Historic District Commission Meeting Packet
Historic District Commission. Jun 18, 2026.
This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.
32 pages have little or no readable text here, often scans or drawings. See the PDF for those.
Page 1
CITY OF DOVER, DELAWARE
HISTORIC DISTRICT COMMISSION MEETING
Thursday, June 18, 2026 at 3:30 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
IN-PERSON and VIRTUAL MEETING NOTICE
The The Historic District Commission Meeting for Thursday, June 18, 2026 will be held as an In-Person Meeting at the City Council Chambers. The public is welcome to attend in person. The Meeting will also be provided as a Virtual Meeting using Webex, an audio/video conferencing system as an electronic means of communication. See the participation information below to join by phone or computer.
PUBLIC PARTICIPATION INFORMATION
City of Dover Historic District Commission Meeting of June 18, 2026
Join By Phone: Dial 1-650-479-3208
Access Code: 253 376 83789
Password from Phones: 36837432
Join Online: https://bit.ly/HDCMeeting06182026
Webinar Number: 2533 768 3789
Password: DoverHDC
If you are new to Webex, get the app now at https://www.webex.com/ to be ready when the meeting starts. For problems accessing the meeting, please call the Planning Office at (302) 736-7196.
WELCOME
ROLL CALL
APPROVAL OF AGENDA
APPROVAL OF MINUTES
- 1.Adoption of Minutes of November 20, 2025
- 2.Adoption of Minutes of February 19, 2026
COMMUNICATIONS & REPORTS
Summary of Activity
1
Page 2
HISTORIC DISTRICT COMMISSION MEETING - June 18, 2026 PAGE 2
- 3.Summary of Applications 2025 and 2026
- 4.Summary of Architectural Review Certifications for 2026
Department of Planning & Inspections Updates
REVISED APPLICATION
- 5.HI-24-07 Legislative Hall Building Addition at 411 Legislative Avenue: Revision for West Entrance ADA Ramp – Review for Recommendation for a Revised Architectural Review Certificate for the addition of an ADA Ramp located at the West Entrance of Legislative Hall. The proposal includes an approximately 160 feet proposed ramp in length, while also providing access to a new accessible entrance created within the exiting west façade. A temporary ramp may also be proposed for during construction. This is associated with the Site Development Plan for the Legislative Hall Building Addition project. The main property of 2.80 acres+/- is zoned IO (Institutional and Office Zone) and subject to the SWPOZ (Source Water Protection Overlay Zone) and the H (Historic District Zone). The subject property is located on the east side of Legislative Avenue as the block between Martin Luther King Jr. Boulevard North and Martin Luther King Jr. South. The owner of record is the State of Delaware. Property Addresses: 411 Legislative Avenue and Court Street. Tax Parcels: ED- 05-077.09-05-15.00-000 and ED-05-077.09-05-14.00-000. Council District 4. This Application HI-24-07 was considered at the Historic District Commission Meeting of October 17, 2024 and granted conditional approval of the Site Plan and Architectural Review Certification by the Planning Commission with Application S-24-19 Legislative Hall Building Addition on November 18, 2024.
NEW APPLICATIONS
Review of Permits Referred to Commission
- 6.HI-26-02 Referral of Siding Permit #26-848 at 108 S. Governors Avenue - Review of Architectural Review Certification as Referred by the City Planner to the Historic District Commission for a Siding Permit #26-848. The project proposes the use of a vinyl siding product in a horizontal format to reclad the three-story residential apartment building. Property is zoned C-2 (Central Commercial Zone) and subject to the H (Historic District Zone). The owner of record is Sarwat Nasr. Address: 108 S. Governors Avenue. Tax Parcel: ED05-077.09-01-41.00-000. Council District 4.
NEW BUSINESS
OLD BUSINESS
Certified Local Government (CLG) Program
Implementation of 2019 Comprehensive Plan
PUBLIC COMMENTS OPPORTUNITY – An opportunity is given for members of the public to provide comments to the Historic District Commission not specifically related to Applications with Public Hearings.
ADJOURN 2
Page 3
HISTORIC DISTRICT COMMISSION MEETING - June 18, 2026 PAGE 3
Posted: June 11, 2026
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING
3
Page 4
Item 1.
CITY OF DOVER
HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
The Meeting of the City of Dover Historic District Commission was held on Thursday, November 20, 2025, at 3:30 PM as an In-Person Meeting in the City Hall Council Chambers (anchor location) and virtually using the audio/videoconferencing system Webex. With Chairman Czerwinski presiding, the other members present were Mrs. Richardson, Ms. Baker, and Ms. Horsey.
The Planning Office Staff members present were Mrs. Melson-Williams, Mrs. Savage-Purnell and Mrs. Duca.
APPROVAL OF AGENDA
Ms. Baker moved for approval of the agenda as presented, seconded by Ms. Horsey and the vote was unanimously carried 4-0.
ADOPTION OF MINUTES OF THE REGULAR HISTORIC DISTRICT COMMISSION MEETING OF AUGUST 21, 2025 Ms. Richardson moved for approval of the Meeting Minutes of August 21, 2025, seconded by Ms. Horsey, and unanimously carried 4-0.
COMMUNICATIONS & REPORTS
Summary of Applications 2024 and 2025 Mrs. Melson-Williams mentioned in your meeting packet was the Summary of Applications. This is where we kind of keep a running tally of the Applications that appeared before the Historic District Commission. In 2024, there were a total of nine (9) Applications. Some of them have been completed, some of them are underway, and some have yet to fully start. I will note that the Legislative Hall Parking Garage, which was Application HI-24-04, did receive its final plan approval. We are awaiting submission of a Building Permit for them to move towards construction. My understanding is that they are probably out to bid at this point for that. And then the other one from 2024 for an update is HI-24-08 for the property at 21 North American Avenue. That project is progressing through its construction to convert what was a duplex into a single-family house. And then in 2025, today we will be dealing with our fourth Application of the year and revisiting one from earlier this year. So, we will talk about that in a bit. But so far in 2025, you've only had four (4) Application items.
Mrs. Melson-Williams asked if there were any questions on the Application status. There were none.
Summary of Architectural Review Certifications for 2025 Mrs. Melson-Williams stated that this chart is really a tracking of the permit activity within the Historic District Zone of the City. Primarily for the Historic District, you are focused on the outside of the building. This chart is tallied through the end of October based on the calendar year for 2025. There have been 32 Permit Applications in the Historic District. This does not include plumbing, mechanical, or fire protection permits. Of those 32 Permits, 28 were either done with Staff approval or did not require review because of the location or type of project that was under
4
Page 5
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
Permit. There were four Permits that the Historic District Commission was involved in. Staff then issue the Permit on your behalf with those conditions.
Mrs. Melson-Williams asked if there were any questions on permit activity in the Historic District.
Chairman Czerwinski asked for Sign Permit # 25-1390 on 108 West Loockerman Street if it was a lit sign and/or what is the details of that sign? Is it a Sign that just matches everybody else’s? Mrs. Melson-Williams replied I believe that was really a change of tenant at that location. There's a projecting hanging sign as the wall sign. I'm not sure if it's on the wall surface or on the roof. There's a pent roof at that location, so I'm thinking it's not. That building does not have a box sign which you are thinking of.
Chairman Czerwinski said I'm just trying to think which building is 108 West Loockerman Street. Mrs. Melson-Williams replied I believe it's the last building next to the park area, the Loockerman Way Plaza. And it's been several different restaurants over time. It's like a two-story brick, has a pent roof, has a storefront, and a take out kind of window at the front of it.
Chairman Czerwinski does anybody else have any questions? There were none.
Department of Planning & Inspections Updates Mrs. Melson-Williams mentioned that there were no particular updates. We did have a new Code Enforcement Inspector that started this week. It's filling one of the open positions because we had a retirement earlier this fall in that Division of our overall Department. There are still a number of vacancies across the Department in general that we're hoping to fill sooner rather than later. With that I'm happy to move on to the Special Recognition.
Special Recognition Mrs. Melson-Williams mentioned on your agenda today is a Resolution honoring the service of Mary Mason to the Historic District Commission. Mary was a member and chose to resign her position in late August. So as is the tradition for this body, Staff prepares a Resolution that the Commission then adopts, and we make that Resolution available to the honoree. I don't believe Mary has joined us today. I do not see her virtually, but we'll make sure that she gets the Resolution. Maybe one of her neighbor friends can deliver it to her. The Resolution reads as follows:
RESOLUTION
Whereas, Mary T. Mason became a member of the City of Dover Historic District Commission in February 2018 and has served with diligence and distinction in this capacity as an advocate for implementation of the Historic District Standards and Guidelines to maintain the historic character of the city’s Historic District; and,
Whereas, Mary T. Mason has played a key role in ensuring fundamental fairness and careful forethought in the planning and development of the Capital City through her service on the Historic District Commission; and,
2
5
Page 6
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
Whereas, Mary T. Mason as a resident of the Historic District has shared her knowledge of Dover and The Green and its history in reviewing applications presented to the Historic District Commission; and,
Whereas, Mary T. Mason has influenced the pattern and appearance of development in the Historic District in Dover through her contributions to the development of the Historic Preservation chapter of the 2019 Comprehensive Plan; and,
Whereas, Mary T. Mason completed her service on the City of Dover Historic District Commission on August 23, 2025.
Now Therefore Be It Resolved That, the City of Dover Historic District Commission does hereby express its sincere appreciation to Mary T. Mason for her faithful and exemplary service to the Citizens of the City of Dover as a member of the City of Dover Historic District Commission.
And upon adoption of this Resolution, it will formally be signed by Eric Czerwinski, who is the Chair of the Historic District Commission and I, Dawn Melson-Williams as the Principal Planner for the Planning Office that supports the Commission as Staff. And it is dated today.
Chairman Czerwinski mentioned that we all very much dearly treasure Mary’s service to the Historic District Commission.
Ms. Horsey stated that as the person who recommended Mary to the Mayor to serve, she would like to move that we adopt this Resolution honoring the services of Mary Terry Mason to the Historic District Commission. The motion for the Resolution was seconded by Chairman Czerwinski and unanimously carried 4-0.
Chairman Czerwinski mentioned and again we send her off with our sincerest thanks for the service she's done to this Commission.
NEW APPLICATIONS
Review of Permits Referred to Commission HI-25-04 Referral of Fence Permit #25-1463 at 55 Kings Hwy SW - Review of Architectural Review Certification as Referred by the City Planner to the Historic District Commission for a Fence Permit #25-1463. The project proposes a 6-foot vinyl fence on the side and rear property lines. Property is zoned C-2A (Limited Central Commercial Zone) and subject to the H (Historic District Zone). The owner of record is RVC Three, LP c/o Colonial Investment. Address: 55 Kings Highway SW. Tax Parcel: ED05-077.05-04-62.00-000. Council District 4.
Mrs. Melson-Williams mentioned that she was not sure if there was a representative in the room representing the Application. We do have a call in-user so let me check with them. She asked if they were there in regard to the Fence Permit Application that was referred to the Commission? If so, if you can identify yourself for the record. I am not seeing anyone here representing this Fence Permit Application that’s been referred to you. I certainly can present the Permit if you want to take action as a follow-up to that or defer waiting until an applicant is in place. We can certainly
3
6
Page 7
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
start the discussion. They were notified by email of all the contacts that we had for that Permit about today's meeting and then provided a copy of the initial Staff Report. At this point in time, if there's no objection I will continue with it.
Mrs. Melson-Williams gave a brief Staff overview of the Application. As noted, this is Fence Permit # 25-1463. It is a Fence Permit for the property at 55 Kings Highway SW. As submitted to the Planning & Inspections Office, it was a permit to construct a 6-foot vinyl fence on the side or north property line of the property and also along the rear or east property line of the property. The subject site is the Merrill Lynch office building that is west of here on Kings Highway.
SLIDE PRESENTATION
We go to the next slide. This shows the presentation of where the building is in relation to the two fence segments. Kings Highway is at the bottom of the page. Highlighted in yellow is where the Permit identifies the placement for the 6-foot vinyl fence. I will note that the office building is existing and there is a parking lot to its rear. On the left-hand side of the building, there is an entrance drive and that is how you reach the parking that is at its rear. The office building is set back 15.3 feet from the front property line. I make note of that because the front yard setback for this property would be 15 feet. With Fence Permits, normally it's a review by Staff as part of the Permit process. However, if there is some concern about the ability to issue the Architectural Review Certification, Planning Staff can refer it to the Commission for additional consultation about the request. Their request is to propose a fence that is 6 feet in height. As you're aware, the Design Standards and Guidelines for the City of Dover Historic District Zone note that fences should not exceed 4 feet in height. And then it goes on to recommended, not recommended, and inappropriate practices for fences as related to materials. Also Planning Staff looked at the regular rules for fences that are found in our Zoning Ordinance. It does limit fences to a height of 4 feet within the front yard setback. So, that would be the portion of the fence that's immediately at the front of the building. Before it passes it, that would also be limited by our regular code to 4 feet in height and then it could be that up to a fence height of 8 feet.
Today the Historic District Commission should consider this Fence Permit. We can go to the image cause that's probably the best way to address this. In this image the building is kind of in the center as a gray roof. The Kings Highway is to the left-hand side, and this would be a Fence Permit that would place the fence on its north property line kind of just off the entrance drive aisle and then along the back parking lot, on its east side where you see existing evergreen trees.
Planning Staff first gave some basic findings regarding the Fence Permit, and I've kind of described the kind of the facts of the case, if you will. The fence would likely be very visible from Kings Highway for the side fence segment with only a portion of the rear fence being visible. So, I'm going refer to you to page three of the Report for that summary. Planning Staff have made a Recommendation and that's found on page four. And, in that we have made some recommendations regarding the side fence and the rear fence. I am happy to try to address any questions that you may have. At this point, the Commission could seek questions, answers to questions, and could actually consider making a Recommendation on this at which time we would inform the Applicant of that. You could certainly defer action and request that the Applicant appear before you, in order to sort this out.
4
7
Page 8
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
Chairman Czerwinski said thank you very much, we appreciate it.
Chairman Czerwinski mentioned right off the top, I have obviously a lot of problems with this one. I'm not sure if we should just defer it or turn it down because there's so many changes. We know right off the top of the head that the height of 4 feet, putting a 6 feet fence right onto the sidewalk like that’s pretty extreme. So, without talking to the owners or the project manager on this one, I'd almost think we'd have to defer it or just turn it down altogether.
Mrs. Richardson agreed with Chairman Czerwinski.
Mrs. Richardson said normally with these requests there is a letter accompanying, explaining the need and that's my question, why? Why are they? I don't like it at all with the 6-foot vinyl fence, and certainly not out to the curb in the front. In the back, there appears to be a line of trees which already provides visibility, but I just can't understand why they are putting this fence up. I think we need somebody to represent.
Ms. Horsey mentioned she agreed. I couldn't agree more. Unless there is a lot of mischief, I do know that the Governor's House, which is just north of here had some mischief, but they did put a fence in, and it's curbed a lot of that trespassing of walking through and between properties. And perhaps that's the reason, but I certainly agree that we need to be consistent in the Historic District and require the metal fence instead of vinyl because it is just not appropriate period, especially on the street front.
Chairman Czerwinski stated because in this case the materials are wrong. We have approved vinyl fences in the past, but those were very limited visibility. In this case it is extremely visible. It's 6 feet. They should go with the metal fence and it's a metal 4-foot fence that fits in with the area. This is extreme.
I don't know if you want to defer action to talk to the members or if you want to get a motion to do that or if you want to just decline it all together.
Ms. Horsey mentioned that she did not think the Commission could approve it today without questions being answered. So, can I get a motion to defer?
Mrs. Richardson made a motion to defer Application Hi-25-04 until the Applicant can provide someone who can answer some questions. The motion was seconded by Ms. Horsey and unanimously carried 4-0.
Mrs. Melson-Williams mentioned that Planning Staff will attempt to have them here before the Commission at a future time. We did have an early conversation with their fence contractor, but to advise referring it to the Commission. We have not heard since that point in time. But we will follow up.
NEW APPLICATIONS
Revised Application
5
8
Page 9
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
HI-25-01 Revised The Old Post at 55 Loockerman Plaza - Public Hearing and Review for Recommendation on Revised Architectural Review Certification for redevelopment of the Old Dover Post Office property consisting of 1.267 acres for a mixed-use project known as The Old Post as revised. This application previously came before the Historic District Commission at their February 20, 2025 Meeting. The project involves the demolition of the rear warehouse portion of the existing building and adaptive re-use of the front 4,560 SF portion of the building for commercial retail and business space. In this Revision are proposed increases in apartment unit count from 36 to 42 units and architectural changes consisting of a second-floor addition to the front wings of the building and a four-story 43,092 SF building addition proposed for forty-two (42) residential apartment units and with parking and other site improvements. The property is zoned C-2 (Central Commercial Zone), subject to the SWPOZ (Source Water Protection Overlay Zone), and subject to the H (Historic District Zone). The property is located on the north side of Loockerman Plaza and adjacent to Innovation Way. The owner of record is The Old Post, LLC. Property Address: 55 Loockerman Plaza. Tax Parcel: ED-05-077.05-04-53.00-000. Council District 4.
Mrs. Melson-Williams gave a summary of Application HI-25-01 Revised.
Mrs. Melson-Williams mentioned that the Commission saw the Application back in February of this year. The development team has slightly changed, and they have in moving forward with this Application have made some revisions to the project. Those revisions necessitate it to be returned to the Historic District Commission for a revised Architectural Review Certification. And also to the Planning Commission, which will happen after you all deal with this. So, our Report really focused on just really updating the original report that was issued back in February. We did include a copy of that in your packet for reference since we have at least one new member since that time.
But this is for the Old Dover Post Office building site. The project itself retains the front building area and would demolish the rear kind of warehouse portion of the Post Office building. With their new project, they are looking to add a second story to what I call the front wings or the pieces that are outside of the columned central portion there. The rear addition where the bulk of the apartments are located would go from a three-story addition to a four-story addition. The parking lot still continues to generally be in the same place, and the site has some lawn areas and landscaping around it and of course their sidewalks.
The biggest portion of their project is the change in the number of stories and then these additional wings at the front. So, the Historic District Commission has to make a Recommendation on the project involving consideration of the partial demolition and the Architectural Review Certification for the new construction. As noted previously, you did grant approval to an Architectural Review Certification for this project. With this addition or revisions, Planning Staff and with the help of our Planning Consultant has gone through and developed a series of Staff comments and recommendations. Those began on page nine and continue for several pages. What I will note is your initial packet included a series of their architectural graphics package. This is the opening slide to that, and then one sheet of their Site Plan. What you found on your desk today, they are updates. The Applicant has in reading some of the Staff comments clarified some things on their Revised building elevations. There are two sheets that present all four sides of the proposed building project and then also there is a more complete Site Plan set, if you will, that helps to
6
9
Page 10
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
answer, if you look at the Site Plan and then the Landscape Plan, some of the questions about what's happening around the building in particular.
Planning Staff have not fully gone back through our comments to see which ones were addressed, but a number of the comments that we have made about the architecture do appear to have been at least provided with additional information. The Applicant may actually share some more of that with us today. Staff will be more than happy to address questions, but I think at this point I would like to turn it over to the Applicant and their project team. I'm not sure which of them is going be the lead speaker to talk about the project and the changes that have been proposed here, including the most recent round of revisions.
Representatives: Mr. Sal Leone, Old Post LLC; Mr. Freddy Bada, Moonlight Architecture Inc., Mr. Chad Warren, Engineer; Davis, Bowen and Friedel.
Mr. Leone stated that he was a project manager for the Old Post LLC and Frank is one of the owners available on Webex. Frank can answer any questions you might have. Also, basically, as Dawn was saying, we just took the project that's been approved previously and added the two- story on the two wings and the fourth floor on the back. Everything else has pretty much remained the same. There were several pages of comments that we received this week that we responded to. I believe everybody has our responses to them. We brought some brick samples and everything too. So, the architects are here and the engineers are here. If you have any questions for them, we are more than happy to answer them.
Chairman Czerwinski asked if there were any questions.
Mrs. Richardson said she did not have any questions but stated that she agrees with the Recommendations that the Planning Staff has recommended.
Ms. Horsey mentioned that she was going to ask the same basic question. Do you agree with all the Staff comments that are in the packet? Mr. Leone replied yes.
Ms. Horsey had a question about the Landscape Plan. Are any of the existing trees or landscapes going to be kept? Is it all going to go away and new ones planted? Mr. Leone replied as far as I know, maybe Chad can help out on this one. There are just three trees in the front, right, that we were going to replace.
Ms. Horsey said they are mature trees, so do they have to be replaced? Mr. Leone replied that they are very low hanging trees though. They're kind of like you run into them when you walk under them, so we were going to replace them with maybe not something that large, but something that narrower and taller. Ms. Horsey said it's going to take a while to grow. Mr. Leone said they don't have to be replaced. Ms. Horsey said okay. Mr. Leone said it would look better for the site.
Ms. Horsey said it's going to take several years to get to the size that's shown. I also have a question on the boxwood that's planned. I know there's this boxwood moth that's eats every single boxwood it encounters. Unless this is immune from that boxwood moth, it's going eat those plants and you
7
10
Page 11
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
might want to consider like a holly instead of the boxwood, just as an FYI. Mr. Leone replied definitely.
Ms. Baker mentioned that she is also a Master Gardener. And yes, the box tree moth just arrived this year. And at the end of last year, it just took my boxwood and my neighbor's boxwood. It can be treated if you wish. And the treatments I understand from my colleagues have been effective. And indeed, my boxwood is now starting even at this time of year to rebloom. So, this is a positive thing. I have a question about ceiling heights and other things in the interior for optimally whoever wishes to respond.
Mr. Freddy Bada of Moonlight Architecture replied I am the project architect for the project. Ms. Baker asked how high the ceilings are in the apartments. Mr. Bada replied 9 feet. Thank you.
Ms. Baker commented that she sees a lot of wonderful things in what was on the desk today. It has the effect of making me feel as though you are understanding the role of this building, which is may be bigger than we all know because this is a consequential building here in Dover. This is the opening to Downtown. It is a gateway building. It must say something. It must welcome; it must be beautiful. Now, do you have some comments about how that has informed your designs? And do you have comments about the relative size. Well, it's going be a lot of people, right? People who live there, people who want to live there, people who are starting out, people who are doing well. If you have comments about how the apartments are managed; are they rented, are they sold? What is the situation? It would be very nice to know because this is really about people. It's not just about a storefront. It's about people coming and it's a 24-hour building, and that's one of the reasons it's so important to all of us. Thank you for all your hard work. Mr. Bada said sure, thank you.
Mr. Bada replied that you know the project's going to be run once it’s constructed, but to answer part of your question about being the gateway and the interest of the City of Dover. We understand it’s a very critical part because you're right, it is one of the first buildings that you will see when you come into Dover. Some of the initial thoughts when we had a single-story building from the original Old Post Office building was how the new building in the back of it would stand out or maybe take presence or be predominant over the front building. So partly by putting a second story on the wings of this building, we're actually using that building to kind of mask part of what might be the new building. Now the new addition is definitely aesthetically pleasing. We're definitely trying to keep up the historic feel with the brick and the EIFS match sort of cast stone and stuff like that, but I think this is also going to make it more present as you first come down that drive and split and see that front of that building. So, it's going give it a little more predominant, a little more aesthetic feel than what it has even now. And it's also going to be more in harmony with a lot of the existing State Buildings that are around the capital. So, that's how the building is going to look and feel when you first enter Dover. You also mentioned that the building's going be used and you know it's going be a centerpiece and people are going live there. As I said we are looking to get different tenants in this building. We want some business here. We wanted to draw people back down to Downtown Dover. You know, we want it to be a community, so people can live here, eat here and enjoy themselves here. We have in the Building Plan an area for storage, bikes, and other things, so people who live here can enjoy and ride around town and enjoy the town, and
8
11
Page 12
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
enjoy the city. But like I said, it's all walking distance to everything so those are the things that we are trying to bring to the Downtown core with this project.
Mr. Leone mentioned that they have a project in Clayton called Railroad Square Apartments that we manage. So, we'll be managing these apartments ourselves also with our management team. We keep everything in house; we don't farm anything out.
Ms. Baker said thank you. She asked, are these rental apartments? Mr. Leone said yes.
Ms. Baker asked, can you give a range? Mr. Leone replied sorry, offhand I believe, $1200 to $2000.
Mr. Bada mentioned that there is a mix of apartments. We have studios, one bedroom, two bedrooms and three bedrooms. We are not just focusing on one crowd. We are focusing on a lot of different groups. So, you know, the rent, you know, as Frank and Mr. Leone mentioned it will vary in a pretty wide spectrum.
Mr. Frank Dimondi mentioned that the range right now I think is for a studio is like $1500-$1550 up to I think and we've got three bedrooms here up to like $1900- $1950. So as Freddie mentioned, we're trying to, you know have a mix, for the single person that maybe is a nurse working at the hospital that may want a studio up to somebody that may be working Downtown or works and lives in the City of Dover and has a kid or kids for a couple of bedrooms for a total of three bedrooms. So as Freddie said, we are trying to hit all cylinders when it comes to being welcoming to singles to basically families there.
Ms. Horsey mentioned that she has some additional questions about the building itself and since we are talking about apartments and businesses, is the main entrance for the apartments off the parking lot as opposed to the front on Loockerman? Or can apartment people also go into the front door, for instance, and access business before they go to their apartments?
Mr. Bada replied, depending on who the future tenants are, we don't really have a tenant for the lower level, first floor at the front building right now. But depending on who that tenant is, there is the possibility for a connection. That floor is continuous right across through the building as it was in the original Post Office building. So, we could put a doorway to the back that connects through. The main entrances for the residential will actually be as you said, off the parking lot. And we have kind of two main entrances: one off of the side street and then of course one off the parking lot. So those will be the predominant ways that most people would probably funnel into the building. But you know depending on who goes in there, whether a coffee shop or someone gets in there, it'd be nice to run downstairs, go grab up the front and go get a pastry or if it's a restaurant run downstairs, go up front, go grab dinner or something. You know, I think a lot of buildings that you do go into that have the combo with the businesses downstairs that there is access, so you don't have to go outside if you do want a cup of coffee or maybe if there's a little grocer or whatever in there. The other comment I want to make is I like the massing that you have done. The addition of the fourth story really works because you've got dormers on the front which really makes a difference and keeps it in design relationship with the other State buildings, for instance. And I like the addition of more dental work in the cornices. I think overall it makes a good presentation. So, thank you.
9
12
Page 13
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
Ms. Baker mentioned that she lived for many years in Washington DC, Arlington Virginia and Alexandria Virginia. And I just want to mention that the studio apartment I rented in 1974 in Foggy Bottom was $150 a month and it's now $2,595. There’s Trader Joe's a block away. Everything alters and everything changes and there's just nothing but a possibility for us. But the other thing that I've noticed in Alexandria is there's a quartet of huge buildings that are apartment buildings. And they look so unseemly from the outside, you know, they look great together, right? But you walk in and it is a welcoming place.
There are places to sit or have a conversation with somebody without an obligation to buy something. There is a concierge desk and the taking of the mail. I would love you to address that; how you are going to distribute the mail in the building? But, at any rate, I just wanted to mention that.
I think that notion of welcome is extremely important and I thank you for paying attention to it. I urge the continuation of attention. And I like the fact that you are keeping the window on the tip of the pediment in the front and that is terrific. I would also invite you to consider “the” 18th century script hand and then Post below in Caslon Baskerville or some other kind of print expression. I'm very hopeful. Thank you.
Mr. Leone mentioned that they have definitely considered the name, but they just have not actually come up with where they were going to put that or what style.
Chairman Cserwinski asked how many additional units did those additional floors add? Mr. Leone replied six.
Chairman Cserwinski asked if there was adequate parking for this because there's been a lot of projects that have been waivered and we've had major parking problems. So, is this going to be adequate for this building? Mr. Leone replied that between what we have on site and the agreement we have with the City, we actually have more parking than we need.
Chairman Cserwinski said awesome.
Ms. Horsey said I have just another quick question. I think there was a comment that this parking lot would not connect to the library parking lot. Is there a reason for that? Just curious.
Mr. Chad Warren, Engineer with Davis, Bowen and Friedel for the project answered. Currently the way the grade is between the existing Post Office parking lot and the Library, there is about 4 feet elevation difference between the two. There is currently an existing ramp to get from the Post Office down to the Library and that will remain in place along with the sidewalk to carry you through to where the proposed easement is with the City of Dover for their additional parking spaces.
Ms. Horsey asked, is that in the back towards the north? There is access now. Mr. Warren replied yes. On this screen it would be at the bottom of the screen. At the bottom right of the screen, there's a cut through to come down to the Library and then there's a sidewalk between the two properties.
10
13
Page 14
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
Ms. Horsey asked if that would stay. Mr. Warren replied yes.
Chairman Cserwinski asked if there were any more questions? There were none.
Mr. Frank DiMondi, who joined virtually, mentioned that he did not have any comments. He certainly appreciates the opportunity to bring the project before the committee here. You know, I just want to remind everybody that our ownership group was one of a dozen bidders for the property. One of the reasons why I was told why we won the ability to be able to buy the properties was because of our commitment to keep the old Post Office look from the front of the building. And we committed that from day one and that obviously fit well for what we were trying to do and what the City wanted to see in that location. We understand its importance. We're excited about the project. You know, we're excited about a professional team that we put together, our Architectural Plan and our Site Plan. We appreciate your time tonight in hearing about the project and hopefully getting your approval to hopefully move this forward as quickly as we can. Thank you.
Mrs. Melson-Williams mentioned as noted earlier, the Applicant has responded to a number of the Staff comments in making their Revised Architecture submission, as what we will call it. I just want to highlight some of those items for the record. I was taking a look through it quickly this afternoon. The change to the use of Hardie siding on the dormers that are added to the front of the building. Some clarification on the gutter and drained downspout systems for the building that has the pitched roof. The introduction of a brick row lock at the brick transition. So, once you take the roof off the existing one-story portion, how do you make that transition to now continuing that brick wall? We had made a suggestion to do something at that point because it'll help alleviate any question of brick color and making that transition much smoother. There were updates to the window style to match the window light configuration that is currently present on the building, which appears to be twelve over twelve when you can see them through the screens and/or storm windows that are there. There was some clarification for the rear addition on how the EFIS would be scored. The rendering seemed to make it look like more of a brick pattern with a heavy grout to it. It appears that’s going to be a different approach there. The round window in the pediment has returned. It's actually a pretty cool feature and I think there's still space there to get the name of the building in whatever appropriate font script you deem for your project marketing. There were some things that could more clearly identify the different building entrances. And the one thing that I did have concern about was the connection of, we'll call it the existing building to the rear addition, and how those roofs interconnect. Because the last thing we want to do is create a place for water to live. So, it looks like they're proposing a roof cricket system, which is a way to make that transition. I think that's going to be a key detail as they move into more complex drawings for the project site overall. This project will have to go to the Planning Commission. The Planning Commission, in addition to looking at the Architectural Review Certification, will be looking at greater details in their parking strategy for this project. That's called out in the Zoning Ordinance about how that review process works and for their active recreation component. Their Landscape Plan is showing labeled areas on the east and west side of the building as a Zen Garden. I'm not sure really what that consists of because right now it looks like there's a lot of evergreen trees because I think there were holly’s and depending on which type of Magnolia it was on the other side of the building and how those spaces will function. I just wanted to make those notes.
11
14
Page 15
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
I do believe I did see a brick sample walk in the door. So, if the Applicant wants to show that to the Historic District Commission. This is a building built in Dover, so I'm more than guessing that the brick company has probably figured out what it originally was.
Mr. Leone said believe it or not, it is still available.
Mrs. Melson-Williams said that's why for brick in Dover when you buy local, you can probably still find it or know exactly what it is. If you want to share what that is, I don't know if it is a Glen Gary brick or something?
Mr. Leone said yes, it is a Glen Gary. It is called Rose Red Range.
Chairman Czerwinski mentioned he’s never seen or heard of a brick rowlock. Is that just like an end on belt course? It presents as a belt course sort of thing, basically that is what it's doing, right? Mr. Leone replied yes.
Chairman Czerwinski said alright. He asked if anybody else had any questions? Alright, thank you very much. I appreciate it.
The Applicants said thank you.
The public hearing is open.
Chairman Czerwinski asked if there was anyone wishing to make a comment?
Mr. Zach Prebula with Kent Economic Partnership. We are the Economic Development Organization covering Kent County. We focus on business attraction and supporting businesses that are here, growing and planning on staying here. We are in support of this project. This project will do two things for us. One will create space to help us attract those businesses and support local businesses looking to expand and also create places for those employees to live and reside Downtown and help us revitalize the area. So, we ask you to support this project. Thank you.
Mrs. Melson-Williams mentioned that there are no other online participants that have joined us this afternoon and the Planning Office has not received any written correspondence to enter into the record as part of the public hearing.
The public hearing was closed seeing no one else wishing to speak in the room or virtually
Mrs. Richardson moved for approval of HI-25-01 for the Recommendation of the Revised Architectural Review Certificate for redevelopment of the Old Dover Post Office property consisting of 1.267 acres for a mixed-use project known as The Old Post to include Staff comments as presented on pages 9-12. The motion was seconded by Ms. Horsey and unanimously carried 4-0.
12
15
Page 16
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
NEW BUSINESS
Election of Chair and Vice-Chair
Mrs. Richardson asked how long Eric has served. Mrs. Melson-Williams replied that he is completing year five. Per the Bylaws, the Chair and Vice Chair can serve two appointed terms, which is basically a period of six years after which time they would have to rotate off of that particular office before returning to it. He is eligible to serve for an additional year in that position if you desire.
Ms. Horsey made the nomination that Mr. Czerwinski remain Chair for the next calendar year. Ms. Baker seconded the nomination for Mr. Czerwinski to remain Chair of the Historic District Commission. All members agreed by acclamation.
Chairman Czerwinski made the nomination that Mrs. Richardson remain Vice-Chair for the next calendar year. Ms. Horsey seconded the nomination for Ms. Richardson to remain Vice- Chair of the Historic District Commission. All members agreed by acclamation.
Mrs. Melson-Williams mentioned that we will make sure all our records show the continuation of your Chair and Vice-Chair in those positions. And as you can see, we still have a vacant seat. I have not heard anything out of the Mayor's office as of yet for any potential applicants for that. So, if you know of someone, or would like to suggest someone, there is an application process or application form that you can download from the city's website in order to be considered or just reach out to the Mayor's office with your suggestion and I'm sure they could follow up.
Chairman Czerwinski mentioned that he was still working on his angle, so hopefully at some point we get that fifth person.
Meeting and Deadline Schedule for 2026 DRAFT Mrs. Melson-Williams mentioned that Staff has prepared a Draft of the Schedule. Your meetings remain on the third Thursday of the month, with a deadline that's established in the month prior. Those tend to fall on either the second or third Friday of the month depending on how the calculations work out. An application has to be filed a minimum of 30 days prior to your meeting. So, this sets out the meetings for all of 2026. We align the filing deadlines of the Historic District Commission and our Board of Adjustment just so our office doesn't go too crazy.
Ms. Baker mentioned that she thinks that the last meeting date needs to read 2027.
Mrs. Melson-Williams mentioned that there's no formal action needed for that. We'll make that correction. Thank you.
OLD BUSINESS
Certified Local Government (CLG) Program
Mrs. Melson-Williams mentioned that the State Historic Preservation Office issued information on the Certified Local Government Grant application process. We gave you in your packet a copy
13
16
Page 17
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
of the application guidelines and then the actual Grant application that we submitted. It was due October 31, 2025. That was a Grant application for Federal Fiscal Year 2024. There's been some timing issues with receipt of Historic Preservation Fund monies from the federal government to the State office and then their ability to regrant out the required monies.
What we did was for that FFY’24 Grant is basically send back in the application that focuses on the addendum to your Design Standards and Guidelines to focus on modern materials and technologies. The plan would be to hire consultant services once we have a grant agreement in place to focus on that. The application itself for use of this grant money requires a match. It's a 60/40 split. The Planning Office does have that match in cash in our current budget, and we have also entered that into our Proposed Budget for the next City fiscal year that we're preparing for. But you can see the description to focus on some of those things that our Design Standards and Guidelines really haven't addressed since they were written in the mid-nineties. This would involve, as I noted, consultant work, they would work both with Staff, and the Commission and some public outreach opportunities as part of this endeavor. The exact deliverables would be more outlined as part of bringing that consultant on board. So that application was made on your behalf, I think since I didn't change it up and you worked on it previously, I think that was a good attempt there. What is also noted is they also put forth information about the FFY’25 Grant Application. That application is due by the end of March. I did not file an application for that as of yet because I did not know the direction as to what type of application the Commission might be interested in doing next. The first one that we submitted would have to be completed by September of 2026. It's probably a nine-month project. The other one would not have to be completed until September of 2027. It gets confusing, cause their fiscal years are different than ours. With the grant application guidelines, I would suggest looking through those if there are things that you think we could potentially target for making that grant request. It is not a bricks and mortar type of grant program. It's for studies, planning efforts, education opportunities, and training opportunities; that’s what these grants are typically used for.
So, with that, I'd be happy to entertain any kind of discussion or thoughts on that. I figured at least early next year we'd have to really delve into what a proposed strategy for that Application submission would be.
Mrs. Richardson asked didn’t the Commission want to update our Historic District Guidelines? Chairman Czerwinski replied yes, that's the Addendum that we have been talking about.
Chairman Czerwinski asked do we actually submit a Grant request for that project?
Mrs. Melson-Williams replied yes. We actually submitted that Addendum to the Design Standards and Guidelines as the project for the Grant Application FFY’24 (Federal Fiscal Year). This would at least get us the document materials and in draft format. The formal process to adopt them might extend beyond that grant timeframe, but this would at least get us the document in place. It does not go back into necessarily the existing Standards and Guidelines and redo them totally, but we might see what those opportunities are in some of the discussion that happens with looking at the Addendum for modern materials.
14
17
Page 18
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 20, 2025
Chairman Czerwinski mentioned that would be a big project. That's a complete rewrite. Thank you very much for submitting the Request for the Grant, appreciate it.
Chairman Czerwinski asked if anybody else had anything?
Ms. Baker mentioned that she just wanted to commend the Staff and her senior colleagues for the tremendous hard work.
Mrs. Melson-Williams mentioned definitely be thinking about what that second grant opportunity could be. There was some notation about emphasis of looking at projects that may be related to the Americas 250, even though that would the grant funding cycle/implementation timeframe may be a little beyond that but that's something to keep in mind as well.
Implementation of 2019 Comprehensive Plan Mrs. Melson-Williams mentioned if you'll remember, there is a Historic Preservation Chapter that has a series of goals and recommendations. We can certainly look to that for ideas for grant application materials or ideas, but there's no specific Implementation item that I need to bring to you today related to the Comprehensive Plan.
Mrs. Richardson asked if the 2019 Comprehensive Plan was online? Mrs. Melson-Williams replied it is. When you first joined the Commission, you may have received a hard copy of it. If you have not, we can certainly get you that. It is posted on the city's website, which would be www.cityof dover.gov, and if you use the directory to go to the Planning and Inspections page, there is a page devoted to the City's Comprehensive Plan. It's posted in two different ways. There is the text document and then also the series of maps. The preservation chapter is Chapter 6, so you can look for that and there are a couple of maps associated with that. It basically identifies where the Historic District is and the various National Register Districts here in Dover for kind of data reference as part of the plan. The next time the Comprehensive Plan comes due for kind of a rewrite, would be 2029. So 2029, the start of 2030, so probably in late 2028 throwing out all these crazy years, is when we would be planning for how we're going to approach that rewrite for the next Comprehensive Plan.
Chairman Czerwinski asked if there were any questions or comments before we adjourn?
Mrs. Horsey moved to adjourn the meeting seeing no other items of business, seconded by Ms. Baker and unanimously carried 4-0 of the members present.
Meeting adjourned at 4:43 PM
Sincerely,
Maretta Savage-Purnell
Secretary
15
18
Page 19
Item 2.
CITY OF DOVER
HISTORIC DISTRICT COMMISSION FEBRUARY 19, 2026
The Meeting of the City of Dover Historic District Commission was held on Thursday, February 19, 2026, at 3:30 PM as an In-Person Meeting in the City Hall Council Chambers (anchor location) and virtually using the audio/videoconferencing system Webex. With Chairman Czerwinski presiding, the other members present were Mrs. Richardson, Ms. Baker, and Ms. Horsey.
The Planning Office Staff members present were Mrs. Dawn Melson-Williams, Mrs. Maretta Savage-Purnell and Mrs. Sharon Duca.
APPROVAL OF AGENDA
Mrs. Richardson made an amendment to the agenda regarding approval of the November 20, 2025 Minutes that are still being prepared. Mrs. Richardson made a motion on the adoption of the agenda to remove that item. The motion was seconded by Chairman Czerwinski. The vote was unanimously carried 4-0.
COMMUNICATIONS & REPORTS
Summary of Applications 2025 Mrs. Melson-Williams mentioned in your meeting packet was the Summary of Applications. In that calendar year, there were a total of four applications. One of them you did see twice; so, we can count that almost as five. That is the project for The Old Post at 55 Loockerman Plaza. Since your last meeting, that item was presented to the Planning Commission, and they granted conditional approval in December of last year. They are in the check print review process to finalize that Site Plan. They are moving towards project construction. The other items we looked at in 2025 included the project for 120 Governors Avenue. I do not see any real movement there with that project as of yet.
The Biggs Museum, I think you will probably see again, as they are evaluating what their path forward will be. And then there was the Referral of the fence at 55 King's Highway, which you were considering and deferred at your November meeting. That Applicant did actually comply with the suggestions that had been made and we were able to issue a Permit for a fence at 4 feet in height using that metal picket style. So, they worked through that. I am not sure if that Permit has been totally issued at this point, but so some progress there.
Mrs. Melson-Willams asked if there were any questions on those Applications? There were none.
Summary of Architectural Review Certifications for 2025 and 2026 Mrs. Melson-Williams stated that she was only reporting on the month of January for 2026. You can see there were three Permits that were issued at that point: a demolition one which was an interior and then the drive through canopy on what used to be the Citizen's Bank building Downtown, then a Fence Permit, and a Sign Permit Application. Looking back into the calendar year for 2025. There was a total of 34 Permits in the Historic District area that were reviewed either by Staff or the Commission. The Staff had the bulk of those with 30 of the 34.
19
Page 20
Item 2.
CITY OF DOVER HISTORIC DISTRICT COMMISSION FEBRUARY 19, 2026
The highest number of Permit types turned out to be Roof Permits at eight (8), Sign Permits at seven (7), and then there were some exterior building item ones with six (6). The balance of those are things related to fences, siding, and windows.
Mrs. Melson-Williams asked if there were any questions on permit activity in the Historic District? There were none.
Department of Planning & Inspections Updates Mrs. Melson-Williams mentioned that she did not have any real updates. We still need a fifth member of this Commission. I don't know where any potential appointments stand with the Mayor's office on that.
NEW APPLICATION
HI-26-01 Referral of Door/Window Permit #26-118 at 1 Kings Hwy NE - Review of Architectural Review Certification as Referred by the City Planner to the Historic District Commission for a Door/Window Permit #26-118. The project proposes removal and replacement of four (4) windows and the removal and replacement of the entry door. Property is zoned RG-1 (General Residence Zone) and subject to the H (Historic District Zone). The owner of record is Richard Arnold. Address: 1 Kings Highway NE. Tax Parcel: ED05-077.05-02-54.00-000. Council District 3.
Chairman Czerwinski recused himself from discussion or any voting. The individual Mr. Arnold is his neighbor. Chairman Czerwinski’s house lies within 200 feet of his property.
Mrs. Melson-Williams gave a brief Staff overview of the Application.
This is a Door and Window Permit that was first filed with the Planning Office. It consists of a proposal to remove and replace four windows and then removal and replacement of the entry door on this building at 1 Kings Highway NE. The building is a three-story single family detached dwelling with a mansard roof and front porch. The door that we are referring to is the front entry door there as it faces the street. Normally with Permits for window and door replacements, it is something that Planning Staff reviews through the permitting process. We look at the Design Standards and Guidelines for the City of Dover Historic District Zone in making decisions about whether that project can be issued in what we call an Architectural Review Certificate for work in the Historic District. In the case of this, Staff had a number of concerns with the proposed project and has chosen to refer it to the Commission. Specifically, in the Design Standards and Guidelines, you would be looking at Chapter 3, where there is information about appropriate practices for doors and windows. Basically, the Guidelines would suggest that building elements such as these be replaced in kind to match the existing conditions. So, for things like windows, that means the same window opening size, operating function, and the panels of light or the panes on how they are divided. For doors, it's very similar in that it would be a door in the same opening size, same door format, and if it had any light or glass in it, something similar to what would be any existing historic door in that era. Today, we refer this Permit to you to consider what is being proposed. I’m not sure that we've received information to clarify which exact windows on the house are being proposed for replacement, but we may be able to learn that today. The door is being proposed to go from what is a double, kind of solid wood door to a single door with a sidelight to take up that space. There is an image in the email
2
20
Page 21
Item 2.
CITY OF DOVER HISTORIC DISTRICT COMMISSION FEBRUARY 19, 2026
trail that we had with the contractor for the project that shows the concept for the door. I will note that in that email, the picture shows both the inside and the outside. So, look at those as a single version of the door with side light and the transom light window above it. In our Report on page 3, Staff lists some findings and then also made some Recommendations in regard to this for our findings regarding window location and format.
We need to clearly understand which windows are being replaced to ensure that the replacement is in that similar style. The door location as noted is the one that faces Kings Highway. It is visible from the sidewalk, especially since the vegetation that was previously in the front yard, has now been removed. There is a new kind of picket style fence that is there (metal fence. The concern that Staff has is really related to the format of the door. It does have a set of double storm doors that's primarily glass and then you can see the double door that is behind it. That double door format is a feature that is typically seen in the late 1800s to early 1900s in this architectural style. There are several buildings in Downtown Dover that have that double door format to them. Staff Recommendations regarding this Permit request would be to provide additional information specifically about which windows, and then regarding the door to focus on if there is a way to repair the existing door. But, if full replacement is necessary, it should be a double door in function. The fact that it has the double storm door format on it is the right way to go when it comes to storm doors in dealing with a property such as this.
Our package for you included our Letter of Referral and their specific Door and Window Permit Application. We also provided you with the Design Standards and Guidelines elements from that document and then there was a recent photo taken within the last few weeks here of the front door. You can see that was before the snow melted away. But Mr. Arnold has joined us this afternoon. So, if he would like to come forward and talk to you a little bit about his project. It's an opportunity for him to do that and to have a conversation about this Permit.
Representative: Mr. Richard Arnold, Owner.
Mr. Arnold stated that referring to the windows, they are the old windows that are way at the back of the house. They cannot be seen from the front at all. They are on the side of the building, so you would not notice them. In fact, two of the windows are on a porch. So, you'd have to be on the porch in order to see it. So, they are hidden if that's the right word. The front door is in bad shape. There is a reason why we put up the storm door, to keep the wind out. It's in bad repair. I've tried to seal it several times. There are cracks in the doors. Somebody who knows how to use wood could probably fix it; I can't. So, I wanted to put in a new whole door and completely reseal everything. But one of the things I want is keyless entry because now I live by myself and I want medical staff or whoever is asked to come into the house. I would be able to give them the code when I call in an emergency or my two sons so that they would be allowed in. Right now, there's one key and if we lose that, forget it, nobody's getting in. The contractor that I had went through extensive measurements and whatever, and the product that they had was too small. And that's why we went to a single door. That door would be able to fit the space. I've read your Report and everything. I'm not going argue with you. It should be a double door, that's fine. You know, we'll just do the windows and then that's it.
Mrs. Richardson asked that within the packet, there's an email from the contractor Gregory
3
21
Page 22
Item 2.
CITY OF DOVER HISTORIC DISTRICT COMMISSION FEBRUARY 19, 2026
Madrigale, and he refers to the windows. “He says all the windows will be replaced in the exact same style including the grids. As far as trim, we typically install a PVC coded aluminum with wood grain texture in order to preserve the integrity of the existing wood. We can match the existing colors as needed. If the original trim needs to remain, we can have alternate installed techniques to keep the existing trim visible.” Is this email enough documentation to answer any of the questions regarding the windows?
Mrs. Melson-Williams mentioned that Staff was generally comfortable with how they were describing an approach to the replacement of the windows. It just wasn't clear where they were on the house itself. The Permit application just said four windows. Mr. Arnold today has described that they are towards the back of the house. We can confirm with him more specifically where they are and be able to deal with the window aspect of the permit.
Mrs. Richardson said thank you. I think that there are really two separate projects. One's the window and then the other is the door. I don't have any problem with the windows. Is there feedback from the Commission?
Ms. Horsey mentioned that she would like to know exactly where those windows are because I think, unless you say it's the porch and this is the oldest part of the house. Is that right? Mr. Arnold replied yes, it is.
Mr. Arnold stated that the house is actually two houses. They had an old farmhouse, which has just four rooms. And that sits this way. And then years later they put on the Victorian section in the front. And that sits this way. So, the windows are on this part of the house, the old part that sits way, way in the back. Like I said, you can't see it for the most part. And you can't see it from the road. He had to be on my property in order to see them. They are exactly what they described. The old windows were six panels over nine, and that's what they have brought in, and they are going to put up. There are six panels over nine. So, they match it exactly and they're white. Just like the ones I've got.
Ms. Horsey mentioned that it would be nice to have a visual. I'm a little more inclined to say yes to the windows possibly. I'd still like to know a little bit more about the materials on the windows even though it says its vinyl. We are always a little leary of anything vinyl which you probably know that. I know vinyl's getting better.
Mr. Arnold said hopefully it will. It matches perfectly. I can go get some pictures of it if you want, but, like I said, you can't see it from the road. You have to be on the property. But I understand the front door. I'm not going to argue with anybody about it. They want double doors and the company cannot provide them. So, I will just do the windows and then go to someplace else because those doors need to be replaced.
Ms. Horsey mentioned that she thinks the doors on this house are iconically located position on the street and on that corner. And even though you really can't see the double doors, changing it out to something like a single door with that sidelight is not historic at all.
4
22
Page 23
Item 2.
CITY OF DOVER HISTORIC DISTRICT COMMISSION FEBRUARY 19, 2026
Mr. Arnold mentioned that he was warned and now that it’s happened, but I'm not going to argue about it or anything. Let’s do it right.
Ms. Horsey said yeah, and I think you'll want to. I mean historic houses are becoming more endangered in Dover every day, and we need to protect them. You understand and that's good, so we don't have to argue that point.
Mrs. Richardson asked Mr. Arnold if he was given a copy of the historic guidelines. Mr. Arnold replied yes. I have a copy here and I was given a copy on the email. I read it and I knew I was coming into this meeting, not going to get approval, but you know, at least we talked about it.
Mrs. Richardson asked Mr. Arnold if he had checked with other contractors regarding the doors and if not, that's a possibility. Mr. Arnold replied no.
Mr. Arnold said yes, the door needs to be replaced, there is no doubt.
Mrs. Richardson said I think it's the style that concerns us. As you know, as far as a keyless entry, I think you can probably put that on double doors like this.
Mr. Arnold mentioned that the door is old and beat up.
Mrs. Richardson said that she was talking about replacing the doors if they are in that bad condition.
Mr. Arnold said that he would appreciate it if Council (the Commission) would say, yeah, you can put in keyless entry. I'm thinking of my safety you know. I don’t have relatives nearby. So, when I call for an emergency or whatever, I can just give them the code and then they can come right in I have a coded entry in the back. I have a hard enough issue getting them to the front door on 1 Kings Highway NE. My neighbor on the right is 109 N. Division Street. So, they think I am on Division Street. So, I need a keyless entry. So, if that's approved, that's a big step for me.
Ms. Baker asked if it was their business to approve or disapprove a keyless entry?
Mrs. Melson-Williams mentioned that your Guidelines do not go into that kind of detail.
Ms. Baker mentioned that she lives around the corner from Mr. Arnold at 3 S. Bradford and her immediate adjacent neighbor is at number 15 S. Bradford. So, I understand the confusion of spaces and numbers. It’s a rarity and it can be fun if you're not in a hurry, right? But you're concerned about if you need help in a hurry. I cannot but believe that there is a competent person(s) who could create a door system for you that would satisfy the historic nature of this incredibly beautiful building. And satisfy your concerns for your own safety, which I totally resonate with. So, I appreciate you being so forthcoming. I'll tell you what on my block, several of us said “Wow! They took down all those shrubs. And now we can see this beautiful house.” So, thank you Mr. Arnold. Thank you so much and thank you for the fence. So now, don't stop here. Drive right on through to a new door until you get what you want. And one that will be the pride of Downtown Dover, and I thank you sir. God speed.
5
23
Page 24
Item 2.
CITY OF DOVER HISTORIC DISTRICT COMMISSION FEBRUARY 19, 2026
Mr. Arnold said thank you.
Vice Chair Richardson asked Ms. Horsey if she had any additional comments? Ms. Horsey said no, I'm fine, thank you.
Vice Chair Richardson stated that she was inclined to conditionally approve the windows but not approve the door. We are asking you to bring back a plan for the door.
Mr. Arnold asked for clarification; plans for the door? Vice Chair Richardson said yes, the door. Mr. Arnold said I think that is going to take a little while, I think. It’s not going to be in the next couple of weeks. Vice Chair Richardson said we only meet once a month. Mr. Arnold said yes. I’m going to look around but doors are expensive, especially when you live on a fixed income.
Vice Chair Richardson mentioned that historic homes are expensive to maintain. We all know.
Mr. Arnold said he had a contractor who was installing a dishwasher and he was standing outside, and he looked at the house, and he said, “I bet you never run out of projects, do you?” So, no.
Ms. Horsey moved for partial approval of Application # HI-26-01 Referral of Door/Window Permit #26-118 Architectural Review Certificate to not approve the door request but to approve the window request based upon the windows being the same configuration as the old ones. The motion was seconded by Mrs. Richardson and unanimously carried 3-0. Mr. Czerwinski abstained as Mr. Arnold is a neighbor.
Mrs. Melson-Williams asked Mr. Arnold if he had a few moments to wait till we finish the meeting, she would talk to him about where exactly the windows are so that the Planning Office can move forward with that portion of the Permit that we have in now and removing the door project, we'll call it, from that. And once you have done some more work on the door project, that would be a separate Permit. It is probable if you come back with a double door or something that staff can approve and you would not end up back before these lovely folks if we could help it.
OLD BUSINESS
Certified Local Government (CLG) Program Mrs. Melson-Williams mentioned that we had made application for grant application to the State of Historic Preservation Office to focus on the work on your Design Standards and Guidelines to focus on alternative materials. We have not taken any additional steps since we made that application. Staff time has been devoted otherwise. In order to begin that, it would be a formal grant agreement with the Historic Preservation Office and then we would have to go out for consultant services. So, we will see how that progresses in the next couple of months here.
Implementation of 2019 Comprehensive Plan Mrs. Melson-Williams mentioned she had no specific items to bring to you today. I will let you know that the City is participating in a voluntary program with the State Housing Authority that will be looking at Land Use and Zoning Reform related to affordable housing or housing in
6
24
Page 25
Item 2.
CITY OF DOVER HISTORIC DISTRICT COMMISSION FEBRUARY 19, 2026
general. So, if there's certainly anything as we move into that process that needs to come before the Commission, we will certainly loop you in. That's meant to look at our Zoning Ordinance related to housing citywide and opportunities for improvements there in our types and variety of housing. We'll see what moves forward with that. Basically, by participating in that program, we get free consultant services to help us look at our Zoning Ordinance. We will know more about that in a couple of weeks. I would say they are going to be making formal announcements about that program shortly.
PUBLIC COMMENTS OPPORTUNITY
Chairman Czerwinski asked if there was anyone in person or online that wishes to make public comments?
Mrs. Melson-Williams mentioned that seeing that there's only one other individual in the room that is public here, and there are no individuals that have joined us online at the moment. Since this is an open meeting that public comment opportunity is an opportunity for the public to bring any general comments to the Commission that aren't associated with a formal application. I don't believe you have anyone wishing to speak today.
Chairman Czerwinski asked if there were any questions or comments before we adjourn?
Ms. Baker mentioned that she would like to thank Staff for taking care of so much, for so many, for so long.
Chairman Czerwinski said I'll second that. Anybody else?
Mrs. Richardson moved to adjourn the meeting seeing no other items of business, seconded by Ms. Horsey and unanimously carried 4-0 of the members present.
Meeting adjourned at 4:02 PM
Sincerely,
Maretta Savage-Purnell
Secretary
7
25
Page 26
City of Dover Historic District Commission
Summary of Applications 2025 Item 3.
Updated thru June 11, 2026
FILE# PLAN NAME LOCATION TYPE ACTION STATUS
HI-25-01 The Old Post at 55 Loockerman Plaza Site Plan for Review for Architectural Review Site Plan reviewed by Historic District and Revised 55 Loockerman (Old Dover Post development of Certification of Site Plan; Public Commission for Recommendation. Site Plan HI-25-01 Plaza Office) mixed-use with Hearing and Review by HDC on Application (S-25-07) filed and granted apartments 2/20/2025 and Recommended conditional approval and ArchRevCert by approval of ArchRevCert for project. Planning Commission on 3/17/2025. Design Revised HI-25-01 filed and scheduled revisions to add additional floor and for HDC Review on 11/20/2025 for architecture requires additional review of consideration of architectural design ArchRevCert by HDC and PC. S-25-07 revisions. recommended for approval of ArchRevCert by HDC and granted by PC 12/15/2025. Final site Plan Approval pending and preliminary interior clean-up/demolition has begun under Permit.
HI-25-02 Mixed Use 120 S Governors Site Plan for Revised Application filed June 2025. Application initially filed in March 2025 Building at 120 S Avenue development of Review for Architectural Review then placed on hold by the Applicant for Governors mixed use building Certification of Site Plan; Public continued design work. Application Avenue (The Hearing and Review by HDC on updated and Site Plan reviewed by Historic Governor) 7/17/2025. HDC Recommended District Commission for Recommendation approval of ArchRevCert for project. in July 2025. Site Plan Application (S-25-11) filed and scheduled for Planning Commission Review on 9/15/2025. Conditional Approval of Site Plan and ArchRevCert granted by Planning Commission. HI-25-03 Biggs Museum 15 The Green and 21 Review for Review for Architectural Review HDC completed review of Request to Expansion: The Green Architectural Certification. Public Hearing and remove/demolish portions of the rear Selected Certification for Review for Architectural Review additions at the buildings as associated Removals at 15 Select Certification by HCD on 5/15/2025. with future project for the Biggs Museum of and 21 The Green Removal/Demolition Granted Approval subject to American Art expansion. Granted of Rear Additions conditions. Architectural Review Certification; moving into design phase for project that will be subject to future ArchRevCert.
26
Page 27
City of Dover Historic District Commission
Summary of Applications 2025 Item 3.
Updated thru June 11, 2026
FILE# PLAN NAME LOCATION TYPE ACTION STATUS
HI-25-04 Referral of Fence 55 Kings Hwy SW Fence Permit Permit #25-1463 referred to HDC by Permit Application received 10/8/2025 and Permit #25-1463 City Planner for consultation on Referred to the HDC for consultation. at 55 Kings Hwy Architectural Review Certification; Permit seeks to construct a 6 foot vinyl SW (Merrill Lynch scheduled for review on 11/20/2025. fence. Applicant revised the application to a Office) HDC deferred action seeking more metal picket style fence at height of 4 feet. information. Fence installed.
27
Page 28
City of Dover Historic District Commission
Summary of Applications 2026 Item 3.
Updated thru June 11, 2026
| FILE# | PLAN NAME | LOCATION | TYPE | ACTION | STATUS |
|---|---|---|---|---|---|
| HI-26-01 | Referral of | 1 Kings Hwy NE | Door/Window | Permit #26-118 referred to HDC by | Permit Application received 1/23/2026 and |
| Door/Window | Permit | City Planner for consultation on | Referred to the HDC for consultation. | ||
| Permit #26-118 at | Architectural Review Certification; | Permit approval grantedd for replacement | |||
| 1 Kings Hwy NE | Reviewed on February 19, 2026 and | of 4 windows found to be not in a visible | |||
| (Residence) | granted conditional approval. | location. HDC noted that the door should | |||
| be replaced as a double door (the proposal | |||||
| for a single door with sidelights was not | |||||
| approved) | |||||
| Permit #26-848 referred to HDC by | |||||
| Referral of Siding | City Planner for consultation on | Permit Application received 5/29/2026 and | |||
| Permit #26-848 at | Architectural Review Certification; | Referred to the HDC for consultation. | |||
| 108 S. Governors 108 S. Governors | scheduled for review by the HDC on | Project proposes replacement of existing | |||
| HI-26-02 | Ave | Avenue | Siding Permit | 6/18/2026. | siding with vinyl siding. |
28
Page 29
Summary of Permit Applications with Architectural Review Certification
Item 4.
2026- Updated Thru 5-31-2026
| DATE | PERMIT # LOCATION | TYPE | ACTION ON ARCHITECTURAL | NOTES |
|---|---|---|---|---|
| REVIEW CERTIFICATE | ||||
| 1/13/2026 25-1668 | 8 W Loockerman Street | Demolition Permit | Staff Approval | Demolition of select interior area and removal |
| of bank drive thru canopy | ||||
| 1/5/2026 25-1767 | 1 Kings Highway NE | Fence Permit | Staff Approval | Installation of black metal picket style fence of |
| 4 foot height | ||||
1/20/2026 26-71 420 S State Street Sign Permit Staff Approval Installation of hanging wall sign 2/10/2026 25-1393 55 The Green; Supreme Building Permit Staff Approval per HDC approval of HI- Project is a one story building expansion clad in Court 24-06 brick with brick and cast stone detailing 2/25/2026 25-1847 55 The Green; Supreme Roof Permit Staff Approval Replacement of existing dome roof and Court associated shingle roof area at the rotunda building entry. Project replaces the shingle roof with a composite slate shingle in DaVinci Inspire Classic Slate in Graphite (color) 2/17/2026 26-64 146 S State Street Building Permit - Interior Staff Approval. No ArchRevCert Interior demolition in anticipation of Renovations/Demolition required renovations for a commercial kitchen to support catering operation, which will be done under a separate permit 2/4/2026 26-118 1 Kings Highway NE Window Permit HDC approved the windows, but did Was initially for 4 replacement windows at rear not approve the replacement of the of building not visible and the replacement of front door. the front door. The existing front entry is a double door that is likely original to the structure 2/17/2026 26-189 202 W Loockerman St Sign Permit Staff Approval Permit for a projecting wall sign on an existing building on Loockerman Street. Sign area is 3.52 SF, which complies with the sign regulations 3/19/2026 25-1443 417 Federal St Roof Permit Staff Approval. ArchRevCert Roof project to replace exiting sloped roof with Approved new synthetic slate singles system, EPDM assemblies, and flat seam copper rooting, and associated flashing, gutters, and coping
29
Page 30
Summary of Permit Applications with Architectural Review Certification Item 4. 2026- Updated Thru 5-31-2026 DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES REVIEW CERTIFICATE 3/24/2026 25-1825 55 Kings Hwy SW Fence Permit Staff Approval. ArchRevCert Installation of a four-foot metal picket fence Approved along the north and east property lines for a total length of 302 feet. This permit supersedes a previous Fence Perit #25-1463 for a vinyl fence of 6 feet that was referred to the HDC as HI-25-04 3/4/2026 26-81 55 Loockerman Plz, The Old Fence Permit Staff Approval Temporary installation of construction fencing Post at 55 Loockerman Plaza as the side of the Old Post project for the renovation, partial demolition, and new addition to the previous Post Office building. Fencing is 6-foot chain link to be installed along the property lines with removable panels on the Innovation Way side for site access as necessary
3/5/2026 26-163 425 East Ave, Legislative Administrative Permit Approved by PC. Staff Approval per For the Site Work for the Legislative Hall Hall Parking Garage PC Final Action of ArchRevCert under Parking Garage project. Project activities under Recommendation of HDC. H-24-04/S- this permit include infrastructure work for the 24-14 project including erosion and sediment controls, temporary Perimeter Construction Fencing, sewer relocation/additions, demolition of site features, grading, and other utilities work 4/15/2026 25-121 122 Martin Luther King Jr. Building Permit - Interior Staff Approval. No ArchRevCert Permit for interior renovations to conference Blvd S Renovation required room area within the Haslett Armory Building
4/8/2026 26-473 32 W Loockerman St L100 Building Permit - Interior Staff Approval. No ArchRevCert Permit for interior renovations of gym area in Renovation required tenant suite L100, which includes the installation of a french drain 4/10/2026 26-530 500 W Loockerman St Building Permit - Interior Staff Approval. No ArchRevCert Interior renovation to existing office space. No Renovation required change in use or exterior changes to the building
30
Page 31
Summary of Permit Applications with Architectural Review Certification Item 4. 2026- Updated Thru 5-31-2026 DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES REVIEW CERTIFICATE 5/13/2026 25-1545 527-529 S State St Building Permit - Interior Staff Approval Permit for interior and exterior remodeling of and Exterior Renovation the existing triplex 5/20/2026 26-162 425 East Ave, Legislative Building Permit Approved by PC. Staff Approval per Permit for Legislative Hall Parking Garage; Hall Parking Garage PC Final Action of ArchRevCert under construction of a 3-story new Parking Garage Recommendation of HDC. HI-24-04 / Structure with 344 vehicle parking soaced with S-24-14 associated surface parking for service area, and the decorative fence and brick wall surrounding the generator 5/27/2026 26-180 55 Lockerman Plz, The Old Demolition Permit Staff Approval per HDC Permit demotion of the rear portion of the Post Recommendation and PC Approval of former post office. Final Site Plan approval ArchRevCert HI-25-01/S-25-07 pending. 5/18/2026 26-692 415 W Loockerman St Building Permit Staff Approval Permit is for interior renovation to an existing building to relocate a restroom
31
Page 32
Item 5.
City of Dover
ARCHITECTURAL REVIEW STAFF REPORT
Before Dover Historic District Commission
June 18, 2026
Application: Revision for West Entrance ADA Ramp – Legislative Hall Building Addition, HI-24-07
Owner: State of Delaware
Location: West side of Legislative Hall Addition perpendicular to Martin Luther King Jr. Boulevard North and Martin Luther King Jr. South
Address: 411 Legislative Avenue and Court Street
Tax Parcels: ED-05-077.09-05-15.00-000 and ED-05-077.09-05-14.00-000
Size: Ramp of 160 linear ft
Present Uses: Legislative Hall
Proposed Use: Legislative Hall – West Entrance ADA Ramp Revision to Legislative Hall Building Addition
Present Zoning: IO (Institutional and Office Zone
H (Historic District Zone)
SWPOZ (Source Water Protection Overlay Zone)
ROS (Recreational and Open Space Zone)
H (Historic District Zone)
For Consideration: Architectural Review Certification of Revision for West Entrance ADA Ramp
- I.PROJECT DESCRIPTION: The Historic District Commission will act on a recommendation for a Revised Architectural Review Certificate for the addition of an ADA Ramp located at the West Entrance of Legislative Hall. The proposal includes an approximately 160 feet proposed ramp in length, while also providing access to a new accessible entrance created within the exiting west façade. A Temporary Ramp is also proposed during construction. This is associated with the Site Development Plan for the Legislative Hall Building Addition. The main property of 2.80 acres+/- is zoned IO (Institutional and Office Zone) and subject to the SWPOZ (Source Water Protection Overlay Zone) and the H (Historic District Zone). The subject property is located on the east side of Legislative Avenue as the block between Martin Luther King Jr. Boulevard North and Martin Luther King Jr. South. The owner of
- P.O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 32
Page 33
Item 5. HI-24-07 Legislative Hall Building Addition; Revision West Entrance ADA Ramp Architectural Review Staff Report for Historic District Commission June 18, 2026 Meeting
records is the State of Delaware. Property Addresses: 411 Legislative Avenue and Court Street. Tax Parcels: ED-05-077.09-05-15.00-000 and ED-05-077.09-05-14.00-000. Council District 4. This Application HI-24-07 was considered at the Historic District Commission Meeting on October 17, 2024 and granted conditional approval of the Site Plan and Architectural Review Certification by the Planning Commission with Application S-24-19 Legislative Hall Building Addition on November 18, 2024.
The original application was considered and motioned to recommend for approval, passing with 3- 0 of the members present for the application by the Historic District Commission at their Meeting of October 17, 2024. They provided a recommendation in regard to the Architectural Review Certification for the Legislative Hall Building Addition and Associated Site Improvements. The recommendation reflected consideration of the Design Standards and Guidelines for the City of Dover Historic District Zone and the project’s compliance with the architectural review standards to the Planning Commission. The Planning Commission granted conditional approval of the Architectural Review Certification on November 18, 2024.
Surrounding Land Uses This subject property location in the block bounded by Legislative Avenue, Martin Luther Kings Jr. North, and Martin Luther King Jr. Boulevard South is part of the Capital Complex where multiple State buildings and offices are located. Across the street to the north is the Delaware Public Archives and to the south across the street is the Tatnall Building (offices) and the proposed location of the Legislative Hall Parking Garage and the Del-One Credit Union Building. Surrounding properties are zoned IO (Institutional and Office Zone) with other open space areas like the Legislative Mall area zoned ROS (Recreational and Open Space Zone). The surrounding properties are within the H (Historic Zone).
Previous Applications The Legislative Hall Building at this location was constructed c. 1931-1933 with later building additions in 1965-1970 and in 1994. Prior to that the Delaware General Assembly met in the Old State House building located on The Green. (Previous Application: MI-94-17 Legislative Hall: Proposed Landscape Plan.) In October 2024, the Historic District Commission approved the application for Legislative Hall with Building Addition to create new main public entrance and Plaza area with Monument Walk (HI-24-07).
II. HISTORIC PROPERTY INFORMATION
Review of Historic Maps A series of historic maps were reviewed by Planning Staff for preliminary information on the area and found that the area was predominately open space with scattered buildings until the 1930s when the new Legislative Hall was constructed and the street network that we know today begins to be constructed as the Capital Complex area developed with various government buildings.
Property Information This property is not listed in the National Register of Historic Places. The property is located within H (Historic District Zone) as established by the City of Dover. The development area consists of two parcels and a street/drive aisle area. The existing Legislative Hall Building is on the western parcel
33
Page 34
Item 5. HI-24-07 Legislative Hall Building Addition; Revision West Entrance ADA Ramp Architectural Review Staff Report for Historic District Commission June 18, 2026 Meeting
in the block and then the eastern area (street/drive aisle area and east parcel) are an existing parking lot and landscape open space area.
III. PROJECT PROPOSAL
PROJECT PROPOSAL (Revised Submission of June 2026 for West Entrance ADA Ramp): The application proposes renovation of Legislative Hall involving the construction of a new ADA- accessible ramp. This is an addition to a previously approved project for Legislative Hall Building Addition at 411 Legislative Avenue (HI-24-07). The Applicant submission includes an architectural drawing illustration labeled as Plan Sheet SK-A.1 on June 4, 2026 that displays where the ADA Ramp is locationally in conjunction with the new Legislative Hall Addition, the new ADA parking spots, mapped accessible routes to the ramp, and an option for a temporary ADA-complian ramp (outlined in blue). The applicant submitted three generated photos (sheet SK-A.2), dated June 4, 2024, of what the new West Entrance ADA-accessible ramp would look like from the directional views of the south, west, and north. The applicant submitted a Narrative Memo, dated June 5, 2026, describing the West Entrance ADA Ramp project and each of its accessible routes. The elements of the project are as follows:
- 1.New Parking Spaces: New ADA-accessible parking spaces will be designated along Martin Luther King Jr. Boulevard South in an area currently utilized for assigned parking. From these spaces, users will proceed west toward Legislative Avenue and connect to a new brick-paved accessible route that replaces an existing stepping condition. The route will continue to the west side of the building, where a new accessible ramp adjacent to the west entrance will provide access to the building.
- 2.Accessible Routes: The SK-A.1 architectural drawing highlights four (4) accessible routes leading from parking areas to the Legislative Hall Building. Detailed descriptions of each route are included in the Narrative Memo.
- 3.ADA Ramp Dimension and Location: The proposed ramp is approximately 160 feet in length and provides access to a new accessible entrance created within the existing west façade. To create the entrance, an existing window will be removed and the exterior masonry wall modified to provide a new door opening at floor level. The wall area above the new opening will be infilled to match the surrounding construction. This new entrance is required because the existing west entrance contains interior steps that prevent direct accessible access from the existing exterior landing.
- 4.Temporary Ramp: A Temporary ADA-compliant ramp constructed out of aluminum is proposed to be installed only for the duration of the Building Addition construction. The Temporary ADA ramp and entrance will be removed upon completion of the construction and brick. This option also includes modification to an existing window opening to provide temporary accessible entrance into the building. Upon construction completion, the opening will be restored to its original window configuration when the Temporary Ramp is removed.
34
Page 35
Item 5. HI-24-07 Legislative Hall Building Addition; Revision West Entrance ADA Ramp Architectural Review Staff Report for Historic District Commission June 18, 2026 Meeting
- 5.Ramp Building Material: The proposed ramp will be constructed of masonry and concrete designed to complement the historic character of Legislative Hall. Exterior-facing surfaces will utilize brick masonry matching the exterior building in color, texture, and bond pattern. Ramp and landing surfaces will consist of concrete slabs incorporating a snow-melt system for year-round accessibility and safety. Guardrails and handrails will feature a wrought-iron design (black metal) consistent with the architectural character of the Legislative Mall and Capitol Complex and City of Dover Design Standards and Guidance. The new accessible entrance door will be a solid wood door matching the existing west entrance doors and will be framed with a cast stone surrounding consistent with other exterior openings throughout the building. Associated walkaways will utilize the same brick paving materials found throughout the Legislative Complex, including a herringbone brick pattern with contrasting brick borders to maintain visual continuity with the surrounding side improvements.
- 6.Trees and Landscaping: Construction of the ADA Ramp will impact two existing trees and adjacent landscaping. The landscaping affected by the Temporary aluminum ADA- compliant ramp be restored upon the completion of the construction.
IV. ZONING REVIEW
The entire project site is located in the H (Historic District Zone) and subject to the provisions of the Zoning Ordinance, Article 3 §21 and referenced sections. Zoning Ordinance, Article 10 §3.2 outlines the review process for Architectural Review Certification and related building height, bulk, and setback standards.
The subject project area is zoned IO (Institutional and Office Zone) The IO zone allows the use for public and institutional building and makes the development subject to provisions of regulations the IO zone. The IO zoning district has a front yard setback of 10 feet.
Review of DESIGN STANDARDS AND GUIDELINES The subject property is located in the Dover Historic District Zone within the Capitol Square Historic Context. The Capitol Square Context is described on pages 2-8 and 2-9. Location within the Dover Historic District Zone requires proposals for demolition, new construction, additions, and certain renovation or rehabilitation activities to existing buildings to receive an Architectural Review Certificate.
As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone, an Architectural Review Certificate will be granted “if it is found that the architectural style, general design, height, bulk and setbacks, arrangement location and materials affecting the exterior appearance are generally in harmony with neighboring structures and complementary to the traditional architectural standards of the historic district.” In accordance with Article 10 §3.2, the Historic District Commission will provide a recommendation to the Planning Commission regarding the project’s compliance with the architectural review standards.
35
Page 36
Item 5. HI-24-07 Legislative Hall Building Addition; Revision West Entrance ADA Ramp Architectural Review Staff Report for Historic District Commission June 18, 2026 Meeting
Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings includes guidance related to various building elements and materials. This proposal must be reviewed for conformity with the design criteria guidelines found in Chapter 4: New Construction, Additions, Demolition and Relocation. Information on the review considerations is given below.
New Construction The Design Standards and Guidelines for New Construction (Chapter 4: pages 4-1 through 4-8) provide the design criteria and development guidelines. The guidelines specify the following individual considerations for new construction to be considered in the review by the Historic District Commission (and Planning Commission) of the project for Architectural Review Certification: • Style • Bays, windows, and doors (size, relationship, spacing of) • Absolute Size (compare overall size of new building) • Massing (relationship of solid-to-void) • Orientation (location of primary façade) • Proportions (comparison of height to width of building and elements) • Materials
Also, in Chapter 4 there is guidance related to “Additions to Existing Buildings” (Chapter 4: pages 4-8 through 4-10) which outlines similar topics of Siting, Scale, Elevation of the First Floor, Floor- to-floor Height, Massing, Orientation, Proportions, Materials, Forms, and other guidance. Reading of this guidance finds that it is primarily focused on additions to residential and smaller scale buildings which have a front façade and rear. For this Legislative Hall West Entrance ADA Ramp project, the considerations for New Construction are more appropriate.
The proposed project must also be reviewed for compliance with the standards established by the Zoning Ordinance. The standards include items such as setbacks from property lines, lot coverage, height, etc. This Proposal for the placement of the ADA Ramps on the West Entrance appears to conform to most of the bulk requirements of the IO Zoning District.
STAFF COMMENTS AND RECOMMENDATIONS
The following are Staff comments and recommendations for this application regarding project activities and Architectural Review Certification.
- 1)Staff recommends conditional approval of the Architectural Review Certificate for the construction of the West Entrance ADA Ramp project finds the ramp addition to be of compatible design with the existing building and the other nearby buildings. The proposal complies with the intent of the Design Standards and Guidelines for the City of Dover Historic District Zone and with its recommendations for development in Capital Complex Historic Context. The proposed ADA Ramp brick masonry is in compliance with the masonry guidelines. The proposed new accessible entrance wooden door is similar to the existing west entrance doors. Its surrounding cast stone frame is consistent with other exterior openings throughout Legislative Hall. The proposed guardrails and handrails made
36
Page 37
Item 5. HI-24-07 Legislative Hall Building Addition; Revision West Entrance ADA Ramp Architectural Review Staff Report for Historic District Commission June 18, 2026 Meeting
of wrought iron is consistent with the architectural character of the Legislative Mall and Capitol Complex and City of Dover historic district standards.
- 2)The following conditions are recommended by Staff to improve the project’s compliance with the recommended guidelines of the Design Standards and Guidelines. The following are recommended conditions:
- a.The selected brick choices should be compatible with the brick of the existing building.
- b.Clarify what trees and landscaping will be impacted by the construction of the ramp in the future Landscape Plan as the architectural renderings may only be concepts. If trees are displaced, then new tree plantings should occur. This is to ensure compliance with the tree planting requirements of the overall project.
- c.Any revisions or changes in the identified materials may be subject to further review by the Historic District Commission.
Historic District Commission Action Required The Historic District Commission shall consider the proposal and provide a recommendation in regard to the Architectural Review Certification for the West Entrance ADA Ramp project. The recommendation should reflect consideration of the Design Standards and Guidelines for the City of Dover Historic District Zone.
37
Page 38
Item 5.
From: Gabriel Cheung, NCARB, LEED-AP, ALEP
2500 Wrangle Hill Road, Suite 110
Bear, DE 19701
cheungg@StudioJAED.com
To: Department of Planning & Inspections
City of Dover
PO BOX 475
Dover, DE 19903
Date: June 5, 2026
Re: Legislative Hall – West Entrance ADA Ramp Revision to Legislative Hall Building Addition Project HI 24-08
The current accessible entrance to Legislative Hall is located at the east entrance. This entrance will be closed for an estimated two-year period during construction of the proposed addition. The original project approach contemplated the construction of a temporary accessible entrance at the west entrance, which would remain in service throughout construction and be removed upon completion of the addition. However, the project team was asked to evaluate the feasibility of constructing a permanent accessible ramp that would satisfy accessibility requirements during construction while also serving as a long-term accessible entrance after the addition is complete.
West Entrance Accessible Ramp
Reference SK-A.1 for the general layout of the proposed accessibility improvements surrounding Legislative Hall.
Accessible Route #1 will serve as the only accessible route during construction of the addition. With the closure of the existing east entrance, Legislative Hall's current accessible public entrance will be unavailable for the duration of construction. New ADA-accessible parking spaces will be provided along Martin Luther King Jr. Boulevard South in an area currently utilized for assigned parking. From these spaces, users will proceed west toward Legislative Avenue and connect to a new brick-paved accessible route that replaces an existing stepped condition. The route will continue to the west side of the building, where a new accessible ramp adjacent to the west entrance will provide access to the building.
The proposed ramp is approximately 160 feet in length and provides access to a new accessible entrance created within the existing west façade. Construction of the ramp will impact two existing trees and adjacent landscaping. To create the entrance, an existing window will be removed and the exterior masonry wall modified to provide a new door opening at floor level. The wall area above the new opening will be infilled to match the surrounding construction. This new entrance is required because the existing west entrance contains interior steps that prevent direct accessible access from the existing exterior landing.
Alternate Accessible Routes
Upon completion of the addition, several additional accessible routes will be available to building occupants and visitors:
- •Accessible Route #2: From the ADA parking spaces along Martin Luther King Jr. Boulevard South one can traverse east towards the new plaza and take the accessible ramps that flank the
38
Page 39
Department of Planning & Inspections - City of Dover
Legislative Hall Addition – West Entrance ADA RampItem 5.
Revision to Legislative Hall Building Project HI 24-08
June 5, 2026
new monumental stairs to the main public entrance.
- •Accessible Route #3: From the Legislative Hall Parking Garage, across Martin Luther King Jr. Boulevard via the pedestrian crosswalk, and the same route as Accessible Route #2 to the main public entrance.
- •Accessible Route #4: From the Legislative Hall Parking Garage through the existing tunnel beneath Martin Luther King Jr. Boulevard. This route is restricted access and provides direct entry into the Legislative Hall addition.
Materials and Architectural Character
The proposed ramp will be constructed of masonry and concrete designed to complement the historic character of Legislative Hall. Exterior-facing surfaces will utilize brick masonry matching the existing building in color, texture, and bond pattern. Ramp and landing surfaces will consist of concrete slabs incorporating a snow-melt system for year-round accessibility and safety.
Guardrails and handrails will feature a wrought-iron design consistent with the architectural character of the Legislative Mall and Capitol Complex and City of Dover historic district standards. The new accessible entrance door will be a solid wood door matching the existing west entrance doors and will be framed with a cast stone surround consistent with other exterior openings throughout the building.
Associated walkways will utilize the same brick paving materials found throughout the Legislative Complex, including a herringbone brick pattern with contrasting brick borders to maintain visual continuity with the surrounding site improvements.
Temporary Ramp Option
SK-A.1 illustrates an option (outlined in blue) for a temporary ADA-compliant ramp constructed out of aluminum that would be installed only for the duration of the Addition construction. This option also includes modifications to an existing window opening to provide a temporary accessible entrance into the building. Upon completion of construction, all temporary ramps will be removed, and the affected landscaping will be restored. The temporary entrance will also be removed, and the opening will be restored to its original window configuration.
Sincerely,
Gabriel Cheung, NCARB, LEED-AP, ALEP
39
Page 40
Item 5.
ACCESSIBLE ROUTE #2 ACCESSIBLE ROUTE #3
MAIN PUBLIC ENTRANCE
LEGISLATIVE HALL PARKING GARAGE
ACCESSIBLE ROUTE #4 LEGISLATIVE HALL ADDITION LEGISLATOR ENTRANCE AT TUNNEL LEVEL ADDITION
ACCESSIBLE ROUTE #2
ACCESSIBLE ROUTE #3
MARTIN LUTHER KING JR BLVD SOUTH MARTIN LUTHER KING JR BLVD SOUTH
NEW ADA PARKING SPOTS
ACCESSIBLE ROUTE #4 -
LEGISLATOR ENTRANCE
VIA TUNNEL UNDER MLK
ACCESSIBLE ROUTE #1
EAST WATER STREET
LEGISLATIVE HALL
OPTION FOR TEMPORARY
NOTE: TWO TREES AND REMOVE WINDOW, INSTALL ALUMINUM ADA RAMP FOR
LANDSCAPING WILL BE NEW ACCESSIBLE ENTRANCE DURATION OF
AFFECTED. CONSTRUCTION ONLY.
NEW CONCRETE RAMP, BRICK EXTERIOR WITH BLACK GUARDRAIL AND HANDRAILS
NEW BRICK NEW BRICK WALKWAY PAVING ACCESSIBLE ROUTE #1
OPTION FOR TEMPORARY RAMP
40
Page 41
Item 5.
WEST ENTRANCE - VIEW FROM SOUTH WEST ENTRANCE - VIEW FROM WEST
WEST ENTRANCE - VIEW FROM NORTH
2
41
Page 42
Item 6.
City of Dover
ARCHITECTURAL REVIEW REPORT
Referral by City Planner to Historic District Commission
Meeting of June 18, 2026
Permit: Siding Permit #26-848
Location: 108 S Governors Ave, Dover
Three-story Residential Apartment Building
Tax Parcel: ED-05-077.09-01-41.00-000
File Number: HI-26-02
Present Zoning: C-2 (Central Commercial Zone) H (Historic District Zone)
Referral of Permit: The following application Siding Permit #26-848 for 108 S Governors Ave is referred by the City Planner to the Historic District Commission for consultation regarding the issuance of the Architectural Review Certificate for a Siding project. The project proposes the use of a vinyl siding product in a horizontal format to reclad the three-story residential apartment building. Applications for certain types of construction activity within the Historic District Zone (H) are reviewed by the City Planner (or Staff as designated) for Architectural Review Certification as part of the Building Permit application review process. Staff is referring the Permit for review under the provisions of Zoning Ordinance, Article 10 Section 3.22(A) and (B). See below.
Section 3.22 Architectural review certification by the city planner. (A) An architectural review certificate for specific classes of building permits, including Fences, signs, siding, window and door replacement, roofing, the addition or replacement of decorative features, minor demolition, residential additions, and other construction of a minor nature, may be issued by the city planner, after a review and determination that the proposed construction is in general accordance with the standards set forth in subsection 3.25. (B) The city planner may refer any permit application for demolition or construction in the historic district for consultation with commission.
Permit Information: Siding Permit #26-848 was filed on May 29, 2026 for a siding project at 108 S Governors Ave in Dover, Delaware. This is a three-story residential apartment with an existing porch, tan siding (appears to be wood horizontal siding and composite shingle siding on the south elevation) and blue shutters on the window, and trimwork. The project listed in the Permit submission consists of the removal and replacement of the building’s siding. The specifics for the siding were identified as to being a horizontal type of vinyl siding.
- P.O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 42
Page 43
Item 6.
HI-26-02 Referral of Siding Permit #26-848 at 108 S. Governors Avenue
Staff Report to the Historic District Commission
Property Information: The project site is located within the local Historic District Zone (H) and subject to the provisions of the Zoning Ordinance, Article 3 §21 and referenced sections. This building is also located within the boundaries of a National Register Historic District, specifically the Victorian Dover Historic District (K-00396.204). The following is the inventory description from the Victorian Dover Historic District nomination:
K-00396.204 108 S Governors Avenue – Pre-1885, 3-story, 3-bay, Italianate-style residence; clapboard siding. Low-hipped roof; 2/2 double -hung sash; façade porch; converted to apartment units.
Staff Review of Permit for Architectural Review Certification: Project activities are reviewed for compliance with the Zoning Ordinance and the Design Standards and Guidelines for the City of Dover Historic District Zone as stated in Zoning Ordinance, Article 10 Section 3.25(A).
Article 10 Section 3.25 Architectural review standards. (A) An architectural review certificate may be issued if it is found that the architectural style, general design, height, bulk and setbacks, arrangement, location and materials and structures affecting the exterior appearance are generally in harmony with neighboring structures and complementary to the traditional architectural standards of the historic district as set forth in the historic district design guidelines and standards adopted by the planning commission and as set forth in the United States Secretary of the Interior's Standards for Rehabilitation.
The element must be in the “public view.” The “public view” is defined in the Zoning Ordinance as “that which can be seen readily from a public street, public building or public property, excluding views from alley rights-of-way.” The front façade and both side elevations are visible from South Governos Avenue due to the position of the building.
In reviewing the proposed project for Architectural Review Certification, Staff referenced various sections of Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings of the Design Standards and Guidelines for the City of Dover Historic District Zone which presents the Recommended, Not Recommended, and Inappropriate approaches to construction of various elements in the Historic District.
This Request should be reviewed for conformity with the design criteria and development guidelines found in the Design Standards and Guidelines for the City of Dover Historic District Zone. Chapter 3 presents the information on the appropriate formats and materials for use in the Historic District. Specifically, Chapter 3, pages 3-1 through 3-3 discuss the philosophy of the Design Standards and Guidelines and then it discusses the Recommended, Not Recommended, and Inappropriate practices associated with each building element. Walls: Wood Siding and Trim is discussion on pages 3-14 to 3-16.
The Design Standards and Guidelines focus on repairing building elements or replacement of the building elements in-kind to match existing conditions. For vinyl siding, this generally means it is not recommended for use in the Victorian historic context of the Dover Historic District Zone due to 108 S. Governors Avenue being located in the Victorian Dover Historic District. The proposed replacement vinyl siding does not comply with the recommended practices of the Design Standards and
43
2
Page 44
Item 6.
HI-26-02 Referral of Siding Permit #26-848 at 108 S. Governors Avenue
Staff Report to the Historic District Commission
Guidelines.
Historic District Commission Action The Historic District Commission should consider the Siding project and take action in regard to the Architectural Review Certification for the Siding Permit #26-848. The Historic District Commission may add conditions for the Siding project in order to comply with the character of the property within the Historic District.
Staff Findings from Review of Siding Permit: Staff findings and recommendations are summarized as follows for the Door and Window project as presented in Permit #26-848 and accompanying documents.
- 1.Siding Material: Vinyl siding is not recommended for the use in the Victorian Historic context of the Dover Historic District zone. Its sheen is noticeable and it is nearly impossible to install without converting up or obliterating original architectural details. Its seams are visible, it tends to wrap and deflect with changes in temperature, and its color will fade notably over time. It also traps and hides potentially damaging moisture within the walls of the house.
- a.Additional recommendations will be provided by Planning Staff prior to the meeting.
Advisory Comments: 1. The applicant shall be aware that issuance of a Siding Permit is required prior to the commencement of construction. The Siding Permit Application will be subject to the conditions of approval established and may be required to be updated, if necessary, to comply with these conditions established through the Architectural Review Certification process.
Attachments: • Letter of Referral Notice to Applicant dated June 10, 2026. • Siding Permit #26-848 Application Form and Siding sample brochure. • Design Standards and Guidelines for the City of Dover Historic District Zone, Chapter 3,
44
3
Page 45
Item 6.
City of Dover
June 10, 2026
Safwat Nasr
3724 Philadelphia Pike Unit A
Claymont DE 19703
Via Email: snasr77@gmail.com
Re: Referral of Siding Permit #26-848 to Historic District Commission, HI-26-02 Siding Project at 108 S Governors Avenue, Dover DE
To Whom It May Concern:
This letter is to inform you that Siding Permit Application # 26-848 has been referred to the City of Dover Historic District Commission for consultation. Siding Permit #26-848 was filed on May 29, 2026 for a siding project at 108 S. Governors Avenue in Dover, Delaware. This is a three-story residential apartment building. The project listed in the Permit submission consists of the removal and replacement of the building’s siding. The specifics for the siding were identified as to location and siding from the existing siding to be wood clapboard siding and a composite shingle siding. Additional correspondence from the proposed samples provided shows horizontal vinyl siding products.
The location of the subject property within the City of Dover’s Historic District zone requires the review and issuance of an Architectural Review Certificate (ARC) for construction and demolition activities. Siding replacement is eligible for Staff review of the ARC during the Building Permit application process if given approval. Project activities are reviewed for compliance with the Zoning Ordinance and the Design Standards and Guidelines for the City of Dover Historic District Zone as stated in Zoning Ordinance, Article 10 Section 3.25(A).
Article 10 Section 3.25 Architectural review standards. (A) An architectural review certificate may be issued if it is found that the architectural style, general design, height, bulk and setbacks, arrangement, location and materials and structures affecting the exterior appearance are generally in harmony with neighboring structures and complementary to the traditional architectural standards of the historic district as set forth in the historic district design guidelines and standards adopted by the planning commission and as set forth in the United States Secretary of the Interior's Standards for Rehabilitation.
In reviewing the proposed project for Architectural Review Certification, Staff referenced Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings of the Design Standards and Guidelines which present the Recommended, Not Recommended, and Inappropriate approaches to activities in the Historic District. The Design Standards and Guidelines focus on repair of building elements or replacement of the building elements in-kind to match existing conditions. For vinyl siding, this generally means it is not recommended for the use in the Victorian historic context of the Dover Historic District Zone due to 108 S Governors Ave being located in the Victorian Dover Historic District. The proposed replacement horizontal vinyl siding does not comply with the recommended practices of the Design Standards and Guidelines. Therefore, I am referring the Siding Permit application to the Historic District Commission for consultation. See Zoning Ordinance, Article 10 Section 3.22 (A) and (B) listed below.
Article 10 Section 3.22 Architectural review certification by the city planner.
- P.O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 45
Page 46
Item 6.
Letter Re: Permit #26-118 Fence at 1 Kings Highway NE, Dover DE
February 11, 2026
(A) An architectural review certificate for specific classes of building permits, including fences, signs, siding, window and door replacement, roofing, the addition or replacement of decorative features, minor demolition, residential additions, and other construction of a minor nature, may be issued by the city planner, after a review and determination that the proposed construction is in general accordance with the standards set forth in subsection 3.25 (B) The city planner may refer any permit application for demolition or construction in the historic district for consultation with commission.
The City of Dover Historic District Commission will review this Permit at their next meeting scheduled for Thursday, June 18, 2026 at 3:30pm. Options for participating in the Meeting include attending In-Person at the City Hall Council Chambers in City Hall at 15 Loockerman Plaza and/or attending the Virtual Meeting presentation using Webex, an audio and video conferencing system. A separate meeting invitation to Join the Meeting virtually will be sent by email to the applicants; where you can click “Join Meeting” to attend that afternoon. This Permit Referral has been assigned Application #HI-26-02. You are encouraged to participate in this meeting in person to discuss the project and provide any additional information on the project. Staff will provide the Historic District Commission with the permit application materials and other background information for their review and action. The Historic District Commission will consider whether Architectural Review Certification can be granted to the project as proposed or if other conditions of approval are required.
Also attached to this Letter are the Design Standards and Guidelines for the City of Dover Historic District Zone pertaining to Walls: Siding and Trim (pages 3-14, 3-15 and 3-16). If you have questions or wish to discuss alternative options, please contact the Planning Office at (302) 736-7196 or compplan@dover.de.us.
Sincerely,
Department of Planning and Inspections
Dawn Melson-Williams, AICP
Principal Planner
Attachments: HI-26-02 Preliminary Report by Planning Staff
Permit #26-848 and Siding Sample booklet
Streetview of the building
Excerpt of Design Standards & Guidelines – Chapter 3
CC: Permit #26-848
HI-26-02
46
Page 47
103 S Governors Ave Item 6.
108 S Governors Avenue, Dover May 2012 View
Dover, Delaware
Google Street View
May 2012 See latest date
Image capture: May 2012 © 2026 Google
47
Page 48
Item 6.
48
Page 49
Item 6.
49
Page 50
Item 6.
50
Page 51
Item 6.
51
Page 52
Item 6.
52
Page 53
Item 6.
53
Page 54
Item 6.
54
Page 55
Item 6.
55
Page 56
Item 6.
56
Page 57
Item 6.
57
Page 58
Item 6.
58
Page 59
Item 6.
59
Page 60
Item 6.
60
Page 61
Item 6.
61
Page 62
Item 6.
62
Page 63
Item 6.
63
Page 64
Item 6.
64
Page 65
Item 6.
65
Page 66
Item 6.
66
Page 67
Item 6.
67
Page 68
Item 6.
68
Page 69
Item 6.
69
Page 70
Item 6.
70
Page 71
Item 6.
71
Page 72
Item 6.
72
Page 73
Item 6.
73
Page 74
Item 6.
74
Page 75
Item 6.
75
Page 76
Item 6.
76
Page 77
Item 6.
77
Page 78
Item 6.
78
Page 79
Item 6.
79