CITY OF DOVER PLANNING COMMISSION
JUNE 17, 2024
The Meeting of the City of Dover Planning Commission was held on Monday, June 17, 2024 at
7:00 PM as an In-Person Meeting and also using the phone/videoconferencing system WebEx.
The Meeting Session was conducted with Vice Chair Mrs. Denney presiding. Members present
were Mr. Cooper, Mr. Roach (virtual), Mr. Witham, Mr. Reaves and Mrs. Welsh. Mr. Baldwin,
Dr. Jones and Mrs. Maucher were absent.
Staff members present were Mrs. Dawn Melson-Williams, Ms. Katherine Oehmke, Mr. Jason
Lyon (virtual), and Mrs. Kristen Mullaney.
APPROVAL OF AGENDA
Mr. Witham moved to approve the Agenda as submitted, seconded by Mrs. Welsh and the motion
was carried 6-0 with Mr. Baldwin, Dr. Jones and Mrs. Maucher absent.
APPROVAL OF MEETING MINUTES OF MAY 20, 2024
Mrs. Welsh moved to approve the Planning Commission Meeting Minutes of May 20, 2024,
seconded by Mr. Witham and the motion was carried 6-0 with Mr. Baldwin, Dr. Jones and Mrs.
Maucher absent.
COMMUNICATIONS & REPORTS
Mrs. Melson-Williams stated that the next Planning Commission regular meeting is scheduled
for Monday, July 15, 2024 at 7:00PM in the City Hall Council Chambers.
Mrs. Melson-Williams provided an update on the regular City Council and various Committee
meetings held on June 10 & 11, 2024.
Mrs. Melson-Williams stated that our offices have been involved in it seems like a special event
every weekend and this upcoming weekend is Positively Dover; the African American Festival.
Staff is involved with the Special Event permitting for that. She does also want to bring to
everyone’s attention that DNREC, their Division of Parks and Recreation is preparing to update
the Statewide Comprehensive Outdoor Recreation Plan known as SCORP. It relates to the
State’s recreation inventory and identifies needs for infrastructure and programs and public
planning related to recreational opportunities. They have scheduled a series of five community
information sessions across the State. The one that may be of most interest here that’s to be held
in Kent County is scheduled for June 25, 2024 at 5:30PM at the Kent County Public Library. If
you need more information on that, certainly visit DNREC’s website at
www.DNREC.delaware.gov/parks/planning/scorpupdate and you can find more information.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Melson-Williams presented the audience information on policies and procedures for the In-
Person Meeting and Virtual Meeting using the WebEx system.
OLD BUSINESS
1
Page 2
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
Requests for Extensions of Planning Commission Approval: None
NEW APPLICATIONS
C-24-01 Tower-Based Wireless Communications Facility at 640 Lafferty Lane (Rise Up Towers,
LLC) - Public Hearing and Review of a Conditional Use Site Plan application to permit
construction of a tower-based wireless communications facility (WCF) and associated equipment
compound in the northeastern area of the mini-storage facility property. The proposed wireless
support structure is a monopole of 124 feet with a lightning rod for a total height of 129 feet. The
18.68-acre subject property is located on the north side of Lafferty Lane, east of South Bay
Road. The property is zoned IPM (Industrial Park Manufacturing Zone). The owner of record
(parcel) is Secure Storage, LLC and the applicant (WCF developer/owner) is Rise Up Towers,
LLC. Property Address: 640 Lafferty Lane. Tax Parcel: ED05-077.00-01-25.00-000. Council
District 2.
Representatives: Mr. Mike Malloy, attorney for Rise Up Towers; Mr. Brett Magaran, project
engineer; Mr. Andrew Peterson, radio frequency engineer specialist, Mr. Scott Galloway, general
contractor; and Mr. Joe Petrosky, representative of the owner
Mrs. Melson-Williams stated that this is the Tower-Based Wireless Communications Facility
proposed at 640 Lafferty Lane. The property owner is actually Secure Storage, LLC but Rise Up
Towers, LLC is the applicant/developer in this case. The address 640 Lafferty Lane is a property
that is over 6.86 acres in size. It is probably most readily recognized as a mini-storage facility at
that site. The property is zoned IPM (Industrial Park Manufacturing Zone) and this proposal is
for construction of a Tower Based Wireless Communications Facility; a monopole specifically.
She does want to note for our Planning Commission members that they did receive an updated
plan set which addresses a number of the Development Advisory Committee comments that
were outlined. We have provided that on the Commissioner’s desks this evening. Additionally,
they did submit for Staff review, the waiver for the Partial Elimination of Upright Curbing. That
is something that the City Planner can review and approve. This is a Conditional Use Site Plan
application. The proposed monopole is to be a total of 129 feet in height. That is basically a
tower monopole that is 124 feet and then there is a 5-foot lightning rod at the top of it. In the
height diagram image on the screen, you can see that there would be opportunity for multiple
antenna sectors with this construction. It is to be located within a fenced compound area. The
area that is fenced is about 50 feet by 50 feet in size. It is enclosed by a chain link fence that
meets the minimum height requirements and it is surrounded by a grouping of evergreen trees.
The IPM (Industrial Park Manufacturing Zone) obviously allows the mini-storage facility as an
allowable use and any Tower Based Wireless Communications Facility is a Conditional Use
Application when found in non-residential zones. The provisions of the Conditional Use are
outlined in the Zoning Ordinance and more specifically for Wireless Communications Facilities,
there is a section of the Code in the Zoning Ordinance, Article 5 Section 23 that outlines how
Wireless Communications Facilities are reviewed and their requirements. This is considered a
new facility. It is limited to a maximum height of 150 feet for such types, and they are certainly
under that. There is also a setback distance from property lines that is required to be 110% of the
structure’s height. It has to be more than 129 feet from any adjacent property lines. They have
placed it in such a fashion that it meets those requirements. There are some additional kind of
2
Page 3
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
conditions related to tower facilities that are outlined and that also includes providing the
opportunity for what they would call “co-location.” They have to have a minimum of three other
service provider locations on the support structure and they do with this Application. They have
the security fence around the compound and the screening of the evergreen plantings. This is an
unmanned facility. There is no particular building and as such, we recognize that there really
isn’t a parking need for the tower itself. There are certainly some parking options at the mini-
storage facility as well as the opportunity for access to this tower compound area. Likewise, Staff
has recognized that when it comes to Dumpsters, normally a non-residential use requires two but
since this is an unmanned facility, it would likely be the carry-in/carry-out method. They
recognize that as an alternative solution. They did file as noted, that request for curbing
elimination. Parking areas and drive aisles are intended to have upright curbing. She thinks that
Staff can readily approve that (waiver) for this location given the scenario with the limited access
to the tower compound. The Plan does note those tree plantings. There are other existing tree
plantings as part of the Secure Storage Mini-Storage Facility. There is also an unmarked
cemetery that is on part of the mini-storage facility but not where the tower is proposed. Because
this property in the IPM (Industrial Park Manufacturing Zone), there is typically a Performance
Standards Review process. Planning Staff has found that in making their submission for the
tower, that they have likely satisfied any kind of discussion about “objectionable elements”
related to its use on the property. This is a Conditional Use Application. Staff has found that the
proposal is generally in compliance with the Wireless Communications Facility regulations of
the Zoning Ordinance. It is a location that has a number of industrial type uses in its proximity
and from the views here, there is some vegetation that is going to further screen it from nearby
roadways. With their submission, she will also note that they did include the full text of the
Wireless Communications Facility Ordinance. She thinks that this is the first time that the
Planning Commission has seen that. In their submission, they provided kind of a background
document about their project and then there is also from the FAA (Federal Aviation
Administration), a determination of “No Hazard to Air Navigation” that was submitted as well.
Most people recognize that this is in the southeastern portion of the City which is in proximity to
the Dover Air Force Base. The Planning Commission tonight will be looking at that Conditional
Use Site Plan.
Mr. Malloy stated that he has a full team ready to answer any questions that the Planning
Commission may have about the application. Rise Up Towers really began ten (10) years ago.
His business partner started a tower company where he built primarily for leases on municipal
land and public land. He always looked for out-of-the way spaces. He did it in 2009 because he
recognized that the iPhone was coming out and so that created this boom for towers. About 2.5
years ago, he recognized after COVID that we are constantly on our phones and we are
constantly using more and more capacity. Rise Up Towers specializes in two things: placing
towers on municipal land and also working hand-in-hand with T-Mobile for their most problem
locations. In this case, they have a utility pole where the lease is expiring. T-Mobile, he will have
you know, is becoming the third largest wireless provider of internet service in the country. They
are entirely tower based. So, when a tower becomes threatened or an antenna location becomes
threatened, they go into full relocation mode. They call us; they came in and found what they
think is a great location, industrially zoned, dimensionally sound, and in compliance with your
Ordinances. They think it will not have an adverse impact on any future development of the area.
They think it’s compatible with the area. They have given consideration to stealthing, and they
3
Page 4
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
think that the traditional kind of stealth would look a little ridiculous. They have a saying, “you
can’t tell us where the nearest cell tower is, but you can always tell us where the nearest tree cell
tower is.” This one would stand out like a sore thumb in the middle of nowhere. Given the
proximity of the airport, it is going to require lights at the top; so, it’s not something that you
want to cloak or hide necessarily. They think that it’s vital to provide the coverage and to allow
T-Mobile to maintain the coverage in the area. They think that this is the lowest possible tower
that they could get. They recognize that the Ordinance would have let them to go higher. They
have found what they think is a “sweet spot” that will allow them to put not only four antennas if
they are so fortunate that they come abroad and want to lease space, but also what they didn’t
point out is that Rise Up Towers also puts any municipal antennas on for free and rent free. Mr.
Scott Galloway, the general contractor says to drop them off, tell us where to put them, and they
will put them up. They have fifteen (15) towers under development right now. They have one
that is built in Langhorn, PA and it has four municipal antennas on it. They have leases for $1.00.
They expect some sort of emergency management or some sort of interest maybe from other
utility providers. They clearly agree with all of the comments on the Advisory Committee’s
memo. They actually turned around that Revised Plan given our rescheduling to this meeting.
Mr. Witham stated that the articles of our Ordinance require you to demonstrate that the
proposed structure cannot be accommodated on existing approved buildings. Is this going to be a
freestanding antenna? Responding to M. Witham, Mr. Malloy stated yes.
Mr. Witham asked if there were any updates on why it can’t be attached to a building.
Responding to Mr. Witham, Mr. Malloy stated that this is why he has experts and Mr. Andy
Peterson may be standing up right now to take a walk down; he will answer that question. The
long and short of it is, we are near the airport and there are no really tall buildings. It’s tough to
accommodate that antenna anywhere.
Mr. Peterson stated that the short answer is that where T-Mobile is currently installed with their
antennas on a utility structure is about three quarters of a mile southwest of this location. They
have to remove their antennas from that structure, so they are looking for a new facility to
support their antennas. The overwhelming preference from the carriers is to utilize existing tall
buildings or existing towers. That way they don’t have to tap a Rise Up or another tower
developer and go through the ordeal of building a new structure. In this case though, there is
nothing in the area that even approaches the height that is required here. As was testified, we are
going to have the antennas at 124 feet. The closest structures in height to that are the utility
towers at about 80-90 feet or so and T-Mobile has to come off of there. In order to adequately
replace the coverage that is being lost, they need to have the antennas elevated to that height of
124 feet. That is going to replace the coverage that is being anticipated to be lost here and
actually improve things a little bit to the north of the exchange there the highways.
Mr. Reaves stated that regards to the Kent Conservation District and where it speaks to the
stormwater plans, it says on the map plan it doesn’t have the site for the third pond. Are you
going to show that on the map? Responding to Mr. Reaves, Mr. Peterson stated that they
certainly can. The site itself is entirely gravel. The County (KCD) has asked them to submit
some sort of stormwater calculation along with their next submission or before Building Permit.
So, they will include some kind of calculation because he understands that the City also
4
Page 5
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
recognizes gravel as impervious surface. They are adding very little stormwater, but they did see
that comment and they will make sure they go back and add whatever basin structure they need
to add there and plus submit whatever minimal stormwater calculations they will have to
provide.
Mrs. Melson-Williams stated that the Kent Conservation District is the delegated stormwater
management agency and they have, as noted in their comment, an active approved plan for
stormwater management for what was a phase development of the mini-storage facility. She
thinks that the closest pond is Pond #3 that may not have been implemented as of yet. In order
for them, should this be successful tonight, to move onto the next step as part of any final plan
approval, the Kent Conservation District will have to sign off on their submission. It sounds like
they are willing to focus in on this one particular tower construction and look at the stormwater
impact to make sure the plans plan for that accordingly.
Mrs. Welsh stated that they mentioned the airport, but she is assuming that they mean the Air
Force Base. Responding to Mrs. Welsh, Mr. Malloy stated yes.
Mrs. Welsh stated that she didn’t see anything in here about coordination with the Air Base. She
is assuming that all of that has been taken care of. Responding to Mrs. Welsh, Mr. Malloy stated
that before they even approached the City and before they started to obviously invest resources
and time and money into this site, they wanted to make sure that everything was clear with the
Air Base. They have submitted with the application to the FAA (Federal Aviation
Administration) and for clearance with the Base. That is where they got the feedback that the
tower will have to have a light on top of it.
Mrs. Denney opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mr. Witham asked if they have to take action on the partial elimination of upright curbing or
does Staff take care of that? Responding to Mr. Witham, Mrs. Melson-Williams stated that the
Waiver Request for the partial elimination of upright curbing is a waiver that the Zoning
Ordinance allows the City Planner to take action on. They typically list it in your application
report just so you are aware of it, but it is something that Staff will deal with. At this point, she is
thinking that they are going to be recommending for that approval to eliminate that requirement.
Mrs. Welsh moved to approve C-24-01 Tower-Based Wireless Communications Facility at 640
Lafferty Lane (Rise Up Towers, LLC), seconded by Mr. Witham and the motion was carried by
6-0 by roll call vote with Mr. Baldwin, Dr. Jones and Mrs. Maucher absent. Mrs. Welsh voting
yes; it is a well thoughtout design and it looks like everything has been covered that needs to be
addressed. It looks like a good plan that will benefit the community. Mr. Cooper voting yes; for
reasons stated. Mr. Roach voting yes. Mr. Witham voting yes; for the reasons stated on the
record and for the information that is submitted in the application. Mr. Reaves voting yes; for
reasons previously stated. Mrs. Denney voting yes; she definitely think that it’s needed and it will
be a benefit to our community.
S-24-09 Procter & Gamble Warehouse Expansions & Parking Improvements - Public Hearing
5
Page 6
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
and Review of a Site Development Plan Application to permit a phased construction of a
110,000 SF addition to JE Warehouse, a 20,000 SF addition to Warehouse 3, an expansion of
employee/visitor parking lot, an expansion and reconfiguration of contractor parking lot, and
expansion of truck drop Lots A & B with associated site improvements. The property of 84.10
acres ± is zoned IPM (Industrial Park Manufacturing Zone) and is subject to the SWPOZ (Source
Water Protection Overlay Zone): Tier 3 – Excellent Recharge Area. The property is located on
the south side of W. North Street/Hazlettville Road at the southeast corner of Electric Avenue
and Mifflin Road intersection with W. North Street. The owner of record is The Dover Wipes
Company and equitable owner Procter & Gamble. Property Address: 1340 W. North Street. Tax
Parcel: ED-05-076.00-01-07.00-000. Council District 2. Waiver Requests: Elimination of
Upright Curbing, Partial Elimination of Sidewalks, and Consideration of Performance
Standards Review Application.
Representatives: Mr. Bob Palmer, Beacon Engineering; Mr. Joe Taylor, Procter & Gamble, Mr.
Justin Hebert, Procter & Gamble
Mrs. Melson-Williams stated that this is a Site Development Master Plan because they are
showing us a series of phases for this project at Procter & Gamble located at 1340 West North
Street. The property is just over 84 acres of land. It is zoned IPM (Industrial Park Manufacturing
Zone) and there is a portion of it that is subject to the SWPOZ (Source Water Protection Overlay
Zone): Tier 3 – Excellent Recharge Area. On the image on the screen, it’s the kind of shaded
light gray that swoops in from the left towards the bottom of the image. Since we are talking
about that, with the SWPOZ (Source Water Protection Overlay Zone) there is a maximum lot
coverage for that portion of the site. It is limited to 30%; however, impervious cover can be
increased to 60% if they are doing a infiltration method for stormwater management and in this
project, it is targeting that in that area. The project is several phases and they are outlined here.
The blue color shown on the screen is two areas of improvement. First in the far upper left
corner, there is the contractor parking lot. In this case, it would be reconfigured and also have a
connection to Electric Avenue. These are contractors that work on the property; it’s not just for
construction but they are in the plant on a daily basis. The second phase is Phase II as shown in
green and this is the two warehouse expansions. There is a larger one on the west side of the
building (kind of “L” shaped in size); and then a small warehouse, there on the southeast corner
of the building. Those are the building aspects of the project. Phase III which is shown in red is
improvements to what is called the “Truck Drop Lot A area” and this is where truck and trailer
parking spaces are currently but there will be some improvements to that parking area. Phase IV,
shown in yellow adjacent to North Street, is improvements to the Employee and Visitor Parking
Lot area that has over 262 vehicle parking spaces. This project is multiphases. It met the
qualifications to have to go through the Preliminary Land Use Services review process. Those
comments from the PLUS Review were made part of the Planning Commission meeting packet
and also the applicant’s response to those comments as well. Over time, there have been several
applications for this site as its expanded since its initial construction, but this is the first one in
probably just over ten years for the site. It is an industrial area of the City and it has neighbors of
Kraft Heinz and some utility infrastructure and to its west and south is the Shutte Park which is a
City owned park which is accessed from Electric Avenue. The IPM (Industrial Park
Manufacturing Zone) of this property does allow for a manufacturing facility and the associated
warehouse shipment and distribution type logistics supports for that facility. With a Site
6
Page 7
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
Development Master Plan, it allows basically one trip to the Planning Commission where they
present in concept the phases for the project and then each phase would not have to come back to
the Planning Commission if there are no significant changes. It would go through an
Administrative Site Plan review process. It allows them to put the big picture out there for the
Planning Commission and then have the technical review process move through an
administrative process. The next slide shows some existing conditions. We do see parking in all
three of the areas where parking will ultimately play out. One thing of note here is that there is a
swale drainage ditch that crosses through the property. As part of the Master Plan, that ditch
network will be partially piped to allow for the accommodation for the proximity to the new
warehouse addition on this project.
Parking for this site has been a little tricky to say the least. There was previously a Variance
Application back in 2013 that established at that time, a set number for the parking requirements
for that property. Parking in the IPM (Industrial Park Manufacturing Zone) is either based on a
rate based on a floor area calculation or a number of employees on the largest shift. The
applicant provided a narrative letter that Staff has analyzed. That Variance from a number of
years ago with the massing of the building basically how it is today, set the parking requirement
at 306 parking spaces; so, we clearly have that. If you looked at that Variance closely, it
translates at a rate based on almost double (rate of 1 space per 1,600 SF) what the Code would
require. They are recognizing that and also finding that from a parking perspective while there
are two lots that are really targeted for the vehicle parking spaces of the normal passenger
vehicle, parking in the truck and trailer areas could accommodate a lot more vehicle parking
spaces if it had to be converted for passenger parking should staffing increase there. Staff is
satisfied that they meet their parking requirements for this property. Likewise for loading spaces,
there are truck docks pretty much around the building on almost all sides so that clearly would be
sufficient based on the call to Planning Staff to determine that sufficiency when buildings are in
excess of 150,000 SF in size. The maximum that the Code can require is three and they are
certainly well beyond that. They are providing bicycle parking and the site includes
improvements to what will be the main access point to West North Street. There is lighting
throughout these parking lot areas. Their Dumpsters are a process as part of the manufacturing
facility itself. They are requesting partial elimination of curbing in select areas. Planning Staff
has granted approval of that finding that they intend to use some of that elimination of curbing
for stormwater management practices adjacent to some of the parking areas. They may include
the parking bumper at the head of its parking spaces that do need that. The other Waiver Request
for the Planning Commission to consider is the partial elimination of sidewalks. Along North
Street, there is a multi-use path that is there. As part of this project they will construct sidewalk
along a portion of Electric Avenue but are seeking relief for kind of the balance of Electric
Avenue. They intend to construct about 450 feet of sidewalk which carries it to the entrance of
the contractor parking area, but for the balance of that where it would run along the east side of
Electric Avenue past the truck areas and around the curve, they are asking for relief from that.
Staff is recommending approval of that to the Planning Commission, but it is the Planning
Commission’s decision regarding that sidewalk.
The project site also includes some wetland areas and they have included the appropriate
buffering from that. There is a portion of the eastern part of the site that is subject to the Special
Flood Hazard Area, the 100-Year Flood Plain. Their project development is not near that. The
7
Page 8
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
final thing with an IPM (Industrial Park Manufacturing Zone) property is the Performance
Standards Review Application. They have submitted a narrative focused on how the project
would not have any of the “objectionable elements” that are outlined in our Code. This Plan does
include landscaping as part of it. There is some woodland area that will be eliminated as part of
the phase for expansion of one of the truck drop lots, but they are under the maximum clearing
that is allowed related to woodland areas. For the Planning Commission, remember that this is a
Site Development Master Plan. They have the Waiver for the partial elimination of sidewalks to
consider and also whether they have satisfactorily made their case as part of the Performance
Standards Review Application.
Mr. Palmer stated that as Mrs. Melson-Williams was giving the presentation, he checked off
items that he wanted to cover; so, he won’t be duplicative. There are a few things that he wants
to go over, in particular, the dumpsters and recycling. The area where the “L” shaped building is
actually called the JE Warehouse. The point of this project is not only expansion of the growing
need for Procter & Gamble’s products, but it’s also a facility efficiency project. What he means
by that is that there is a shortage of warehousing space for both raw materials and finished
product. And there is also a shortage of trailer space on the project as you can see by the number
of parking spaces that they are adding for the drop lots. What happens today is, the trucks bring
in raw materials and they are checked in at the guard house. Those trucks are either dispatched to
a drop lot space where a yard jockey will then bring them to the plant to off load the product, or
those trucks will be turned around and sent back out to offsite warehousing within the
community or an offsite drop lot that is up north of town. When that raw material is needed at the
plant, then a truck is dispatched to gather that material and then it is checked back in at the guard
shack and distributed about the property. Unfortunately, the same thing happens with the
finished product. So, through this project it is as much an expansion as it is creating efficiency
for the operation at this facility which will have a benefit to reducing truck traffic by 26-30%
when the project is completed. Getting back to the Dumpster area, in the alcove which is at the
bottom just left of center, that is the proposed JE Warehouse expansion. In that kind of right end
of the “L”, that’s where two roll-offs are located for trash that’s created at the facility as well as a
recycling space. Those Dumpsters in that covered roll-off area will be relocated to the south side
of the building and we have an area earmarked in the southwest corner. There is discussion about
moving it to the south central area in one of the existing loading bays kind of in the top center to
the right of that lower bump out, basically in between where the Warehouse 3 expansion is
shown in the southeast corner. It would be just west of that. They are providing their Dumpsters
and making sure that they are covered and screened from view.
He would like to talk about the sidewalk waiver and the shared use path across the front of the
property. In discussing with Staff and kind of pondering the nature of the request, with existing
pathways through Schutte Park and the main pedestrian draw of Schutte Park for the ball fields
and other activities that go on at the park, it doesn’t feel like a wise use of sidewalk on the
eastern side along the wooded area. What he means by that is, not only does the sidewalk
provide access to the park, but it would also provide access to the facility that it runs along. The
existing facility is restricted. There is a fence that runs around the entire perimeter of the
property so there would be no access or opportunity for pedestrians accessing the facility from a
sidewalk that ran any further south than the proposed entrance to the contractor lot. That is really
the main basis for the Waiver Request. They did speak with Staff about some opportunities to
8
Page 9
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
provide alternative means of compliance and they intend to work through that process and
whether it’s made whole in that it’s a true one for one transition or alternative or whether it’s
some higher percentage. They do have intention of complying but in an alternate way. For
wetland and buffering, Mrs. Melson-Williams spoke about the wetlands that are shown on the
Plan. They did have a delineation conducted. The Army Corps of Engineers and Subaqueous
Land Section from DNREC were both present and have signed off on the wetland delineation as
it’s been depicted on the Plan. With the acreage of undeveloped area that they have at the south
side of the facility, they are intending to avoid any disturbance to any of the Code prescribed
wetland buffers. With regard to the Performance Standards, he won’t belabor the Report that
they prepared, but he does want to touch on the comment with regard to DelDOT. They have
since met with DelDOT and held our presubmittal meeting to discuss the continued use of the
existing entrance. They are in the process of working with DelDOT to seek a design deviation
from the left turn lane warrant. There’s a left turn lane that’s warranted, a right turn lane that’s
warranted, and the existing right turn lane at the facility exceeds the minimum requirement.
There is a third lane for truck queuing and staging that is proposed at the guard shack to also help
with maintaining trucks onsite as they are going through the check in process. The other item of
note that he thinks is important from a multi-modal perspective is that DelDOT is requiring that
the existing bus stop that’s in front of Procter & Gamble be improved for ADA accessibility. So,
that bus pad will be improved to meet current requirements and it will be relocated slightly east
of its current location; they are coordinating with DelDOT with all of that. With regard to the
DAC comments, they see no issues with any of the comments or recommendations and it’s their
intent to comply with those comments. There was a note about electric and providing
consideration for electric vehicles charging. He will let Mr. Hebert or Mr. Taylor speak to this,
but essentially, Procter & Gamble’s corporate policy hasn’t been updated to allow that provision
to exist on the property. They are looking at renewable energy sources. They have several acres
of rooftop. They are considering solar panels but that’s very early in the process. They haven’t
made any final decisions yet but they are looking very seriously at it. Mrs. Melson-Williams
referenced that they have a number of locations where they have bicycle parking. They have two
access points for pedestrian mobility, along with the existing shared use path that runs along
West North Street. He spoke to the bus stop that would serve not only the employees at Procter
& Gamble, but the visitors and travelers in the area. So, they have also taken a look at the multi-
modal element.
Mr. Reaves asked what impact, if any, would that have on the individuals who travel down that
road to the Little League fields? Responding to Mr. Reaves, Mr. Palmer stated that he is not sure
that he understands the question.
Mr. Reaves asked if any of the construction or any of the improvements hinder people from
traveling down Electric Avenue to the baseball fields? Responding to Mr. Reaves, Mr. Palmer
stated that there is no intent to disrupt the existing traffic pattern. They do have, as you can see
on the screen, the proposed entrance to the reconstructed contractor parking lot. They are
working with Mr. Lyon and his team to make sure that it all meets City Code. There may be lane
closures during the day but during the nights and weekends, there would be no construction.
Their construction entrance would be used during the construction and development of the drop
lots and also bringing raw materials in for constructing the two warehouses. From a traffic
perspective, they will see an uptick in traffic on Electric Avenue during construction but it would
9
Page 10
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
be during normal working hours, not evenings and weekends and times when the ball fields
would be in play.
Mr. Reaves stated that during the normal operation once you get everything constructed, Schutte
Park is often used for a lot of high schools and middle schools for cross country and a lot of
people run inside that park. Will that have any impact environmentally on anyone that is
participating in sports in that area? Responding to Mr. Reaves, Mr. Palmer stated no.
Mr. Witham stated that given the expansion of the warehouse facilities, he would expect that you
may anticipate an increased number of trucks going in and out of the property. Have you
considered if that is going to have any adverse effect that you are aware of with respect to the
roadways? Responding to Mr. Witham, Mr. Palmer stated that this project, despite adding nearly
130,000 SF of warehouse space, will actually reduce the truck traffic that accesses this facility
because they are eliminating the duplicative handling of both raw materials and finished product.
Raw materials will come into the site once and then they will leave as baby wipes. They are
actually proposing that this project will reduce the 10-year projected truck traffic by 20% over
today’s truck traffic.
Mrs. Denney stated that she is trying to understand the sidewalk issue. So, if you are inside the
fence and you have employees parking and as they are walking from their parking lot into their
job, walk her through how they get there. Are they crossing parking lots? These days you will
see employees go out and take a break at lunch and just take a walk. Will there be some sidewalk
or some area available, whether it’s just a walking path? Responding to Mrs. Denney, Mr.
Malloy stated yes, there are two sources. With the contractor parking lot, there is of course the
sidewalk that is proposed along Electric Avenue that connects in with the West North Street and
Hazlettville Road pedestrian network. That sidewalk comes into the site and then crosses the
entrance and runs south on the south side of the parking lot between the contractor lot and the
fenced drop lot. There is also a sidewalk that runs in a north/south direction along the east side of
the contractor lot that is proposed. Those two sidewalks come together in the southeast corner
and then run through a secure area for the workers. There is a crosswalk at the stop movement at
the guard shack and then they would continue along with employees. Skipping over to the
employees, there is an existing sidewalk that runs along the south side of that employee parking
lot. At this point, contractors and employees use the same path. That path continues in an
easterly direction, crosses the fire lane, and then there are existing sidewalks that bring the
contractors and employees to the main facility entrance. There are a number of outdoor spaces
for employees for breaks. There’s a number of personnel doors about the facility and there are in
some locations, just a picnic table and other cases it might be covered with some sort of an
awning. He is not sure if those are sanctioned or if they just kind of show up with employees.
There is also a service road that runs around the entire perimeter and while it doesn’t qualify as a
fire lane in all locations, it’s marked as such. There is a line that runs along the entire perimeter
of the property along this road and he is told that it’s a “health path” should workers desire on
their break to walk. There are secure and safe places on the facility to do that.
Mrs. Denney opened the public hearing.
Mr. Zack Prebula – Kent Economic Partnership at 555 Bay Road Dover, DE 19901
10
Page 11
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
Mr. Prebula stated that they are the economic development organization for Kent County and
they are in support of this project. Part of his role as a business developer is to focus on business
retention and expansion with local companies and this is a great example of a major employer in
the area looking to do just that and expand. In 2021, they had the Rockport 2.0 Study completed
and this study identified that warehousing and manufacturing as our local target companies for
Kent County and Dover. This expansion is looking to touch on both of those target industries.
With that being said, they ask that the Commission please support this project.
Mrs. Denney closed the public hearing.
Mrs. Welsh moved to approve S-24-09 Procter & Gamble Warehouse Expansions & Parking
Improvements inclusive of the DAC comments and the Waiver Requests for the elimination of
upright curbing, for the partial elimination of sidewalks, and consideration of the Performance
Standards Review Application, seconded by Mr. Witham and the motion was carried 6-0 by roll
call vote with Mr. Baldwin, Dr. Jones and Mrs. Maucher absent. Mrs. Welsh voting yes; the
presenters gave a very good description of what they plan to do. It seems like it is very necessary
and that their solutions are quite equitable for the improvement of the site and the expansion of
business in the Dover area. Mr. Cooper voting yes; based on the motion. Mr. Roach voting yes;
based on reasons stated. Mr. Witham voting yes; the Site Development Master Plan appears to
him, to be a well-developed and thought-out plan. Mrs. Reaves voting yes; for the reasons stated
previously. Mrs. Denney voting yes; she thinks it’s well thought-out and it’s a really good plan.
It’s going to bring employment to our area. She did initially have some questions about the
sidewalk but now that it’s been explained, she thinks it’s perfect.
NEW BUSINESS
HI-24-02 Building at 148 S. Bradford Street: Demolition – Appeal to the Planning Commission
of the Historic District Commission Action to deny the Architectural Review Certification for
the Demolition of the existing 1 ½ story, stucco clad building. The parcel consists of 0.13 +/-
acres of land. The property is zoned C-2 (Central Commercial Zone) and subject to H (Historic
District Zone). The property is located on the west side of S. Bradford Street and slightly north
of Minor Street Alley. The owner of record is Russell and Dee Ann Widder. The applicant is the
Downtown Dover Partnership. Property Address: 148 S. Bradford Street. Tax Parcel: ED-05-
077.09-02-25.00-000. Council District 4.
HI-24-03 Building at 150 S. Bradford Street: Demolition – Appeal to the Planning Commission
of the Historic District Commission Action to deny the Architectural Review Certification for
the Demolition of the existing 2 ½ story, frame building. The parcel consists of 0.17 +/- acres of
land. The property is zoned C-2 (Central Commercial Zone) and subject to H (Historic District
Zone). The property is located on the west side of S. Bradford Street at the corner with Minor
Street Alley. The owner of record is CEI Properties, LLC. The applicant is the Downtown Dover
Partnership. Property Address: 150 S. Bradford Street. Tax Parcel: ED-05-077.09-02-27.00-000.
Council District 4.
Representative: Ms. Diane Laird, Executive Director for Downtown Dover Partnership; Mr.
Ken Anderson, Downtown Dover Partnership; Mr. Jed Hatfield, Colonial Parking; Mr. Michael
11
Page 12
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
Caine, Bernardon; Mr. J.D. Bartlett, EDiS Company; Mr. John Childress, Mosaic Development
Partners
Mrs. Melson-Williams stated that Application HI-24-02 Building at 148 S. Bradford Street has a
proposal for demolition. This is an Appeal from the action taken by the Historic District
Commission. In the Zoning Ordinance, the requirement for a property such as this in the Historic
District then, demolition requires an approval through a process called Architectural Review
Certification. This was an Application that was to the Historic District Commission. That
application, in front of the Historic District Commission was subject to a public hearing. That
Historic District Commission consideration happened back on May 16, 2024 and their vote was a
vote of 2-1 to deny the Architectural Review Certification for Demolition. The City’s Zoning
Ordinance in Article 10, Section 3 includes a process whereby the action taken by the Historic
District Commission can be appealed to the Planning Commission to determine whether or not
the Architectural Review Certification for Demolition should be issued. The information on this
Application consists of basically the Report that went initially to the Historic District
Commission along with the applicant’s request to demolish the building. The information that
Staff provided as part of the Staff Review Report notes that basically this is a property that has
an existing 1 ½ story building on it. The property is zoned C-2 (Central Commercial Zone) and is
within the H (Historic District Zone). On the screen, you see a couple of historical maps who
always give kind of a sense of how the building may have come to be. On the screen is the 1868
Beers Map where the location is circled, but it’s likely not the same building that the map
initially depicts. In the Sanborn Map that’s next and in the Bird’s Eye View Map, we start to see
additional buildings in the area. This building at 148 S. Bradford Street still really doesn’t look
like what is there currently. It doesn’t truly appear until you see the 1929 Sanborn Map on which
it is depicted. From an architectural perspective, it does look like it’s an early 1920’s
construction. The property was noted in the National Register of Historic Places Inventory as a
20th Century construction. You can see that it’s kind of a craftsman style building now stucco
sheathed. It has that kind of projecting dormer window on the front and there is a more recent
addition to the rear. It was listed as part of a Historic District in the National Register of Historic
Places known as the Victorian Dover Historic District. With the location, the project is within the
City’s Historic District and as such, there is a process for review of activities within the Historic
District. In this case, their project proposal is for demolition and that’s what the applicant
initially outlined to the Historic District Commission. The Historic District Commission and now
the Planning Commission is charged with review of the Design Standards and Guidelines of the
City of Dover Historic District Zone. That document includes a discussion in Chapter 4 that deals
with demolition. It basically puts forth a series of specific criteria that you are to consider when
evaluating a property for demolition. If you are looking at the Report, it’s on Page 4 where there
are Numbers 1-5 as Items that are identified. Staff initially gave comments and recommendations
in regards to the request noting the situation with the potential for demolition and also
identifying other options perhaps related to this building or its documentation should its
demolition be approved. Back on May 16, 2024, the Historic District Commission conducted a
Public Hearing. Their Draft Meeting Minutes were forwarded to the Planning Commission
today; and there is also a copy of them on your desks this evening. That was a pretty busy
meeting, so it took them a bit to get through the Minutes. The Historic District Commission
action was a motion to deny demolition of the building. Tonight, the Appeal to the Planning
Commission of that Architectural Review Certification is before you. That Historic District
12
Page 13
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
Commission action can be appealed to the Planning Commission. The Commission has to review
it with the same standards. The process and she knows this is probably going to be a little
difficult for most of the people in the room to hear, it does not require a Public Hearing in front
of the Planning Commission. The Code does not outline that requirement as Planning Staff has
read and interpreted the Code. The only time that an Architectural Review Certification is very
specifically called out for a hearing before the Planning Commission is when the Planning
Commission is considering another application type. For example, if there was a Site
Development Plan, you would be also considering the Architectural Review Certification along
with that Site Development Plan. In this case they are just looking at just demolition. It is an
Appeal regarding the Building at 148 S. Bradford Street. The applicant is given the opportunity
to present their Appeal request to the Commission. She believes that they have a number of
individuals that will share on their project. There is a presentation that they have and there is also
a copy of that on the Commissioner’s desks this evening because sometimes seeing screens at a
distance may be a little bit difficult.
Ms. Laird stated that as you know, their team is here tonight to Appeal to the Planning
Commission with regard to the 2-1 decision of the Historic District Commission to deny the
request for demolition of two properties within the Victorian Dover Historic District. This
presentation will actually be simultaneous for two properties: this one and the next one on the
Agenda. (Note: The next one is HI-24-03 Building at 150 S Bradford Street: Demolition.) These
parcels are required to enable the build of a Mobility Center in the heart of the business district
and this follows the priority recommendation of the Capital City 2030: Transforming Downtown
Dover Master Plan. Just to clarify, they are here to discuss the location, the massing, and
proposed configuration of the Center, not the actual design which will be discussed at a later
time. It would not be a stretch to say that this Mobility Center is the cornerstone on which many
components of the much larger, more comprehensive plan rests. A plan that will bring about the
growth and development required to make Delaware’s Capital City a truly transformed center of
sustainable commerce and vibrant residential activity. She wants to take a moment to introduce
members of their team that are here this evening: Mr. Todd Stonesifer, DDP Board President;
Mr. Ken Anderson, DDP Property Development Director, Mr. Jed Hatfield, President of
Colonial Parking, Inc.; Mr. Michael Caine, Senior Designer for Bernardon; Mr. J.D. Bartlett,
Operations Manager for EdiS; and Mr. John Childress, Business Development Director from
Mosaic Development Partners. You will hear briefly from members of this group tonight. Our
team has taken your concerns and suggestions provided as a result of both the Historic District
Commission hearing and a subsequent Open House with regard to the design and considerations
for this mobility center. They believe that you will find a broad and thoughtful and responsive
consideration was given with regard to the input that they have received. They are continuing to
seek the best solution for the Mobility Center for the Downtown Dover. While this is just one
priority project in the Master Plan, we cannot over emphasize the importance of this specific
project as a catalyst to bring about increased public and private investment in mixed use
redevelopment and to address parking needs that together, will provide the foundation to reach
target numbers of new residents and to fill storefronts that are now well over 50% vacant,
including recruitment of restaurants that are so necessary to vibrant cities and require substantial
parking resources. Discussion of the need for a parking structure and transportation amenities
goes back to at least 2006 when the Hyett Palama consultants recommended three cameo
projects; one of which was a parking garage. In 2018, a parking study concluded that while
13
Page 14
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
parking was sufficient at the time, it would be necessary to reassess capacity and that time is now
with the targeted infusion of 2,000 new residents over the next 6-8 years and the increase
commercial activities to ensure that our storefronts are filled to capacity. In 2019, the Dover
Comprehensive Plan recommended balancing preservation, development activity and planning
initiatives to strengthen Loockerman Street and adjacent areas. Now, the Capital City 2030
Master Plan calls for increased density, more residents, varied modes of transportation including
cars, bikes, micro-transit and buses, and a coordinated architectural approach that honors the
history while introducing new designs that will complement the historic landscape. The 2030
Master Plan engaged and continues to invite considerable input from residents, property and
business owners, leaders, subject matter experts, and elected officials by way of charettes, group
discussions, one-on-ones, Zoom and in-person meetings, and surveys. At this point, at least 900
people have been engaged and formally weighed in at some point. We focus on a new vibrant
future. This future targets some compelling results. Over 900 new residential units and as she
mentioned, about 2,000 new residents, a river walk, an art walk, a new ampha-theater for music,
a grocery store, improved and fully occupied commercial spaces in the district and nearly 800
parking spaces to support this development. The Mobility Hub at the heart of Downtown, is the
catalyst for the majority of other re-development recommended in the Plan. The value of the
mobility hub has brought in significant plans under consideration through the Dover/Kent MPO
include removing some parking on Loockerman Street to invite more place making and
pedestrian oriented activities and restaurants with outdoor dining. The Mobility Hub will be able
to absorb that parking while promoting Downtown safety and convenience. Onsite professional
staffing , consistent monitoring with cameras, better lighting, and more eyes on the street will
create a safer area reducing illegal activity and increasing viability of small businesses which
will reduce commercial vacancy. This will all enhance residential opportunity along Loockerman
Street and in Downtown to focus on people and business.
Mr. Hatfield stated that they have been working on parking with Downtown Dover Partnership
for over fifteen years. They have had a lot of time studying this and being involved in the
thoughts and planning and have been involved through the Master Plan and now what they are
looking at for the implementation of the Mobility Center. As Ms. Laird said, the pivotal role that
a Mobility Center plays in attracting retention for businesses Downtown is the lack of parking. It
has been referred to as a deterrent over the years and providing a centrally located parking
facility that will be support for the small businesses and restaurants Downtown and create one
hub for mobility throughout Downtown to help reverse the vacancy in upwards of 50% that’s
been seen in the current condition. They see this as also a key element to support residential
expansion and create a safe and convenient parking area for residents in some of the proposed
new residential development Downtown. It also will be owned by the Downtown Dover
Partnership to be a source of revenue generation to re-invest into the City. Part of the Master
Plan was talking about a parking benefits district so any of the revenue generated from the
Mobility Center will come back to the Partnership and be able to be deployed in streetscape
improvements and things to improve the Downtown overall. They also looked at through the
Master Plan, and where to locate a Mobility Center with an eye towards trying to be in the center
of town. They looked at really the star at the center of main and main in Dover with Governors
Avenue and Loockerman Street as really the key to Downtown. During the course of the process,
the City also looked at what the C-2 (Central Commercial Zone) looked like to be able to support
this type of growth and the concept outlined in the Master Plan. So, part of the changes that he’s
14
Page 15
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
sure this Committee played a role in and with the Planning Department of the City for the C-2
(Central Commercial Zone) was eliminating parking mandates that previously existed for
individual projects. It’s a trend that’s happening nationally and creates an opportunity for having
centralized shared parking rather than each project having parking, often timed oversized for its
need. A Mobility Center is a little bit different than a parking garage. It is designed to meet a
variety of needs. It’s designed to bring together all of the different mobility options: bicycle
parking, potentially bike sharing, scooter parking, access for car share and electric vehicle
charging. Those types of things are within the Mobility Center. It’s thought to be kind of a
destination from which people can then, within a half a block, be on Loockerman Street or right
across the street from the proposed multi-use facility at 120 S. Governors Avenue. It would be a
shared facility. Rather than specific to one project, it would be available for people coming to
work during the day, for people who live in town at night, for visitors 24 hours a day, and be
more efficient and get more utilization than a private single purpose building parking facility
may. In the original Master Plan, we contemplated a site that is illustrated on this slide for how
they would situate the Mobility Center element on the property. At that time, it was looking at
the Bradford Street Parking Lot which is largely owned by the Downtown Dover Partnership and
the City of Dover and for its central location and ownership. It seemed like a logical place to be.
There was one key property that was not within that ownership structure and they were not able
to reach a conclusion to acquire that to make this footprint work. So it drove them to look at what
the other options were in locating it. After a lot of research and looking at design, it’s what led
them to 148 and 150 S. Bradford Street as alternatives to be able to allow the Mobility Center to
move forward and fit it to the property. Thanks to the comments of the Historic District
Commission, it forced them to go back and really look at what they were contemplating with the
project and what were they trying to accomplish. Their initial thought was that the buildings
were within the footprint and they needed to remove them to build. At the encouragement of the
Historic District Commission, they stepped back and they really went through a fairly extensive
process of looking at what are the options. One that they looked at in earnest, and some of the
team will talk about a little bit more soon, is relocation. Would it be feasible to preserve these
buildings by relocating them somewhere else to get them off of the site? The other option where
they started is replacement of those with the Mobility Center; and then the third was co-
habitation of how could we preserve those buildings and work with the site with a smaller site
around those buildings. That led them to two potential schemes as they started analyzing what
could they do with the site. Scheme A on the left was the original plan that occupies from
Governors Avenue to South Bradford Street and occupies the entire site including the footprints
of 148 & 150 S. Bradford Street. It’s a five level parking structure that nets a little over 400
parking spaces which is the goal of the Mobility Center. Scheme B was the co-habitation. How
could they design the garage to be able to fit and preserve those buildings? Part of it, they still
need some of the land from those properties in order to have the ramping work. The garage
encroaches on the back yards but they are able to make it fit. But in order to meet the goal of 400
spaces, it got taller. So less parking per floor, more floors to be able to accommodate the goal. It
too, is a little over 400 parking spaces on seven floors rather than five. The rendering on the
screen helps kind of put it in context of what that looks like. The same design with Scheme A on
the left with five floors and Scheme B on the right with seven floors. He will now turn it over to
Mr. Michael Caine who is the project architect working on the project for us who has done a
great deal of research and design to figure out what the alternatives are.
15
Page 16
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
Mr. Caine stated that that his company has offices in Philadelphia, Wilmington, and West
Chester. They have been a large component in compiling the original Capital City 2030 Master
Plan including the recommendations for the original scheme. Moving forward, one thing to
mention is that for both of these schemes, they are striving to acknowledge not only the
architectural fabric of Downtown including the zone of historic cornice lines and historic
rooflines, but finding ways to architecturally integrate into the story and compliment those
historic structures. Public comments during this June 3, 2024 (Open House) meeting, the
majority of them have been in favor of replacing the two structures. They want to ensure the
Commission that they intend to address and have investigated all design options as previously
addressed by Mr. Hatfield. One thing to note zooming out aerially is that the structure will be
located within a five minute walk to the majority of the Central Business District on Loockerman
Street, providing an easy way to commute to businesses as well as their further recommendations
down the line as part of this Master Plan. He would also like to note the two blue lines are the
additional parking garages that are being constructed: one at Legislative Hall and another at
Family Court. Those will primarily address the activities pertaining to those activities and this
structure will really pertain to the Central Business District for the public. They would also like
to acknowledge that this project does sit within the Victorian District of Dover as well as the
Historic District of the City itself. They plan to fully investigate architectural implementations to
fold their structure into this typology. Zooming out a little bit further and looking at the parcels,
he won’t belabor this point; he believes Mr. Hatfield and Mrs. Melson-Williams have really
outlined thoroughly their intent for these parcels and he will not waste time. Looking at the
existing conditions of the site, the two structures in question, 148 and 150 S. Bradford Street are
surrounded on three sides by surface parking lots. This will really consolidate and reduce the
amount of footprint required for parking. Going into the Historic Places Nomination for the
National Register, the index (inventory listing) of these two buildings have been acknowledged.
One thing that they would like to note is the block description of the inventory that states within
the Nomination 1979 that within the 20th century the residential character of this block has been
altered and the buildings were removed and replaced with parking lots in both the center and
northern sections of this block. The two structures within the description have only been grouped
as an index and not particularly named as contributing structures. That is 118 (S. Bradford
Street), which is for the block, the most interesting. It is the chapel north of this site. Going in
further, the Historic (National Register) nomination and the character that this nomination was
describing may not be fully seen today. Through previous zoning conditions a large portion of
the Victorian District’s footprint has been eroded to facilitate the creation of dedicated surface
parking. With the recently passed C-2 (Central Commercial Zone) Rezoning Ordinance, a
conveniently located structure will allow Dover to consolidate parking and rebuild the density
lost to surface parking creating a vibrant and cohesive Downtown core. With that consolidated
parking, they can begin to imagine the future of Downtown Dover as they reclaim these empty
spaces to enhance Dover’s fabric. They would also like to acknowledge the Design Standards
and Guidelines set forth for us through the City of Dover Historic Zone and they would also just
like to outline that for these development related applications. The City should review these
plans for the new structure and help weigh the virtues of the new versus what exists. The
relocation of these two buildings in the eyes of the Historic Zone Design Standards is to be
viewed as the same effect as demolition as moving these structures will eliminate the fabric and
story that these structures tell to the District in how they are exhibiting or displaying within the
blocks that they will be relocated to.
16
Page 17
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
Mr. Bartlett stated that as part of the Historic District Commission’s review comments and also
comments received from the public at the Open House mentioned on June 3, 2024, they heard a
lot of feedback about reconsidering relocation of these structures. As part of their analysis and
sort of listening to the concerns of the public and vetting those, he participated in an existing
conditions analysis as well as a study on relocation of structures. Starting with the relocation
study, in talking with regional experts in the structure moving industry, typically relocations of
such are one to two blocks in nature and never further than five blocks. He wants to outline why
there is that limitation. The need for relocation is typically in a Downtown setting and you end
up with vertical circulation issues related to the routing. As an example, these buildings are 1.5
stories plus and when they are lifted to haul, they would be upwards of thirty feet of aerial
clearance. When you think about any direction from this part of the City, there is a lot of trouble
that would go into that. There would be detours required for traffic and really the ability to
facilitate moving the buildings. He thinks that along with that, we all know the tree canopies in
the City of Dover and the aerial utility lines, they really add to the streetscape here. Those would
all have to be interpreted. In fact, to relocate these structures they would really have to look at
cutting the tree lines back, nearly to the full street width in some cases in order to relocate these
buildings. In addition, they also analyzed the existing conditions of the building. He wants to
provide a little oversight that isn’t clear just by looking at the aesthetics of the exterior. Starting
with 148 S. Bradford Street, the existing exterior has stucco which contains asbestos and will
need to be completely remediated prior to relocating the structure. He thinks the thing that is
difficult to hear is that not only will the whole exterior have to be shed off of the building, in
order to do this you would have to remove all of the window trim, the eaves, and the soffits that
are all coated with stucco. Those would all of to be removed in order to completely remediate the
asbestos. Again, this would all have to be done prior to disturbing this material. On the interior of
the building, they have 7,000 SF of asbestos also found in the joint compound of the drywall.
Nearly all of the drywall of the building is impacted and again, this would have to be addressed
before they could consider disturbing the building. Lastly, in terms of environmental
considerations for 148 S. Bradford Street, there is an underground fuel oil tank that is 10,000
gallons adjacent to the foundation. It is noted and a study was completed by the Downtown
Dover Partnership that this tank has likely leeched into the soil and that’s anticipated. That would
also have to be addressed. He thinks that the difficultly is without removal of the structure, it
would be a question mark as to whether or not they were able to achieve removing all of that soil
that needs to be remediated. Moving onto structural considerations on 148 S. Bradford Street,
the original structure, again that’s a 46x30. Any of the subsequent additions that were done on
the structure are not structurally connected meaning the building could not be relocated as one
structure. It would have to be relocated in individual pieces. With that, he thinks it’s worth
noting that the existing exterior wall construction is single width masonry. So, when they talk
about preparing to relocate what will be a fragile structure, they will definitely have to invest in
shoring and reinforcement. When you think of ship crating that is sort of what would come to
mind and would have to be done to prepare this building for relocation. Next, the service
entrances for all of the utilities and the bulk of the building systems originate in the basements of
these buildings. So in order to lift the structure, those systems would all have to be removed and
replaced at its new location. Lastly, related to the context of the original construction, the current
windows have been replaced with vinyl windows and they are currently trimmed in aluminum.
You can see in the existing photo that it appears that those were wood windows with wood trim
17
Page 18
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
originally. Shifting gears to 150 S. Bradford Street, that structure does not have the same
environmental concerns. They did; however, look at the structural considerations. That original
structure was a 41x18 and again, the same situation where any of the additions that were done,
although they are physically connected, they are not structurally connected so you couldn’t
relocate the building in one piece. To complicate that, with the porch foundation and floor
framing that you kind of see in the 1979 photo on the screen, that porch is independently
supported. Again, the roof ties into the sidewalls, but from a foundation standpoint they are
independent from each other. To complicate that, there is a projection on the second floor that
extends over the porch foundation that is solely supported by the structure that is the porch. One
other point of note, the existing chimney interior to the building is in severe disrepair and would
have to be removed in order to relocate the building. It’s in such a condition that the owner has a
setup for cleaning the bricks that fall out of it on a regular basis. The service entrances, again, on
this structure originate in the basement and also would have to be removed and reinstalled at its
new location as well. To point out what is similar in comparing the 1979 view to today, you will
note that the original construction was slate roof and this is now an asphalt shingled roof. The
exterior siding previously was a lap siding and it’s now a cedar shake siding. You will see in the
1979 view, there was a screened porch and now it’s no longer. You can’t really see it in the
picture provided but he thinks there are other contexts on other sheets. This kind of gives you a
better idea of what the current condition is if you are not familiar.
Mr. Hatfield stated that having gone through the exercise that they just enumerated of looking at
the three options that they identified: a relocation, of removal. and of cohabitation, where they
have landed in their conclusion of the best option to be able to create this vital element to the
Downtown Dover Master Plan was with removal of the buildings. They think relocation is not
practical for all of the reasons that Mr. Bartlett enumerated. So, its looking at how do we create
the best Mobility Center for the future of Downtown Dover and be able to provide that critical
element for the future master planning. Keeping it five stories rather than seven was part of the
consideration. In the design of the full block, because of the ramping requirements, they are also
able to gain a little more ground level retail in the Governors Avenue side which they are
contemplating maybe a bicycle shop for that form of mobility or other amenities for the
Downtown. It created an improved visibility. The Mobility Center will be visible from both
Bradford Street and Governors Avenue rather than hidden behind the two existing buildings. As
the earlier slide illustrated it’s the five-minute radius to everything within the Downtown, it
creates a pedestrian friendly path. It would have the opportunity to improve Minor Street as a
pedestrian connector as well as its connection and to both to the planned multi use facility at 120
S. Governors Avenue and the half a block to all of the businesses along Loockerman Street. For
all of those reasons, they have concluded that the best design for the Mobility Center would be
the removal of the buildings at 148 and 150 S. Bradford Street and designing the whole block.
Mr. Stonesifer stated that he is the President of the Downtown Dover Partnership and he lives
and works Downtown and he owns buildings Downtown. He is so proud of how far we’ve come
in the Master Plan for of the future of the City of Dover. He is super excited about where we are
going. He remembers his own history of walking Downtown on Governors Avenue and
Loockerman Street and it was the center of commerce. Everything was open. Sears was there.
Athletic Attic was there. They did all of their shopping there. Today, we are where we are. This
is the history of Dover. We want to preserve the history. The definition of insanity is doing the
18
Page 19
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
same thing and expecting a different result. They have come so far. They have federal grants that
the private sector can’t obtain to clean up environmental conditions. They have State funding;
the Governor’s Team has supported the success of this Plan through the offering of $25 million.
$15 million of that money comes with strings and those strings say that the money has to be
spent by December 31, 2026. You guys (the Commission) has a decision that will absolutely
make or break the success of this Master Plan. Anything other than yes, you are allowed to take
those buildings and replace them for the betterment of the City of Dover, sets them back to a
point where they cannot meet that requirement. The entire thing hinges on tonight. Please be
careful, please be considerate, and please make a wise decision. With that, they ask that the
Commission please consider demolition and the replacement of these two buildings so that they
can prune this bush and they can save the history of the rest of the Downtown of the City of
Dover. They promise that they will do everything in their power to make as many people happy
as possible, but they understand that they can’t make everybody happy all of the time.
Mrs. Denney stated that this point there is no public hearing because this is an Appeal on a
decision that was made by the Historic District Commission to deny this. There is no public
hearing and no public comment. At this point, the Commissioners certainly have an opportunity
to discuss this and then vote on it.
Mr. Witham asked that since this is an Appeal, is the appeal “day novo” or on the record.
Responding to Mr. Witham, Mrs. Denney stated that it’s really on the record. They were
provided with the minutes at the eleventh hour, which could help them understand their thinking
process, but it’s just an Appeal on what they found. Do we agree with it or do we not?
Mr. Witham stated that given that it’s an Appeal on the record, he would move if it’s
appropriate, that we add to the record the Draft Minutes of the decision of the City of Dover
Historic District Commission. Since this is only a Draft, his motion would apply to a Final
Minutes of the Meeting since the Appeal has to be based upon that decision by the Historic
District Commission. Second of all, he would add to that that they should also admit into the
official record the applicant’s presentation today which is reflected on the slides and we all have
hand copies of the record along with those portions of the Code that tells us what’s involved with
the demolition from the City standpoint. He thinks Mrs. Melson-Williams knows what he’s
talking about; the actual standards that they have to go by.
Mrs. Melson-Williams stated that for the Design Standards and Guidelines document, they were
included as part of the transmittal for tonight’s meeting. They are listed in the attachments and as
were the Draft Minutes excerpt. When they issued their Staff Report, they were pending
completion and they got through the two applications that they needed to for tonight’s meeting.
But there is a motion by Mr. Witham to clearly add some things to the record, you will need a
second and an action on that and then we can proceed.
Mr. Witham moved to add the Minutes from the Historic District Commission and comments
from this evening to the record prior to our decision making, seconded by Mrs. Welsh and the
motion was carried 6-0 by voice vote with Mr. Baldwin, Dr. Jones and Mrs. Maucher absent.
Mr. Witham asked if the opponents have a right to respond or not. Responding to Mr. Witham,
19
Page 20
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
Mrs. Melson-Williams stated that she noted at the beginning that the Zoning Ordinance and
Article 10 Section 3 is where it talks about this process called Architectural Review
Certification. It lays out certain types of activities that can be reviewed by Staff, others that
require Historic District Commission action, and even a third level if it’s a project that is going
through a Site Plan review process and then it’s the Historic District Commission and a Planning
Commission action. When it is an Application to the Historic District Commission, they conduct
a public hearing and take action on what is called Architectural Review Certification which is
basically the authorization of the project finding that it meets the City’s Guidelines and
Standards for the Historic District Zone which is a somewhat subjective document. That Zoning
Ordinance allows the Historic District Commission action on an Architectural Review
Certification to be appealed to the Planning Commission. So, that is what we have this evening;
an Appeal of the decision that was made by the Historic District Commission. What the Planning
Commission is really charged with is for their Architectural Review Certification Request for
Demolition whether you agree with the Historic District Commission or you think otherwise and
would grant that Architectural Review Certification. The Code charges you to look at the
provisions for an Architectural Review Certificate in that the Code, Article 10 Section 3.25
Architectural Review Standards, Item A states, “an architectural review certificate may be issued
if it’s found that the architectural style, general design, height, bulk and setbacks, arrangement,
location and materials and structures affecting the exterior appearance are generally in harmony
with neighboring structures and complimentary to the traditional architectural standards of the
Historic District as set forth in the Historic District Guidelines and Standards adopted by the
Planning Commission and as set forth by the Secretary of Interior Standards for Rehabilitation.”
That statement really focuses on if they were building new or doing something with materials on
a structure. It doesn’t really necessarily focus on demolition; however, the “Design Guidelines
and Standards” that are referenced in that Code are the Design Standards and Guidelines for the
Historic District Zone document which does have a discussion about demolition. That discussion
gives a series of criteria upon which to evaluate demolition and its certification for it to be
allowed to happen. You can certainly look at those criteria and make your determination of
whether their proposal meets those criteria or could meet those criteria with additional conditions
perhaps in looking at a way to focus on that Architectural Review Certification process. In short,
you have a decision that the Historic District Commission came to. The Planning Commission is
charged at looking at the same thing basically. That’s why Staff gave you all of the same
documentation that was presented to the Historic District Commission and their meeting
minutes. The Planning Commission then goes through kind of the same process to look at
Architectural Review Certification. Staff has looked on the question of whether the opposing
side gets to speak. In looking at the Code, it does not specifically say that an Appeal to the
Planning Commission requires a public hearing. The references in that section talk specifically
about hearings before the Historic District Commission. The only reference to a public hearing
before the Planning Commission in that referenced section, in Article 10 Section 3.26C Item 6 is
that “if the Planning Commission is reviewing another type of application process wise;
Conditional Use, Site Plan, or whatever the case may be, then the notice of public hearing on
those types of applications must also reference that an Architectural Review Certification is
under consideration.” In that situation, the scenario would be a new building that required it to go
to the Historic District Commission, the Historic District Commission makes a recommendation
to the Planning Commission, and as part of your review as a Site Plan, you have a public hearing
and it also includes that action on Architectural Review Certification. She knows that it is a little
20
Page 21
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
confusing, but it is Staff’s interpretation that an Appeal does not require a public hearing at the
Planning Commission level.
Mrs. Denney stated that what they do have the opportunity to do, is ask questions and speak
among ourselves.
Mrs. Welsh stated that she is just curious as far as reviewing the Scheme A and Scheme B
proposals in the packet. At this point, she is hearing that demolition is the only option. She is
curious as to the purpose of the two schemes. Was that an exercise in economics or feasibility or
is that something that they can contemplate at this point? Responding to Mrs. Welsh, Mrs.
Denney stated that they are here not to say whether or not they like a certain plan. They are here
for is the Historic District Commission voted that this should not happen and there is an Appeal
as to whether or not they take that side. It’s not about what will replace it because they all know
that it’s not another historic building.
Mrs. Welsh stated that she understands that. It’s not so much that she’s saying that they would
choose one over the other or that we are looking at that, she is just not sure why it was brought to
their attention. Responding to Mrs. Welsh, Mrs. Denney stated that she was listening and letting
them go on and thinking that she’s not exactly sure because they are not deciding on what they
do next. She feels privileged to be on a Board for the City of Dover. She has said this from time
to time in public hearings and things, we live in the Capital City of the State that started the
Nation. It is filled with history; it’s part of history. Whether this building was built in 1638 or it
was built in the 1900’s, when you follow it through that legacy, it’s not all about the buildings in
the 1600’s. We are packed with tourism; people come because of our history. What it
demonstrates to the people is that you can follow through the architecture. She has often said to
her kids that her grandkids will all look up and say that’s Victorian because she always says if
you go to New York City, look up. That’s where the real story is. You can follow our history
through the architecture. In reading the Minutes, that’s somewhat what the Historic District
Commission was saying when they said no. Again, we are just here to hear the Appeal, but they
did allow the applicants to tell them why. They kind of gave them a little plan but in this Design
Plan, which by the way they wouldn’t be held to anyway. She doesn’t see any historic Victorian
building like we would see if we went to New York City or someplace like that. The other thing
is that absolutely right, is the testimony tonight is theirs. Its adjacent to an empty lot that doesn’t
have Victorian buildings because somebody let them take them down.
Mrs. Melson-Williams stated that Staff would note that they think why we heard a little bit about
potential schemes is that it was part of their evaluation and looking at the criteria because the
criteria for demolition does give some suggestion as to looking at what is next. In this case, she
thinks they gave us a glimpse of what is next. You are certainly correct, anything that they
presented tonight they could not hold them to because “what’s next” is not what’s under
consideration with the Architectural Review Certification step that we are at. The Architectural
Review step that we are at is regarding demolition and there are certainly options related to
demolition. She thinks that the Commission has heard a little bit about that. Staff did, in their
Report to the Historic District Commission that you have a copy of, note some other scenarios
for “what ifs”. She thinks they addressed the “what if” options of relocation or the cohabitation.
But with these buildings, there is definitely what was the initial core of the building and then it
21
Page 22
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
has rear additions that happened over time for 148 and 150 S Bradford Street. But right now, we
are dealing with 148 S Bradford Street.
Mrs. Denney stated that as do many historical buildings because a lot of them here, especially
some of the really early ones began with a kitchen and then grew.
Mr. Cooper stated that when we are reviewing this application, he understands that we are just an
Appeal on the original ruling. But as the Planning Commission, shouldn’t we be looking at what
could be coming and what would be coming as a result of the Appeal? Or is he just looking at the
same exact thing that the Historic District Commission looked at? Responding to Mr. Cooper,
Mrs. Denney stated that she believes that they are not looking at what comes next because there
is nothing written in stone. This is not like the Ten Commandments written in stone; it’s what
she would always call “the book of suggestions.” What could, should, or might happen but
doesn’t have to happen. The only thing that they are deciding when they make this vote tonight is
not about the future other than will those two buildings remain. They are buildings on the
National Register of Historic Places. Again, no they are not 1600’s or 1700’s buildings but not
everybody just looks at the architecture of the building. A lot of people follow history through
how they developed. Originally, if you want to think about it, there were thirteen brick houses
here in this area, in what we consider Kent County. Then slowly, they built different style houses
so that the people who were serving or working for or bringing goods to the people that had the
money to build the original houses. That is kind of how it developed. It’s not like modern day
development where people want to live near this so they build a beautiful new modern home
development out west or east or something. It’s how people lived back there; they all kind of
lived together. Again, there is no guarantee and all that they are voting on here is to say if they
agree with the Historic District Commission. They made a decision and do we agree with them?
Are we going to uphold them? They have had an opportunity to tell us. Are we going to let them
(the applicant) do what they want?
Mr. Witham stated that as he understands it, what was before the Historic District Commission
was an application and a public hearing was conducted in review of an action on the
Architectural Review Certification for a Demolition of two existing structures in the Downtown
Dover Historic District. The vote on both applications was 2-1. So the Appeal is an appeal of that
decision. Before us today is whether we agree with the Appeal or are we going to reverse the
Appeal. What we do by that action is we are saying that they are going to give an Architectural
Review Certification for the Demolition of the two buildings. He reviewed what the Historic
District Commission is designed to do and primarily they are concerned with the preservation of
historic buildings; a laudable thing to do and we all support that he believes. They are going to
have a strong presumption that those buildings should be preserved. In the notes, he sees that
they say when you move historical buildings out of or into or within the Historic District, it
should be discouraged. The moving of historic buildings within the Historic District has the same
effect as demolition. He doesn’t think that they really cared about whether or not they were
going to move them and what the cost would be; they were concerned about the preservation of
these two buildings. He doesn’t consider that as a major impediment for our decision.
Responding to Mr. Witham, Mrs. Denney nor does she.
Mr. Witham stated that their marching orders from the Code is that they are more than just
22
Page 23
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
interested in preserving buildings. They are here to make sure that whatever is being built in
Dover is designed correctly, is placed correctly, and does not have an adverse impact on
surrounding property owners. It will improve the City of Dover. Our interest is broader than the
Historic District Commission. He is saying that as his thought process. It seems to him that if the
City of Dover has approved this long term Plan called the 2030 Master Plan of Downtown Dover
which has been approved by the public, that if it’s our position to reverse this, then they would
are supporting that Plan.
Mr. Witham moved to reverse the order of the Historic District Commission and authorize the
Architectural Review Certification for the Demolition of the existing buildings and his proposal
would apply to both properties.
Mr. Reaves stated that he thinks that they are still in discussion and he would like to further the
discussion before there is a motion. He thought that in the process, the Vice Chair would say that
she was moving the floor to a motion rather than someone just making it from the beginning with
no discussion. He doesn’t think that’s the process; so, he thinks that they should continue with
discussion. Responding to Mr. Reaves, Mrs. Denney stated that in order to discuss it, there has to
be a second to a motion. That brings it forward so that we can have discussion on it.
Mr. Witham withdrew his motion since there was a need for more discussion.
Mr. Reaves stated that as they were on the path of having a discussion to talk about what’s going
to transpire with regard to the Architectural Review Certification for Demolition, the thought of
what’s going down into the Dover District should be irrelevant to our decision of deciding on the
demolition. It should not be based on what’s going to be built. It should be based on the decision
of the historic buildings and what is required for demolition. Responding to Mr. Reaves, Mrs.
Denney stated that she agrees that they should not be entertaining what comes next because they
are addressing an Appeal from the Historic District Commission because they voted not to allow
these historic buildings to be demolished. You are absolutely right in what you are saying and
suggesting.
Mr. Reaves stated that what he would like to contribute to the discussion and Mrs. Melson-
Williams can give more clarity to this, but it’s the supplemental document which calls for
demolition and the characteristics of the demolition. He is not sure of the name of this document;
however, he has not received enough information from the presentation to understand that these
buildings meet the criteria for Demolition according to what is reviewed by the Historic District
Commission. He just does not see that at this point in time. Responding to Mr. Reaves, Mrs.
Denney stated that she agrees with him. She also read, although it’s a Draft and they came at the
eleventh hour, but in what they received from the Historic District Commission in their Minutes,
it gives you a greater understanding of why they voted no.
Mrs. Welsh stated that on Page 4 of the package under Demolition and it says “the proposal for
demolition of the building must be reviewed for conformity with the design criteria guidelines
found in Chapter 4” and it lists the names of the Chapter. Skipping down it says “these
guidelines are summarized below and an excerpt of Chapter 4 is attached.” Then it has five
guidelines. The first one is “determine the financial implications of maintaining a property versus
23
Page 24
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
demolition.” Then “regardless of economic issues, the relative significance of the individual
building slated for demolition shall be evaluated.” Number 3 says “in development related
applications, the City should review the schematic plans for the new structures to weigh the
virtues of the new structure versus what exists.” She is not sure that that doesn’t tell them to
evaluate more than just demolition. Can Mrs. Melson-Williams clarify that? Responding to Mrs.
Welsh, Mrs. Melson-Williams stated that there is not always a “what’s next” if that makes any
sense. Number 3 of that demolition criteria talks about “in development related applications, the
City should review the schematic plans for new structures to weigh the virtues of the new
structure versus what exists.” So, if this was a combination application where the Request for
Demolition was also accompanied by the new building. They have seen that with some
applications in the past but that is not the case with this one. They chose to do a step at a time.
The Request for Demolition was the first step here and that is all that they brought forward.
Certainly in their presentation, they gave some suggestion that this is related to a project for the
Mobility Center to come, but the Commission is not doing Architectural Review Certification on
the project for the Mobility Center. How it would be constructed, what does it look like, and all
of that; that is not what is before the Commission.
Mrs. Welsh stated that clarifies that paragraph for her.
Mr. Cooper stated that he understands everything that we have said and he has read the five
bullets. It’s hard to ignore the gigantic elephant in the room when looking at this discussion. We
have what he believes is a perceived parking issue in Downtown Dover at our current state of
50% businesses occupied. He doesn’t visit the Downtown as much as he should and he doesn’t
support the businesses as much as he should but he has never had trouble finding a parking
space. With that being said, when we get to a point where we are 100% occupied and we get to a
point where we have apartments over retail and so on and so forth, the elephant that’s in the
room is going to be needed. We can’t get there from here. He hates to see an old building go as
much as anybody else. He lives in an old historic house, but he also understands that we can’t get
to where we want to get to as a city with our Comprehensive Plan, with DDP’s plan, and with all
of the Plans that are involved without moving in this general direction. So, he is having a hard
time separating the two.
Mrs. Denney stated that frankly she can think of other areas like what she always calls the old
Acme Building, on Governors Avenue which is a huge lot much bigger and could certainly
accommodate a parking garage. Although she honestly doesn’t believe that parking garages
belong in historic venues unless they look historic, but that’s just her personal opinion. There are
other places that could accommodate them, especially with the new Family Court Building
which is not a vision; it’s a reality that is being done now. That would be a perfect area and
actually, to me, she has never had a problem parking but we are going to have new development
with this Downtown revitalization. But nowhere when they were charged with this were they
told that they were going to that. They were going to do something but to take away some of the
historic stuff either to her, there are other places for a parking garage. Obviously, the parking
garage is going to include apartments somewhere in the vicinity but there is room for both there
on that lot as well.
Mr. Cooper stated that he thinks the lot on Governors Avenue with the old Acme is under
24
Page 25
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
different ownership and he has heard rumblings that there are other plans for that so this couldn’t
go there. Responding to Mr. Cooper, Mrs. Denney stated that we are really not voting on what’s
going there in the future. We are voting on whether we are going to support our Historic District
Commission in what they said. Either we are or we’re not going to support the Historic District
Commission’s decision.
Mr. Witham stated that not to offend anyone, in his view, this train has left the station for these
two houses. For these two houses, he has heard nothing on the record that some famous person
lived in these houses or that they may be a representative of good architectural structures in
Dover. One is Victorian and the other is a different type of really quite interesting structures;
however, there are other structures just like these throughout Dover. The problem with these two
houses is that they are unoccupied, they are deteriorating, and the owners want to sell and the
Downtown Dover Partnership wants to buy them. So what is going to happen? Are we going to
make Downtown Dover Partnership maintain those properties? At what cost? We don’t have the
power to do that by this Commission, but is that what the citizens of Dover expect them to do? If
so, that’s not going to happen. They will come with a different plan. The plan may fail given
what we have heard tonight. We may be facing another 10-20 years of Dover going through the
same process that we have gone through the last 20 years of not getting anything done.
Mr. Reaves stated that he didn’t’ necessarily hear all of the additional information about the
owners of the property wanting to sell, but he might have missed that information. Responding to
Mr. Reaves, Mrs. Denney stated that she thinks she missed that information as well.
Mr. Reaves stated that it just seems like it’s information that is added to this conversation;
however, because the Historic District Commission voting like they did, he believes that they put
a lot of thought and effort and understanding into what they were making a decision on. He
thinks that for them to just overturn it that could be a mistake. However, when you look at the
scheme proposals with regards to the second scheme of parking, it then allows for the additional
parking and it allows for the preservation of the buildings. In his opinion, he thinks that voting
just to overturn a Board’s decision as we are a Board/Commission also; he thinks that has to be
well thought-out before we just arbitrarily do that.
Mrs. Denney stated that would be her sentiments. Again, they had a hearing and we have a Draft
of the Minutes. She doesn’t think that they just arbitrarily made a decision either. Unfortunately,
because of the rules and procedures for this meeting, a representative from that group can’t stand
up and tell their side because essentially they are appealing what was done and what’s in the
minutes. She does not disagree with Mr. Reaves.
Mr. Reaves stated that unless there is more Commission discussion on the floor or we are going
to continue discussion, he would like to make a motion when that time comes.
Mr. Witham stated that he draws at inference at the fact that the Downtown Development
Corporation has gotten commitments from the owners of these properties to buy them. Why else
would they present this Plan if they did not believe that they could control these properties? He
disagrees, respectfully to Mr. Reaves’ position. He thinks that you can draw that inference from
the discussions. Responding to Mr. Witham, Mrs. Denney stated, again, we are not here because
25
Page 26
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
they could say yes, tear the buildings down, and there is nothing written in stone saying what
they are going to do next. That really can’t be part of what we are here for. We are here and our
lens is focused on after the Historic District Commission’s hearing and their recommendation
and their vote. Do we agree with our Historic District Commission or do we go against them; and
it’s with regard to the structures of these two buildings.
Mr. Reaves stated that on Page 4-11 of the Supplement, it says the following criteria should be
evaluated and considered for applications for demolition of historic buildings within Dover
Historic District: “to determine the financial implications of maintaining property versus
demolishing it. The City may ask an applicant to submit documentation pertaining to differential
costs, structural soundness, or suitability.” He has not heard in the presentation, anything about
the differential cost or the structural soundness. They spoke to the estimated market value of the
property but he didn’t hear anything with regards to that. He believes that if the Downtown
Dover District was offering some compensation for these properties, he believes that it may have
come out in their presentation but he did not hear anything with regards to that. Responding to
Mr. Reaves, Mrs. Denney stated that she can’t recall anything in the Draft Minutes. Again, they
had hearings and the same group of people had an opportunity to speak; and they (the Historic
District Commission) made the decision. That is all that we are here to discuss; not whether they
should do what they proclaim they propose to maybe do. What is before is before us is do we
agree with the decision of the Historic District Commission or not. She managed a town once
and she chairs a Board for Kent County. The people who speak at those particular meetings
come and are sworn in by an attorney. That doesn’t happen here; it’s far more casual. Nobody is
signing agreements or swearing to anything that will happen. She gets what Mr. Witham is
saying about do we want to discourage the Downtown revitalization; and certainly that’s not the
point, but she has seen buildings with brand new stuff built around the preservation of old
historic buildings just to keep the flavor of what’s going on.
Mr. Witham stated that he has a technical question and it may be just because he doesn’t know
what City of Dover approved. Has the City of Dover approved this 2030 Downtown
Development Plan? Responding to Mr. Witham, Mrs. Melson-Williams stated that the
Transforming Downtown Dover: Capital City 2030 Plan was a plan that was commissioned by
the Downtown Dover Partnership. They had a number of partners that participated in its
development. Certainly the City heard presentations on it but it is not a formal application or
plan that required action by the City Council or even this body as kind of a regulatory process.
It’s certainly in the City’s Comprehensive Plan which is formally adopted by the Planning
Commission and City Council and certified by the Governor. It has a number of things that focus
on Downtown and its redevelopment and about development citywide, but the Transforming
Downtown Dover Plan is not adopted in the same fashion.
Mr. Reaves moved to deny the Architectural Review Certification of demolition of 148 and 150 S.
Bradford Street in support of the Historic District Commission’s decision that was previously
made.
Mr. Witham stated that he believes that the more appropriate motion would be to affirm the
decision of the Architectural Review Certification under the Historic District Commission’s
decision.
26
Page 27
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
Mr. Reaves moved to affirm the Historic District Commission’s decision to deny the
Architectural Review Certification for Demolition of 148 and 150 S Bradford Street, seconded by
Mrs. Denney and the motion failed 2-4 by roll call vote with Mr. Baldwin, Dr. Jones and Mrs.
Maucher absent. Mr. Reaves voting yes; to affirm the denial of the Architectural Review
Certification for demolition based upon the reasons for the opportunity for the development of
the parking in support of the future goals of the Downtown District and also preservation of the
historical buildings that we have in Dover. Mrs. Welsh voting no. Mr. Cooper voting no. Mr.
Roach voting no; he would like to demolish the buildings and he feels as though the parking is
needed and preserving the Historic District is not lost entirely by two buildings. He feels as
though the parking is definitely needed. He knows that other people say that they haven’t had
parking issues, but he has had them a lot because he frequents that area often. Mr. Witham
voting no; he votes to reverse the decision of the Historic District Commission on the
presentation that they made before their Commission. The reason why is because the City of
Dover is waiting for redevelopment. Many people have had the opportunity already. It’s
confirmed already in the record not by the City of Dover as an official plan but most people
wanted to support this redevelopment. If we don’t allow these two houses to be demolished, then
we are going to hold up the process; and in terms we may lose $25 million unless the applicant
can move promptly to come up with a better plan, but the time bomb is ticking on the situation.
Mrs. Denney voting yes; she believes that this wasn’t just a quick decision that was made by the
Historic District Commission. She thinks a lot of thought went into it. She thinks that they can
still have a parking lot if they need a parking lot. What they probably can’t have is a parking lot
and a bunch of apartment buildings and a paid parking lot. She goes Downtown now and parks
for free and she enjoys that ability. Once there is a business there for paid parking, she’s not
sure that’s going to help businesses Downtown.
Mrs. Melson-Williams stated that in light of the motion failing, she thinks it would be
appropriate to entertain an alternative motion so that it is clear on the action taken.
Mrs. Denney stated that Mrs. Melson-Williams is suggesting that we have another motion and
that it be an opposite motion. She is hoping that people will change their mind when they vote.
Responding to Mrs. Denney, Mrs. Melson-Williams stated not necessarily.
Mr. Reaves asked if it is possible in this appeal process to remand this to the Historic District
Commission. Responding to Mr. Reaves, Mrs. Melson-Williams stated that she thinks that
technically that may be an option, but the (Planning) Commission would have to give very clear
direction as to something that they (Historic District Commission) did not consider in making
their first action taken. She is not sure that it would yield any different result at this point.
Mr. Reaves stated that he believes that this Commission was not supplied with enough
information to either validate or refute the decision by the Historic District Commission. He
would feel like we are missing something because we don’t have the full picture in order to make
the proper decision. Also receiving the updated proposal by the Downtown Dover District
(Partnership) at the last minute in this forum doesn’t give an opportunity to all participants to
understand the gravity of the options that are available to preserve two buildings and also
provide for parking.
27
Page 28
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
Mr. Witham stated that he doesn’t see anything in the Code that gives us the power to act as a
court. We are not a court. We are an administrative body and he agrees with Mr. Reaves that
they could have gotten more information. He doesn’t think the Historic District Commission
went through the process properly to weigh all of the factors. They just simply heard testimony
and quickly made a decision. They didn’t support the votes; so, we don’t have a whole lot to go
on.
Mrs. Denney asked if they could table it. Responding to Mrs. Denney, Mr. Witham stated that
you will have to reconsider the vote and be prepared to entertain a motion to table the vote for
more information, but we have already voted so we would have to reverse that.
Mrs. Melson-Williams stated that Staff is getting a little uncomfortable if you are looking to do
some of what you mentioned, then we would actually need legal counsel to weigh in on it. You
have acted on a motion. She is not sure if that pertained to one or both of the applications. It
wasn’t clear but she would imagine that it meant both of them. These questions of remanding or
deferring action are treading in a territory that is going to be beyond Staff’s ability to answer
questions and we would need legal counsel.
Mr. Roach stated that he wants to echo what was stated earlier that we are not here to look at
what’s going on in the future. Our job here today is to make a decision. He feels as though
tabling it would kind of be irresponsible with the task that they are given this evening because to
say that we are going to table it, why would we table it if the original vote wasn’t approved?
Mrs. Denney said multiple times that we are here to focus on what we are going to do with the
information presented to us, not what is going to happen in the future. Now that it didn’t go in
that direction, he doesn’t think it’s fair to table it. Responding to Mr. Roach, Mrs. Denney stated
that some of what he said was broken. What she is trying to discern is if you making make a
motion to table it or are you saying that we should not table it?
Mr. Roach stated that he is saying that they should not table it because as stated by the Chair this
evening, we are here to make a decision based upon the information that we have. He doesn’t
know why we would table it now since the vote didn’t go in the direction of the Historic District
(Commission). We were okay making that vote without the information to support the Historic
District so why would we want to table it.
Mrs. Denney stated that essentially Mr. Roach thinks that we should not be tabling the motion.
Mr. Reaves asked if Mr. Roach could see the screenshot that is on the screen now. Responding to
Mr. Reaves, Mr. Roach stated yes.
Mr. Reaves stated that in regards to that and you said that your interest in your vote was for the
parking, but the Scheme B provides for parking and it also provides for the preservation of the
buildings. He just wants to understand what Mr. Roach’s position is as far as the demolition. Is it
just the parking or is it just the demolition of the buildings? Responding to Mr. Reaves, Mr.
Roach stated that he is going based off exactly what they are saying. Mrs. Denney stated that our
job tonight is not to pay attention to what is going to happen in the future. It is just whether we
28
Page 29
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
are going to overturn or uphold the decision by the Historic District Commission. Why was it
okay for us to vote on it to support the Historic District Commission but then when we voted no,
now all of a sudden we talk about tabling it to get more information? To him, it seems
irresponsible that we can put it in a scope to just focus on whether we are supporting or not
supporting the Historic District until we are not supporting the Historic District. It just doesn’t
feel right to him.
Mrs. Denney stated again what it comes down to is do we or do we not support the Historic
District Commission’s decision.
Mrs. Melson-Williams stated that there is not a motion. Staff suggested a clarifying motion be
made because the motion was to affirm the decision of the Historic District Commission and that
motion failed 2-4. Responding to Mrs. Melson-Williams, Mrs. Denney stated that essentially she
is asking that the Commission reword it so that we affirm of vote of denying the Historic District
Commission’s ruling so that it’s clearer.
Mrs. Melson-Williams stated that she thinks its how Mr. Witham worded it earlier to reverse
their decision and grant the Architectural Review Certification for Demolition. Responding to
Mrs. Melson-Williams, Mr. Witham stated that he withdrew that motion and the motion that we
approved was to affirm that decision of Historic District Commission; therefore, the appeal is
going to fail.
Mrs. Melson-Williams stated that the motion that was made was to affirm the decision to deny
the Architectural Review Certification. The vote on that motion was 2 yes votes and 4 no.
Mr. Witham stated that the Historic District Commission voted to deny the application to
demolish the two buildings by a 2-1 decision on both houses. Responding to Mr. Witham, Mrs.
Denney stated that is correct.
Mr. Witham stated that what is before us is whether an Appeal of that decision. If we grant the
Appeal, then they will reverse the decision of the Historic District Commission. Responding to
Mr. Witham, Mrs. Denney stated yes.
Mr. Witham stated that he doesn’t understand Mr. Reaves’ motion. He made the motion.
Mr. Reaves stated that he made the motion to affirm the denial. The clarification would most
likely be to 148 and 150 S Bradford Street. But the motion would still stand as affirming the
Historic District Commission’s denial of the Architectural Certification of Demolition.
Responding to Mr. Reaves, Mr. Witham stated that means the Appeal failed.
Mr. Roach moved to reverse the Historic District Commissions’ decision in regards to 148 and
150 S. Bradford Street.
Mrs. Denney stated that just for clarification, Mr. Roach made a motion to reverse the decision
of the Historic District Commission. Responding to Mrs. Denney, Mr. Roach stated yes, for both
properties.
29
Page 30
CITY OF DOVER PLANNING COMMISSION JUNE 17, 2024
Mr. Witham asked if everyone understands the motion. Responding to Mr. Witham, Mrs.
Denney stated that she does. Her understanding is that it is to reverse the decision of the Historic
District Commission which would mean that they will be permitted to tear the buildings down.
Mr. Roach moved to reverse the Historic District Commissions’ decision in regards to 148 and
150 S Bradford Street, seconded by Mr. Witham and the motion was carried 4-2 with Mr.
Baldwin, Dr. Jones and Mrs. Maucher absent. Mr. Roach voting yes; because he feels as though
the upgrade as far as parking is more of a need in the Downtown Development project to keep
the City moving in the right direction. Mr. Witham voting yes; because he believes the reversal of
the Historic District Commission is necessary to further the improvement of the City of Dover
with the understanding that this is the first step. We are not just starting a parking lot; we are
bringing other businesses and apartments into the area and we need to have a fair and equitable
manner. Mr. Reaves voting no; because the Historical District had 2 votes to 1 with one person
being absent and another person recusing themselves. The outcome could have been more
favorable to prevent demolition of the buildings. He also feels that the parking objectives will
still be met with the buildings not be demolished. Mrs. Welsh voting yes; she really is torn about
it because she really in her heart is in favor of historical preservation but she has thought about
it and she’s seen Dover change over the years. She doesn’t see right now in the last few years, a
lot of growth or activity that are building up our Downtown or other areas of the City. She
understands the whole problem with vagrancy and things like that. She thinks that at some point,
they need to do something to start in another direction as far as addressing issues like that. She
thinks that just trying to take steps for revitalizing the City and it’s her thought that even though
there are two houses now that would be missing from the footprint of the City, that revitalizing
the City in the term and the future would preserve the majority of the other areas of the City
rather than have the City end up declining and we lose everything that is of historical
significance of the City. Mr. Cooper voting yes; for the reasons stated previously by himself,
Commissioner Witham and Commissioner Welsh. Mrs. Denney voting no; she doesn’t think that
they have to destroy those buildings in order to improve that lot. She thinks that if somebody
wants to go to the back of the lot and put up a giant money making condominium building or
apartment building with parking underneath of it; great, but she absolutely doesn’t think that a
parking garage goes there.
Meeting adjourned at 10:21 PM.