing
of its decision. If additional information was requested by the city planning
department to complete an application, the time required by the WCF
applicant to provide the information shall not be counted toward the 150 day
review period
23.58 Fees. Each application for permit or plan approval shall be accompanied by a fee as provided for
in Appendix F—Fees and Fines.
(a) Permit fees. The city may assess appropriate and reasonable permit fees directly related to
the city's actual costs in reviewing and processing the application for approval of a WCF, as
well as related inspection, monitoring and related costs. Such permit fees shall be
established by Appendix F—Fees and Fines and shall comply with the applicable
requirements of the FCC.
(b) Reimbursement for WCF in right-of-way. In addition to permit fees as described in this
section, every small WCF in the right-of-way is subject to the city's right to recover its
actual costs incurred as a result of the small WCF's presence in the right-of-way, including,
but not limited to, the costs of the administration and performance of all reviewing,
inspecting, permitting, supervising and other right-of-way management activities by the
city. The owner of each small WCF shall reimburse the city for the city's costs reasonably
incurred in connection with the activities described above. All fees shall comply with
applicable state and federal law and not exceed amounts presumed reasonable by the FCC.
23.6 Small wireless communication facilities (small WCF). The following regulations shall apply to all small
WCF and associated wireless support structures as defined by this Section 23.
(a) Location.
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 8 of 15
61
Page 62
Item 2.
i. Small WCF are permitted to be located in all city zoning districts subject to the application
requirements of this Section 23.
ii. Small WCF are subject to compliance with zoning ordinance provisions outlined in Section
23.52.
iii. Small WCF are permitted to be located within the public right-of-way subject to application
requirements of this Section 23.
(b) Development regulations.
i. Sizing. To be considered as small WCF, the WCF must comply with the criteria established
in the definition of small wireless communications facility in Section 23.2.
ii. Height. The total height of a small WCF shall comply with the maximum height permitted in
the zoning district of the property to the extent technically feasible. In accordance with
industry standards, small WCF applicants must submit documentation to the city justifying
the total height of the WCF.
iii. Height. The total height of a small WCF when located in the public right-of-way shall be no
more than ten percent taller than the tallest existing utility pole or wireless support
structure within a 250 radius of the proposed WCF or 50 feet above ground level,
whichever is greater.
iv. Placement. All small WCF shall comply with the applicable requirements of the Americans
with Disabilities Act and all applicable requirements pertaining to streets and sidewalks, as
codified in Chapter 98 of the Dover Code.
v. Placement. Small WCF in the public right-of-way requiring the installation of a new wireless
support structure shall not be located directly in front of any building entrance or exit such
that it would interfere with ingress or egress.
vi. Accessory equipment. Small WCF and accessory equipment shall be located so as not to
cause any physical or visual obstruction to pedestrian or vehicular traffic, create safety
hazards to pedestrians and/or motorists, or to otherwise inconvenience public use of the
ROW as determined by the city.
(c) Design standards. All small WCF shall be designed to meet applicable requirements of the city
"Small Wireless Communications Facility Design Manual," a copy of which is kept on file at the
city planning department.
23.7 Non-tower wireless communication facilities (non-tower WCF). The following regulations shall apply to
all non-tower WCFs as defined by this Section 23 and that do not meet the definition of a small WCF.
(a) Location.
i. Non-tower WCF are permitted to locate in all city zoning districts subject to the application
requirements of this Section 23.
ii. Non-tower WCF are subject to compliance with zoning ordinance provisions outlined in
Section 23.52.
iii. Non-tower WCF are permitted to be located within the public right-of-way subject to
application requirements of this Section 23.
iv. Non-tower WCF shall be collocated on existing wireless support structures, such as poles,
certain existing buildings or tower-based WCF.
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 9 of 15
62
Page 63
Item 2.
v. Historic buildings. Non-tower WCF may be located within 100 feet of any property, or on a
building or structure that is listed on the National Register of Historic Places if an approved
architectural review certification is obtained pursuant to Article 10, Section 3 of this
ordinance.
(b) Prohibitions on certain structures. Non-tower WCF shall not be located on one-family detached
dwellings, one-family attached dwellings, semi-detached dwellings, duplexes, townhouses,
manufactured homes, mobile homes, modular homes, or any residential accessory structure.
(c) Development regulations.
i. Sizing. To be considered as non-tower WCF, the WCF must comply with the criteria
established in the definition of non-tower wireless communications facility in Section 23.2.
ii. Height. The total height of a non-tower WCF shall not exceed the maximum height
permitted in the zoning district. In accordance with industry standards, non-tower WCF
applicants must submit documentation to the city justifying the total height of the WCF.
iii. Replacement of existing support structure. The replacement of an existing support
structure with a similar structure that is required to support the weight of the proposed
WCF is allowed.
iv. Accessory equipment buildings. If accessory equipment is to be located in a separate
building, the building shall comply with the minimum requirements for accessory structure
in the applicable zoning district.
v. Fences. A security fence with a minimum height of six feet and a maximum height of eight
feet shall surround any separate equipment compound located outside the right-of-way.
vi. Access. Vehicular access to the accessory equipment building or equipment compound
shall not interfere with the parking or vehicular circulations on the site for the principal
use.
(d) Design standards. Where appropriate, non-tower WCF shall employ stealth technology and be
treated to match the wireless support structure in order to minimize aesthetic impact. The
stealth technology utilized by the WCF applicant shall be subject to the application approval
process.
23.8 Tower-based wireless communication facilities (tower-based WCF). The following regulations shall apply
to all tower-based WCFs as defined by this Section 23 and that do not meet the definition of a small
WCF.
(a) Conditional uses. Tower-based WCF are permitted outside the public rights-of-way in certain
zoning districts upon conditional use approval of the planning commission in accordance with the
procedures and subject to the general conditions set forth in Article 10 Section 1 of this
ordinance.
i. In approving the conditional use, the planning commission may take into consideration the
following:
a. The aesthetic impact of the proposed facility, including, but not limited to,
whether its decision upon the subject application will promote the harmonious
and orderly development of the zoning district involved;
b. Encourage compatibility with the character and type of development existing in
the area;
c. Prevent a negative impact on the aesthetic character of the community;
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 10 of 15
63
Page 64
Item 2.
d. Preserve woodlands and trees existing at the site to the greatest possible
extent; and
e. Encourage sound engineering and land development design and construction
principles, practices and techniques.
ii. Additional antennae. As a condition of approval for all tower-based WCF, the WCF
applicant shall provide with a written commitment that it will allow a minimum of two
other service providers the opportunity to collocate antennae on tower-based WCF where
technically feasible.
(b) Location.
i. Tower-based WCF are conditionally permitted to locate in the nonresidential zones.
Nonresidential zones are defined in Article 12—Definitions of this ordinance.
ii. Exception. Tower-based WCF in the IPM3 (Industrial Park Manufacturing Zone—Industrial
Aviation and Aeronautics Center) zoning district are only allowed in support of aviation,
aeronautics, or related operation per Article 3, Section 20B of the ordinance.
iii. Tower-based WCF are subject to the application requirements of this Section 23.
iv. Tower-based WCF are subject to compliance with zoning ordinance provisions outlined in
Section 23.52.
v. Historic places. Tower-based WCF may be located within 100 feet of any building or
structure that is listed on the National Register of Historic Places if an approved
architectural review certification is obtained pursuant to Article 10, Section 3 of this
ordinance.
(c) Uses on property.
i. Principal use. A tower-based WCF shall be permitted as a sole principal use on a lot.
ii. Combined with another use. A tower-based WCF may be permitted on a property with an
existing use, or on a vacant parcel in combination with another permitted use.
iii. Existing uses. The existing use on the property may be any permitted use in the applicable
zoning district and need not be affiliated with the WCF.
iv. Ability to use. Where applicable, the WCF owner shall present documentation that the
property owner has granted an easement or other property right for the proposed facility.
(d) Development regulations.
i. Minimum lot area. The minimum lot area shall comply with the requirements for the
applicable zoning district and shall be the area needed to accommodate the tower-based
WCF and guy wires, the equipment building, security fence, and buffer planting.
ii. Height. Tower-based WCFs shall be designed and kept at the minimum functional height.
The maximum total height of a tower-based WCF shall not exceed the 150 feet. No WCF
applicant shall have the right under these regulations to erect a tower to the maximum
height specified in this section unless it proves the necessity for such height.
iii. Minimum setbacks. The minimum distance between the base of a tower-based WCF and
any property line or street right-of-way line shall equal 110 percent of the proposed height
of the tower-based WCF, unless the WCF applicant shows to the satisfaction of the
planning commission that the proposed tower-based WCF has been designed in such a
manner that a lesser setback will have no negative effects on public safety.
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 11 of 15
64
Page 65
Item 2.
(e) Design standards.
i. Multiple antennae. Any proposed tower-based WCF shall be designed structurally to
accommodate both the WCF applicant's antennae and at least two comparable antennae
for future users.
ii. Security. Any tower-based WCF shall be equipped with an anti-climbing device, as
approved by the manufacturer.
iii. Lighting. No tower-based WCF shall be artificially lighted, except as required by law. If
lighting is required, the WCF applicant shall provide a detailed plan for sufficient lighting,
demonstrating as unobtrusive and inoffensive an effect as is permissible under state and
federal regulations.
iv. Surrounding environs. Existing vegetation, trees and shrubs located within proximity to the
tower-based WCF structure shall be preserved to the maximum extent possible.
v. Fences. A security fence having a minimum height of six feet and a maximum height of
eight feet shall surround any tower-based WCF, as well as guy wires, equipment compound
or housing WCF equipment.
vi. Screening. A screen of evergreen trees planted eight feet on center, each at least four feet
in height, shall surround the tower-based WCF and security fence. Existing vegetation shall
be preserved to the maximum extent possible and landscaping is not required where
landscaping already exists
vii. Accessory equipment. Where feasible, accessory equipment associated, or connected, with
a tower-based WCF shall be placed underground. Any above-ground accessory equipment
associated or connected with a tower-based WCF shall be screened from public view using
stealth technology. All ground-mounted accessory equipment, utility buildings and
accessory structures shall be architecturally designed to blend into the environment in
which they are situated.
viii. Accessory equipment buildings. If accessory equipment is to be located in a separate
building, the building shall comply with the minimum requirements for accessory
structures in the applicable zoning district.
ix. Accessory equipment. Accessory equipment not exceeding 500 square feet in area shall be
permitted for each unrelated company sharing space on the tower-based WCF.
x. Access road. Where necessary, an access road, turnaround space and parking shall be
provided to ensure adequate emergency and service access to tower-based WCF.
Maximum use of existing roads, whether public or private, shall be made to the extent
practicable. Road grades shall closely follow natural contours to assure minimal visual
disturbance and minimize soil erosion.
xi. Visual appearance. Tower-based WCF shall employ stealth technology which may include
painting or finish of the tower portion. All tower-based WCF and accessory equipment shall
be aesthetically and architecturally compatible with the surrounding environment and shall
maximize the use of a like facade to blend with the existing surroundings and neighboring
buildings to the greatest extent possible.
23.9 General requirements for wireless communication facilities. The following shall apply to all types of
wireless communication facilities. Each application for a WCF shall require proof of compliance with
the following.
23.91 Standards for wireless communication facilities.
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 12 of 15
65
Page 66
Item 2.
(a) Wind and ice. Each WCF shall be designed to withstand the effects of wind gusts and ice to
the standard designed by the American National Standards Institute as prepared by the
engineering departments of the Electronics Industry Association, and Telecommunications
Industry Association (ANSI/TIA-222, as amended), or to the industry standard applicable to
the structure.
(b) Aviation safety. WCF shall comply with all federal and state laws and regulations
concerning aviation safety.
(c) Interference. WCF shall not interfere with public safety communications or the reception of
broadband, television, radio or other communication services by occupants of nearby
properties.
(d) Radio frequency emissions. WCF shall not, by itself or in conjunction with other WCFs
existing on the same structure at the time of installation, generate radio frequency
emissions in excess of the standards and regulations of the FCC, including, but not limited
to, the FCC Office of Engineering Technology Bulletin 65 entitled "Evaluating Compliance
with FCC Guidelines for Human Exposure to Radio Frequency Electromagnetic Fields," as
amended.
(e) Signage. WCF owners shall post a sign in a readily visible location identifying the name,
phone number of a party to contact in the event of an emergency, and permit number. The
only other signage permitted on the WCF shall be those required by the FCC, or any other
federal or state agency.
(f) Noise. WCF shall be operated and maintained so as not to produce noise in excess of
applicable noise standards under state law and the City Code, except in emergency
situations requiring the use of a backup generator, where such noise standards may be
exceeded on a temporary basis only.
(g) Engineer seal and signature. All plans and drawings for a WCF shall contain a seal and
signature of a professional structural engineer, licensed in the State of Delaware.
(h) FCC license. Each person that owns or operates a tower-based WCF shall submit a copy of
its current FCC license, including the name, address, and emergency telephone number for
the operator of the facility.
23.92 Maintenance and care of wireless communications facilities.
(a) Standard of care. Any WCF shall be designed, constructed, operated, maintained, repaired,
modified and removed in strict compliance with all current applicable technical, safety and
safety-related codes, including, but not limited to, the most recent editions of the
American National Standards Institute (ANSI) Code, National Electrical Safety Code,
National Electrical Code, National Association of Tower Erectors, or to the industry
standard applicable to the structure.
(b) Maintenance. Any WCF shall at all times be kept and maintained in good condition, order
and repair by qualified maintenance and construction personnel, so that the same shall not
endanger the life of any person or damage any property in the city. Such maintenance shall
be performed to ensure the upkeep of the WCF in order to promote the safety and security
of the city's residents and utilize industry standard technology for preventing failures and
accidents. The following maintenance requirements shall apply:
i. The WCF shall be fully automated and unattended on a daily basis and shall be
visited only for maintenance or emergency repair.
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 13 of 15
66
Page 67
Item 2.
ii. Such maintenance shall be performed to ensure compliance with applicable
structural safety standards and radio frequency emissions regulations.
iii. All maintenance activities shall conform to industry maintenance standards.
(c) Lighting. The WCF applicant shall promptly report any outage or malfunction of FAA-
mandated lighting to the appropriate governmental authorities and to the city.
(d) Graffiti. Any graffiti on the WCF or on any accessory equipment shall be removed at the
sole expense of the owner within 30 days of notification by the city.
23.93 Inspection of wireless communication facilities. The city reserves the right to inspect any WCF to
ensure compliance with the provisions of the Appendix B: Zoning and any other provisions found
within the City Code or state or federal law. The city and/or its agents shall have the authority to
enter the lease area of any property upon which a WCF is located at any time, upon reasonable
notice to the operator, to ensure such compliance.
23.94 Construction and repairs in the right-of-way.
(a) Work in right-of-way. The City of Dover Electric Department and the City of Dover Public
Works Department, in consultation with the city planning department, shall determine the
time, place and manner of construction, maintenance, repair and/or removal of all small
WCF in the ROW based on public safety, traffic management, physical burden on the ROW,
and related considerations. All construction, maintenance, repair and/or removal of small
WCF shall comply with the applicable requirements of the City Code.
(b) Pole repairs. In the event of damage to a small WCF attached to a utility pole owned or
controlled by the City of Dover Electric Department, the owner of the small WCF shall be
solely responsible for all costs associated with the repair of the small WCF, unless such
damage was caused by the city's own negligence or willful misconduct.
(c) Repairs of city property. In the event of damage to city property during installation of any
WCF, including utility poles, streets, sidewalks, streetlights, signs, or other infrastructure,
the company responsible for the damage shall make repairs accepted by the city or shall
reimburse the city for the cost of such repairs.
(d) Change or alteration required. Within 90 days following written notice from the city, or
such longer period as the city determines is reasonably necessary or such shorter period in
the case of an emergency, an owner of a small WCF in the ROW shall, at its own expense,
temporarily or permanently remove, relocate, change or alter the position of any WCF
when the city, consistent with its police powers and applicable public utility commission
regulations, determines that such removal, relocation, change or alteration is reasonably
necessary under the following circumstances:
i. The construction, repair, maintenance or installation of any city or other public
improvement in the right-of-way;
ii. The operations of the city or other governmental entity in the right-of-Way;
iii. Vacation of a street or road or the release of a utility easement; or
iv. An emergency as determined by the city.
In such cases the city will make reasonable efforts to assist the WCF owner in identifying
and permitting an alternate location for the WCF.
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 14 of 15
67
Page 68
Item 2.
23.95 Removal. In the event that use of a WCF is to be discontinued, the owner shall provide written
notice to the city of its intent to discontinue use and the date when the use shall be discontinued
and removed. Unused or abandoned WCF, or portions of WCF, shall be removed as follows:
(a) Complete removal of the structure of a tower-based WCF shall require a demolition permit
in accordance with permit policies and procedures pursuant to Appendix B, Article 8,
Section 1—Building Permit.
(b) Any unused portions of tower-based WCF, including antennae, shall be removed within 90
days of the time of cessation of operations. All replacements of portions of a tower-based
WCF previously removed are subject to the provisions of this Section 23.
(c) All used or abandoned WCFs and accessory equipment shall be removed from the wireless
support structure within 90 days of the cessation of operations at the site unless a time
extension is approved by the city.
(d) If the WCF or accessory equipment is not removed from the wireless support structure
within 90 days of the cessation of operations at a site, or within any longer period
approved by the city, the WCF and/or associated facilities and equipment may be removed
by the city and the cost of removal assessed against the owner of the WCF.
(Ord. No. 2020-13, 11-9-2020)
Created: 2024-04-29 14:29:42 [EST]
(Supp. No. 40, Update 1)
Page 15 of 15
68
Page 69
Item 3.
City of Dover
DATA SHEET FOR SITE DEVELOPMENT PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF June 5, 2024
PLANNING COMMISSION MEETING June 17, 2024
Plan Title: Procter & Gamble Warehouse Expansions & Parking Improvements
S-24-09
Plan Type: Site Development Plan/Site Development Master Plan
Property Owner: The Dover Wipes Company
Equitable Owner: Procter & Gamble
Location: South side of W. North Street/Hazlettville Road at the southeast corner of Electric
Avenue and Mifflin Road intersection with W. North Street
Address: 1340 W. North Street
Tax Parcel: ED-05-076.00-01-07.00-000
Site Area: 84.10 acres+/-
Zoning: IPM (Industrial Park Manufacturing Zone)
SWPOZ (Source Water Protection Overlay Zone): Tier 3 Excellent Recharge
Area
Present Use: Manufacturing Facility
Proposed Use: Manufacturing Facility with Warehouse Additions and Parking Improvements
Sanitary Sewer: City of Dover
Water Supply: City of Dover
Waivers Requested: Elimination of Upright Curbing
Partial Elimination of Sidewalks
For Consideration: Performance Standards Review Application
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service 69
Page 70
City of Item 3.
Dover
CITY OF DOVER Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: June 5, 2024
APPLICATION: Procter & Gamble Warehouse Expansions & Parking Improvements
FILE #: S-24-09 REVIEWING AGENCY: City of Dover Planning Office
CONTACT PERSON: Dawn Melson-Williams, AICP PHONE #: 302.736.7196
I. PLAN SUMMARY
This is a Site Development Plan/Master Plan at Procter & Gamble to permit a phased
construction of a 110,000 SF addition to JE Warehouse, a 20,000 SF addition to Warehouse 3, an
expansion of employee/visitor parking lot, an expansion and reconfiguration of contractor
parking lot, and expansion of truck drop Lots A & B with associated site improvements. The
property of 84.10 acres ± is zoned IPM (Industrial Park Manufacturing Zone) and is subject to
the SWPOZ (Source Water Protection Overlay Zone): Tier 3 – Excellent Recharge Area. The
property is located on the south side of W. North Street/Hazlettville Road at the southeast corner
of Electric Avenue and Mifflin Road intersection with W. North Street. The owner of record is
The Dover Wipes Company and equitable owner Procter & Gamble. Property Address: 1340 W.
North Street. Tax Parcel: ED-05-076.00-01-07.00-000. Council District 2.
Preliminary Land Use Services Review (PLUS)
An application (PLUS Review #2024-04-05) related to this Procter & Gamble project was
reviewed by the State’s Preliminary Land Use Services, as required by the City of Dover’s
Memorandum of Understanding (MOU). It was reviewed by the State at the meeting on April 24,
2024. This MOU requires that non-residential developments of over 75,000 square feet complete
the PLUS Review process prior to application submission. Copies of the PLUS Review
Comments (dated May 20, 2024) and of the applicant’s response letter (dated June 6, 2024) are
attached to this Report. There also was a PLUS Review #2013-07-15 in 2013 for a similar
project that was not constructed.
II. PROJECT DESCRIPTION
The Site Development Plan/Master Plan proposes a phased construction of a series of warehouse
expansions (a 110,000 SF addition to JE Warehouse and a 20,000 SF addition to Warehouse 3);
and truck parking/drop lots (Lots A & B/C) to stage and store trucks involved in delivery of raw
materials and the shipping out of finished products. Additionally, the parking lot for contractors
(working in the facility) and the parking lot for employees/visitors will be reconfigured and
improved. Overall, the project involves the following phases per the Plan as shown on Sheet
SP1.0 in colored areas:
• Phase 1 (Blue): Contractor Parking Lot reconfiguration for 113 vehicle parking spaces
and entrance improvement from Electric Avenue; Expansion of Truck Drop Lot B/C for
186 truck/trailer parking spaces.
70
Page 71
Item 3.
S-24-09 Procter & Gamble Warehouse Expansion & Parking Improvements
DAC Report of June 5, 2024
Page 3 of 13
• Phase 2 (Green): Warehouse Expansions consisting of 110,000 SF addition to JE
Warehouse and a 20,000 SF (21,400 SF) addition to Warehouse 3. And stormwater
management improvements to pipe a stream/swale on west side of building.
• Phase 3 (Red): Improvements to Truck Drop Lot A for 117 truck/trailer parking spaces.
• Phase 4 (Yellow): Improvements to Employee/Visitor Parking Lot area for 262 vehicle
parking spaces.
The project includes stormwater management facility improvements as an unnamed tributary of
the Puncheon Run crosses through the property. The site will be subject to a Performance
Standards Review Application to ensure the proposed use complies with Zoning Regulations.
See Section IX of this Report.
Previous Applications
The property was developed initially (prior to 1992) for a paper products manufacturing facility
(Scott Paper) which later became Procter & Gamble. Over the years, there have been multiple
development applications that have expanded the facility. Mostly recently these plans include: a
Site Plan S-98-35 Procter & Gamble Addition of building additions totaling 76,340 SF with
parking lot areas, stormwater management improvements, and tree plantings/reforestation area in
1998; MI-02-09 Procter & Gamble Entrance; Site Plan S-04-02 Revised Procter & Gamble
Truck Loading Dock Addition in 2004; and V-13-10 Procter & Gamble (Area Variance related
to parking).
Surrounding Properties
The subject property of Procter & Gamble is located on the south side of W. North Street where
other lands are also zoned IPM (Industrial Park Manufacturing Zone) including the Kraft Heinz
facility, a City elevated water tank, and an electric generating facility. To the south is the City’s
VanSant Generating Station and the City’s Public Works yard on a parcel zoned ROS
(Recreational and Open Space Zone). To the west and south across Electric Avenue is Schutte
Park which includes the Pitts Recreation Center and various sports fields and is zoned ROS
(Recreational and Open Space Zone). To the north across W. North Street, are a series of single
family residences zoned R-8 (One Family Residence Zone), and then areas zoned IPM including
office building, the Capital School District Offices, and other buildings in the Enterprise
Business Park.
III. ZONING REVIEW
IPM (Industrial Park Manufacturing Zone)
Zoning Ordinance, Article 3 Section 20 lists the permitted uses, conditional uses, and other
provisions of the IPM (Industrial Park Manufacturing Zone) zone. In Article 3 Section 20.11, it
notes for the IPM zone that the use of as manufacturing facility is an allowable use and also
allowed area warehousing, transshipment and distribution, and logistics support and trucking
terminals. The bulk standards for the IPM zone (Conventional Lot Development) are listed in
Article 4 Section 4.16.
SWPOZ – Source Water Protection Overlay Zone, Tier 3: Excellent Recharge Area
The subject area is also partially subject to the SWPOZ (Source Water Protection Overlay Zone).
In this case, the SWPOZ: Tier 3 – Excellent Recharge Area crosses through the southwestern
portion of the subject area. The regulations regarding the Tier 3 - Excellent Recharge Areas of
the SWPOZ can be found in Article 3 §29.79 of the Zoning Ordinance. For Tier 3: Excellent
Recharge Areas, the maximum lot coverage for the site is 30% unless infiltration is utilized then the
71
Page 72
Item 3.
S-24-09 Procter & Gamble Warehouse Expansion & Parking Improvements
DAC Report of June 5, 2024
Page 4 of 13
maximum lot coverage is 60%. In the SWPOZ, the differential volume of stormwater between the
30% and 60% lot coverage must utilize infiltration. The Plan indicates that the impervious coverage
in the SWPOZ area is 39% and they are planning for infiltration measures.
The purpose of the Source Water Protection Overlay Zone (Zoning Ordinance Article 3 §29) is
to provide a safe drinking water supply and to ensure that groundwater is adequately protected
and maintained. The following uses listed below are prohibited throughout the SWPOZ,
including in the Tier 3 area. The proposed use of this type of manufacturing facility and
associated warehouse additions and parking areas would be allowed.
Zoning Ordinance Article 3 Section 29
29.51 Uses prohibited:
a) Automobile body/repair shop, motor vehicle, boat or farm equipment service;
b) Gas stations and motor vehicle service stations;
c) Fleet/trucking/bus terminal;
d) Dry cleaner;
e) Electrical/electronic manufacturing facility;
f) Machine shop;
g) Metal plating/finishing/fabricating facility;
h) Chemical processing/storage facility;
i) Wood preserving/treating facility;
j) Junk yard/scrap yard/salvage yard;
k) Mines/gravel pit;
l) Land divisions resulting in high density (> one unit/acre) septic systems;
m) Equipment maintenance/fueling areas;
n) Injection wells/dry wells/sumps, except for single-family residences directing
gutter downspouts to a drywell;
o) Underground storage tanks;
p) All uses not permitted in the underlying zone district.
Tier 3 – Excellent Recharge Area and the use of infiltration to allow for impervious surface
coverage of 39% will be reviewed as part of the Stormwater Management Plan by the Kent
Conservation District.
Site Development Master Plan
The plan for this project is submitted for review under the Site Development Master Plan process
(See Zoning Ordinance, Article 10 §2.44 listed below). This process allows for a series of
construction phases to be outlined in a Master Plan for Planning Commission review and
approval. Prior to each Phase of construction, a Site Plan specific to that phase is submitted for
Administrative Site Plan review.
Article 10 §2.44 Site development master plans. Conceptual site development master plans shall
be reviewed by the planning commission in accordance with the provisions of subsection 2.43.
Conceptual site development master plans shall depict a site development proposal that reflects
general compliance with the provisions of the zoning ordinance and shall also reflect the following
information on the plan:
(A) Conceptual Master Plan. Conceptual Master Plan shall include the proposed general
layout of building, streets, parking, open space, landscape concepts, and stormwater
management areas.
(1) Detailed site construction plans, details, and specifications are not required as part of
a site development master plan submission.
(2) The plan shall illustrate distinct phase boundaries for each proposed construction
72
Page 73
Item 3.
S-24-09 Procter & Gamble Warehouse Expansion & Parking Improvements
DAC Report of June 5, 2024
Page 5 of 13
phase and shall depict proposed construction and site improvements planned for
each phase. Bulk quantities and area totals for each construction phase, and for the
total site, shall be tabulated in a data column on the plan.
(3) Each construction phase shall be enumerated in sequential order on the site
development master plan according to the order of construction contemplated by the
plan. Phases shall be implemented in accordance with the approved site
development master plan unless the city planner approves an alternate phasing.
(4) Each construction phase represented on the master plan shall be planned and
designed to function independent of construction and site improvements
contemplated in future construction phases in all respects, including but not limited to
bulk area provisions of the zoning district in which the site is located, off-street
parking requirements, site entrances, emergency access requirements, site utilities,
and stormwater management improvements except where the requirements and
needs of a later phase are met and remain met by a previous phase of completed
construction.
(5) Any special agreements or conditions of approval relative to the overall development
that have been specified by regulatory agencies shall be documented on the site
development master plan.
(B) Phased site plan approval. Individual phased components of the Conceptual Master Plan
are to be reviewed and approved as an Administrative Site Plan. Final site construction
plans, including detailed site grading, paving, utilities, stormwater management, and tree
planting and preservation plans shall be submitted for final approval by the city planner
and/or authorized designee, and to other agencies having jurisdiction, on a phase by
phase basis in accordance with the approved site development master plan, and all
regulations of the City of Dover governing the approval of site plans as set forth in
subsection 2.4 and 2.5.
IV. PARKING SUMMARY
The parking requirement in the IPM zoning district is one space per 800 S.F. floor area or one
space per employee of the largest shift. With this Master Plan, the total floor area of the facility
is estimated at 662,942 SF and the largest shift is identified as 185 employees. The plan shows
an Employee/Visitor Parking Lot and a Contractor Parking Lot as parking spaces for (passenger)
vehicles. Additionally, there are truck parking areas in the Truck Drop Lots A and B/C (not at
the loading docks) allows for more parking functionally related to building operations for staging
of trucks on-site. From the plan, there appear to be 387 car parking spaces and 303 truck/trailer
parking spaces.
The applicant has provided a narrative letter regarding parking at this facility which analyzed a
previous variance application V-13-10; company employee and contractor projections; the
parking strategy; and truck traffic volumes and distribution. See attached Letter and attachments
of June 6, 2024.
Planning Staff is satisfied that the project Master Plan meets its parking requirements. Planning
Staff in evaluating the parking compliance for this project site considered the 2013 Board of
Adjustment Application V-13-10 that established a parking requirement of 306 parking spaces (a
reduction from 766 parking spaces based on a rate of one parking space per 800 SF of the floor area
at the site for just over 600,000 SF floor area). This variance as analyzed by the applicant suggests it
could translate to a rate of one parking space per 1,961 SF of floor area which would also cover the
anticipated employee population of the facility. There are clearly over 306 parking spaces for
passenger vehicles proposed in this Master Plan S-24-09. The Building Additions that are proposed
for this Master Plan are for warehouse areas where the Truck Drop Lot Parking is more closely
associated with that function operationally; and the truck/trailer parking will be expanded by this
project. The Truck Drop Lot parking area could also be viewed as accommodating passenger
73
Page 74
Item 3.
S-24-09 Procter & Gamble Warehouse Expansion & Parking Improvements
DAC Report of June 5, 2024
Page 6 of 13
vehicle parking (at 2 cars per truck space) which would clearly meet the parking requirements based
on total floor area (662,942 SF floor area requires 829 spaces).
Loading Spaces
The requirement for loading spaces in the IPM zone is based on building square footage of the
specific uses. However, the number of required loading spaces for buildings in excess of 150,000
square feet is not specified and the applicant is to provide sufficient off-street loading berths for
the operations. Planning Staff is to evaluate the sufficiency of the loading area proposed. This
plan shows multiple loading dock locations around the building to satisfy this requirement.
Additionally, there are a series of parking spaces for truck/trailer parking.
Bicycle Parking
The site is required to provide bicycle parking. The bicycle parking calculation is one for every
twenty parking spaces. Several bike rack locations are noted on the plan.
V. BUILDING ARCHITECTURE
The proposed Warehouse additions are expansions of the existing building and area anticipated
to be similar in architectural appearance. Specific elevations were not submitted; building
addition are exempt from this submission requirement per Zoning Ordinance, Article 5 §19 (3).
The facility must comply with the maximum height limitations of the IPM zoning district. For
this zoning district, the maximum height is limited to distance of the element from the nearest
property line. The building placement is within the buildable area established by the front yard
setback of 60 feet and side yard and rear yard setbacks of 40 feet.
VI. SITE CONSIDERATIONS
Access
The site has a main access/egress points to W. North Street where access onto the property is
controlled by a proposed improved Logistics and Security Office kiosk building. The Contractor
Parking Lot will have access from Electric Avenue only.
Lighting
The lighting internal to the site is shown within the parking lots in island areas and the
perimeters of the truck drop lot parking areas. There is likely other lighting attached to or in
proximity of the building.
Dumpster
For non-residential uses, a minimum of two Dumpsters are required for the site. The plan
indicates several locations serving as a Dumpster area.
Sidewalk
Waiver Request - Partial Elimination of Sidewalk
Sidewalk is required along all street frontages and within the site in accordance with Zoning
Ordinance, Article 5 §18. A multi-use path/sidewalk exists along the frontage of W. North
Street. The project proposes construction of a sidewalk along about 450 feet of the Electric
Avenue extending from the W. North Street /Hazlettville Road intersection south to the
improved contractor parking lot entrance (on Electric Avenue). They have submitted a Waiver
Request to eliminate the sidewalk on the east side of their remaining Electric Avenue frontage
(approximately 2,300 linear feet) as pedestrians are not desired in that area; see Letter of May 3, 74
Page 75
Item 3.
S-24-09 Procter & Gamble Warehouse Expansion & Parking Improvements
DAC Report of June 5, 2024
Page 7 of 13
2024. The Planning Commission should act on this waiver request as part of their review of the
Site Development Plan; see the following Zoning Ordinance citation on waivers of pathways.
Sidewalks are a type of pathway.
Article 15 §18.5 Waiver of pathway locations requirements. The property owner or developer may
request a waiver from the planning commission or city planner, according to the type of plan
review required by article 10 of this ordinance, under the following circumstances in order to
reduce or eliminate the requirements for pathway installation:
a) When the property is isolated from the existing pathway network, with no existing
pathways within the immediate vicinity of the property.
b) When the proposed use would not generate or attract additional pedestrian, bicycle, or
other non-motorized trips.
c) When physical characteristics of the property are such that pathway installation is
impractical or impossible.
As part of the Waiver Request, they have proposed an Alternative Method of Compliance with
an offer to expand the sidewalk on the west and southern sides of Electric Avenue from the
current pathway terminus (near the first curve of Electric Avenue) to the Dover Little League
Complex area. This offer would have to be evaluated by the City of Dover for feasibility.
In addition, on the site, sidewalks are shown connecting from the street frontage sidewalks into
the site and for pedestrian access from parking areas to building entrances.
Curbing
Waiver Request: Partial Elimination of Curbing
The Zoning Ordinance, Article 6 §3.6(b) requires upright curbing for all parking areas and access
drives. The presence or lack of curbing surrounding the parking lots and truck drop lot areas
must be clarified. A written waiver request for the elimination of upright curbing in select area of
the Contractor and Employee Parking Lots was submitted to the Planning Office in a Letter of June
6, 2024 citing the reasons for the request related to drainage related to stormwater management. The
Letter indicates that curbing will be utilized in the Truck Drop Lot areas.
Wetlands & Buffering
The Zoning Ordinance, Article 5 §11.22 prescribes provisions related to wetland areas. It
requires setbacks from wetland areas that are over 0.25 acres in size. This plan depicts Non-Tidal
wetlands which coincide with a stream in the wooded area to the south of the existing building in
the vicinity of the existing stormwater management facility. A 100-foot setback is required;
however, this can be reduced to 50 feet with implementation of a Riparian Buffer or reduced to
30 feet with bank stabilization. Adjacent to the wetland/stream the plan shows a 100 foot riparian
buffer on its south side where existing woodland vegetation will be maintained. Portions on the
northern side of the wetland area are non-conforming to this buffer requirement as adjacent
development predates these requirements.
VII. SPECIAL FLOOD HAZARD AREAS
Flood Hazard Area
Portions of the subject property are within the Special Flood Hazard Area (100-year floodplain/
1% chance of annual of flooding). This property is found on the FEMA FIRM Panels of Kent
County Delaware Map Number 10001C0168H effective 5/5/2003. The Zoning Ordinance,
Article 5 §11.21 requires that flood hazard areas (100-year floodplain) remain as open natural
75
Page 76
Item 3.
S-24-09 Procter & Gamble Warehouse Expansion & Parking Improvements
DAC Report of June 5, 2024
Page 8 of 13
areas with no impervious surfaces. The select areas on the along the southeastern area of this
tract of land are where the Special Flood Hazard Area is found will remain as the natural area
and it is outside of the proposed development area.
VIII. TREE PLANTING AND LANDSCAPE PLAN
The Landscape Plan shows a concept for woodland area preservations, existing tree preservation,
and the concept for new tree plantings. Zoning Ordinance, Article 5 Section 16 lays out the
requirements for tree planting and preservation. A new project is required to provide tree planting
at a rate of one (1) tree per 3,000 SF of “Development Area.” The Zoning Ordinance Article 5,
Section 16 defines “Woodland” as follows:
Woodland. An area of contiguous wooded vegetation (7,500 square feet or greater), where
trees exist at a density of at least one tree with a caliper dimension of six inches or greater per
375 square feet of land and where the tree branches form a contiguous canopy.
According to plans, there are x acres of existing woods, and they propose to remove a portion of the
woodland area (4.1 acres) to make way for the Truck Drop Lot B/C expansion development and
preserving 89% of the woodland. The maximum amount of woodland that can be cleared is 50%
with anything over that amount requiring mitigation.
Based on a development area of 25.87 acres, the minimum required number of trees is 376. The site
plans show existing and proposed trees spread over the site around the parking lots, in a lawn area in
front of the building, and other locations.
IX. PERFORMANCE STANDARDS REVIEW
Uses in the IPM (Industrial Park Manufacturing Zone) are subject to the performance standards
summarized in Zoning Ordinance, Article 5 §8.1 and as more specifically outlined in Article 5
§8.5.
Article 5 §8.1 Dangerous and objectionable elements. No land or building in any zone shall
be used or occupied in any manner so as to cause any one or more of the following
conditions to exist and to be dangerous, injurious, noxious or offensive beyond the
boundaries of such premises in such a manner or in such amount as to adversely affect the
reasonable use of the surrounding area or adjoining premises: Fire, explosive or other
hazard; noise, or vibration; smoke, dust, odor or other form of air pollution; heat, cold,
dampness or electromagnetic disturbance; glare, liquid or solid refuse or waste; traffic
congestion causing roadways or intersections in the surrounding highway network to fall
below acceptable levels of comfort and convenience; or other substance, condition or
element (referred to hereinafter as "dangerous or objectionable elements"), provided that any
use permitted or not expressly prohibited by this ordinance may be undertaken and
maintained if it conforms to the regulations of this section limiting dangerous and
objectionable elements at the point of the determination of their existence.
The project’s compliance with a series of performance standards for the “dangerous and
objectionable elements” are to be considered by the Planning Commission. The “dangerous and
objectionable elements” are as follows:
• Fire and explosion hazards (activities with and storage of)
• Radioactivity or electromagnetic disturbance
• Noise (sound pressure level)
• Vibration
• Smoke
76
Page 77
Item 3.
S-24-09 Procter & Gamble Warehouse Expansion & Parking Improvements
DAC Report of June 5, 2024
Page 9 of 13
• Odors (Odorous gases or odorous matter)
• Fly ash, dust, fumes, vapors, gases, and other forms of air pollution
• Glare (from lighting or high temperature processes)
• Liquid or solid wastes
• Traffic congestion (Level of Service E)
The project cannot cause the above conditions to exist so that they adversely affect the
surrounding areas or adjoining properties. The specific limits of each performance standard are
described in the Zoning Ordinance. Where the performance standards conflict with regulations
established by other state or local agencies such as the Delaware Department of Natural
Resources and Environmental Control (DNREC), the more restrictive regulations apply.
As part of this procedure, a Performance Standard Review Application is required to accompany
this Plan submission for review and approval. The Applicant has submitted a Performance
Standard Review Application Report (dated May 2, 2024) indicating how the proposed
development would restrict the emission of dangerous and objectionable elements detailed in
Article 5, Section 8.5.
VIII. CITY AND STATE CODE REQUIREMENTS:
The subject proposal has been reviewed for code compliance, plan conformity, and completeness
in accordance with the agency’s authority and area of expertise. The following items have been
identified as elements which need to be addressed by the applicant:
1) Review and Approval of the Performance Standards Review Application is required for the
property development in accordance with Zoning Ordinance, Article 5 §8. The applicant has
submitted a Performance Standard Review Application Letter indicating how the proposed
development would restrict the emission of dangerous and objectionable elements detailed in
Zoning Ordinance, Article 5, Section 8.5.
2) Upright curbing must be provided around all parking areas and circulation drives in
accordance with the Zoning Ordinance. A waiver may be granted by the City Planner, if
necessary, for stormwater management. A Waiver Request was submitted.
3) Sidewalks must be provided along the full frontage of Electric Avenue unless the Waiver
Request is approved for the partial elimination of the sidewalk. The Planning Commission
will consider the Waiver Request for the partial elimination of sidewalks.
4) Sheet T-1, Cover Sheet:
a) Add title of signee for the owner/developer.
b) Indicate the location of zoning SWPOZ (Source Water Protection Overlay Zone).
c) Zoning Location Map does not include the location of the SWPOZ; add or note for
clarify. The map also references Sussex County rather than Kent County.
d) General Notes:
i) Update reference for Miss Utility to new name.
e) Site Data Column:
i) List SWPOZ (Source Water Protection Overlay Zone): Tier 3 – Excellent Recharge
Area under Zoning.
ii) List Building Additions individually by area.
77
Page 78
Item 3.
S-24-09 Procter & Gamble Warehouse Expansion & Parking Improvements
DAC Report of June 5, 2024
Page 10 of 13
iii) List activities of each Phase.
iv) Identify size of area in SWPOZ in square feet.
v) Clarify the listing of Parking Requirements as it appears to mix vehicle and truck
parking.
vi) List bicycle parking calculation and number provided.
5) Sheet Series EX, Existing Conditions Plan:
a) Show the location of the Floodplain boundary.
b) Label sizes of wetland areas.
c) In Legend identify line and hatch as SWPOZ (Source Water Protection Overlay Zone:
Tier 3 – Excellent Recharge Area.). Ensure Legend includes all linework items.
d) Check the labels of the Match lines to ensure they reference the correct sheet series.
e) Label number of bicycle parking spaces at each rack identified.
f) List complete Zoning Ordinance reference for the wetland buffers (Zoning Ordinance,
Article 5 Section 11).
g) Show boundary of stormwater pond to the south of the building.
6) Sheet series SP – Site Plan:
a) Clarify locations of areas of curbing.
b) Label existing/ proposed fences and their materials and height.
c) Add a detailed listing of components of each Phase.
d) Identify width of walkway trails and sidewalks and format of crosswalk areas.
e) Add traffic control signage for fire lanes and handicapped parking signage/markings
locations.
f) Ensure accessible ramps are provided from handicapped spaces onto sidewalk system and
also at points of intersection of sidewalk with parking lot.
g) Ensure access point through new fence to maintain new stormwater management pond.
7) Sheet series LS - Landscape Plan:
a) Complete listings of calculations of development area and tree plantings.
b) Update Match line labels to this sheet series.
c) Confirm the woodland area and woodland clearing amounts in the Development Area.
d) Information and tree planting calculations will need to be made by Phase.
e) Provide a list of existing trees to remain and check the number of existing trees to be
retained.
f) Check tree placement for utility conflicts and relocate as necessary to maintain adequate
separation distances.
8) Clarify size of Warehouse 3 Addition as in the documents it is listed as 20,000 SF and 21,400
SF.
9) Construction details for items such as curbing, parking bumpers, traffic control signage, light
fixtures, stormwater, and utility details, etc. will need to be provided as part of
Administrative Site Plan submissions.
10) A separate Record Plan sheet must be submitted to show items such as right-of-way
dedications, any easements, and other items affecting the property lines or if required by
another agency’s approval process.
78
Page 79
Item 3.
S-24-09 Procter & Gamble Warehouse Expansion & Parking Improvements
DAC Report of June 5, 2024
Page 11 of 13
11) The Master Plan/ Site Plans must reflect any changes recommended by the Planning
Commission. Add notes for any waivers or conditions acted upon by the Planning
Commission.
12) The proposed sign locations shown on this plan sheet are for informational purposes only and
approval of this plan does not grant approval to this signage. All signage must comply with
Sign Regulations of the Zoning Ordinance and is subject to a separate Sign Permit
Application. Signs are subject to a separate review and approval process in the City of Dover.
13) Any Sediment & Stormwater Management Plans granted approval by the Kent Conservation
District must reflect the Site Plan layout and design conditionally approved by the Planning
Commission and be in compliance with the Zoning Ordinance and technical review
requirements of other agencies.
14) Additional review comments may be provided in the future as more detailed plans are
developed during the Administrative Site Plan review process.
X. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET
CODE OBJECTIVES:
In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in
considering and acting upon Site Development Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the
public in general, and the residents of the immediate neighborhood in particular shall be taken
into consideration. These safeguards may to the maximum extent possible further the expressed
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed
in subsections 2.21 to 2.28.
1) Approved Waiver Request:
a. Waiver Request - Elimination of Upright Curbing: Planning Staff grants approval
to the elimination of upright curbing for select areas of the parking lots
recognizing existing conditions and anticipated stormwater management practices
where parking lot are being expanded or improved.
2) Recommendation on Waiver Request:
a. Waiver Request – Partial Elimination of Sidewalk: Planning Staff recommends
approval of the waiver request to eliminate the requirement for the construction of
sidewalks along eastern side of Electric Avenue south of the Contractor Parking
Lot entrance. This is based on the findings of the physical characteristics of this
frontage area and that it is segment unlikely to be traveled by pedestrians for
access purposes.
3) Parking: Planning Staff has evaluated the Master Plan for parking compliance and finds
based on the previously established variance V-13-10; the proposed Parking Lot areas
and Truck Drop Lots; the building floor area and facility function; and the expected
employee population for the Procter & Gamble facility that the Plan proposed satisfies
the parking requirements. See discussion in the Report (page 5). 79
Page 80
Item 3.
S-24-09 Procter & Gamble Warehouse Expansion & Parking Improvements
DAC Report of June 5, 2024
Page 12 of 13
4) Consideration of Performance Standards Review Application: Planning Staff has
reviewed the Performance Standards Review Letter submitted and finds that it
sufficiently demonstrates the intent to comply with the restrictions as provided in Zoning
Ordinance, Article 5 Section 8.1 and 8.2 and that the continued use of the building as a
manufacturing facility, its warehouse additions, and truck drop/parking facilities are not
likely to cause these objectionable elements.
5) Electric Vehicle: Planning Staff encourages this project to consider the installation of
Electric Vehicle Charging Stations in its parking lots/parking areas. Currently, the Zoning
Ordinance does not require them, but many other jurisdictions have implemented such
requirements. Electric Vehicle Charging Stations formats include EV-Capable, EV-
Ready, and EV-Installed.
Other agencies may recommend additional considerations to meet code objectives in accordance
with their areas of expertise. Action on all considerations identified in this section is at the
discretion of the Planning Commission.
ADVISORY COMMENTS TO THE APPLICANT:
1) The Planning Commission should act upon the request for waivers as part of any motion
regarding this project application, or as a separate motion as necessary. Note: All waivers
are at the discretion of the Planning Commission. The Commission may approve or deny
waiver requests.
2) The site is located within the SWPOZ (Tier 3: Excellent Recharge Area) and the Planning
Office and Kent Conservation District will coordinate to ensure compliance.
3) In the event, that major changes and revisions to the Site Development Plan/ Master Plan
occur in the finalization of the Plan contact the Planning Office. Examples include
reorientation of the complex/building, relocation of site components like stormwater
management areas, and increases in floor area count. These changes may require
resubmittal for review by the Development Advisory Committee, Planning Commission,
or other agencies and commissions making recommendations in regard to the plan.
4) Following Planning Commission approval of the Site Development Master Plan, the Plan
must be revised to document all conditions of approval from the Development Advisory
Committee or as otherwise noted. This process involves submission of Check Prints in
order to achieve Final Plan approval; the finalization of the Master Plan and the Site Plan
for Phase 1 can be achieved together. Then the Site Plan of each construction
phase/project area (Phases 2-4) must be submitted for Administrative Site Plan Review
by the Planning Office and other agencies. Zoning Ordinance, Article 10 §2.44 (D) sets
forth the construction timing in relation to approvals.
Article 10 §2.44
(D) Expiration of planning commission approval. For projects which are reviewed and
approved by the planning commission as conceptual master plans, approval of the
conceptual master plan shall remain valid for a period not to exceed five years from the date
of planning commission approval, provided that the authorized construction or use has
commenced within two years of approval and is proceeding toward completion. In addition,
80
Page 81
Item 3.
S-24-09 Procter & Gamble Warehouse Expansion & Parking Improvements
DAC Report of June 5, 2024
Page 13 of 13
the time between the completion of one phase and the initiation of the next phase shall not
exceed a period of two years.
5) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
6) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate site inspections, Pre-Construction meeting and permits/licenses
are required.
7) Construction may have an effect on the nearby properties and the travel lanes of W.
North Street and Electric Avenue. Any work requiring the closing or rerouting of visitors
to other properties served by this road should be coordinated as to offer the least amount
of inconvenience.
8) For building new construction, the requirements of the building code and the fire code
must be complied with. Consult with the Chief Building Inspector and City of Dover Fire
Marshal for these requirements. The resolution of these items may impact the site design
including such items as building dimensions and height, building openings, and fire
protection needs, etc.
9) The applicant shall be aware that Master Plan/Site Plan approval does not represent a
Sign Permit, nor does it convey permission to place any sign on the premises. Any
proposed site or building identification sign shall require a Sign Permit from the City of
Dover prior to placement of any such sign. It is recommended that the applicant discuss
the sign regulation requirements with the Planning Staff prior to applying for a Sign
Permit.
10) The applicant shall be aware that Master Plan/Site Plan approval does not represent a
Building Permit and associated construction activity permits. A separate application
process is required for issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
81
Page 82
Item 3.
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MAY 29, 2024
APPLICATION: Procter & Gamble Warehouse Expansion & Parking
Improvements
FILE #: S-24-09
REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater
CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services
CONTACT PHONE #: 302-736-7025
CONTACT EMAIL #: jlyon@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
SANITATION
1. The property will require private trash collection services.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from
Kent Conservation District is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert
elevations must be labeled on all stormwater structures.
STREETS
1. Final site plan approval will not be granted until a copy of the approved entrance plan, signed by DelDOT is submitted to our
office.
2. Please add the following notes to the plans:
a. Standard City of Dover sidewalk, as per chapter 98, article IV of the Dover Code of Ordinances, shall be required to be
installed along the entire public street frontage of a property. Where frontage sidewalk exists but does not meet the
standards of chapter 98, article IV, the sidewalk shall be re-laid to meet the standards. Sidewalk shall include barrier-free
access ramping at points of intersection with street crossings and at other locations so as to afford reasonable barrier-free
pedestrian movement and site access.
b. In accordance to Appendix A, Article VI, Section B.3, all sidewalks shall ascend from the curbstone to the building line at the
ratio of one-quarter of an inch to the foot. Nothing in this section shall be construed to affect any pavement previously laid
by order of the city council, until it is taken up and relaid.
3. The current City of Dover standard street section provides for a 3’ grass strip between the curb and sidewalk. This standard was
administratively revised to meet ADA and FHA compliance with cross slope requirements and to prevent cars from scrapping at
82
Page 83
Item 3.
Procter & Gamble Warehouse Expansion & Parking Improvements
File #: S-24-09
May 29, 2024
Page 2 of 4
driveways. The revised standard utilizes a five feet (5’) wide public sidewalk with a five feet (5’) wide grass strip behind the
curb.
WATER
1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010.
Please contact our office for more information.
2. The following notes must be added to the plans:
a. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the project.
b. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance
with the City of Dover Department of Water & Wastewater specifications and requirements.
c. The site contractor shall contact the City of Dover Department of Water & Wastewater Construction Manager at (302) 736-
7025 prior to the start of construction. A representative from the City of Dover Department of Water & Wastewater must
observe and approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted in the field
due to conditions of the existing main. Possible conditions that would require tapping relocation include proximity to pipe
joints, other taps, concrete encasements, conflict with other utilities, and the like. Test holes must be performed by the
contractor to determine the best tapping location. The City of Dover will not be held responsible for field conditions requiring
adjustment of the tapping location or for any work required by the contractor to make an appropriate and lawful connection.
WASTEWATER
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall discharge or cause
to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff, subsurface drainage,
uncontaminated noncontact cooling water or unpolluted industrial process waters to any sanitary sewer”, this shall include
condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as “…any system used for conveying rain water,
surface water, condensate, cooling water or similar liquid wastes, exclusive of sewage.” The contractor, developer, owner
and designers shall ensure during construction that no illegal discharges to the sanitary sewer system are created with the
site improvements.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This must
be included as a note on the plan.
2. No trees may be planted within ten feet (10’) of utility infrastructure.
3. No structure may be installed within ten feet (10’) of city owned utility infrastructure, please depict all underground utilities and
structures on the utility plan sheet to confirm compliance.
4. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2018 (.dwg format).
b. Adobe Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
83
Page 84
Item 3.
Procter & Gamble Warehouse Expansion & Parking Improvements
File #: S-24-09
May 29, 2024
Page 3 of 4
SANITATION / STORMWATER / STREETS / GENERAL
1. None.
WATER
1. The water infrastructure on this site is privately owned and maintained. We suggest that structures should be installed within
ten feet (10’) of water infrastructure.
WASTEWATER
1. The wastewater infrastructure on this site is privately owned and maintained. We suggest that structures should be installed
within ten feet (10’) of wastewater infrastructure.
ADVISORY COMMENTS TO THE APPLICANT
WATER
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with extending and
providing service to the proposed development.
2. Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking Water for
review and approval. The owner/developer will be responsible for providing all completed forms and plan sets to the City of
Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the Office of Drinking Water until
review has been completed by our office.
3. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of Water &
Wastewater directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the site.
4. Water impact fees may be required to be paid prior to Certificate of Occupancy for this project.
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated with extending
and providing service and capacity to the proposed development.
2. Prior to plan approval, it may be required to submit the sanitary sewer system plans to the DNREC, Division of Water Resources,
Surface Water Discharges Section for review and approval. The owner/developer is responsible for providing all application fees,
completed forms and plan sets directly to DNREC.
3. Profiles of the sanitary sewer main must be provided with the construction plans. All water, sanitary sewer and storm sewer
crossings must be shown on the profiles.
4. Wastewater impact fees may be required to be paid prior to Certificate of Occupancy for this project.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be abandoned,
flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan
set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission Checklist,
which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
SANITATION / STORMWATER / STREETS
1. None.
84
Page 85
Item 3.
Procter & Gamble Warehouse Expansion & Parking Improvements
File #: S-24-09
May 29, 2024
Page 4 of 4
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE
P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
85
Page 86
Item 3.
CITY OF DOVER ELECTRIC
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MAY 29, 2024
APPLICATION: Procter & Gamble Warehouse Expansions & Parking
Improvements
FILE #: S-24-09
REVIEWING AGENCY: City of Dover Electric Department
CONTACT PERSON: Shawn Burgett, Engineering Services & System Ops Superintendent
CONTACT PHONE #: 302-674-7568
CONTACT EMAIL #: sburgett@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all existing underground electric, communications and water facilities.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric
Department. Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to
construction. Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
86
Page 87
Item 3.
Procter & Gamble Warehouse Expansions & Parking Improvements
File #: S-24-09
May 29, 2024
Page 2 of 2
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months’ notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook
is now available on the website at the following link: https://evogov.s3.amazonaws.com/media/27/media/13108.pdf.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. Provide load sheets as soon as possible for proper sizing of transformers and creation of primary fee estimates.
Current load sheets can be found at the following link:
https://www.cityofdover.com/media/Electric%20Department/COD%20Electric%20Load%20Sheet.pdf.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON
AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
87
Page 88
S-24-09 C F
Item 3.
CITY OF DOVER
I I
T R
DEVELOPMENT ADVISORY COMMITTEE Y E
APPLICATION REVIEW COMMENTARY O M
F A
D.A.C. MEETING DATE: May 29, 2024 R
D S
O H
APPLICATION: Proctor & Gamble Warehouse Expansions and Parking Improvements V A
E L
FILE #: S-24-09 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal R
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
josika@dover.de.us
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed occupancy classification is warehouse/storage.
2. Building Access shall be no further than 50 feet from a primary entrance.
Where buildings are provided with an automatic sprinkler system installed in accordance with
NFPA 13, access shall be no further than 100 feet from the primary entrance.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.4)
3. Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times the
width of the door(s) or for 10 feet, whichever is greater.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
4. Perimeter access shall be 50% and clearly shown on the plans.
Perimeter Access minimum width shall be10 feet for one-story buildings and 15 feet for buildings of
two or more stories, measured from the face of the building at grade with a maximum slope of ten
percent (10%). Plantings and utility services (includes condenser units, transformers, etc.) shall be
permitted within the perimeter access, and shall not interfere with emergency services fire ground
operations.
If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building
perimeter shall not be included in the calculation of Percent of Perimeter Access.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5)
Where parking is located between the building and perimeter access area, parking shall not be
located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall
for building of two or more stories.
5. Fire lanes shall cover 25% of the proposed building.
88
Page 89
Item 3.
Fire lanes are required to be 24 feet wide and run along the front of the building as determined by the
primary entrance(s). In cases where there is more than one primary entrance(s), each shall be served
by a fire lane even if this exceeds the percentage as required.
The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and the
closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one or two
stories in height; 40 feet if three or four stories in height, or 30 feet if over four stories in height.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5)
6. Where parking is located between the building and the fire lane, parking shall not be located closer
than 15 feet to the exterior wall.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.4.1)
Where parking is located between the building and the perimeter access area, parking shall not be
located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall
for building of two or more stories. 2021 Delaware State Fire Prevention Regulations, 705, Chapter 5,
3.5.2
7. All Fire Lanes shall be marked as follows:
both the inner and outer edges of the fire lane shall be marked, where curbs are present, the top and
face of the curb shall be painted yellow, where no curbs are present, a four inch (4”) solid yellow
demarcation line shall mark the edge(s) of the fire lane.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
8. The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware
Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be
suitable for street surfaces
9. Fire lane signs shall be located as follows:
see Figure 5-16 – Approved Sign For Marking Fire Lanes, fire lane signs shall be spaced at 150 foot
intervals maximum, all fire lane signs shall be located no less than six feet (6’) and no higher than
eight feet (8’) above the pavement, signs shall be placed at each end of the fire lane, and signs shall
face all oncoming traffic.
Where parking is not restricted roadway markings shall utilize the words "FIRE" and "LANE" in lieu
of fire lane signs and shall conform to the specifications of 7.6.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
10. Where overhangs, canopies, balconies, or any other building or site features must project over any
fire lane, an unobstructed vertical clearance of not less than 13’-6” above the fire lane shall be
provided and the portion of the building perimeter which contains overhangs, canopies, balconies, or
any other building features shall not apply towards the fire lane accessibility requirements of Section
4.0, Table 5-1 in this chapter.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.8)
11. All access roadways shall be paved and be a minimum of 20 feet clear width for two-way traffic and
14 feet clear width for one-way traffic. The paved width of access roadway shall be measured from
edge of parking spaces, or face of curb for vertical curb and back of curb for mountable curb, or edge
of pavement if there is no curbing.(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5,
5.2)
89
Page 90
Item 3.
12. Multiple Access Roads shall be provided when a fire department access road (fire lane) is determined
by the Fire Marshal to be impaired by vehicle congestion, condition of terrain, climatic conditions, or
other factors that could limit access such as placement of fire hose from fire equipment.
13. Street width shall be in accordance with City of Dover Code of Ordinances, Appendix A, Article VII,
Section A. 13,
Residential areas
24 feet wide with no parking,
30 feet wide with parking on one side, or
36 feet wide with parking on both sides
Commercial areas
26 feet wide with no parking,
32 feet wide with parking on one side, or
38 feet wide with parking on both sides
Alley
12 feet wide
14. Any dead-end road more than 300 feet in length shall be provided with a turnaround or cul-de-sac as
outlined in the 2021 Delaware State Fire Prevention Regulations 705, chapter 5, 2.3.
15. Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in
reference to this process.
16. Gated Areas: Fire Department access shall be provided to the property through the use of a system or
device approved by the Fire Marshal. The system or device required shall be located in an area
accessible to the fire department and approved by the Fire Marshal. All gates shall be either
automatic or manual.
An automated system shall consist of one manual and one automated means to open the gate. The
owner or their representative shall meet with the Fire Marshal prior to submission to agree on the
system. A letter of agreement shall be created and signed by both parties. The letter shall include a
detailed description of both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their representative
shall meet with the Fire Marshal prior to submission to agree on the means to open. A letter of
agreement shall be created and signed by both parties. The letter shall include a detailed description
of the manual means to open.
To be considered accessible for fire department apparatus the actual clear openings shall be not less
than 14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate shall be
setback from the perpendicular street by at least 50 feet.
Please contact this office to discuss options available to comply with this requirement.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)
17. Fire hydrants shall be installed per the requirements of City of Dover Public Utilities
Water/Wastewater Handbook, NFPA requirements, and Delaware State Fire Prevention
Regulations. City Ordinance Sec 46-9 (f).
5.1.1 Hydrant spacing as shown in the Fire Flow Tables shall be used as a general rule. Hydrants shall
be located at the direction of the State Fire Marshal so as to minimize friction in fire hose. All
hydrant spacing shall be located along available roads or at the direction of the State Fire Marshal.
This measurement shall be calculated by way of accessible thoroughfare(s) from the building to be
90
Page 91
Item 3.
protected to the hydrant and may not necessarily be a radius. 5.1.3 Additional hydrants shall be
provided when the State Fire Marshal deems it necessary based on the configuration of the site,
building(s), exposures, construction, occupancy, and/or specific hazard(s).
Fire Flow table 2, hydrant spacing shall be 800 feet on center for one and two family detached
dwellings, other residential, rowhouses and townhouses, assembly, health care, business, education,
storage, industrial, mercantile, and mini storage. (702, Chapter 6)
NFPA 1
18.5.2 detached one- and two-family dwellings, fire hydrants shall be provided for detached one- and
two-family dwellings in accordance with both of the following: 1. the maximum distance to a fire
hydrant from the closest point on the building shall not exceed 600 feet 2. the maximum distance
between fire hydrants shall not exceed 800 feet.
18.5.3 buildings other than detached one- and two-family dwellings, fire hydrants shall be provided
for buildings other than detached one- and two-family dwellings in accordance with both of the
following 1. The maximum distance to a fire hydrant from the closet point on the building shall not
exceed 400 feet 2. The maximum distance between fire hydrants shall not exceed 500 feet
18. All fire hydrants shall be marked as prescribed within the appropriate section of this regulation and
as illustrated by the appropriate figures of this regulation.
All fire hydrants shall have minimum of four-inch (4") solid yellow demarcation lines to define
specific areas, where fire hydrants are located along a curb line with permitted parking, the area
between the fire hydrant and the street or fire lane shall be stenciled with four inch (4") demarcation
lines and the words "NO PARKING", demarcation lines shall be measured from the center line of the
fire hydrant and extend for a distance 15 feet on both sides.
Where fire hydrants are located in parking lots or other areas susceptible to blockage by parked
vehicles they shall be treated as follows: fire hydrants shall be protected in all directions for a
distance of seven feet (7') with barriers or curbing, Minimum four-inch (4") diameter steel bollards
filled with concrete and marked yellow shall be installed at the outermost corners of the fire hydrant
demarcation area. The minimum height of the bollard shall be 36 inches above the finished grade of
the adjacent surface, and the steamer connection of all fire hydrants shall be positioned so as to be
facing the edge of the street, or traffic lane.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2)
The owner is responsible if the hydrant is private.
19. Hydrant barrels shall be provided with reflective material, such as paint, durable for
highway/roadway markings or a reflective tape of a minimum of 2” in width around the barrel under
the top flange, hydrant bonnets shall be color coded based on the following criteria: class AA 1500
GPM - painted light blue, class A 1,000 GPM -1499 GPM - painted green, class B 500 - 999 GPM -
painted orange, class C 250 - 499 GPM - painted red, class D under 250 GPM - painted black.
(2021 Delaware State Fire Prevention Regulations 703, Chapter 3. 4)
The owner is responsible if the hydrant is private.
20. Hydrants are to be Darling Co. B-62-B Breakaway https://american-usa.com/products/valves-and-
hydrants/fire-hydrants/5-1-4-american-darling-b-62-b-5
21. NFPA 72 compliant Fire Alarm System required per occupancy code requirements.
Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an
occupancy determined to be a place of assembly by the fire marshal and is capable of receiving an
occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with
NFPA codes governing the installation of fire alarms and the National Electrical Code.
91
Page 92
Item 3.
Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined to
be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50 percent of
the assessed value of the building and is capable of receiving an occupant load 75 persons or greater
or is being enlarged to receive an occupant load of 75 persons or greater, shall be required to install
a complete fire alarm system in accordance with NFPA codes governing the installation of fire
alarms and the National Electrical Code.
Public mode audible requirements. To ensure that audible public mode signals are clearly heard by
occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average
ambient sound level or five decibels (dB) above the maximum sound level having a duration of at
least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area required
to be served by the system using the A-weighted scale dBA. In the event the stated requirement
cannot be met a shunt trip relay/switches shall be the approved method of meeting the intent of
this section of the Code.
(City Code of Ordinances 46-171)
22. Sprinkler system required. System is to be monitored by an approved Fire Alarm System.
This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions which
are modified by more than 50% after the effective date of these Regulations. The 50% figure shall be
calculated utilizing the gross square footage of the building, structure, marine vessel, premises and
conditions as to arrive at the correct application.
Any proposal that is presented to the Office of the State Fire Marshal for review and approval
for a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of the gross square
footage of a non-sprinklered building, may not have another such project for the same building
submitted for review and approval any sooner than three (3) years after the date of the final inspection
unless sprinkler projection is provided throughout the entire building.
In all buildings exceeding 10,000 square feet of aggregate, gross floor area.
In all buildings in excess of 40 feet in height or more than four (4) stories in height.
In all buildings or areas thereof used for the storage, fabricating, assembling, manufacturing,
processing, display or sale of combustible goods, wares, merchandise, products, or materials when
more than two (2) stories or 25 feet in height.
In all basement areas exceeding 2,500 square feet floor area.
In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and
exceeding two (2) stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or
Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment
buildings storage areas except individual unit closets that are located within individual residential
living units.
In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA 101,
as adopted and/or modified by these Regulations. In all buildings or areas classified as "high hazard"
under the Life Safety Code, NFPA 101, or "extra hazard" under the Standard for the Installation of
Sprinkler Systems, NFPA 13, as adopted and/or modified by these Regulations.
92
Page 93
Item 3.
All buildings used as dormitories, in whole or in part, to house students at a public or private
school or public or private institution of higher education. (16 Del.C. Ch. 88) This applies to all such
dormitories regardless if new or existing.
(2015 State of Delaware fire Prevention Regulations, 702, Chapter 4)
Places of assembly shall be sprinklered throughout in accordance with the most recently adopted
edition of NFPA 13 when the following apply:
All new indoor places of assembly with an occupant load of 150 persons or greater.
Any interior renovations of 50 percent or more to an existing place of assembly with an occupant
load greater than 150 persons.
Any additions or increase in interior size to an existing place of assembly that would create an
occupant load of 150 persons or greater.
Places of assembly where alcohol is served for consumption on the premises shall be sprinklered
throughout in accordance with the most recently adopted edition of NFPA 13 when the following
apply:
All new indoor places of assembly with an occupant load of 100 persons or greater and where
alcohol will be served for consumption on the premises.
Any interior renovation of 50 percent or more to an existing place of assembly with an occupant
load greater than 100 persons and where alcohol will be served for consumption on the premises.
Any additions or increase in interior size to an existing place of assembly which would create an
occupant load of 100 persons or greater and where alcohol will be served for consumption on the
premises.
New educational occupancies of 5,000 square feet or greater shall be sprinklered throughout in
accordance with the most recently adopted edition of NFPA 13.
(City of Dover Code of Ordinances 46-162)
23. Fire Department Connection is to be a 5-inch stortz connection on a 30-degree elbow located within
50 feet of main entrance. Access to the Fire Department Connection must be clear unobstructed
access as defined by the AHJ.
Fire department connections. Unless otherwise approved by the fire marshal, fire department
connections shall be on the street side of the building and shall be located and arranged so that
hose lines can be readily and conveniently attached to without interference from any nearby
obstructions as defined by the fire marshal's office. Fire department connections shall be a five-
inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover Fire
Hydrant and within 50 feet of the main entrance of the structure it serves. All fire department
connections shall be not less than three feet nor more than five feet in height above finished grade.
The fire marshal shall have the authority to require more stringent requirements when deemed
necessary. (City of Dover Code of Ordinances 46-162)
93
Page 94
Item 3.
24. Parking and/or obstructions shall be prohibited in front of fire department connections for a distance
measuring from the center line and extending four feet on both sides.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
25. Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose would
come off the fire equipment.
26. If there is any type of rack storage, the following will be required: 1) a diagram showing the layout
and type of rack system 2) a list and quantity of items being stored 3) a letter from an
authorized/licensed fire suppression contractor stating that in rack sprinklers are or are not needed.
If in rack sprinklers are not needed, a letter may be requested from an authorized/licensed fire
suppression contractor to ensure that the sprinkler system is adequate for the storage presented.
27. All standpipe and sprinkler connections shall be marked as prescribed within the appropriate
section of this regulation and as illustrated by the appropriate figures of this regulation. All
standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow demarcation
lines to define specific areas, Solid yellow demarcation lines shall be measured from the center line of
the connection and extend for a distance of four feet (4') on both sides, and where parking is allow
between the building and the street or fire lane the solid yellow demarcation lines shall extend from
the end of the sidewalk surface to the street or fire lane (Markings shall not be required on the
sidewalk surface). All fire department connections (standpipe and sprinkler) shall have a minimum
12" x 18" sign that reads FIRE DEPT. CONNECTION, sign lettering shall be a minimum of 3 inches
(3") in height with red scotchlite letters on white scotchlite background. The sign shall be clearly
visible from the fire lane or roadway, and signs using NFPA international symbols shall be an
acceptable alternative. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)
28. Standpipes shall be provided in all areas and buildings as required in the codes and standards listed
in Regulation 701 as well as the following areas or buildings:
In all Class A and Class B places of assembly and institutional occupancies two (2) stories or 25 feet
in height or over,
In any building over three (3) stories, In any building over 35 feet in height,
In any building that has a floor above the first floor over 10,000 square feet gross floor area,
In all buildings where the 1st floor exceeds 60,000 gross square feet,
a Class I horizontal standpipe system installed in accordance with the applicable codes and
standards listed in Regulation 701 of these Regulations shall be provided. All standpipe systems shall
be installed in accordance with the applicable codes and standards listed in Regulation 701.
The standpipe system shall be carried up with each floor and shall be installed and ready for use as
each floor progresses.
Standpipes shall not be more than one floor below the highest forms of staging,
The 2½-inch of hose connections on Class I systems shall be provided in the following locations, At
the highest intermediate landing between floor levels in every required exit stairway,
Where intermediate landing is not provided, hose connections shall be permitted to be located at the
main floor landings in exit stairways when approved by the authority having jurisdiction,
94
Page 95
Item 3.
Where the local fire department has the capability of providing the required pressure, hydraulically
designed standpipe systems in fully sprinklered, non-high-rise buildings shall be designed to provide
the required waterflow rate.
A sign shall be provided at each landing, in all interior stairways, designating the floor level. (2021
Delaware State Fire Prevention Regulations 702, Chapter 4, 2)
29. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be
protected from impact damage by impact protection. Natural gas and LP gas meters, regulators, and
valves located inside structures shall have impact protection, except when located in separate
protected utility rooms.
Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The
bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in concrete at
a minimum of 18 inches surrounding the bollard. The bollards must be a least 48 inches (four ft.) in
height above the finish grade elevation. Any deviation of the stated requirements must be approved
by the fire marshal and/or chief building inspector. The above dimensions shall serve as the
requirement for installation; however, the fire marshal and/or chief building inspector shall have the
authority to require more stringent dimensions to fit the needs of devices warranting impact
protection.
Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors shall be
of fluorescent or have a reflective coating. Any deviation of the stated requirements must be approved
by the fire marshal and/chief building inspector.
(City of Dover Code of Ordinances, 46-4)
30. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley, shall
have displayed on that wall, in legible, easily read characters which are of contrasting color to the
background, the proper street number for such house, building, or structure in accordance with the
following:
One-family and two-family residential structures, height, the number shall measure a minimum of four inches
in height, location, the number shall be placed on the house above or to the left or right of the front
entrance, color, the number shall be contrasting to the background color, Arabic numerals, all numbers
shall be Arabic numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when
identifying individual apartments with exterior doors, and 12 inches when identifying buildings with
apartment complexes where there are two or more buildings not assigned street addresses.
Individual buildings with street addresses shall have numbers measuring six inches, location, numbers
shall be placed either in the center of the building or on the street end of the building so as to be
visible from either the public or private street or from the parking lot, color, numbers shall be
contrasting to the background color, Arabic numerals, all numbers used shall be Arabic numerals.
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in
height, location generally, numbers shall be placed either in the center of the building or on the street
end of the building so as to be visible from either the public or private street or from the parking lot,
property line or driveway, should the building be located far enough from a public or private road so that
the numbers are not clearly visible from the street, then the street address shall also be posted on the
property at or near the property line or driveway to said building,
95
Page 96
Item 3.
color; each building, numbers shall be contrasting to the background color and shall be placed on each
building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite number
affixed to the front of the tenant space and on the outside of the rear door which corresponds with
that tenant space. Numbers shall measure six inches in height.
(City of Dover Code of Ordinances, 98-344)
31. All required means of egress shall have an exit discharge consisting of a non-slip surface and leading
to and terminating at a public way. NFPA 101
32. All new passenger elevators in a building shall be provided with a car sized to accommodate an
ambulance cot 24 inches (609 mm) by 84 inches (2133 mm) in its horizontal open position. Where
two or more new passenger elevators are located in a single hoist way and serve all or the same
portion of the building, only one elevator car that provides a car sized to accommodate an ambulance
cot 24 inches by 84 inches in its horizontal position for each hoist way shall be required. Elevator
cars required to comply with 15.1 or 15.2 shall be identified by the international symbol for emergency
medical services (star of life). The symbol shall be not less than 3 inches (76 mm) in height and shall
be placed inside on both sides of the hoist way door frame. Firefighter recall keys shall be provided in
a manner acceptable to the local fire department. (2021 Delaware State Fire Prevention Regulations
705, Chapter 1, 15)
33. Buildings over 25,000 Sq. Ft are to have radio performance testing done prior to Final CO. This must
be scheduled in advance with an authorized vendor.
34. Project to be completed per approved Site Plan.
35. Full building and fire plan review is required.
36. Separate building permits/plans submission will be required for each building and/or tenant fit out. If
the permit submission is for a “shell” a Certificate of Occupancy will not be issued. Separate plans
and permits submissions will be required for each “tenant fit out” at which time a Certificate of
Occupancy will be issued upon compliance/completion of each “tenant fit out”.
Each “shell” will require a fire permit for sprinkler and fire alarm if applicable. Those systems (for the
“shell”) must be accepted into service prior to any “tenant fit out” fire permits being issued.
37. Construction or renovations cannot be started until building plans are approved.
38. Fire alarm systems, fire suppression systems, hoods, exhaust ducts, and hood suppression systems
require a fire permit from the Fire Marshal’s Office. This work cannot be started until the permit is
approved.
39. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
40. The following is City Ordinance, Appendix B-Zoning, Article 8 Enforcement and Penalties:
Section 1. - Building permits.
No building or structure in any district shall be erected or structurally altered without a building permit
duly issued upon application to the building inspector. No building permit shall be issued unless the
proposed construction or use is in full conformity with all the provisions of this ordinance. Any building
permit issued in violation of the provisions of this ordinance shall be null and void and of no effect,
96
Page 97
Item 3.
without the necessity for any proceedings for revocations or nullification thereof, and any work
undertaken or use established pursuant to any such permit shall be unlawful (see section 4 for
penalties).
1.1 No building permit shall be issued for the construction or alteration of any building upon a lot
without frontage upon, or legal permanent access to, a public street improved to the satisfaction of the
planning commission, or without access to a public sewer.
1.2 No building permit shall be issued for any building where the site development plan of such
building is subject to approval by the planning commission, except upon approval of such plans
approved by the said commission.
1.21 No building permit shall be issued for any building in a subdivision unless the subdivision plot has
been approved by the planning commission.
1.3 No building permit shall be issued for a building to be used for any conditional use in any zone
where such use is allowed only with approval of the planning commission, unless and until such
approval has been duly granted by the said commission.
(Ord. of 7-12-1993, § 3)
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. Please provide the distance from the building to the edge of the fire lane (see item # 5 listed
above)
2. Please confirm that the entrance roadway at the guard booth is at least 14’ wide (see item # 11
listed above) unless it is existing
3. There are two existing fire hydrants. Does one stay and the other is relocated?
4. Need to discuss hydrants and if they are the same system as the fire pump or separate. Need to
ensure that they have the proper PSI
5. Please add a fire hydrant to the Southeast corner where the 20,000 ft2 warehouse is being built.
6. Please see the attached items listed below for large area buildings. Some of the requirements
are the following:
a. Standpipes
b. Voice Evacuation for the fire alarm
c. Smoke management.
d. Standby power
e. Complete floor plans to be placed at the fire alarm panel
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2021 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
97
Page 98
Item 3.
“Large Area Building” Any building that exceeds one-hundred thousand (100,000) square feet gross floor
area on any one floor.
Chapter 5 Mid Rise, High Rise and Large Area Buildings
1.0 Application
1.1 This chapter shall apply to all new buildings and this chapter shall apply to all existing buildings
that undergo a change in occupancy.
1.2 This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions
which are modified by more than 50% after the effective date of these Regulations. The 50% figure shall
be calculated utilizing the gross square footage of the building, structure, marine vessel, premises and
conditions as to arrive at the correct application.
1.3 Any proposal that is presented to the Office of the State Fire Marshall for review and approval
for a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of the gross square
footage of a non-sprinklered building, may not have another such project for the same building submitted
for review and approval any sooner than three (3) years after the date of the final inspection unless sprinkler
projection is provided throughout the entire building.
19 DE Reg. 843 (03/01/16)
4.0 Large Area Buildings.
4.1 Application. The application of this Chapter pertains to any building exceeding one-hundred
thousand (100,000) square feet gross floor area on any one floor. This Chapter does not apply to Strip
Shopping/Office Center with no individual tenant exceeding 100,000 sq. ft.
4.1.1 If any one individual tenant in a Strip Shopping/Office Center exceeds 100,000 sq. ft. per
floor, these requirements shall apply only to those tenants.
4.2 Horizontal Standpipes.
4.2.1 Horizontal Standpipes shall be required in accordance with Regulation 702, Chapter 4 of
these Regulations
4.3 Emergency Voice/Alarm Communications and Detection System.
4.3.1 Large area buildings shall be equipped with a voice alarm, communication and detection
system which shall be installed in accordance with the applicable codes and standards listed in Regulation
701 of these Regulations; and approved by the Office of the State Fire Marshal
4.4 Fire Command Station.
98
Page 99
Item 3.
4.4.1 Large area buildings containing Health Care Occupancies, Ambulatory Health Care and
Detention and Correction Occupancies shall contain a fire command center for fire department operations
in a location reviewed by the responsible Fire Chief and approved by the Office of the State Fire Marshal.
The Office of the State Fire Marshal may require a Fire Command Center for other Large Area Buildings.
4.4.2 The fire command center shall contain the following:
4.4.2.1 Voice alarm and public address panels
4.4.2.2 Fire department communications panel
4.4.2.3 Fire detection and alarm system annunciator panels and smoke management panels
4.4.2.4 Status indicator for elevator and annunciator indicating which elevators are
operational
4.4.2.5 Status indicators and controls for air handling systems
4.4.2.6 Controls for unlocking all fire exit stairway doors simultaneously
4.4.2.7 Emergency power, light and system controls; and status indicators
4.4.2.8 Telephone and internet access for fire department use
4.4.2.9 Emergency and standby power status indicators
4.4.2.10 Generator supervision devices and manual start and transfer features
4.4.2.11 Public address system, where specifically required by other sections of this Code
4.4.2.12 Controls required for smoke control
4.4.2.13 Important keys to include
4.4.2.13.1 Elevator machine room
4.4.2.13.2 Elevator hoistway door access key
4.4.2.13.3 Side access door elevator car key
4.4.2.13.4 Electric room keys
4.4.2.13.5 Fire pump room keys
4.4.2.13.6 Mechanical room keys
4.4.2.13.7 Any master key
4.4.2.14 As built drawings. Specific types and format of drawings to be determined by the
Office of the State Fire Marshal at time of plan review.
4.4.3 The fire command center shall be separated from the remainder of the building by one-hour
construction and equipped with a heating, ventilating and air conditioning system that will prevent smoke
laden air from entering the space.
4.4.4 It is not the intent of this section to require a room dedicated for this purpose, but the area
provided must be available for immediate use in case of emergency.
4.4.5 The room shall be a minimum of 96 square feet with a minimum dimension of 8 feet.
4.4.6 The fire command room door shall be clearly identified for use by the fire department.
4.5 Smoke Management Systems
4.5.1 Large area buildings shall be equipped with a smoke management system approved by the
Office of the State Fire Marshal, designed in accordance with §4.5.2 or §4.5.3, and shall be capable of
being operated by the fire department.
4.5.2 This smoke control system shall, at a minimum, consist of manually operated smoke vents
installed in accordance with the Standard for Smoke and Heat Venting, NFPA 204 with the following criteria:
4.5.2.1 One, 100 sq. ft. vent per 25,000 sq. ft. of floor area.
4.5.2.2 Each vent shall be centrally located within the 25,000 sq. ft. protected area.
99
Page 100
Item 3.
4.5.3 Large Area buildings using mechanical means of smoke management shall be installed in
accordance with NFPA 92A, NFPA 92B and approved by the Office of the State Fire Marshal. Such system
shall provide the following:
4.5.3.1 Egress Stair Tower Pressurization if stairs are more than three (3) communicating
floor levels
4.5.3.2 Area of Refuge Pressurization
4.5.3.3 Horizontal Exit Passageway Pressurization
4.5.3.4 Fire Floor or Fire Area Smoke Exhaust
4.5.3.5 Other Criteria as deemed necessary by the Office of the State Fire Marshal for
Unusual Spaces
4.5.4 Smoke management system operation/actuation shall be approved by the Office of the State
Fire Marshal.
Note: As per NFPA 92A and NFPA 92B, the smoke management system shall be provided with a graphic
annunciator and manual override panel to be located in the fire command center. The design and
operation of the graphic annunciator shall be approved by the Office of the State Fire Marshal.
4.6 Standby Power, Light, and Emergency Systems.
4.6.1 Large area buildings shall be equipped with standby power, light, smoke management system
and emergency systems which shall comply with the provisions of the Standard for Emergency and Standby
Power Systems, NFPA 110, as adopted and/or modified by these Regulations.
Exception: If the occupancy is such that “standard” battery operated emergency systems (emergency
lighting, exit signs, fire alarm signaling system backup power, etc.), are deemed to be adequate by the
State Fire Marshal.
13 DE Reg. 629 (11/01/09)
19 DE Reg. 843 (03/01/16)
100
Page 101
Item 3.
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
T
===============================================================
APPLICATION: Procter & Gamble Warehouse Expansions & Parking Improvements
FILE#: S-24-09 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Will Mobley PHONE#: 302-760-2141
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
No person, firm, corporation or the like shall construct, open, reconstruct, maintain, modify or use any
crossing or entrance onto a state-maintained highway, street or road, including any drainage modifications
leading into or carried by the highway drainage system, without first having complied with standards and
regulations adopted by the Department and having obtained a permit issued by the Department.
Please contact the Delaware Department of Transportation - Development Coordination section to begin
permit process.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
1. The Department has held a pre-submittal meeting with the applicant on 23 May 2024. The
applicant will utilize the formal plan submission process (Record and Entrance Plans) for
approval from the Department. Frontage improvements on North St will be required and
identified in the plan submission. Please refer to the Development Coordination Manual
for guidelines to submission and submit via the PDCA online portal. Direct all questions
to Will T Mobley III, Kent County Review Coordinator Delaware Department of
Transportation.
101
Page 102
KENT CONSERVATION DISTRICT
Item 3.
1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
JUNE 2024
APPLICATION: Proctor & Gamble Warehouse Expansions & Parking Improvements
FILE #: S-24-09
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: Kate Owens
PHONE: (302) 608 – 5370
EMAIL: stormwater@kentcd.org
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY
AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS
ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
Source: 2019 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. Changes or revisions to the approved site plan must be reviewed and approved by Kent Conservation
District prior to commencing construction.
2. A Notice of Intent (NOI) for Stormwater Discharges Associated with Construction Activity must be
submitted for the owner of record and accepted by DNREC.
ADVISORY COMMENTS TO THE APPLICANT:
1. This will be submitted as a detailed sediment and stormwater management plan. Application for a detailed
plan review, fee schedule, and review checklist may be accessed on the Kent Conservation District’s website:
https://www.kentcd.org/services/sediment-stormwater/design-permitting
2. Performance of any required maintenance of the existing stormwater facility may be a condition of approval.
3. A letter of no objection to recordation will be provided once the Sediment and Stormwater Management Plan
has been approved.
102
Page 103
Item 3.
CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
APPLICATION REVIEW COMMENTARY Planning
D.A.C. MEETING DATE: 6/5/2024 Organization
S-24-09 Procter & Gamble Warehouse Expansions & Parking Improvements
FILE # S-24-09 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030
Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or
eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The
MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be
waived.
City of Dover Planning Commission
Site Development Plan Review
S-24-09 Procter & Gamble Warehouse Expansions & Parking Improvements
No objections to the current site plan. Note that Dover Kent MPO is currently working on two
separate studies related to freight in the Dover area. The first of these is the Dover Municipal
Freight Plan, which will examine the existing freight conditions in the City of Dover and propose
solutions to some of the recurring problems. Solutions may include both physical changes to the
existing infrastructure and changes to local policies or truck routes.
The second study is Phase II of the Kent County East-West Truck Freight Route Feasibility
Analysis. This study will cover the entirety of Kent County, including Dover. It will use a
combined technical analysis and engagement with relevant stakeholders to determine how east-
west truck movement may be improved. The solutions are intended to make travel easier for
truck drivers while also alleviating truck congestion and parking concerns in downtown areas.
(See Phase I of the study here.)
The site changes at the Procter & Gamble facility are likely to improve parking and staging
conditions for the property owner, which is something the MPO regularly advocates for. The site
plan will also be beneficial when crafting recommendations for both of the current studies.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
103
Page 104
Item 3.
23318 Cedar Lane · Georgetown, DE 19947 · 302.864.8825
info@beaconengineeringllc.com
Transmitted via Email: dmelson@dover.de.us
June 6, 2024
City of Dover
Department of Planning & Inspections
15 Lookerman Plaza
Dover, Delaware 19903
Attn: Ms. Dawn Melson-Williams, AICP, Principal Planner
RE: Curb Waiver Request – Zoning Ordinance, Art. 6 §3.6(b)
Warehouse Expansion & Parking Improvements
Procter & Gamble
Tax Map # 2-05-07600-01-0700
City of Dover, East Dover Hundred
Kent County, Delaware
Project No. P&G01-02
Dear Ms. Melson-Williams:
The purpose of this letter would be to request a waiver from
providing certain sections of upright curbing as required by
Zoning Ordinance, Art. 6 §3.6(b). The areas in question are
associated with the proposed contractor parking lot and
employee parking lot and are highlighted in the exhibits
enclosed in this letter. The purpose for requesting this
waiver would be to maintain existing runoff patterns
associated with the employee parking lot and to provide
flexibility with regard to localized stormwater quality BMPs
associated with the contractor parking lot. Truck curb is
proposed around the perimeter of both Drop Lot A and
Drop Lot B.
Should you have any questions, please call.
Respectfully Submitted,
Robert J. Palmer, P.E.
President | Senior Engineer
104
Page 105
Item 3.
23318 Cedar Lane · Georgetown, DE 19947 · 302.864.8825
info@beaconengineeringllc.com
Transmitted via Email: dmelson@dover.de.us
May 3, 2024 (Revised June 6, 2024)
City of Dover
Department of Planning & Inspections
15 Lookerman Plaza
Dover, Delaware 19903
Attn: Ms. Dawn Melson-Williams, AICP, Principal Planner
RE: Waiver Request – Sidewalk along Public Street Frontage
Warehouse Expansion & Parking Improvements
Procter & Gamble
Tax Map # 2-05-07600-01-0700
City of Dover, East Dover Hundred
Kent County, Delaware
Project No. P&G01-02
Dear Ms. Melson-Williams:
The purpose of this letter would be to respectfully request consideration that a waiver with regard to
sidewalk placement be granted by the Planning Commission during the June 17th Public Hearing where
the above referenced project is anticipated to be considered for the grant of preliminary site
development master plan approval. Specifically, App. B, Art. 5, Sec. 18.3(a) requires “…Standard City
of Dover sidewalk…shall be required to be installed
along the entire public street frontage of a property.”
This request pertains to the portion of the subject
property that runs by and with Electric Avenue in
Schutte Park. This waiver request considers
elimination of approximately 2,300 linear feet of
sidewalk as shown in Exhibit 1.
The preliminary master development plan proposes to
extend the existing pedestrian network along West
North Street by installing approximately 450 linear feet
of City of Dover sidewalk along the easterly side of
Electric Avenue between West North Street and the
proposed entrance to a contractor parking lot at the
Procter & Gamble (P&G) facility as shown in Exhibit 2
to promote multimodal transportation options for P&G Exhibit 1 – Sidewalk Subject to Request
contractors. However, continuing a pedestrian route
105
Page 106
Item 3.
Waiver Request – Procter & Gamble
May 3, 2024 (Revised June 6, 2024)
Page 2 of 2
south of this connection is not desired by P&G because it is considered to be a safety and security issue
with citizens potentially illegally entering the property. With the presence of a sidewalk/path that runs
through Schutte Park on the west side of Electric Avenue, a pedestrian network exists to support
activities within the park. An extension of the pedestrian network along the east side of Electric Avenue
is not viewed as a benefit because pedestrians travelling to P&G would access the property using the
existing shared use path that runs along the entire frontage of West North Street or via the proposed
sidewalk to the contractor parking lot. Also, pedestrian access to the City facilities on the east side of
Electric Avenue are likewise not viewed as
facilities that would be supported by pedestrian
traffic. As a result, P&G would prefer park related
pedestrian traffic to be on the Park side of Electric
Avenue.
Following your review, please contact me with
any questions or concerns.
Respectfully Submitted:
Exhibit 2 – Proposed Sidewalk
Robert J. Palmer, P.E.
President | Senior Engineer
RJP/
cc: Mr. Justin Hebert, Project Manager via Email
Mr. Joseph L. Taylor, EH&S Team Leader via Email
106
Page 107
Item 3.
23318 Cedar Lane · Georgetown, DE 19947 · 302.864.8825
info@beaconengineeringllc.com
Transmitted via Email: dmelson@dover.de.us
June 6, 2024
City of Dover
Department of Planning & Inspections
15 Lookerman Plaza
Dover, Delaware 19903
Attn: Ms. Dawn Melson-Williams, AICP, Principal Planner
RE: Variance Clarification Request – V-13-10
Warehouse Expansion & Parking Improvements
Procter & Gamble
Tax Map # 2-05-07600-01-0700
City of Dover, East Dover Hundred
Kent County, Delaware
Project No. P&G01-02
Dear Ms. Melson-Williams:
The purpose of this letter would be to request clarification to apply the purpose and intent of variance
V-13-10 that was granted by the Board of Adjustment on July 12, 2013. This variance granted relief
from the requirement that the larger of 1 parking space per 800 square feet of floor area or 1 space per
employee per the largest working shift be provided. At the time this variance was granted, Mr.
Bramble, EH&S and Utilities Manager, testified that 186 people were employed at P&G, which resulted
in 96 parking spaces required for the employee calculation. Mr. Bramble also testified that the gross
floor area calculation based upon a then 600,013 SF building warranted 766 spaces. The variance
granted the request to reduce the total parking to 306 spaces, a variance of 460 spaces without
assigning a future method of calculating the required parking for future expansion. If the parking
calculation is based upon 306 spaces being provided for a 600,000 SF building, a reasonable method
for calculating parking based on the spirit of the variance would result in 1 parking space provided per
1,961 SF of floor area.
Enclosed, please find e-mail correspondence between P&G representatives and Beacon Engineering
where the 10-year employee and contractor census projection would be 215 and 80 persons,
respectively (refer to pages 9 & 10 of the document. The site development master plan (master plan)
site data column publishes a proposed building area of 662,942 square feet. Applying 1,961 square
feet of floor area per parking space, the total parking required would be 338 spaces. The master plan
demonstrates 371 parking spaces are proposed, not including the 15 spaces north of the guard house.
107
Page 108
Item 3.
Variance Clarification Request – V-13-10
Ms. Dawn Melson-Williams, AICP
June 6, 2024
Page 2 of 2
With the contractor and employee populations using separate parking areas, it is also important to
demonstrate that each population is apportioned an appropriate number of parking spaces. The 10-
year projection for contract employees is 80, and 112 spaces are proposed in the contractor parking lot.
The 10-year employee projection is 215, and 259 spaces are proposed in the employee lot. As a result,
it appears that the total parking is consistent with variance V-13-10, and the apportionment of parking
between contractors and employees also supports the census.
Following your review, please confirm that the above described parking rationale remains in harmony
with the variance V-13-10 and the proposed contractor and employee parking is consistent with the
intent of that variance. Should you have any questions, please call.
Respectfully Submitted,
Robert J. Palmer, P.E.
President | Senior Engineer
Enclosure
RJP/
108
Page 109
Item 3.
Brian Sweetman
From: Hebert, Justin [Non-PG] <hebert.j.1@pg.com>
Sent: Thursday, March 7, 2024 10:09 AM
To: Brian Sweetman
Cc: Robert Palmer; Laura Hudson; Elobeid, Mohammed
Subject: RE: P&G01-02 - Existing and proposed traffic data for the site
Brian,
I asked our team to analyze the truck volume by hour and was actually more even loaded than I imagined.
Let me know if you need anything else to complete the DOT submission.
Cheers,
Jus#n
Justin Hebert
Engineering, Innovation, Leadership Consultant at Faith Innovation Inc.
+1-513-332-3120 (mobile)
Hebert.j.1@pg.com
Justin@FaithInnovation.net
From: Hebert, Justin [Non-PG]
Sent: Friday, March 1, 2024 9:50 AM
1 109
Page 110
Item 3.
To: Brian Sweetman <BSweetman@beaconengineeringllc.com>
Cc: Robert Palmer <RPalmer@beaconengineeringllc.com>; Laura Hudson <LHudson@beaconengineeringllc.com>; Elobeid, Mohammed <elobeid.m@pg.com>
Subject: RE: P&G01-02 - Existing and proposed traffic data for the site
Answers below:
Justin Hebert
Engineering, Innovation, Leadership Consultant at Faith Innovation Inc.
+1-513-332-3120 (mobile)
Hebert.j.1@pg.com
Justin@FaithInnovation.net
From: Brian Sweetman <BSweetman@beaconengineeringllc.com>
Sent: Friday, March 1, 2024 9:28 AM
To: Hebert, Justin [Non-PG] <hebert.j.1@pg.com>
Cc: Robert Palmer <RPalmer@beaconengineeringllc.com>; Laura Hudson <LHudson@beaconengineeringllc.com>; Elobeid, Mohammed <elobeid.m@pg.com>
Subject: RE: P&G01-02 - Existing and proposed traffic data for the site
[EXTERNAL]
Justin:
Thanks for the updated data. I have a few follow up questions. Your data says currently 64 trucks a day. Is that total the number of trucks entering and
exiting or just trucks entering? This is the total number of physical trucks, each one entering and exiting once. Please confirm if the FedEx, UPS, and
USPS deliveries will use the truck entrance or the employee entrance. They will use the truck entrance. Do these truck numbers already include the
FedEx, UPS, and USPS deliveries? Yes these numbers include courier deliveries. Is the truck traffic evenly distributed threw out the day or do you know
when the peak number of trucks typically enter and or exit the site? Definitely peaks during daytime business hours. Would you like an estimate here?
Regards,
Brian Sweetman
Senior Civil Designer / GIS
Beacon Engineering, LLC
23318 Cedar Lane
Georgetown, DE 19947
Phone: 302.864.8825
Email: bsweetman@beaconengineeringllc.com
2 110
Page 111
Item 3.
From: Hebert, Justin [Non-PG] <hebert.j.1@pg.com>
Sent: Thursday, February 29, 2024 5:34 PM
To: Brian Sweetman <BSweetman@beaconengineeringllc.com>
Cc: Robert Palmer <RPalmer@beaconengineeringllc.com>; Laura Hudson <LHudson@beaconengineeringllc.com>; Elobeid, Mohammed <elobeid.m@pg.com>
Subject: RE: P&G01-02 - Existing and proposed traffic data for the site
Brian, thanks for your pa#ence here. The detailed truck analysis took #me to iron out and showed significantly more traffic than our first look.
See below the answers to your ques#ons:
Jus#n
Justin Hebert
Engineering, Innovation, Leadership Consultant at Faith Innovation Inc.
+1-513-332-3120 (mobile)
Hebert.j.1@pg.com
Justin@FaithInnovation.net
From: Brian Sweetman <BSweetman@beaconengineeringllc.com>
Sent: Tuesday, February 13, 2024 8:47 AM
To: Hebert, Justin [Non-PG] <hebert.j.1@pg.com>
Cc: Robert Palmer <RPalmer@beaconengineeringllc.com>; Laura Hudson <LHudson@beaconengineeringllc.com>
Subject: RE: P&G01-02 - Existing and proposed traffic data for the site
[EXTERNAL]
Justin:
The purpose of this request would be to establish current traffic patterns and trip distribution to support the DelDOT Pre-Submittal Meeting Request we are currently
preparing.
Existing truck traffic data request:
3 111
Page 112
Item 3.
Please provide the current daily truck traffic totals for all trucks entering and leaving the property. The numbers should include delivery trucks, the trailers that are
leaving the site and being stored off site, the stored trailers returned to the property to be stored or unloaded, and the outbound shipments. This could be the truck
totals over the span of a month, quarter, or a year. It would also be helpful to have a narrative that describes the trucking operations in your current arrangement so
that we may clearly convey to DelDOT the impact associated with the use of offsite warehousing and drop lots.
Current Daily truck traffic: 64 trucks per day. This is based on the six month period from July 1 2023 to Dec 31 2023.
Incoming materials are received at the site and unloaded directly or redirected to offsite storage; offsite materials come back to the site again when ready for
consump#on. This results in double-handling and extra trucks coming from/going to the site.
Finished product bound for P&G’s distribu#on network always departs from the site directly; product that is stored temporarily at offsite storage returns to the
site before depar#ng again for the distribu#on network. This results in double-handling and extra trucks coming from/going to the site.
Proposed truck traffic data request:
Please provide the projected daily truck totals in similar manner as in the existing traffic data request. Indicate how the proposed warehouse and drop lots will reduce,
or eliminate, the dependence on offsite warehousing and drop lots.
The addi#on of warehouse capacity for raw materials and finished product, as well as drop lot capacity, will eliminate the need to rely on external warehouses
and lots for storage. This will result in a reducon of truck traffic despite projec#ons of produc#on growth in the coming 3-5 years. AJer the project is
opera#onal, truck traffic will reduce to 41 trucks/day.
Please let me know if you have any questions.
Regards,
Brian Sweetman
Senior Civil Designer / GIS
Beacon Engineering, LLC
23318 Cedar Lane
Georgetown, DE 19947
Phone: 302.864.8825
Email: bsweetman@beaconengineeringllc.com
4 112
Page 113
Item 3.
From: Hebert, Justin [Non-PG] <hebert.j.1@pg.com>
Sent: Monday, February 12, 2024 4:59 PM
To: Brian Sweetman <BSweetman@beaconengineeringllc.com>
Cc: Robert Palmer <RPalmer@beaconengineeringllc.com>; Laura Hudson <LHudson@beaconengineeringllc.com>
Subject: RE: P&G01-02 - Existing and proposed traffic data for the site
Hi Brian,
I talked this with Miebach last week and they requested un#l the end of this week, earliest, to provide that data.
In addi#on to future state of trucks coming/going, is there other data you need from the study? In Bob’s mee#ng notes today, he stated:
ACTION ITEMS:
1. Beacon – P&G: Coordinate with PM Hebert to finalize site circulation for shipping and
receiving on the north side of the warehouse. Internal P&G analysis is in process. Details
will be provided in the next few weeks.
Let me know what this looks like, as specific as you can, so I can be sure to pass on to the consulting team.
Thanks,
Justin
Justin Hebert
Engineering, Innovation, Leadership Consultant at Faith Innovation Inc.
+1-513-332-3120 (mobile)
Hebert.j.1@pg.com
Justin@FaithInnovation.net
From: Brian Sweetman <BSweetman@beaconengineeringllc.com>
Sent: Monday, February 12, 2024 4:04 PM
To: Hebert, Justin [Non-PG] <hebert.j.1@pg.com>
5 113
Page 114
Item 3.
Cc: Robert Palmer <RPalmer@beaconengineeringllc.com>; Laura Hudson <LHudson@beaconengineeringllc.com>
Subject: RE: P&G01-02 - Existing and proposed traffic data for the site
[EXTERNAL]
Justin:
Do you have the breakdown of the truck traffic for how many trucks are going to/coming from external storage to understand the future ideal state?
Regards,
Brian Sweetman
Senior Civil Designer / GIS
Beacon Engineering, LLC
23318 Cedar Lane
Georgetown, DE 19947
Phone: 302.864.8825
Email: bsweetman@beaconengineeringllc.com
From: Hebert, Justin [Non-PG] <hebert.j.1@pg.com>
Sent: Monday, January 22, 2024 7:27 AM
To: Brian Sweetman <BSweetman@beaconengineeringllc.com>
Cc: Robert Palmer <RPalmer@beaconengineeringllc.com>; Laura Hudson <LHudson@beaconengineeringllc.com>
Subject: RE: P&G01-02 - Existing and proposed traffic data for the site
Brian,
I got a first look at raw data for trucks this morning: In 2023 there were a total of 7100 trailer trucks arriving and leaving the site. I do not yet have a breakdown
of how many of these are going to/coming from external storage to understand the future ideal state.
6 114
Page 115
Item 3.
Note that these numbers do not include UPS/Fedex/USPS/Amazon/catering deliveries. If you need to include those, we will need to es#mate. A star#ng point
might be 3 deliveries per business day (~250 days/year, or 750 deliveries/year).
I’ll pass on the breakdown of external storage trucks soon. Is there any other data you might need?
Cheers,
Jus#n
Justin Hebert
Engineering, Innovation, Leadership Consultant at Faith Innovation Inc.
+1-513-332-3120 (mobile)
Hebert.j.1@pg.com
Justin@FaithInnovation.net
From: Brian Sweetman <BSweetman@beaconengineeringllc.com>
Sent: Thursday, January 18, 2024 9:11 AM
To: Hebert, Justin [Non-PG] <hebert.j.1@pg.com>
Cc: Robert Palmer <RPalmer@beaconengineeringllc.com>; Laura Hudson <LHudson@beaconengineeringllc.com>
Subject: RE: P&G01-02 - Existing and proposed traffic data for the site
[EXTERNAL]
Justin:
Thanks, have a great day.
Regards,
Brian Sweetman
Senior Civil Designer / GIS
Beacon Engineering, LLC
23318 Cedar Lane
Georgetown, DE 19947
Phone: 302.864.8825
Email: bsweetman@beaconengineeringllc.com
7 115
Page 116
Item 3.
From: Hebert, Justin [Non-PG] <hebert.j.1@pg.com>
Sent: Thursday, January 18, 2024 9:09 AM
To: Brian Sweetman <BSweetman@beaconengineeringllc.com>
Cc: Robert Palmer <RPalmer@beaconengineeringllc.com>; Laura Hudson <LHudson@beaconengineeringllc.com>
Subject: RE: P&G01-02 - Existing and proposed traffic data for the site
Brian,
Yes the dayshiJ workers are nominally 09:00-17:00 and the shiJ workers are the 07:00-19:00.
Raw data for truck movements should be available in a few business days.
Thanks,
Justin
Justin Hebert
Engineering, Innovation, Leadership Consultant at Faith Innovation Inc.
+1-513-332-3120 (mobile)
Hebert.j.1@pg.com
Justin@FaithInnovation.net
From: Brian Sweetman <BSweetman@beaconengineeringllc.com>
Sent: Thursday, January 18, 2024 9:06 AM
To: Hebert, Justin [Non-PG] <hebert.j.1@pg.com>
Cc: Robert Palmer <RPalmer@beaconengineeringllc.com>; Laura Hudson <LHudson@beaconengineeringllc.com>
Subject: RE: P&G01-02 - Existing and proposed traffic data for the site
[EXTERNAL]
Justin:
8 116
Page 117
Item 3.
Thanks, Yosra provided us with the same numbers as the Design target (+10% buffer) column. I believe this email will work for the
employee/contractor data I requested. I want to clarify a point of your data. When you say dayshift employees do you mean people working 09:00-
17:00? I want to confirm the shift x2 shifts workers are the ones working from 07:00-19:00.
I look forward to receiving the truck data when it is available.
Regards,
Brian Sweetman
Senior Civil Designer / GIS
Beacon Engineering, LLC
23318 Cedar Lane
Georgetown, DE 19947
Phone: 302.864.8825
Email: bsweetman@beaconengineeringllc.com
From: Hebert, Justin [Non-PG] <hebert.j.1@pg.com>
Sent: Wednesday, January 17, 2024 8:11 PM
To: Brian Sweetman <BSweetman@beaconengineeringllc.com>
Cc: Robert Palmer <RPalmer@beaconengineeringllc.com>; Laura Hudson <LHudson@beaconengineeringllc.com>
Subject: RE: P&G01-02 - Existing and proposed traffic data for the site
Here are the assump#ons from Yosra, as I can find in email history. Can you confirm this lines up with your data?
This is for dayshiJ peak, at shiJ exchange:
Per Ownership, average daily
Design target
visitor traffic represents 10% of
Day shift Current Future (10 years) (+10% buffer)
employee traffic.
P&G Parking 165 195 215
9 117
Page 118
Item 3.
Contractor Parking 82 72 80
Trailer Drop Lot Parking 205 250 275
The 195 P&G employees consist of approximately 50 per shiJ x2 shiJs (at exchange) and 95 dayshiJ employees.
The 80 contractors consists of 20 per shiJ x2 shiJs (at exchange) and 40 dayshiJ employees.
Does that answer your ques#ons here?
Cheers,
Jus#n
Justin Hebert
Engineering, Innovation, Leadership Consultant at Faith Innovation Inc.
+1-513-332-3120 (mobile)
Hebert.j.1@pg.com
Justin@FaithInnovation.net
From: Brian Sweetman <BSweetman@beaconengineeringllc.com>
Sent: Wednesday, January 17, 2024 10:19 AM
To: Hebert, Justin [Non-PG] <hebert.j.1@pg.com>
Cc: Robert Palmer <RPalmer@beaconengineeringllc.com>; Laura Hudson <LHudson@beaconengineeringllc.com>
Subject: RE: P&G01-02 - Existing and proposed traffic data for the site
[EXTERNAL]
Justin:
Thank you, I look forward to receiving the truck data when it is available. Yosra did provide employee / contractor totals. I wanted to confirm those
numbers are still correct and if you could provide the split between shifts per each group employees and contractors.
Regards,
Brian Sweetman
Senior Civil Designer / GIS
Beacon Engineering, LLC
23318 Cedar Lane
Georgetown, DE 19947
10 118
Page 119
Item 3.
Phone: 302.864.8825
Email: bsweetman@beaconengineeringllc.com
From: Hebert, Justin [Non-PG] <hebert.j.1@pg.com>
Sent: Wednesday, January 17, 2024 10:07 AM
To: Brian Sweetman <BSweetman@beaconengineeringllc.com>
Cc: Robert Palmer <RPalmer@beaconengineeringllc.com>; Laura Hudson <LHudson@beaconengineeringllc.com>
Subject: RE: P&G01-02 - Existing and proposed traffic data for the site
Hi Brian,
We are working a model of the truck flows this month and can #e in your request to that work. It will take a week or two to complete the analysis.
In the meanwhile, I can confirm that shiJ change occurs at 07:00 and 19:00.
For the employee/contractor totals, didn’t Yosra provide these to Beacon in order to converge on the latest concept? I’ll have to find that communica#on to
confirm.
Thanks,
Jus#n
Justin Hebert
Engineering, Innovation, Leadership Consultant at Faith Innovation Inc.
+1-513-332-3120 (mobile)
Hebert.j.1@pg.com
Justin@FaithInnovation.net
From: Brian Sweetman <BSweetman@beaconengineeringllc.com>
Sent: Wednesday, January 17, 2024 9:27 AM
To: Hebert, Justin [Non-PG] <hebert.j.1@pg.com>
11 119
Page 120
Item 3.
Cc: Robert Palmer <RPalmer@beaconengineeringllc.com>; Laura Hudson <LHudson@beaconengineeringllc.com>
Subject: P&G01-02 - Existing and proposed traffic data for the site
[EXTERNAL]
Hi Justin:
Bob asked me to contact you to seek the existing and proposed traffic data for the site. The purpose of this request would be to establish current traffic patterns and
trip distribution to support the DelDOT Pre-Submittal Meeting Request we are currently preparing.
Existing traffic data request:
Please provide the current daily truck traffic totals for all trucks entering and leaving the property. The numbers should include delivery trucks, the trailers that are
being stored off site, the stored trailers returned to the property to be stored or unloaded, and the outbound shipments. This could be the truck totals over the span of
a month, quarter, or a year. It would also be helpful to have a narrative that describes the trucking operations in your current arrangement so that we may clearly
convey to DelDOT the impact associated with the use of offsite warehousing and drop lots.
Please also provide the current number of employees and contractors that access the site daily on a daily basis, by shift. Please confirm the shift change occurs in the
07:00 and 19:00 hours.
Proposed traffic data request:
Please provide the projected daily truck totals in similar manner as in the existing traffic data request. Indicate how the proposed warehouse and drop lots will reduce,
or eliminate, the dependence on offsite warehousing and drop lots.
Please confirm the projected number of employees at 215 and contractors at 80. At this point, we have assumed that this data is split evenly between the 2 shifts, but
if one shift is more heavily populated, that would be important to understand.
Please let me know if you have any questions.
Regards,
Brian Sweetman
Senior Civil Designer / GIS
Beacon Engineering, LLC
23318 Cedar Lane
Georgetown, DE 19947
Phone: 302.864.8825
Email: bsweetman@beaconengineeringllc.com
12 120
Page 122
Item 3.
Performance Standards Evaluation Report – Procter & Gamble
Warehouse Expansion and Parking Improvements May 2, 2024
I. Introduction
Procter & Gamble contracted with Beacon Engineering, LLC (BEACON) to prepare a Site
Development Master Plan, for a warehouse expansion with parking, located in the City of Dover
corporate limits. The site is situated on tax parcel ED-05-076.00-01-07.00-00001. The property is
zoned IPM (Industrial Park Manufacturing). The site is located at the southeasterly corner of the
intersection of West North Street and Electric Avenue. The northern boundary runs by and with
West North Street. This parcel is bound to the south and west by Electric Avenue, Schutte Park,
and the City of Dover VanSant Generating Station. The parcel is bound to the east by DOC
Energy.
The property consists of 84.10 acres of land, 13.7 of which are the subject of this performance
standards evaluation report. The parcel is currently developed as an industrial manufacturing
facility that supplies all Pampers and Luvs brand baby wipes to North America. The property
contains 37.01 acres of woodlands, and 4.1 acres are proposed to be cleared to support the
proposed warehouse and parking expansion. A total of 89% of existing woodland would remain
after the conclusion of this project.
The property is partially subject to the City Source Water Protection Overlay Zone being mapped
in an excellent recharge area. The existing and proposed impervious surfaces within the mapped
excellent recharge area would be increased from 25% to 39%. The property is situated in the
Puncheon Run Creek Watershed which is a watershed of concern due to flooding observed in the
lower reaches of the watershed.
II. Proposed Development
Procter & Gamble intends to redevelop this property through the construction of a 110,000 SF
addition to the JE Warehouse, a 20,000 SF addition to Warehouse 3, expansion of the existing
employee/visitor parking lot, expansion and reconfiguration of the existing contractor parking lot,
and expansion of truck drop lots A & B. The additional employee parking is intended to support
future expansion of production as well as a migration from contract employees. The contractor
entrance is proposed to be relocated from the main (truck) entrance on West North Street to
Electric Avenue to reduce traffic volumes entering and exiting the site directly from West North
Street. The Electric Avenue entrance will improve traffic safety on West North Street by making
use of the controlled movements at the West North Street/Hazletteville Road – Electric
Avenue/Mifflin Road intersection. The expanded truck drop lot space is intended to support the
future expansion of production and eliminate the existing need for offsite material storage. The
truck drop lot expansion is intended to reduce the truck traffic as more particularly described
below. The existing buildings will be minimally affected as a result of this project.
III. Performance Standards
In accordance with Appendix B, Article 3 – Section 20.5, All uses within the IPM district are subject
to performance standards as set forth in Article 5, Section 8. This section is listed below with
descriptions of compliance.
Project No. P&G01-02
Performance Standards Evaluation Report
Page 1 of 6
122
Page 123
Item 3.
Performance Standards Evaluation Report – Procter & Gamble
Warehouse Expansion and Parking Improvements May 2, 2024
8.1 Dangerous and objectionable elements. No land or building in any zone shall be used or occupied in
any manner so as to cause any one or more of the following conditions to exist and to be dangerous,
injurious, noxious or offensive beyond the boundaries of such premises in such a manner or in such
amount as to adversely affect the reasonable use of the surrounding area or adjoining premises: Fire,
explosive or other hazard; noise, or vibration; smoke, dust, odor or other form of air pollution; heat,
cold, dampness or electromagnetic disturbance; glare, liquid or solid refuse or waste; traffic congestion
causing roadways or intersections in the surrounding highway network to fall below acceptable levels
of comfort and convenience; or other substance, condition or element (referred to hereinafter as
"dangerous or objectionable elements"), provided that any use permitted or not expressly prohibited by
this ordinance may be undertaken and maintained if it conforms to the regulations of this section
limiting dangerous and objectionable elements at the point of the determination of their existence.
The proposed project will not produce any dangerous or objectionable elements. The expansion of
Drop Lots A & B and the additions proposed to the JE Warehouse and Warehouse 3 will reduce the
traffic impacts of the existing facility entrance. These items are described in greater detail in the
following subsections.
8.2 Uses requiring performance standards review procedure. Those uses in the C-3, IPM, IPM2, IPM3, and
M zones and uses accessory thereto, which are specified as being subject to performance standards
review procedure, are subject to the procedure specified in article 5, section 8.6 in obtaining a site plan
approval. The city planner may require other uses, whether existing or proposed and regardless of the
particular zoning district, to submit to the performance standards review procedure when there exists
reasonable grounds to believe that a proposed use is in violation, or is likely to violate, the performance
standards, in which event, the property owner shall comply with [the] performance standards review
procedure.
It is understood that this project, which is within the IPM district, will require a performance standards
review. This letter is to serve as the statements of compliance to satisfy this requirement.
8.3 Enforcement provisions applicable to other uses. Even though compliance with the performance
standards procedure in obtaining a site plan approval is not required for some proposed uses, initial
and continuing compliance with the performance standards themselves is required of every use, and
provisions for enforcement to ensure continued compliance with the performance standards shall be
invoked by the city planner against the property owner, tenant, or other responsible party if there are
reasonable grounds to believe that performance standards are being violated by a particular activity or
use.
It is understood that these performance standards are perpetual in nature, and that future compliance
with these standards will be required and enforced by the City.
8.4 Nonconforming uses. Certain uses established before the effective date of this ordinance and
nonconforming as to performance standards shall be given a reasonable time in which to conform
therewith, as provided in article 7, section 1.53.
This section is not applicable to this application for development.
8.5 Performance standards regulations. Where the following regulations overlap regulations of the
Delaware Department of Natural Resources and Environmental Control or other state or local agencies,
Project No. P&G01-02
Performance Standards Evaluation Report
Page 2 of 6
123
Page 124
Item 3.
Performance Standards Evaluation Report – Procter & Gamble
Warehouse Expansion and Parking Improvements May 2, 2024
the more restrictive regulations shall apply in case of a conflict:
8.51 Fire and explosion hazards. All activities involving, and all storage of, inflammable and explosive
materials shall be provided at any point with adequate safety devices against the hazard of fire
and explosion and adequate firefighting and fire suppression equipment and devices standard in
the industry. Burning of waste materials in open fires is prohibited at any point. The relevant
provisions of the state and local laws and regulations shall also apply.
There are no anticipated fire or explosion hazards with this development application. It is
understood that open fires are prohibited. The site is supported by 3 diesel tanks that are the fuel
supply for fire protection equipment and emergency generators. All tanks are of a double wall
design. One 500 gallon and 1 300 gallon tank are located inside of buildings. One 300 gallon
tank is located outside, near the boiler house on the east side of the property.
8.52 Radioactivity or electromagnetic disturbance. No activities shall be permitted which emit
dangerous radioactivity at any point, or electromagnetic disturbance adversely affecting the
operation at any point of any equipment other than that of the creator of such disturbance.
There are no anticipated radioactive or electromagnetic hazards with this development
application or located on the property.
8.53 Noise. The maximum sound pressure level radiated by any use or facility (other than
transportation facilities open to the public) at the property line shall not exceed the values in the
designated octave bands given in [the following] table I, after applying the corrections shown in
[the following] table II. The sound pressure level shall be measured with a sound level meter and
associated octave band analyzer conforming to standards prescribed by the American Standards
Association (American Standard Sound Level Meters for Measurement of Noise and Other
Sounds, Z243-1944, American Standards Association, Inc., New York, N.Y., and American
Standard Specification for an Octave Band Filter Set for the Analysis of Noise and Other Sounds,
Z24.10-1953, American Standards Association, Inc., New York, N.Y., shall be used).
There are no anticipated significant sources of excessive noise associated with this development
application or located on the property. The loudest anticipated noises will be the yard trucks
moving the trailers around the property. A copy of the 2022 noise analysis is enclosed with this
narrative.
8.54 Vibration. No vibration shall be permitted which is discernible without instruments at the
property line.
There is no anticipated vibration with this development application or located on the property.
8.55 Smoke. No emission shall be permitted at any point, from any chimney or otherwise, of visible
grey smoke of a shade equal to or darker than No. 2 on the Power's Micro-Ringlemann Chart,
published by McGraw-Hill Publishing Company, Inc., and copyrighted 1954 (being a direct
facsimile reduction of the standard Ringlemann chart as issued by the United States Bureau of
Mines), except that visible grey smoke of a shade equal to No. 2 on said chart may be emitted for
four minutes in any 30 minutes. These provisions applicable to visible grey smoke shall also apply
to visible smoke of a different color, but with an apparently equivalent opacity. Any emission shall
be in conformance with air pollution regulations of the Delaware Department of Natural
Resources and Environmental Control.
Project No. P&G01-02
Performance Standards Evaluation Report
Page 3 of 6
124
Page 125
Item 3.
Performance Standards Evaluation Report – Procter & Gamble
Warehouse Expansion and Parking Improvements May 2, 2024
There are no anticipated smoke emissions with this development application. All emissions are
existing from equipment on the property and are permitted by a DNREC synthetic minor air
permit. No discharge is permitted other than when the fire pumps and generators are exercised.
The stacks are visually monitored for compliance with the permit requirements and to visually
document the opacity of the startup smoke disappears within the required period allowed by the
permit. The engines that drive the fire pumps are operated for 30 minutes on a weekly basis.
The emergency generators are operated for 20 minutes on a weekly basis.
8.56 Odors. No emission shall be permitted of odorous gases or other offensive odorous matter in
such quantities as to be readily detectable when diluted in the ratio of one volume of odorous air
emitted to four volumes of clean air. Any process which may involve the creation or emission of
any offensive odors shall be provided with a secondary safeguard system, so that control will be
maintained if the primary safeguard system should fail. There is hereby established as a guide in
determining such quantities of offensive odors Table III, Odor Thresholds, in chapter 5, "Air
Pollution Abatement Manual," copyright 1951 by Manufacturing Chemists' Association, Inc.,
Washington D.C., and said manual and/or table as subsequently amended.
There are no anticipated odors associated with this development application or located on the
property. Please also refer to responses found in performance standard 8.53.
8.57 Fly ash, dust, fumes, vapors, gases, and other forms of air pollution. No emission shall be
permitted which can cause any damage to health, to animals, vegetation, or other forms of
property, or which can cause any excessive soiling, at any point, and/or which does not conform
to air pollution regulations of the Delaware Department of Natural Resources and Environmental
Control, and, in no event, any emission, from any chimney or otherwise, of any solid or liquid
particles in concentrations exceeding 0.3 grain per cu. ft. of the conveying gas resulting from
combustion. Standard corrections shall be applied to a stack temperature of 500 degrees
Fahrenheit and 50 percent excess air.
There are no anticipated fly ash, dust, fumes, vapors, gases, or other forms of air pollution
anticipated with this development application. Please also refer to responses found in
performance standard 8.55.
8.58 Glare. No direct or sky-reflected glare, whether from floodlights or from high-temperature
processes such as combustion or welding or otherwise, shall be permitted. This restriction shall
not apply to signs otherwise permitted by the provisions of this ordinance.
There are no anticipated sources of glare associated with this development application or located
on the property. All lighting will be shielded, downturned, and will comply with City of Dover
Lighting Regulations.
8.59 Liquid or solid wastes. No discharge shall be permitted at any point into any public sewer, private
sewage disposal system or stream, or into the ground, except in accord with standards approved
by the Delaware Department of Natural Resources and Environmental Control, of any materials of
such nature or temperature as can contaminate any water supply or otherwise cause the emission
of dangerous or offensive elements.
All liquid and solid waste generated at this facility is managed in conformance with DNREC, Kent
County, and the City of Dover regulations. Hazardous waste that is generated at this facility is
Project No. P&G01-02
Performance Standards Evaluation Report
Page 4 of 6
125
Page 126
Item 3.
Performance Standards Evaluation Report – Procter & Gamble
Warehouse Expansion and Parking Improvements May 2, 2024
managed by Clean harbors/Safety Clean and is processed at a permitted offsite location.
Universal waste that is generated at this facility is managed by Covanta and is incinerated to
produce waste energy. Metal, plastic, and cardboard waste is recycled to the maximum extent
practicable.
Process wastewater generated at this facility is discharged through the East and South outfalls and
is governed by an industrial pretreatment permit issued by the Kent County Wastewater
Treatment Facility. Domestic wastewater associated with the facility restrooms are discharged
through the North outfall.
Stormwater runoff associated with this application will be collected and managed using an
infiltration basin, and it is planned that stormwater runoff through the 100-yr storm event will be
infiltrated with little to no discharge to the unnamed tributary of Puncheon Run Creek.
Stormwater management will meet or exceed all requirements of the Delaware Sediment &
Stormwater Regulations, the Kent Conservation District requirements to overmanage stormwater
runoff to mitigate downstream flooding, and the City of Dover Source Water Protection Overlay
Zone.
8.60 Traffic congestion. When, in the surrounding highway network, operating conditions are at or
near the design capacity level beyond which would result in functional failure of the surrounding
highway network. All speeds are reduced to a low, but relatively uniform value. Freedom to
maneuver within the traffic stream is extremely difficult, and it is generally accomplished by
forcing a vehicle or pedestrian to "give way" to accommodate such maneuvers. Comfort and
convenience levels are extremely poor, and driver or pedestrian frustration is generally high.
Operations at this level are usually unstable, because small increases in flow or minor
perturbations within the traffic stream will cause functional failures beyond acceptable levels.
(The conditions described in this [sub]section are also used to describe "level of service E" as
defined by the highway capacity manual developed by the transportation research board, dated
1985.)
There are no anticipated traffic congestion concerns associated with this development
application. The expansion of Drop Lot A and B will reduce the need for offsite storage
of trucks. Currently, trucks that bring raw materials to the property are checked in and
either dispatched to 1 of the onsite drop lots or to an offsite warehouse for temporary
storage. Trucks that are loaded with finished product are likewise dispatched to one of
the onsite drop lots or taken to an offsite warehouse for temporary storage. When
offsite raw materials are ready for manufacturing or finished products are ready for
distribution, trucks from the facility are dispatched to retrieve the product for inspection
at the plant before raw materials are brought into the plant or finished products are
transported to the global distribution network. The current trucking operation generates
128 trips per day.
The proposed warehouse expansions will reduce the need for offsite warehousing of
raw materials and finished goods with a goal of all raw materials and finished product
being warehoused on site and only passing 1 time through the facility entrance. The
proposed truck traffic, when this project is complete, will be reduced to 82 trips per day
associated with the facility 10-year master plan. This represents a 36% reduction in
truck traffic on Dover and DelDOT truck routes.
Project No. P&G01-02
Performance Standards Evaluation Report
Page 5 of 6
126
Page 127
Item 3.
Performance Standards Evaluation Report – Procter & Gamble
Warehouse Expansion and Parking Improvements May 2, 2024
The addition of the contractor entrance on Electric Avenue will reduce traffic congestion
at the entrance on West North Street and direct this traffic to a controlled movement
intersection.
Coordination with DelDOT is ongoing. A pre-submittal meeting is scheduled for May
23, 2024. This project will comply with all DelDOT and the City of Dover traffic
requirements and regulations.
Signed Affidavit:
“I am aware of the performance standards required by Article 3, Section 8, and I have read and
understand these standards. I hereby agree to always conform to the applicable standards.”
____________________________________________
Joseph L. Taylor
Environmental Health and Safety Program Leader
Procter & Gamble
Project No. P&G01-02
Performance Standards Evaluation Report
Page 6 of 6
127
Page 128
Item 3.
City of Dover Noise Ordaince: Dover, Delaware, Code of Ordinances/Part II - Code of Ordinances/Appendix B-
Zoning/Article 5. - Supplementary Regulations/Section/Section 8. - Performance Standards/ Section 8.53 Noise
which states:
The maximum sound pressure level radiated by any use or facility (other than transportation facilities) at the
property line shall not exceed the values in the designated octave bands given in [the following] table I, after
applying the corrections shown in [the following] table II. The sound pressure level shall be measured with a
sound level meter and associated octave band analyzer conforming to standards prescribed by the American
Standards Association (American Standard Sound Level Meters for Measurement of Noise and Other Sounds,
Z243-1944, American Standards Association, Inc., New York, N.Y., and American Standard Specification for an
Octave Band Filter Set for the Analysis of Noise and Other Sounds, Z24.10-1953, American Standards Association,
Inc., New York, N.Y., shall be used).
Table 1
Octave Band Range In Cycles per Second Sound Pressure Level in Decibels re 0.0002 dyne/cm2
30-300 60
301-2,400 40
Above 2,400 30
* If the noise is not smooth and continuous and is not radiated between the hours of 10:00 p.m. and 7:00 a.m.,
one or more of the corrections in table II shall be applied to the decibel levels given in table I.
Table 2
Type of Location of Operation or Character of Noise Correction in Decibels
Daytime Operation Only
Noise Source operates less than*
20 percent of any one-hour period 5
05 percent [sic] of any one-hour period 10
Noise of impulsive character (hammering, etc.) -5
Noise of periodic character (hum, screech,etc.) -5
Property is located in one of the following zones and is not withing 500 feet of any residential district*
Central commercial C-2 Zone 5
Service commercial C-3 Zone
10
Manufacturing M Zone
Property is located in industrial park manufacturing
10
zone IPM
Add state
Limit-60+10 Limit-40+10 Limit-30+10
Combined requirem
Location of Test (dB) (dB) (dB) Odor
(dB) ent to
30-300 301-2400 >2400
colum E
Command Center Front Fence 29 18 18.5 54.5 No
36 18.1 17.5 55.9 No
23 15.8 16.7 52 No
33.3 16.7 18.8 50.8 No
128
Page 129
Item 3.
35.5 17 15 51.9 No
33.1 15.6 18.7 52.8 No
North East Corner 37.4 18.1 17.1 50.9 No
34 17 16.7 56.6 No
33 16.4 18 57.1 No
44.9 19 12.3 59.9 No
44.9 16.4 15.7 62.9 No
45.6 20.6 17.5 62 No
45 19.2 15.8 60.9 No
Boiler House Hydro Thrift Running 49 13.2 15.6 61.7 No
32 15.8 19.5 63.7 No
44 17.2 18.3 65 No
47 17 18 65.5 No
45.4 16 14 63.6 No
South East Corner Plant 47.6 17 10.2 65.4 No
49.2 19 13.1 66.2 No
46.9 16 12.3 59.4 No
20 18 15 49.9 No
29 19.4 16.7 48 No
28 18.6 13.8 48.2 No
18 18 10 61.2 No
Diesel Fire Pump (not running) 20.4 20.4 19.5 45 No
24.6 24 26 41.2 No
26 16 13.1 47 No
21.4 26 15.3 48.2 No
13.7 17.2 17.7 48.4 No
14.1 18.7 15 54.7 No
26 19.8 23 56.7 No
21 22.5 17.7 51 No
Drop Lot B 36 17 16.1 54.2 No
25 16.1 11.6 53 No
24.4 14.9 14.5 60 No
21.7 12.3 11.1 58.7 No
Drop Lot A 27.9 13.3 15.5 55.8 No
22.3 14.4 16.4 57.6 No
20.5 16.8 13.8 52.3 No
16.9 16.9 20 60 No
24.3 17.4 19.9 50 No
sw corner of contractor parking lot 29.3 17.9 10.5 55 No
nw corner of contractor parking lot 20.3 18 16.7 59.8 No
nw light pole inside PG parking lot 23.7 19.8 17.9 55.9 No
24.9 11.2 13.6 54 No
29.3 13.8 14.1 57 No
129
Page 130
Item 3.
STATE OF DELAWARE
OFFICE OF MANAGEMENT AND BUDGET
OFFICE OF STATE PLANNING COORDINATION
May 20, 2024
Robert Palmer
Beacon Engineering, LLC
23318 Cedar Lane
DE, Georgetown 19947
RE: PLUS review – 2024-04-05; Procter & Gamble Warehouse Expansion
Dear Mr. Palmer:
Thank you for meeting with State agency planners on April 24, 2024, to discuss the Procter &
Gamble Warehouse Expansion. According to the information received, you are seeking review
of a proposed site plan for a 110,000 SF expansion of the existing JE warehouse and 20,000 SF
expansion of warehouse 3 as well as improved truck storage and parking. This project is on 13.6
acres zoned IPM (Industrial Park Manufacturing).
Please note that changes to the plan, other than those suggested in this letter, could result in
additional comments from the State. Additionally, these comments reflect only issues that are
the responsibility of the agencies represented at the meeting. The developers will also need to
comply with any Federal, State, and local regulations regarding this property. We also note
that the City of Dover is the governing authority over this land, the developers will need to
comply with any and all regulations/restrictions set forth by the City.
Strategies for State Policies and Spending
This project is located in a Level 1 investment area, which is consistent with the 2020 Strategies
for State Policies and Spending. This site is located in the City of Dover and consistent with their
Comprehensive Plan.
Investment Level 1 reflects areas that are already developed in an urban or suburban fashion,
where infrastructure is existing or readily available, and where future redevelopment or infill
projects are expected and encouraged by State policy. Because development in Level 1 is
consistent with the 2020 Strategies for State Policies and Spending, the Office of State Planning
Coordination has no objections to this site plan, provided it meets the relevant codes and
ordinances of the City of Dover.
122 Martin Luther King Jr. Blvd. South – Haslet Armory ⋅ Third Floor ⋅ Dover, DE 19901
Phone (302)739-3090 ⋅ Fax (302) 739-5661 ⋅ www. stateplanning.delaware.gov 130
Page 131
Item 3.
PLUS review 2024-04-05
Page 2 of 14
Code Requirements/Agency Permitting Requirements
Department of Transportation (DelDOT) – Contact Stephen Bayer 302-760-4834
• This project is located within the regulated airspace of Dover Air Force Base (DAFB).
Federal Aviation Regulation (FAR) Part 77 imposes height restrictions on any structures
within these zones. DelDOT requires that the applicant for this project submits a
“Proposed Construction/Alteration in Airport Zones Notification Form” in accordance
with Delaware Code (2 Del. C. § 602). This notification form can be submitted during the
plan approval process with the local land use jurisdiction, but DelDOT’s Office of
Aeronautics is willing to test hypothetical height numbers to prevent any future project
complications. Please contact Mr. Austin Gray with the Office of Aeronautics at (302)
760-2145 with any questions or concerns. A copy of the notification form can be found
at this address:
https://www.deldot.gov/Programs/aviation_svcs/pdfs/aviation_obstruction_review_for
m. pdf?012913.
• Any site access points onto State maintained roads must be designed in accordance with
DelDOT’s Development Coordination Manual, which is available at
http://www.deldot.gov/Business/subdivisions/index.shtml?dc=changes.
• Section 1.7 of the Manual addresses fees that are assessed for the review of
development proposals. DelDOT anticipates collecting the Initial Stage Fee when the
record plan is submitted for review and the Construction Stage Fee when construction
plans are submitted for review.
• As necessary, in accordance with Section 3.2.5 and Figure 3.2.5-a of the Manual, DelDOT
will require dedication of right-of-way along the site’s frontage. By this regulation, this
dedication is to provide a minimum of 30 feet of right-of-way from the physical
centerline of West North Street along the site’s frontage. The following right-of-way
dedication note is required, “An X-foot wide strip of right-of-way from the centerline is
hereby dedicated in fee simple to the State of Delaware, acting by and through the
Delaware Department of Transportation.”
• In accordance with Section 3.2.5.1.2 of the Manual, DelDOT will require the
establishment of a 15-foot wide permanent easement across the property frontage.
The location of the easement shall be outside the limits of the ultimate right-of-way.
The easement area can be used as part of the open space calculation for the site. The
following note is required, “A 15-foot wide permanent easement is hereby dedicated
in fee simple to the State of Delaware, acting by and through the Delaware
Department of Transportation.”
131
Page 132
Item 3.
PLUS review 2024-04-05
Page 3 of 14
• Referring to Section 3.4.2.1 of the Manual, the following items, among other things, are
required on the Record Plan:
o A Traffic Generation Diagram. See Figure 3.4.2-a for the required format and
content.
o Notes identifying the type of off-site improvements, agreements (signal, letter)
contributions and when the off-site improvements are warranted.
• Section 3.5.4.2 of the Manual addresses requirements for Shared Use Paths (SUP) and
sidewalks. For projects in Level 1 and 2 Investment Areas, installation of paths or
sidewalks along the frontage on State-maintained roads is required.
• In accordance with Section 5.2.9 of the Manual, the Auxiliary Lane Worksheet should be
used to determine whether auxiliary lanes are warranted at the site entrances and how
long those lanes should be. The worksheet can be found at
http://www.deldot.gov/Business/subdivisions/index.shtml. Based on the updates to
this project since the original Auxiliary Lane Worksheet submission a new sheet is
necessary.
• In accordance with Section 5.4 of the Manual, sight distance triangles are required and
shall be established in accordance with American Association of State Highway and
Transportation Officials (AASHTO) standards. A spreadsheet has been developed to
assist with this task. It can be found at
http://www.deldot.gov/Business/subdivisions/index.shtml.
• In accordance with Section 5.14 of the Manual, all existing utilities must be shown on
the plan and a utility relocation plan will be required for any utilities that need to be
relocated.
DART First State – Contact Jared Kauffman 302-576-6062
• A Type 2 (5x8) bus stop pad is needed on Hazlettville Road.
• Bicycle parking is recommended.
Department of Natural Resources and Environmental Control (DNREC) – Contact Beth Krumrine
302-735-3480
Staff from the Delaware Department of Natural Resources and Environmental Control
(DNREC) reviewed the project submitted for PLUS review. The absence of comments regarding
specific resources does not indicate that there are not additional constraints or environmental
issues on site, nor does it indicate DNREC support of a project.
132
Page 133
Item 3.
PLUS review 2024-04-05
Page 4 of 14
Special Stormwater Management Requirements
Time stormwater release exists for the stormwater system receiving any additional flow volume
to lessen flooding conditions downstream.
• The project applicant must consult with the Kent Conservation District on the timing
of stormwater released into this system.
Plan review agency contact: Kent Conservation District at (302) 608-5370.
Website: http://kentcd.org/
General stormwater contact: DNREC Sediment and Stormwater Program at (302) 739-9921.
E-mail: DNREC.Stormwater@delaware.gov.
Website: https://dnrec.delaware.gov/watershed-stewardship/sediment-stormwater/
General Stormwater Management Requirements
The project proposes greater than 5,000 square feet of land disturbing activities and will be
subject to Delaware’s Sediment and Stormwater Regulations.
• A Sediment and Stormwater Plan must be developed, then approved by the appropriate
plan review agency prior to any land disturbing activity taking place on the site. For this
project, the plan review agency is the Kent Conservation District.
• Additionally, to address federal requirements, construction activities that exceed 1.0
acre of land disturbance require Construction General Permit coverage through
submittal of an electronic Notice of Intent for Stormwater Discharges Associated with
Construction Activity. This form must be submitted electronically
https://enoi.dnrec.delaware.gov/, select Construction Stormwater General Permit) to
the DNREC Division of Watershed Stewardship, along with the $195 fee.
• Schedule a project application meeting with the appropriate plan review agency prior to
moving forward with the stormwater and site design. As part of this process, you must
submit a Stormwater Assessment Study.
Plan review agency contact: Kent Conservation District at (302) 608-5370.
Website: http://kentcd.org/
General stormwater contact: DNREC Sediment and Stormwater Program at (302) 739-9921.
E-mail: DNREC.Stormwater@delaware.gov.
Website: https://dnrec.delaware.gov/watershed-stewardship/sediment-stormwater/
Industrial Stormwater
This site may hold an existing industrial stormwater discharge permit under the National
Pollutant Discharge Elimination System.
133
Page 134
Item 3.
PLUS review 2024-04-05
Page 5 of 14
• The applicant must contact the DNREC Surface Water Discharges Section to determine
regulatory requirements.
Contact: DNREC Surface Water Discharges Section at (302) 739-9946.
Website: https://dnrec.delaware.gov/water/commercial-government/npdes/industrial-
stormwater/
Wetlands and Waterways
Maps from the Statewide Wetlands Mapping Project indicate the potential presence of non-
tidal wetlands on the site, as also marked on the preliminary plan. The application indicates
that wetlands have been delineated, with no direct impacts to the wetlands expected.
• If the site design changes and dredge or fill of wetlands or waterways becomes
necessary, permitting and/or authorization requirements may apply.
• Federal permits from the U.S. Army Corps of Engineers may also be necessary if plans
change and dredge or fill is proposed in non-tidal wetlands or streams. A delineation of
waterways and wetlands may be required, to be completed by a qualified professional
hired by the landowner. In certain cases, permits from the US Army Corps of Engineers
may trigger additional certifications from DNREC (Coastal Zone Federal Consistency
Certification and 401 Water Quality Certification). Work with the U.S. Army Corps of
Engineers to determine the appropriate permitting requirements if federal permits are
required.
Federal Contact: U.S. Army Corps of Engineers (Dover Office) at (267) 240-5278.
Website: https://www.nap.usace.army.mil/Missions/Regulatory/Contacts/
State Contact: DNREC Wetlands and Waterways Section at (302) 739-9943.
Website: https://dnrec.delaware.gov/water/wetlands/
Wellhead Protection Area
A Wellhead Protection Area is located at the far southeastern corner of the site. Wellhead
Protection Areas are the surface and subsurface areas surrounding a water well, or a public
water supply wellfield. Contaminants leaching into the soil have the potential to reach the
water supplies in these areas.
• The applicant must comply with all county and municipal codes that affect public
drinking water supply Wellhead Protection Areas.
Contact: DNREC Source Water Assessment and Protection Program at (302) 739-9945.
Website: https://dnrec.delaware.gov/water/supply/ground-water-protection/
Excellent Groundwater Recharge Area
An Excellent Groundwater Recharge Area is located on the western half of the property. The
proposed tractor trailer expansion and 110,000 square foot building expansion, as designed,
would sit immediately over this Excellent Groundwater Recharge Area. These areas have soils
that are conducive to water infiltrating downward from surface water into groundwater.
134
Page 135
Item 3.
PLUS review 2024-04-05
Page 6 of 14
Preservation of these areas is important for replenishing groundwater supplies and ensuring
drinking water for future generations.
• The applicant must comply with all county and municipal requirements for construction
and uses in Excellent Groundwater Recharge Areas.
Contact: DNREC Source Water Assessment and Protection Program at (302) 739-9945. Website:
https://dnrec.delaware.gov/water/supply/ground-water-protection/
Previous Contamination
DNREC records indicate that contamination has occurred on the project site. Records show that
Scott Paper Company - Dover Plant (project ID DE-060) is a closed remediation site under the
Hazardous Substance Cleanup Act (HSCA).
• No issues have been identified at this time. Contact the DNREC Remediation Section
for any concerns.
• Additional information may also be found online by searching Delaware’s
Environmental Navigator at https://den.dnrec.delaware.gov/.
Contact: Division of Waste and Hazardous Substances Remediation Section at (302) 395-2600.
Website: https://dnrec.delaware.gov/waste-hazardous/remediation/
Leaking Underground Storage Tanks
Based on DNREC records, there has been one or more confirmed leaking underground storage
tank(s) located on the proposed site.
• Additional information may be found online through Delaware’s Environmental
Navigator at https://den.dnrec.delaware.gov/.
• Contact the Division of Waste and Hazardous Substances Remediation Section to
determine the status of the remedy for the leaking underground storage tank and any
associated restrictions.
• If any indication of a Release of a Regulated Substance from a tank is discovered, the
Responsible Parties shall report it within 24 hours: 24-hour Release Hot Line, (800) 662-
8802.
Contact: Division of Waste and Hazardous Substances Remediation Section at (302) 395-2600.
Website: https://dnrec.delaware.gov/waste-hazardous/remediation/
135
Page 136
Item 3.
PLUS review 2024-04-05
Page 7 of 14
Delaware Department of Agriculture (DDA) – Contact Milton Melendez 302-698-4500
• No Delaware Department of Agriculture code or regulations apply to this PLUS project.
Delaware Emergency Management Agency (DEMA) – Contact Phillip Cane 302-659-2325
Proposed Project Parcel Flood Concern
• The majority of this parcel primarily is located within an area of Minimal Flood Concern
of 1,000 years or greater and therefore no direct concern; however, the southeastern
portion borders a Special Flood Hazard Area identified as Flood Zone AE—a 1% Annual
Chance Flood Hazard or 100-year Flood Plain—that follows the Beaver Dam Creek.
Though no construction appears to be directly within the flood zone.
Parcel Status within County Evacuation Zone Location
• The parcel is not yet located within a Kent County Evacuation Zone.
136
Page 137
Item 3.
PLUS review 2024-04-05
Page 8 of 14
Parcel Status within the 10-mile Emergency Planning Zone (EPZ) for the Salem Nuclear Power
Plant
• The parcel is not located within the 10-mile EPZ for the Salem Nuclear Power Plant.
State Historic Preservation Office (SHPO) – Contact Carlton Hall 302-736-7400
• There are no known archaeological sites or known National Register-listed or eligible
properties on the parcel.
• The proposed expansion includes expanded truck storage and stormwater management
on the southwestern portion of the parcel. The southwestern portion of the parcel is
adjacent to a stream and is composed of well-drained soils.
• There are considered favorable conditions for past human occupation. Historic maps
and aerials show an occupation in the southwestern corner of the parcel. Due to known
occupation, there is high potential for historic archaeological sites.
• Our Office recommends an archaeological survey prior to any ground disturbance for
the proposed Trailer Lot B/C and stormwater pond. The developer should be aware of
Delaware's Unmarked Human Remains Law (Del. Code Title 7 Chapter 54).
• If there are any questions, inquiries, or concerns, feel free to contact the Delaware State
Historic Preservation Office for assistance at 302-736-7400.
Recommendations/Additional Information
This section includes a list of site-specific suggestions that are intended to enhance the project.
These suggestions have been generated by the State Agencies based on their expertise and
subject area knowledge. These suggestions do not represent State code requirements.
They are offered here in order to provide proactive ideas to help the applicant enhance the site
design, and it is hoped (but in no way required) that the applicant will open a dialogue with the
relevant agencies to discuss how these suggestions can benefit the project.
Department of Transportation (DelDOT) – Contact Stephen Bayer 302-760-4834
• The applicant should expect a requirement that all PLUS and Technical Advisory
Committee (TAC) comments be addressed prior to submitting plans for review.
• Please be advised that the Standard General Notes have been updated and posted
to the DelDOT website. Please begin using the new versions and look for the
revision dates of March 21, 2019, and March 16, 2021. The notes can be found at
https://www.deldot.gov/Business/subdivisions/
137
Page 138
Item 3.
PLUS review 2024-04-05
Page 9 of 14
Department of Natural Resources and Environmental Control (DNREC) – Contact Beth Krumrine
302-735-3480
Wetlands and Waterways/Vegetated Buffer Zones
• As proposed, implement an upland buffer of at least 100 feet along all wetlands (or
increase the wetland buffer to 100 feet across the entire site), including those
containing existing forest or natural vegetative cover.
• Use wide, open bottom box culverts to allow for passage of amphibians.
• Maintain habitat connections to undeveloped open space, which are especially
important for species movement across the landscape.
• Vegetated buffer zones should be left undisturbed during construction and should be
identified outside of the Limit of Disturbance on the engineering plans. In some
instances, stormwater outfalls, conveyances, and emergency spillways may cross
through these zones, and will require temporary disturbance during construction.
• Maintain vegetated buffer zones as either grasslands/meadows or forest. Buffer zones
should be planted exclusively with native trees and plants. Native plants are well-suited
to our climate and require limited maintenance. They also provide an increasingly
important role in the survival of native birds and beneficial insects whose habitat is
shrinking due to development and climate change.
• Grass cutting for vegetated buffer zones if maintained as meadow should not occur
between April 1st to July 31st to reduce impacts to nesting birds and other wildlife
species that utilize meadows and grasslands for breeding habitat.
Contact: DNREC Wildlife Species Conservation & Research Program at (302) 735-3600. Website:
https://dnrec.delaware.gov/fish-wildlife/contact-information/
Land and Water Conservation Fund or Outdoor Recreation, Parks, and Trails
This site is adjacent to Schutte Park, a property that is held under Outdoor Recreation, Parks,
and Trails (ORPT) protection. State grant funding was specifically used to improve public-use
areas such as playgrounds, trails, and other recreational opportunities.
• It is recommended to extend the existing raised berm and plant evergreen trees
sufficient to continue the existing tree line the full length of said berm. The berm
should run the full length of the proposed parking lot edge facing Schutte Park.
Contact: DNREC Division of Parks and Recreation, Parks Resource Office at (302) 739-9215.
Website: https://dnrec.delaware.gov/parks/planning/recreation-parks-trails/
138
Page 139
Item 3.
PLUS review 2024-04-05
Page 10 of 14
Removal of Forest
The preliminary plan proposes to remove 3.8 acres of forest on the site, while allowing 33.8
acres of forest to remain intact. The removal is limited to the placement of a stormwater
management pond and the expansion of trailer drop lot B/C.
• Removing forested areas for development should be avoided to the greatest extent
possible.
• In general, contiguous forest and connected areas of natural habitat are more beneficial
to wildlife, allowing for safer movement from one area to another while reducing
roadway mortality.
• To reduce impacts to nesting birds and other wildlife species that utilize forests for
breeding, it is recommended that tree clearing not occur from April 1st to July 31st.
Likewise, avoid mowing open space areas and grass filter strips during the same
timeframe, as various species of birds utilize these areas for nesting sites.
Contact: DNREC Division of Fish and Wildlife, Species Conservation and Research Program at
(302) 735-3600.
Website: https://dnrec.delaware.gov/fish-wildlife/contact-information/
Water Quality
• Reduce impervious surfaces on the project site by eliminating areas of impervious
pavement and/or using pervious pavement where practicable. Break up large
parking lots with planted islands.
• Reduce the necessity for nutrient application by maintaining open space as
meadow or forest planted exclusively with native plants. Native plants are well-
suited to our climate and require limited maintenance.
Contact: DNREC Division of Watershed Stewardship’s Watershed Assessment Section at (302)
739-9939. https://dnrec.alpha.delaware.gov/watershed-stewardship/
Excellent Groundwater Recharge Area
• For Excellent Groundwater Recharge Areas, limit impervious surfaces to no more than
20% of the entire area designated as having excellent recharge.
Contact: DNREC Source Water Assessment and Protection Program at (302) 739-9945. Website:
https://dnrec.delaware.gov/water/supply/ground-water-protection/
139
Page 140
Item 3.
PLUS review 2024-04-05
Page 11 of 14
Stormwater Management
• Where the site and soil conditions allow, integrate runoff reduction techniques including
infiltration basins, bioretention (rain gardens), filter strips, and pavers to encourage on-
site stormwater infiltration and reduce runoff.
• For improved stormwater management, preserve existing trees, wetlands, and passive
open space.
Plan review agency contact: Kent Conservation District at (302) 608-5370.
Website: http://kentcd.org/
General stormwater contact: DNREC Sediment and Stormwater Program at (302) 739-9921.
E-mail: DNREC.Stormwater@delaware.gov.
Website: https://dnrec.delaware.gov/watershed-stewardship/sediment-stormwater/
Drainage
• All existing drainage ditches on the property should be evaluated for function and
cleaned, if needed, prior to the construction of the project.
• Environmental permits or exemptions may be required by the County Conservation
District (Standard Plan), the DNREC Sediment and Stormwater Program (eNOI/NOT),
Army Corp of Engineers, and/or DNREC Wetlands and Waterways Section prior to
clearing and/or excavating ditch channels.
• All precautions should be taken to ensure the project does not hinder any off-site
drainage upstream of the project or create any off-site drainage problems downstream
by the release of on-site storm water.
• Any area designated as a drainage/utility easement should be open space and not
owned by the individual landowners.
• Any drainage/utility easement should not possess structures such as decks, buildings,
sheds, kennels, or fences within the drainage easement to allow for future drainage
maintenance. Trees and shrubs planted within a drainage/utility easement should be
spaced to allow for drainage maintenance at maturity.
Contact: DNREC Drainage Program at (302) 855-1930.
Website: https://dnrec.delaware.gov/drainage-stormwater/
Sustainable Practices
• On large expanses of impervious surfaces and asphalt, design parking areas to include
trees for shading.
• Incorporate nonmotorized connectivity and install bicycle racks where feasible to help
facilitate non-vehicular travel modes.
140
Page 141
Item 3.
PLUS review 2024-04-05
Page 12 of 14
• Consider installing electric vehicle charging stations for staff/visitors. Installation costs
can vary significantly depending on the parking and electricity distribution at a given
location, so it is often easier and cheaper to plan for the installation at construction,
rather than doing costly retrofits later. The DNREC Division of Climate, Coastal and
Energy offers rebates of up to 80% of the cost of the charging station for commercial,
multi-unit dwelling and other public properties. These programs address climate change
goals of reducing greenhouse gas emissions and improving overall air quality
(https://dnrec.delaware.gov/climate-coastal-energy/clean-transportation/).
• Consider using renewable energy infrastructure such as solar or geothermal to reduce
energy costs and further reduce pollution created from offsite generation. Grant funds
and incentives are available for Delmarva Power customers through the DNREC Green
Energy Fund, which includes several funding types through the state’s major electric
utilities ((https://dnrec.delaware.gov/climate-coastal-energy/renewable/assistance/).
• Consider planting stands of native trees. Native trees improve air, water, and soil
quality. Planting and nurturing trees is also a nature-based solution to reducing the
greenhouse gases that drive climate change. In addition, native trees have an
increasingly important role in the survival of native birds and beneficial insects whose
habitat is shrinking due to development and climate change.
• Use efficient Energy Star rated products and materials in construction and
redevelopment. Energy efficient appliances use less energy over time. This saves
consumers and businesses money, while also helping to reduce pollution from power
generation.
• Use structural paint coatings that are low in Volatile Organic Compounds to help protect
air quality. Air pollution from new construction is generated through the use of
maintenance equipment, paints, and consumer products like roof coatings and primers.
• Use recycled materials, such as reclaimed asphalt pavement, to reduce heat island
effects on paved surfaces, prevent landfill waste, and lower material costs.
Contact: DNREC Division of Climate, Coastal & Energy at (302) 735-3480.
Website: https://dnrec.delaware.gov/climate-coastal-energy/
Delaware Emergency Management Agency (DEMA) – Contact Phillip Cane 302-659-2325
Population
• The county has a population density of 310.20 persons per square mile based on the US
2020 Census report; an increase from 2010 at 271.30 persons per square mile. The
specific census block(s) the project is located on has a total population of 15 persons,
though, with development, this will undoubtedly change. The 15 adjacent blocks
aggregated bring the area to a total population of 1230 persons.
141
Page 142
Item 3.
PLUS review 2024-04-05
Page 13 of 14
FEMA National Risk Index
• The FEMA National Risk Index is an online mapping application that identifies
communities most at risk to 18 natural hazards: Avalanche, Coastal Flooding, Cold
Wave, Drought, Earthquake, Hail, Heat Wave, Hurricane, Ice Storm, Landslide, Lightning,
Riverine Flooding, Strong Wind, Tornado, Tsunami, Volcanic Activity, Wildfire, and
Winter Weather. The FEMA National Risk Index is calculated by multiplying the Expected
Annual Loss times the Social Vulnerability and dividing that by the Community
Resilience.
• According to FEMA’s National Risk Index, the parcel is considered relatively low for
overall natural hazards risks.
• Community Resilience is a consequence reduction risk component and a community risk
factor that represents the ability of a community to prepare for anticipated natural
hazards, adapt to changing conditions and withstand/recover rapidly from disruptions.
Social Vulnerability is a consequence-enhancing risk factor that represents the
susceptibility of social groups to the adverse impacts of natural hazards.
• Its community resilience is rated at relatively high whereas its social vulnerability is
rated as very high.
Renewable Energy Commitment
• Regarding energy use and consumption, the census tract utilizes utility/natural gas as
the predominant fuel type for heating purposes.
• DEMA strongly encourages the use of renewable energies and high-efficiency appliances
and utilities. Regarding utilities, DEMA suggests incorporating 90% series furnaces/HVAC
systems; the closer to 99%, the better, as well as A/C units of 20 Seer or greater. DEMA
recommends using tankless water heaters, and battery backup systems for sump pumps
to reduce potential water damage from power failure. Lastly, DEMA encourages the
integration of modern and emerging technologies, such as the potential for electric
vehicles in garages/parking lots, green roofs or solar panels where applicable and
allowable, and the like.
142
Page 143
Item 3.
PLUS review 2024-04-05
Page 14 of 14
Following receipt of this letter and upon filing of an application with the local jurisdiction, the
applicant shall provide to the local jurisdiction and the Office of State Planning
Coordination a written response to comments received as a result of the pre-application
process, noting whether comments were incorporated into the project design or not and the
reason, therefore.
Thank you for the opportunity to review this project. If you have any questions, please contact
me at 302-739-3090.
Sincerely,
David L. Edgell, AICP
Director, Office of State Planning Coordination
143
Page 144
Item 3.
23318 Cedar Lane · Georgetown, DE 19947 · 302.864.8825
info@beaconengineeringllc.com
Transmitted via Email: rose.zappacosta@delaware.gov for Mr. David L. Edgell, AICP
June 6, 2024
Office of State Planning Coordination
122 Martin Luther King junior Blvd. South- Haslet Armory, 3rd Floor
Clover, DE space 19901
Attn: Mr. David L. Edgell, AICP, Director
RE: PLUS Review – 2024-04-05
Warehouse Expansion & Parking Improvements – Procter & Gamble
Tax Map # 2-05-07600-01-0700
City of Dover, East Dover Hundred
Kent County, Delaware
Project No. P&G01-02
Dear Ms. Edgell:
The purpose of this letter would be to provide a general acknowledgement of comments and
recommendations provided by the various government and regulatory agencies that participated in the
above reference PLUS review. Generally, it is the Design Team’s intent to comply with the spirit of
those recommendations subject to the following:
Build Requirements/Agency Permitting Requirements
DelDOT: All comments and recommendations are acknowledged and will be incorporated into the site
development master plan (master plan).
DART First State: The Design Team has coordinated with DART First Sand DelDOT Planning to locate a
Type 2 bus stop. Also, please note that bicycle parking is proposed at numerous locations throughout
the facility.
DNREC: Special Stormwater Management Requirements: Prior to this PLUS meeting, the Design Team
coordinated with the Kent Conservation District to establish design and permitting objectives.
DNREC: General Stormwater Management Requirements: All comments and recommendations are
acknowledged and will be incorporated into the site development master plan (master plan).
DNREC: Industrial Stormwater: This facility is subject to an industrial stormwater discharge permit.
All comments and recommendations are acknowledged and will be incorporated into the site
development master plan (master plan).
144
Page 145
Item 3.
PLUS Review Response – 2024-04-05
Mr. David L. Edgell, AICP
June 6, 2024
Page 2 of 3
DNREC: Wetlands & Waterways: A wetland delineation has been prepared by Environmental
Resource Insights, and this delineation has been reviewed with the Wetlands and Waterways Section
and the US Army Corps of Engineers. No disturbance of wetlands or the City prescribed 100-foot
riparian buffer from non-tidal wetlands is proposed. All comments and recommendations are
acknowledged and will be incorporated into the site development master plan (master plan).
DNREC: Excellent Groundwater Recharge Area: All comments and recommendations are
acknowledged and will be incorporated into the site development master plan (master plan).
DNREC: Previous Contamination: All known contamination has been remediated consistent with State
and Federal requirements.
DNREC: Leaking Underground Storage Tanks: All leaking underground storage tanks have been closed
in accordance with State and Federal requirements.
DDA: Acknowledged. This agency is not applicable to this project.
DEMA: This agency indicated that the proposed project does not adversely impact this agency’s
programs and objectives.
SHPO: All comments and recommendations are acknowledged and will be incorporated into the site
development master plan (master plan).
Recommendations/Additional Information
Though the suggestions made by the referenced agencies do not represent State code requirements, it
is the intent of the Design Team to generally comply with the suggestions made by the following
agencies:
DeLDOT: All comments and recommendations are acknowledged and will be incorporated into the
site development master plan (master plan).
DNREC: Wetlands and Waterways/Vegetated Buffer Zones: All comments and recommendations are
acknowledged and will be incorporated into the site development master plan (master plan).
DNREC: Land and Water Conservation Fund or Outdoor Recreation, Parks and Trails: All comments
and recommendations are acknowledged and will be incorporated into the site development master
plan (master plan).
145
Page 146
Item 3.
PLUS Review Response – 2024-04-05
Mr. David L. Edgell, AICP
June 6, 2024
Page 3 of 3
DNREC: Removal of Forest: All comments and recommendations are acknowledged and will be
incorporated into the site development master plan (master plan).
DNREC: Water Quality: Given the heavy traffic associated with the proposed use, the use of
permeable paving is not advised because permeable paving does not provide a durable surface that is
warranted for this use. Consideration will be provided to convert certain areas of the developed land to
meadow.
DNREC: Excellent Groundwater Recharge Area: The Design Team intend to comply with the City of
Dover Code with regard to the Tier 3 Excellent Recharge Area.
DNREC: Stormwater Management: All comments and recommendations are acknowledged and will
be incorporated into the site development master plan (master plan).
DNREC: Drainage: All comments and recommendations are acknowledged and will be incorporated
into the site development master plan (master plan).
DNREC: Sustainable Practices: All comments and recommendations are acknowledged and will be
incorporated into the site development master plan (master plan) with the exception of the following:
• No electric vehicle charging stations will be provided because this recommendation is not
consistent with current corporate policy
DEMA: All comments and recommendations are acknowledged and will be incorporated into the site
development master plan (master plan).
Should you have any questions, please call.
Sincerely,
Robert J. Palmer, P.E.
President | Senior Engineer
CC: Ms. Dawn Melson-Williams, AICP, Principal Planner – City of Dover
146
Page 147
Item 3.
05/02/2024
05/02/2024
147
Page 148
Item 3.
05/02/2024
148
Page 149
Item 3.
05/02/2024
149
Page 150
Item 3.
05/02/2024
150
Page 151
Item 3.
05/02/2024
151
Page 152
Item 3.
05/02/2024
152
Page 153
Item 3.
05/02/2024
153
Page 154
Item 3.
05/02/2024
154
Page 155
Item 3.
05/02/2024
155
Page 156
Item 3.
05/02/2024
156
Page 157
Item 3.
05/02/2024
157
Page 158
Item 3.
05/02/2024
158
Page 159
Item 3.
05/02/2024
159
Page 160
Item 3.
05/02/2024
160
Page 161
Item 3.
05/02/2024
161
Page 162
Item 3.
05/02/2024
162
Page 163
Item 3.
05/02/2024
163
Page 164
Item 4.
City of Dover
ARCHITECTURAL REVIEW REPORT
Before Dover Historic District Commission
May 16, 2024
Appeal of Historic District Commission Action
to the Planning Commission for Meeting of June 17, 2024.
Project Name: Building at 148 South Bradford Street: Building Demolition
Location: West side of South Bradford Street between West Loockerman
Street and Reed Street, just north of the Minor Street Alley.
148 South Bradford Street
Tax Parcel: ED-05-077.09-02-25.00-000
Property Owner: Russell and Dee Ann Widder
Applicant: Downtown Dover Partnership
Present Zoning: C-2 (Central Commercial Zone)
H (Historic District Overlay Zone)
Present Use: Offices (Previously a single-family home)
Proposed Use: Vacant site
File Number: HI-24-02
Action by Historic District Commission:
The Historic District Commission conducted a public hearing and
considered the Application HI-24-02 for Architectural Review
Certification to demolish the building at 148 S. Bradford Street.
The vote was 2-1 to deny the Architectural Review Certification
for demolition (1 member absent and another recused).
Application: HI-24-02 – Building at 148 South Bradford Street: Building Demolition
This Architectural Review Certification application was reviewed by the Historic District
Commission on May 16, 2024. The following is the content of the Architectural Review Staff
Report and includes information the Historic District Commission considered.
PROJECT DESCRIPTION:
The Historic District Commission will act on an Architectural Review Certificate regarding
Demolition of the one-and-half story building located at 148 South Bradford Street. The property
is zoned C-2 (Central Commercial Zone) and subject to H (Historic District Zone). The parcel
consists of 0.13 +/- acres of land. The property is located on the west side of S. Bradford Street
and slightly north of Minor Street Alley. The owner of the record is Russell and Dee Ann
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service 164
Page 165
Item 4.
HI-24-02 148 S. Bradford Street: Demolition
Report for Appeal to Planning Commission: HI-24-02 Building at 148 S. Bradford Street: Demolition
Meeting of June 17, 2024
Widder. The applicant is the Downtown Dover Partnership. Property Address: 148 S. Bradford
Street. Tax Parcel: ED-05-077.09-02-25.00-000.
The following application for demolition at 148 South Bradford Street is submitted to the
Historic District Commission regarding the issuance of the Architectural Review Certificate for a
Demolition project. Applications for certain types of construction activity within the Historic
District Zone (H) are reviewed by the Historic District Commission for Architectural Review
Certification as part of the application review process. The Application is for review under the
provisions of Zoning Ordinance, Article 10 Section 3.23. See below:
3.23 Architectural review certification by the historic district commission.
(A) The historic district commission shall issue architectural review certificates for the construction
or demolition of single-family and two-family homes, and nonresidential structures or additions
involving a gross floor area of 3,000 square feet or less, after review of the proposed construction
and after a determination that the construction is in general accordance with the standards set
forth in subsection 3.25 below.
(B) All applications to the historic district commission for architectural review certification shall be
subject to the procedures set forth in subsection 3.26.
(C) All decisions of the historic district commission pursuant to this subsection shall be formalized in
a written notice of decision. When the commission grants a conditional approval under this
subsection, all conditions of approval shall be set forth in writing in the notice of decision. In the
event of a denial, the notice of decision shall state the reasons for denial and shall identify all
elements of the application found to be contrary to the provisions or intent of this subsection.
(D) An applicant may appeal the decision of the historic district commission to the planning
commission, and such appeal shall be considered as an architectural review certification
application to the planning commission and shall meet all of the requirements set forth in
subsection 3.24 and subsection 3.26.
The Historic District Commission will act on an Architectural Review Certificate regarding the
request for Demolition of the building at 148 S. Bradford Street.
Property Information
This building is located within a National Register of Historic Places Historic District,
specifically the Victorian Dover Historic District. Provided below is the building summary from
the building inventory listing found within the National Register nomination completed for the
Victorian Dover Historic District (nomination completed 1977-78).
K0396.152 – 148 South Bradford Street – 20th Century, 1 ½, 3-bay, frame, bungalow-style dwelling, now
used as a doctor’s office; stucco-sheathed; gable roof, dormer, overhang on gable ends with large triangle
brackets, hip roof façade dormer; 4/1 sash, Palladian window in gable end, half-round attic window;
modern brick porch with iron rail.
The property is located within H (Historic District Zone) as established by the City of Dover.
A series of historic maps were reviewed by Planning Staff for preliminary information on this
block of South Bradford Street. The 1868 Beers Map published by Pomeroy & Beers shows the
established street grid and rear alley although the parcel lines may be slightly different. There
appears to be a building on the site, with a different size, shape, and orientation. The 1885 Bird’s
165
2
Page 166
Item 4.
HI-24-02 148 S. Bradford Street: Demolition
Report for Appeal to Planning Commission: HI-24-02 Building at 148 S. Bradford Street: Demolition
Meeting of June 17, 2024
Eye View of Dover shows a series of residential buildings on this west side of S. Bradford Street
and smaller detached structures in rear yards. The series of Sanborn Fire Insurance Maps is also
a reference source for information on the series of buildings which occupied this property over
time. The 1897-1919 Sanborn Maps show a building with a vacant space at the subject site just
north of the Minor Street Alley with another building located further north. The 1929 Sanborn
Map shows this building present with an accessory structure along the alley and what appears to
be a new division of the parcel. (see Attachments at the end of report)
According to the tax records for the City of Dover, the Craftsman style stucco clad building at
148 S. Bradford Street was built in 1930. There is a parking lot at the rear of the property that
looks to be connected to the parking lot at 150 S. Bradford Street. The accessory structure that
was present in the 1929 Sanborn Map is not mentioned in the 1978 inventory for the National
Register of Historic Places application. A small open front porch has a low metal railing.
PROJECT PROPOSAL FOR DEMOLITION
The applicant has filed an application for Architectural Review Certification for the demolition
of 148 S. Bradford Street. The submission consists of a narrative with attachments including a
photo gallery. The project is described below:
1. Demolition of Building: The project involves the demolition of the existing 1 1/2-story
stucco clad frame building on the property.
The scope of Demolition notes that an asbestos survey will be conducted and the process for
demolition and removal of debris. Information on the stabilization of the surfaces following
removal of the building listed installation of sand/gravel to fill (to bring to grade). The rear of the
existing property is paved for parking with access from a rear alley. The future use of the
property is part of the Downtown Dover Partnership’s strategic plan Transforming Downtown
Dover: Capital City 2030. This site will be combined with others to create a multi-modal
transportation hub to be used for multiple businesses in the area for current and future
enhancements to the downtown area. The redevelopment of the site will be subject to a separate
review process.
Review of DESIGN STANDARDS AND GUIDELINES
The subject property is located in the Dover Historic District Zone within the Loockeman
Historic Context. The Loockerman Historic Context is described on pages 2-7 through 2-8.
Location within the Dover Historic District Zone requires proposals for specific types of
construction activities such as new construction, additions to existing buildings, exterior
renovations, and demolition of buildings to receive an Architectural Review Certificate.
As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone,
an Architectural Review Certificate will be granted for the project “if it is found that the
architectural style, general design, height, bulk and setbacks, arrangement location and materials
affecting the exterior appearance are generally in harmony with neighboring structures and
complementary to the traditional architectural standards of the historic district.”
166
3
Page 167
Item 4.
HI-24-02 148 S. Bradford Street: Demolition
Report for Appeal to Planning Commission: HI-24-02 Building at 148 S. Bradford Street: Demolition
Meeting of June 17, 2024
Demolition
The proposal for demolition of the building must be reviewed for conformity with the design
criteria guidelines found in Chapter 4: New Construction, Additions, Demolition and Relocation.
The Design Standards and Guidelines gives guidance to the Historic District Commission by
listing specific criteria to be evaluated when considering applications for the demolition of
buildings (or portions of buildings) in the historic district (Chapter 4: pages 4-10 to 4-12). These
guidelines are summarized below (see Design Standards and Guidelines for the complete text);
an excerpt of Chapter 4 is attached.
1. Determine the financial implications of maintaining a property versus demolition.
2. Regardless of economic issues the relative significance of the individual buildings slated for
demolition should be evaluated.
3. In development related applications the City should review the schematic plans for the new
structures to weigh the virtues of the new structure versus what exists.
4. Determine the extent of adequate recordation of a property the applicant would be
required to complete if demolition were approved.
5. Lots left vacant by demolition should be treated in a manner that is sympathetic to the
historic context.
The Design Standards and Guidelines note that parking should not be permitted on vacant lots
and suggests alternative uses. Also provided is information about development of parking lots
(page 3-27) in the Historic District. The Guidelines excerpt for parking lots is as follows:
Parking lots are the awkward by-product of a mobile culture. Their incorporation into historic districts is
problematic. Parking lots should be screened from the street, their layout should include borders, and islands
planted with trees and shrubs to break-up expanses of paved areas. Given any parking lot within the Dover
Historic District zone, at least 20% of the area within it should be unpaved and planted.
The Applicant, in their narrative, considers the Design Standards and Guidelines for Demolition
outlining their reasons for such Demolition request.
STAFF COMMENTS AND RECOMMENDATIONS
The following are the Staff comments and recommendations for this application regarding
project activities and an Architectural Review Certificate.
1) The Design Standards and Guidelines outline specific criteria to be evaluated in considering
demolition applications (Chapter 4). The following are Staff’s consideration of the criteria
for Demolition.
a) In this instance, the economic maintenance evaluation of the property individually is not
the issue for the applicant, but rather the need for the land to as part of a larger project in
the Downtown Dover Partnership plan to revitalize the Downtown area and provide
central parking. A central parking area would allow people to park their cars and visit
businesses and residences on foot.
167
4
Page 168
Item 4.
HI-24-02 148 S. Bradford Street: Demolition
Report for Appeal to Planning Commission: HI-24-02 Building at 148 S. Bradford Street: Demolition
Meeting of June 17, 2024
b) Most of the structures included in the National Register of Historic Places Victorian
Dover Historic District were constructed in the mid to late 1800’s. The Victorian Era, by
definition, goes from 1820-1914. This building was built after the Victorian Era and
along the way has had modifications to keep it current with the times and building code.
c) Included in the application is a draft concept of the lots and its future use. However, the
redevelopment project is not being reviewed at this time.
d) We have not been provided detailed plans or renderings for the multi-modal
transportation hub development. Nor have bids gone out for the demolition of the
building. An asbestos survey will be initiated when the project can move forward, as
required by the building and inspections department.
e) The lot is not expected to be left vacant past 2026.
2) While it is not the practice of the Planning Staff to recommend Demolition of a historic
building that has been adaptively reused, consideration must be given to the future
redevelopment of the area. The building generally has integrity of its form of the Craftsman
Style Bungalow. However, improvements to some exterior finishes (i.e. window
replacements, doors, and roofing) since its original construction as a house. It became an
office prior to 1978 and has functioned as that use since.
3) Staff notes the opportunities for the relocation of the building could also be an option for
consideration.
4) Staff are not aware of any documentation/recordation of the existing building. The Historic
District Commission could require additional documentation/recordation of the building if
deemed appropriate.
a) If demolition is unavoidable then, given the early twentieth century age of the building,
the building should also have additional documentation completed in the form of
measured drawings of the building’s floor plans. This should include other data gathering
on the building’s construction.
b) A series of photographs of the building’s exterior and interior should be systematically
completed to include keyed location map of photographs.
5) If approval for demolition of the building is granted, Staff recommends the following
conditions pertaining to the building demolition and site stabilization. These conditions are
presented to improve the project’s compliance with the recommended guidelines for
consideration of demolition in the Design Standards and Guidelines and other code
provisions:
a) A specific timeframe for demolition activities and site stabilization should be established.
b) All utilities must be properly capped and/or abandoned.
c) Clarify the plan for site stabilization of the site.
i) The building footprint area following demolition of the building and removal of the
basement foundation walls must be restored to grade. The disturbed area is to include
stabilization with topsoil and seeding to establish a grass lawn area. The grass lawn
area is to be properly maintained.
d) Staff do not recommend installation of solid (opaque) fencing or chain link fencing on the
site. If areas need to be segregated on the site, other alternative fence styles may be more
appropriate.
168
5
Page 169
Item 4.
HI-24-02 148 S. Bradford Street: Demolition
Report for Appeal to Planning Commission: HI-24-02 Building at 148 S. Bradford Street: Demolition
Meeting of June 17, 2024
e) Parking could continue on the paved (rear parking) area only. Stabilization of the
building footprint area with gravel is not an approved parking surface even as a
temporary measure.
ADVISORY COMMENTS:
1) The applicant shall be aware that a Demolition Permit is required to proceed with any
demolition activities on the property should Architectural Review Certification be granted for
the demolition proposal. The Demolition Permit application must comply with the conditions
of approval granted through the Architectural Review Certification process.
2) If major changes and revisions to the project proposal occur, contact the Department of
Planning and Inspections. These changes may require resubmittal for review by the Historic
District Commission.
3) Any future construction activities such as redevelopment of the site for a building or for an
expanded parking facility are subject to additional review processes for permitting and plan
review.
4) If the building is or will be vacant prior to the Demolition, then it may be required to be
registered as a Vacant Building with the City under the Vacant Buildings program.
Historic District Commission Action
The Historic District Commission at their meeting of May 16, 2024, considered the proposal for
demolition of the building at 148 S. Bradford Street and took action to deny the request for
Architectural Review Certification for demolition. The application was represented by Diane
Laird (Downtown Dover Partnership), Ken Anderson (Downtown Dover Partnership), and Jed
Hatfield (Colonial Parking Inc.).
• See Draft Meeting Minutes of May 16, 2024 (being prepared).
• Motion to deny the demolition of the building at 148 S. Bradford Street was passed with
a vote of 2-1 with the following Historic District Commission members present; Eric
Czerwinski, Ann Baker Horsey, and Ellen Richardson. Mary Terry Mason was absent.
Jonathan Street was also in attendance but recused himself as a board member of the
Downtown Development Partnership.
• Staff noted that the decision of the Historic District Commission could be appealed to the
Planning Commission.
Appeal to the Planning Commission
The Zoning Ordinance allows for decisions of the Historic District Commission to be appealed
to the Planning Commission (Zoning Ordinance, Article 10 Section 3.2 Architectural Review
Certification). The Planning Commission is to determine if the proposal for the Demolition of
the Building at 148 S. Bradford Street should be granted Architectural Review Certification
based on the following standards:
Article 10
3.25 Architectural review standards.
169
6
Page 170
Item 4.
HI-24-02 148 S. Bradford Street: Demolition
Report for Appeal to Planning Commission: HI-24-02 Building at 148 S. Bradford Street: Demolition
Meeting of June 17, 2024
(A) An architectural review certificate may be issued if it is found that the architectural style,
general design, height, bulk and setbacks, arrangement, location and materials and structures affecting
the exterior appearance are generally in harmony with neighboring structures and complementary to the
traditional architectural standards of the historic district as set forth in the historic district design guidelines
and standards adopted by the planning commission and as set forth in the United States Secretary of the
Interior’s Standards for Rehabilitation.
The “historic district design guidelines” referenced in the Zoning Ordinance are the document
entitled Design Standards and Guidelines for the City of Dover Historic District Zone. The
Planning Commission may add conditions to their action.
Attachments:
1) Letter of Notice of Historic District Commission Action
2) Draft Excerpt of Historic District Commission Meeting Minutes of May 16, 2024
(pending completion).
3) HI-24-02 Application Submission Documents.
4) Historical Maps of the property
5) Design Standards and Guidelines for the City of Dover Historic District Zone - Excerpts
from Chapter 4: New Construction, Additions, Demolition and Relocation.
6) Design Standards and Guidelines for the City of Dover Historic District Zone – Excerpt
from Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic
Buildings.
7) Google Street View photo.
8) Applicant’s Letter requesting Appeal dated June 4, 2024.
170
7
Page 171
Item 4.
City of Dover
June 7, 2024
Downtown Dover Partnership
101 W. Loockerman St., Ste 2B
Dover, DE 19904
Emails: ken@downtowndoverpartnership.com & diane@downtowndoverpartnership.com
RE: Notice of Historic District Commission Action (Architectural Review Certification)
Demolition Application HI-24-02 to Historic District Commission
Proposed Demolition of the Existing Building at 148 South Bradford Street, Dover DE
Tax Parcel: ED-05-077.09-02-25.00-000
Dear Applicants:
Under the provisions of Zoning Ordinance, Article 10, Section 3.23 the Application HI-24-02 was filed
for review and consideration by the Historic District Commission regarding the issuance of the
Architectural Review Certificate due to its location within the City of Dover’s Historic District zone.
Demolition Application HI-24-02 was considered on May 16, 2024, for demolition of the existing
building at 148 South Bradford Street in Dover, Delaware. The Project outlined in the Application for
Architectural Review Certification submission listed demolition of the building.
The Design Standards and Guidelines for the City of Dover Historic District Zone, Chapter 4: New
Construction, Additions, Demolition and Relocation presents approaches to activities in the Historic
District. For Demolition activities, the Design Standards and Guidelines also gives guidance by listing
specific criteria to be evaluated when considering applications for the demolition of buildings (or portions
of buildings) in the Historic District.
At its Meeting of May 16, 2024, the City of Dover Historic District Commission considered this
Demolition Application and acted to deny the Architectural Review Certificate for Demolition
Application HI-24-02. After discussion of the request for demolition, the motion to deny was passed
by a vote of 2-1 (with one member recused and one member absent).
The appeal process for a Historic District Commission decision is outlined in the Zoning Ordinance
Article 10, Section 3.23 (D). Please be aware that future uses and/or improvements to the property are
subject to additional review processes for plans and permits. If you have questions, please contact the
Planning Office at (302)736-7196 or by email at dmelson@dover.de.us .
Sincerely,
On Behalf of the Historic District Commission
Department of Planning and Inspections
Dawn Melson-Williams, AICP
Principal Planner
CC: HI-24-02
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service 171
Page 172
Item 4.
Downtown Dover Partnership
Main Street Dover
101 W. Loockerman Street, Ste 2B
Dover, DE 19904
(302)678-2940
April 22, 2024
To: Members of the City of Dover Historic District Review Commission (May 16 meeting)
Re: 148 S. Bradford St., Dover, DE
The Downtown Dover Partnership (DDP) seeks an Architectural Review Certificate for 148 S. Bradford St. The
DDP acknowledges and values this historic building, as well as the historic context of which this building is a
part. Nevertheless, a larger initiative is underway that will require demolition of this property: The Capital City
2030: Transforming Downtown Dover! master plan (“the Plan”).
The Downtown Dover Partnership has led development of The Plan, the goal of which is to transform downtown
Dover into a thriving residential, cultural, and business district with recreational, arts and music amenities, as
well as a multi-modal transportation hub. The plan was created through significant community engagement and
has been supported by a broad range of public and private entities, as well as non-profits and individuals. Most
recently the Governor committed $25M toward two projects to kick-start the transformation.
The property that has been identified for the public transportation hub is comprised of two existing parcels (city
and DDP-owned, respectively) and requires the adjacent parcel of 148 S. Governor’s Ave. to complete the land
massing for the structure.
We ask that members of the committee be assured that The Plan will not only set the stage for a strong,
sustainable future for the downtown business district and neighboring communities of Dover for years to come,
but will also ensure that the Downtown Dover Historic Victorian district maintains a majority of its assets,
character, and intrinsic value throughout the encompassing transformation that is associated with The Plan.
The DDP appreciates the committee’s thoughtful consideration for the proposed demolition.
Sincerely,
Diane Laird
Executive Director
CC: DDP Board of Directors
172
Page 193
Item 4.
1868 Pomeroy & Beers Map:
1897 Sanborn Map
193
Page 194
Item 4.
1919 Sanborn Map
1885 O.H. Bailey & Co Bird’s eye map
194
Page 195
Item 4.
Demolition
The pressure to demolish buildings within any historic district is a regrettable fact of life. Either
through catastrophic damage or through years of neglect, there are and will continue to be
situations when a building is deemed beyond repair and "not worth" preserving. As the Dover
Historic District continues to attract new residents and businesses, there will be pressure to
"make way" for the "progress” that new construction is believed by some to represent.
Whereas issues of design guidelines for preservation and new construction are driven by
architectural and aesthetic considerations, demolition, especially of repairable structures, is
more frequently an economic issue. Indeed, the only other legitimate reason for consideration of
demolition is if the building poses a threat to public safety. In considering applications for
demolition, especially those based on economic or development considerations, the City must
weigh issues beyond matters of architectural appropriateness, for demolition of an historic
building in an Historic District is rarely if ever appropriate. Rather, the City must be convinced
that all possible means of saving the building have been exhausted.
It should be noted that the City of Dover is trying to prevent unnecessary demolition by giving
the Historic District Commission the authority to determine when "Demolition by Neglect" is
occurring. "Demolition by Neglect" is defined as "improper maintenance or lack of maintenance
of a building, structure or object which results in substantial and widespread deterioration of the
building, structure or object which threatens the likelihood of preservation, and which presents a
threat to the public safety, health and welfare of the immediate community." Once the Historic
District Commission determines that a property is in a state of Demolition by Neglect, it can
direct the building inspector to take actions under the City's Dangerous Building Code or
Housing Code to order repairs. It is the responsibility of all citizens to look for and report
instances of Demolition by Neglect to the City of Dover Historic District Commission.
The following criteria should be evaluated in considering applications for the demolition of
historic buildings within the Dover Historic District:
To determine the financial implications of maintaining a property versus demolishing it, the City
may ask an applicant to submit documentation pertaining to differential costs, structural
soundness, suitability for rehabilitation, estimated market value of the property as is and after
renovation for continued use, economic feasibility of rehabilitation, purchase price, income, and
cash flow information (relating to the property only) and any other information considered
necessary.
Regardless of economic issues, the relative significance of the building slated for demolition
should be evaluated. If the building is not considered a contributing structure in the District, then
its demolition may not be objectionable. If a building is significant, then even a finding of
economic hardship may not be sufficient to allow demolition. Some buildings, such as the
Richardson mansion, the Parke-Ridgely House, the Rose Cottage, etc., are so significant that
extraordinary measures should be made to delay or prevent their demolition. Adaptive reuse of
historic buildings is always preferable to demolition and new construction.
In development-related applications, the City should review schematic plans for the new
structure, in order to help weigh the virtues of the new versus what exists.
82 | P a g e
195
Page 196
Item 4.
Further, in order to provide some slight mitigation of the effects of unavoidable demolition of
historic structures within the Dover Historic District, owners should be required to provide
adequate recordation of a property. The extent of such recordation would depend on the
significance of the property. At the least, archival photographs should be produced for every
historic building that is lost to demolition within the District. When the demolition of an extremely
significant building is unavoidable, measured drawings should be produced that comply with the
standards of the Historic American Buildings Survey.
Lots left vacant by demolition should be treated in a manner that is sympathetic to the historic
context. In the residential and commercial contexts, a 5' high opaque barrier should be
constructed at the building line, either a fence or plant materials or both. Parking should not be
permitted on vacant lots. Community gardens or parks should be encouraged.
Relocation of Existing Buildings
Moving historic buildings out of, into or within the Historic District should be discouraged. The
removal of historic buildings from the District has the same effect as demolition on the historic
character of the District. Moving historic buildings within the District confuses the actual history
of the District. Moving historic buildings into the District falsifies the existing historic record by
adding a building that does not belong to either time or place. Relocating a building, however, is
always preferable to its demolition.
83 | P a g e
196
Page 200
Item 5.
City of Dover
ARCHITECTURAL REVIEW REPORT
Before Dover Historic District Commission
May 16, 2024
Appeal of Historic District Commission Action
to the Planning Commission for Meeting of June 17, 2024.
Project Name: Building at 150 South Bradford Street: Building Demolition
Location: West side of South Bradford Street between West Loockerman
Street and Reed Street, just north of the Minor Street Alley.
150 S. Bradford Street
Tax Parcel: ED-05-077.09-02-25.00-000
Property Owner: CEI Properties
Applicant: Downtown Dover Partnership
Present Zoning: C-2 (Central Commercial Zone)
H (Historic District Overlay Zone)
Present Use: Offices (Previously a single-family home)
Proposed Use: Vacant site
File Number: HI-24-03
Action by Historic District Commission:
The Historic District Commission conducted a public hearing and
considered the Application HI-24-02 for Architectural Review
Certification to demolish the building at 148 S. Bradford Street.
The vote was 2-1 to deny the Architectural Review Certification
for demolition (1 member absent and another recused).
Application: HI-24-03 – Building at 150 S. Bradford Street: Building Demolition
This Architectural Review Certification application was reviewed by the Historic District
Commission on May 16, 2024. The following is the context of the Architectural Review Staff
Report and includes information on the Historic District Commission considered.
PROJECT DESCRIPTION:
The Historic District Commission will act on an Architectural Review Certificate regarding
Demolition of the 2 ½ story frame building located at 150 South Bradford Street. The property is
zoned C-2 (Central Commercial Zone) and subject to H (Historic District Zone). The parcel
consists of 0.17 +/- acres of land. The property is located on the west side of S. Bradford Street
and north of Minor Street Alley. The owner of the record is CEI Properties. The applicant is the
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service 200
Page 201
Item 5.
HI-24-03 150 S. Bradford Street: Demolition
Report for Appeal to Planning Commission: HI-24-03 Building at 150 S. Bradford Street: Demolition
Meeting of June 17, 2024
Downtown Dover Partnership. Property Address: 150 S. Bradford Street. Tax Parcel: ED-05-
077.09-02-27.00-000.
The following application for demolition at 150 South Bradford Street is submitted to the
Historic District Commission regarding the issuance of the Architectural Review Certificate for a
Demolition project. Applications for certain types of construction activity within the Historic
District Zone (H) are reviewed by the Historic District Commission for Architectural Review
Certification as part of the application review process. The Application is for review under the
provisions of Zoning Ordinance, Article 10 Section 3.23. See below:
3.23 Architectural review certification by the historic district commission.
(A) The historic district commission shall issue architectural review certificates for the construction
or demolition of single-family and two-family homes, and nonresidential structures or additions
involving a gross floor area of 3,000 square feet or less, after review of the proposed construction
and after a determination that the construction is in general accordance with the standards set
forth in subsection 3.25 below.
(B) All applications to the historic district commission for architectural review certification shall be
subject to the procedures set forth in subsection 3.26.
(C) All decisions of the historic district commission pursuant to this subsection shall be formalized in
a written notice of decision. When the commission grants a conditional approval under this
subsection, all conditions of approval shall be set forth in writing in the notice of decision. In the
event of a denial, the notice of decision shall state the reasons for denial and shall identify all
elements of the application found to be contrary to the provisions or intent of this subsection.
(D) An applicant may appeal the decision of the historic district commission to the planning
commission, and such appeal shall be considered as an architectural review certification
application to the planning commission and shall meet all of the requirements set forth in
subsection 3.24 and subsection 3.26.
The Historic District Commission will act on an Architectural Review Certificate regarding the
request for Demolition of the building at 150 S. Bradford Street.
Property Information
This building is located within a National Register of Historic Places Historic District,
specifically the Victorian Dover Historic District. Provided below is the building summary from
the building inventory listing found within the National Register nomination completed for the
Victorian Dover Historic District (nomination completed 1977-78).
K0396.151 – 150 South Bradford Street - Late-19th century, 2-story, 5-bay, single family dwelling; gable
roof; single-bay 2nd floor projection at the center of the facade; gable roof, full return; 6/1 sash; facade
porch, fluted columns, Ionic capitals, balustrade; converted into double-dwelling in 1966.
The property is located within H (Historic District Zone) as established by the City of Dover.
A series of historic maps were reviewed by Planning Staff for preliminary information on this
block of South Bradford Street. The 1868 Beers Map published by Pomeroy & Beers shows the
established street grid and rear alley although the parcel lines may be slightly different. There
appears to be a building on the site with a different size and shape. The 1885 Bird’s Eye View of
201
2
Page 202
Item 5.
HI-24-03 150 S. Bradford Street: Demolition
Report for Appeal to Planning Commission: HI-24-03 Building at 150 S. Bradford Street: Demolition
Meeting of June 17, 2024
Dover shows a series of residential buildings on this west side of S. Bradford Street and smaller
detached structures in rear yards. The series of Sanborn Fire Insurance Maps is also a reference
source for information on the series of buildings which occupied this property over time. The
1897-1919 Sanborn Maps show a building at the subject site with a growing footprint as rear
additions were made. The accessory structure in the rear changed between 1897 and 1919.
Between 1919 and 1929, the accessory structure was also enlarged. Staff believes this structure
first presented in the 1897 Sanborn Map to be the structure that is present today. (see
Attachments at the end of report)
According to the tax records for the City of Dover, the shingle clad building at 150 S. Bradford
Street was built in 1930 (appears to be an inaccurate estimation). There is a parking lot at the rear
of the property that looks to be connected to the parking lot at 148 S. Bradford Street. The
accessory structure that was present in the 1929 Sanborn Map is not mentioned in the 1978
inventory for the National Register of Historic Places application.
PROJECT PROPOSAL FOR DEMOLITION
The applicant has filed an application for Architectural Review Certification for the demolition
of 150 S. Bradford Street. The submission consists of a narrative with attachments including a
photo gallery. The project is described below:
1. Demolition of Building: The project involves the demolition of the existing 2 1/2-story
shingle clad frame building on the property.
The scope of Demolition notes that an asbestos survey will be conducted and the process for
demolition and removal of debris. Information on the stabilization of the surfaces following
removal of the building listed installation of sand/gravel to fill (to bring to grade). The rear of the
existing property is paved for parking with access from a rear alley. The future use of the
property is part of the Downtown Dover Partnership’s strategic plan Transforming Downtown
Dover: Capital City 2030. This site will be combined with others to create a multi-modal
transportation hub to be used for multiple businesses in the area for current and future
enhancements to the downtown area. The redevelopment of the site will be subject to a separate
review process.
Review of DESIGN STANDARDS AND GUIDELINES
The subject property is located in the Dover Historic District Zone within the Loockeman
Historic Context. The Loockerman Historic Context is described on pages 2-7 through 2-8.
Location within the Dover Historic District Zone requires proposals for specific types of
construction activities such as new construction, additions to existing buildings, exterior
renovations, and demolition of buildings to receive an Architectural Review Certificate.
As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone,
an Architectural Review Certificate will be granted for the project “if it is found that the
architectural style, general design, height, bulk and setbacks, arrangement location and materials
affecting the exterior appearance are generally in harmony with neighboring structures and
complementary to the traditional architectural standards of the historic district.”
202
3
Page 203
Item 5.
HI-24-03 150 S. Bradford Street: Demolition
Report for Appeal to Planning Commission: HI-24-03 Building at 150 S. Bradford Street: Demolition
Meeting of June 17, 2024
Demolition
The proposal for demolition of the building must be reviewed for conformity with the design
criteria guidelines found in Chapter 4: New Construction, Additions, Demolition and Relocation.
The Design Standards and Guidelines gives guidance to the Historic District Commission by
listing specific criteria to be evaluated when considering applications for the demolition of
buildings (or portions of buildings) in the historic district (Chapter 4: pages 4-10 to 4-12). These
guidelines are summarized below (see Design Standards and Guidelines for the complete text);
an excerpt of Chapter 4 is attached.
1. Determine the financial implications of maintaining a property versus demolition.
2. Regardless of economic issues the relative significance of the individual buildings slated for
demolition should be evaluated.
3. In development related applications the City should review the schematic plans for the new
structures to weigh the virtues of the new structure versus what exists.
4. Determine the extent of adequate recordation of a property the applicant would be
required to complete if demolition were approved.
5. Lots left vacant by demolition should be treated in a manner that is sympathetic to the
historic context.
The Design Standards and Guidelines note that parking should not be permitted on vacant lots
and suggests alternative uses. Also provided is information about development of parking lots
(page 3-27) in the Historic District. The Guidelines excerpt for parking lots is as follows:
Parking lots are the awkward by-product of a mobile culture. Their incorporation into historic districts is
problematic. Parking lots should be screened from the street, their layout should include borders, and islands
planted with trees and shrubs to break-up expanses of paved areas. Given any parking lot within the Dover
Historic District zone, at least 20% of the area within it should be unpaved and planted.
The Applicant, in their narrative, considers the Design Standards and Guidelines for Demolition
outlining their reasons for such Demolition request.
STAFF COMMENTS AND RECOMMENDATIONS
The following are the Staff comments and recommendations for this application regarding
project activities and an Architectural Review Certificate.
1) The Design Standards and Guidelines outline specific criteria to be evaluated in considering
demolition applications (Chapter 4). The following are Staff’s consideration of the criteria
for Demolition.
a) In this instance, the economic maintenance evaluation of the property individually is not
the issue for the applicant, but rather the need for the land to as part of a larger project in
the Downtown Dover Partnership plan to revitalize the Downtown area and provide
central parking. A central parking area would allow people to park their cars and visit
businesses and residences on foot.
203
4
Page 204
Item 5.
HI-24-03 150 S. Bradford Street: Demolition
Report for Appeal to Planning Commission: HI-24-03 Building at 150 S. Bradford Street: Demolition
Meeting of June 17, 2024
b) The structure of this property has been through several changes over the years. First from
single family home, to duplex, to commercial use. The style was adapted by the owners at
the time of renovations. If the structure present today is the same structure as the one
present in the 1885 O.H. Bailey & Co Bird’s eye map, the projecting upper level in the
middle bay was not present. The fish scale shingles on the attic level and the diamond
shaped window are not mentioned in the 1979 description in the inventory of the National
Register of Historic Places. This structure seems to be a combination of many styles that
have evolved over its lifespan and not a significant representation of the time frame for
the Victorian era.
c) Included in the application is a draft concept of the lots and its future use. However, the
redevelopment project is not being reviewed currently.
d) We have not been provided detailed plans or renderings for the multi-modal
transportation hub development. Nor have bids gone out for the demolition of the
building. An asbestos survey will be initiated when the project can move forward, as
required by the building and inspections department.
e) The lot is not expected to be left vacant past 2026.
2) While it is not the practice of the Planning Staff to recommend Demolition of a historic
building that has been adaptively reused, consideration must be given to the future
redevelopment of the area. The building generally is a historic structure, though not a
representative of a specific style. However, improvements to some exterior finishes (i.e.
window replacements, exterior finishes, porch renovations, front decking addition, various
building additions, doors, and roofing) since its original construction as a houseAt some
point, it became an office use.
3) Staff notes the opportunities for the relocation of the building could also be an option for
consideration.
4) Staff are not aware of any documentation/recordation of the existing building. The Historic
District Commission could require additional documentation/recordation of the building if
deemed appropriate.
a) If demolition is unavoidable then, given the late nineteenth century age of the building,
the building should also have additional documentation completed in the form of
measured drawings of the building’s floor plans. This should include other data gathering
on the building’s construction.
b) A series of photographs of the building’s exterior and interior should be systematically
completed to include keyed location map of photographs.
5) If approval for demolition of the building is granted, Staff recommends the following
conditions pertaining to the building demolition and site stabilization. These conditions are
presented to improve the project’s compliance with the recommended guidelines for
consideration of demolition in the Design Standards and Guidelines and other code
provisions:
a) A specific timeframe for demolition activities and site stabilization should be established.
b) All utilities must be properly capped and/or abandoned.
c) Clarify the plan for site stabilization of the site.
i) The building footprint area following demolition of the building and removal of the
basement foundation walls must be restored to grade. The disturbed area is to include
204
5
Page 205
Item 5.
HI-24-03 150 S. Bradford Street: Demolition
Report for Appeal to Planning Commission: HI-24-03 Building at 150 S. Bradford Street: Demolition
Meeting of June 17, 2024
stabilization with topsoil and seeding to establish a grass lawn area. The grass lawn
area is to be properly maintained.
d) Staff do not recommend installation of solid (opaque) fencing or chain link fencing on the
site. If areas need to be segregated on the site, other alternative fence styles may be more
appropriate.
e) Parking could continue on the paved (rear parking) area only. Stabilization of the
building footprint area with gravel is not an approved parking surface even as a
temporary measure.
ADVISORY COMMENTS:
1) The applicant shall be aware that a Demolition Permit is required to proceed with any
demolition activities on the property should Architectural Review Certification be granted for
the demolition proposal. The Demolition Permit application must comply with the conditions
of approval granted through the Architectural Review Certification process.
2) In the event that major changes and revisions to the project proposal occur, contact the
Department of Planning and Inspections. These changes may require resubmittal for review
by the Historic District Commission.
3) Any future construction activities such as redevelopment of the site for a building or for an
expanded parking facility are subject to additional review processes for permitting and plan
review.
4) If the building is or will be vacant prior to the Demolition, then it may be required to be
registered as a Vacant Building with the City under the Vacant Buildings program.
Historic District Commission Action
The Historic District Commission at their meeting of May 16, 2024, considered the proposal for
demolition of the building at 150 S. Bradford Street and took action to deny the request for
Architectural Review Certification for Demolition. The application was represented by Diane
Laird (Downtown Dover Partnership), Ken Anderson (Downtown Dover Partnership), and Jed
Hatfield (Colonial Parking Inc.).
• See Draft Meeting Minutes of May 16, 2024 (being prepared).
• Motion to deny the demolition of the building at 150 S. Bradford Street was passed with
a vote of 2-1 with the following Historic District Commission members present; Eric
Czerwinski, Ann Baker Horsey, and Ellen Richardson. Mary Terry Mason was absent.
Jonathan Street was also in attendance but recused himself as a board member of the
Downtown Development Dover Partnership.
• Staff noted that the decision of the Historic District Commission could be appealed to the
Planning Commission.
205
6
Page 206
Item 5.
HI-24-03 150 S. Bradford Street: Demolition
Report for Appeal to Planning Commission: HI-24-03 Building at 150 S. Bradford Street: Demolition
Meeting of June 17, 2024
Appeal to the Planning Commission
The Zoning Ordinance allows for decisions of the Historic District Commission to be appealed
to the Planning Commission (Zoning Ordinance, Article 10 Section 3.2 Architectural Review
Certification). The Planning Commission is to determine if the proposal for the Demolition of
the Building at 150 S. Bradford Street should be granted Architectural Review Certification
based on the following standards:
Article 10
3.25 Architectural review standards.
(A) An architectural review certificate may be issued if it is found that the architectural style,
general design, height, bulk and setbacks, arrangement, location and materials and structures affecting
the exterior appearance are generally in harmony with neighboring structures and complementary to the
traditional architectural standards of the historic district as set forth in the historic district design guidelines
and standards adopted by the planning commission and as set forth in the United States Secretary of the
Interior’s Standards for Rehabilitation.
The “historic district design guidelines” referenced in the Zoning Ordinance are the document
entitled Design Standards and Guidelines for the City of Dover Historic District Zone. The
Planning Commission may add conditions to their action.
Attachments:
1) Letter of Notice of Historic District Commission Action
2) Draft Excerpt of Historic District Commission Meeting Minutes of May 16, 2024
(pending completion).
3) Application HI-24-03.
4) Historical Maps of the property
5) Design Standards and Guidelines for the City of Dover Historic District Zone - Excerpts
from Chapter 4: New Construction, Additions, Demolition and Relocation.
6) Design Standards and Guidelines for the City of Dover Historic District Zone – Excerpt
from Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic
Buildings.
7) Google Street View photo.
8) Applicants Letter requesting Appeal dated June 4, 2024.
206
7
Page 207
Item 5.
City of Dover
June 7, 2024
Downtown Dover Partnership
101 W. Loockerman St., Ste 2B
Dover, DE 19904
Emails: ken@downtowndoverpartnership.com & diane@downtowndoverpartnership.com
RE: Notice of Historic District Commission Action (Architectural Review Certification)
Demolition Application HI-24-03 to Historic District Commission
Proposed Demolition of the Existing Building at 150 South Bradford Street, Dover DE
Tax Parcel: ED-05-077.09-02-27.00-000
Dear Applicants:
Under the provisions of Zoning Ordinance, Article 10, Section 3.23 the Application HI-24-03 was filed
for review and consideration by the Historic District Commission regarding the issuance of the
Architectural Review Certificate due to its location within the City of Dover’s Historic District zone.
Demolition Application HI-24-03 was on May 16, 2024, for demolition of the existing building at 150
South Bradford Street in Dover, Delaware. The Project outlined in the Application for Architectural
Review Certification submission listed demolition of the building.
The Design Standards and Guidelines for the City of Dover Historic District Zone, Chapter 4: New
Construction, Additions, Demolition and Relocation presents approaches to activities in the Historic
District. For Demolition activities, the Design Standards and Guidelines also gives guidance by listing
specific criteria to be evaluated when considering applications for the demolition of buildings (or portions
of buildings) in the Historic District.
At its Meeting of May 16, 2024, the City of Dover Historic District Commission considered this
Demolition Application and acted to deny the Architectural Review Certificate for Demolition
Application HI-24-03. After discussion of the request for demolition, the motion to deny was passed
by a vote of 2-1 (with one member recused and one member absent).
The appeal process for a Historic District Commission decision is outlined in the Zoning Ordinance
Article 10, Section 3.23 (D). Please be aware that future uses and/or improvements to the property are
subject to additional review processes for plans and permits. If you have questions, please contact the
Planning Office at (302)736-7196 or by email at dmelson@dover.de.us .
Sincerely,
On Behalf of the Historic District Commission
Department of Planning and Inspections
Dawn Melson-Williams, AICP
Principal Planner
CC: HI-24-02
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service 207
Page 208
Item 5.
Downtown Dover Partnership
Main Street Dover
101 W. Loockerman Street, Ste 2B
Dover, DE 19904
(302)678-2940
April 22, 2024
To: Members of the City of Dover Historic District Review Commission (May 16, 2024 meeting)
Re: 148 S. Bradford St., Dover, DE
The Downtown Dover Partnership (DDP) seeks an Architectural Review Certificate for 150 S. Bradford St. The
DDP acknowledges and values this historic building, as well as the historic context of which this building is a
part. Nevertheless, a larger initiative is underway that will require demolition of this property: The Capital City
2030: Transforming Downtown Dover! master plan (“the Plan”).
The Downtown Dover Partnership has led development of The Plan, the goal of which is to transform downtown
Dover into a thriving residential, cultural, and business district with recreational, arts and music amenities, as
well as a multi-modal transportation hub. The plan was created through significant community engagement and
has been supported by a broad range of public and private entities, as well as non-profits and individuals. Most
recently the Governor committed $25M toward two projects to kick-start the transformation.
The property that has been identified for the public transportation hub is comprised of two existing parcels (city
and DDP-owned, respectively) and requires the adjacent parcel of 150 S. Governor’s Ave. to complete the land
massing for the structure.
We ask that members of the committee be assured that The Plan will not only set the stage for a strong,
sustainable future for the downtown business district and neighboring communities of Dover for years to come,
but will also ensure that the Downtown Dover Historic Victorian district maintains a majority of its assets,
character, and intrinsic value throughout the encompassing transformation that is associated with The Plan.
The DDP appreciates the committee’s thoughtful consideration for the proposed demolition.
Sincerely,
Diane Laird
Executive Director
CC: DDP Board of Directors
208
Page 229
Item 5.
1868 Pomeroy & Beers Map:
1897 Sanborn Map
229
Page 230
Item 5.
1919 Sanborn Map
1885 O.H. Bailey & Co Bird’s eye map
230
Page 231
Item 5.
Demolition
The pressure to demolish buildings within any historic district is a regrettable fact of life. Either
through catastrophic damage or through years of neglect, there are and will continue to be
situations when a building is deemed beyond repair and "not worth" preserving. As the Dover
Historic District continues to attract new residents and businesses, there will be pressure to
"make way" for the "progress” that new construction is believed by some to represent.
Whereas issues of design guidelines for preservation and new construction are driven by
architectural and aesthetic considerations, demolition, especially of repairable structures, is
more frequently an economic issue. Indeed, the only other legitimate reason for consideration of
demolition is if the building poses a threat to public safety. In considering applications for
demolition, especially those based on economic or development considerations, the City must
weigh issues beyond matters of architectural appropriateness, for demolition of an historic
building in an Historic District is rarely if ever appropriate. Rather, the City must be convinced
that all possible means of saving the building have been exhausted.
It should be noted that the City of Dover is trying to prevent unnecessary demolition by giving
the Historic District Commission the authority to determine when "Demolition by Neglect" is
occurring. "Demolition by Neglect" is defined as "improper maintenance or lack of maintenance
of a building, structure or object which results in substantial and widespread deterioration of the
building, structure or object which threatens the likelihood of preservation, and which presents a
threat to the public safety, health and welfare of the immediate community." Once the Historic
District Commission determines that a property is in a state of Demolition by Neglect, it can
direct the building inspector to take actions under the City's Dangerous Building Code or
Housing Code to order repairs. It is the responsibility of all citizens to look for and report
instances of Demolition by Neglect to the City of Dover Historic District Commission.
The following criteria should be evaluated in considering applications for the demolition of
historic buildings within the Dover Historic District:
To determine the financial implications of maintaining a property versus demolishing it, the City
may ask an applicant to submit documentation pertaining to differential costs, structural
soundness, suitability for rehabilitation, estimated market value of the property as is and after
renovation for continued use, economic feasibility of rehabilitation, purchase price, income, and
cash flow information (relating to the property only) and any other information considered
necessary.
Regardless of economic issues, the relative significance of the building slated for demolition
should be evaluated. If the building is not considered a contributing structure in the District, then
its demolition may not be objectionable. If a building is significant, then even a finding of
economic hardship may not be sufficient to allow demolition. Some buildings, such as the
Richardson mansion, the Parke-Ridgely House, the Rose Cottage, etc., are so significant that
extraordinary measures should be made to delay or prevent their demolition. Adaptive reuse of
historic buildings is always preferable to demolition and new construction.
In development-related applications, the City should review schematic plans for the new
structure, in order to help weigh the virtues of the new versus what exists.
82 | P a g e
231
Page 232
Item 5.
Further, in order to provide some slight mitigation of the effects of unavoidable demolition of
historic structures within the Dover Historic District, owners should be required to provide
adequate recordation of a property. The extent of such recordation would depend on the
significance of the property. At the least, archival photographs should be produced for every
historic building that is lost to demolition within the District. When the demolition of an extremely
significant building is unavoidable, measured drawings should be produced that comply with the
standards of the Historic American Buildings Survey.
Lots left vacant by demolition should be treated in a manner that is sympathetic to the historic
context. In the residential and commercial contexts, a 5' high opaque barrier should be
constructed at the building line, either a fence or plant materials or both. Parking should not be
permitted on vacant lots. Community gardens or parks should be encouraged.
Relocation of Existing Buildings
Moving historic buildings out of, into or within the Historic District should be discouraged. The
removal of historic buildings from the District has the same effect as demolition on the historic
character of the District. Moving historic buildings within the District confuses the actual history
of the District. Moving historic buildings into the District falsifies the existing historic record by
adding a building that does not belong to either time or place. Relocating a building, however, is
always preferable to its demolition.
83 | P a g e
232