This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.
Page 1
CITY OF DOVER, DELAWARE
PLANNING COMMISSION SEPTEMBER 21, 2026
Monday, September 21, 2026 at 7:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
Written comments are accepted via mail to City of Dover – Planning Commission, P.O. Box 475 Dover DE 19903 and via email at CompPlan@doverde.gov
IN-PERSON and VIRTUAL MEETING NOTICE
The Planning Commission Meeting for September 21, 2026 will be held as an In-Person Meeting at City Hall in City Council Chambers at 7:00 PM and as a Virtual Meeting using Webex, an audio/video conferencing system as an electronic means of communication. The public is welcome to attend in person or virtually with the participation information below to join by phone or computer.
PUBLIC PARTICIPATION INFORMATION
City of Dover Planning Commission Meeting of Monday, September 21, 2026 Join By Phone: Dial +1-650-479-3208 Access Code: 253 155 59188 Password from Phones: 3683772
Join Online: https://bit.ly/PCMeeting09212026
Webinar Number: 2531 555 9188
Webinar Password: DoverPC
If you are new to Webex, get the app now at https://www.webex.com/ to be ready when the meeting starts. For problems accessing the meeting, please call the Planning Office at (302) 736-7196.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
ADOPTION OF AGENDA
APPROVAL OF MINUTES
- 1.Adoption of Meeting Minutes of August 17, 2026
1
Page 2
PLANNING COMMISSION SEPTEMBER 21, 2026 - September 21, 2026 PAGE 2
COMMUNICATIONS & REPORTS
Meeting Reminder: The next Planning Commission regular meeting date is October 19, 2026 at 7:00 P.M.
Update on City Council Actions
Department of Planning & Inspections Updates
OPENING REMARKS CONCERNING MEETING PROCEDURES FOR APPLICATIONS
OLD BUSINESS
Requests for Extension of Planning Commission Approval
Revised Development Applications:
- 2.HI-25-01 Revised #2 and S-25-07 Revised #2 The Old Post at 55 Loockerman Plaza – Public Hearing and Review for Revised Architectural Review Certification and Revised Site Development Plan Application for redevelopment of the Old Dover Post Office property consisting of 1.267 acres for a mixed-use project (commercial and residential uses) known as The Old Post as Revised. This Revised #2 Plan proposes the demolition of the existing building in its entirety and reconstruction of the front building portion its current form adding the second-floor addition to the front wings of the building and with the four-story rear Building Addition. Architectural Revisions request utilization of an EIFS brick exterior cladding system in place of the conventional and thin brick materials for the building elevations. This Revised #2 Plan seeks to increase the apartment unit count from 42 to 45 units while keeping the exact same building footprint and total building square footage as previously approved. The overall project will consist of a building with forty-five (45) residential apartment units and commercial space and with parking and other site improvements. The property is zoned C-2 (Central Commercial Zone), subject to the SWPOZ (Source Water Protection Overlay Zone), and subject to the H (Historic District Zone). The property is located on the north side of Loockerman Plaza and adjacent to Innovation Way. The owner of record is The Old Post, LLC. Property Address: 55 Loockerman Plaza. Tax Parcel: ED-05-077.05-04-53.00-000. Council District 4. For Consideration with Revision: Parking Strategy Statement and Active Recreation Area Plan. Application HI-25-01 was considered for Architectural Review Certification at the Historic District Commission Meeting of February 20, 2025 and as Revised at their November 20, 2025 Meeting. Application S-25-07 was granted conditional approval of the Site Plan and Architectural Review Certification by the Planning Commission on March 17, 2025 and as Revised at their December 15, 2025 Meeting.
- 3.HI-25-02 Revised and S-25-11 Revised The Governor: Mixed Use Building at 120 S Governors Avenue – Public Hearing and Review of a Revised Architectural Review Certification and Revised Site Development Plan Application for the construction of a four story, 169,080 SF Mixed Use Building including a grocery, retail and restaurant spaces, a child day care, 120 apartment units, and a roof-top courtyard with site improvements of a parking lot, a courtyard, and landscaping. The Revision includes refinement to the building architectural elevations and materials, and adjustments to the building entrances, courtyard and loading areas. The main parcel contains 1.70 +/- acres. The properties are zoned C-2
2
Page 3
PLANNING COMMISSION SEPTEMBER 21, 2026 - September 21, 2026 PAGE 3
(Central Commercial Zone) and partially subject to H (Historic District Zone). The properties are located on the west side of South Governors Avenue and halfway between Reed Street and West Loockerman Street. The owners of record are Downtown Dover Development Corporation c/o Downtown Dover Partnership and The City of Dover. Property Addresses: 105 S. New Street, 111 S. New Street, 115 S. New Street, 120 S. Governors Avenue, Dover, DE. Tax Parcels: ED-05-077.09-01-44.00-000, ED-05-077.09-01-37.00-000, ED-05-077.09- 01-42.00-000, ED-05-077.09-01-43.00-000. Council District 4. Waiver Approved for Opaque Barrier – Fence Components and Approved Parking Strategy Statement. This Application HI-25-02 was considered at the Historic District Commission Meeting of July 17, 2025 and granted conditional approval of the Site Plan and Architectural Review Certification by the Planning Commission with Application S-25-11 The Governor 120 S Governors Avenue on September 15, 2025.
NEW APPLICATIONS
- 4.S-26-13 Winner Subaru Building Additions at 1387 North DuPont Highway – Public Hearing and Site Development Plan Review to permit the construction of 12,346 SF in Building Additions to the existing auto dealership building and site improvements on a 5.48-acre parcel for Motor Vehicle Sales and Service Establishment. The project entails the construction of a new 8,817 SF +/- Building Addition, a new 3,336 SF +/- Building Addition, and an additional new 193 SF +/- Building Addition, and associated parking and site improvements. The property is zoned C-4 (Highway Commercial Zone) and a portion is subject to the SWPOZ (Source Water Protection Overlay Zone): Tier 3-Excellent Recharge Area. The property is located on the east side of North DuPont Highway and northwest of the entrances to the Dover Mall. The owner of record is 1387 N. Dupont Highway, LLC c/o Michael Hynansky and lessee is Winner Dover 1387, LLC c/o Michael Hynansky. Property Address: 1387 North DuPont Highway, Dover DE. Tax Parcel: ED-05-057.00-01-15.00-000. Council District 3. Waiver Requested: Reduction of Arterial Street Buffer.
- 5.S-26-14 William Henry Campus Improvements at 65 Carver Road, Dover, DE – Public Hearing and review of a Site Development Plan for the demolition of an existing 140,382 SF school buildings (William Henry) and portion of the Kent County Community School (KCCS) and construction of a new 81,362 SF Kent County Secondary Intensive Learning Center, a 36,098 SF Addition for KCCS and a head house associated with the new geothermal system. The proposal also includes site work consisting of a new bus and parent dropoff/pickup loops, parking lots, vehicular and pedestrian circulation, and a geothermal system field. The property is zoned IO (Institutional and Office Zone) and also partly subject to the COZ-1 (Corridor Overlay Zone). The Owner of record is Dover Special School District (Capital School District). The Property consists of 45.46 Acres. The Property is located on the north side of Forest Street and east of Carver Road. Property Address: 65 Carver Road, Dover, DE. Tax Parcel: ED-05- 076.07-01-55.00. Council District 4. Waiver Request: Reduction of Parking Requirement.
NEW BUSINESS
- 6.MI-26-07 SJR8 - City of Dover DSHA Technical Assistance for Housing and Land Use Reform - Presentation on City of Dover Regulatory Analysis Summary Report
- 7.Annual Meeting of the Planning Commission (Nomination and Election of Officers and Appointment to Subcommittees)
3
Page 4
PLANNING COMMISSION SEPTEMBER 21, 2026 - September 21, 2026 PAGE 4
PUBLIC COMMENT OPPORTUNITY - An opportunity given for members of the public to provide comments to the Planning Commission not specifically related to Applicants with Public Hearings.
ADJOURN
Posted Agenda: September 11, 2026
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING
4
Page 5
Item 1.
CITY OF DOVER PLANNING COMMISSION
August 17, 2026
The Meeting of the City of Dover Planning Commission was held on Monday, August 17, 2026, at 7:00 PM as an In-Person Meeting and also using the phone/videoconferencing system Webex. The Meeting Session was conducted with Vice-Chairwoman Mrs. Denney presiding. Members present were Mr. Lewis, Mrs. Maucher, Dr. Jones, Mrs. Welsh, Mr. Reaves (virtual) and Mrs. Denney. Mr. Roach and Mr. Baldwin were absent.
Staff members present were Mrs. Dawn Melson-Williams, Mr. Alex Dewey, Mr. Jason Lyon (virtual), and Mrs. Kristen Mullaney.
APPROVAL OF AGENDA
THIS AGENDA HAS BEEN REVISED BY ADDING ITEM #2 – REQUEST FOR
EXTENSION - for S-24-11 Warehouse Building at 601 Garrison Oak Drive (Lot 3 - Garrison Oak Business and Technology Center) under OLD BUSINESS – Requests for Extension of Planning Commission Approval (with subsequent agenda items renumbered).
Mrs. Maucher moved to approve the Revised Agenda as presented, seconded by Mr. Lewis and the motion was carried 6-0 by voice vote with Mr. Roach and Mr. Baldwin absent.
APPROVAL OF MEETING MINUTES OF JULY 20, 2026
Mrs. Welsh moved to approve the Planning Commission Meeting Minutes from July 20, 2026, seconded by Mrs. Maucher and the motion was carried 6-0 by voice vote with Mr. Roach and Mr. Baldwin absent.
COMMUNICATIONS & REPORTS
Mrs. Denney stated that the next Planning Commission regular meeting is scheduled for Monday, September 21, 2026 at 7PM in the City Hall Council Chambers.
Mrs. Melson-Williams provided an update on the regular City Council and various Committee meetings held on July 27 & 28, 2026 and August 10 & 11, 2026.
Mrs. Melson-Williams stated that at the August 10th Council Meeting, Mrs. Donna Lee Williams was appointed to fill the seat vacated by Mr. Witham. She will fill the unexpired term through June 2027. She has joined us this evening online to just observe what happens with the Planning Commission meeting and we will be doing a full onboarding meeting with her as Planning Staff.
Mrs. Melson-Williams stated that they have hired an additional Planner, Mr. Chris Salzano. You may remember him as he was previously with our office. He is a re-hire into the Planner II position; so, you will be seeing him at your upcoming meetings as projects are assigned.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Melson-Williams presented the audience information on policies and procedures for the In- Person Meeting and Virtual Meeting using the Webex system.
1
5
Page 6
CITY OF DOVER PLANNING COMMISSION AUGUST 17, 2026
Item 1.
OLD BUSINESS
Requests for Extensions of Planning Commission Approval:
S-24-11 Warehouse Building at 601 Garrison Oak Drive: Extension Request – Request for One Year Extension of the Planning Commission Approval granted on August 19, 2024 for Site Development Plan for a 100,000+/- SF Warehouse Building with associated site improvements. The site is located at Lot 3 of the Garrison Oak Business & Technology Park. The property is zoned IPM-2 (Industrial Park Manufacturing Zone – Business and Technology Center) and subject to the SWPOZ (Source Water Protection Overlay Zone: Tier 2 – Primary Wellhead Protection Area). The property of 12.813 acres is located on the west side of Garrison Oak Drive on the inside of the loop. The owner of record is Garrison Oaks LLC. Property Address: 601 Garrison Oak Drive. Tax Parcel: LC-05-068.00-02-03.00-000. Council District 3. Approved Waiver Requests: Partial Elimination in Upright Curbing and Reduction of Parking Requirement. Approved: Performance Standards Review Application. The Final Site Plan Approval was granted April 28, 2026.
Representative: None
Mrs. Melson-Williams stated that Planning Staff did provide to the Planning Commission members, their Letter of Request that was filed once we discovered that it was coming up on expiration at the end of this month. That is the Site Plan S-24-11 proposal for a warehouse building at 601 Garrison Oak Drive which is Lot 3 of the Garrison Oak Business & Technology Park. The Site Plan does have Final Site Plan Approval. That was actually granted, meaning that they have gotten all of their agency approvals in hand back on April 28, 2026. They have just not moved forward to the permitting process or commenced construction. In order to keep a project alive, you have to continue to make progress on the request.
Mrs. Maucher asked if there was a time period in which they must begin pulling permits and is it as long as they begin before the one year extension deadline is up, that is fine? Or is there an expectation that they pull before that? Responding to Mrs. Maucher, Mr. Melson-Williams stated that the Zoning Ordinance established an initial approval timeframe of two years from your initial action. The Code allows for an additional one-year extension upon request. So if they are successful with this Request, they would have until August 31, 2027 to move into that permitting process, pull a permit, and commence construction. If they do not pull a permit and commence construction activity, then they will have to restart the application review process.
Mrs. Maucher asked if the activity has to begin by August 31, 2027 or do they just have to pull the permit? Responding to Mrs. Maucher, Mrs. Melson-Williams stated that have to pull permits and be in active construction. The specific language in the Code is “commence activity”.
Mrs. Welsh moved to approve S-24-11 Warehouse Building at 601 Garrison Oak Drive: Extension Request for one year, seconded by Dr. Jones and the motion was carried 6-0 by roll call vote with Mr. Roach and Mr. Baldwin absent. Mrs. Welsh voting yes. Mr. Lewis voting yes. Mrs. Maucher voting yes; but she is a little reluctant to as it is one thing if they are held up by
2
6
Page 7
CITY OF DOVER PLANNING COMMISSION AUGUST 17, 2026
Item 1.
things outside of their force but they have gone so far along and do not have what appears to be tenants for the property. Dr. Jones voting yes. Mr. Reaves voting yes. Mrs. Denney voting yes.
Revisions to Applications:
HI-24-07 Legislative Hall Building Addition at 411 Legislative Avenue: Revision for West Entrance ADA Ramp – Update and Action for a Revised Architectural Review Certificate for the addition of an ADA Ramp located at the West Entrance of Legislative Hall. The proposal includes an approximately 160 feet proposed ramp in length, while also providing access to a new accessible entrance created within the exiting west façade. A temporary ramp may also be proposed for during construction. This is associated with the Site Development Plan for the Legislative Hall Building Addition project. The main property of 2.80 acres+/- is zoned IO (Institutional and Office Zone) and subject to the SWPOZ (Source Water Protection Overlay Zone) and the H (Historic District Zone). The subject property is located on the east side of Legislative Avenue as the block between Martin Luther King Jr. Boulevard North and Martin Luther King Jr. South. The owner of record is the State of Delaware. Property Addresses: 411 Legislative Avenue and Court Street. Tax Parcels: ED-05-077.09-05-15.00- 000 and ED-05- 077.09-05-14.00-000. Council District 4. This Application HI-24-07 was considered at the Historic District Commission Meeting of October 17, 2024 and granted conditional approval of the Site Plan and Architectural Review Certification by the Planning Commission with Application S-24-19 Legislative Hall Building Addition on November 18, 2024. This Revision for the West Entrance ADA Ramp was considered at the Historic District Commission Meetings of June 18, 2026 and July 16, 2026
Representatives: Mr. Dan Ridgely, Studio JAED
Mrs. Melson-Williams stated that this request is specifically associated with a proposal to add a west entrance ADA ramp to the Legislative Hall Building. This property previously went through review with the Historic District Commission and Planning Commission back in the Fall of 2024 for what is a proposed Legislative Hall Building Addition on the east side of the building. This; however, makes a change to the west side of the building. It was presented to the Historic District Commission back in June and July of this year. The Historic District Commission initially had some design concerns with the opening or the entry door from the ramp system into the Legislative Hall Building and asked the applicant to do some design improvements or to go and take a look at that. They did that and that information was presented to the Historic District Commission at their meeting in July on July 16, 2026. The Historic District Commission is recommending approval of the Revised Architectural Review Certificate associated with this application which is HI-24-07. The information will be added to the overall project. But because of how intertwined it was with what was previously presented to both the Historic District Commission and Planning Commission, we are bringing it back as at least an informational reporting to this Commission.
As you can see in the image in the plan diagram that was presented, the west entrance to Legislative Hall currently has a set of monumental steps that brings you up into the elevated first floor entry. With any potential project affecting the east side of the building, then their ADA accessibility becomes more limited for this building. So, this ramp addition on the west side was
3
7
Page 8
CITY OF DOVER PLANNING COMMISSION AUGUST 17, 2026
Item 1.
proposed. It is a brick ramp with kind of a metal railing system and it makes entry into the building through what is currently a window. With this design, they are redesigning that window opening into a door opening. The Historic District Commission encouraged keeping basically the general form of that window opening including the keystone that is above and encouraging the use of glass in that door to replicate at least forom a distance, that it is very similar to the window and because of the significant amount of symmetry that exists on that side of the building. We have included in the packet, the review portion of the Historic District Commission and what they saw and including the Staff recommendations. The applicant is here this evening and you can hear from him a little bit more about this particular aspect of the project. We bring it to you somewhat like an informational item because this is something that given the form could have just be approved by the Historic District Commission. But because you saw a larger project and ultimately issued that Architectural Review Certification, we felt it best to have the information presented to you as well. There is no public hearing required with this application presentation.
Mr. Ridgely stated that Mrs. Melson-Williams explained very well the intent to add an ADA compliant ramp to the west side of Legislative Hall. Just a little history on how we got here; we have been commissioned to design an Addition to Legislative Hall which takes care of some programming needs that they have. It has been placed on the east side of property. That Addition will be fully ADA compliant and will include multiple elevators on the interior and all of the interior spaces will be ADA compliant. The issue that we have that we are currently trying to address is that during construction, which we estimate to take several years for the Addition, we have to take the current ADA access to the building offline which is on the east side of the building. As you see the Site Plan that is on the screen, you can see the darker somewhat rectangular shaped space on the upper side of the plan that is roughly where the current ADA ramp is going within that Addition footprint. When we start building that Addition, we have to take the ramp offline. Talking to our client, which is the Division of Facilities Management with the State of Delaware, they directed us to propose a permanent ramp on the west side. We came up with one that we took special care to respect the symmetry of the façade and historic detailing of it but are also trying to make it function as it intends and come to a point in the building where it can be addressed by security as well as the other public entrance. So, security has given us approval at this location and we found it constructible. We did our best to maintain the aesthetics and obviously it does take away a little bit from the symmetry of the building. We are doing what we can to maintain by keeping it a window like opening as Mrs. Melson-Williams mentioned. It’s large using a lot of glass and white trim to match the opposite window and using architectural details that are appropriate for the high level of detail on the building and with the wrought iron railing systems and the brickwork on the ramp. We would also be using a snow melt system which would provide a safe access. That is our proposal today, to add this west ramp to our overall scope of work so that the building which will remain occupied during construction, can maintain its accessibility and then for the foreseeable future, have multiple accessible points of entry.
Mrs. Maucher stated that she saw in the summary from the Historic District Commission that one of the questions was how close is handicapped parking to this because she knows that we have the parking garage going up. Are you going to have to go all the way from there or is there handicap parking on the streets or on the backside of the west side? Responding to Mrs. Maucher, Mr. Ridgely stated that’s a great question. If you look at the screen, you can see on the
4
8
Page 9
CITY OF DOVER PLANNING COMMISSION AUGUST 17, 2026
Item 1.
right-hand side of the page, that is Martin Luther King Jr Blvd South and on that side we are proposing restriping and reorienting parking spaces to create multiple ADA spots. There will be an accessible route from those spots to the new ramp. We are also adding a ramp on the site. you can see it in the bottom right, a little red area. That is currently brick steps that they are going to convert to a ramp as well. So there will be an accessible route; however, since this plan has been submitted, we took note of the Historic District Commission’s recommendation and we asked our civil designer to add some ADA parking on the north side too. We are looking to improve on the plan that you are looking at today.
Mrs. Maucher asked if pulling out the steps further and making more of a platform, was that an option because it is just odd that you are taking a window and making it into a door? Responding to Mrs. Maucher, Mr. Ridgely stated that there is a challenge inside the building. As you walk into that front door there are additional four or five steps. You are in a vestibule and then to get to the main level, there are additional steps. Unfortunately it would a lot more disruptive to modify that main entrance to be accessible.
Mrs. Denney stated that having a passion to preserve history and the aesthetics and having a historic house in Camden, she really appreciates your expertise in trying to preserve and do as much as you can with this Mr. Ridgely.
Mrs. Maucher moved to approve HI-24-07 Legislative Hall Building Addition at 411 Legislative Avenue: Revision for West Entrance ADA Ramp and accept the Historic District Commission’s recommendations, seconded by Mr. Lewis and the motion was carried 6-0 by roll call vote with Mr. Roach and Mr. Baldwin absent. Mrs. Maucher voting yes; she thinks they did a fine job accommodating all of the needs of everyone. Dr. Jones voting yes; for reasons stated by Mrs. Maucher. Mr. Reaves voting yes. Mrs. Welsh voting yes; she just wants to comment that in the past she has done historical restorations and she appreciates just what you said about the door and window matching and how difficult that can sometimes be. Mr. Lewis voting yes; good luck with the project. Mrs. Denney voting yes.
NEW APPLICATIONS
US-26-01 Dover Commerce Park Comprehensive Signage Plan – Public Hearing and Review of a Unified Comprehensive Signage Plan for the Dover Commerce Park (previously known as Dover Industrial Park) consisting of a thirty-two (32) square foot, 9 feet-4-inch-tall freestanding sign to identify the campus. The campus is to consists of three multi-tenant flex warehouse buildings (Buildings A, B, C) with parking and site improvements including a shared entrance with an adjacent building at 300 Lafferty Lane. The property is zoned M (Manufacturing Zone) and is subject to the AEOZ (Airport Environs Overlay Zone): Accident Potential Zones I & II. The property consists of 19.74 acres. The property is located on the north side of Lafferty Lane, approximately one quarter mile west of Horsepond Road. The owner of record is Dover Industrial, LLC. Property Address: 350 Lafferty Lane. Tax Parcel Number: ED-05-077.16-02- 05.00-000. Council District 2. PLUS Review # 2024-08-08. The campus is under development as Phase 2 of this project was granted conditional approval by the Planning Commission with Site Plan S-25-10 Dover Industrial Phase 2: Warehouses in July 2025. Phase 1 of this project was approved as Site Plan S-24-13 Flex Use Facilities Commercial Warehouse in September 2024
5
9
Page 10
CITY OF DOVER PLANNING COMMISSION AUGUST 17, 2026
Item 1.
and with Final Plan is under construction.
Representative: Mr. Chris Evans, Coastal Commercial Construction
Mrs. Melson-Williams stated that this is a Unified Comprehensive Signage Plan for the property known as the Dover Commerce Park. It went through our review process as the Dover Industrial Park. The property is located at 350 Lafferty Lane. The overall site is just over 9.7 acres of land and originally went through the review process here with the Planning Commission for the development of the site. Ultimately, they are proposing three warehouse type buildings. Building A which was Phase 1 has been constructed and we are working through tenant fit-outs for portions of that building. Phase 2 which will be Buildings B and C on the site, was reviewed as Site Plan S-25-10 Dover Industrial Phase 2 and that is working through its Check Print review process on its Final Plan. Noting that there are three buildings with this project is key because with any campus that has three main buildings such as this, it qualifies for consideration of a Unified Comprehensive Sign Plan. The Site Plan image shows the entire property. What is shown in the pinkish color is Building A or Phase 1 which also included improvements to a stormwater management plan. They are working through the final details to be able to finalize the plan for the Phase 2 which is in blue. With a Comprehensive Sign Plan, it allows the Planning Commission to consider alternatives to our regular sign regulations which are part of the Zoning Ordinance. Our sign regulations are based on the type of road and the proximity to residential of that property. With this proposal, they are bringing to us one sign. It is a free standing sign that will be located on the east end of their parking lot near Lafferty Lane. The sign is near the entrance to the property which is actually a shared entrance with its neighbor to the east. What you see on the screen for the Dover Commerce Park is the proposal of this freestanding sign. It generally meets the description of what we deem as a monument sign. It is a little wider than it is tall; however, the Planning Commission is being asked to consider some alternatives to the strict provisions that are established in the City’s Sign Regulations. Specifically, those are related to the overall height of the sign and then the number of tenants that receive a tenant space on the sign itself. The strict interpretation of the Sign Regulations would limit this sign to seven feet in height. This current version of the sign that this applicant has brought to us has an overall height of 9 feet 4 inches. It is a little taller than what is typically allowed if we wanted to review it as a Sign Permit review process with Staff. The other item is related to those tenant space panels. The design guidelines for our Sign Regulations would limit that to three tenants. They are asking for the ability to provide space for seven tenants. The Planning Staff is recommending approval of this version of the monument sign for the Dover Commerce Park. We have worked with the applicant and some of their earlier versions of this sign were in a different location and took a very different format. Their Comprehensive Sign Plan for this project just focuses on this one sign. Any additional signage on the campus would be subject to our regular Sign Regulations which prescribe the limitations on things such as wall signs. There is the ability to do some directional signage onsite without a permit, but this is what is before the Commission tonight. The Comprehensive Sign Plan does charge the Planning Commission in reviewing this to take a look at whether the size and complexity of the campus warrants the need for the types of signage under these provisions. Also, it’s looking at the number and type of entrances and how the sign is placed near those entrances and then if the signage proposed is adequate to safely direct the public to the uses on the site. You also have to look at the proposed sign to ensure it will not have an adverse impact on the visibility of
6
10
Page 11
CITY OF DOVER PLANNING COMMISSION AUGUST 17, 2026
Item 1.
neighboring signs and then also if the sign itself is generally of a style and color to compliment the architecture of the site and the area in general. She will note that this utilizes kind of a blue color for the base. That blue color is also found in the exterior wall surfaces of at least Building A at this point. The end tenant spaces have a blue that is utilized where the rest of the wall system is kind of a series of grays.
Mr. Evans stated that they are proposing this monument sign for this business park. He thinks it fits in with the design of at least Building A right now which is 54,000 SF. Potentially, we do have two tenants in right now and we are getting a third tenant to take the remainder of the building. We are proposing a Phase 2 to be a 45,000 SF building and the third building would be proposed to be a 133,000 SF building. That is why we are proposing the seven tenant spaces on this sign. This sign will fit in well with the architecture of at least Building A at this point.
Mrs. Maucher asked if there were other signs along this street. Responding to Mrs. Maucher, Mr. Evans stated that there are. Across the street, there is a smaller business park and they used to have just a plywood sign on 2x4 posts and now they did recently install a new sign with multiple tenants on their sign as well.
Mrs. Denney opened a public hearing.
Ms. Jo Del Rome (virtual) – unknown Ms. Del Rome stated that as long as they are staying on their property, she doesn’t have any questions. She was just curious if they had planned on trying to expand outside of their property. Responding to Ms. Del Rome, Mr. Evans stated that the proposed sign is on our property.
Note: It is noted that Zach Prebula of the Kent Economic Partnership (KEP) was online observing the consideration of the application. He did not wish to speak.
Mrs. Denney closed the public hearing.
Mr. Lewis moved to approve US-26-01 Dover Commerce Park Comprehensive Signage Plan for the Unified Comprehensive Signage Plan, seconded by Mrs. Welsh and the motion was carried 6-0 with Mr. Roach and Mr. Baldwin absent. Mr. Lewis voting yes; and hopefully they will have tenants to fill the whole sign very soon. Mrs. Maucher voting yes; and that will be inclusive of the additional height and the allowance for up to seven tenants on the sign. It is in character with the surrounding area and not in conflict with other signage. Dr. Jones voting yes. Mr. Reaves voting yes. Mrs. Welsh voting yes. Mrs. Denney voting yes.
NEW BUSINESS
MI-26-10 Active Recreation Provisions Update – Presentation and Discussion of Potential Changes to Active Recreation Requirements for Residential Development
Mrs. Melson-Williams stated that this presentation this evening is going to be given by Mr. Tom West who is with the Rossi Group. They have been doing some research. If you remember us talking about the SJR8 (Senate Joint Resolution #8) which is a housing and land use reform
7
11
Page 12
CITY OF DOVER PLANNING COMMISSION AUGUST 17, 2026
Item 1.
effort. One of the things that they have flagged is related to our Active Recreation requirements. As noted earlier in this meeting, one of the Council Subcommittees heard this presentation last week and they felt it appropriate to bring to the Commission this evening.
Mr. West stated that he is a Certified Community Planner with the Rossi Group and one of the team members working on the project which is Land Use and Zoning Reform Project. One of the things that she described is that we are basically looking at zoning and subdivision provisions and processes for each of the jurisdictions that we work with the things that raise flags are things to be discussed. Tonight he is here to talk about specifically the open space recreation and public facilities provisions that are in place in your Zoning Ordinance in Section 10. The next slide shows points on the project itself. It is a voluntary pilot program. Starting with Dover, we are looking at the regulatory analysis and we are looking at active recreation requirements. Part of it is to look at some of the examples that have happened recently that created confusion or delay. Most notably are the Cecil Street Townhome project and the Nixon Lane Minor Subdivision which he thinks came up in the same meeting. There was discussion about some of the provisions but they will look at some details about how the Code affected those and other ones too.
The next slide shows some Code language. For recreation area in the City, a development needs to provide 275 SF per dwelling unit or one-half acre. That is pretty straight forward; that’s an area size that if developments are coming in, they need to provide open space. It gives all of the details about why open space and recreation are important. With that requirement, there are some exceptions and this is one of the things that we are looking at. The first two which are different provisions in the Ordinance and have different requirements or in this case, different exceptions. That is part of the things that we are looking at to fix. Is there context or things that can be clearer? These are basically exemptions from meeting that requirement for recreation area or a fee that we will talk about.
The next slide talks about a cash-in-lieu. There are exceptions to providing recreation area but you are supposed to provide a fee. There needs to be a determination of how to get to the fee. In Dover’s case, it is based on an appraisal value of the land that is under consideration and that is part of the plan that was submitted to you. So to get the fee, an appraisal needs to be done for the value of that land if it is to be developed. They are not giving the recreation area; they are providing money instead based on some of the exceptions. He will talk about the cash-in-lieu but again, the main take away from this is you need an appraisal which costs money, it takes time, and sometimes applicants aren’t as familiar with it especially for smaller projects. That is where some of these more complex provisions come into play.
The next slide is also another section of the Ordinance that talks about cash-in-lieu for exceptions. This is when it is very small development and in this case, less than 5 acres. They are not providing their land but they are providing a fee. Again, you need an appraisal for it and it is based on the gross land area. The applicant needs to provide that up front as part of the appraisal for the construction financing money. They are doing for the appraisals for other things. We talked about land and we talked about determining a fee.
If we go to the next slide, this is just talking about in general about some of the challenges with
8
12
Page 13
CITY OF DOVER PLANNING COMMISSION AUGUST 17, 2026
Item 1.
the process in the way it’s currently set up. There are too many carve outs and exceptions and sometimes they are not always the same. It’s a confusing process going through the Ordinance and for applicants to look at it and he imagines for the Planning Commission too. When you are looking at a plan, it’s what is being required and what the Ordinance is saying in different provisions. The second one is the cash-in-lieu. Again, he mentioned that you need an appraisal for it. Sometimes it happens where smaller projects are coming in and they do not owe an appraisal. It’s kind of a surprise to them at times that they need to do this. Then they are trying to secure construction financing and all of sudden they have a problem to move forward with it. None of these are really troubling for bigger developments or applicants who have been through the process before. He thinks the case where we are seeing the processes create bumps or challenges is on smaller projects. He is moving on from this foundation that he has labeled; you need area or the cash-in-lieu of open space and recreation. We are suggesting this as part of this process to promote affordable housing and looking at your Code to see if there are ways to clear up provisions. Open space is very important and it’s needed but can it be clarified so especially smaller projects don’t get caught up in some of the complexities of it.
The next slide is showing a new approach where there are different tiers. Our analysis and discussions with City Staff is that it is really not impacting larger developments like Bay Village or ones like it; it is smaller developments where it becomes confusing or causes delays because when people are going through it, they are just not as aware of it and it causes problems as the process unfolds. There are also at the bottom, minor subdivisions. We are recommending that certain ones be exempt like minor lot line changes and minor subdivisions. The third one down under is for projects under those thresholds, meaning other than major subdivisions, conditional use applications, and site plans, a flat fee could be established off of an appraised fee. Instead of cash-in-lieu of with an appraisal, we have looked at other flat fees in the area. These are some examples in nearby communities. Harrington, Smyrna, New Castle County, and Delaware City. We look at those and say these are not impact fees but instead of a cash-in-lieu of from an appraisal, let’s just set a flat fee. It becomes much clearer in your Ordinance and then to applicants that are going through the process if they are just dealing with that dollar value upfront.
The next slide is showing some comparisons of how the areas are broken down. So in Newark and Smyrna, you can see how much is required for recreation area. Right now, Dover is requiring 275 SF or half an acre. We are looking at some of the land dedication examples in other communities such as this tiered one in Newark or 15% in Smyrna. The next slide is showing instead of other communities, some recent developments and how much they have dedicated to the recreation area going forward. Bay Village is at the top and the two ones that are lower are more in the City proper, if you will. You see there the different unit sizes and how much site area there is and then how much of the recreation area was provided as part of the approved plans moving forward for these developments. Thankfully, we looked at that as we were comparing how to approach the overall process and if we can streamline it.
The next slide is kind of a wrap up. This is the information that we have looked at for just this one section of the Code for open space and recreation. We think open space and recreation is very important. The summary of it is that the provisions work well for larger developments but we think that there are smaller infill developments coming in where it might be too much for
9
13
Page 14
CITY OF DOVER PLANNING COMMISSION AUGUST 17, 2026
Item 1.
them. There are definitely some things that might be conflicts in the Ordinance to look at cleaning up. We are looking for if there is support for that general framework. The top two tiers would stay pretty much the same and the bottom one we would be exempting very small developments from the requirements as a suggestions, and the middle one is to just change the fee-in-lieu of calculations instead of an appraised fee to a flat fee. We are looking for your thoughts on that general framework. Should Minor Subdivisions be exempt or subject to a flat fee? Right now, they are subject to a flat fee and is there a general sense of what the area requirements should be based on a gross land area density.
Mr. Lewis stated that he was on the City Council Subcommittee panel that heard this last week and just in general the City Council seems sympathetic to the revision proposals. To him, it seems like common sense to make some revisions and it did to them as well. He thinks that particularly of our friend with the Cecil Street townhouses who has been here multiple times and to that other panel multiple times going back and forth on what his cash-in-lieu would be. Ideally, we would be encouraging more people like that and he could see where that could get in the way of somebody wanting to do that to be forced to come back multiple times for something like this. He is in favor of the revisions.
Mrs. Maucher stated that currently does that go to the General Fund or is there a dedicated Capital Park Improvement fund? Responding to Mrs. Maucher, Mrs. Melson-Williams stated that the question is about when that cash-in-lieu payment occurs, where does it go? It is very specifically in our Code that it must be designated for a Parks and Recreation Fund. So, it goes to into a fund that can be utilized for park and recreation improvements citywide. So, it is a specific pot of money.
Mrs. Maucher further asked if it was specifically for capital improvements. Responding to Mrs. Maucher, Mrs. Melson-Williams stated that she is not sure if it is specifically listed for only capital improvements. She thinks that is what it has trended to be used for. She is not sure if it can be utilized for any kind of programming efforts as well. In the past, she knows they have used it to replace playground equipment and things of that nature. But that is certainly something that could be clarified moving forward.
Mrs. Maucher stated that on the different tiers, she is more sympathetic to duplexes and townhomes that don’t have yards necessarily available, but why were single family detached homes thrown into that grouping? Also, was any consideration given to the proximity of the project to other recreation areas? Responding to Mrs. Maucher, Mr. West stated that the grouping, from his understanding, is the way that it’s setup now. Anything with at least 23 lots, it doesn’t matter what kind of housing it is, is subject to that tier. He is not aware of if there is any consideration of proximity to existing parks or other things that would affect that impact from those types of developments. But it is basically broken down by lots and multi-family at the top.
Dr. Jones stated that it may not have direct relationship to the considerations to the revisions, but she thinks that they are generally good. She does have a question about the administration of the fees. At what point in time currently or with the proposal, is the assessment for in-lieu of paid? Is it paid up front or is it at the completion? Responding to Dr. Jones, Mrs. Melson-Williams stated that if a project currently goes through the process and the cash-in-lieu is accepted instead of
10
14
Page 15
CITY OF DOVER PLANNING COMMISSION AUGUST 17, 2026
Item 1.
building recreation area as part of the project, the administration involves the submission of the appraisal from the applicant. Staff then does the calculation and that calculation is reported both to the Planning Commission and to the Parks and Recreation Committee as part of the review of the plan for active recreation. That fee does not come due until you are ready for your first Building Permit. It must be paid prior to us issuing the first Building Permit for that development.
Dr. Jones stated that she has mentioned this; she lives in a development where the developers have changed two or three times and she thinks there were some wrinkles in the active recreation area. So that is why she is asking. If a developer, for whatever reason, goes bankrupt and somebody else comes in; she knows some things have happened in her development that may have finally come to fruition. Responding to Dr. Jones, Mrs. Melson-Williams stated that with that particular development, there was the original plan for what active recreation was going to be for that larger subdivision. The plan for the subdivision changed and it became about half the number of units it was initially planned for and at that time, there was also a proposed revision to the active recreation area. She is not sure which developer is what, but the plan was revised. She thinks that neighborhood initially had a plan for a clubhouse and different things that way. When the number of units changed, then the active recreation required area went down and they proposed alternatives for active recreation. Basically, she thinks they kept some very small open space parcels but the main amenity in the case of that neighborhood, was to ensure that there was the walkability to what is one of our major parks, Schutte Park. It was to ensure that there were the sidewalk connections to get from this neighborhood to that existing large City parkland. Proximity to something actually helped that project because it was accepted as meeting part of the active recreation requirements for that property. Right now, with a project depending on the type of project between what the actual requirements are and those exemptions that we have, you end up with a land area number that is required for active recreation and then how the developer chooses to meet that is reviewed as part of the process. Whether it is building amenities as part of the development or if they aren’t going to propose building amenities, then it is that cash-in-lieu scenario which results in a donation to the Parkland Fund based on the appraisal and the calculation process that we must do.
Dr. Jones stated that she thinks there were three developers there. As we move along with this process, like she said, she thinks the revisions are great but she thinks that there should be some consideration about when that fee actually comes in, when the assessment is actually levied to the developer.
Mr. Reaves asked with that in regards to the fee in the fund, who is the approval authority for dispersing those in-lieu-of fees? Responding to Mr. Reaves, Mrs. Melson-Williams stated that she believes that would reside with kind of a combination of the Department of Parks and Recreation for the City. If it is a capital project, it is probably outlined as part of the City’s budget process. If it is for a certain amount in the City’s Capital Improvements Plan, which is part of our budget process, that is certainly something that we can learn more about. It is not a responsibility of the Planning Commission to approve dispersements from that fund or for the Planning Office to approve dispersements from that fund.
Mrs. Denney stated that many years ago, she managed the Town of Camden. She was a
11
15
Page 16
CITY OF DOVER PLANNING COMMISSION AUGUST 17, 2026
Item 1.
Councilwoman and eventually she became the Town Administrator. There came a time where a very gracious senior citizen who knew that she would not be with us anymore, left her land to the Town of Camden. Initially, there was a little bit back and forth on if it was going to Town of Camden or Kent County. Ultimately, it was left. At this point, she held no office there but she has been very close to her, and we were represented by a lawyer because that was the first thing that she thought needed to happen. To cut to the chase, there was a “what do we do with this” and ultimately everyone knows that it ended up being Piccadilly Castle. We really had very little funds; almost no funds. At that point, $10,000 was a small amount but we had some monetary help. The City of Dover felt like they should be contributing to the Camden park; there were a lot of politics involved, but ultimately they ended up deciding that the community in and of itself will build it. They went to electric companies and water companies and eventually through the graciousness of smaller monetary contributions as well as a lot of blood, sweat, and tears we ended up building a little city there. They had people who were providing food, cooking food, businesses who would donate the food and we would feed the people. We were operating 24/7 and they had well drillers and electricians who were donating time and energy and telephone poles. It was a wonderful project but anytime something like this comes up where we are saying in-lieu-of recreation that is a giant example. But to her when we do that and we take money instead, she feels like we are taking away what could be a couple of park benches or a little bit of a dog park because that wasn’t as popular back then. When you are over there now, there are so many people walking dogs there so there should be dog parks and things. She always in her mind have trouble with this “in-lieu-of” because she thinks it should be something that the people who live in the houses of that particular development or apartment complex should be able to appreciate. It shouldn’t go to some type of general fund. The other question she has is what happens if a family comes in and a great grandfather left a 600-acre family farm to 18 grandkids and they want to make it into individual lots. If you have all of these fees from breaking up these lots, how does that get divided? Ultimately, they just inherited the land and they probably could just leave it but if they are going to build houses, what happens? How does that work out with the in-lieu-of aspect? Responding to Mrs. Denney, Mrs. Melson-Williams stated that she doesn’t know if they are going to be able to answer any of those questions. This is meant to be a discussion, thoughts, concerns on things that the Planning Commission members have seen when dealing with this requirement for active recreation. This is purposeful to bring initial concepts. It is not in ordinance form yet. That is to come and that will have to move through review with this body and City Council before it is adopted or make any changes to what our Code exists today for active recreation.
Mr. West stated that he really appreciates the discussion and the direction. This was one that rose to the top which is why we wanted to go to Council and the Planning Commission, because you have experiences with these provisions and how it plays out and how the in-lieu-of fee is impacted. They will be taking your direction. They are working on a lot of other parts of recommendations or suggestions to consider. You will be hearing more on that. There will be a document that comes out soon that talks about many of the other ones that they are looking at. There should be a workshop coming up just to get the public input on it. We are still gathering our facts but will come back to you eventually with whatever we do move forward with and they will develop suggested Code amendments. We will definitely be back before the Planning Commission and Council. He looks forward to working with the team to help you out with the project and working with you in the weeks and months to come with it.
12
16
Page 17
CITY OF DOVER PLANNING COMMISSION AUGUST 17, 2026
Item 1.
Mrs. Maucher stated that she is in support of the flat fee. She thinks it is a cleaner and easier way to handle that. She thinks it should be high enough to be meaningful but not so high to add additional burden to what we trying to do which is to create affordable housing. She thinks it should also be scalable to some extent so that it is not set in Code and you have to amend Code to be able to change that dollar amount. If there was some way that it could be placed in a review every five years or something like that.
Mrs. Denney stated that she agrees with Mrs. Maucher.
Mr. West stated that he has seen similar provisions like that that are scalable. Since it is in the Code, it would be harder to update all of the time but you should have some timeframe or some criteria that there are updates to it.
Annual Meeting of the Planning Commission (Nomination and Election of Officers and Appointments to Subcommittees)
Mrs. Melson-Williams stated that your By-Laws indicate that July is the Annual Meeting of the Planning Commission. That is the time where you have received information on any reappointments, new appointments, and the like. We pushed that off because in July we had not heard that to date. Since that time, you have had one of the positions; Madam Vice Chair’s term was renewed. She was reappointed for a three year term. There are two other members of the Commission that there term is up this time of year. She would imagine that the Mayor’s Office is working through that process, if you seek to continue or not. With the resignation of your previous Chair, Mr. Witham, that seat has now been filled with a new member for the Commission and that is Ms. Donna Lee Williams. At this point, you can certainly move forward with the nominations and elections for Officers for the Planning Commission. There is a Chair and a Vice-Chair per your By-Laws. We did submit to you a copy of your By-Laws so that you have that for reference. There are limitations on how many years someone can serve in the Chair position but we do not have that situation at this point. By the By-Laws, the election process is by ballot unless you suspend that voting process in a separate motion. At this point, if you are interested in moving forward with your election of Officers then she would believe that our Acting Chair would be in acceptance of motions regarding the positions of Chair and Vice-Chair.
Mrs. Denney stated that whatever the Planning Commissioners as a whole would like to do, she is open to either ballots or voice nomination votes.
Mrs. Welsh stated that according to the meeting minutes from the last meeting, we did make a motion to defer voting until the appointments and reappointments have taken place. Responding to Mrs. Welsh, Mrs. Denney stated that she was reappointed and we have a new member that has been appointed. She doesn’t know who else is up or if anybody is up.
Mrs. Maucher stated that if there are two additional reappointments that have to occur, there is no guarantee that the person holding the Chair currently would be reappointed. She would move that she thinks they should wait until those final appointments are done and then Ms. Williams would be here instead of just observing. Responding to Mrs. Maucher, Mrs. Melson-Williams
13
17
Page 18
CITY OF DOVER PLANNING COMMISSION AUGUST 17, 2026
Item 1.
stated that the appointments to the Planning Commission are structured so that three terms expire each year. At this point, of the three that are expiring this summer, one of them has been reappointed and that is Mrs. Denney. There are two other individuals whose terms are up. Per the By-Laws or in Code, she is not sure which, the current appointees continue to serve until superseded by someone else or they are reappointed themselves. Dr. Jones and Mr. Reaves are the two individuals whose terms also expire in 2026 but the full process for formal reappointment has not yet been completed. At this point, the earliest that this could happen would be in September because the Mayor makes the appointment and it is acted upon by City Council. The next City Council meetings are not scheduled until September.
Mrs. Denney stated that perhaps given that, we should just wait until the September meeting.
Mrs. Maucher moved to defer voting on Officers until September when reappointments have taken place, seconded by Mrs. Welsh and the motion was carried 6-0 by voice vote with Mr. Roach and Mr. Baldwin absent.
Mrs. Melson-Williams stated that Planning Staff was asked to pursue the availability of the two design professional members for the Architecture Review Oversight Subcommittee for the Planning Commission. They are waiting to hear information back on that piece of this so they will certainly see if they can have answers on that for the September meeting.
PUBLIC COMMENTS OPPORTUNITY
Mrs. Donna Lee Williams stated that she wanted to thank members of the Planning Commission for deferring this vote this evening so that she will have the opportunity to meet with all of you and participate in this process. She is very much looking forward to meeting with everyone. She has attended a few Planning Commission meetings in the past; however, she has not had the chance to personally speak with all of you. She is really looking forward to this opportunity to work with you and in service our community.
Meeting adjourned at 8:46 PM.
Sincerely,
Kristen Mullaney
Secretary
14
18
Page 19
Item 2.
City of Dover
DATA SHEET FOR REVISED SITE PLAN REVIEW & REVISED ARCHITECTURAL
REVIEW CERTIFICATION
DEVELOPMENT ADVISORY COMMITTEE MEETING OF September 9, 2026
PLANNING COMMISSION MEETING OF September 21, 2026
Plan Title: The Old Post at 55 Loockerman Plaza, S-25-07 Revised #2
Plan Type: REVISED #2 Site Development Plan and REVISED #2 Architectural Review Certification
Location: Northwest corner of Loockerman Plaza and Innovation Way in Dover, DE
Owner: Old Post, LLC
Address: 55 Loockerman Plaza
Tax Parcel: ED-05-077.05-04-53.00-000
Size: 1.267 acres +/-
Present Uses: Vacant Building – Former Dover Post Office
Proposed Use: Mixed-Use Commercial and Multi-family Housing (Apartments) and associated parking
Zoning: C-2 (Central Commercial Zone)
H (Historic District Zone)
SWPOZ (Source Water Protection Overlay Zone) – portion of site
Building Area: 47,652 SF
Off Street Parking: 66 provided on-site; 29 provided in easement with City of Dover
Sewer & Water: City of Dover
For Consideration: Revised Architectural Review Certification with parking to building separation reduction
Prior Approvals: Parking Strategy Statement (Revised November 2025) Active Recreation Area Plan
- P.O. Box 475 Dover, DE 19903 19 Community Excellence Through Quality Service
Page 20
Item 2.
CITY OF DOVER
City of
DEVELOPMENT ADVISORY COMMITTEE Dover
Planning
APPLICATION REVIEW COMMENTARY Office
D.A.C. MEETING DATE: September 9, 2026
APPLICATION: Revised #2 The Old Post at 55 Loockerman Plaza
FILE #: S-25-07 Revised #2 and HI-25-01)
REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Dawn Melson-Williams, AICP, Principal Planner & Alex Dewey, Planner I
PHONE: 302-736-7196
This Report for Revised #2 S-25-07 The Old Post at 55 Loockerman Street was updated upon submission of an updated Site Plan set and associated Revised Architectural package.
- I.PLAN SUMMARY (Reviewed Revised Plan Sets of August 18, 2026)
The Planning Commission will act on a REVISED #2 Site Development Plan Application and associated Revised #2 Architectural Review Certification for the redevelopment of the Old Dover Post Office property consisting of 1.267 acres for a mixed-use project (commercial and residential) known as The Old Post as Revised. The Revised #2 Plan proposes the demolition of the existing building in its entirety and reconstruction of the front building portion its current form adding the second-floor addition to the front wings of the building and with the four-story rear Building Addition. Architectural Revisions request utilization of an EIFS brick exterior cladding system in place of the conventional and thin brick materials for the building elevations. This Revised #2 Plan seeks to increase the apartment unit count from 42 to 45 units while keeping the exact same building footprint and total building square footage as previously approved. The overall project will consist of a building with forty-five (45) residential apartment units and commercial space and with parking and other site improvements. The property is zoned C-2 (Central Commercial Zone), subject to the SWPOZ (Source Water Protection Overlay Zone), and subject to the H (Historic District Zone). The property is located on the north side of Loockerman Plaza and adjacent to Innovation Way. The owner of record is Old Post, LLC. Property Address: 55 Loockerman Plaza. Tax Parcel: ED-05- 077.05-04-53.00-000.
The Project Site is subject of HI-25-01 Revised #2 The Old Post as will be considered at the Historic District Commission Meeting of September 17, 2026, to provide a Revised Recommendation for Architectural Review Certification. This Application Revised #2 S-25-07 for the Site Plan will be subject to the same process with a public hearing before the Planning Commission.
Previous Applications The existing structure was constructed in the 1960s and was in service as the Dover Post Office until the new post office opened on Bank Lane in 2021. The property owner was the City of 20
Page 21
Item 2.
S-25-07 REVISED #2 The Old Post
DAC Report of September 9, 2026
Dover. After the Post Office closed, the City initiated an RFP process to solicit proposals for redevelopment of the site. The current owner, Old Post, LLC was selected through this process. Application Z-24-01, approved by City Council on February 12, 2024, rezoned the property from IO (Institutional and Office Zone) to C-2 (Central Commercial Zone) with it remaining in the H (Historic District Zone) and SWPOZ (Source Water Protection Overlay Zone).
In February 2025, the Historic District Commission recommended approval of the Architectural Review Certificate for the proposed building renovations/reconstruction in HI-25-01. On March 17, 2025, the Planning Commission conditionally approved the Site Plan S-25-07, inclusive of the Architectural Review Certificate. Then a Revised Plan was submitted in late 2025. Previously at the Historic District Commission Meeting of November 20, 2025, the Commission considered the Revised Application and has provided a Recommendation on the Architectural Review Certification for the project. Also, the Site Plan S-25-07 Revised The Old Post was granted conditional approval by the Planning Commission on December 15, 2025 (Revised Plan Sets of print date 11/6/2025 and 12/3/2025). The Site Plan was ready for Final Plan Approval in August 2026 then the Revision was proposed. This Revised #2 submission seeks to revise the Site Plan and Architectural Review Certificate previously approved. See attached Revised #2 Architectural Review Certification.
Preliminary Land Use Services Review (PLUS): The PLUS Review is required by a City of Dover Memorandum of Understanding (MOU) for certain types of projects. Due to its Downtown Dover Redevelopment Target Area, this project was not required to complete PLUS Review process.
II. PROJECT DESCRIPTION
PROJECT PROPOSAL Revised #2 (documents of August 2026 and Updated Set of 08/24/2026) The REVISED #2 application proposes the demolition of the full existing structure and the reconstruction of the front portion in its current form featuring a second-floor addition to the front wings and along with a new four-story building addition in the rear of the front building portion. Capital City 2030: Transforming Downtown Dover Master Plan identified the Old Dover Post Office as a Project Site. The Master Plan proposes that a new mixed-use building could reactivate the site. This project is also identified as a Key Project within the City’s Downtown Development District (Renewal) application of 2024.
The proposed development proposes a 4,560-SF commercial tenant space in the (reconstructed first floor) portion front area. The rear warehouse portion of the building will be demolished and replaced with a new four-story structure (and including the second floor of the front building portion) comprised of 45 apartment (multifamily) units.
The Applicant’s REVISED #2 submission includes a Site Plan set and Architectural Graphics set with building elevations and 3-D views. The elements of the project are as follows:
- 1.Full Demolition: The rear flat-roofed warehouse portion of the building and now the existing front portion of the building are to be demolished. Due to structural conditions associated with the existing front portion of the old Dover Post office, the entire building will now need to be demolished and reconstructed. The total building square footage and building footprint will remain the same when reconstruction of the building takes place. 21
Page 22
Item 2.
S-25-07 REVISED #2 The Old Post
DAC Report of September 9, 2026
- 2.Front Façade Building and Addition: The project involves reconstruction of the front portion of the building in the same general form. New Azek trim work and the installation of six (6) 12” HB&G Fiberglass columns with decorative capital and base is proposed to match the existing building colonnade. New replacement shutters, windows, and front door are noted to match the existing. The Revised #2 Plan includes the addition of an additional floor to the front wings to make, two story. The Revised #2 Plan shows a gable roof in asphalt shingles following the form of the original building and front wings with two dormers added over each wing. The Revised #2 Plan also displays a brick EIFS system being installed on the front, rear, and side elevations of each wing. The Revised Plan #2 shows that each wing of the front portion of the building will include paired sets of glass doors with Azek Trim and stucco-like EIFS around the door area.
- 3.Rear Building Additions: The Revised #2 proposed four-story addition will be located directly behind the front massing portion of building (main block). The proposed addition will be 43 feet 6 inches tall. The existing building is 33 feet 2 inches tall at the peak of its roof. The addition appears to feature the use of the EIFS brick system with engaged pilasters and horizontal banding in brick detailing along all sides on floors two, three, and four, and floor one uses EIFS in a white scored finish. The Revised #2 roof features a wide cornice at the roofline. The east and west elevations include large glass windows (with door) for entry into the apartments. Glass and black aluminum railings (black steel cable railing) will be used to enclose balconies. The Revised addition adds architectural relief by recessing balconies partially into the building. The Revised addition also wraps sections of the building with one row of brick EIFS banding on each floor, totaling four (4) rows that are visible from the north, south, east, and west elevations.
- 4.Parking Lot: A parking lot will be developed along the west side and north side of the building with access from Innovation Way. This new parking lot will not have vehicular access from the large municipal parking lot at the Dover Public Library. The applicant has worked with the City in regard to the adjacent row of parking east of the Library establishing an easement for its shared use. The parking lot is to be fenced with a black aluminum fence and appears to have narrow bands of grass at the perimeter on the west and north.
- 5.Sidewalks and Site Amenities: The proposal maintains connected sidewalks along Innovation Way and Loockerman Plaza. There are also sidewalks adjacent to the parking lot leading to the building and from the street frontage sidewalks. At some points, steps are necessary to ascend to the building. A ramp system is noted on the Site Plan for the north building elevation but not fully depicted in the renderings. A fenced Zen garden is proposed to abut the Building Addition along Innovation Way. The Updated Plan shows a curving pathway in the East Zen Gardens with benches and a Yoga space. The amenities of this plan also propose a second-floor gym as part of the Active Recreation. A series of benches are shown in the West Zen Garden.
- 6.Tree Planting and Landscaping: The Revised Landscape Plan identifies three trees to be removed and 19 trees to be planted. The trees are along Loockerman Plaza and then within the Zen Gardens flanking the rear of the Building.
22
Page 23
Item 2.
S-25-07 REVISED #2 The Old Post
DAC Report of September 9, 2026
See the attached Revised #2 Plan submission and associated graphics and drawings for detailed information on building dimensions, locations, and material choices.
Surrounding Land Uses This subject property location at the northwest corner of Innovation Way and Loockerman Plaza is within the Downtown Development District. Properties immediately adjacent to the subject project location are zoned IO (Institutional and Office). The surrounding properties are also within the H (Historic District Zone). The Dover Public Library and Dover City Hall are located west of the subject site. State offices are to the north and south of the subject site and a mixed-use building with offices and a restaurant are located to the east across Innovation Way.
III. ZONING REVIEW
C-2 (Central Commercial Zone) The subject property is zoned C-2 (Central Commercial Zone); this zoning designation will remain in place. The description of the C-2 (Central Commercial Zone) zoning district is provided in Article 3 §13 of the Zoning Ordinance and provisions identify the allowable (permitted) uses and the related bulk standards for the C-2 zone. The C-2 zone allows for “retail stores, apartments and multi-family dwellings provided that no dwelling units shall be permitted on the first floor on the street frontage of Loockerman Street; uses accessory to the residential units such as lobby and amenity spaces are permitted on the first floor; live-work units; parking lots and parking structures” as principal uses. The subject property has frontage on two streets, Loockerman Plaza and Innovation Way. The C-2 zone requires a zero minimum front yard. No side yard is required; however, if one is provided then it shall be a 5-foot side yard minimum. A 20-foot rear yard setback is required above ground floor and 5-foot is required at ground floor. The maximum building height for this district is 10 stories or 125 feet.
Code Compliance for C-2 Required Provided
Front yard (ft.) 0 varies
Side yard (ft.) None required, but 5 feet Over 5 feet minimum if provided
Rear yard (ft.) 20 feet above ground floor; at Over 20 feet ground floor 5 feet
Off-street parking 0 66 new spaces (3 ADA), 29
shared with City of Dover (2
ADA)
Building height 10 stories/125 feet maximum 4 stories/45 feet
Lot Coverage Not specified 80.11%
Floor Area Ratio 5.0 0.86
23
Page 24
Item 2.
S-25-07 REVISED #2 The Old Post
DAC Report of September 9, 2026
The building’s height and number of stories comply with the C-2 zone. The total lot coverage for the project is listed as 80.11%. The C-2 zone does not specify a maximum lot coverage requirement. The maximum floor area ratio (FAR) permitted is 5.0. The plan does not indicate the FAR, but based upon the building area presented for the existing building and proposed addition, the FAR is 0.86.
The C-2 zoning district also includes design standards and provisions. See the code excerpt below:
Article 3 Section 13
13.5 Design standards. The following standards shall apply to the site and building development in the central commercial zone (C-2):
13.51 Façade articulation. Building facades should incorporate design elements to provide a base, middle, and top of the building to reinforce the pedestrian scale at the street level.
13.52 Height. For buildings greater than four stories in height, then the upper floors above the fourth story shall step back six feet for fifty percent of the width of the primary facade. For buildings greater than six stories, then the upper floors above the sixth floor shall step back an additional six feet on the primary façade. These step back areas may begin at a lower height than these minimums as part of the building design in order to be compatible with the character of the area.
13.53 Step back areas. The step back areas should be open to the sky and can be open air balcony spaces or other design architectural features that are not enclosed spaces.
13.54 Off-street parking. Off-street parking lots shall not be permitted to be situated between the street line and the primary facade of the principal building. Consideration should be given to locating parking to the side or rear of the building.
13.55 Screening. Any off-street parking lots provided shall be screened from the street line by buildings, landscaping, or other means. Off-street parking lots shall be screened from adjacent residential zones and residential uses. This screening provision does not apply to adjacent alleys.
The plan as presented complies with these design standards. Landscaping must be shown along Innovation Way to screen the parking area from this street. A Revision presented to the Historic District Commission proposed a design alternative to create an island between the parking lot entrances where landscape could be implemented.
The property is partially within the SWPOZ (Source Water Protection Overlay Zone) Tier 3 Excellent Recharge Area, but it is exempt from the requirements of this zone due to its location within the Downtown Redevelopment Target Area.
H (Historic District Zone) The entire project site is located in the H (Historic District Zone) and subject to the provisions of the Zoning Ordinance, Article 3 §21 and referenced sections. The H (Historic District Zone) is described in Zoning Ordinance, Article 3 Section 21 with the following purpose statement:
Article 3, Section 21. - Historic district (H). 21.1 Purpose. The purpose of this historic district regulation is to preserve and enhance that unique character and value of the old portion of Dover as an area of special charm and interest. It is particularly intended that the regulations prevent, in the historic dis trict, any change of conditions that would be deemed to be a disfigurement or degradation of the present unique visual and architectural qualities of the district. 24
Page 25
Item 2.
S-25-07 REVISED #2 The Old Post
DAC Report of September 9, 2026
IV. ARCHITECTURAL REVIEW CERTIFICATION
Zoning Ordinance, Article 10 §3.2 outlines the review process for Architectural Review Certification and related building height, bulk, and setback standards. This process begins with Review by the Historic District Commission.
Review of DESIGN STANDARDS AND GUIDELINES Location within the H (Historic District Zone) requires proposals for demolition, new construction, additions, and certain renovation or rehabilitation activities to receive an Architectural Review Certificate. As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone, an Architectural Review Certificate will be granted “if it is found that the architectural style, general design, height, bulk and setbacks, arrangement location and materials affecting the exterior appearance are generally in harmony with neighboring structures and complementary to the traditional architectural standards of the historic district.” Zoning Ordinance, Article 10 §3.2 outlines the review process for Architectural Review Certification and related building height, bulk, and setback standards.
This proposal must be reviewed for conformity with the design criteria guidelines found in Chapter 4: New Construction, Additions, Demolition and Relocation. The Design Standards and Guidelines for New Construction (Chapter 4: pages 4-1 through 4-8) provide the design criteria and development guidelines. The guidelines specify a series of individual considerations for new construction to be considered in the review by the Historic District Commission (and Planning Commission) of the project for Architectural Review Certification.
The proposed project must also be reviewed for compliance with the standards established by the Zoning Ordinance. The standards include items such as setbacks from property lines, floor area ratio, height, etc.
HISTORIC DISTRICT COMMISSION – REVISED #2 RECOMMENDATION
(PENDING)
For The Old Post project, the Historic District Commission considered a Revised application for HI-25-01 on November 20, 2025, for an Architectural Review Certificate for development of The Old Post and associated Site Improvements given the latest Revisions, Revision #2 must also be reviewed by the Historic District Commission and Planning Commission again. This is scheduled for September 17 and September 21, 2026. The Historic District Commission will consider the Revised proposal for construction and has provided a recommendation to the Planning Commission in regard to the Architectural Review Certification for the project. The specific recommendation involved consideration of the Design Standards and Guidelines. See attached Revised #2 Architectural Review Certification Report (staff Review) as prepared for the Historic District Commission Meeting of September 17, 2026.
The Planning Commission should act upon the Revised #2 Architectural Review Certification as part of any motion to approve this project, or as a separate motion if necessary. In taking this action, the Planning Commission is to consider the standards and guidelines found in Chapter 4 of the Design Standards and Guidelines for the City of Dover Historic District Zone and other referenced sections.
25
Page 26
Item 2.
S-25-07 REVISED #2 The Old Post
DAC Report of September 9, 2026
- V.PARKING SUMMARY The C-2 (Central Commercial Zone) does not include a minimum parking requirement. Additionally, Article 6 §3 of the Zoning Ordinance states:
For new construction within the downtown redevelopment target area, as described in appendix C of the Dover Code of Ordinances, there is no minimum off-street parking requirement based on use. To utilize this exception, a parking strategy statement must be submitted for review as part of the site development plan approval required by appendix B, zoning, article 10, section 2.
The applicant previously submitted a Parking Strategy Statement for consideration with the Site Plan. The parking strategy indicates that 124 parking spaces are recommended. The Site Plan and parking strategy statement show 66 spaces on-site and proposes using 29 spaces on the adjacent parcel owned by the City of Dover under an easement. Based on the parking strategy statement provided the parking to be provided for the proposed site is as follows: 66 onsite parking spaces will be provided for use of the tenants of the apartment units; 29 parking spaces will be provided on the adjacent parcel directly to the west (Dover Library) through an existing easement with the City of Dover to support the apartments and proposed restaurant/commercial use; and an additional 180 +/- public parking spaces are available to serve the patrons of the proposed restaurant/commercial use along Innovation Way, Loockerman Plaza, and the Dover Library parking lot. A copy of the easement document is on file in the Planning Office with the increase in Apartment units from 42 to 45 (addition of 3 studio units).
VI. SITE CONSIDERATIONS
Lighting The site plan and architectural package do detail two proposed light poles with a colonial style lamp head for lighting of the site. Article 5, Section 7.1 details that lighting of commercial uses shall provide no less than 1½ footcandles at grade. Light shall be deflected away from adjacent residential areas and shall not be distracting to traffic on adjacent roads. Dumpsters Dumpster requirements are specified in Article 5, Section 6, with minimum number required specified below.
Use Dumpsters Required
Apartment complex or apartment building Two required for the first 48 apartments; one required for each additional with over 10 units 24 apartments or fraction thereof Nonresidential uses Two required per property
Based on this, two dumpsters are required. Two dumpster units within an enclosure are provided at the northwest corner of the parking lot to the rear of the building.
Sidewalks There are existing sidewalks along the frontage of Loockerman Plaza and Innovation Way along the perimeter of the property.
VII. TREE PLANTING AND LANDSCAPE PLAN
Tree Planting Requirements The Zoning Ordinance further requires tree planting at a rate of one tree per 3,000 SF of non- woodland development area. Based on the total non-woodland area for the submitted plan of 1.267 26
Page 27
Item 2.
S-25-07 REVISED #2 The Old Post
DAC Report of September 9, 2026
acres, or 55,190.52 SF, 19 trees are required to be planted. Three trees exist along the frontage of the property, and the Landscape Plan shows removal of these trees and planting of 19 trees on the site.
VIII. OPEN SPACE and RECREATION PLAN The proposed development qualifies for an exemption under Article 5, §10.515 Residential developments located within the Downtown Redevelopment Target Area as defined in Appendix C. Under this provision, the applicant must provide 75 square feet of active recreation per dwelling unit with a minimum of 2,500 square feet provided on site. The applicant proposes to provide two Zen Gardens and an indoor Gym on the proposed site. The Zen Garden on the west side of the building is 1,643 SF and provides patios, benches, shade trees, and shrubbery for tenants of the apartments. The Zen Garden to the east of the proposed apartments is 2,450 SF and will provide patios, shade trees, benches, a walking path, and a yoga station as amenities for the apartment tenants. A 506 SF indoor gym is proposed on the second floor of the apartment building in the front portion of the building for tenant use. With the change in unit count proposed in Revision #2 from 42 to 45 units, the amount of required active recreation area has increased. Altogether, the active recreation area for this site totals 4,599 SF +/-; this is well within the required 3,375 SF +/- for active recreation for this property.
IX. CITY AND STATE CODE REQUIREMENTS:
The subject Revised #2 proposal has been reviewed for code compliance, plan conformity, and completeness in accordance with the agency’s authority and area of expertise. The following items have been identified as elements which need to be addressed by the applicant:
S-25-07 Revised The Old Post has a Final Plan Approval pending (as of August 2026), as previous corrections to the Plan were made and agency approvals achieved after the December 2025 Plan Review. With this submission of Revision #2, that Plan Approval has been placed on hold.
- 1)Submitted Construction Plans are missing a Demolition Plans and Lighting Plan
- 2)Cover Sheet, C-001 Data Column:
- a)Parking Strategy must reflect the parking requirement for each unit to reflect 2 parking spaces required per unit, along with creating a column for the total number of parking spaces per unit type.
- b)Parking ratio needs to be written.
- 3)Site Plan, C-102:
- a)Missing contour lines.
- b)Adjacent properties are missing zoning classification.
- c)Pavement dimensions for the parking lot are not detailed.
- 4)For building with multi-family units, the Zoning Ordinance, Article 6 §5.3 requires that the parking spaces be at least 15 feet from the wall of the building and three feet from side and rear property lines. Provide dimensions to confirm compliance. It appears that the row which includes the handicapped parking does not comply with the distancing requirement from the building wall. Previously, the Applicant was approved for a reduction of this distance under the provisions of the Architectural Review Certification. The continued allowance of reduced distance (from [parking to building wall) must be further discussed with the Fire Marshal’s Office. 27
Page 28
Item 2.
S-25-07 REVISED #2 The Old Post
DAC Report of September 9, 2026
- 5)The construction of the site entrances and street improvements must comply with the requirements of DelDOT and the City of Dover Public Works Department based on street maintenance responsibilities.
- a)Identify any changes to on-street parking spaces along the project frontages.
- 6)With the updated details provided about the Active Recreation amenities for the site, staff recommends approval of the Active Recreation Plan subject to the following clarifications or conditions for the details of the recreational amenities:
- a.Identify surface of Yoga Area and ensure connection to accessible pathway.
- b.Ensure placement of the benches are accessible from the walking pathway and allow for someone to move off the pathway to rest.
- c.Ensure the placement of light posts does not impede any sidewalk. Check light post positions along the parking area.
- 6)The Historic District Commission will consider the Revised #2 Architectural Review Certificate for the construction of the project. See attached Revised #2 Architectural Review Report (and the verbal reporting of the September 17th Historic District Recommendation) for recommended conditions.
- 7)Any Erosion & Sediment Control Plans and Stormwater Management Plans granted approval by the Kent Conservation District must reflect the Site Plan layout and design conditionally approved by the Planning Commission and be in compliance with the Zoning Ordinance and technical review requirements of other agencies.
- 8)The Final Plan set must include notes documenting any action taken by the Planning Commission on the requested waivers and must list any additional conditions of approval.
- X.RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES:
In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in considering and acting upon Site Development Plans may prescribe appropriate conditions and safeguards so that the public health, safety, and welfare, the comfort and convenience of the public in general, and the residents of the immediate neighborhood in particular shall be taken into consideration. These safeguards may to the maximum extent possible further the expressed intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed in subsections 2.21 to 2.28.
- 1)Revised #2 Architectural Review Certification Staff recommends conditional approval of the Architectural Review Certificate for the construction of The Old Post finding that the building to be of a design compatible with the intent of the Design Standards and Guidelines for the City of Dover Historic District Zone.
- a)Staff provided a series of recommendations and comments regarding the Architectural Review Certification and review of the project for compliance with the Design Standards and Guidelines. These items were previously identified during the review of the project by the Historic District Commission. See HDC Architectural Review Report.
- 2)Staff recommends the following pertaining to the site design elements of the project:
- a)The C-2 zoning district requires that parking lots be screened from the street. This Revised 28
Page 29
Item 2.
S-25-07 REVISED #2 The Old Post
DAC Report of September 9, 2026
Plan appears to have proposed an island with plantings to screen the parking lot improvements from Innovation Way by adding curbing and grass areas. b) Evaluate the parking lot space locations as some spaces are not full sized or would be impacted by the Dumpster Enclosure gates. Remove unnecessary pavement to create green islands. c) The sidewalk system on the street frontage should continue and include barrier free access, crosswalk striping, etc. at the points of intersection with the entrance and exit drive aisles. d) Any proposed landscaping or tree planting locations, and lighting fixture locations should be depicted on the plan and be consistent with the character of these elements as they exist within the Capitol Square Context area.
- 3)Electric Vehicle Charging Stations: Identify if the project is planning for the installation of Electric Vehicle Charging Stations in the Parking Lot. Currently, the Zoning Ordinance does not require them, but many other jurisdictions have implemented such requirements. Electric Vehicle Charging Stations formats include EV-Capable, EV-Ready, and EV-Installed.
XI. ADVISORY COMMENTS TO THE APPLICANT:
- 1)The Planning Commission should act upon the Revised #2 Architectural Review Certification as part of any motion to approve this project, or as a separate motion if necessary.
- 2)The Planning Commission should act upon the request for waivers as part of any motion regarding this project application, or as a separate motion as necessary. Note: All waivers are at the discretion of the Planning Commission. The Commission may approve or deny waiver requests.
- 3)In the event that major changes and revisions to the Revised #2 Site Plan occur in the finalization of the Plan contact the Department of Planning and Inspections. Examples include relocation of site components like paving and increases in footprint. These changes may require resubmittal for review by the Development Advisory Committee, Historic District Commission, Planning Commission, or other agencies and commissions making recommendations in regard to the Plan.
- 4)Following Planning Commission approval of the Revised #2 Site Plan, the Plan must be revised to meet all conditions of approval from the Development Advisory Committee or as otherwise noted. A Check Print must be submitted for review by Planning Office Staff and the other commenting agencies. Upon determination that the Plan is complete and all agency approvals have been received, copies of the Plan may be submitted for final endorsement (Final Plan Approval).
- 5)Other agencies and departments which participate in the Development Advisory Committee may provide additional comments related to their areas of expertise and code requirements.
- 6)The applicant/developer shall be aware that prior to any ground disturbing activities on the site the appropriate Site Plan approvals, Pre-Construction meetings, site inspections and permits are required.
- 7)Construction and demolition will have an effect on the adjacent property owners, employees of adjacent buildings, and nearby sidewalks and streets. Any work requiring the closing or rerouting of potential customers, employees, or visitors to the adjacent properties (including 29
Page 30
Item 2.
S-25-07 REVISED #2 The Old Post
DAC Report of September 9, 2026
those who park in the existing parking lot), and streets or alleys should be coordinated as to offer the least amount of inconvenience. Careful consideration will need to be given to the access to other properties which requires the crossing of these properties or travel over the public alley.
- 8)For building new construction, the requirements of the building code and the fire code must be complied with. Consult with the Chief Building Inspector and City of Dover Fire Marshal for these requirements. The resolution of these items may impact the site design including such items as building dimensions and height, building openings, and fire protection needs, etc.
- 9)The applicant shall be aware that Revised Site Plan approval does not represent a Building Permit and associated construction activity permits. A separate application process is required for issuance of a Building Permit from the City of Dover. Building Permits will be required for each building.
- 10)The applicant shall be aware that Plan approval does not represent a Sign Permit, nor does it convey permission to place any sign on the premises. Any proposed site or building identification sign may require a Sign Permit from the City of Dover prior to placement of any such sign in accordance with Zoning Ordinance Article 5 §4.
If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Office as soon as possible.
30
Page 31
Item 2.
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: SEPTEMBER 2, 2026
APPLICATION: REVISED #2 The Old Post at 55 Loockerman Plaza FILE #: S-25-07 & HI-25-01 REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater CONTACT PERSON: Kate L. Mills, P.E., Interim Director of Water & Wastewater / Engineering Services CONTACT PHONE #: 302-736-7025 CONTACT EMAIL: kmills@doverde.gov
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
SANITATION
- 1.Every commercial customer shall provide such premises with a sufficient number of solid waste containers to provide adequate capacity for the solid waste placed out for collection without overloading the capacity of the containers. The City of Dover shall provide commercial customers with a maximum of two (2), 90-gallon trash containers and two (2), 90-gallong recycling containers.
- 2.Trash collection site shall be oriented for side-loading pick-up if customer is utilizing City of Dover sanitation services.
- 3.Any commercial customer requiring more containers, or larger containers, than provided above, must utilize private service. STORMWATER
- 1.Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from Kent Conservation District is submitted to our office.
- 2.The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert elevations must be labeled on all stormwater structures.
- 3.Please coordinate with the City of Dover to obtain as-built information from a recent stormwater project. The installed infrastructure surrounds the property. STREETS
- 1.Final site plan approval will not be granted until a letter of no objection, signed by DelDOT is submitted to our office.
- 2.The current City of Dover standard street section provides for a 3’ grass strip between the curb and sidewalk. This standard was administratively revised to meet ADA and FHA compliance with cross slope requirements and to prevent cars from scrapping at driveways. The revised standard utilizes a five feet (5’) wide public sidewalk with a five feet (5’) wide grass strip behind the curb. Sidewalk and curb shall be installed for the width of the project scope.
- 3.It shall be unlawful for any person to alter the curb of any street so as to create a curb depression for the purpose of permitting vehicles to enter onto or exit from the city streets, without a permit issued by the city manager.
31
Page 32
Item 2.
REVISED #2 The Old Post at 55 Loockerman Plaza
File #: S-25-07 & HI-25-01
September 2, 2026
- 4.Please add the following notes to the plans:
- a.Standard City of Dover sidewalk, as per Chapter 98, Article IV of the Dover Code of Ordinances, shall be required to be installed along the entire public street frontage of a property. Where frontage sidewalk exists but does not meet the standards of Chapter 98, Article IV, the sidewalk shall be re-laid to meet the standards. Sidewalk shall include barrier-free access ramping at points of intersection with street crossings and at other locations so as to afford reasonable barrier-free pedestrian movement and site access.
- b.In accordance with Appendix A, Article VI, Section B.3, all sidewalks shall ascend from the curbstone to the building line at the ratio of one-quarter of an inch to the foot. Nothing in this section shall be construed to affect any pavement previously laid by order of the city council, until it is taken up and re-laid.
WATER
- 1.All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information.
- 2.The following notes must be added to the plans:
- a.Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the project.
- b.Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
- c.The site contractor shall contact the City of Dover Department of Water & Wastewater Construction Manager at (302) 736- 7025 before the start of construction. A representative from the City of Dover Department of Water & Wastewater must observe and approve all City-owned water and sanitary sewer interconnections and testing. All water taps must be performed by a City of Dover-approved contractor. The proposed location for the water connection may need to be adjusted in the field due to conditions of the existing main. Possible conditions that would require tapping relocation include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be held responsible for field conditions requiring adjustment of the tapping location or for any work required by the contractor to make an appropriate and lawful connection.
- 3.The size, type, and location of all proposed and existing water lines and valves must be shown on the plan. Please be advised that, effective May 1, 2022, water mains can now be constructed using DR 18 PVC.
- 4.Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine the size of the domestic and irrigation (if applicable) water meter for the proposed buildings. These projections must be submitted prior to approval so the meter size can be placed on the final site plan. The proposed water meters must be installed in a pit per City of Dover requirements and manufacturer’s recommendations. Also, a dual check valve is required downstream of the meter.
- 5.The domestic service, fire main connection, and valves must be clearly shown for each building. A valve must be installed at the tee to isolate the combined fire and domestic water service to the building from the water loop. Typically, this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside of the building. The domestic water tap and valve should be as close to the building as possible. Typically, the domestic tap and valve are located within five feet (5’) to ten feet (10’) of the building. A blow-up detail of this layout is recommended.
- 6.Provide a construction detail for the proposed restraining system for the fire main located within the buildings. There shall only be one (1) water service per building. The Department of Water & Wastewater will test and inspect all fire mains to a blind flange located inside the buildings. The blind flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the floor to the ninety-degree (90°) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through walls and slabs must be Class 52 cement-lined ductile iron pipe. Confirm particulars to meet this requirement with the mechanical designer.
32
Page 33
Item 2.
REVISED #2 The Old Post at 55 Loockerman Plaza
File #: S-25-07 & HI-25-01
September 2, 2026
- 7.Water services shall be either type K copper or SDR-9. 1. All non-metallic water lines (mains and services) shall be installed with a tracer wire and identification tape. The wire shall be a minimum of twelve (12) gauge blue-coated solid copper wire, wrapped around the pipe, and extending up into all valve and curb boxes. The identification tape shall be six inches (6”) wide, laid one foot (1’) above the pipe, with the following text: “Caution: Buried Water Line Below”. 3M marker balls, model 1423-XR, or approved equal, shall be installed at every service line connection to the water main and all bends on the service line.
- 8.On October 24, 2022, the City of Dover Council approved the new Cross Connection Control Program. This program requires certain backflow prevention assemblies on water service connections to the city’s distribution system. Please provide a specific description of the activities within this project.
WASTEWATER
- 1.All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information.
- 2.The following notes must be added to the plans:
- a.Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
- b.Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff, subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as “…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes, exclusive of sewage.” The contractor, developer, owner, and designers shall ensure during construction that no illegal discharges to the sanitary sewer system are created with the site improvements.
- 3.The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines. Rim and invert elevations must be labeled on all sanitary structures.
- 4.Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the right-of- way, and at all bends. Any cleanout located within a traffic-bearing location shall be installed with a heavy-duty cast iron frame and cover to prevent damage to the cleanout and lateral.
- 5.Sizing (flow) calculations must be submitted for all sanitary sewer mains showing that velocity and all other requirements are met.
- 6.The minimum size of all sanitary sewer laterals shall be six-inch (6”).
- 7.If kitchen facilities are proposed, a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County ordinance requirements, must be provided. A construction detail for the proposed grease trap, as well as the proposed location, must be provided on the plan. GENERAL
- 1.All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This must be included as a note on the plan.
- 2.No trees may be planted within ten feet (10’) of utility infrastructure.
- 3.No structure may be installed within ten feet (10’) of utility infrastructure, please depict all underground utilities and structures on the utility plan sheet to confirm compliance.
- 4.The final site plan must be submitted in the following compatible digital formats:
- a.AutoCAD 2021 (.dwg format).
- b.Adobe Reader (.pdf format).
33
Page 34
Item 2.
REVISED #2 The Old Post at 55 Loockerman Plaza
File #: S-25-07 & HI-25-01
September 2, 2026
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES SANITATION / STORMWATER / STREETS / WATER / WASTEWATER / GENERAL 1. As-built plans shall be provided prior to the certificate of occupancy and shall be provided in .dwg and .pdf format.
ADVISORY COMMENTS TO THE APPLICANT
WATER
- 1.The City of Dover water system is available to this site. The developer is responsible for all costs associated with extending and providing service to the proposed development.
- 2.Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking Water, for review and approval. The owner/developer will be responsible for providing all completed forms and plan sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the Office of Drinking Water until review has been completed by our office.
- 3.Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of Water & Wastewater directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the site.
- 4.Water impact fees will be required to be paid prior to the Certificate of Occupancy for this project. Each apartment unit is equal to one (1) Equivalent Dwelling Unit (EDU). The retail portion will also have impact fees, the amount will be dictated by the proposed fixture count. WASTEWATER
- 1.The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated with extending and providing service and capacity to the proposed development.
- 2.Prior to plan approval, it may be required to submit the sanitary sewer system plans to the DNREC, Division of Water Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible for providing all application fees, completed forms, and plan sets directly to DNREC.
- 3.Profiles of the sanitary sewer main must be provided with the construction plans. All water, sanitary sewer, and storm sewer crossings must be shown on the profiles.
- 4.Wastewater impact fees will be required to be paid prior to the Certificate of Occupancy for this project. Each apartment unit is equal to one (1) Equivalent Dwelling Unit (EDU). The retail portion will also have impact fees, the amount will be dictated by the proposed fixture count. GENERAL
- 1.The applicant is advised that, depending upon the size of the existing water service and sanitary sewer lateral to be abandoned, flowable fill may be required.
- 2.Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team- logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88. SANITATION / STORMWATER / STREETS
- 1.None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
34
Page 35
C F
Item 2.
I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A APPLICATION REVIEW COMMENTARY R D.A.C. MEETING DATE: 09/02/26 D S O H V A E L R APPLICATION: HI-25-01 Revised # 2 and S-25-07 Revised # 2 The Old Post at 55 Loockerman Plaza
FILE #: HI-25-01 and S-25-07 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457 josika@dover.de.us
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
- 1.Proposal is an architectural review only using the exact footprint of S-25-07
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
- 1.It is noted that this is using the exact footprint, all S-25-07 comments apply
- 2.This adds 3 apartments and the square footage appears to change
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association) 2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association) 2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association) 2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association) 2009 IBC (International Building Code) Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations 2021 Delaware State Fire Prevention Regulations City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above contact person listed.
35
Page 36
Item 2.
From: Jones, Tijah (DelDOT)
To: Melson-Williams, Dawn
Cc: Hickman, Kevin (DelDOT)
Subject: EXTERNAL: DAC Comments
Date: Thursday, September 3, 2026 3:00:04 PM
You don't often get email from tijah.jones@delaware.gov. Learn why this is important
WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Morning Dawn,
Here are the comments from DelDOT for the applications discussed in the DAC Meeting 02 September
S-26-13 Winner Subaru Building Additions at 1387 North DuPont Highway 1. Schedule a pre-submittal meeting with the department. S-26-14 William Henry Campus Improvements at 65 Carver Road, Dover, DE 2. Schedule a pre-submittal meeting with the department. HI-25-01 Revised #2 and S-25-07 Revised #2 The Old Post at 55 Loockerman Plaza 3. Schedule a pre-submittal meeting with the department. HI-25-02 Revised and S-25-11Revised The Governor: Mixed Use Building at 120 S Governors Avenue 4. Schedule a pre-submittal meeting with the department.
TiJah Jones
Subdivision Review Engineer
Economic Development Coordination
Delaware Department of Transportation
(302) 760-2124
tijah.jones@delaware.gov
36
Page 37
Item 2.
CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
ADVISORY BRIEF Planning
D.A.C. MEETING DATE: 9/9/2026 Organization
HI-25-01 Revised #2 and S-25-07 Revised #2 The Old Post at 55 Loockerman Plaza
FILE # HI-25-01 / S-25-07 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030
Attached, please find comments submitted by Dover Kent MPO for each of the current City of Dover Development Advisory Committee (DAC) applications. These comments are a part of the MPO’s ongoing goals of promoting transportation safety and connectivity within the region. They are submitted in accordance with the support given by the MPO Council on November 6, 2024.
Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be waived.
City of Dover Planning Commission
Site Development Plan Review
HI-25-01 Revised #2 and S-25-07 Revised #2 The Old Post at 55 Loockerman Plaza
Dover Kent MPO has no major objections to the revised site plan, which includes ADA ramps, accessible parking spaces, and outdoor bicycle parking. Sidewalks are already present along the property’s frontage. Although many of the MPO’s concerns have been addressed in the revised site plan, the applicants should continue to work with DelDOT and the City of Dover to address safety and connectivity issues within and around the property. When construction takes place, the applicants should avoid negative impacts to safety and connectivity, such as the temporary obstructing of sidewalks.
The revised site plan includes concrete sidewalks running across the entrance to the parking area from Innovation Way. These facilities are accompanied by ADA ramps, Type 1 curbing, and landscaping that will support pedestrian use. Dover Kent MPO supports this revision to the site plan as it will improve safety and connectivity for pedestrians around the property. These measures are also consistent with the goals laid out in Capital City 2030: Transforming Downtown Dover, the City’s downtown master plan, which encourages incorporating pedestrian
37
Page 38
Item 2.
improvements into all site development on Loockerman Street, Loockerman Plaza, and in Dover’s downtown.1
The site plan includes a parking strategy that proposes shared parking with the properties adjacent to the Old Post Office. As stated when reviewing the previous iterations of the site plan, Dover Kent MPO recommends that crosswalks and pedestrian paths be provided at each of the primary crossing locations between properties, which will improve access for residents that are parking off-site. This is important from a safety perspective as well as for accessibility and ADA considerations.
Note that DelDOT has an active project that involves sidewalk and crosswalk improvements to Loockerman Plaza.2 This project resulted from the recommendations in Dover Kent MPO’s Downtown Dover Pathways Plan and from a submission to the FY26 Bike/Ped Pool Prioritization Process.3 The project is ongoing and is still in the early stages. Once completed, it will improve access to the Old Post Office property and benefit residents of the new building.
For Dover Kent MPO’s full comments on the previous iterations of the site plan, please refer to the City of Dover Planning Commission meeting packets from March 17, 2025,4 and from December 15, 2025.5
If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Department as soon as possible.
1 Capital City 2030: Transforming Downtown Dover. Downtown Dover Partnership (DDP) (2023). https://www.downtowndoverpartnership.com/ddp/downtown-dover-strategic-master-plan/. 2 “Loockerman Plaza Sidewalk and Crosswalk.” DelDOT Project Portal. Delaware Department of Transportation (DelDOT). https://deldot.gov/projects/index.shtml?dc=details&projectNumber=T202601201. 3 Downtown Dover Pathways Plan. Dover/Kent County MPO (2024). https://doverkentmpo.delaware.gov/files/2024/08/Downtown-Dover-Pathways-Final-Report-2024-07- 11.pdf#page=65. 4 City of Dover, Delaware Planning Commission: March 17, 2025 (Packet). City of Dover (2025). https://evogov.s3.us-west-2.amazonaws.com/meetings/27/attachments/18345.pdf#page=126. 5 City of Dover, Delaware Planning Commission: December 15, 2025 (Packet). City of Dover (2025). https://evogov.s3.us-west-2.amazonaws.com/meetings/27/attachments/19521.pdf#page=60.
38
Page 39
Item 2.
City of Dover ARCHITECTURAL REVIEW STAFF REPORT for REVISED #2 PLAN Before Dover Historic District Commission September 17, 2026 Previous Recommendations from the Dover Historic District Commission on February 20, 2025 & November 20, 2025
Application: The Old Post at 55 Loockerman Plaza, HI-25-01 REVISED #2
Previous Owner: City of Dover
Current Owner: Old Post, LLC
Location: Northwest corner of Loockerman Plaza and Innovation Way in Dover, DE
Addresses: 55 Loockerman Plaza
Tax Parcels: ED-05-077.05-04-53.00-000
Size: 1.267 acres +/-
Present Uses: Vacant Building – Former Dover Post Office
Proposed Use: Mixed-Use Commercial and Multi-family Housing (Apartments) and associated parking
Present Zoning: C-2 (Central Commercial Zone)
H (Historic District Zone)
SWPOZ (Source Water Protection Overlay Zone) – portion of site
For Consideration: Revised #2 Architectural Review Certification with parking to building separation reduction
This Report for Revised #2 HI-25-01 The Old Post was updated upon submission of a Revised #2 Architectural package and Site Plan. The Planning Staff deemed the revision substantial enough to warrant the Application to go back through the formal Architectural Review Certification process with the Historic District Commission and Planning Commission. Application HI-25-01 was initially considered by the Historic District Commission on February 20, 2025, and then considered by the Planning Commission on March 17, 2025, as Site Plan S-25-07 The Old Post. Application HI-25-01 Revised was initially considered by the Historic District Commission on November 20, 2025, and then considered by the Planning Commission on December 15, 2025, as Site Plan S-25- 07 Revised The Old Post.
- P.O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 39
Page 40
Item 2. HI-25-01 Revised #2 The Old Post at 55 Loockerman Plaza Revised #2 Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
- I.PROJECT DESCRIPTION:
The Historic District Commission will act to make a Recommendation for a Revised #2 Architectural Review Certificate for a Site Development Plan Application for the redevelopment of the Old Dover Post Office property consisting of 1.267 acres for a mixed-use project (commercial and residential) known as The Old Post as Revised. The Revised #2 Plan proposes the demolition of the existing building in its entirety and reconstruction of the front building portion its current form adding the second-floor addition to the front wings of the building and with the four-story rear Building Addition. Architectural Revisions request utilization of an EIFS brick exterior cladding system in place of the conventional and thin brick materials for the building elevations. This Revised #2 Plan seeks to increase the apartment unit count from 42 to 45 units while keeping the exact same building footprint and total building square footage as previously approved. The overall project will consist of a building with forty-five (45) residential apartment units and commercial space and with parking and other site improvements. The property is zoned C-2 (Central Commercial Zone), subject to the SWPOZ (Source Water Protection Overlay Zone), and subject to the H (Historic District Zone). The property is located on the north side of Loockerman Plaza and adjacent to Innovation Way. The owner of record is Old Post, LLC. Property Address: 55 Loockerman Plaza. Tax Parcel: ED-05- 077.05-04-53.00-000.
The Project Site subject of HI-25-01 Revised #2 The Old Post will be considered at the Historic District Commission Meeting of September 17, 2026 to provide a Revised Recommendation for Architectural Review Certification. This Application Revised #2 S-25-07 for the Site Plan will be subject to the same process with a public hearing before the Planning Commission.
See the attached Revised #2 Plan submission and associated graphics and drawings for detailed information on building dimensions, locations, and material choices.
Surrounding Land Uses This subject property location at the northwest corner of Innovation Way and Loockerman Plaza is within the Downtown Development District. Properties immediately adjacent to the subject project location are zoned IO (Institutional and Office). The surrounding properties are also within the H (Historic District Zone). The Dover Public Library and Dover City Hall are located west of the subject site. State offices are to the north and south of the subject site and a mixed-use building with offices and a restaurant are located to the east across Innovation Way.
Previous Applications The existing structure was constructed in the 1960s and was in service as the Dover Post Office until the new post office opened on Bank Lane in 2021. The property owner was the City of Dover. After the Post Office closed, the City initiated an RFP process to solicit proposals for redevelopment of the site. The current owner, Old Post, LLC was selected through this process. Application Z-24-01, approved by City Council on February 12, 2024, rezoned the property from IO (Institutional and Office Zone) to C-2 (Central Commercial Zone) with it remaining in the H (Historic District Zone) and SWPOZ (Source Water Protection Overlay Zone).
40
Page 41
Item 2. HI-25-01 Revised #2 The Old Post at 55 Loockerman Plaza Revised #2 Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
In February 2025, the Historic District Commission recommended approval of the Architectural Review Certificate for the proposed building renovations/reconstruction in HI-25-01. On March 17, 2025, the Planning Commission conditionally approved the Site Plan S-25-07, inclusive of the Architectural Review Certificate. Then a Revised Plan was submitted in late 2025. Previously at the Historic District Commission Meeting of November 20, 2025, the Commission considered the Revised Application and has provided a Recommendation on the Architectural Review Certification for the project. Also, the Site Plan S-25-07 Revised The Old Post was granted conditional approval by the Planning Commission on December 15, 2025 (Revised Plan Sets of print date 11/6/2025 and 12/3/2025). The Site Plan was ready for Final Plan Approval in August 2026 then the Revision was proposed. This Revised #2 submission seeks to revise the Site Plan and the Architectural Review Certificate previously approved.
Preliminary Land Use Services Review (PLUS): The PLUS Review is required by a City of Dover Memorandum of Understanding (MOU) for certain types of projects. Due to its Downtown Dover Redevelopment Target Area, this project was not required to complete PLUS Review process.
II. HISTORIC PROPERTY INFORMATION
Review of Historic Maps Prior to 1926, Loockerman Plaza did not extend beyond South State Street. Loockerman Plaza was extended between 1926 and 1936. The existing building was constructed in the 1960’s.
Property Information The subject property is located within H (Historic District Zone) as established by the City of Dover. There are four contexts that contribute to the historic character of Dover, including the Green Historic Context; the Victorian Historic Context; the Loockerman Historic Context; and the Capitol Square Historic Context. This property is located within the Capitol Square Historic Context. The first buildings in the Capitol Square Context were built in the 1930’s and 1940’s as part of the Federal Works Project Administration. The Design Standards and Guidelines for the City of Dover Historic District Zone describe this context as “neo-Georgian featuring two-story brick facades with a water table, marble surround at the entrance, keystones over the window heads, dentilled cornices and hip roofs… greater latitude is recommended in determining what is appropriate for new construction and additions within this context… a compatible contemporary building is preferable to a falsely historical one.”
The building located at 55 Loockerman Plaza was constructed in the 1960s. The most prominent features are the 5-bay Classical pediment with its turned gable, tympanum, and large columns. Under this projection, the front elevation wall is setback and includes the door entry with pedimented surround. The building has a gable roof with the rear being a flat roof system. It features a brick exterior, columns, dentil cornices, and shuttered windows. The building currently includes second floor offices (approximately 2,160 SF), a basement (approximately 5,865 SF), and the first floor of approximately 21,151 SF. There is an existing on-site parking lot (unmarked) and loading dock. The interior has been completely gutted as a result of recent asbestos abatement.
41
Page 42
Item 2. HI-25-01 Revised #2 The Old Post at 55 Loockerman Plaza Revised #2 Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
The structure is not listed on the National Register of Historic Places, and this portion of the Historic District is not part of a Historic District listed on the National Register of Historic Places.
III. PROJECT PROPOSAL
PROJECT PROPOSAL Revised #2 (documents of August 2026 and Updated Set of 08/24/2026) The REVISED #2 application proposes the demolition of the full existing structure and the reconstruction of the front portion in its current form featuring a second-floor addition to the front wings and along with a new four-story building addition in the rear of the front building portion. Capital City 2030: Transforming Downtown Dover Master Plan identified the Old Dover Post Office as a Project Site. The Master Plan proposes that a new mixed-use building could reactivate the site. This project is also identified as a Key Project within the City’s Downtown Development District (Renewal) application of 2024.
The proposed development proposes a 4,560-SF commercial tenant space in the (reconstructed first floor) portion front area. The rear warehouse portion of the building will be demolished and replaced with a new four-story structure (and including the second floor of the front building portion) comprised of 45 apartment (multifamily) units.
The Applicant’s REVISED #2 submission includes a Site Plan set and Architectural Graphics set with building elevations and 3-D views. The elements of the project are as follows:
- 1.Full Demolition: The rear flat-roofed warehouse portion of the building and now the existing front portion of the building are to be demolished. Due to structural conditions associated with the exiting front portion of the old Dover Post office, the entire building will now need to be demolished and reconstructed. The total building square footage and building footprint will remain the same when reconstruction of the building takes place.
- 2.Front Façade Building and Addition: The project involves reconstruction of the front portion of the building in the same general form. New Azek trim work and the installation of six (6) 12” HB&G Fiberglass columns with decorative capital and base is proposed to match the existing building colonnade. New replacement shutters, windows, and front door are noted to match the existing. The Revised #2 Plan includes the addition of an additional floor to the front wings to make, two story. The Revised #2 Plan shows a gable roof in asphalt shingles following the form of the original building and front wings with two dormers added over each wing. The Revised #2 Plan also displays a brick EIFS system being installed on the front, rear, and side elevations of each wing. The Revised Plan #2 shows that each wing of the front portion of the building will include paired sets of glass doors with Azek Trim and stucco-like EIFS around the door area.
- 3.Rear Building Additions: The Revised #2 proposed four-story addition will be located directly behind the front massing portion of building (main block). The proposed addition will be 43 feet 6 inches tall. The existing building is 33 feet 2 inches tall at the peak of its roof. The addition appears to feature the use of the EIFS brick system with engaged
42
Page 43
Item 2. HI-25-01 Revised #2 The Old Post at 55 Loockerman Plaza Revised #2 Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
pilasters and horizontal banding in brick detailing along all sides on floors two, three, and four, and floor one uses EIFS in a white scored finish. The Revised #2 roof features a wide cornice at the roofline. The east and west elevations include large glass windows (with door) for entry into the apartments. Glass and black aluminum railings (black steel cable railing) will be used to enclose balconies. The Revised addition adds architectural relief by recessing balconies partially into the building. The Revised addition also wraps sections of the building with one row of brick EIFS banding on each floor, totaling four (4) rows that are visible from the north, south, east, and west elevations.
- 4.Parking Lot: A parking lot will be developed along the west side and north side of the building with access from Innovation Way. This new parking lot will not have vehicular access from the large municipal parking lot at the Dover Public Library. The applicant has worked with the City in regard to the adjacent row of parking east of the Library establishing an easement for its shared use. The parking lot is to be fenced with a black aluminum fence and appears to have narrow bands of grass at the perimeter on the west and north.
- 5.Sidewalks and Site Amenities: The proposal maintains connected sidewalks along Innovation Way and Loockerman Plaza. There are also sidewalks adjacent to the parking lot leading to the building and from the street frontage sidewalks. At some points, steps are necessary to ascend to the building. A ramp system is noted on the Site Plan for the north building elevation but not fully depicted in the renderings. A fenced Zen garden is proposed to abut the Building Addition along Innovation Way. The Updated Plan shows a curving pathway in the East Zen Garden with benches and a Yoga space. The amenities of this plan also propose a second-floor gym as part of the Active Recreation. A series of benches are shown in the West Zen Garden.
- 6.Tree Planting and Landscaping: The Revised Landscape Plan identifies three trees to be removed and 19 trees to be planted. The trees are along Loockerman Plaza and then within the Zen Gardens flanking the rear of the Building.
See the attached Plan submission and associated graphics and drawings for detailed information on building dimensions, locations, and material choices.
IV. ZONING REVIEW
The entire project site is located in the H (Historic District Zone) and subject to the provisions of the Zoning Ordinance, Article 3 §21 and referenced sections. Zoning Ordinance, Article 10 §3.2 outlines the review process for Architectural Review Certification and related building height, bulk, and setback standards.
The property is partially within the SWPOZ (Source Water Protection Overlay Zone) Tier 3 Excellent Recharge Area, but it is exempt from the requirements of this zone due to its location within the Downtown Redevelopment Target Area.
43
Page 44
Item 2. HI-25-01 Revised #2 The Old Post at 55 Loockerman Plaza Revised #2 Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
The subject project area is zoned C-2 (Central Commercial Zone). The C-2 zone allows for “retail stores, apartments and multi-family dwellings provided that no dwelling units shall be permitted on the first floor on the street frontage of Loockerman Street; uses accessory to the residential units such as lobby and amenity spaces are permitted on the first floor; live-work units; parking lots and parking structures” as principal uses. The subject property has frontage on two streets, Loockerman Plaza and Innovation Way. The C-2 zone requires a zero minimum front yard. No side yard is required; however, if one is provided then it shall be a 5-foot side yard minimum. A 20-foot rear yard setback is required above ground floor and 5-foot is required at ground floor. The maximum building height for this district is 10 stories or 125 feet.
| Code Compliance for C-2 | Required | Provided |
|---|---|---|
| Front Setback | 0 feet | > 35 feet |
| Rear Setback | 20 feet above ground floor. At | > 100 feet |
| ground floor, 5’required | ||
| Side Setback | None required, but 5-foot min. | Approx. 15 feet |
| if provided | ||
| Building Height | 10 stories (125 feet) | 4 stories (43 feet 6 inches) |
The C-2 zoning district also includes design standards provisions. See the code excerpt below: Article 3 Section 13 13.5 Design standards. The following standards shall apply to the site and building development in the central commercial zone (C-2):
13.51 Façade articulation. Building facades should incorporate design elements to provide a base, middle, and top of the building to reinforce the pedestrian scale at the street level.
13.52 Height. For buildings greater than four stories in height, then the upper floors above the fourth story shall step back six feet for fifty percent of the width of the primary facade. For buildings greater than six stories, then the upper floors above the sixth fl oor shall step back an additional six feet on the primary façade. These step back areas may begin at a lower height than these minimums as part of the building design in order to be compatible with the character of the area.
13.53 Step back areas. The step back areas should be open to the sky and can be open air balcony spaces or other design architectural features that are not enclosed spaces.
13.54 Off-street parking. Off-street parking lots shall not be permitted to be situated between the street line and the primary facade of the principal building. Consideration should be given to locating parking to the side or rear of the building.
13.55 Screening. Any off-street parking lots provided shall be screened from the street line by buildings, landscaping, or other means. Off-street parking lots shall be screened from adjacent residential zones and residential uses. This screening provision does not apply to adjacent alleys.
- V.Review of DESIGN STANDARDS AND GUIDELINES
The subject property is located in the H (Historic District Zone) within the Capitol Square Context. The Capitol Square Context is described on pages 2-8 and 2-9 of the Design Standards and
44
Page 45
Item 2. HI-25-01 Revised #2 The Old Post at 55 Loockerman Plaza Revised #2 Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
Guidelines for the City of Dover Historic District Zone. This Design Standards and Guidelines describe this context as “neo-Georgian featuring two-story brick facades with a water table, marble surround at the entrance, keystones over the window heads, dentilled cornices and hip roofs… greater latitude is recommended in determining what is appropriate for new construction and additions within this context… a compatible contemporary building is preferable to a falsely historical one.” Location within the Dover Historic District Zone requires proposals for demolition, new construction, building additions, and certain renovation or rehabilitation activities to existing buildings to receive an Architectural Review Certificate.
As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone, an Architectural Review Certificate will be granted “if it is found that the architectural style, general design, height, bulk and setbacks, arrangement location and materials affecting the exterior appearance are generally in harmony with neighboring structures and complementary to the traditional architectural standards of the historic district.” In accordance with Article 10 §3.2, the Historic District Commission will provide a recommendation to the Planning Commission regarding the Revised #2 project’s compliance with the architectural review standards.
This Revised #2 proposal must be reviewed for conformity with the design criteria guidelines found in Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings and Chapter 4: New Construction, Additions, Demolition and Relocation. Information on the review considerations is given below.
Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings The Design Standards and Guidelines for Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings (Chapter 3: pages 3-1 through 3-27) provide the design criteria and development guidelines. The preservation of the historic character of the District is largely a function of the preservation of the existing historic building fabric. This Chapter discusses the various building elements and should also be referenced with new construction.
Any off-street parking lots provided shall be screened from the street line by buildings, landscaping, or other means. The guidelines specify that “parking lots should be screened from the street; their layout should include borders and islands planted with trees and shrubs to break-up expanses of paved areas. Given a parking lot within the Dover Historic District zone, at least 20% of the area within it should be unpaved and planted.”
Demolition The proposal for demolition of the existing building (in its entirety) must be reviewed for conformity with the design criteria guidelines found in Chapter 4: New Construction, Additions, Demolition and Relocation. The Applicant has provided a Narrative Letter discussing this request. The Design Standards and Guidelines gives guidance to the Historic District Commission by listing specific criteria to be evaluated when considering applications for the demolition of buildings (or portions of buildings) in the historic district (Chapter 4: pages 4-10 to 4-12). These guidelines are summarized below (see Design Standards and Guidelines for the complete text).
- 1.Determine the financial implications of maintaining a property versus demolition.
45
Page 46
Item 2. HI-25-01 Revised #2 The Old Post at 55 Loockerman Plaza Revised #2 Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
- 2.Regardless of economic issues the relative significance of the individual buildings slated for demolition should be evaluated.
- 3.In development related applications the City should review the schematic plans for the new structures to weigh the virtues of the new structure versus what exists.
- 4.Determine the extent of adequate recordation of a property the applicant would be required to complete if demolition were approved.
- 5.Lots left vacant by demolition should be treated in a manner that is sympathetic to the historic context.
New Construction The Design Standards and Guidelines for New Construction (Chapter 4: pages 4-1 through 4-8) provide the design criteria and development guidelines. The guidelines specify the following individual considerations for new construction to be considered in the review by the Historic District Commission (and Planning Commission) of the project for Architectural Review Certification: • Style • Scale (building to reflect dominant cornice and roof height of adjacent buildings) • Elevation of the First Floor • Floor-to-Floor heights • Bays, windows, and doors (size, relationship, spacing of) • Absolute Size (compare overall size of new building) • Massing (relationship of solid-to-void) • Orientation (location of primary façade) • Proportions (comparison of height to width of building and elements) • Materials • Forms (shape of building and roof to be complementary) • Siting (location of building on lot and in relation to street) • High density/ large-scale construction
The proposed project must also be reviewed for compliance with the standards established by the Zoning Ordinance. The standards include items such as setbacks from property lines, lot coverage, height, etc. This Revised #2 Proposal for the Old Post appears to conform to most of the bulk requirements of the C-2 Zoning District; however, should be verified via Site Plan review. The City of Dover Zoning Ordinance authorizes the Historic District Commission to waive certain bulk standards when issuing its recommendation to the Planning Commission for an Architectural Review Certificate if necessary. It is noted that the Zoning Ordinance also includes other site development requirements such as dumpsters, lighting, tree planting, bicycle parking, rear emergency access, spacing requirements, etc.
46
Page 47
Item 2. HI-25-01 Revised #2 The Old Post at 55 Loockerman Plaza Revised #2 Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
ACTION on ARCHITECTURAL REVIEW CERTIFICATION (for HI-25-01 with February 2025 Review by Historic District Commission and March 17, 2025 Review by Planning Commission): Application HI-25-01 was considered at the February 20, 2025 Meeting of the Historic District Commission. The following members were present at the February Meeting: Chairman Eric Czerwinski, Vice-Chair Mrs. Ellen Richardson, Mrs. Ann Horsey, and Ms. Mary Mason. The application was represented by Mike Glick of Lighthouse Construction along with Lauren Townsend. Public testimony was received during the Public Hearing from Todd Stonesifer as Board President of the Downtown Dover Partnership.
During the Meeting, the Historic District Commission heard the applicants’ presentation on The Old Post Project and including their response to the series of Staff Comments and Recommendations. They presented information on the site’s history; the development site and building placement; building architectural features and materials; and other site items. Questions focused on the building elevation detailing, planned uses in the building, and building height.
Action on Architectural Review Certification Recommendation by Historic District Commission: The motion to recommend approval passed 4-0 of the members present for this application at the February 20, 2025 Meeting. The Historic District Commission recommended approval of the Architectural Review Certificate for Application HI-25-01 The Old Post at 55 Loockerman Plaza based on the applicant’s presentation and plans with reference to the Staff notes and amendments (Staff Recommendation Report – Section VI) and with information from the applicant’s Response Letter.
Action on Architecture Review Certification and Site Plan by the Planning Commission: On March 17, 2025, the Planning Commission voted 9-0 to approve the Site Plan, including the Architectural Review Certification. The motion is as follows:
Mr. Lewis moved to approve S-25-07 The Old Post at 55 Loockerman Plaza and the associated Architectural Review Certification for the redevelopment of the old Post Office property including the Parking Strategy Statement and the Active Recreation Area Plan, seconded by Mr. Baldwin and the motion was carried 9-0 by roll call vote. Mr. Lewis voting yes; he thinks it is much needed in the area and it’s an exciting plan. He is looking forward to seeing it come to fruition. Mr. Roach voting yes; for reasons previously stated. Mrs. Denney voting yes; but she really does object to the parking. She sees problems but otherwise she thinks it is well done. Mrs. Maucher voting yes; for reasons stated. Mr. Baldwin voting yes; he thinks it is a great use of the building. Dr. Jones voting yes; for reasons previously stated. Mr. Reaves voting yes; for reasons previously stated. Mrs. Welsh voting yes; she thinks it is a professionally well done package and she thinks it’s in keeping with what we are trying to accomplish in Downtown Dover. Mr. Witham voting yes; he thinks this is an excellent use of this property given the limited use of this space that the property has. He thinks that the parking arrangement is probably the best that they could come up with given the environment that they are faced with. It is a well-designed building and the only drawback that he see is that it does not have a flagpole indicated. He votes
47
Page 48
Item 2. HI-25-01 Revised #2 The Old Post at 55 Loockerman Plaza Revised #2 Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
yes for the reasons stated in the record by fellow Commissioners as well as the DAC comments and the Planning Commission’s statements.
ACTION on ARCHITECTURAL REVIEW CERTIFICATION (for HI-25-01 Revised with November 20, 2025 Review by Historic District Commission and December 15, 2025 Review by Planning Commission): Application HI-25-01 Revised was considered at the November 20, 2025 Meeting of the Historic District Commission. The following members were present at the November Meeting: Chairman Eric Czerwinski, Vice-Chair Mrs. Ellen Richardson, Mrs. Ann Horsey, and Ms. Ann Baker. The application was represented by Mr. Sal Leone, Old Post LLC; Mr. Freddy Bada, Moonlight Architecture Inc.; Mr. Chad Warren, Engineer; Davis, Bowen and Friedel. Public testimony was received during the Public Hearing from Mr. Zach Prebula with Kent Economic Partnership.
During the Meeting, the Historic District Commission heard the applicants’ presentation on The Old Post Project as Revised and including their response to the series of Staff Comments and Recommendations. They presented information on the site’s history; the development site and building placement; building architectural features and materials; and other site items. Questions focused on the building elevation detailing, planned uses in the building, and building height.
Action on Architectural Review Certification Recommendation by Historic District Commission: The motion to recommend approval passed 4-0 of the members present for this application at the November 20, 2025 Meeting. The Historic District Commission recommended approval of the Architectural Review Certificate for Application HI-25-01 Revised The Old Post at 55 Loockerman Plaza based on the applicant’s presentation and plans with reference to the Staff comments (Staff Recommendation Report – Section VI) and with information from the applicant’s Response Letter.
Action on Architecture Review Certification and Site Plan by the Planning Commission: On December 15, 2025, the Planning Commission voted 9-0 to approve the Site Plan, including the Architectural Review Certification. The motion is as follows:
Mrs. Denney moved to approve S-25-07 which would also include the Parking Strategy Statement as well as the Active Recreation Area Plan. She thinks this is very well thought out and she is sure this was an extra expense to have the brick side and all but, she thinks that this building as we are seeing it just really lends itself to the area, the architecture and the historic aspect of the City of Dover; the Capital City of the State that started the Nation and also including the Architectural Review Certification. The motion was seconded by Mrs. Welsh and the motion was carried 9-0 by roll call vote. Mrs. Denney voting yes; in keeping with her motion. She thinks this is a lovely addition and change and it somewhat saves at least the front façade of the Post Office. Mrs. Maucher voting yes; based on DAC comments. Mr. Baldwin voting yes; it will be a great addition. Dr. Jones voting yes; it seems like it’s going to be an exciting project and she hopes there will be consideration for the inclusion of children in the active recreation area. Mr. Reaves voting yes; for reasons previously stated. Mrs. Welsh voting yes; for reasons previously stated. Mr. Lewis voting yes. Mr. Roach voting yes. Mr. Witham voting yes; it’s an excellent use of a valuable resource in Dover and as the applicant
48
Page 49
Item 2. HI-25-01 Revised #2 The Old Post at 55 Loockerman Plaza Revised #2 Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
stated, it opens the gateway to the Downtown Area which he thinks is going to be very helpful. He would love to see a flagpole; he doesn’t know whether or not that is in the plans.
VI. STAFF COMMENTS AND RECOMMENDATIONS
The Staff Comments and Recommendations for this application regarding the Architectural Review Certification were originally provided in the Architectural Review Staff Report Issued for the February 20, 2025 Historic District Commission Meeting and then were provided in the Revised Architectural Review Staff Report Issued for the November 20, 2026 Historic District Commission Meeting. The comments and recommendations were updated for this Report following Staff’s review of the Revised #2 Submission dated August 18, 2026.
- 1)Staff again recommends conditional approval of the Revised #2 Architectural Review Certificate for The Old Post project, finding that the building to be of a compatible design with the nearby buildings and with the intent of the Design Standards and Guidelines for the City of Dover Historic District Zone. This includes the demolition of the entirety of the building, the new building addition at the rear (north) using brick EIFS material, and reconstruction of the entire building using brick EIFS material. The Planning Office Staff finds that the full-envelope installation of a brick-finish EIFS system is structurally imperative because the building sits atop where discovered unstable, low-bearing-capacity soils severely limit the foundation’s load limits. Replacing the envelope with traditional, heavy clay masonry could introduce excessive dead load, risking differential and catastrophic foundation failure whereas the ultra-lightweight EIFS assembly achieves the required historic aesthetic while keeping structural loads well within safe geotechnical margins. The proposed multi-use site enhances the pedestrian scale of the Downtown area. The reconstruction of general building massing portion (and footprint) fronting Loockerman Plaza maintains the historic context of the area. The brick exterior finishes to resemble bricks take cues from the architectural styles seen in the Loockerman Street corridor and Capitol Square context.
- 2)The following conditions are recommended by Staff to improve the project’s compliance with the recommended guidelines of the Design Standards and Guidelines. The following are recommended conditions:
- a.The selected exterior finish choices should be compatible with the brick on the existing structure. The brick material color, size, and format should be identified.
- b.Continue to use the wall section at the cornice in a pattern that allows the cornice to protect in a different plane than the general wall surface. Cornicework is a very significant feature of the buildings in the area. Dentil cornices are recommended, particularly on the south-facing side of the building.
- c.While shutters are encouraged, vinyl and aluminum shutters may be inappropriate.
- d.It is inappropriate to remove historic decorative elements. The round six-part window with trim work in the tympanum should be replicated and the building name can be placed under it still in the pediment.
- e.Consideration of wall or free-standing signage may require additional review.
49
Page 50
Item 2. HI-25-01 Revised #2 The Old Post at 55 Loockerman Plaza Revised #2 Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
- f.Ensure the roof to wall connection from the front building to the rear addition does not result in valleys trapping water and debris.
- g.Identify any roof drainage systems i.e. gutters and downspouts and the proposed materials.
- h.Clarify if brick EIFS will be used as the exterior cladding materials for the dormer. Typically, masonry is not used in these features and a siding material and trim work is more often used.
- i.Identify the main entrance door(s) to the apartment building area; is it on Innovation Way or from the parking lot sides?
- j.Identify the railing materials along the steps in the sidewalk system and for the accessible ramp on the north end of the building. Ensure there is adequate space to fit the ramp and sidewalk.
- k.Any light fixtures utilized on the property should be consistent with the style of the lighting used in the nearby areas of the Capitol Square Context of the Historic District.
- l.Any revisions or changes in the identified materials may be subject to further review by the Historic District Commission.
- 3)Staff recommends the following pertaining to the site design elements of the project:
- a.The C-2 zoning district requires that parking lots be screened from the street. This Revised #2 includes a parking lot island improvements at the entrance from Innovation Way that added curing and grass areas.
- b.The sidewalk system on the street frontage should continue and include barrier free access, crosswalk striping, etc. at the points of intersection with the entrance and exit drive aisles.
- c.Any proposed landscaping or tree planting locations, and lighting fixture locations should be depicted on the plan and be consistent with the character of these elements as they exist within the Capitol Square Context area.
- 4)The existing building has a cornerstone/date stone that should be retained. There may also be an opportunity to add a plaque or other method outlining the history of the building (time of service as the Dover Post Office).
- 5)For building construction, the requirements of the building code or fire code must be complied with. Consult with the Building Inspection Staff and Fire Marshal regarding these requirements. The resolution of these items can impact the site design in some cases.
- 6)In the event that major changes and revisions to the design, materials, or site layout occur in the finalization of the plan and/or construction drawings contact the Department of Planning and Inspections. These changes may require resubmittal for review by the Historic District Commission.
- 7)This site development plan for this Revised project is also subject to the application and review process for Site Development Plan (Article 10 §2 of the Zoning Ordinance) before the Planning Commission. Note: Additional technical items for compliance with the Zoning
50
Page 51
Item 2. HI-25-01 Revised #2 The Old Post at 55 Loockerman Plaza Revised #2 Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
Ordinance and other regulations may be identified during the Site Plan Process. Review comments pertaining specifically to the Site Plan set will be issued at that time.
- 8)The applicant shall be aware that Building Permits are required to proceed with any construction activities on the project site. The permit applications must comply with the approvals and conditions granted through the Architectural Review Certification and Site Plan Review process.
- 9)The applicant should be aware that a Sign Permit is required to proceed with the placement of signage on the property.
VII. Historic District Commission Action Required on Revised #2 Submission
The Historic District Commission shall consider the Revised #2 Proposal and provide a Revised #2 Recommendation in regard to the Revised #2 Architectural Review Certification for the Old Post building and associated Site Improvements as Revised. The Revised #2 Recommendation should reflect consideration of the Design Standards and Guidelines for the City of Dover Historic District Zone.
This Revised #2 Recommendation will be presented to the Planning Commission at their September 21, 2026 Meeting with Public Hearing and Review of the Revised #2 HI-25-01/S-25- 07.
51
Page 52
Item 2.
52
Page 53
Item 2.
On behalf of Old Post LLC, we respectfully submit Revision #2 for consideration by the Historic Commission and Planning Commission for the Old Post Project located at 55 Loockerman Street, Dover, Delaware.
We are requesting approval of two modifications to the previously approved project. These requested modifications are the result of unforeseen structural and subsurface conditions discovered during additional investigation, testing, demolition planning, and engineering work following the original approval.
It is important to emphasize that the project is not being redesigned or replaced with a materially different development. Rather, the requested revisions are intended to address conditions that were not reasonably apparent at the time of the original approval and to allow the previously approved development to be constructed in a safe, structurally responsible, and practical manner.
- 1.REQUEST TO DEMOLISH THE EXISTING STRUCTURE IN ITS ENTIRETY
We respectfully request permission to demolish the existing building in its entirety, with the possible exception of portions of the existing front foundation footings, where technically feasible and appropriate.
Following the purchase of the property from the City of Dover, extensive testing and investigation revealed significant quantities of garbage, refuse, and other unsuitable materials below grade. Several rounds of additional testing and engineering analysis have demonstrated that these unforeseen subsurface conditions materially affect the structural design and construction methodology for the project.
As a result of these conditions, the project now requires the installation of specialized rigid-inclusion piles, representing an additional construction cost of more than $375,000. Additional investigation has also determined that the foundation work necessary to connect the remaining portion of the existing building to the new rear tower would be exceptionally difficult to construct because of the subsurface conditions encountered on the property.
The subsurface conditions have also raised concerns regarding the actual weight and structural behavior of the existing building and the potential for settlement beyond standard construction tolerances. These findings have required the project team to reevaluate the safest and most appropriate method of proceeding with demolition and reconstruction.
53
Page 54
Item 2.
Several demolition contractors who have reviewed the project have independently expressed concerns regarding the safety of attempting to retain and selectively demolish a portion of the existing structure.
In particular, the existing building contains substantial steel beams and steel floor trusses. Attempting to cut and remove these structural members in order to separate the existing building from the new construction could create a significant risk of an uncontrolled structural collapse during demolition. Such a condition could potentially result in serious injury or loss of life to workers or others on the site.
This concern is particularly significant at the location where the remaining portion of the existing building would meet and connect with the new tower construction.
In addition, we have recently observed a significant crack in the northeast exterior wall of the existing structure. This condition has further increased our concern regarding the stability of the building and the safety of attempting to selectively demolish portions of the structure while leaving other portions standing.
For these reasons, we believe that complete demolition of the existing structure represents the safer and more responsible approach to both demolition and reconstruction.
The additional area proposed for demolition represents less than 25% of the area originally contemplated for retention. The overall project design, massing, elevations, and architectural intent will remain substantially consistent with the previously approved plans.
We remain committed to maintaining the approved appearance and character of the front façade. Where practical and structurally appropriate, we also intend to salvage and reuse existing architectural and structural elements, including columns and other materials, as part of the reconstruction.
Complete demolition will also provide the project team with the opportunity to properly waterproof and insulate the building envelope at the front portion of the property. This will improve the long-term performance, durability, and energy efficiency of the building.
We respectfully submit that allowing complete demolition will provide a safer construction environment while allowing the previously approved project to proceed in a more practical and structurally sound manner.
- 2.REQUEST TO MODIFY EXTERIOR FAÇADE MATERIAL TO EIFS BRICK
Our second request concerns the exterior façade materials.
54
Page 55
Item 2.
The currently approved plans provide for EIFS on the first floor of the residential four-story tower, with thin brick and conventional brick used on other portions of the building.
In response to the structural and subsurface conditions identified during our additional engineering investigations, we respectfully request permission to utilize an EIFS brick system in place of conventional and thin brick materials on the portions of the building currently proposed to receive those materials.
The proposed EIFS brick system is intended to provide the appearance and character of traditional brick while substantially reducing the overall weight imposed on the building structure.
This reduction in weight is particularly important given the unforeseen subsurface conditions and the structural and settlement concerns identified during our additional testing and engineering analysis.
The proposed material change will not change the building elevations, architectural design, massing, height, or overall appearance of the approved project. The requested revision is limited to the exterior cladding material.
The first floor of the residential tower was already approved with an EIFS system. We also understood during the original approval process that EIFS had been contemplated and approved for the tower as a whole when the tower was three stories.
Given the conditions now identified, extending the EIFS system in a brick appearance would provide a practical means of reducing the overall weight of the building while maintaining the architectural character and appearance contemplated by the approved plans.
The use of an EIFS brick system would also assist the project in maintaining appropriate structural and engineering margins with respect to the anticipated settlement conditions.
We will provide physical samples of the proposed EIFS brick system at the hearings for the Commissioners to review and evaluate.
CONCLUSION
The two requested revisions are being proposed as a direct response to unforeseen conditions discovered after the original approval of the project.
The intent of Old Post LLC remains to proceed with the previously approved development while addressing the significant structural, subsurface, safety, and construction issues that have been identified during the project's engineering and pre-construction process.
55
Page 56
Item 2.
We believe that the proposed revisions will allow the project to proceed in a safer, more structurally responsible, and more practical manner, while preserving the architectural character, elevations, massing, and overall intent of the previously approved project.
The requested changes are not intended to create a materially different development. Rather, they are necessary modifications to the means and methods by which the approved development can be safely and responsibly constructed in light of conditions that were not known at the time of the original approval.
Accordingly, we respectfully request that the Historic Commission and Planning Commission approve Revision #2, including:
- 1.Permission to demolish the existing structure in its entirety, with the possible exception of portions of the existing front foundation footings where feasible and appropriate; and
- 2.Permission to utilize an EIFS brick exterior cladding system in place of the conventional and thin brick materials currently shown on portions of the approved plans.
We appreciate the Commissions' time and consideration of this request. We look forward to presenting the additional engineering information, demolition concerns, and proposed material samples at the upcoming hearings.
Thank you for your consideration.
Respectfully submitted,
Francis A. DiMondi
Managing Member
Old Post LLC
91 Brenda Lane, Suite A
Camden, DE 19934
Email: INFO@FADoffice.net
Phone: 302-730-0150
56
Page 57
Item 2.
Ring W. Lardner, P.E.
August 20, 2026 W. Zachary Crouch, P.E.
Michael E. Wheedleton, AIA, LEED GA
Jason P. Loar, P.E.
City of Dover Jamie L. Sechler, P.E.
15 Loockerman Plaza
Dover, DE 19901
Attn: Dawn Melson-Williams, AICP
RE: Old Dover Post
55 Loockerman Plaza
DBF #: 2916A036
Dear Mrs. Melson-Williams:
On behalf of the developer, we are writing this letter to confirm that the site is still in compliance with City of Dover Code with additional dwelling units proposed with the revised building.
As the structural conditions of the existing front portion of the old Dover Post office were unsuitable, the entire building will now be reconstructed. In doing so, the architects were able to create a more efficient design of the floors within the building, allowing for 3 additional studio apartment units. The brings the total dwelling units within the building up from 42 to 45 while keeping the exact same building footprint and total building square footage as the previously approved architectural plans.
As the total building square footage remains the same, this does not affect the floor area to lot area ratio, or the maximum allowed gross floor area. The one effect it does have is on the active recreation area as the 3 additional units raise the required recreation area from 3,150 s.f. to 3,375 s.f (at a rate of 75 s.f per dwelling unit). The building revision also did not remove any of the previously approved recreation space which is unchanged as follows: East Zen Garden 2,450 s.f., West Zen Garden 1,643 s.f., Second Floor Gym 506 s.f., As with the previously approved building, the total recreational area is 4,599 s.f., well above what is required. With these minimal changes to the building, an none to the site, both the architectural and site construction plans remain in compliance with City of Dover Code.
If you have any questions or require additional information, please do not hesitate to contact me at (302) 424-1441 or via email at csw@dbfinc.com.
Thank you,
Davis, Bowen & Friedel, Inc.
Chad S. Warren, P.E.
Associate/Sr. Civil Engineer
601 E. MAIN STREET, SUITE 100, SALISBURY, MD 21804 • 410-543-9091 1 PARK AVENUE, MILFORD, DE 19963 • 302-424-1441 106 N. WASHINGTON STREET, SUITE 103, EASTON, MD 21601• 410-770-4744 57 www.dbfinc.com
Page 58
Item 2.
OLD DOVER POST
DATA COLUMN
1 TAX MAP ID 2-05-07705-04-5300-00001
2 ENGINEER OWNER / DEVELOPER
DAVIS, BOWEN & FRIEDEL, INC. OLD POST LLC,
1 PARK AVENUE 91 BRENDA LANE, SUITE A
MILFORD, DE 19963 CAMDEN, DE 19934
CHAD WARREN FRANK DIMONDI
COMMERCIAL PROPERTY
PHONE: (302) 424-1441 EMAIL:FDIMONDI@MSN.COM
EMAIL: CSW@dbfinc.com
| 3 | DATUM | HORIZONTAL | VERTICAL |
| NAVD 83 (DE STATE PLANE) | NAVD 88 |
EAST DOVER HUNDRED
| SITE | 4 | ZONING | EXISTING | PROPOSED |
| C2/H/SWPOZ | C2/H//SWPOZ | |||
| 5 | LAND USE | EXISTING | PROPOSED | |
| POST OFFICE | MIXED USE |
CITY OF DOVER, KENT COUNTY, DELAWARE 4,560 S.F. RESTAURANT & 45 APARTMENT UNITS
| 6 | FLOODPLAIN | THE PROPERTY IS NOT IMPACTED BY THE 100 YEAR FLOODPLAIN AS DETERMINED |
| BY FEMA PANEL 10001C0167H , DATED MAY 5, 2003. | ||
|---|---|---|
| 7 | GROUNDWATER RECHARGE | A PORTION OF THE PROPERTY IS LOCATED IN AN AREA OF EXCELLENT |
| GROUNDWATER RECHARGE. | ||
GENERAL NOTES: 8 WELLHEAD PROTECTION AREA THE PROPERTY IS NOT LOCATED IN A WELLHEAD PROTECTION AREA.
LOCATION MAP 1.
2.
VERTICAL DATUM IS NAVD 88.
EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS, INCLUDING TELEPHONE, ELECTRIC, CABLE TV, GAS, TRAFFIC, SIGNAL, DBF #5209A001 9
10
WETLANDS
UTILITIES
THE PROPERTY IS NOT IMPACTED BY STATE AND FEDERALLY REGULATED
WETLANDS.
WATER SEWER
FEBRUARY 2026
WATER, SEWER, FORCE MAINS AND STORM DRAINAGE ARE BASED UPON THE BEST AVAILABLE INFORMATION AND ARE SHOWN CITY OF DOVER CITY OF DOVER 1" = 1200' FOR THE CONVENIENCE OF THE CONTRACTOR ONLY. NO GUARANTEE IS MADE OR IMPLIED REGARDING THE ACCURACY OR COMPLETENESS THEREOF. CONTRACTOR IS RESPONSIBLE FOR THE VERIFICATION OF THE LOCATION, DEPTH, SIZE AND MATERIAL OF ALL UNDERGROUND UTILITIES TO HIS OWN SATISFACTION BEFORE BEGINNING ANY EXCAVATION OR PIPE LAYING. 11 CODE COMPLIANCE REQUIRED PROPOSED THE CITY, OWNER, AND ENGINEER DISCLAIM ANY RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS OF SAID FRONT SETBACK 0 FT 0 FT
CONSTRUCTION PLANS INFORMATION. IF THE CONTRACTOR RELIES ON SAID INFORMATION, HE DOES SO AT HIS OWN RISK. THE GIVING OF THE INFORMATION ON THE PLANS WILL NOT RELIEVE THE CONTRACTOR OF HIS OBLIGATIONS TO SUPPORT AND PROTECT ALL SHOWN SIDE SETBACK 5 FT 5 FT OR NOT SHOWN EXISTING UTILITIES AND APPURTENANCES. SHOULD ANY EXISTING UTILITIES BE DAMAGED BY THE CONTRACTOR, REAR SETBACK 20 FT 20 FT THEN THE CONTRACTOR SHALL REPAIR THE DAMAGE CAUSED TO THE CITY'S SATISFACTION, AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL MAKE HIS OWN INVESTIGATION AND TEST PIT EXISTING UTILITIES AS REQUIRED. MAXIMUM BUILDING HEIGHT 75 FT 45 FT PARKING (SEE PARKING STRATEGY TABLE THIS 66 ONSITE SPACES (INCLUDING 3 ADA 3. CONTRACTOR SHALL NOTIFY "MISS UTILITY" (1-800-282-8555 IN DE) & (1-800-441-8355 OUTSIDE OF DE) AT LEAST 48 HOURS PRIOR SHEET) ACCESSIBLE SPACES) TO EXCAVATION TO HAVE EXISTING UNDERGROUND UTILITIES LOCATED AND MARKED.
R1UBV 29 SPACES ON AN EASEMENT WITH THE 4. ALL MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. CITY OF DOVER ON ADJACENT PARCEL INNO
KINGS HW 5. USE ONLY SUITABLE AND APPROVED GRANULAR MATERIAL FOR BACK FILLING TRENCHES. (INDLUDING 2 ADA ACCESSIBLE VAT SPACES) SITE Y. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF TRAFFIC IN ALL WORK AREAS IN ACCORDANCE WITH DELAWARE ION ST. 95 TOTAL SPACES
CITY OF DOVER, KENT COUNTY, DELAWARE
ER MAN MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (DE MUTCD), MOST RECENT VERSION. ANY PAVEMENT MARKINGS OR PAINTED WY. OCK LINES DISTURBED OR REMOVED DURING CONSTRUCTION SHALL BE REPLACED IN KIND AFTER COMPLETION OF PAVEMENT BICYCLE PARKING 1 OUTSIDE BICYCLE PARKING SPACE E. LO RESTORATION. COST SHALL BE INCLUDED IN THE PRICES BID FOR PIPE INSTALLATION. FOR EVERY 20 ONSITE VEHICLE 5 OUTSIDE BICYCLE PARKING SPACES
ISLA PARKING SPACES LAZA LEG P 7. CONTRACTOR SHALL DETERMINE THE LOCATION OF ALL RIGHT-OF-WAY LINES AND PROPERTY LINES TO HIS OWN SATISFACTION. 20 INSIDE BICYCLE PARKING SPACES AN CK ERM ALL PROPOSED UTILITIES ARE TO BE CONSTRUCTED WITHIN THE STREET RIGHT-OF-WAY OR EASEMENT AREAS PROVIDED. ANY LOO DISTURBED AREAS BEYOND THE RIGHT-OF-WAY OR EASEMENT LINES SHALL BE RESTORED IMMEDIATELY TO THEIR ORIGINAL 25 TOTAL SPACES FED TIVE CONDITION. PAYMENT FOR THIS WORK SHALL BE INCLUDED IN THE COST OF ITEMS BID.
OLD DOVER POST ERA AVE BLV D. LOT COVERAGE 85.00% 81.53% . 8. CONTRACTOR SHALL PROVIDE STAKEOUT SURVEY NECESSARY FOR THE PARKING LOT CONSTRUCTION, THE INSTALLATION OF . IN G JR L ST RK . UTILITY WORK AND APPURTENANCES, AND DETERMINATION OF RIGHT-OF-WAY. RECREATIONAL AREA 75 S.F. OF RECREATIONAL AREA PER EAST ZEN GARDEN: 2,450 S.F. ST. LU THE H TIN DWELLING UNIT. WEST ZEN GARDEN: 1,643 S.F. ORT MAR E. N 9. FITTINGS SHOWN ON THE PLANS ILLUSTRATE ANTICIPATED SIZE AND ANGLE OF DEFLECTION. THIS INFORMATION IS SHOWN FOR 75 S.F. X 45 UNITS = 3,375 S.F. SECOND FLOOR GYM: 506 S.F. GENERAL INFORMATION ONLY, AND IS NOT GUARANTEED. ACTUAL SIZE AND ANGLE MAY VARY DUE TO FIELD CONDITIONS. THE TOTAL RECREATIONAL AREA: 4,599 S.F. NWI WETLANDS CONTRACTOR WILL NOT BE ENTITLED TO ADDITIONAL COMPENSATION FOR CHANGES RESULTING FROM SUCH CONDITIONS. FLOOR AREA RATIO GROSS FLOOR AREA/LOT AREA 52,212 S.F. / 55,191 S.F. = .0.94 1" = 400' 10. THROUGHOUT THE PROJECT, WHERE ANY UNDERGROUND UTILITIES ARE LOCATED IN, ACROSS OR ADJACENT TO DRAINAGE = MAXIMUM OF 5.0 DITCHES AND SWALES, THE CONTRACTOR SHALL RESTORE DISTURBED AREAS TO THEIR ORIGINAL GRADES. INSTALL EROSION TOTAL GROSS FLOOR AREA MAXIMUM OF 275,955 S.F. 9,120 S.F. + 43,092 S.F. = 52,212 S.F. CONTROL MATTING (AMERICAN GREEN SN 150) AND VEGETATE AS REQUIRED. PAYMENT OF THIS RESTORATION SHALL BE 2 INCLUDED IN THE COST OF ITEMS BID. TREE PLANTING REQUIREMENTS 1 TREE PER 3,000 S.F. OF 19 PROPOSED TREES NON-WOODLAND DEVELOPMENT AREA 11. CONTRACTOR SHALL EXERCISE CAUTION AND TAKE MEASURES NECESSARY TO PROTECT TREES DURING CONSTRUCTION WATER 55,191 S.F. / 3,000 S.F. = 19 TREES INNO ACTIVITIES. DAMAGED TREES TO BE REPLACED, IN KIND, AT THE CONTRACTOR'S EXPENSE. 12 AREAS 3 KINGS HW ION 12. ALL ROADWAYS ARE TO BE SWEPT FREE OF SEDIMENT ON A DAILY BASIS. PARCEL AREA 55,191 S.F. (1.267 AC.) VAT SITE Y. 1 IMPERVIOUS COVER 45,168 S.F. (1.037 AC.) (81.85%) 13. THE CONTRACTOR SHALL REMOVE AND IMMEDIATELY REPLACE, RELOCATE, RESET OR RECONSTRUCT ALL OBSTRUCTIONS IN T. AN S THE WORK AREA, INCLUDING, BUT NOT LIMITED TO, MAILBOXES, SIGNS, LANDSCAPING, LIGHTING, PLANTERS, CULVERTS, WY. ERM 13 PROPOSED LAND USE AREAS
COMMERCIAL PROPERTY OCK DRIVEWAYS, PARKING AREAS, CURBS, GUTTERS, FENCES, OR OTHER NATURAL OR MAN-MADE OBSTRUCTIONS. TRAFFIC E. LO CONTROL REGULATORY, WARNING, AND INFORMATIONAL SIGNS SHALL REMAIN FUNCTIONAL AND VISIBLE TO THE APPROPRIATE BUILDINGS/PARKING 38,343 S.F. (0.880 AC.) (69.46%) LEG LANES OF TRAFFIC AT ALL TIMES, WITH THEIR RELOCATION KEPT TO A MINIMUM DISTANCE. THE COST SHALL BE INCLUDED IN THE AZA 4 SIDEWALKS 6,824 S.F. (0.157 AC.) (12.39%) COST OF ITEMS BID. N PL ISLA SITE RMA CKE 5 OPEN SPACE 10,023 S.F. (0.230 AC.) (18.15%) LOO 14. STANDARD CITY OF DOVER SIDEWALK, AS PER CHAPTER 98, ARTICLE IV OF THE DOVER CODE OF ORDINANCES, SHALL BE 6 TIVE TOTAL 55,191 S.F. (0.267 AC.) (100.00%) REQUIRED TO BE INSTALLED ALONG THE ENTIRE PUBLIC STREET FRONTAGE OF A PROPERTY. WHERE FRONTAGE SIDEWALK . FED AN ST AVE BLV D. EXISTS BUT DOES NOT MEET THE STANDARDS OF CHAPTER 98, ARTICLE IV, THE SIDEWALK SHALL BE RELAID TO MEET THE KERM STANDARDS. SIDEWALK SHALL INCLUDE BARRIER FREE PEDESTRIAN MOVEMENT AND SITE ACCESS. W. LO OC ERA . G JR. KIN HER ST. L ST LUT 15. IN ACCORDANCE WITH APPENDIX A, ARTICLE VI, SECTION B.3, ALL SIDEWALKS SHALL ASCEND FROM THE CURBSTONE TO THE RTH TIN . NO MAR PARKING STRATEGY . BUILDING LINE AT THE RATIO OF ONE-QUARTER OF AN INCH TO THE FOOT. NOTHING IN THIS SECTION SHALL BE CONSTRUED TO E AFFECT ANY PAVEMENT PREVIOUSLY LAID BY ORDER OF THE CITY COUNCIL, UNTIL IT IS TAKEN UP AND RE-LAID.
- 16.PARKING SPACES RESERVED FOR USE BY THE HANDICAPPED AND RELATED ACCESSIBLE ROUTES SHALL BE CONSTRUCTED IN NECESSARY PARKING ACCORDANCE WITH THE AMERICAN NATIONAL STANDARDS INSTITUTE GUIDELINES ENTITLED "ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES" (REFERENCE: ANSI A117.1-1998). UNIT TYPE REQUIREMENT NUMBER OF UNITS FLOOR AREA NUMBER OF SPACES
- 17.LIGHTING SHALL PROVIDE NO LESS THAN 1 1/2 FOOTCANDLES AT GRADE. LIGHT SHALL BE DEFLECTED AWAY FROM ADJACENT 1 BEDROOM APARTMENT 1 SPACE 17 17 RESIDENTIAL AREAS AND SHALL NOT BE DISTRACTING TO TRAFFIC ON ADJACENT ROADS. 2 BEDROOM APARTMENT 2 SPACE 15 30 FEMA FLOOD MAP 18. ALL EXISTING REGULATORY AND WARNING TYPE TRAFFIC SIGNS, AND ALL STREET NAME SIGNS OCCURRING WITHIN THE 3 BEDROOM APARTMENT 3 SPACE 4 12 PANEL #10001C0167H SCALE: 1" = 1/2 MILE PROPOSED PROJECT LIMITS SHALL BE REMOVED AND IMMEDIATELY REPLACED AS DIRECTED BY THE CITY. STUDIO APARTMENT 1 SPACE 9 9
- 19.THE CONSTRUCTION OF THE SITE ENTRANCES AND STREET IMPROVEMENTS MUST COMPLY WITH THE REQUIREMENTS OF SUB-TOTAL: 68 SPACES DELDOT AND THE CITY OF DOVER PUBLIC WORKS DEPARTMENT BASED ON STREET MAINTENANCE RESPONSIBILITIES.
SacB Lo 20. CONTRACTOR SHALL GRADE, TOPSOIL, SEED, AND MULCH ALL DISTURBED AREAS OF CONSTRUCTION, INCLUDING PIPE 1 SPACE PER 4 SEATS/3 BAR INSTALLATION OR DITCH CONSTRUCTION. EROSION CONTROL MATTING SHALL BE PROVIDED ON ALL SLOPES GREATER THAN 3:1. RESTAURANT 4,560 S.F. 56 STOOLS 21. DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. ALL CONSTRUCTION MUST BE DONE IN SUB-TOTAL: 56 SPACES COMPLIANCE WITH THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970, AS AMENDED AND ALL RULES AND REGULATIONS 0 400 800 1200 LOCATION MAP THERETO APPURTENANT. TOTAL: 124 SPACES 22. THE CONTRACTOR SHALL NOTIFY THE FOLLOWING TWO WEEKS PRIOR TO THE START OF CONSTRUCTION AND SHALL APPRAISE AND COORDINATE DURING ALL PHASES OF CONSTRUCTION: SCALE: 1"=400' HkB W DAVIS, BOWEN & FRIEDEL, INC. - (302) 424-1441 CITY OF DOVER/WATER & WASTEWATER - (302) 736-7025 PROVIDED PARKING INNO
2026-08-20 BUILDING REVISION FOR ADDITIONAL UNITS
CITY OF DOVER/PLANNING AND INSPECTION - (302) 736-7010
BICYCLE PARKING
Y.
2026-03-09 CITY OF DOVER DAC, PW, FM COMMENTS CITY OF DOVER/ELECTRIC UTILITY - (302) 736-7070 PARKING TYPE KINGS HW VAT KENT CONSERVATION DISTRICT - (302) 608-5370 SITE PARKING TYPE ION ST. MAN 23. THE OWNER/DEVELOPER WILL UTILIZE PRIVATE COLLECTION FOR SOLID WASTE. PROPOSED ONSITE APARTMENTS 66 KER
2026-04-08 CITY OF DOVER PW COMMENTS
WY. E. LO
OC
PROPOSED OUTSIDE OF
5
SHARED SPACES ON EXISTING BUILDING
LEG
2026-05-12 DNREC WPCC COMMENTS 2026-06-10 DNREC WPCC COMMENTS ZA APARTMENTS AND N PLA EASEMENT WITH CITY OF RESTAURANT 29 RMA ISLA DOVER ON ADJACENT PARCEL CKE PROPOSED INSIDE OF LOO 20 INDEX OF SHEETS BUILDING ERA TIVE ADJACENT PROPERTY OWNERS PUBLIC SPACES (LIBRARY
FED
LOT, INNOVATION WAY, RESTAURANT 180±
. C-001 TITLE
| AVE | LVD | LOOCKERMAN PLAZA) | |||||
|---|---|---|---|---|---|---|---|
| J | R. B | 1 | 2-05-07705-04-5500-00001 | IO ZONING | CITY OF DOVER | 35 LOOCKERMAN ST., DOVER, DELAWARE 19901 | |
| L ST | ING | ||||||
| . | |||||||
| RK | C-002 | LEGEND | TOTAL: 25 SPACES | ||||
| ST. | LU | THE | 2 | 2-05-07705-04-5100-00001 | IO ZONING | STATE OF DELAWARE | 89 KINGS HWY., DOVER DELAWARE 19901 |
| H | |||||||
| . | |||||||
| ORT | TIN | C-101 | EXISTING CONDITIONS | TOTAL: 275± SPACES | |||
| E. N MAR | |||||||
| 3 | 2-05-07705-04-5200-00001 | IO ZONING | CENTRAL DOVER OFFICES, INC. | 9 E LOOCKERMAN ST., DOVER, DELAWARE 19901 | |||
| SOILS MAP | C-102 | SITE PLAN | |||||
| 4 | 2-05-07709-05-1300-00001 | IO ZONING | STATE OF DELAWARE | 121 MARTIN L KING JR BLVD., DOVER, DELAWARE 19901 | |||
| 1" = 400' | C-103 | SITE DETAILS | |||||
| 5 | 2-05-07709-05-1200-00001 | IO ZONING | STATE OF DELAWARE | 60 LOOCKERMAN ST., DOVER, DELAWARE 19901 | |||
| C-104 | SITE DETAILS | ||||||
| SOILS DATA | 6 | 2-05-07709-05-1100-00001 | IO ZONING | STATE OF DELAWARE | 401 FEDERAL ST., DOVER, DELAWARE 19901 | ||
| C-105 | ENTRANCE PLAN | ||||||
| LABEL | |||||||
| HkB | |||||||
| SOIL NAME | |||||||
| Handbrook Urban Land Complex, 0 to 5 Percent Slopes | |||||||
| TYPE | |||||||
| B | C-106 | TURNING DIAGRAMS | |||||
| OWNER/DEVELOPER STATEMENT | |||||||
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-TITLE.dwg Aug 20 , 2026 - 4:19pm warc C-107 ACTIVE RECREATION PLAN I, THE UNDERSIGNED, HEREBY STATE THAT I AM THE OWNER OF THE PROPERTY BENCHMARK INFORMATION Date: FEBRUARY 2026 DESCRIBED AND SHOWN ON THIS PLAN, THE PLAN WAS MADE AT MY DIRECTION, I C-301 GRADING OVERVIEW BM# DESCRIPTION LOCATION ELEVATION ACKNOWLEDGE THE SAME TO BE MY ACT AND DESIRE THE PLAN BE RECORDED Scale: C-302 - C-303 GRADING PLAN 15.08' (NAVD 88) ACCORDING TO LAW. AS NOTED 1 IRON ROD W/CAP N:422446.8983 E:626423.5746 C-401 SEDIMENT AND STORMWATER COVERSHEET AND GENERAL NOTES Dwn.By: CAW C-402 PRE CONSTRUCTION SITE STORMWATER MANAGEMENT PLAN Proj.No.: 5209A001 C-403 CONSTRUCTION SITE STORMWATER MANAGEMENT PLAN 8/20/2026 C-404 - C-405 CONSTRUCTION SITE DETAILS AND NOTES FRANK DIMONDI DATE OLD POST LLC. C-501 UTILITY PLAN 91 BRENDA LANE SUITE A CAMDEN, DE 19934 CITY OF DOVER C-502 UTILITY DETAILS
C-504
L-101
SEWER PROFILES
LANDSCAPE PLAN ENGINEER'S STATEMENT TITLE L-102 LANDSCAPE DETAILS I, CHAD S. WARREN, P.E., HEREBY STATE THAT I AM A REGISTERED ENGINEER IN THE STATE OF DELAWARE, THAT THE INFORMATION SHOWN HEREON HAS BEEN V-101 RECORD TITLE PREPARED UNDER MY SUPERVISION AND TO MY BEST KNOWLEDGE AND BELIEF REPRESENTS GOOD ENGINEERING PRACTICES AS REQUIRED BY THE V-102 RECORD PLAN APPLICABLE LAWS OF THE STATE OF DELAWARE.
Dwg.No.:
C-001 8/20/2026 by CHAD S. WARREN, P.E. DATE DAVIS, BOWEN & FRIEDEL, INC. 1 PARK AVE. ENGINEER DATE MILFORD, DELAWARE, 19963 58 THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2024
Page 59
Item 2.
8/20/2026
MANMADE ROADSIDE FEATURES UTILITY FEATURES NATURAL FEATURES FEATURE DESCRIPTION EXISTING PROPOSED ID FEATURE DESCRIPTION EXISTING PROPOSED FEATURE DESCRIPTION EXISTING PROPOSED
BOLLARD ELECTRIC - UNDERGROUND HEDGEROW OR THICKET
C
CURB, TYPE 1 AND 3 ELECTRIC MANHOLE E SHRUBBERY
A
CURB OPENING WITH SIDEWALK C ELECTRIC METER EM TREE - CONIFEROUS
F
FENCE - CHAINLINK OR STRANDED ELECTRIC TRANSFORMER TREE - DECIDOUS
LAMP AND POST - RESIDENTIAL GAS - UNDERGROUND UGE UGE TREE LINE
| MB | MB | |||
|---|---|---|---|---|
| MAILBOX | GAS MANHOLE | G | CONTOUR ELEVATION & LABEL | 33 |
21.96
TRAFFIC SIGN AND POST GAS METER ELEVATION
C
CURB OPENING GAS VALVE
O
RAILROAD TRACKS
SANITARY MAIN 8SS
SANITARY SEWER MANHOLE RIGHT-OF-WAY FEATURES DRAINAGE FEATURES
CITY OF DOVER, KENT COUNTY, DELAWARE
FEATURE DESCRIPTION EXISTING PROPOSED
SOIL BORING LOCATION
FEATURE DESCRIPTION EXISTING PROPOSED ID EASEMENT PE
TELEPHONE TEST POINT
FE
FLARED END SECTION PROPERTY LINE
UTILITY POLE GUY WIRE ANCHOR
OLD DOVER POST
MH
DRAINAGE MANHOLE D RIGHT-OF-WAY BASELINE
UTILITY POLE 1+00
DI
DRAINAGE INLET RIGHT-OF-WAY LINE
WATER MAIN 8W
DIRECTIONAL FLOW ARROW TAX DITCH RIGHT OF WAY WATER - FIRE HYDRANT RR RIPRAP PERMANENT EASEMENT PE PE WATER VALVE P TEMPORARY CONSTRUCTION EASEMENT DRAINAGE PIPE TCE WATER LATERAL UD UNDERDRAIN SANITARY SEWER CLEANOUT/ LATERAL UDO UNDERDRAIN OUTLET
COMMERCIAL PROPERTY SES SAFETY END SECTION
BIOFILTRATION SWALE BFS SURVEY CONTROL & MONUMENTATION
PAVEMENT SECTIONS
FEATURE DESCRIPTION EXISTING PROPOSED
DITCH CENTERLINE
DRAINAGE JUNCTION BOX
JB
PAVEMENT BM#2
SURVEY BENCHMARK LOCATION
DRAINAGE PIPE HEADWALL EXISTING SIDEWALK
IRON ROD WITH CAP SET
PROPOSED SIDEWALK
CMF
CONCRETE MONUMENT
IPF IRON PIPE FOUND
IDENTIFIERS IRF IRON ROD FOUND
FEATURE DESCRIPTION ID
A
ABANDON BY CONTRACTOR C
A
ABANDON BY OTHERS C
ADJUST BY CONTRACTOR
A
C
MISCELLANEOUS FEATURES
A FEATURE DESCRIPTION EXISTING PROPOSED
ADJUST BY OTHERS
2026-08-20 BUILDING REVISION FOR ADDITIONAL UNITS O
2026-03-09 CITY OF DOVER DAC, PW, FM COMMENTS
CJB LIMIT OF DISTURBANCE LOD
CONVERT TO JUNCTION BOX
WETLAND BOUNDARY - DELINEATED WET
2026-04-08 CITY OF DOVER PW COMMENTS CMH CONVERT TO DRAINAGE MANHOLE
2026-05-12 DNREC WPCC COMMENTS 2026-06-10 DNREC WPCC COMMENTS DO NOT DISTURB DND
PC
PEDESTRIAN CONNECTION/TYPE
PEDESTRIAN CONNECTION/TYPE WITHOUT PC-N
DETECTABLE WARNING SYSTEM
RL
RELOCATE BY CONTRACTOR C
RL
RELOCATE BY OTHERS O
RM
REMOVE BY CONTRACTOR C
RM
REMOVE BY OTHERS
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-TITLE.dwg Aug 20 , 2026 - 4:19pm warc O Date: FEBRUARY 2026 Scale: NOT TO SCALE Dwn.By: CAW Proj.No.: 5209A001
LEGEND
Dwg.No.:
C-002 59 THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2024
Page 60
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-EXISTING CONDITIONS.dwg Aug 20 , 2026 - 4:19pm warc
EX-12SS EX-12SS EX-12SS EX-12SS EX-12SS EX-12SS EX-12SS EX-12SS EX-12SS EX-12SS EX-12SS
INNOVATION WY.
(CITY OF DOVER MAINTAINED) (LOCAL
ROAD)
60' EXIST. R.O.W.
EX-8W EX-8W (DELDOT LOOCKER EX-8W MAINTAIN ED) (OTHE MAN ST. EX-8W R PRINCIP AL ARTER EX-8W IA L) (KCR 0 23) EX-8W EX-8W EX-8W EX-8W EX-8W W EX-8W EX-8W EX-8 EX-8W EX-8W EX-8W EX-8W
EXIST.
R.O.W.
VARIES
0
20
40
60 THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2025
Scale: Date: Proj.No.: Dwn.By: 2026-03-09 CITY OF DOVER DAC, PW, FM COMMENTS Dwg.No.: 2026-04-08 CITY OF DOVER PW COMMENTS OLD DOVER POST 2026-05-12 DNREC WPCC COMMENTS 2026-06-10 DNREC WPCC COMMENTS EXISTING 2026-08-20 BUILDING REVISION FOR ADDITIONAL UNITS COMMERCIAL PROPERTY CAW 1"=20' 5209A001 CITY OF DOVER, KENT COUNTY, DELAWARE C-101 CONDITIONS FEBRUARY 2026
8/20/2026
60 Item 2.
Page 61
Item 2.
SITE HATCH LEGEND: SITE LEGEND:
8/20/2026 A STOP SIGN (SEE DETAIL ON SHEET C-103) EXISTING CONCRETE B HANDICAP PARKING SPACE WITH SIGN (SEE DETAIL ON SHEET C-103)
C MODIFIED 1-6 CURB (SEE DETAIL ON SHEET C-103)
EX-12SS D DUMPSTER ENCLOSURE (SEE DETAIL ON SHEET C-103) PROPOSED CONCRETE E PROPOSED SIDEWALK
F PROPOSED ADA RAMP (WITH RAILING TO MATCH PROPOSED 4' BLACK FENCE)
G PROPOSED 4' TALL BLACK ALUMINUM FENCE (SEE DETAIL ON SHEET C-103) PROPOSED PAVEMENT SECTION H PROPOSED GATE
I PROPOSED STEPS
EX-12SS J PROPOSED PATIO/BALCONY
K PROPOSED FLAG POLE
L PROPOSED LIGHT POLE (WITH COLONIAL STYLE LAMP HEAD)
M EXISTING LIGHT POLE
N PROPOSED PATIO
O PROPOSED BIKE RACK
EX-12SS P PROPOSED BENCH INNOVATION WY. 4'-3" MAX RETAINING WALL Q PROPOSED YOGA STATION
60' EXIST. R.O.W. (CITY OF DOVER MAINTAINED) (LOCAL ROAD) (SEE RETAINING WALL SECTION-1 ON SHEET C-103) R PROPOSED RETAINING WALL (SEE DETAIL SHEET C-103)
5' SIDE 6' MAX RETAINING WALL S EXISTING WALL (SEE RETAINING WALL SETBACK SECTION-2 ON SHEET C-103) T PARKING BUMPER
Q
EX-12SS
'
R2 F F R2 R3 F P G
S
CITY OF DOVER, KENT COUNTY, DELAWARE ' '
A M G R 8' M
M G 104 L L
13'
5' A C I S.F. I DOOR (TYP.)
R R5 PROPOSED 2'
' H 5'
EAST ZEN GARDEN H
8'
OLD DOVER POST 5' 2,450 S.F. 3' 5'
EX-12SS
J J J J J
' I
M 24' 18' R5 M
B WALKING PATH (CONSTRUCTED
(VARIES) J
F WITH PAVERS)
I K
18' 9'
N K
B
K
EX-12SS
ACK
PROPOSED
9' 4 STORY ETB EXIST.
M BUILDING
11 11 R.O.W.
ADDITION ONT VARIES
43,092 S.F. S
68 L.F. WALL
9' B
14
0' FR
24' 18' F
COMMERCIAL PROPERTY
| 18' | 023) |
| T | |
|---|---|
| L) (KC | |
| M | 9.75' |
| R | |
| 4.75' | |
| EX-12SS | |
| 9' | 6 |
| T | |
LO
5'
INTAIN OCKERMAN G 9' 2'
R5 J J J J ' F
ED) (M ST.
9' PROPOSED
INOR 5' 12' WEST ZEN GARDEN P 1,643 S.F. P
ARTE
RIA
I
20'
EX-12SS
M 10'
(VARIES) 8'
C
OT MA
R
24'
(DELD
M 18' 18' J
20' REAR '
9' R5
SETBACK 9'
D
M
EX-12SS 5' SIDE 24 J 1' T G SETBACK O H S L EXISTING PORTION OF WALL TO BE FILLED L
G M M S M M
EX-12SS
2026-08-20 BUILDING REVISION FOR ADDITIONAL UNITS M
2026-03-09 CITY OF DOVER DAC, PW, FM COMMENTS 2026-04-08 CITY OF DOVER PW COMMENTS EXISTING SHARED USE PARKING EASEMENT WITH THE CITY OF DOVER
2026-05-12 DNREC WPCC COMMENTS 2026-06-10 DNREC WPCC COMMENTS EX-12SS
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-SITE PLAN.dwg Aug 20 , 2026 - 4:19pm warc Date: FEBRUARY 2026 Scale: 1"=20' Dwn.By: CAW Proj.No.: 5209A001
SITE PLAN
Dwg.No.:
0 20 40 60 C-102 61 THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2025
Page 62
Item 2.
HANDICAP SIGN (R7-8) & HANDICAP SIGN (R7-8) & HANDICAP SIGN (R7-8) VAN ACCESSIBLE SIGN (R7-8P) VAN ACCESSIBLE SIGN (R7-8P) (USE THIS SIGN AT ALL (USE THIS COMBINATION OF SIGNS AT (USE THIS COMBINATION OF SIGNS AT HANDICAPPED PARKING R7-8 LOCATIONS NOTED ON PLAN) LOCATIONS NOTED ON PLAN) 3 LOCATIONS) SIDEWALK 4" CHAMFER FENCE THIS SIGN TYPICAL AT
8/20/2026
#4 BENT BARS w/ 16" ALL ACCESSIBLE PARKING SPACES
LEGS @ 18" O.C.
#5 @ 18"
O.C.
HORIZ.
#4 @ 18" STONE DRAINAGE
O.C., E.W. 1' LAYER "U"-CHANNEL POST (2-LBS./FT.)
4'-3" (MAX.) #5 @ 12" O.C. VERT.
5' MIN. FROM GRADE/7' MAX.
FILTER FABRIC
5'-3"
DRAIN TILE 9'-0" 6"R 9'-0" 9'-0"
2" CLR.
1'-0" (MIN.)
112"Ø PVC
WEEPS @
10'-0" O.C. #5 @ 12" O.C. 18"
6" 4" PIPE BOLLARD PAINTED TRAFFIC
2" CLR. YELLOW, FILLED W/ CONCRETE (4) #5 CONT. 2'R 6" 1'-0" 8" 2'-6" 3" CLR. 18 SLOPE TOP OF CONCRETE 18'-0" "R 4"
| 1'-0" | 180° HOOKED | 15" | |||
|---|---|---|---|---|---|
| END, TYP. | |||||
| GROUND/PAVING | |||||
| #4 STAND | 4'-2" | SURFACE | |||
| BARS, TYP. | 3'-9" | 9'-0" | 3'-9" | 9'-0" | 3'-9" |
3" CLR. 6" #57 STONE NOTES: BASE 9'-0" 9'-0" 9'-0" 3500 P.S.I. 1. CONCRETE SHALL BE 4,000 PSI. P.C. CONCRETE 2. INSTALL VERTICAL CONSTRUCTION JOINTS @ 30'-0" O.C. MAX., REINFORCEMENT SHALL BE CONTINUOUS THROUGH THE JOINT. 3. INSTALL VERTICAL "V"-NOTCH CONTROL JOINTS, 10'-0" O.C. 3" 4. ASSUMED SOIL PROPERTIES USED FOR RETAINING WALL 2'-0" DESIGN, SHALL BE VERIFIED BY GEOTECH ENGINEER: - SOIL DENSITY = 120 PCF - SOIL BEARING CAPACITY = 2,000 PSF - SOIL FRICTION ANGLE = 30.0° - COEFF. OF FRICTION = 0.45 4" WIDE BLUE IN COLOR,
CITY OF DOVER, KENT COUNTY, DELAWARE ADJACENT PARKING SPACE PAINTED STRIPING TO BE BLUE IN PAINTED STRIPING TO BE BLUE IN 1'-6" RETAINING WALL SECTION - 1 LINE COLOR, 4" WIDE, 24" ON CENTER AND AT A 45° ANGLE COLOR, 4" WIDE, 24" ON CENTER AND AT A 45° ANGLE (SOIL HEIGHTS 3.0'-4.25')
SIGNAGE FOR HANDICAPPED PARKING SPACE HANDICAP PARKING DETAIL NOT TO SCALE
OLD DOVER POST
NO TO SCALE
3
4" CHAMFER FENCE
#4 BENT BARS w/ 16"
LEGS @ 18" O.C.
PARKING LOT PAVEMENT (SEE DETAIL)
#5 @ 18"
O.C.
HORIZ.
#5 @ 12"
O.C. VERT. 11'-0" 11'-0"
12'-0" GATE GATE
8" X 18" POURED CONCRETE
6'-0" (MAX.)
#4 @ 18" FOOTER - 30" BELOW GRADE
EDGE OF SLAB (FOR 8" C.M.U. WALL SUPPORT
O.C., E.W. STONE DRAINAGE
1' LAYER
7'-0" 6" REINFORCED
EXPANSION JOINT
CONCRETE SLAB
COMMERCIAL PROPERTY
(SEE DETAIL)
FILTER FABRIC CONTROL JOINT
DRAIN TILE
2" CLR.
22'-8"
1'-0" (MIN.) 11'-8" 12'-8" 1.83 6" #5 @ 12" O.C. 2" CLR. (6) #5 CONT. 1'-0" 8" 4'-7" 3" CLR. (4) - 6" DIA. X 4'-0" SCH. 40 BOLLARDS FILLED WITH CONC. @ O.C. (PAINTED SAFETY YELLOW)
1'-0" 180° HOOKED END, TYP.
NOT LESS THAN 10'
24'
6'-3" R1-1
#4 STAND
3" CLR. BARS, 6" #57 (36"x36") TYP. STONE 8" C.M.U. WALL BEYOND NOTES: 1. CONCRETE SHALL BE 4,000 PSI. BASE SIGN DETAIL W/ CONC. DOMED TOP (EIFS FINISH COLORED 2. INSTALL VERTICAL CONSTRUCTION JOINTS @ 30'-0" O.C. MAX., REINFORCEMENT SHALL BE CONTINUOUS THROUGH THE JOINT. TO MATCH BUILDING.) 3. INSTALL VERTICAL "V"-NOTCH CONTROL JOINTS, 10'-0" O.C. 1'MIN 4. ASSUMED SOIL PROPERTIES USED FOR RETAINING WALL DESIGN, SHALL BE VERIFIED BY GEOTECH ENGINEER: - SOIL DENSITY = 120 PCF LOCK RETAINING YOKE (TYP.) - SOIL BEARING CAPACITY = 2,000 PSF AT EXTRA COST - SOIL FRICTION ANGLE = 30.0° - COEFF. OF FRICTION = 0.45 SCH. 40 GALV. FENCE POST 6'-8" AND GATES W/PRIVACY SLATS
RETAINING WALL SECTION - 2 R= 8.5" ANCHOR SECURITY (SOIL HEIGHTS 4.25'-6.0') HINGES (AS REQUIRED) O.C. CAP (TYP.) 1'-5" 4.0' TYPICAL SIGN INSTALLATION NOTES:
2026-08-20 BUILDING REVISION FOR ADDITIONAL UNITS FINISH GRADE 1. DUMPSTER WALLS TO BE 6"-8" HIGH
2026-03-09 CITY OF DOVER DAC, PW, FM COMMENTS NOT TO SCALE 2. CONSTRUCT DUMPSTER ENCLOSURE WITH 8" SPLIT FACE BLOCK (EIFS FINISH 2.0' POURED RETAINING WALL DETAIL WITH FENCE 30" COLORED TO MATCH BUILDING ) 3. PROVIDE CONC, PAD STEEL SLEEVES FINISH
2026-04-08 CITY OF DOVER PW COMMENTS
1"=2' FOR THE GALV. LOCKING PINS IN THE
8" GRADE
OPEN AND CLOSED POSITION.
2026-05-12 DNREC WPCC COMMENTS 2026-06-10 DNREC WPCC COMMENTS 18" (8"X18" POURED CONCRETE FOOTING BEYOND 4'-3" 1'-9"
SAWCUT 1 1/2" DEEP CONTROL JOINT FRONT ELEVATION SIDE ELEVATION 4000 PSI CONCRETE NOTES: 1. THE DEVELOPER MUST SUBMIT A REQUEST FOR STREET LIGHTING 2" CLEAR 5/8" DIA. MOUNTING HOLE FOR TO THE ELECTRICAL ENGINEERING DIVISION AT 302-736-7070. 1/2" DIA. MASONRY ANCHOR (TYP.)
- 2.THE ELECTRICAL ENGINEERING DIVISION DESIGNS AND FURNISHES TO THE DEVELOPER THE LAYOUT PLANS AND SPECIFICATIONS FOR THE LIGHTS. THE CITY RETAINS THE SOLE AUTHORITY TO DETERMINE THE LIGHTING REQUIREMENTS AND THE INSTALLATION SEQUENCE FOR THE DEVELOPMENT. THE PLANS WILL BE SUBMITTED TO THE 2" CLEAR
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-SITE PLAN.dwg Aug 20 , 2026 - 4:20pm warc DEVELOPER ALONG WITH THE ELECTRICAL EXTENSION PLANS.
- 3.THE DEVELOPER IS RESPONSIBLE FOR THE INSTALLATION OF THE MATERIALS Date: CONDUITS AND BELOW GRADE EQUIPMENT ACCORDING TO THE PLANS 2" NOM., SCHED. 40, ASTM A500, WELDED SEAMLESS-STEEL FEBRUARY 2026 AND SPECIFICATIONS. THE DEVELOPER WILL BE RESPONSIBLE FOR THE RENTAL COSTS OF ALL STREET OR ALLEYWAY LIGHTS, AS PER THE PIPE CONSTRUCTION Scale: 5" 1" BATTER (2) LAYERS OF 6 X 6 - W 2.1 X W2.1 W.W.F. COMPACT SUBGRADE TO 95% OF ASTM D1557 AS NOTED APPLICABLE TARIFF RATE, UNTIL SUCH TIME AS THE STREETS ARE 3/8" X 3" H.R. STEEL FLAT-BAR FOR FOOT ASSEMBLIES NORMAL CURB DEDICATED TO THE CITY. 1/2" DIA. H.R. STEEL ROUND-BAR FOR LOCK-RETAINING YOKES Dwn.By: 6.0' CAW DEPRESSED VARIES, REFER 2-1/2" NOM., SCHED. 40, ASTM A500, WELDED SEAMLESS-STEEL LIGHT POLE DETAIL 4. FOR 3 21" 1 1 THE CITY WILL INSTALL THE STANDARD STREET LIGHT POLE AND LED HEAD 2" R CURB TO PLANS Proj.No.: 1" PIPE FOR BELOW-GRADE SLEEVES 5209A001 THE CURRENT MARKET RATE; THIS FEE WILL BE ROUTINELY RE-EVALUATED NOT TO SCALE AND WILL RECOVER 100% OF THE MATERIAL COST (INCLUDING CURRENT WAREHOUSE "R DUMPSTER ENCLOSURE DETAIL FABRICATION OVERHEAD RATE). THIS FEE WILL BE BILLED AT THE SAME TIME AS THE “EXTENSION 18" 1 1 2 NOT TO SCALE ALL METALLURGICAL JOINTS ARE MIG WELDS
- -LOT FEE” WHICH IS COLLECTED PRIOR TO THE INSTALLATION OF ANY ELECTRIC 2 21" FACILITIES, SEE SECTION II,PAGE 17. ANY NON-STANDARD STREET LIGHT INSTALLATION REFER TO PAVEMENT FINISHES WILL BE BASED ON THE ACTUAL COST OF THE MATERIALS (INCLUDING CURRENT SECTION WAREHOUSE OVERHEAD RATE), FOR EXAMPLE THE LIGHTS AT EDEN HILL. THE CITY BLACK THERMOPLASTIC POWDER COATING 8 TO 10 MILS THICK WILL NOT BE RESPONSIBLE FOR MAINTAINING THE STOCK OF NON-STANDARD BOTTOM OF CURB HOT-DIPPED GALVANIZED STREETLIGHTS, THIS WILL BE THE RESPONSIBILITY OF THE CUSTOMER OR DEVELOPER. 4" CR-1 WHEN TREATED BASE IS SPECIFIED. 3 14" TYPE C HOT MIX (2 LIFTS, 141" & 2") SITE DETAILS COMPACTED SUBGRADE TO 95% OF ASTM D-1557. 6" NOTE: 6" GABC WHEN ADJACENT TO CONCRETE PAVEMENT, 9'-0" SUB GRADE COMPACTED TO 95% OF INSTALL APPROVED EXPANSION JOINT. MODIFIED PROCTOR @ ±2% OPTIMUM PLAN VIEW MOISTURE CONTENT OF ASTM D1557
MODIFIED P.C.C. CURB, TYPE 1 DETAIL Dwg.No.:
C-103
NOT TO SCALE PAVEMENT SECTION
(TRAVEL LANES) BIKE RACK DETAIL
PROPOSED STRUCTURAL NUMBER = 2.14 NOT TO SCALE
62 THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2025
Page 63
Item 2.
8/20/2026
CITY OF DOVER, KENT COUNTY, DELAWARE
OLD DOVER POST
48" TALL BLACK ALUMINUM FENCE DETAIL
NOT TO SCALE
COMMERCIAL PROPERTY
2026-08-20 BUILDING REVISION FOR ADDITIONAL UNITS
2026-03-09 CITY OF DOVER DAC, PW, FM COMMENTS
2026-04-08 CITY OF DOVER PW COMMENTS
2026-05-12 DNREC WPCC COMMENTS 2026-06-10 DNREC WPCC COMMENTS
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-SITE PLAN.dwg Aug 20 , 2026 - 4:20pm warc Date: FEBRUARY 2026 Scale: AS NOTED Dwn.By: CAW Proj.No.: 5209A001
42" TALL BLACK ALUMINUM FENCE DETAIL NOT TO SCALE
SITE DETAILS
Dwg.No.:
C-104 63 THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2025
Page 64
Item 2.
SITE HATCH LEGEND:
8/20/2026
EXISTING CONCRETE
PROPOSED CONCRETE
PROPOSED PAVEMENT SECTION
INNOVATION WY.
(CITY OF DOVER MAINTAINED) (LOCAL ROAD)
PROPOSED PAVERS
SITE LEGEND: A PROPOSED LIGHTPOLE (WITH COLONIAL STYLE LAMP HEAD)
B PROPOSED BENCH
C PROPOSED 4' TALL BLACK ALUMINUM FENCE (SEE DETAIL SHEET C-103) 5' SIDE
SETBACK D PROPOSED GATE
E PROPOSED RETAINING WALL (SEE DETAIL SHEET C-103)
F PROPOSED PATIO/BALCONY C B E 8SS B I 8SS 8SS C 8SS8' 8SS 8SS 8SS 8SS 8SS 8SS 8SS E 8SS 8SS G PROPOSED WALKING PATH
H PROPOSED YOGA STATION 3' E H 104 S.F. A A PROPOSED I I PROPOSED STEPS S G D ACTIVE RECREATION AREA 8S G SIDEWALK
CITY OF DOVER, KENT COUNTY, DELAWARE 8SS D 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W REQUIRED PROPOSED AREA PROPOSED 5' I 8' EAST ZEN GARDEN 13' 2,450 S.F. EAST ZEN GARDEN 2,450 S.F.
6FW
F F F F F
75 S.F. OF RECREATIONAL
OLD DOVER POST
2'
AREA PER DWELLING UNIT. WEST ZEN GARDEN 1,702 S.F.
75 S.F. X 45 UNITS = 3,375 S.F.
SECOND FLOOR GYM 506 S.F. 3W 5' PROPOSED SHRUB (TYP.) PROPOSED 6FW (SEE LANDSCAPE SHEETS L-101 & L-102) 4 STORY BUILDING ADDITION TOTAL: 4,658 S.F. 43,092 S.F. NOTE: SEE ARCHITECTURAL PLANS FOR MORE INFORMATION ABOUT THE 3W PROPOSED SECOND FLOOR GYM.
6FW
EAST ZEN GARDEN
COMMERCIAL PROPERTY SCALE: 1"=10'
6FW
3W
PROPOSED SHRUB (TYP.)
(SEE LANDSCAPE SHEETS L-101 & L-102)
PROPOSED
6FW 4 STORY
BUILDING
ADDITION
3W 43,092 S.F.
2026-08-20 BUILDING REVISION FOR ADDITIONAL UNITS
2026-03-09 CITY OF DOVER DAC, PW, FM COMMENTS
3W
6FW 2'
6FW
2026-04-08 CITY OF DOVER PW COMMENTS F F F F
2026-05-12 DNREC WPCC COMMENTS 2026-06-10 DNREC WPCC COMMENTS 1W 9'
B B 12' PROPOSED B B
WEST ZEN GARDEN
17'
1,643 S.F.
1W PROPOSED TREE (TYP.) 5' PROPOSED SIDEWALK (SEE LANDSCAPE SHEETS L-101 & L-102)
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-ACTIVE RECREATION PLAN.dwg Aug 20 , 2026 - 4:20pm warc 10'
1W
Date:
FEBRUARY 2026
Scale:
1"=10'
18' Dwn.By:
CAW
WEST ZEN GARDEN Proj.No.:
SCALE: 1"=10' 5209A001
ACTIVE RECREATION PLAN
Dwg.No.:
0 10 20 30 C-107 64 THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2025
Page 65
Item 2.
EX-8W
4/15/2026
8/20/2026
EX-8W
EX-12SS
EX-8W
EX-12SS
EX-8W
EX-12SS
60' EXIST. R.O.W.
INNOVATION WY. PROPOSED YOGA STATION
5' SIDE
EX-8W
SETBACK
PROPOSED BENCHES
1-CC
EX-12SS 3-ND
CITY OF DOVER, KENT COUNTY, DELAWARE
4-RH 2-RH 2-PL
2-PL
3-ND
W
EX-8
8SS 8SS 8SS 8SS 8SS
8-BN
8S 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W
OLD DOVER POST S 3-ND 8W
EX-12SS
2-RH
1-PL 2-RH 3-ND 1-PL 3-ND 1-PL 1-CC
6FW 2-RH
EX-8W 8W S PROPOSED EAST ZEN GARDEN 8S 3W PROPOSED FLAG POLE 8SS (TYP.) 8W 6FW
EX-12SS 8SS PROPOSED 4 STORY EXIST. BUILDING R.O.W. EX-8W 3W ADDITION VARIES 43,092 S.F. 1-CC 30-TO
COMMERCIAL PROPERTY 6FW PROPOSED WEST ZEN GARDEN
EX-12SS
PROPOSED BENCHES PROPOSED BENCHES
3W
2-ND 3-ND
2-ND
3-RH 6-NT 2-RH 6-NT 3-RH
6FW EX-8W
N ST.
ERMA 1W
1-QR 1-QR 1-QR 1-QR 1-QR LOOC K
EX-12SS 1-MV EX-8W 1W
1-MV
20' REAR
SETBACK 1-CC
EX-12SS 5' SIDE 1W
EX-8W SETBACK G 1W 1W 1W 1W 1-MV
EX-12SS
2026-08-20 BUILDING REVISION FOR ADDITIONAL UNITS EX-8W
2026-03-09 CITY OF DOVER DAC, PW, FM COMMENTS
2026-04-08 CITY OF DOVER PW COMMENTS
2026-05-12 DNREC WPCC COMMENTS 2026-06-10 DNREC WPCC COMMENTS
EX-12SS
EX-8W
EX-8W
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-LANDSCAPE PLAN.dwg Aug 20 , 2026 - 4:21pm warc Date: FEBRUARY 2026 Scale: 1"=20' Dwn.By: EX-8W CAW Proj.No.: 5209A001
EX-8W LANDSCAPE PLAN
Dwg.No.:
L-101
EX-8W 0 20 40 60
65 THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2025
Page 66
Item 2.
SITE DATA: TREE PIT
STRAPS, TYP. GENERAL LANDSCAPE NOTES 1. DEVELOPER: OLD POST, LLC 91 BRENDA LANE, SUITE A 1. QUALITY AND SIZE OF PLANTS, SPREAD OF ROOTS, AND SIZE OF BALLS SHALL BE TREE ROOT BALL IN ACCORDANCE WITH THE CURRENT STANDARDS OF THE AMERICAN CAMDEN, DELAWARE 19934 ASSOCIATION OF NURSERYMEN "AMERICAN STANDARDS FOR NURSERY STOCK". FRANK DIMONDI EMAIL: FDIMONDI@MSN.COM 2. CONTRACTOR SHALL BE REQUIRED TO GUARANTEE ALL PLANT MATERIALS FOR A PERIOD OF ONE YEAR AFTER INSTALLATION IS COMPLETE AND FINAL 2. DESIGN PROFESSIONAL: DAVIS, BOWEN & FRIEDEL, INC. ACCEPTANCE OF SITE WORK HAS BEEN GIVEN. AT THE END OF ONE YEAR ALL 1 PARK AVENUE PLANT MATERIAL WHICH IS DEAD OR DYING SHALL BE REPLACED AT THE ALL DECIDUOUS SHADE TREES OVER 2" CALIPER MILFORD, DELAWARE 19963 CONTRACTOR'S EXPENSE AS ORIGINALLY SPECIFIED. AND ALL EVERGREEN TREES OVER 6' IN HEIGHT CHAD S. WARREN P.E. SHALL USE THREE STAKES FOR STABILIZATION. PHONE: 302-424-1441 3. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO UTILITIES AND MAY EMAIL: CSW@DBFINC.COM MAKE MINOR ADJUSTMENTS IN SPACING AND/OR LOCATION OF PLANT MATERIALS. TREE PIT CONTRACTOR TO VERIFY "AS BUILT" LOCATION OF ALL UTILITIES. 3. SITE AREA: 1.267 ACRES TREE ROOT BALL 4. NO SUBSTITUTIONS SHALL BE MADE WITHOUT APPROVAL OF THE OWNER. 4. PROPERTY ADDRESS: 55 LOOCKERMAN PLAZA, DOVER, DE 19903 STRAPS, TYP. 5. ALL AREAS NOT STABILIZED IN PAVING OR PLANT MATERIALS SHOULD BE SEEDED 5. ZONING: C2 MIXED USE COMMERCIAL & MULTIFAMILY. AND MULCHED. (SEE EROSION & SEDIMENT CONTROL PLAN.)
- 6.NO EXISTING WETLANDS ON SITE. 6. ALL DECIDUOUS SHADE TREES SHALL BRANCH A MINIMUM OF 6'-0" ABOVE GROUND LEVEL. TREES SHALL BE PLANTED AND STAKED IN ACCORDANCE WITH NOTE:
- 7.NO EXISTING WOODLANDS ON SITE. THE STAKING DETAIL SHOWN.
- -WATER DEEPLY ONCE A WEEK DURING THE FIRST TWO SUMMERS. STAKES TO BE 7. THE FULL EXTENT OF ALL PLANTING BEDS SHALL RECEIVE 4" OF TOPSOIL AND 3" APPLY A MINIMUM OF 5-10 LOCATED PARALLEL 0F BARK MULCH PER SPECIFICATIONS. GALLONS OF WATER EACH WEEK. TO PAVEMENT
- -CAREFULLY REMOVE CONTAINERS, WRAPPINGS, WIRES AND TIES FROM PLAN 8. THE CONTRACTOR SHALL SUPPLY ALL PLANT MATERIALS IN QUANTITIES
CITY OF DOVER, KENT COUNTY, DELAWARE SUFFICIENT TO COMPLETE THE PLANTINGS SHOWN ON THIS DRAWING AND AS
| ROOT BALL BEFORE PLANTING. | SPECIFIED. | |
|---|---|---|
| - LOOSEN OUTSIDE ROOTS, AND | ||
| UNWRAP ANY CIRCLING ROOTS | 9. | ALL PLANTS SHALL BEAR THE SAME RELATIONSHIP TO FINISHED GRADE AS THE |
| - SECURE STAKES WITH WIDE PLANT'S ORIGINAL GRADE BEFORE DIGGING. | ||
| WEBBING STRAPS OR CHAINLOCK | ||
| TIES. ALLOW FOR TREE MOVEMENT. | 10. | THE CONTRACTOR SHALL WATER ALL PLANTS THOROUGHLY TWICE DURING THE |
| - DO NOT HEAVILY PRUNE THE TREE AT DECIDUOUS TREE | ||
| FIRST 24-HOUR PERIOD AFTER PLANTING, AND THEN WEEKLY OR MORE OFTEN, IF | ||
OLD DOVER POST PLANTING. DO NOT REMOVE THE NECESSARY, DURING THE FIRST GROWING SEASON. TERMINAL BUDS OF BRANCHES THAT EVERGREEN TREE EXTEND TO THE EDGE OF THE CROWN. IF 11. AREAS WITHIN THE DRIP LINE OF EXISTING TREES ARE NOT TO BE DISTURBED NECESSARY, PRUNE ONLY CROSSOVER REMOVE ANY TWINE, DURING THE CONSTRUCTION PROCESS. LIMBS, CO-DOMINANT LEADERS AND TAPE OR TAGS BROKEN OR DEAD BRANCHES.
2"x2" STAKES
NOTCH STAKES TO 4"-6" HOLD STRAPS IN PLACE EVERGREENS 4'- 6' HT., STAKE 2'- 3' ABOVE GROUND SET BASE OF TRUNK AT OR DECIDUOUS TREES & JUST ABOVE FINAL GRADE EVERGREENS 6'- 8' HT., STAKE 3'- 4' ABOVE GROUND APPLY 3-4" LAYER OF DOUBLE SHREDDED HARDWOOD
LANDSCAPE PLANT SCHEDULE DECIDUOUS TREES & MULCH. KEEP 2-3" FROM TREE EVERGREENS 8'- 10' HT., TRUNK.
COMMERCIAL PROPERTY STAKE 4'- 5' ABOVE GROUND FINISHED GRADE
TREE BACKFILL WITH EXISTING SOIL SYMBOL NATIVE KEY BOTANICAL NAME COMMON NAME SIZE QUANTITY ROOT FROM THE HOLE. TAMP LIGHTLY AS 4-6" TALL SOIL BERM BALL THE HOLE IS FILLED. DECIDUOUS TREE - CANOPY DIG A HOLE AT 4"-6" MIN. LEAST TWO TIMES THE ROOTBALL 6"-8" MV MAGNOLIA VIRGINIANA SWEETBAY MAGNOLIA 1 3/4" - 2" Cal., B&B 3 DIAMETER. SCARIFY DIAMETER SIDES OF TREE PIT. ROOT BALL SET ROOT BALL ON UNDISTURBED SOIL TO PREVENT SETTLING CC CERCIS canadensis EASTERN REDBUD 1 1/2"- 2" Cal., B&B 4
| TREE PLANTING DETAIL | QR | QUERCUS robur 'FASTIGIATA' | COLUMNAR OAK | 1 1/2"-2" Cal., B&B | 5 |
| NOT TO SCALE | |||||
|---|---|---|---|---|---|
| TOTAL | 12 | ||||
| EVERGREEN TREE-CANOPY | |||||
TO THUJA occidentalis 'SMARAGD' EMERALD GREEN ARBORVITAE 5-6'HT., B&B 30
| TOTAL | 30 | |||
| EVERGREEN SHRUBS | ||||
|---|---|---|---|---|
| ND | NANDINA domestica 'LEMON-LIME' | 'LEMON-LIME' NANDINA | 24"-36' | 22 |
| BN | BUXUS NEWGEN FREEDOM | NEWGEN FREEDOM BOXWOOD | 24"-36"., B&B | 8 |
RHODODENDRON hybrid 'CONLES
2026-08-20 BUILDING REVISION FOR ADDITIONAL UNITS RH AUTUMN EMPRES 24"-36" B&B 20
2026-03-09 CITY OF DOVER DAC, PW, FM COMMENTS 5'-6' HT., B&B
2026-04-08 CITY OF DOVER PW COMMENTS
PL PRUNUS laurocerasus 'SCHIPKAENSIS' SKIP LAUREL 7
| 2026-05-12 DNREC WPCC COMMENTS | 2026-06-10 DNREC WPCC COMMENTS |
|---|---|
| TOTAL | 57 |
| GRASSES | |
NT NASSELLA tenuisima MEXICANA FEATHER GRASS #1 CONT., 18" O.C. 12
TOTAL 12
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-LANDSCAPE PLAN.dwg Aug 20 , 2026 - 4:22pm warc Date: FEBRUARY 2026 Scale: AS NOTED Dwn.By: CAW
LANDSCAPE ARCHITECT'S STATEMENT Proj.No.: 5209A001 I, TIMOTHY M. METZNER, HEREBY STATE THAT I AM A REGISTERED LANDSCAPE ARCHITECT IN THE STATE OF DELAWARE, THAT THE INFORMATION SHOWN HEREON HAS BEEN PREPARED UNDER MY SUPERVISION AND TO MY BEST KNOWLEDGE AND BELIEF REPRESENTS GOOD ARCHITECTURAL PRACTICES AS REQUIRED BY THE APPLICABLE LAWS OF THE STATE OF DELAWARE.
LANDSCAPE
DETAILS
4/15/2026
____________________________________________________
SIGNATURE DATE
REGISTERED LANDSCAPE ARCHITECT: TIMOTHY M. METZNER, RLA
DAVIS, BOWEN & FRIEDEL, INC.
1 PARK AVENUE Dwg.No.:
MILFORD, DELAWARE 19963
L-102 66 THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2025
Page 67
Item 2.
67
Page 68
Item 2.
68
Page 69
Item 2.
69
Page 70
Item 2.
70
Page 71
Item 2.
71
Page 72
Item 2.
72
Page 73
Item 2.
73
Page 74
Item 2.
74
Page 75
Item 2.
75
Page 76
Item 2.
76
Page 77
Item 2.
77
Page 78
Item 2.
78
Page 79
Item 2.
79
Page 80
Item 2.
80
Page 81
Item 2.
81
Page 82
Item 2.
82
Page 83
Item 2.
83
Page 84
Item 2.
84
Page 85
Item 2.
85
Page 86
Item 2.
86
Page 87
Item 2.
87
Page 88
Item 2.
88
Page 89
Item 2.
89
Page 90
Item 2.
90
Page 91
Item 2.
91
Page 92
Item 2.
92
Page 93
Item 2.
93
Page 94
Item 2.
94
Page 95
Item 2.
95
Page 96
Item 3.
City of Dover
DATA SHEET FOR SITE PLAN REVIEW & ARCHITECTURAL REVIEW CERTIFICATION
DEVELOPMENT ADVISORY COMMITTEE MEETING OF September 3, 2025
PLANNING COMMISSION MEETING OF September 15, 2025
Plan Title: The Governor: Mixed-Use Building at 120 S. Governors Avenue, S-25-11
Plan Type: Site Development Plan
Location: On the west side of South Governors Avenue and halfway between Reed Street and West Loockerman Street in Dover, DE
Owners: Downtown Dover Development Corporation c/o Downtown Dover Partnership and the City of Dover (parcels at 105 and 115 S. New Street)
Addresses: 120 South Governors Avenue
(Related Properties) 105, 111, and 115 South New Street
Tax Parcel: ED-05-077.09-01-44.00-000 (Related Properties) ED-05-077.09-01-37.00-000, ED-05-077.09-01-42.00-000, ED-05-077.09- 01-43.00-000
Size: 1.7622 acres +/- (main parcel)
1.9813 acres +/- (total of all parcels)
Present Uses: Vacant lot – Building with former auto retail store and child daycare center was demolished Proposed Use: Mixed Use Commercial (Grocery, retail, restaurant, child day care center) and Multi-family Housing (Apartments) and associated parking
Zoning: C-2 (Central Commercial Zone)
H (Historic District Zone)
Building Area: Total Square Feet: 139,306 square feet (also listed as 169,080 SF)
Off Street Parking: 13 vehicle parking spaces including 1 van accessible ADA parking space, and 40 bicycle parking spaces
Sewer & Water: City of Dover
Waiver Requests: Opaque Barrier – Elimination of Fence Component
Tree Mitigation Plan (for off-site tree planting)
For Consideration: Architectural Review Certification
Parking Strategy Statement
Active Recreation Area Plan
P. O. Box 475 Dover, DE 19903 96
Community Excellence Through Quality Service
Page 97
Item 3.
CITY OF DOVER
City of
DEVELOPMENT ADVISORY COMMITTEE Dover
Planning
APPLICATION REVIEW COMMENTARY Office
D.A.C. MEETING DATE: September 3, 2025
APPLICATION: The Governor: Mixed-Use Building at 120 South Governors Avenue
FILE #: S-25-11 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Dawn Melson-Williams, AICP PHONE: 302-736-7196
Note: This Review Report was initially prepared by Staff of the Rossi Group (under a Planning Service contract with eh City of Dover.) The Report was completed with additional review and editing by the City’s Planning Office.
- I.PLAN SUMMARY
This Application is for Review of a Site Development Plan Application and associated Architectural Review Certification to permit construction of a mixed use commercial and multi-family (apartment) building in Downtown Dover, to be located between South Governors Avenue and South New Street, midway between Reed Street and West Loockerman Street. The proposal includes a four- story, 139,306 SF Mixed-Use Building that includes space for retail, child daycare, 120 residential apartments, and a roof-top courtyard, with 13 vehicle parking spaces and associated site improvements. The 1.76+/- acre main property is a vacant lot that was formerly an auto parts retail store and daycare center. The property is zoned C-2 (Central Commercial Zone) and is subject to H (Historic District Zone). The owners of record include the Downtown Dover Development Corporation c/o Downtown Dover Partnership and the City of Dover. Property Addresses: 120 South Governors Avenue, 105 South New Street, 111 South New Street, and 115 South New Street. Tax Parcels: ED-05-077.09-01-44.00-000, ED-05-077.09-01-37.00-000, ED-05-077.09-01-42.00-000, and ED-05-077.09-01-43.00-000.
The Project Site is subject to Application HI-25-02 Mixed-Use Building at 120 South Governors Avenue. At the July 17, 2025 meeting of the Historic District Commission, the Commission considered the Application and have provided a Recommendation on the Architectural Review Certification for the project. (See attached Recommendation Report.)
Previous Applications The property owners are the Downtown Dover Development Corporation c/o Downtown Dover Partnership and the City of Dover. On June 20, 2024, the Historic District Commission granted approval of the Architectural Review Certification allowing demolition of the previous structure, a one-story Auto Parts/AutoPlus retail store and daycare center, located at 120 South Governors Avenue (HI-24-05). On March 14, 2025, the applicant submitted the initial filing of the application for redevelopment to the Historic District Commission. The application was held at the request of the applicant while additional design refinements were made to the submission. The applicant made design changes to the proposal and submitted an updated 120 South Governors Avenue Mixed-Use 97
Page 98
Item 3.
S-25-11 The Governor: Mixed-Use Building at 120 S. Governors Avenue
DAC Report of September 3, 2025
Development Narrative Letter, Site Plan set, and Architectural Graphics set with building elevations and 3-D views, to the Department of Planning and Inspections on June 13, 2025. It was reviewed as HI-25-02 before the Historic District Commission on July 17, 2025.
There was previous proposal in 2011 for demolition of the building and redevelopment of the property with applications HI-11-04 Acme Site Redevelopment Master Plan and S-11-11 Lands at DDP at 120 South Governors Avenue: Master Plan. The plans were never finalized and expired.
Preliminary Land Use Services Review (PLUS): The PLUS Review is required by a City of Dover Memorandum of Understanding (MOU) for certain types of projects. Due to its Downtown Dover Redevelopment Target Area, this project was not required to complete PLUS Review process.
II. PROJECT DESCRIPTION
The application proposes construction of a mixed-use commercial and multi-family (apartment) building with associated site improvements for the development of ‘The Governor.’ The property is located on the west side of South Governors Avenue and midway between Reed Street and West Loockerman Street. It is bounded by South New Street on the west. The four-story structure is being designed to include 120 residential apartment units, a rooftop courtyard, grocery, retail and restaurant spaces, and a child day care facility with other site improvements such as a parking lot, courtyard, and landscaping. Capital City 2030: Transforming Downtown Dover Master Plan (Capital City 2030) identified this project as a priority project for the revitalization of Downtown Dover.
The Governor will be located directly across from the proposed Site Plan S-25-01 Dover Mobility Center (Parking Garage), which is also prioritized in the Capital City 2030. Additionally, the proposed mixed-use redevelopment project will support an additional revitalization strategy within the Master Plan, which is to increase the number of mixed-income residents living in downtown, provide access to food within Downtown Dover, and increase retail and service opportunities. It is also identified as a Key Project in the Downtown Development District Plan.
Surrounding Land Uses The subject property is within the Downtown Development District, located one block north of Loockerman Street. The site is bordered by South Governors Avenue to the east and South New Street to the west. As previously noted, the parcels are zoned C-2 (Central Commercial Zone) and within the Historic District. Properties immediately adjacent to the subject project location are also zoned C-2. Others in the immediate area are zoned RG-1 (General Residence Zone). The subject property is currently vacant with recent demolition of the one-story Auto Parts/AutoPlus retail store and daycare center; (known as the Acme site). The largest of the subject parcels is within the H (Historic District Zone), as are properties to the south and east, as well as to the north fronting South Governors Avenue. The smaller parcels that are adjacent to the main subject of this application are outside of the H (Historic District Zone). Properties west of the subject site across South New Street are also outside of the H (Historic District Zone). Surrounding uses are a combination of mixed use and residential, with a church located at the southeast corner of South New Street and Reed Street.
98
Page 99
Item 3.
S-25-11 The Governor: Mixed-Use Building at 120 S. Governors Avenue
DAC Report of September 3, 2025
III. ZONING REVIEW
C-2 (Central Commercial Zone) The subject property is zoned C-2 (Central Commercial Zone). Article 3 §13 of the Zoning Ordinance details the permitted uses within the C-2 (Central Commercial Zone) as well as design standards. Article 4, §4.14 provides the bulk standards for the C-2 zone. The subject property fronts on two streets, South Governors Avenue and South New Street. The C-2 zone requires a zero minimum front setback and a zero minimum side setback, but a minimum of five feet if a side setback is provided. Per the Site Data table, the front setback ranges from 6.16 feet on South Governors Avenue to 52.27 on South New Street. Side setback ranges from 10.9 feet on the north lot line to 21.7 feet on the south lot line.
The building height and number of stories (at four stories) are in compliance with the C-2 zone. The floor area ratio (FAR) proposed is 1.81, which is in compliance with the maximum FAR allowed of 5.0. The total lot coverage of the project is listed as 78.6%. The C-2 zone does not have a maximum lot coverage requirement.
The C-2 zoning district also includes some design standards provisions. See the code excerpt below:
Article 3 Section 13 13.5 Design standards. The following standards shall apply to the site and building development in the central commercial zone (C-2):
13.51 Façade articulation. Building facades should incorporate design elements to provide a base, middle, and top of the building to reinforce the pedestrian scale at the street level.
13.52 Height. For buildings greater than four stories in height, then the upper floors above the fourth story shall step back six feet for fifty percent of the width of the primary facade. For buildings greater than six stories, then the upper floors above the sixth floor shall step back an additional six feet on the primary façade. These step back areas may begin at a lower height than these minimums as part of the building design in order to be compatible with the character of the area.
13.53 Step back areas. The step back areas should be open to the sky and can be open air balcony spaces or other design architectural features that are not enclosed spaces.
13.54 Off-street parking. Off-street parking lots shall not be permitted to be situated between the street line and the primary facade of the principal building. Consideration should be given to locating parking to the side or rear of the building.
13.55 Screening. Any off-street parking lots provided shall be screened from the street line by buildings, landscaping, or other means. Off-street parking lots shall be screened from adjacent residential zones and residential uses. This screening provision does not apply to adjacent alleys.
The plan as presented complies with these design standards. The façade on S. Governors Avenue includes step backs at the second floor level and above.
Child Day Care Facility The proposed use of a portion of the building as a child day care facility is required to be considered as a Conditional Use per Zoning Ordinance, Article 5 Section 14 and Article 10 Section 1. When serving more that thirteen (13) children the facility meets the definition as a Child Day Care Center. It also requires a parking rate based on the one space per adult attendant and one space per every ten children and also outdoor play space per State requirements. 99
Page 100
Item 3.
S-25-11 The Governor: Mixed-Use Building at 120 S. Governors Avenue
DAC Report of September 3, 2025
H (Historic District Zone) The main parcel of the project site is located in the H (Historic District Zone) and subject to the provisions of the Zoning Ordinance, Article 3 §21 and referenced sections. The H (Historic District Zone) is described in Zoning Ordinance, Article 3 Section 21 with the following purpose statement:
Article 3, Section 21. - Historic district (H). 21.1 Purpose. The purpose of this historic district regulation is to preserve and enhance that unique character and value of the old portion of Dover as an area of special charm and interest. It is particularly intended that the regulations prevent, in the historic district, any change of conditions that would be deemed to be a disfigurement or degradation of the present unique visual and architectural qualities of the district.
IV. ARCHITECTURAL REVIEW CERTIFICATION
Zoning Ordinance, Article 10 §3.2 outlines the review process for Architectural Review Certification and related building height, bulk, and setback standards. This process begins with Review by the Historic District Commission; this occurred on July 17, 2025.
Review of DESIGN STANDARDS AND GUIDELINES The subject property is located in the H (Historic District Zone) within the Loockerman Context. The Loockerman Context is described on pages 2-7 and 2-8 of the Design Standards and Guidelines for the City of Dover Historic District Zone. The Design Standards and Guidelines describe this context as “a coherent, densely-built commercial area that would have an attractive mix of historic and new buildings and related parking.” Location within the Dover Historic District Zone requires proposals for demolition, new construction, building additions, and certain renovation or rehabilitation activities to existing buildings to receive an Architectural Review Certificate.
As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone, an Architectural Review Certificate will be granted “if it is found that the architectural style, general design, height, bulk and setbacks, arrangement location and materials affecting the exterior appearance are generally in harmony with neighboring structures and complementary to the traditional architectural standards of the historic district.” In accordance with Article 10 §3.2, the Historic District Commission will provide a recommendation to the Planning Commission regarding the project’s compliance with the architectural review standards.
This proposal must be reviewed for conformity with the design criteria guidelines found in Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings and Chapter 4: New Construction, Additions, Demolition and Relocation. Information on the review considerations is given below.
New Construction The Design Standards and Guidelines for New Construction (Chapter 4: pages 4-1 through 4-8) provide the design criteria and development guidelines. The guidelines specify the following individual considerations for new construction to be considered in review by the Historic District Commission (and Planning Commission) of the project for Architectural Review Certification: • Style • Scale (building to reflect dominant cornice and roof height of adjacent buildings) • Elevation of the First Floor • Floor-to-Floor heights • Bays, windows, and doors (size, relationship, spacing of) 100
Page 101
Item 3.
S-25-11 The Governor: Mixed-Use Building at 120 S. Governors Avenue
DAC Report of September 3, 2025
- •Absolute Size (compare overall size of new building)
- •Massing (relationship of solid-to-void)
- •Orientation (location of primary façade)
- •Proportions (comparison of height to width of building and elements)
- •Materials
- •Forms (shape of building and roof to be complementary)
- •Siting (location of building on lot and in relation to street)
- •High density/ large-scale construction
Design criteria and development guidelines specific to the Loockerman Historic Context are detailed on page 4-6 of the Design Standards and Guidelines and provide that “the siting of new construction in the Loockerman historic context should conform to the building line of adjacent buildings, to reinforce the sense of the ‘wall’ of buildings, especially along Loockerman Street. New commercial buildings should occupy the full width of their lot at the street line. Freestanding "object" buildings that do not conform to the street and lot lines should not be permitted in the Loockerman historic context. Where a commercial building is built adjacent to a vacant lot, it should be built with a party wall in anticipation of subsequent new construction being built adjacent and up to the property line.” The Design Standards and Guidelines Chapter 3 includes information about the use of certain materials within the Historic District.
The Design Standards and Guidelines note that “the vacant lots to the north and south of Loockerman Street are not desirable locations for large-scale construction, because they are in the transition area between the commercial and residential zoning districts.”
HISTORIC DISTRICT COMMISSION - RECOMMENDATION
The Historic District Commission considered the application HI-25-02 on July 17, 2025, regarding an Architectural Review Certificate for construction of The Governor: Mixed Use Building at 120 S. Governors Avenue. The Historic District Commission considered the proposal for construction and has provided a recommendation to the Planning Commission in regard to the Architectural Review Certification for the project. The specific recommendation involved consideration of the Design Standards and Guidelines. See attached Recommendation Report from the Historic District Commission.
The Planning Commission should act upon the Architectural Review Certification as part of any motion to approve this project, or as a separate motion if necessary. In taking this action, the Planning Commission is to consider the standards and guidelines found in Chapter 4 of the Design Standards and Guidelines for the City of Dover Historic District Zone and other referenced sections.
- V.PARKING SUMMARY The C-2 (Central Commercial Zone) does not include a minimum parking requirement. Additionally, Article 6 §3 of the Zoning Ordinance states:
For new construction within the downtown redevelopment target area, as described in appendix C of the Dover Code of Ordinances, there is no minimum off-street parking requirement based on use. To utilize this exception, a parking strategy statement must be submitted for review as part of the site development plan approval required by appendix B, zoning, article 10, section 2.
The applicant has submitted a Parking Strategy Statement with the application. A summary of the key points in the Parking Strategy includes the small parking lot of thirteen (13) spaces on the site, 101
Page 102
Item 3.
S-25-11 The Governor: Mixed-Use Building at 120 S. Governors Avenue
DAC Report of September 3, 2025
utilization of parking availability in the Dover Mobility Center (Parking Garage), on-site bicycle parking (exterior racks and interior storage areas), and opportunities for other modes of transportation including pedestrian, bicycle, and public transit.
Bicycle Parking Bicycle parking shall be provided for parking spaces at a rate of one (1) bicycle parking space for every twenty (20) parking spaces. Based on the 13 parking spaces provided, 1 bicycle space is required. The Plans submitted include 40 bicycle parking spaces consists of 20 spaces in an interior storage space and exterior bicycle racks within the west facing court and at the front entry on Governors Avenue.
VI. SITE CONSIDERATIONS
Loading Zone Access and Site Access The proposed Site Plan has no vehicular access from South Governors Avenue but provides two access points from South New Street with one as an entrance and one as an exit for the one-way circulation. This access leads to the small surface parking lot and the loading zone. A loading zone is shown on the plan along the southern side of the building. This proposed loading zone narrows 21.7’ to 18’, which may present issues for delivery vehicles to maneuver.
Pedestrian Site Access The proposed building presents to the sidewalk along South Governors Avenue, proving convenient pedestrian access from the Governors Avenue sidewalk. Most of the parking for this site will be provided by the adjacent Mobility Center, which is located across South Governors Avenue. Direct access via a dedicated mid-block crosswalk or other devices approved by the City and DelDOT should be installed on South Governors Avenue to safe crossing of the road. There is also sidewalk along S. New St with connections leading to the court (plaza) area with multiple building entries.
Trash Strategy The applicant has submitted a trash strategy that is attached. The Zoning Ordinance requires two (2) dumpsters for the first 48 residential units, and one (1) additional for every additional 24 units. The Governor proposes 120 units, requiring five (5) dumpsters. It also requires two (2) dumpsters for any non-residential units, totaling seven (7) dumpsters. The applicant proposes two (2) external dumpsters and seven (7) internal trash rooms.
Opaque Barrier Requirements Waiver Request – Elimination of Fence Component The applicant has submitted an attached request to eliminate the opaque barrier portion of the buffer and to require only the continuous evergreen screen portion of the buffer along the entirety of the common property line with the parcel to the north (Lands of Family Legacy) which is currently used as residential. The Landscape Plan shows a hedge planting with Magnolia Tees interspersed as the landscaping screening.
VII. BUILDING ARCHITECTURE
The application proposes a mixed-use commercial and multi-family (apartment) building. The four- story building includes space for retail, daycare, 120 residential apartments, and a roof-top courtyard, with 13 vehicle parking spaces and recreation amenities. The proposed four-story building will be 60 feet tall. The proposed mixed-use building will feature two main material palettes. The first includes a blend of masonry colors, feature material such as copper-brown metal panels, matte black 102
Page 103
Item 3.
S-25-11 The Governor: Mixed-Use Building at 120 S. Governors Avenue
DAC Report of September 3, 2025
metal trim, fiber cement panel in neutral tones, and black or dark bronze decorative metal elements and frames which will be wrapped around the building’s northeast and southeast corners. The second includes neutral tones of plank siding and fiber cement panel, matte black metal trim, masonry, and black or dark bronze decorative metal elements and window frames. The building’s façade on S. Governors Avenue will primarily feature retail frontages that alternate between masonry piers, glazing, fiber cement panel piers, and accent metal panels. Both street-facing elevations follow a brickwork pattern of varying orientations up to cornice lines, where it then transitions to a more muted expression for the upper levels.
The u-shaped form of the building creates an outer court on the west elevation. Per the Zoning Ordinance, Article 5 §2.52 defines the “court” limitations where the depth of court can not exceed the width. For this building, the court depth is 111.2 feet as compared to the court width of 51.6 feet. The Planning Commission will need to address this form during the Architectural Review Certification.
VIII. ACTIVE RECREATION AREA PLAN
Residential projects require Active Recreation Areas. The proposed development qualifies for an exemption under Article 5, §10.515 Residential developments located within the Downtown Redevelopment Target Area as defined in Appendix C. Under this provision, the applicant must provide 75 square feet of active recreation per dwelling unit with a minimum of 2,500 square feet provided on site. With 120 units, the required active recreation area is 9,000 SF. The plan identifies a park area with a dog park, playground area, and a connecting path; interior spaces including community spaces and a fitness center; a courtyard wellness area; and a rooftop courtyard amenity of 7,225 SF. The Open Space and Recreation Plan is subject to review by the Parks, Recreation and Community Enhancement Committee and will be presented to the Committee on September 9, 2025. See the attached Active Recreation Area Plan Review Report for details and comments. The Committee will make a recommendation to the Planning Commission.
IX. TREE PLANTING AND LANDSCAPE PLAN
Tree Planting Requirements The Zoning Ordinance further requires tree planting at a rate of one tree per 3,000 SF of non- woodland development area. Based on the total non-woodland area for the submitted plan of 86,307 SF, 29 trees are required to be planted. The Tree Preservation and Density table indicates that 29 trees are required based on a site area of 86,037 SF. The applicant has proposed to retain 7 trees and plant 28 new trees. However, of the new trees only eighteen trees are on the site and ten are planted as street trees. This planting plan will need to be accepted through consideration of a Tree Mitigation Plan as trees are to be planted on-site.
Request for Tree Mitigation Plan The applicant has submitted a Request Consideration of a Tree Mitigation Plan, requesting that some of required trees be planted off-site as street trees along the street frontages of the subject property. This Tree Mitigation Plan was provided for consideration by the Planning Commission at a rate of 1 tree per 1 deficit tree as per Article 5, Section 16 of the Zoning Ordinance; see below. The specific planting locations for the ten (10) off-site tree plantings are documented on the Landscape Plan.
103
Page 104
Item 3.
S-25-11 The Governor: Mixed-Use Building at 120 S. Governors Avenue
DAC Report of September 3, 2025
Article 5 Section 16 16.9 Tree mitigation. 16.91 Planning commission waiver. The planning commission may waive the provisions of subsections 16.52, 16.53, and 16.62, and require replacement planting for mitigation purposes should the planning commission determine, after demonstration by the applicant, that due to physical limitations of the land which would otherwise prohibit the reasonable use of the land, or for purposes of preserving, protecting and promoting the interest of public health, safety, welfare and/or public convenience. All tree mitigation plantings must occur within the corporate limits of the City of Dover. Tree mitigation may occur off-site in accordance with the provisions listed below in this ordinance:
(a) If a waiver is sought from the provisions of subsection 16.62, new tree plantings are required at a rate of 1:1. All new tree plantings shall meet the minimum size at planting requirements of the City of Dover table of trees.
(b) If a waiver is sought from the provisions of subsection 16.52 and/or subsection 16.53, then mitigation must be in the form of newly created woodland areas. New woodlands shall be created at a rate of 1.25 times the amount of woodlands to be removed. A woodland mitigation plan shall be prepared by a licensed forester, landscape architect, or certified nursery professional, for the consideration of the planning commission.
(c) All tree mitigation must occur on-site unless an off-site location is specifically approved by the planning commission. When considering off-site locations for tree mitigation, the commission shall consider: 1) A physical hardship related to the land which would otherwise prohibit compliance on the subject site; 2) Whether the mitigation plan proposed by the applicant is superior in terms of environmental benefits, tree quantity, or aesthetic qualities compared to strict compliance with the ordinance on-site.
- X.CITY AND STATE CODE REQUIREMENTS: The subject proposal has been reviewed for code compliance, plan conformity, and completeness in accordance with the agency’s authority and area of expertise. The following items have been identified as elements which need to be addressed by the applicant:
- 1)A Tree Mitigation Plan was submitted as some of the required tree plantings are proposed for off-site planting as street trees. Ten of the new trees are proposed as street trees planted off-site. The Planning Commission must consider this request to grant the waiver to approve the Tree Mitigation Plan.
- 2)The Plan needs to identify the Child Day Care requirements and its compliance thereof; notes should be added to the Plan The Planning Commission must consider this as a Conditional Use application.
- 3)The Waiver Request for the Opaque Barrier to eliminate the fence component along the northern property line where a residential use (multi-unit building) exists. The updated Landscape Plan shows the location of the screening hedge planting. The Planning Commission must consider this Waiver Request.
- 4)Sheet C-001: Confirm that overall floor area of the building as conflicting information is contained within the plan documents.
104
Page 105
Item 3.
S-25-11 The Governor: Mixed-Use Building at 120 S. Governors Avenue
DAC Report of September 3, 2025
- 5)The directional arrow on the left lane of the southern South New Street entrance should be updated to indicate that traffic can turn left (into short-term parking) or continue straight. This update should be applied to all sheets.
- a)Also consider traffic control signage/markings for the loading zone area.
- 6)Provide construction details for the following items but not limited to, dumpster pad/enclosure, traffic control signage, lighting fixtures, bicycle racks, handicap signage, parking spaces, etc.
- 7)Ensure consistency of the plan layout for the designs of the parking lot, playground, dog park, dumpster, etc. between the architectural graphics package versus the Site Plan set.
- 8)Landscape Plan (as Updated 9/4/2025):
- a)On Sheet Z-100, add the signature box for the signature of the landscape architect.
- b)Ensure tree planting locations do not conflict with sidewalk paving and comply with separation distances from utilities. Compare to Site Plan sheets.
- c)Show planting details.
- 9)The construction of the site entrances and street improvements must comply with the requirements of DelDOT and the City of Dover Public Works Department based on street maintenance responsibilities. Governors Avenue is state-maintained, and New Street is city- maintained.
- 10)The Historic District Commission recommended conditional approval of the Architectural Review Certificate for the construction of the project. See attached Recommendation Report for recommended conditions.
- a)The form of the outer court (depth is twice the width) must be authorized as part of the Architectural Review Certificate since the Zoning Ordinance requirement is depth cannot exceed the width.
- 11)The Active Recreation Area Plan must be reviewed by the Council Committee of the Whole: Parks, Recreation, and Community Enhancement Committee. See separate Recommendation Report.
- 12)Any Erosion & Sediment Control Plans and Stormwater Management Plans granted approval by the Kent Conservation District must reflect the Site Plan layout and design conditionally approved by the Planning Commission and be in compliance with the Zoning Ordinance and technical review requirements of other agencies.
- 13)Clarify if a parcel consolidation is proposed to consolidate the main development parcels with the three small parcels on S. New Street. A separate Record Plan sheet will be required.
- 14)The Final Plan set must include notes documenting any action taken by the Planning Commission on the requested waivers and must list any additional conditions of approval.
XI. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES:
In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in considering and acting upon Site Development Plans may prescribe appropriate conditions and safeguards so 105
Page 106
Item 3.
S-25-11 The Governor: Mixed-Use Building at 120 S. Governors Avenue
DAC Report of September 3, 2025
that the public health, safety, and welfare, the comfort and convenience of the public in general, and the residents of the immediate neighborhood in particular shall be taken into consideration. These safeguards may to the maximum extent possible further the expressed intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed in subsections 2.21 to 2.28.
- 1)Conditional Use – Child Day Care Center: Staff recommends approval of the use for a Child Day Care Center to be part of this Mixed Use Building as it is a service readily needed in residential areas. It is also within walking distance of other residential neighborhoods and employment.
- 2)Architectural Review Certification: Staff recommends conditional approval of the Architectural Review Certificate for the construction of The Governor: Mixed Use Building at 120 S. Governors Avenue finding that the building to be of a design compatible with the intent of the Design Standards and Guidelines for the City of Dover Historic District Zone.
- a)Staff provided a series of recommendations and comments regarding the Architectural Review Certification and review of the project for compliance with the Design Standards and Guidelines. These items were previously identified during the review of the project by the Historic District Commission. See HDC Recommendation Report.
- b)This approval would also include authorization for the dimensions of the outer court as presented. The outer court may still be subject to other Building Code or Fire Code compliance requirements.
- 2)Waiver Requests: Staff recommends approval of the Waiver Request for the Opaque Barrier to Eliminate the Fence Component finding that the landscape screening is sufficient. The Planning Staff also finds the Tree Mitigation Plan acceptable to plant some of the required trees as street trees adjacent to the site.
- 3)Staff recommends installing parking bumpers on parking spaces to provide additional space between vehicles and light poles.
- 4)Traffic Considerations: Most of the parking for the residents and visitors to The Governor will be provided across South Governors Avenue at the Dover Mobility Center (Parking Garage). A mid-block crossing should be considered to clearly define a convenient and safe location for Mobility Center users to cross. The applicant should also clearly indicate how the loading zone will be used by delivery vehicles.
XII. ADVISORY COMMENTS TO THE APPLICANT:
- 1)The Planning Commission should act upon the Architectural Review Certification as part of any motion to approve this project, or as a separate motion if necessary.
- 2)The Planning Commission should act upon the request for waivers as part of any motion regarding this project application, or as a separate motion as necessary. Note: All waivers are at the discretion of the Planning Commission. The Commission may approve or deny waiver requests.
- 3)In the event that major changes and revisions to the Site Plan occur in the finalization of the Plan contact the Department of Planning and Inspections. Examples include relocation of site components like paving and increases in building footprint. These changes may require resubmittal 106
Page 107
Item 3.
S-25-11 The Governor: Mixed-Use Building at 120 S. Governors Avenue
DAC Report of September 3, 2025
for review by the Development Advisory Committee, Historic District Commission, Planning Commission, or other agencies and commissions making recommendations in regard to the Plan.
- 4)Following Planning Commission approval of the Site Plan, the Plan must be revised to meet all conditions of approval from the Development Advisory Committee or as otherwise noted. A Check Print must be submitted for review by Planning Office Staff and the other commenting agencies. Upon determination that the Plan is complete and all agency approvals have been received; copies of the Plan may be submitted for final endorsement (Final Plan Approval).
- 5)Other agencies and departments which participate in the Development Advisory Committee may provide additional comments related to their areas of expertise and code requirements.
- 6)Clarify the status of the ownership status of the parcels at 105 and 115 S. New Street as there is a specific process for the disposal of City owned properties.
- 7)If any specialized evaluation and review of this area was completed to determine any environment contamination and/or the site’s participation in any environmental remediation program. Provide copies of any agency approvals/permits to the Planning Office so that we may be aware of any specific conditions of redevelopment.
- 8)The applicant/developer shall be aware that prior to any ground disturbing activities on the site the appropriate Site Plan approvals, Pre-Construction meetings, site inspections and permits are required.
- 9)Construction and demolition will have an effect on the adjacent property owners, employees of adjacent buildings, and nearby sidewalks and streets. Any work requiring the closing or rerouting of potential customers, employees, or visitors to the adjacent properties (including those who park in the existing parking lot), and streets should be coordinated as to offer the least amount of inconvenience.
- 10)For building new construction, the requirements of the building code and the fire code must be complied with. Consult with the Building Inspection Staff and City of Dover Fire Marshal regarding these requirements. The resolution of these items may impact the site design including such items as building dimensions and height, building openings, and fire protection needs, etc.
- 11)The applicant shall be aware that Site Plan approval does not represent a Building Permit and associated construction activity permits. A separate application process is required for issuance of a Building Permit from the City of Dover. Building Permits will be required for each building.
- 12)The applicant shall be aware that Plan approval does not represent a Sign Permit, nor does it convey permission to place any sign on the premises. Any proposed site or building identification sign may require a Sign Permit from the City of Dover prior to placement of any such sign in accordance with Zoning Ordinance Article 5 §4.
- 13)The proposed development will also be subject to City of Dover Business Licenses, Public Occupancy Permits, and Rental Dwelling Permit upon completion of construction.
If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Office as soon as possible. 107
Page 108
Item 3.
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: SEPTEMBER 2, 2026
APPLICATION: REVISED The Governor: Mixed Use Building at 120 S Governors Avenue FILE #: S-25-11 & HI-25-02 REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater CONTACT PERSON: Kate L. Mills, P.E., Interim Director of Water & Wastewater / Engineering Services CONTACT PHONE #: 302-736-7025 CONTACT EMAIL: kmills@doverde.gov
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
SANITATION
- 1.Every commercial customer shall provide such premises with a sufficient number of solid waste containers to provide adequate capacity for the solid waste placed out for collection without overloading the capacity of the containers. The City of Dover shall provide commercial customers with a maximum of two (2), 90-gallon trash containers and two (2), 90-gallong recycling containers.
- 2.Trash collection site shall be oriented for side-loading pick-up if customer is utilizing City of Dover sanitation services.
- 3.Any commercial customer requiring more containers, or larger containers, than provided above, must utilize private service. STORMWATER
- 1.Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from Kent Conservation District is submitted to our office.
- 2.The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert elevations must be labeled on all stormwater structures. STREETS
- 1.Final site plan approval will not be granted until a letter of no objection, signed by DelDOT is submitted to our office.
- 2.The current City of Dover standard street section provides for a 3’ grass strip between the curb and sidewalk. This standard was administratively revised to meet ADA and FHA compliance with cross slope requirements and to prevent cars from scrapping at driveways. The revised standard utilizes a five feet (5’) wide public sidewalk with a five feet (5’) wide grass strip behind the curb. Sidewalk and curb shall be installed for the width of the project scope.
- 3.Please add the following notes to the plans:
- a.Standard City of Dover sidewalk, as per chapter 98, article IV of the Dover Code of Ordinances, shall be required to be installed along the entire public street frontage of a property. Where frontage sidewalk exists but does not meet the standards of chapter 98, article IV, the sidewalk shall be re-laid to meet the standards. Sidewalk shall include barrier-free 108
Page 109
Item 3.
REVISED The Governor: Mixed Use Building at 120 S Governors Avenue
File #: S-25-11 & HI-25-02
September 2, 2026
access ramping at points of intersection with street crossings and at other locations so as to afford reasonable barrier-free pedestrian movement and site access. b. In accordance to Appendix A, Article VI, Section B.3, all sidewalks shall ascend from the curbstone to the building line at the ratio of one-quarter of an inch to the foot. Nothing in this section shall be construed to affect any pavement previously laid by order of the city council, until it is taken up and relaid.
WATER
- 1.All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information.
- 2.The following notes must be added to the plans:
- a.Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the project.
- b.Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
- c.The site contractor shall contact the City of Dover Department of Water & Wastewater Construction Manager at (302) 736- 7025 prior to the start of construction. A representative from the City of Dover Department of Water & Wastewater must observe and approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted in the field due to conditions of the existing main. Possible conditions that would require tapping relocation include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be held responsible for field conditions requiring adjustment of the tapping location or for any work required by the contractor to make an appropriate and lawful connection.
- 3.The size, type, and location of all proposed and existing water lines and valves must be shown on the plan. Please be advised that effective May 1, 2022, water mains can now be constructed using DR 18 PVC.
- 4.Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine the size of the domestic and irrigation (if applicable) water meter for the proposed buildings. These projections must be submitted prior to approval so the meter size can be placed on the final site plan. The proposed water meters must be installed in a pit per City of Dover requirements and manufacturer’s recommendations. Also, a dual check valve is required downstream of the meter.
- 5.The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be installed at the tee to isolate combined fire and domestic water service to the building from the water loop. Typically, this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside of the building. The domestic water tap and valve should be as close to the building as possible. Typically, the domestic tap and valve are located within five feet (5’) to ten feet (10’) of the building. A blow up detail of this layout is recommended.
- 6.Provide a construction detail for the proposed restraining system for the fire main located within the buildings. There shall only be one (1) water service per building. The Department of Water & Wastewater will test and inspect all fire mains to a blind flange located inside the buildings. The blind flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the floor to the ninety degree (90°) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through walls and slabs must be Class 52 cement lined ductile iron pipe. Confirm particulars to meet this requirement with mechanical designer.
- 7.Water services shall be either type K copper or SDR-9. 1. All non-metallic water lines (mains and services) shall be installed with a tracer wire and identification tape. The wire shall be a minimum of twelve (12) gauge blue coated solid copper wire, wrapped around the pipe, and extending up into all valve and curb boxes. The identification tape shall be six-inches (6”) wide, laid one foot (1’) above the pipe, with the following text: “Caution: Buried Water Line Below”. 3M marker balls, model 1423-XR, or approved equal shall be installed at every service line connection to the water main and all bends on the service line.
109
Page 110
Item 3.
REVISED The Governor: Mixed Use Building at 120 S Governors Avenue
File #: S-25-11 & HI-25-02
September 2, 2026
- 8.On October 24, 2022, City of Dover Council approved the new Cross Connection Control Program. This program requires certain backflow prevention assemblies on water service connections to the city’s distribution system. Please provide a specific description of the activities in this building.
- 9.Prior to final site plan approval, a plan must be submitted and agreed upon for the 12” water main relocation that is currently located in the alley. The 12” water main shall be cut and capped north of the proposed development with a blow off assembly.
- 10.A fire hydrant shall be installed at the end of the water main extension in S Governors Avenue.
WASTEWATER
- 1.All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information.
- 2.The following notes must be added to the plans:
- a.Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
- b.Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff, subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as “…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes, exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no illegal discharges to the sanitary sewer system are created with the site improvements.
- 3.The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines. Rim and invert elevations must be labeled on all sanitary structures.
- 4.Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty cast iron frame and cover to prevent damage to the cleanout and lateral.
- 5.Sizing (flow) calculations must be submitted for all sanitary sewer mains showing that velocity and all other requirements are met.
- 6.The minimum size of all sanitary sewer laterals shall be six-inch (6”).
- 7.If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County ordinance requirements, must be provided. A construction detail for the proposed grease trap, as well as the proposed location, must be provided on the plan.
- 8.Depending on the effluent flow, the downstream pump station may be required to be evaluated by the developer / engineer to verify it can handle the additional effluent flow.
GENERAL
- 1.All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This must be included as a note on the plan.
- 2.No trees may be planted within ten feet (10’) of utility infrastructure.
- 3.No structure may be installed within ten feet (10’) of utility infrastructure, please depict all underground utilities and structures on the utility plan sheet to confirm compliance.
- 4.The final site plan must be submitted in the following compatible digital formats:
- a.AutoCAD 2021 (.dwg format).
- b.Adobe Reader (.pdf format).
110
Page 111
Item 3.
REVISED The Governor: Mixed Use Building at 120 S Governors Avenue
File #: S-25-11 & HI-25-02
September 2, 2026
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES SANITATION / STORMWATER / STREETS / WATER / WASTEWATER / GENERAL 1. As-built plans shall be provided prior to the certificate of occupancy and shall be provided in .dwg and .pdf format.
ADVISORY COMMENTS TO THE APPLICANT
WATER
- 1.The City of Dover water system is available to this site. The developer is responsible for all costs associated with extending and providing service to the proposed development.
- 2.Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking Water for review and approval. The owner/developer will be responsible for providing all completed forms and plan sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the Office of Drinking Water until review has been completed by our office.
- 3.Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of Water & Wastewater directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the site.
- 4.Water impact fees will be required to be paid prior to Certificate of Occupancy for this project. Each apartment unit is equal to one (1) Equivalent Dwelling Unit (EDU). The retail portion will also have impact fees, the amount will be dictated by the proposed fixture count.
WASTEWATER
- 1.The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated with extending and providing service and capacity to the proposed development.
- 2.Prior to plan approval, it may be required to submit the sanitary sewer system plans to the DNREC, Division of Water Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible for providing all application fees, completed forms and plan sets directly to DNREC.
- 3.Profiles of the sanitary sewer main must be provided with the construction plans. All water, sanitary sewer and storm sewer crossings must be shown on the profiles.
- 4.Wastewater impact fees will be required to be paid prior to Certificate of Occupancy for this project. Each apartment unit is equal to one (1) Equivalent Dwelling Unit (EDU). The retail portion will also have impact fees, the amount will be dictated by the proposed fixture count. GENERAL
- 1.The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be abandoned, flowable fill may be required.
- 2.Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team- logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88. SANITATION / STORMWATER / STREETS
- 1.None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE . 111
Page 112
Item 3.
CITY OF DOVER ELECTRIC
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: AUG 27, 2025
APPLICATION: The Governor: Mixed Use Building at 102 S Governors Avenue FILE #: S-25-11 REVIEWING AGENCY: City of Dover Electric Department CONTACT PERSON: Shawn Burgett, Engineering Services & System Ops Superintendent CONTACT PHONE #: 302-674-7568 CONTACT EMAIL #: sburgett@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
- 1.The roadway and curbing must be in.
- 2.The right-of-way must be within 6" of final grade.
- 3.The property corners must be staked.
- 4.Owner is responsible for locating all existing underground electric, communications and water facilities.
- 5.Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department specifications.
- 6.Owner is responsible for site and/or street lighting.
- 7.Meter locations will be determined by City of Dover Engineering Department.
- 8.Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to receiving approved electrical construction drawings.
- 9.Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the owner’s expense.
- 10.Prior to construction, owner is responsible for granting an easement to the City of Dover Electric Department. Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
- 11.Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to construction. Owner is required to sign off plans prepared by the Electric Department.
- 12.Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric Engineering Department. 112
Page 113
Item 3.
Dover Industrial Phase 2: Warehouse at 350 Lafferty Lane
File #: S-25-10
Jul 02, 2025
- 13.Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric Engineering Department with a physical address of the property.
- 14.All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will be furnished by the City’s Electric Engineering Department.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES ELECTRIC 1. Owner must give the City of Dover Electric Department three (3) months’ notice prior to construction. Owner is responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is now available on the website at the following link: https://evogov.s3.amazonaws.com/media/27/media/13108.pdf.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
- 1.Provide load sheets as soon as possible for proper sizing of transformers and creation of primary fee estimates. Current load sheets can be found at the following link: https://www.cityofdover.com/media/Electric%20Department/COD%20Electric%20Load%20Sheet.pdf.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
113
Page 114
C F
Item 3.
I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A APPLICATION REVIEW COMMENTARY R D.A.C. MEETING DATE: 09/02/26 D S O H V A E L R APPLICATION: HI-25-02 and S-25-11 Revised The Governors Mixed Use Building at 120 S Governors
FILE #: HI-25-02 and S-25-11 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457 josika@dover.de.us
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
- 1.Proposal is an architectural review only using the exact footprint of S-25-11
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
- 1.It is noted that this is an architectural review only, all S-25-11 comments apply
- 2.In door storage is new.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association) 2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association) 2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association) 2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association) 2009 IBC (International Building Code) Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations 2021 Delaware State Fire Prevention Regulations City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above contact person listed.
114
Page 115
Item 3.
From: Jones, Tijah (DelDOT)
To: Melson-Williams, Dawn
Cc: Hickman, Kevin (DelDOT)
Subject: EXTERNAL: DAC Comments
Date: Thursday, September 3, 2026 3:00:04 PM
You don't often get email from tijah.jones@delaware.gov. Learn why this is important
WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Morning Dawn,
Here are the comments from DelDOT for the applications discussed in the DAC Meeting 02 September
S-26-13 Winner Subaru Building Additions at 1387 North DuPont Highway 1. Schedule a pre-submittal meeting with the department. S-26-14 William Henry Campus Improvements at 65 Carver Road, Dover, DE 2. Schedule a pre-submittal meeting with the department. HI-25-01 Revised #2 and S-25-07 Revised #2 The Old Post at 55 Loockerman Plaza 3. Schedule a pre-submittal meeting with the department. HI-25-02 Revised and S-25-11Revised The Governor: Mixed Use Building at 120 S Governors Avenue 4. Schedule a pre-submittal meeting with the department.
TiJah Jones
Subdivision Review Engineer
Economic Development Coordination
Delaware Department of Transportation
(302) 760-2124
tijah.jones@delaware.gov
115
Page 116
Item 3. KENT CONSERVATION DISTRICT 1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG
CITY OF DOVER ADMINISTRATIVE SITE PLAN REVIEW SEPTEMEBER 2025
APPLICATION: The Governor: Mixed Use Building at 120 S. Governors Avenue FILE #: S-25-11 REVIEWING AGENCY: Kent Conservation District CONTACT PERSON: Cullen Baker PHONE: (302) 608 - 5370 EMAIL: stormwater@kentcd.org
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
Source: 2019 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
- 1.As the disturbance for this site will exceed 5,000 square feet, a detailed sediment and stormwater management plan must be reviewed and approved by the District prior to any land disturbing activity (i.e. clearing, grubbing, filling, grading, etc.) taking place. The review fee and a completed Application for a Detailed Plan are due at the time of plan submittal to the District’s office.
- 2.The following notes must appear on the record plan:
- a.The Kent Conservation District reserves the right to enter private property for purposes of periodic site inspection.
- b.The Kent Conservation District reserves the right to add, modify, or delete any erosion or sediment control measure, as it deems necessary.
- c.A clear statement of defined maintenance responsibility for stormwater management facilities must be provided on the Record Plan. ADVISORY COMMENTS TO THE APPLICANT:
- 1.We request that the 2015 imagery be used for the existing conditions of parcels 43,42, & 37. Historically those sites had buildings that could account towards the reduction of impervious for the proposed conditions.
- 2.Refer to Delaware 5101 Sediment and Stormwater Regulations 5.6.2.4 for guidance in reduction of impervious for RPv Compliance.
- 3.Since the site is reducing the impervious coverage, we can assume that there will be a reduction of flow for the Cv and Fv storm events with no adverse impact, resulting in no need for a stormwater BMP to control the Cv and Fv storm events.
- 4.Please note the Kent Conservation District will not review an application more than three times. If after the third review the plan is still not found to be approvable, the application will be denied, and a new application with review fees are to be re-submitted to continue a detailed plan review.
- 5.As a reminder, the Kent Conservation District is required to verify that a Notice of Intent (NOI) for Stormwater Discharges Associated with Construction Activity under a NPDES General Permit has been received by DNREC prior to District approval.
- 6.A letter of no objection to recordation will be provided upon approval of the Sediment and Stormwater Management Plan. 116
Page 117
Item 3.
CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
ADVISORY BRIEF Planning
D.A.C. MEETING DATE: 9/9/2026 Organization
HI-25-02 Revised and S-25-11 Revised The Governor: Mixed Use Building at 120 S Governors Avenue
FILE # HI-25-02 / S-25-11 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030
Attached, please find comments submitted by Dover Kent MPO for each of the current City of Dover Development Advisory Committee (DAC) applications. These comments are a part of the MPO’s ongoing goals of promoting transportation safety and connectivity within the region. They are submitted in accordance with the support given by the MPO Council on November 6, 2024.
Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be waived.
City of Dover Planning Commission
Site Development Plan Review
HI-25-02 Revised and S-25-11 Revised The Governor: Mixed Use Building at 120 S Governors Avenue
Sidewalks are included in the site plan, both along the property’s frontage and internally. The applicant should follow both the City of Dover Code for sidewalks 1 and the DelDOT specifications for sidewalks, 2 to make sure the requirements of both entities are met. Any sidewalks that are damaged or removed during the construction process will need to be replaced.
A connection between New Street and Governors Avenue should be considered. The loading zone on the southern end of the property would be an ideal location for this complete connection.
1 “Dover Code: Appendix B, Article 5, Section 18.” City of Dover, DE. https://library.municode.com/de/dover/codes/code_of_ordinances?nodeId=PTIICOOR_APXBZO_ART5SURE_S18 PEBIMUDAACRE. 2 Pedestrian Accessibility Standards Manual. Delaware Department of Transportation (DelDOT) (2021). https://deldot.gov/Publications/manuals/pedestrianAccessibility/pdfs/2021/Pedestrian-Accessibility-Standards-for- Facilities-in-the-Public-Right-of-Way-2021-Edition.pdf.
117
Page 118
Item 3.
The current site plan requires large vehicles to back into or out of the loading zone and exit the property by driving past the daycare, which could lead to conflicting uses during peak hours. By creating an exit onto Governors Avenue and restricting its use to certain types of vehicles (such as fire trucks and trash collection vehicles), the traffic flow of the property would be improved.
A related issue is the availability of space for large vehicles. The planned building will include 120 apartment units, a grocery store, retail and restaurant spaces, and other residential and commercial uses, all within a small area. This will result in large vehicles (such as moving vans, freight trucks, and trash collection vehicles) constantly needing to access the property. The loading zone and parking area will not always be able to fit all of these vehicles. As a result, the applicant will need to coordinate with the City of Dover and strategically direct these vehicles so that they do not obstruct the flow of traffic on Governors Avenue, a major corridor for vehicle traffic, and that they do not block the drive aisle or parking area on the property.
A crosswalk should be added to the parking area on the western side of the property, extending northward across the drive aisle and towards the daycare. Pedestrians tend to use the most direct route, which means if they are headed to the daycare, they are less likely to use the planned crosswalk that extends eastward. Another crosswalk would help with keeping these people safe and giving them a designated place to walk.
The applicant should ensure that bicycle racks are included in the plan, in order to meet the City of Dover’s requirements on bicycle parking. This should be done at a rate of one (1) bicycle parking space for every twenty (20) vehicle parking spaces. 3 If more information on specific types of bicycle racks is needed, please contact Dover Kent MPO.
Finally, motorists are likely to park their vehicles and then walk across Governors Avenue between this property and the planned mobility center, either as tenants of the apartments or customers at one of the businesses. They will probably try to cross the road directly in front of the parking garage, as the nearest crosswalk is to the south at the intersection with Loockerman Street, which is not as convenient. Given the expected increase in pedestrian traffic, a crosswalk with a Rectangular Rapid Flashing Beacon (RRFB) should be considered for the purpose of creating a safe connection between the two properties. RRFBs are identified as a Proven Safety Countermeasure by the Federal Highway Administration (FHWA), and they have been shown to reduce pedestrian crashes by up to 56%. 4 They are most useful at unsignalized locations with noted pedestrian safety concerns. Dover Kent MPO is willing to work with the applicant and DelDOT to find solutions to the issue of getting pedestrians safely across Governors Avenue.
If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Department as soon as possible.
3 “Dover Code: Appendix B, Article 6, Section 3.10.” City of Dover, DE. https://library.municode.com/de/dover/codes/code_of_ordinances?nodeId=PTIICOOR_APXBZO_ART6OREPAD RLOFA_S3REOREPASP. 4 Kent County Safety Action Plan. Dover/Kent County MPO (2025). https://doverkentmpo.delaware.gov/files/2025/06/Kent-County-Safety-Action-Plan-FINAL-June- 2025.pdf#page=61.
118
Page 119
Item 3.
City of Dover DRAFT ARCHITECTURAL REVIEW STAFF REPORT for REVISED PLAN Before Dover Historic District Commission September 17, 2026 Previous Recommendation from the Dover Historic District Commission on July 17, 2025
Application: The Governor: Mixed Use Building at 120 Governors Avenue, HI-25-02 REVISED Assoc. Application: S-25-11
Owners: Downtown Dover Development Corporation (Downtown Dover Partnership) City of Dover Downtown Dover Partnership Corporation
Location: Between South Governors Avenue and South New Street, midway between Reed Street and West Loockerman Street in Dover, DE
Address: 120 South Governors Avenue
Related Properties: 105, 111 and 115 South New Street
Tax Parcels: ED-05-077.09-01-44.00-000
Related Parcels: ED-05-077.09-01-37.00-000, ED-05-077.09-01-42.00-000, ED-05-077.09- 01-43.00-000
Project Area: 1.70 Acres +/- (Main parcel)
2.03 Acres +/- (Total of all parcels)
Present Uses: Vacant Lots – Former auto retail store and daycare center, building previously demolished
Proposed Use: Mixed Use Commercial (Grocery, Retail, Restaurant, Child Day Care Center) and Multi-family Housing (Apartments) and associated parking
Present Zoning: C-2 (Central Commercial Zone) H (Historic District Zone)
For Consideration: Revised Architectural Review Certification including alternative side yard setback
This Report for Revised HI-25-02 Mixed Use Building at 120 S Governors Avenue was updated upon submission of Revised Architectural package of a Summary Letter, Revised Design Narrative, Updated Architectural Graphics Package, and Updated Site Plan Sheet by the Applicant. The Planning Staff deemed the revision substantial enough to warrant the Application to go back through the formal Architectural Review Certification process with the Historic District Commission and the Planning Commission. Application HI-25-02 was initially considered by the
- P.O. Box 475 Dover, DE 19903 119 Community Excellence Through Quality Service
Page 120
Item 3. HI-25-02 REVISED Mixed Use Building at 120 S Governors Avenue Revised Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
Historic District Commission on July 17, 2025 and then considered by the Planning Commission on September 15, 2025 as Site Plan S-25-11 The Governor: Mixed Use Building at 120 S Governors Avenue
Note: The original Staff Review Report of July 17, 2025 was initially prepared by Planning Staff. This Revised Staff Review Report utilizes that original Report as a starting point.
- I.PROJECT DESCRIPTION:
The Historic District Commission will act to make a Recommendation for a Revised Architectural Review Certificate for a Site Development Plan Application for the proposed construction of a mixed use commercial and multi-family (apartment) development in Downtown Dover, to be located at 120 South Governors Avenue. The project is construction of a four story, 169,080 SF Mixed Use Building includes a grocery, retail and restaurant spaces, a child day care, 120 apartment units, and a roof-top courtyard with site improvements of a parking lot, a courtyard, and landscaping. The parcel contains 1.70 +/- acres. The property is zoned C-2 (Central Commercial Zone) and subject to H (Historic District Zone). The property is located on the west side of South Governors Avenue and midway between Reed Street and West Loockerman Street. It is bounded by South New Street on the west. The owner of record is Downtown Dover Development Corporation c/o Downtown Dover Partnership.
The project also proposes improvements on adjacent related properties at 105, 111, and 115 South New Street. One of these parcels is owned by the Downtown Dover Partnership and the other two are owned by the City of Dover. These parcels are not within the H (Historic District Zone).
The design Revisions for The Governor: Mixed Use Building at 120 S Governors Avenue are presented and focus on a shift in the main entrance, building courtyard, and loading area enhancing internal functionality, façade language, and some changes in site circulation to better serve fire and emergency vehicles. The Building form remains overall the same, elevations have been revised to blend more seamlessly with nearby architecture, including new trim on the ground-floor façade and revisions to the brick facades to balance the composition of the structure with the existing historic buildings nearby.
Surrounding Land Uses The subject property is within the Downtown Development District, located one block north of Loockerman Street. The site is bordered by South Governors Avenue to the east, South New Street to the west, and part of the Minor Street (paper alley) to the south. As previously noted, the parcels are zoned C-2 (Central Commercial Zone) and within the Historic District. Properties immediately adjacent to the subject project location are also zoned C-2. Others in the immediate area are zoned RG-1 (General Residence Zone). The subject property is currently vacant, the previous auto parts store and day care center building having been demolished several years ago. The largest of the subject parcels is within the H (Historic District) Zone, as are properties to the south and east, as well as to the north fronting South Governors Avenue. The smaller parcels that are adjacent to the main subject of this application are outside of the H (Historic District Zone). Properties west of the subject site across South New Street are also outside of the H (Historic District Zone). Surrounding
120
Page 121
Item 3. HI-25-02 REVISED Mixed Use Building at 120 S Governors Avenue Revised Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
uses are a combination of mixed use and residential, with a church located at the southeast corner of South New Street and Reed Street.
Previous Applications The property owners are the Downtown Dover Development Corporation c/o Downtown Dover Partnership and the City of Dover. On June 20, 2024, the Historic District Commission granted approval of the Architectural Review Certification allowing demolition of the previous structure, a one-story Auto Parts/AutoPlus retail store and daycare center, located at 120 South Governors Avenue (HI-24-05). On March 14, 2025, a Narrative Letter, a Site Plan set, and Architectural Graphics set with building elevations and 3-D views were submitted to the Department of Planning and Inspections as the initial filing of the application to the Historic District Commission. Only 120 South Governors was included in that submission and not the additional parcels located at 105, 111, and 115 South New Street. The application was held at the request of the applicant while additional design refinements were made to the submission. The design changes were made to the proposal and the status of the three additional parcels located at 105, 111, and 115 South New Street was clarified and incorporated into the 120 South Governors Avenue Mixed Use Development Narrative Letter, Site Plan set, and Architectural Graphics set with building elevations and 3-D views, which were submitted to the Department of Planning and Inspections on June 13, 2025. This was reviewed as HI-25-02 Mixed Use Building at 120 S Governors Avenue by the Historic District Commission on July 17, 2025, with a recommendation of conditional approval. It was then reviewed by the Planning Commission on September 15, 2025, achieving conditional approval of the Site Plan S-25-11 and Architectural Review Certification approval.
There was previous proposal in 2011 for demolition of the building and redevelopment of the property with applications HI-11-04 Acme Site Redevelopment Master Plan and S-11-11 Lands at DDP at 120 South Governors Avenue: Master Plan; the plans were never finalized and expired.
II. HISTORIC PROPERTY INFORMATION
Review of Historic Maps Historically, this block of Downtown between South Governors Avenue and South New Street north of West Loockerman Street was part of an area known as the Comegy’s Lots laid out in the 1850s with development occurring 1859-1885. The 1868 Beers Map shows the subject site primarily vacant with one building owned by L. Geiser and a school building. By 1885, a series of residential dwellings fronting on both Governors Avenue and New Street were in existence. The subject site is just north of the original building location of the Robbins Hose Fire Company building. The 1887 Map of Dover published by W.B. Roe continues to show a public school in the southern portion of the site with dwellings to the north. The Sanborn Fire Insurance Map Series from 1885 – 1944 with updates also documents the history of buildings on the subject site. The 1885 Map shows a two-story school building and a Sunday School & Meeting House building with two-story residential dwellings with accessory buildings (garages, sheds). By 1897, the school building was replaced by a Methodist Protestant Church building with the residential dwellings remaining. These uses for the subject site continue through the early twentieth century. By the mid-twentieth century, the church building was replaced by a one-story cinderblock store building adjacent to Governors Avenue. In the late 1960s, the subject site was redeveloped with the recently demolished masonry commercial building (the Acme grocery store building) setback
121
Page 122
Item 3. HI-25-02 REVISED Mixed Use Building at 120 S Governors Avenue Revised Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
in the middle of the block; its construction appears to have eliminated approximately nine residential dwellings.
Property Information The subject property is located within H (Historic District Zone) as established by the City of Dover. There are four contexts that contribute to the historic character of Dover, including the Green Historic Context; the Victorian Historic Context; the Loockerman Historic Context; and the Capitol Square Historic Context. This property is located within the Loockerman Historic Context. Buildings in the Loockerman Context include a wide variety of nineteenth century commercial buildings. The Design Standards and Guidelines for the City of Dover Historic District Zone describe this context as “a coherent, densely-built commercial area that would have an attractive mix of historic and new buildings and related parking.”
The subject property is located within the boundaries of a National Register of Historic Places Historic District, specifically the Victorian Dover Historic District (K-396) but the previous mid- twentieth century commercial building was considered a non-contributing building.
III. PROJECT PROPOSAL
PROJECT PROPOSAL as Revised (Summary Letter, Revised Architectural Graphics Package with Site Plan dated August 24, 2026)
The Revised Application proposes construction of a Mixed Use Building and other site improvements for the development of The Governor. The project location also includes three parcels to the north: two owned by the City, and one owned by Downtown Dover Partnership.
The Applicant’s original submission to the Historic District Commission included a Design Narrative, a site plan graphic, and building elevations and 3-D views. The original site plan application also included a Tree Mitigation and Active Recreation Plan, as well as parking plan for the property. The documents were originally filed August 01, 2025.
The Applicant’s Revised submission of August 24, 2026 includes a Summary Letter giving an overview of the Design revisions, a Revised Architectural Graphics Package, and an Updated Site Plan diagram.
The elements of the project are as follows with notations on the Revisions:
- 1.Entrance and Loading Area: The proposed Revisions to the main building entrance include a shift of the entrance along South Governors Avenue to align better with the center of the residential lobby and amenity spaces. The loading area, which had initially shared access with the fire lane along the south side has been relocated to be a loading entry rollup door on the S. New Street (west) elevation of the building. This enhances site circulation and fire and emergency vehicle access. This shift has not impacted the overall building form.
- 2.Facades: The Building Architecture of the Revised facades consists of a tall ground (first) floor with trim work detailing, storefront window system and an entry clad in a dark grey
122
Page 123
Item 3. HI-25-02 REVISED Mixed Use Building at 120 S Governors Avenue Revised Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
color. The Revised upper floors of 2 – 4 are presented more in a building section pattern with increased usage of brick and with the other sections clad in two colored (taupe and white) fiber cement panel systems. The Revisions include the introduction of divided-light windows, which are more reflective of the architectural language of the surrounding area. There has been additional façade articulation proposed along South New Street to support the overall continuity of design on all sides of the proposed building. Storefront windows have been incorporated into the grocery-facing elevation, and integrated canopies have been added to activate the sidewalks and provide shade. Further Revisions have changed the design on the South New Street elevations, creating an opportunity for a mural, and relocating an egress stair tower on a less prominent portion of the building where there are already service-related activities. The building continues to architecturally consist of a base, wall, then cornice at the top roof line. Again, these modifications have done little to change the shape of the building but have impacted the architectural aesthetics.
See the attached Revised Design Narrative Letter, the Revised Architectural Graphics Package, and updated Site Plan for the associated graphics and drawings for detailed information on building dimensions, locations, and material choices.
IV. ZONING REVIEW
The large parcel that fronts South Governors Avenue is located in the H (Historic District Zone) and subject to the provisions of the Zoning Ordinance, Article 3 §21 and referenced sections. Zoning Ordinance, Article 10 §3.2 outlines the review process for Architectural Review Certification and related building height, bulk, and setback standards.
The entire project area is zoned C-2 (Central Commercial Zone). The C-2 zone allows for “retail stores, apartments and multi-family dwellings; uses accessory to the residential units such as lobby and amenity spaces are permitted on the first floor; live-work units; parking lots and parking structures” as principal uses. The subject property has frontage on two streets: South New Street and South Governors Avenue.
Code Compliance for C-2 Required Provided
Front Setback 0’ > 5’
Rear Setback 20’ above ground floor. At 37’ ground floor
ground floor, 5’ required 54’ above ground floor
Side Setback None required, but 5’ min. 10’ on the North
if provided 22’ on the South
Building Height (Max) 10 stories (125’) 4 stories (60’)
The C-2 zoning district also includes some design standards provisions. See the code excerpt below: Article 3 Section 13 13.5 Design standards. The following standards shall apply to the site and building development in the central commercial zone (C-2):
13.51 Façade articulation. Building facades should incorporate design elements to provide a base, middle, and top of the building to reinforce the pedestrian scale at the street level.
123
Page 124
Item 3. HI-25-02 REVISED Mixed Use Building at 120 S Governors Avenue Revised Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
13.52 Height. For buildings greater than four stories in height, then the upper floors above the fourth story shall step back six feet for fifty percent of the width of the primary facade. For buildings greater than six stories, then the upper floors above the sixth floor shall step back an additional six feet on the primary façade. These step back areas may begin at a lower height than these minimums as part of the building design in order to be compatible with the character of the area.
13.53 Step back areas. The step back areas should be open to the sky and can be open air balcony spaces or other design architectural features that are not enclosed spaces. 13.54 Off-street parking. Off-street parking lots shall not be permitted to be situated between the street line and the primary facade of the principal building. Consideration should be given to locating parking to the side or rear of the building.
13.55 Screening. Any off-street parking lots provided shall be screened from the street line by buildings, landscaping, or other means. Off-street parking lots shall be screened from adjacent residential zones and residential uses. This screening provision does not apply to adjacent alleys.
- V.Review of DESIGN STANDARDS AND GUIDELINES The subject project area is located in the Dover Historic District Zone within the Loockerman Context. The Loockerman Context is described on pages 2-7 and 2-8 of the Design Standards and Guidelines for the City of Dover Historic District Zone. This Design Standards and Guidelines describe this context as “a coherent, densely-built commercial area that would have an attractive mix of historic and new buildings and related parking.” Location within the Dover Historic District Zone requires proposals for demolition, new construction, additions, and certain renovation or rehabilitation activities to existing buildings to receive an Architectural Review Certificate.
As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone, an Architectural Review Certificate will be granted “if it is found that the architectural style, general design, height, bulk and setbacks, arrangement location and materials affecting the exterior appearance are generally in harmony with neighboring structures and complementary to the traditional architectural standards of the historic district.” In accordance with Article 10 §3.2, the Historic District Commission will provide a recommendation to the Planning Commission regarding the Revised project’s compliance with the architectural review standards.
This Revised proposal must be reviewed for conformity with the design criteria guidelines found in Chapter 4: New Construction, Additions, Demolition and Relocation. Information on the review considerations is given below.
New Construction The Design Standards and Guidelines for New Construction (Chapter 4: pages 4-1 through 4-8) provide the design criteria and development guidelines. The guidelines specify the following individual considerations for new construction to be considered in the review by the Historic District Commission (and Planning Commission) of the project for Architectural Review Certification: • Style • Scale (building to reflect dominant cornice and roof height of adjacent buildings) • Elevation of the First Floor
124
Page 125
Item 3. HI-25-02 REVISED Mixed Use Building at 120 S Governors Avenue Revised Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
- •Floor-to-Floor heights
- •Bays, windows, and doors (size, relationship, spacing of)
- •Absolute Size (compare overall size of new building)
- •Massing (relationship of solid-to-void)
- •Orientation (location of primary façade)
- •Proportions (comparison of height to width of building and elements)
- •Materials
- •Forms (shape of building and roof to be complementary)
- •Siting (location of building on lot and in relation to street)
- •High density/ large-scale construction
Design criteria and development guidelines specific to the Loockerman Historic Context are detailed on page 4-6 of the Design Standards and Guidelines and provide that “the siting of new construction in the Loockerman Historic Context should conform to the building line of adjacent buildings, to reinforce the sense of the ‘wall’ of buildings, especially along Loockerman Street. New commercial buildings should occupy the full width of their lot at the street line. Freestanding "object" buildings that do not conform to the street and lot lines should not be permitted in the Loockerman Historic Context. Where a commercial building is built adjacent to a vacant lot, it should be built with a party wall in anticipation of subsequent new construction being built adjacent and up to the property line.” The Design Standards and Guidelines Chapter 3 includes information about the use of certain materials within the Historic District.
The Revised proposed project must also be reviewed for compliance with the standards established by the Zoning Ordinance. The standards include items such as setbacks from property lines, lot coverage, height, etc. This Revised Proposal for the 120 South Governors Avenue Mixed Use Building appears to conform to the bulk requirements of the C-2 zoning district; however, this will be verified via Site Plan review process. The City of Dover Zoning Ordinance authorizes the Historic District Commission to waive certain bulk standards when issuing its recommendation to the Planning Commission for an Architectural Review Certificate if necessary; this was authorized by the earlier application review and will also be required for this Revision. In this case there was no bulk modifications authorized by the Historic District Commission, or recommended in the Staff Report. HDC Recommended a redesign of the north and south elevations and façade cornices to incorporate the brick elements with the possible dentiling and/or bracketing.
The Design Standards and Guidelines note that “the vacant lots to the north and south of Loockerman Street are not desirable locations for large-scale construction, because they are in the transition area between the commercial and residential zoning districts.”
ACTION on ARCHITECTURAL REVIEW CERTIFICATION (for HI-25-02 with July 2025 Review by the Historic District Commission and September 15, 2025 Review by Planning Commission): The application was considered at the July 17, 2025 Meeting of the Historic District Commission. The following members were present at the July Meeting: Chairman Eric Czerwinski, Vice-Chair Mrs. Ellen Richardson, and Mrs. Ann Horsey; one member was absent and one member not appointed. The application was represented by Todd Stonesifer, Chair/President of Downtown
125
Page 126
Item 3. HI-25-02 REVISED Mixed Use Building at 120 S Governors Avenue Revised Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
Dover Partnership Board; Ken Anderson, Downtown Dover Partnership; Mr. Michael Henry, Becker Morgan Group; Ms. Candice Schuster, CoreStates Group; and Mrs. Leslie Smallwood- Lewis and Ms. Meagan Whetstone, Mosaic Development Partners. Public testimony was received during the Public Hearing from Tom Smith of 36 The Green.
During the Meeting, the Historic District Commission heard the applicants’ presentation on the project for the Mixed Use Building at 120 S. Governors Avenue. and including their response to the series of Staff Comments and Recommendations. They presented information on the site’s history; the development site and building placement; building architectural features and materials; and other site items. Questions focused on the building elevation detailing, parking lot and its screening, shopping carts, types of brick, the cornices, window sizing and operation, architectural form design of the grocery section of the building, and planned uses in the building. The Meeting Minutes of the Historic District Commission of July 17 2025, are provided.
Action on Architectural Review Certification Recommendation by Historic District Commission: The motion to recommend approval passed 3-0 of the members present for application HI-25-02 at the July 17, 2025 Meeting. The Historic District Commission recommended approval of the Architectural Review Certificate for Application HI-25-02 The Governor: 120 South Governors based on the applicant’s presentation and plans with reference to the Staff notes and amendments (Staff Recommendation Report – Section VI). The Historic District Commission also required the consideration for redesign of the north and south elevations and façade cornices to incorporate the brick elements with the possible dentiling and/or bracketing to improve the cornice presentation.
Action on Architecture Review Certification and Site Plan by the Planning Commission: Application S-25-11/HI-25-02 was considered at the September 15, 2025 Meeting of the Planning Commission with 8 members present. The application was represented by Mike Riemann of Becker Morgan Group; Michael Cane and Bob Bloczynski of Core States Group; Ms. Meagan Whetstone of Mosaic Development Partners; Mr. J.D. Bartlett of EDiS Company; and Staff of the Downtown Dover Partnership. Public testimony was received during the Public Hearing from Ms. Karen Speakman of NeighborGood Partners and Mr. Zach Prebula of the Kent Economic Partnership. During the Meeting, the Planning Commission heard the applicants’ presentation on the Mixed Use Building at 120 S Governors Avenue. The Governor Project includes a Tree Mitigation Plan for off-site tree planting, an Active Recreation Area Plan, and Conditional Use Approval for the proposed Day Care center, as well as approval of a Waiver for the fence component of the design.
The motion to approve Site Plan S-25-11 The Governor: Mixed Use Building at 120 S Governors Avenue passed 8-0 of the Planning Commission members present for this application at the September 15, 2025 Meeting. This action included approval of the Architectural Review Certification with the alternative side yard setbacks, approval of the Tree Mitigation Plan, Active Recreation Plan, conditional approval for the day care and approval of the Waiver for Opaque Barrier – Fence Component.
VI. STAFF COMMENTS AND RECOMMENDATIONS
The Staff Comments and Recommendations for this application regarding project activities and Architectural Review Certification were originally provided in the Architectural Review Staff
126
Page 127
Item 3. HI-25-02 REVISED Mixed Use Building at 120 S Governors Avenue Revised Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
Report issued for the July 17, 2025 Historic District Commission Meeting. The comments and recommendations were updated for this Report following Staff’s review of the Revised Submission dated August 24, 2026.
The following are Staff comments and recommendations for this application regarding project activities and Architectural Review Certification for the Revised Submission.
- 1)Staff again recommends conditional approval of the Revised Architectural Review Certificate for The Governor, Mixed Use Building at 120 South Governors Avenue project, finding that the building as Revised to be of a compatible design with the nearby buildings and with the intent of the Design Standards and Guidelines for the City of Dover Historic District Zone. The proposed multi-use site enhances the pedestrian scale of the Downtown area and supports the Capital City 2030: Transforming Downtown Dover Master Plan. The revised brick and fiber cement paneled exterior finishes take cues and architectural style from the buildings downtown and the form breaks up the total façade into smaller building segments and set back (steps-back) in certain areas making it look like multiple connected buildings. Sidewalk expansions and the implementations of pedestrian elements will add to the urban activity expected within the Loockerman Historic Context.
- 2)Staff again recommends the following conditions to improve the project’s compliance with the recommended guidelines of the Design Standards and Guidelines. The following are the recommended conditions for the Revised project:
- a.The selected brick choice should be compatible with the brick of other existing buildings in the area. Clarify the brick size and patterning.
- b.Clarify the window glass area material as mirrored or colored glass is not always appropriate for use in the Historic District Zone.
- c.Clarify the edge treatment (railing material and form) at the west roof facing the courtyard area. It appears to be a dark colored picket style railing.
- d.Consideration of wall or free-standing signage may require additional review and will need to go through the Sign Permit application process.
- e.Consider screening and placement of any roof-mounted equipment.
- f.Any light fixtures utilized on the property should be consistent with the style of the lighting used in the nearby areas of the Loockerman Context of the Historic District
- g.Any revisions or changes in the identified material may be subject to further review by the Historic District Commission.
- 3)The Governor: Mixed Use Building at 120 S. Governors Avenue appears to comply with the design standards of the C-2 zoning district in regard to the building façade articulation (having a base, middle and top). The project has also incorporated the step backs for the lower floors (under the fourth floor) and balcony elements. The project design show consideration of the pedestrian at the street level.
- 4)In regard to the placement of off-street parking, South Governors Avenue is considered the primary façade of the building. The placement of a small on-site parking lot along the S. New Street frontage of the property can be considered as it is a secondary front elevation due to the full block depth of the development site. Appropriate screening by landscaping or low
127
Page 128
Item 3. HI-25-02 REVISED Mixed Use Building at 120 S Governors Avenue Revised Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
fence/wall elements of the parking must be considered. There is space between the parking and the street frontage sidewalk; the renderings show shrub plantings.
- 5)Some of the site improvements/amenities were not specifically described or had limited information within the application information. Please provide information for consideration and discussion.
- a.Consider the format of the area to the south of the building for its surface treatments, ability or limitation for pedestrian access, landscaping of area, and any screening of this loading/fire lane area at its connection to South Governors Avenue.
- b.Section 5-5 of the Design Standards and Guidelines for the City of Dover Historic District Zone details recommendations for signage. Signs at the storefront level should be oriented primarily to pedestrians and sized and designed for pedestrian vision. Large-scale signs are not recommended.
- c.Off-street parking lots provided shall be screened from the street line by buildings, landscaping, or other means. Page 11 of the proposed submission indicates the off- street parking lot will be screened by shrubs. Screening in compliance with Zoning Ordinance, Article 6, Section 5 – Supplementary Regulations for Parking and Loading Facilities and the design standards of the C-2 Zone are also evaluated with the Site Development Plan submission.
- d.Provide information on the dumpster enclosure/ utility area construction and screening.
- 6)Clarify whether existing trees on the site or adjacent streetscape area will be preserved. If they are proposed to be removed, replacement of removed trees will be required. The development area (the property) is also subject to tree planting requirements of the Zoning Ordinance. This is considered during the Site Plan Review.
- 7)Staff recommends the following pertaining to the site design elements of the project:
- a.The sidewalk system on the street frontage along both South New Street and South Governors Avenue should continue and include barrier free access, crosswalk striping, etc. at the points of intersection with the entrance and exit drive aisles. These appear to be shown.
- b.Any proposed landscaping or tree planting locations, and lighting fixture locations should be depicted on the plan and be consistent with the character of these elements as they exist within the Loockerman Context area. Lighting fixtures are shown for the parking lot and street frontages.
- 8)The review of the development of the three adjacent parcels along S. New Street occurred with the Site Plan review process as some of the planned amenities are tied to code requirements for certain uses such as the Child Day Care Center and Active Recreation for the residential units.
- 9)The central Courtyard/Wellness Area may be an opportunity for public art installations.
- 10)For building construction, the requirements of the building code or fire code must be complied with. Consult with the Building Inspections Staff and Fire Marshal regarding these requirements. The resolution of these items can impact the site design in some cases.
128
Page 129
Item 3. HI-25-02 REVISED Mixed Use Building at 120 S Governors Avenue Revised Architectural Review Staff Report for Historic District Commission September 17, 2026 Meeting
- 11)In the event that major changes and revisions to the design, materials, or site layout occur in the finalization of the plan and/or construction drawings contact the Department of Planning and Inspections. These changes may require resubmittal for review by the Historic District Commission.
- 12)This site development plan for this project is also subject to the application and review process for Site Development Plan (Article 10 §2 of the Zoning Ordinance) before the Planning Commission. Note: Additional technical items for compliance with the Zoning Ordinance and other regulations were identified during the Site Plan Process for Site Plan S-25-11. The Revised project remains subject to the DAC Report and Comments issued for S-25-11 (The Planning Commission will be provided the DAC Report issued for September 2025).
- 13)The applicant shall be aware that Building Permits are required to proceed with any construction activities on the project site. The permit applications must comply with the approvals and conditions granted through the Revised Architectural Review Certification and Site Plan Review process.
- 14)The applicant should be aware that a Sign Permit is required to proceed with the placement of signage on the property.
VII. Historic District Commission Action Required on Revised Submission The Historic District Commission shall conduct a Public Hearing and shall consider the proposal and provide a Revised Recommendation in regard to the Revised Architectural Review Certification for the 120 South Governors Avenue Mixed Use Building development. The Revised Recommendation should reflect consideration of the Design Standards and Guidelines for the City of Dover Historic District Zone. This Revised Recommendation will be presented to the Planning Commission at their September 21, 2026 Meeting with Public Hearing and Review of the Revised HI-25-02/S-25-11.
129
Page 130
Item 3.
CITY OF DOVER HISTORIC DISTRICT COMMISSION
JULY 17, 2025
Excerpt from Meeting Minutes – Draft
The Meeting of the City of Dover Historic District Commission was held on Thursday, July 17, 2025, at 3:30 PM as an In-Person Meeting in the City Hall Council Chambers (anchor location) and virtually using the audio/videoconferencing system Webex. With Chairman Czerwinski presiding, the other members present were Mrs. Richardson and Ms. Horsey (virtual). Mrs. Mason was absent. (There is currently one member not appointed.)
The Planning Office Staff members present were Mrs. Melson-Williams, Mr. Salzano, and Mrs. Savage-Purnell.
NEW APPLICATION
HI-25-02 Mixed Use Building at 120 S Governors Avenue – Public Hearing and Review for Recommendation on Architectural Review Certification for the construction of a four story, 169,080 SF Mixed Use Building including a grocery, retail and restaurant spaces, a child day care, 120 apartment units, and a roof-top courtyard with site improvements of a parking lot, a courtyard, and landscaping. The parcel contains 1.70 +/- acres. The property is zoned C-2 (Central Commercial Zone) and subject to H (Historic District Zone). The property is located on the west side of South Governors Avenue and halfway between Reed Street and West Loockerman Street. The owner of record is Downtown Dover Development Corporation c/o Downtown Dover Partnership. Property Address: 120 S. Governors Avenue, Dover. Tax Parcel: ED-05-077.09-01- 44.00-000. Council District 4.
Mrs. Melson-Williams mentioned that this is a proposal for a four-story mixed-use building with a mixture of commercial and residential units that are being proposed. As part of the process, there is an Architectural Review Staff Report that is prepared that gives a narrative about the project, the different Code provisions and Design Standards and Guidelines for the Historic District that you need to be looking at as well as a series of Staff Recommendations. The location of 120 South Governors Avenue is to the north of Loockerman Street which is at the bottom of the image here (as she referred to the slide presentation) its the main parcel shaded in blue. You can see that it expands the full width of the block between South Governors Avenue, which is on the right-hand side and then South New Street is on the left-hand side of the block.
There are several adjacent parcels to the north of this large tract that are not within the Historic District but may involve improvements in those areas as it moves through the Site Development Plan review process that it will have to go through. The building is on a property that is zoned C-2 which is the Central Commercial Zone and also found in the Historic District Zone. Anytime you have new construction in the Historic District, it is going to be subject to the process called Architectural Review Certification. This property previously held what we call and know as the Acme building. The demolition of that building has occurred. That occurred after the request for its demolition appeared before this body in June of last year as application HI-24-05 and that was approved for demolition of that mid-20th century commercial building (grocery store building) that was there. The narrative does include some information on the historic development of this
130 Excerpt of Historic District Commission Meeting Minutes of July 15, 2025 Page 1 of 13
Page 131
Item 3.
parcel, but that commercial building was the last in the line before this new proposal here. The property is fully located in the City's Historic District Zone. I will also note that the property is within the National Register of Historic Places in the Historic District, known as the Victorian Dover Historic District, but that previous commercial building was considered a non- contributing building to that district.
The project proposal today, as we will hear more from the Applicant about its details, is a mixed- use building. It is 4-stories in height. As part of the project, there is part of the parcel that would be developed as a parking lot and then there's other associated site amenities that would be proposed for improvement or new construction, things like sidewalks, placements of trees, and the like. With this property being in the C-2 zoning district, there are some design standards related to that. Our report outlines the code compliance items related to setbacks. They are meeting those with the placement of the building overall. The C-2 zone does allow for a building of four stories in height as the maximum building height is ten stories or 125 feet. This Plan proposes four stories at 60 feet for this project. In reviewing this project, the Historic District Commission is charged with looking at the Design Standards and Guidelines for the City of Dover Historic District Zone, specifically mostly focused on Chapter 4 where new construction is discussed and the appropriate kind of guidelines and standards for doing such a new construction. There are also some references to Chapter 3, which is where each kind of building element and materials are discussed in greater detail. For new construction, they're really looking at things related to the massing of the building, like how does it present itself to its street and its adjacent neighbors. And also, things like orientation, size, overall portions of things like walls to window, and those types of criteria. The Planning Staff in doing the Staff Review Report always gives a series of Comments and Recommendations in regards to the project. Those are found on the Report beginning on page 7. Staff is recommending conditional approval of the Architectural Review Certificate, finding that the building is of a compatible design with adjacent buildings and would meet the intent of the Design Standards and Guidelines. We believe that their use of the various brick finishes takes cues from the adjacent and greater Downtown Dover area, and how the facade particularly is broken up, it really, even though it is one overall building could be easily read as several smaller buildings along a streetscape area. The other Staff comments that are included in the Report, ask some questions about things that probably should be clarified. The Applicant may actually focus on some of those as we continue a review on this project. I’d be happy to circle back to those comments after we hear from the Applicant and if the Historic District Commission members have other questions. But at this point in time, I think your time is best used in hearing from the Applicant and the details of their project. There are a number of the project team members here. I'm not sure who is taking the lead today.
Representatives: Mr. Todd Stonesifer, Chair of the Downtown Dover Partnership Board, Mr. Michael Henry, Becker Morgan Group, Ms. Candice Schuster, CoreStates Group, Ms. Leslie Smallwood-Lewis and Ms. Meagan Whetstone, Mosaic Development Partners.
Presentation Mr. Stonesifer stated that he lives at 115 N. State Street, Dover, Delaware. I'm also the Chair of the Downtown Dover Partnership. Just to paint a little picture, we would like to present to you as much information as we can to make your decisions easier. We may miss the mark. If so, please ask us questions and if not, then wonderful. We did a good job. I'm here with my team. I'm simply the Chair of the Board of Directors and we have established a wonderful team over the last couple of years. So, in 2021, we set out to find out what the solution is to make Dover more attractive.
131
Page 132
Item 3.
And the solution is we went through a planning process for a little over one year. We engaged community members to give us input, and the community came together wonderfully to provide feedback and to build through this process where they provided information. We took the information and collected that into iterations of ideas, brought it back, presented it, they gave us more feedback, we went back and drilled down into finer details.
The Plan was delivered to us in January of 2023. Part of that Plan was that we would find Staff and have someone dedicated to implementing this Plan through a Property Development Director. I am pleased to introduce Mr. Ken Anderson. Then we'll meet the rest of our team: Jed with Colonial Parking, Monica and JD Bartlett with EDiS Construction, Candice Schuster with CoreStates Group, Leslie Smallwood-Lewis and Meagan Whetstone with Mosaic-Colonial Associates, and the Civil Engineers of the Becker Morgan Group. This was a one-year process just to get us to the overarching Plan that conceptualized this. We have now been working on the implementation stages to get us to this point.
Mr. Ken Anderson stated that he is the Property Development Director Consultant for the Downtown Dover Partnership. I am so excited to be at this portion of the project. In my role over the last 18 months, I've primarily been responsible for the assessment with some key structures that are specific to our Downtown Dover Master Plan. As a result of site assessments, overseeing the bid and procurement process, identifying remediation requirements from some of the structures, and having to come before you previously for a couple of little structures where we had to get permission to demolish certain buildings.
I'm grateful that through all the community input that we got as part of that process, all the feedback, and the menagerie of phone calls we received while demolishing buildings. While doing remediation, we have successfully gotten to this point. I think this building is a benchmark and is iconic representation of what this Master Plan is all about.
When Todd asked me to come and participate with this incredible team, this is what I was looking forward to. At this moment, I'm grateful that when we came to you regarding our request to demolish the old Acme building, you gave us unanimous consent to do so. As a result, concurrent with all these other activities that we just heard about, the design process took place by this team. We are at, I think, an incredible next step and next phase of the Master Plan. Thank you for your input today as we look forward to going forward.
Mr. Stonesifer mentioned that we'll turn it over to Meagan and Leslie from Mosaic Development Partners. They are the ones really driving the train on this design and leading the charge. Hello, I'm Ms. Meagan Whetstone the Senior Vice President at Mosaic Development Partners. I'm here today with those Development Partners. What we are really trying to talk to you about is the broad sweeping market identity for this project. You know, a healthy walkable city comes with the verb and people to drive it. And so, what we are trying to do with this Site is not only embrace outcomes of the new Mobility Center but also pay attention really carefully to New Street and make sure that there is no real backdoors, which is an incredibly hard thing to do in a building that is supposed to have grocery and retail and all these amazing things. We're trying to do it really carefully because within that Historic District, the scale has to be at the pedestrian level. So, what we're hoping to achieve here is something that fits the cadence along Governors really matches the identity of the town. And also allow for people to really inhabit the space. What we are envisioning in the residential part of this is affordable luxury units that are going to be delivered at
132
Page 133
Item 3.
kind of a market luxury level, but with different funding mechanisms used on our capital stack side to enable people of any income level to join in on this project and be part of the community.
It's not really, you know, for any one type of person. It's for everybody, but really providing a high level of care and community within the building itself. With that, a lot of the units have requirements, but there's a really high level of mix so we can have emerging professionals as well as families starting to enjoy this space as they're looking to put permanent footing down in Dover. The retail is along South Governors. A lot of times the grocery store actually heads back to most of the space because it all requires refrigeration. So, what we've done is have three special little micro-retail pieces along Governors to kind of give startup space back to the community and to provide a front door. Then the grocery store itself is more extended back into the building. It is accessible for both sides just thinking about the way people will engage with the building itself.
Mrs. Melson-Williams noted that Michael Caine from CoreStates Group has also joined us online.
I'm going to turn it over to Ms. Candice Schuster of CoreStates Group and she'll talk to you more about the architectural realization as well as the programming along the street.
Good afternoon. My name is Ms. Candice Schuster and I'm the architect for 120 South Governors. I'm the Associate Director of Housing for CoreStates Group, formerly known as Bernardon. The proposed community is a four-story multifamily, mixed use, mixed income residential property offering thoughtfully designed apartments while maintaining the historic character. Exterior and shared spaces help in reinforcing the street grid and the historic pedestrian connectivity. The ground floor of the building is programmed to serve a variety of activities which promote the urban experience. Key occupancies will include a grocer, a cafe, a daycare, and three small retail and restaurant spaces that are perfect for small businesses serving a community. This building concept proposes two front doors as Meagan previously stated which gives revitalization to New Street as well as Governors Avenue. These two spaces will give use to the exterior courtyard located at the rear of the building to help stitch in the existing community. There is surface parking at the back that will accommodate both the grocer and the daycare. The upper floors are a mix of studios, one beds, two beds, and three beds with an outdoor rooftop courtyard above the grocer.
Rendering Although contemporary in design, the development's architecture respects the historic context rather than replicating the neighborhood structure. The building incorporates the guideline principles of scale, rhythm, proportion, and materiality. It enables the structure to harmonize with the surroundings and avoid appearing foreign in the community, while introducing additional contemporary textures and materials to complement the historical context. The building massing follows the surrounding historical communal vernacular. The building is scaled with the urban fabric of Dover’s Downtown context. The southern façade is four stories while the facade steps down to the north of the building where we have two-story adjacent buildings to weave in with the fabric that's existing there. The facade lends itself to more of a neighborhood aesthetic to fit in with a local community. The dynamic process of the facade allows for a pedestrian friendly walkway both on Governors Avenue and New Street. It also creates identifiable entry points at the corners of the building as well as the residential entry in the center. The facades are treated with brick, masonry, and historic talent aligned with the context in the surrounding neighborhoods. Decorative cornices and bandings align with the historic cornice heights within the district, upper floors are treated architecturally to blend and maintain focus on the first story. Large storefronts on
133
Page 134
Item 3.
the ground floor with tall narrow windows are to maximize the comfort of the units and the aesthetic of the overall building. Railings will tend to hold historic character while using modern materials. The façade will feature a primarily retail frontage alternating between masonry piers, glazing, and premanufactured panels. The brickwork employs varying orientations, particularly in the column bases and at the cornices or perceived cornices lines of the building. This technique ensures the harmonious line of Dover’s historic vernacular. All street facing elevations, follow the brickwork pattern up to varying cornice lines that step down as you get more into the residential area of Dover that's on the north side of the property. These design choices reflect the commitment to honoring the previously received public input, integrating the contemporary style with historical contexts, and aligning with the Design Standards and Guidelines of the City for the Historic District Zone.
Chairman Czerwinski asked if the Board members had any questions? He mentioned that he had questions. Mrs. Richardson mentioned that she had questions, but would like to see and hear the full presentation before asking questions.
Chairman Czerwinski asked if there was anyone else presenting? There were no other presenters.
Mrs. Richardson mentioned that she was in favor of the project and was also impressed.
Mrs. Richardson asked about the off-street parking on page 16 of the pictorial presentation. It shows a hedge. The presentation shows a hedge and a hint of a low fence. Will the final design include both a fence and a hedge? If you don’t have a fence, someone is going to walk right through it.
Mr. Mike Henry (Civil Engineering Team of the Becker Morgan Group) replied that right now, only a screening hedge has been shown, but there is a possibility; we just haven't proceeded that far at this point. Mrs. Richardson said she would recommend it.
Okay there is a screening requirement and the hedge meets that, but I'm asking if there's going to be a fence condition because if there's an illusion of it maybe you can't really see it on that.
Ms. Leslie Smallwood-Lewis mentioned that they were also concerned about putting up a fence and creating an optics of that the community is not welcome and we don't want them in; sometimes provides that illusion. So, we want to make sure of that because there is going to be interior space that public installations might be able to occur. We don't want it to look like we are closed off. It’s something that we just want to make sure that we consider collectively.
Mrs. Richardson mentioned on page 4 of the pictorial presentation it stated that there are 14 parking spaces. She asked will there be a maximum time limit on parking in these spaces? The proposal indicates that this parking lot is to accommodate the needs of residents, business owners, and shoppers. And if it's going to be the employee of a business, they are going to come in at 7:00 o’clock in the morning and park all day, when they only have 30 minutes.
Ms. Smallwood-Lewis mentioned that primarily, this parking has been envisioned to serve the grocery user, which is a big because of the size of the grocery actually really requests further needs, really high turnover parking and not a lot of them. Another use we're envisioning is for leasing so you can come in and then daycare drop off is a huge part of it. That's kind of why it's a
134
Page 135
Item 3.
wide lane and for fire lane use. It is more of a temporary stay lot with the parking envisioned across the street.
Mrs. Richardson said but back to part of my original question. Do you plan to have a limit, like a 2-hour parking limit on these spaces like the rest of the town? Ms. Smallwood-Lewis responded by saying that it has not been considered yet, but certainly could be considered. Mrs. Richardson stated that she would recommend it.
Mrs. Richardson asked on what street will the entrance to the parking lot be located? On page 5 of the pictorial presentation, it indicates that it will be on Minor Street, which is just an alley. Is that how you are going to get into the parking lot? It's one way, you know, the one entrance and then the other side is the exit.
Mr. Henry replied the parking will come off of New Street. It's basically a U-shape. Minor Street is technically a paper alley that doesn't truly exist.
Mrs. Richardson asked, is it the same entrance as the truck access to the back of the grocery loading area? Mr. Henry replied yes.
Mrs. Richardson mentioned it appears that there is only one return for grocery carts which are located on South Governors. Are there other areas planned? Will there be a routine collection of carts which have not been returned? For example, if carts were left near where customers parked. Ms. Weststone replied that they are going to park across the street in the parking garage. Mrs. Richardson said then they are going to leave the carts up there. They are not going down and pull them (the carts) across the street.
Mrs. Richardson asked if they are in the parking lot, do they come in the back door? There's only one cart return area and it's looking to be at the front of the grocery store away from where anyone is going to park.
Ms. Weststone replied we have discussed these operational questions with the grocer as well as the parking team to understand the best-case scenario for them. Likely, it would be an operational exercise by the grocers themselves. The grocery has two entrances and so that the hallway in between that funnels in the middle is envisioned as that collecting space for the shopping carts. Should we need to add more (cart) parking in the same parking lot or elsewhere we can certainly consider it. Right now, the grocer that would go here is a smaller on their footprint and more of a grocery basket type. So, it's not envisioned that they would need it and they're not heavy cart users.
Mrs. Richardson mentioned that she understood. She assumed that it would be the grocer’s responsibility, but the concern was it didn't look like you could return your carts through the backdoor. It was only at the front of the grocer.
Ms. Weststone replied that it is also in the back. There will be a sliding door to connect to that corridor.
Ms. Horsey asked if she could interact with that because she had the same question about the shopping carts. We have shopping carts left all over the Dover and it's a huge problem. I would suggest that this grocer please charge $0.25 (twenty-five cents) like Aldi’s. They don’t have any
135
Page 136
Item 3.
carts anywhere. They are the one place where you get your quarter back after returning the cart. She would really like to see that.
Mrs. Richardson asked why we are using three different types of bricks versus staying consistent (reference page 7, item IV #2 of the submitted proposal)? This is reminiscent of the smorgasbord of material used on the Dover Library. She has heard many comments around town after the library was built that it was obvious a committee put that building together.
Ms. Schuster mentioned looking at all the different materials here, it can seem like a lot. We studied this building for quite a long time as was said previously. When we got all of the opinions and the public's comments on this building, we decided that to fit in with the neighborhood of Dover and to really stitch into the fabric that we were going to go for more of a communal façade. That look is where you kind of start getting these different materials. Now, we are very careful that these materials relate to each other. It may be a different brick color, but the brick size may stay the same. The portions of the building are going to stay materially continuous in that section. We are not mixing and matching different materials within the same portion of the building where we have one brick type. We are keeping that and then we are having a separate façade look. We are doing something that compliments that, but it's not matching the building to get one cohesive building feel although the scale is breaking down to more of a pedestrian level.
Mrs. Richardson stated that she did understand that, and you did clarify that in your initial comments.
Mrs. Richardson, other than two very plain metal cornices, the design doesn't seem to include any decorative historical details that other buildings in the area have. That is a disappointment to her (see picture of Priscilla Block another historic building in the area). I'm not seeing anything historical in this building.
Ms. Schuster mentioned when we were looking at this building, we certainly wanted to have a nod to the historical context of Dover, which is very important. The building should feel like it fits. We did also look at the building having a little bit more of a contemporary look to kind of lead the future building opportunity. We can certainly look at putting some cornices in, but I think the way that the cornices lay out with this façade kind of stepping down feels appropriate too to the building façade.
Mrs. Richardson said it is very plain. It doesn't add anything to it.
Ms. Whetstone stated that I think one thing about replicating what is there is respecting it, which we do because we are trying to pull the columns up and really connect it to the edges to get context and those kinds of cornices. I don't think they are in the drawings, but you can kind of see them in the rendering where you start to get a little more play with the brick and articulation. I think one thing that we're thinking about, you know, is the marketing of this space and bringing people down. It is also a second layer of bringing additional private investment in with other people. And so its having that kind of fresh feel while merging it into the middle. Plain, we don't want plain. So, we will absolutely look at that and how it kind of demonstrates the shadow lines coming together to become clearer. I think that's coming back to what we're talking about with the pedestrian scale. You really feel it when you're on the ground floor. But also coming back with the bricks. You're coming down Main Street and every single brick building is brick and it's worn
136
Page 137
Item 3.
brick, but they come from a very slightly different place. It is a slightly different clay, and they are all a little different as you march your way down. That's kind of what we are trying to do; so, you feel like you're not just walking past a monolith and it's something to get past, but it’s something to stop and consider. So, with this lens of trying to bring people in and trying to make something familiar for everybody. Within a historic district, it has to have that scale. From an investment perspective, you know making people understand you know Dover is doing something here and it’s something really cool. And what does that look like? So, it looks like a little bit of everybody but with that same rhythm and then with that same scale demonstrates I think you're speaking to. That is our vision.
Mrs. Richardson said okay, thank you.
Mrs. Richardson said none of the windows pictured in the pictorial presentation reflect any hint of historical connection with the area. They are all modern windows.
Ms. Schuster mentioned that with the window sizing and proportion of the window, we tried to match what was in the vernacular. That means tall and more narrow in size. The materials of the window are going to be more modern. I think that kind of lends to the type of living that's going to be happening in this building and the users at the end of this using these apartments. But with the proportion of the windows, we try to match the historical context.
Ms. Whetstone mentioned on the brick buildings, you're seeing a black frame on the windows and on the newer stuff, you're seeing the white frame. Coming back to that play of old and new, the brick is kind of replicating the idea of more of a warehouse window look. So, it's old and it's going to be reminiscent of what's already typically within the brick frame. I'm wondering if this is a render issue because it's so early in this concept is reading a little flat. It would be more set in. We would get shadow lines. There are millions on there that you would start to see. We can definitely take a look at how that could read with modern materials in a more contextual way.
Mrs. Melson-Williams asked if they could look at page 15. I think that page would probably help a little bit in the discussion you are having about cornice lines, windows, and old versus new.
Ms. Whetstone said that it is absolutely helpful. I defer to my team for all of the technical stuff, but that's not my strength. I do want to just note from a more global approach to this is the Master Plan. That is what Mosaic was brought in to focus on and to make sure that there is a true impact on Downtown Dover. In order to do that, there's constantly a balancing act that has to occur where we respect your City, because we love it so much. It's got such a quite feel to it because of its historic background. But we also know that it's very important to meet the needs of what people are looking for now in their living environment. And a lot of that has to do with a somewhat of a fresher look, the windows, the balconies, how things are laid out, and the amenities that will be in this building. We are charged with making sure that we actually do what was put into the Master Plan. We know and have done this so much that we know what these future residents and commercial tenants are going be looking for. We are always having this push and pull between what the social needs are going to be for the future residents and tenants and how do we respect the City of Dover to make sure that comes out. It's not going to look exactly how everything else does in Dover because we won't achieve the ultimate goal of really densifying and bringing in a kind of a new generation of residents to Downtown Dover.
137
Page 138
Item 3.
Ms. Horsey mentioned overall I really like what you have done here. I think you have achieved the goal of making it people's street level friendly facade. I do have one comment on this north end which is on the right side of the slide is that it seems to be what you see first. It is plain and kind of white and it will definitely show a little more. I was thinking possibly that could be a slightly darker color or maybe a little more interest in just the plain facade that it reads now because it looks like a white cube. So, that would be my only comment. I think you have answered a lot of questions that I had. Some of them were similar to Mrs. Richardson questions. The only other question I might have would be the trees. Are they hopefully canopy trees, or do we know yet or is this too early in the process? I would urge you to plant some canopies to bring in the shade because as we all know, that's what makes Downtown's livable are the trees. Thank you.
Chairman Czerwinski commented that overall, the design is really nice. I think it is a postmodern kind of look. Mixing the old and new, he appreciates that. I think that the idea behind it is wonderful. My concerns about it are as follows. I think when she was talking about the cornices, I think there's an issue when you are dealing with cornices and trying to draw the eye down. So, what you're trying to do is you're drawing everybody away from the higher elevations or higher façade. I think you need a little bit more detail than just putting sheet metal or sheet aluminum because that's what it is going to be or represent the cornice. What we are talking about it simple, either incorporating that within the brick structure by making the cornice itself brick and then adding maybe some bracketing or some dentiling that adds a little bit of design elements to that. Because if you're going draw people's eyes down and you are going to respect the historical architectural features of Downtown Dover, you are going to have to make those little features.
I say just some simple bracketing or dentiling on the corners. I would hope that maybe you would stick with brick instead of trying to use aluminum. What you're trying to do, and I'm not an architect myself, but, you know, there's a fine line between trying to draw people's eyes down and being brutalistic within building design. Because effectively the top half of the building is not existen; there is no design elements up there. It's just the box, the white box. And so, if you're going to draw people's eyes down, I would ask that you enhance the details of those areas that you want to pop out. I think the idea of making the north elevation and darkening it down to like a gray might work, you know, just to break up the white. I understand what you're saying is you want that to disappear. One of my biggest problems is the south elevation. What I'm finding with these new buildings, and we typically do this all the time, is we ignore the elevation and put everything out on the façade and then there's nothing on the (side) elevation. And the thing is, this is a four-story building. So, from Loockerman. that building is going to stick out. If you have just an elevation with the brick and then the rest of it is just the white, you are going see a white building from Loockerman. It is going to be a featureless white building going all the way back. I'm asking that on the south elevation is wrapping that brick building all the way around for twelve bays on the elevation side of the building. Because we have another building on the Water Street where they just did the façade and it’s very painfully obvious when the roof ends right there at the façade. It cuts off, you can just see where there's no roof there and there is no features. It's going to be the same thing right there especially from Loockerman where all you're going to see is that brick ending at the corner. You are just going to see a plain white building going all the way down to the rest of the building. So, I asked if you could wrap the facade of the south side around the elevation instead of just having to stop. On the back, it's kind of weird because you have the features. Go to page 16 and at the rear of the building, you go to a wainscoting which is kind of weird. The wainscoting really kind of brings out a warehouse look to the building. I'm not sure if that's necessary. I would just stick with the white going all the way around the back. The wainscoting
138
Page 139
Item 3.
gives off the feature of a warehouse; it's not necessarily attractive. And then where the grocery building is, you kind of lose all the architectural features and you basically have the rear of a hospital right there. So, I would ask that for the grocery area to put a little more features on that to match the rest of the brick, because that looks really sterile. But basically, its like the emergency entrance to the hospital and especially from New Street. It's going to be extremely visible if you're walking. You want something that looks neighborly and that doesn't really look neighborly. So, I'd ask that you continue that same sort of treatment as far as the brick with the columns.
Ms. Whetstone mentioned that they are all in set brick panels and it can be a little difficult to see, but okay.
Chairman Czerwinski mentioned they are very subtle. Ms. Whetstone said okay.
Chairman Czerwinski said it's a square box back there. That's another thing I see. But like I said, overall, I think the building design is very well executed. I just wish architects would look more at the elevation sometimes to give a little bit more respect to the elevations. We have the same thing with the other project with parking garage where the side stops, and it just becomes concrete along the whole back side of it. And these are big structures. So, when you are talking about massing and height these things are absorbing everything else, whether it's the Kent County Family Court Building, or whether it's this. These buildings will be seen from blocks away literally because everything else is two to three stories. So, all I ask is to respect the elevations. I know we talked about the facades, but I'm trying to get away from the facade so we can get more into the building to look like a complete building instead of just adding stuff onto the front of it. Ms. Whetstone said okay.
Chairman Czerwinski mentioned as he referred to the Staff notes that this project has unusually not a large number of questions that are brought up in Staff notes. The Staff summary for this was in the Review Staff Report for this project in Section 6. In Section 6, there is a whole list of details that were not clarified in the project and some of it was highlighted by my counterparts here. And so, to me it's kind of hard to go ahead and approve an Architectural Review Certification when you have two or three pages of unclarified details. It's not on the building but the bushes, the fences, the masking of the parking lot, and things like that. If Staff does recommend, then we can go ahead and approve it. However, we need strict adherence to Section 6 of the Review Staff Report to make sure that everything's been addressed to Staff’s satisfaction to make sure the project gets pushed through.
Chairman Czerwinski asked if any of his counterparts have any further questions?
Ms. Horsey stated that she thinks they also have to include all the comments in question seven. There are a lot and as long as you are all aware of these and are working on them, I don't really have a problem with this.
Mrs. Richardson asked if they could get clarification on your page 8 of the Staff proposal at the very top: clarify the window glass area material if it’s mirrored or colored glass. Ms. Schuster replied that the windows do not have mirrored or colored glass.
139
Page 140
Item 3.
The public hearing is open.
Chairman Czerwinski asked if there was anyone who would like to speak.
Mrs. Melson-Williams mentioned that we do have one individual that joined us online and that's Michael Caine from the CoreStates Group. He did not have any comments.
Mrs. Melson-Williams stated that there were no written comments received by any members of the community.
Mr. Tom Smith: I live at 36 The Green. I thought the comments so far have been really good. First, I'd like to say that this morning when I was emptying the garbage, I looked out and I saw the facade on the side of the new parking garage that's for the Family Court had been built. The windows there looked fantastic. I thought, geez, this parking garage is beautiful; and you know, how can a parking garage be beautiful? It was really terrific. It was so good that I wrote a note to Bill Lenihan congratulating him. In some sort of the same manner, my daughter bought a new electric car, a very fancy car. She loved the car, but on the front of it there's a grill. And the grill is totally fake. And you can see right through the grill. You can see the metal of the regular car. And it was just sort of objectionable. In the same way, all the different facades that we're talking about, in some respect to me, are a little objectionable. I think that the facade should be specific for a purpose. To make a distinguishing difference between the residential and the retail, is important. That part is good. I think that in some respects; this may be a little overdone. I think it might be too much, especially if you talked about the hospital appearance with the marketplace; you know, I totally agree with that. I briefly looked over the Plans and I saw where the third and fourth floors that were residential had different colors on the side. And I thought, “Well, what's the reason for that?” And I'm thinking that it's more like the library. Do the windows open because the windows are tricky here and I could see them overtime being not as attractive. For instance, the windows in that parking garage are spectacular, with the trim and so forth. I thought that something needs to be done to dress up the windows here. If they open that's kind of important. That makes them more attractive than if they don’t open.
Chairman Czerwinski asked for clarification if the windows open or don't open? Ms. Whetstone asked if he could be more specific regarding which windows. Chairman Czerwinski said any apartment windows. Ms. Whetstone replied that the residential windows are operable. For the portions of the windows are operable. The storefront on the ground floor, those are fixed.
Ms. Schuster mentioned for clarification that this building is going for a really, really high level of sustainability. We are not only considering LED, but also Passive House. And so, as we explore the Passive House, which is like a Net Zero, it’s a really incredibly resilient and environmentally responsible type of building. That might limit our ability to do operable windows, but it would only be because of that reason we would not.
Chairman Czerwinski asked is that something that you actually had in your design. I assume that you had it in the design elements for the building that there was supposed to be a “green” building. Ms. Schuster replied yes. Chairman Czerwinski said he was just checking.
The public hearing was closed seeing no one else wishing to speak in the room or virtually.
140
Page 141
Item 3.
Chairman Czerwinski commented that there are a lot of Staff notes that would have to be questions that have to be addressed. I know there's design elements that I would like to see and then I don't want to approve the Application as is: the problems with the cornices and the change of the wraparound of the façade onto the elevation on the south elevation. They did it on the north but not on the south.
Mrs. Melson-Williams mentioned that I think we can probably ask the applicant to clarify that question on the north and the south elevations because I think that it is in our packets if there's questions about material on those.
Chairman Czerwinski mentioned that page 13 shows the elevations. If you look at the south elevation it is a little confusing of how it is presented. It has the south and then the north, but is the north, I assume at the bottom?
Mrs. Melson-Williams replied we are on page 13, and it’s the interior of the courtyard. This is a u- shaped building if that helps you. So, the page before it, page 12 is actually the true, I guess, north elevation and south elevation of the building.
Chairman Czerwinski mentioned that he was satisfied with that. Perhaps we request a redesign of the cornice with more elements.
Mrs. Richardson stated that she would prefer to seek more Historic District details included. I understand the basic concept. I appreciate that you did your homework and went around to the different historical details around town and took pictures. I'm not seeing where they've been incorporated into the design.
Chairman Czerwinski mentioned that he could see what they were talking about regarding the Victorian window massing.
Mr. Stonesifer mentioned regarding the elements that you would like to see, can we approach this from a conditional approval and have Staff and Planning help us work through that in the interest of time? We are open and certainly open to doing all the suggestions.
Mrs. Melson-Williams noted that Planning Staff to the Historic District Commission are making a recommendation on the Architectural Review Certification for this project. So, if you have specific concerns, you can note those in making your recommendation. The ultimate issuance of the Architectural Review Certification for this project will be issued by the Planning Commission as part of their review of the Site Development Plan for this project, because it's required to go to them. The Staff presented a series of comments and recommendations. A number of these are, I would consider them more minor things, or they may be things that are more in the realm of some of the Code requirements that the Planning Commission would be looking at: things like screening of that parking lot area, some of the other tree planting requirements, and those types of things. Some of them are truly comments or things that were not real clear, such as that window glass area.
Then its clarifying what the material truly was in the Presentation that we had received in their graphics package. So, there are a number of things that way. Certain elements that were not real clear,like is it mirrored (the glass) or tinted? We have determined that answer is no. What are the
141
Page 142
Item 3.
certain edge treatments for things like the railings and other elements of the building or site detailing. I think as the project progresses they will be flushed out. But if there is certainly some particular elements or design features of the building that you have concerns with, your action on the recommendation for this building could certainly articulate those.
Chairman Czerwinski moved to forward a motion of the Recommendation of the Architectural Review Certification for Conditional Approval of the Architectural Review Certification of HI-25- 02 Mixed Building at 120 South Governors Avenue with inclusion requirements of complying with Section 6 of the Staff Review Report to be in compliance with those. In addition, with a requirement for consideration for redesign of the north and south elevations and façade cornices to incorporate the brick elements with the possible dentiling and/or bracketing. With one or the other to improve the cornice presentation of the building to better reflect the Downtown Dover area. The motion was seconded by Ms. Horsey and approved 3-0. Ms. Mason was absent.
Mrs. Melson-Williams summarized the motion that your recommendation regarding this Application is for conditional approval of the Architectural Review Certification. It's subject to compliance with the items identified in Section 6 (of the Review Report), which is the Staff Comments and Recommendations, and then to consider potential design changes on the north and south elevations and cornice areas to add potentially more brick in certain areas and/or cornice detailing.
Mrs. Melson-Williams noted that a written Notice of Decision, the information found in this Report and the action of the Historic District Commission will be forwarded to the Planning Commission. It will accompany your Site Development Plan once that is filed. That next step of a Site Development Plan review process is with the City's Planning Commission.
142
Page 143
The Governor Context Photos Item 3.
1
New St. Residential Entrance Dark Fiber Cement Panel
152 S Governors Ave. 125 S Governors Ave.
Governor St Entry Cladding Taupe Fiber Cement Panel``
2 W. Loockerman St. 107 W. Loockerman St. 52-DD Brick White Fiber Cement Panel
The Governor - 120 S Governor Ave. Dover DE 19904 August 24, 2026 143
Page 144
The Governor Site (PREVIOUS DESIGN) Item 3.
2
The Governor - 120 S Governor Ave. Dover DE 19904 August 24, 2026 144
Page 145
The Governor Site Item 3.
3
The Governor - 120 S Governor Ave. Dover DE 19904 August 24, 2026 145
Page 146
The Governor Governor Ave.. (PREVIOUS DESIGN) Item 3.
4
CORE STATES GROUP
The Governor - 120 S Governor Ave. Dover DE 19904 August 24, 2026 146
Page 147
The Governor Governor Ave. Item 3.
5
The Governor - 120 S Governor Ave. Dover DE 19904 August 24, 2026 147
Page 148
The Governor Governor Ave.. (PREVIOUS DESIGN) Item 3.
6
CORE STATES GROUP
The Governor - 120 S Governor Ave. Dover DE 19904 August 24, 2026 148
Page 149
The Governor Governor Ave.. Item 3.
7
The Governor - 120 S Governor Ave. Dover DE 19904 August 24, 2026 149
Page 150
The Governor New St.. (PREVIOUS DESIGN) Item 3.
8
CORE STATES GROUP
The Governor - 120 S Governor Ave. Dover DE 19904 August 24, 2026 150
Page 151
The Governor New St.. Item 3.
9
The Governor - 120 S Governor Ave. Dover DE 19904 August 24, 2026 151
Page 152
The Governor New St. (PREVIOUS DESIGN) Item 3.
10
CORE STATES GROUP
The Governor - 120 S Governor Ave. Dover DE 19904 August 24, 2026 152
Page 153
The Governor New St. Item 3.
11
The Governor - 120 S Governor Ave. Dover DE 19904 August 24, 2026 153
Page 154
Item 4.
City of Dover
DATA SHEET FOR SITE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF: September 9, 2026
PLANNING COMMISSION MEETING OF: September 21, 2026
Plan Title: Winner Subaru Building Additions
Plan Type: Site Development Plan, S-26-13
Location: East side of North DuPont Highway and northwest of the entrances to Dover Mall
Address: 1387 North DuPont Highway, Dover DE
Tax Parcel: ED-05-057.00-01-15.00-000
Owner: Owner of Record: 1387 DuPont Highway, LLC Lessee: Winner Dover 1387, LLC (c/o Michael Hynansky)
Lot Size: 5.48 acres +/-
Zoning: C-4 (Highway Commercial Zone)
Partially subject to SWPOZ (Source Water Protection Overlay Zone)
Existing/Proposed Use: Auto Dealership
Building Area: Existing Building(s) – 37,491 S.F. (Total) Auto Showroom/Service Building (18,465 S.F.), Auto Detailing Building (2,976 S.F.), Auto Showroom/Service Building (20,178 S.F.) Proposed – Building Addition (8,817 S.F.) (3,336 S.F.) & (193 S.F.)
| Impervious Areas: | 95.4% |
| Floor Area Ratio: | 0.209 (4.0 Maximum) |
Off Street Parking: Required – 167 spaces (6 handicap spaces, 1 van accessible) Provided – 422 spaces (6 handicap spaces, 4 van accessible)
Sanitary Facilities: City of Dover
Water Supply: City of Dover
Waiver Request: Reduction of 30’ Arterial Street Buffer
- P.O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 154
Page 155
Item 4.
City of
Dover
CITY OF DOVER Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: September 9, 2026
APPLICATION: Winner Subaru Building Additions at 1387 North DuPont Highway
FILE #: S-26-13 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Alex Dewey, Planner I & Dawn Melson-Williams, AICP, Principal Planner
PHONE #: (302) 736-7196
- I.PLAN SUMMARY This is a Site Plan to allow for the construction of 12,346 SF in Building Additions to the existing auto dealership building and site improvements on a 5.48-acre parcel for Motor Vehicle Sales and Service Establishments. The project entails the construction of a new 8,817 SF +/- Building Addition, a new 3,336 SF +/- Building Addition, and an additional new 193 SF +/- Building Addition, and associated parking and site improvements. The property is zoned C-4 (Highway Commercial Zone), and a portion is subject to the SWPOZ (Source Water Protection Overlay Zone): Tier 3-Excellent Recharge Area. The property is located on the east side of North DuPont Highway and northwest of the entrances to the Dover Mall. The owner of record is 1387
- N.Dupont Highway, LLC c/o Michael Hynansky and lessee is Winner Dover 1387, LLC c/o Michael Hynansky. Property Address: 1387 North DuPont Highway, Dover DE. Tax Parcel: ED- 05-057.00-01-15.00-000.
Previous Applications S-02-15 was a Site Plan for the addition of buildings to the site which expired with no construction occurring. Site Plan S-08-06 gave the site a total of two buildings by adding the “detailing building.” The last application for this property was associated with application S-14- 05 for the addition of a structure in the southwest portion of the property to be used by the Volkswagen dealership, while making adjustments to the display area along the property frontage and a new pylon sign. Through Building Permit application (Permit #14-124), it had completed interior and exterior renovations to the existing building which became the location for the Subaru dealership upon completion of the New Volkswagen Showroom project.
II. PROJECT DESCRIPTION
This project will add building additions to the northern building used by the Winner Subaru dealership, while the existing structure to the south continues to house the Volkswagen dealership. Major construction for the Winner Subaru dealership includes a 3,336 SF +/- building addition to be built on the left side of the existing building for service intake bays and an 8,817 +/- building addition in the rear of the existing structure for the service area. The front of the 155
Page 156
Item 4.
S-26-13 Winner Subaru Building Additions
DAC Report of September 9, 2026
building proposes a 193 SF +/- building addition. Also, the front of the building proposes taking away 7 parking spaces in order to install a patio area and entry sidewalk with a canopy. The portion of the property’s parking lot located on the southwestern side of the property (including the 7 parking spaces in the front) will be taking away 23 parking spaces and 1 handicap parking space to accommodate the building addition. Also, the Site Plan for this project proposes bituminous pavement to be paved northwestern side area where the proposed 3,336 SF +/- building addition is to be constructed and the front of the property. In the rear parking lot of the property, there is a proposed electric vehicle charging station to be installed where there is existing parking.
III. BUILDING ARCHITECTURE
The architecture of the proposed Subaru dealership and service facility renovation is presented in a series of conceptual color renderings. The overall design features a modern aesthetic utilizing a combination of exterior metal panels, wood-grain finish elements, glass storefront systems, stone veneer, cladding, and masonry. The primary front elevations features a prominent central showroom with a raised roof volume wrapped in dark bronze anodized exterior metal panels and trim. The lower portion of the front façade incorporates an exterior storefront window system framed dark bronze, complemented by decorative metal columns and exterior metal finishes with a wood-grain appearance. Centrally positioned above the glass storefront is main brand signage depicting the Subaru logo and lettering. Extending along the right side of the front façade is a section clad in sandstone stone veneer featuring secondary dealer branding. To the left, the service and express bay area is finished with black EIFS and black CMU, incorporating metal panel columns and dark glass overhead service bay doors. A continuous roof overhang with decorative woodgrain finished metal columns spans across the front elevation to integrate the service area with the main showroom. The side elevation transitions from the modern storefront and stone veneer cladding at the front to existing painted tan CMU toward the rear of the building structure. Additional garage access bays are integrated along the side wall adjacent to the stone veneer section for the service area. All displayed dealer and brand signage shown across the renderings remain subject to separate review and approval processes for signs.
IV. ZONING REVIEW
The C-4 zoning district requires 150 ft. of lot width per building (Zoning Ordinance, Article 4 §4.15). With only 400 feet of lot width along North DuPont Highway/Route 13, the property would be limited to the two buildings.
On February 19, 2014, the Board of Adjustment granted an area variance (V-14-04) to allow a reduction of the minimum lot width to 133.33 per building for three (3) buildings totaling 400 feet. The existing service/detail building is at the rear of the property and has limited visibility from the public right-of-way.
Source Water Protection Overlay Zone A portion of the property lies within the Source Water Protection Overlay Zone (SWPOZ), Tier 3. For redevelopment of existing sites or portions within the SWPOZ, a 15-percent reduction in the amount of impervious surface on the site is required compared to pre-redevelopment conditions. This Site Plan shows a 29-percent reduction in imperious surface for the portion of the property subject to the SWPOZ.
156
Page 157
Item 4.
S-26-13 Winner Subaru Building Additions
DAC Report of September 9, 2026
- V.PARKING SUMMARY The parking requirement in the C-4 zoning district is 1.5 parking spaces per 300 S.F. of floor area or one space per employee. The number of employees was not identified. Based on the floor area of 49,837 S.F. for the total facility, a minimum of 250 parking spaces is required. The existing site includes a total of 491 marked parking spaces and will have a total of 422 parking spaces upon completion of this project. The following table presents a tally of the types of parking spaces proposed for the site.
| Parking Description | Number of Parking Spaces |
|---|---|
| Customer | 23 |
| Used Car Display/Storage | 59 |
| Subaru New Car Display/Storage | 59 |
| Volkswagen New Car | 181 |
| Display/Storage | |
| Active Service | 40 |
| Employee Parking | 50 |
| Wholesale | 10 |
| TOTAL | 422 |
The Zoning Ordinance does not have a parking calculation specific to motor vehicle sales and motor vehicle service to address the fact that the sales inventory and service inventory is actually ‘parked’ on site. The applicant is reminded that parking on grass surfaces is also prohibited.
Loading Spaces The requirement for loading spaces for retail and service establishments is based on building square footage. The rate is one loading space for establishments of 8,000 to 25,000 square feet in floor area with an additional loading space per 25,000 square feet of floor area or fraction thereof. However, the maximum number of required loading spaces for buildings totally up to 150,000 square feet is three loading spaces. This site will require two (2) loading spaces. This plan notes that loading will occur in the non-public areas in the rear of the site behind the buildings.
Bicycle Parking The site is required to provide bicycle parking. The bicycle parking calculation is one for every twenty parking spaces. Based on the number of required parking spaces at 250, then thirteen (13) bicycle parking spaces are required. The plan does not appear to indicate the location of any bicycle parking spaces; the applicant has stated that there are bike racks at each auto dealership building.
VI. SITE CONSIDERATIONS
Dumpster This project is non-residential; the requirement is for two (2) Dumpsters. For this plan, the applicants have submitted on their Site Plan the construction of two (2) new Dumpsters relocated along the northwest property line. An enclosure is required when the Dumpsters are visible from the public right-of-way or from an adjacent property.
157
Page 158
Item 4.
S-26-13 Winner Subaru Building Additions
DAC Report of September 9, 2026
Lighting The location of the proposed lighting is shown on the plan with lighting fixtures at the edges of the parking lot areas and within the parking lot.
Sidewalk Sidewalk is required along the street frontage of North DuPont Highway in accordance with Zoning Ordinance, Article 5 §18. In addition, sidewalks connecting from the street frontage sidewalk into the site are required and for pedestrian access from parking areas to building entrances.
The existing site frontage consists of a paved sidewalk along the North DuPont Highway frontage. Also, at the front of the Subaru Building the frontage of the proposes concrete pavers with a 1’ x 1’ joint pattern. This area also proposes a sidewalk with recessed in-grade light, while proposed to be flush with pavement at ADA Ramp location. The dimensions of this sidewalk and patio area are not included in the Site Plan.
Curbing The Zoning Ordinance, Article 6 §3.6(b) requires upright curbing for all parking areas and access drives. The plan shows new curbing for the parking areas at the rear of the site, and in the parking areas along the property lines near the Volkswagen dealership building. Some areas along the northwest property line do not include curbing and this is considered an existing condition.
Signage The project documents indicate the removal and replacement of one (1) freestanding pylon sign currently in the parking/display area in front of the existing Subaru showroom structure. A second pylon sign exists in front of the proposed new showroom structure. Additional signage is proposed near the roofline on the building frontage, as well as the left and right-side elevations and handicapped parking.
This property is associated with Unified Comprehensive Signage Plan US-15-01; proposing the permitted construction of signage to include illuminated freestanding signage and illuminated wall signage on two (2) showroom buildings. The application was heard by the Planning Commission on July 20, 2015. This application was granted Conditional Approval. US-15-01 received final plan approval on January 1, 2016.
Any additional signage must be approved through a separate sign approval and permitting process. The existing site is considered legal non-conforming with respect to the number of signs.
VII. TREE PLANTING AND LANDSCAPE PLAN
One (1) tree is required for every 3,000 SF of land area. The tree planting requirement is based on the total lot area. This project site consists of a total lot area of 5.48 acres (238,708.80 S.F.). Based on the 5.48 acres of non-woodland area, 80 trees are required. A Landscape Plan is included in the submission, indicating that all proposes trees on the site that will be installed in the rear of the building.
158
Page 159
Item 4.
S-26-13 Winner Subaru Building Additions
DAC Report of September 9, 2026
The C-4 zoning district requires a landscape strip of open space that is ten (10) feet in width along street lines. Only small areas along the southern portion of the North DuPont Highway frontage comply with this requirement. The remaining frontage areas are considered existing conditions where the vehicle display and parking areas limit the open space.
The site is also subject to the Arterial Street Landscape Buffer requirement along the North DuPont Highway frontage of the property for a landscaped open space of thirty (30) feet, per Article 5 of the Zoning Ordinance. The existing configuration does not meet this requirement due to the existing condition of paved areas for vehicle display and parking.
Waiver Request of 30’ Arterial Street Landscape Buffer Article 5 § 7.3 allows the Planning Commission to grant a waiver to approve a lesser amount of landscape buffering due to lot constraints or other conditions provided that the objective of establishing landscaped open space along arterial roadways is achieved. The applicant is seeking a Waiver Request for a 30’ Arterial Street Landscape Buffer located along the northeast entrance between the existing site pavement and the curb where North Dupont is 9’ at the narrowest point and 15’ at the widest point. The existing pavement along the frontage of the property is not being modified from its existing condition; therefore, the applicant feels the reduction is warranted. For the southern portion of the frontage of the property, fronting the Volkswagen showroom building, includes an overall reduction in paved area is also achieved in response to the requirements of the Source Water Protection Overlay Zone (SWPOZ) in the southern corner of the property.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
VIII. CITY AND STATE CODE REQUIREMENTS:
- 1)The Site Plan must be updated with changes recommended or approvals including any waivers granted by the Planning Commission. Add to plan as reference notes.
- 2)Plan needs Minor Grading Plan or information (spot grades) to reflect changes around the rear addition. Also add a General Plan Details Sheet to add the construction details for site elements such as bicycle racks, sidewalks, traffic control signage, etc.
- 3)Sheet C-001:
- a)The Site Data Column will need to be updated prior to Final Approval with the following:
- i)Provide Floor Area Ratio for project site. ii) Parking Ratio of what is required needs to be indicated. iii) Need clarification if the number of parking spaces is 422 versus 421 the Planning Office counted on the Site Plan. iv) Any changes recommended or approvals including information on any waivers granted by the Planning Commission.
- v)Plan needs a written purpose for each of its additions it has indicated on the Site Plan in the General Notes. 159
Page 160
Item 4.
S-26-13 Winner Subaru Building Additions
DAC Report of September 9, 2026
vi) List the existing and proposed impervious surface coverage as a percent and in square feet.
- 4)Sheet C-201:
- a)Label parking rows with space tally.
- b)Dimensions of the proposed patio, sidewalk, and canopy are missing.
- c)Identify the location of the bike racks and number of spaces.
- 5)The proposed sign locations shown on this plan are for informational purposes and approval of this plan does not grant approval to the signage shown on the Site Plan or in building elevation drawings. Additional review is required to evaluate compliance with the Sign Regulations.
IX. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES: In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in considering and acting upon Site Development Plans may prescribe appropriate conditions and safeguards so that the public health, safety, and welfare, the comfort and convenience of the public in general, and the residents of the immediate neighborhood in particular shall be taken into consideration. These safeguards may to the maximum extent possible further the expressed intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed in subsections 2.21 to 2.28.
- 1)Waiver Request- Arterial Street Landscape Buffer: Staff recommends conditional approval of the Waiver Request to reduce the width of the Arterial Street Landscape Buffer to recognize existing conditions for the north area of the property.
- a)Staff notes that a portion of the North DuPont Highway frontage south of the entrance is within the Source Water Protection Overlay Zone (SWPOZ) and includes a landscaped area to comply with the impervious surface limitations.
- b)Staff recommends that the landscape buffer includes a landscape treatment of shrubs and groundcovers in lieu of or addition to grass where space is available.
- X.ADVISORY COMMENTS TO THE APPLICANT:
- 1)Any offsite traffic improvements imposed by DelDOT may potentially impact the configuration and area of the proposed Arterial Street Landscape Buffer and require modifications to the final Site Plan.
- 2)The Planning Commission should act upon any waiver requests including the Request of 30’ Arterial Street Landscape Buffer for the project as part of any motion to approve this project, or as a separate motion if necessary. Note: All waivers are at the discretion of the Planning Commission. The Commission may approve or deny waiver requests.
- 3)Other agencies and departments which participate in the Development Advisory Committee may provide additional comments related to their areas of expertise and code requirements.
160
Page 161
Item 4.
S-26-13 Winner Subaru Building Additions
DAC Report of September 9, 2026
- 4)Following Planning Commission approval of the Site Plan, the Plan must be revised to meet all conditions of approval from the Development Advisory Committee or as otherwise noted. A Check Print must be submitted for review by Planning Office Staff and directly to other agencies. Upon determination that the Plan is complete and all agency approvals have been received, copies of the Plan may be submitted for final endorsement.
- 5)In the event, major changes and revisions to the Site Development Plan occur in the finalization of the Site Plan contact the Planning Office. Examples include reorientation of the buildings, relocation of site components like stormwater management areas, and increases in floor area count. These changes may require resubmittal for review by the Development Advisory Committee, Planning Commission, or other agencies and commissions making recommendations in regard to the plan.
- 6)For building construction, the requirements of the building code or fire code must be complied with. Consult with the Building Inspection Staff and City of Dover Fire Marshal regarding these requirements. The resolution of these items may impact the site design including such items as building dimensions and height, building openings, and fire protection needs, etc.
- 7)The applicant/developer shall be aware that prior to any ground disturbing activities on the site the appropriate site inspections, Pre-Construction meetings (including a City of Dover Pre-Construction meeting), and permits are required.
- 8)Construction may have an effect on the adjacent property owners and nearby travel lanes. Any work requiring the closing or rerouting of potential customers or visitors to adjacent properties should be coordinated as to offer the least amount of inconvenience to the adjacent property owners.
- 9)The applicant shall be aware that Site Plan approval does not represent a Sign Permit, nor does it convey permission to place any sign on the premises. Any proposed site or building identification sign shall require a Sign Permit from the City of Dover prior to placement of any such sign. It is recommended that the applicant discuss the sign regulation requirements with the Planning Staff prior to applying for a Sign Permit.
- 10)The applicant shall be aware that Site Plan approval does not represent a Building Permit and associated construction activity permits. A separate application process is required for issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Department as soon as possible.
161
Page 162
Item 4.
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: SEPTEMBER 2, 2026
APPLICATION: WINNER SUBARU BUILDING ADDITION @ 1387 NORTH
DUPONT HIGHWAY
FILE #: S-26-13
REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater CONTACT PERSON: Kate L. Mills, P.E., Interim Director of Water & Wastewater / Engineering Services CONTACT PHONE #: 302-736-7025 CONTACT EMAIL: kmills@doverde.gov
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
SANITATION
- 1.Every commercial customer shall provide such premises with a sufficient number of solid waste containers to provide adequate capacity for the solid waste placed out for collection without overloading the capacity of the containers. The City of Dover shall provide commercial customers with a maximum of two (2), 90-gallon trash containers and two (2), 90-gallong recycling containers.
- 2.Trash collection site shall be oriented for side-loading pick-up if customer is utilizing City of Dover sanitation services.
- 3.Any commercial customer requiring more containers, or larger containers, than provided above, must utilize private service. STORMWATER
- 1.Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from Kent Conservation District is submitted to our office.
- 2.The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert elevations must be labeled on all stormwater structures. STREETS
- 1.Final site plan approval will not be granted until a letter of no objection, signed by DelDOT is submitted to our office.
- 2.The current City of Dover standard street section provides for a 3’ grass strip between the curb and sidewalk. This standard was administratively revised to meet ADA and FHA compliance with cross slope requirements and to prevent cars from scrapping at driveways. The revised standard utilizes a five feet (5’) wide public sidewalk with a five feet (5’) wide grass strip behind the curb. Sidewalk and curb shall be installed for the width of the project scope.
- 3.Please add the following notes to the plans:
- a.Standard City of Dover sidewalk, as per chapter 98, article IV of the Dover Code of Ordinances, shall be required to be installed along the entire public street frontage of a property. Where frontage sidewalk exists but does not meet the standards of chapter 98, article IV, the sidewalk shall be re-laid to meet the standards. Sidewalk shall include barrier-free 162
Page 163
Item 4.
Winner Subaru Building Addition @ 1387 North DuPont Highway
File #: S-26-13
September 2, 2026
access ramping at points of intersection with street crossings and at other locations so as to afford reasonable barrier-free pedestrian movement and site access. b. In accordance to Appendix A, Article VI, Section B.3, all sidewalks shall ascend from the curbstone to the building line at the ratio of one-quarter of an inch to the foot. Nothing in this section shall be construed to affect any pavement previously laid by order of the city council, until it is taken up and relaid.
WATER
- 1.All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information.
- 2.The following notes must be added to the plans:
- a.Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the project.
- b.Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
- c.The site contractor shall contact the City of Dover Department of Water & Wastewater Construction Manager at (302) 736- 7025 prior to the start of construction. A representative from the City of Dover Department of Water & Wastewater must observe and approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted in the field due to conditions of the existing main. Possible conditions that would require tapping relocation include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be held responsible for field conditions requiring adjustment of the tapping location or for any work required by the contractor to make an appropriate and lawful connection.
- 3.The size, type, and location of all proposed and existing water lines and valves must be shown on the plan. Please be advised that effective May 1, 2022, water mains can now be constructed using DR 18 PVC.
- 4.Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine the size of the domestic and irrigation (if applicable) water meter for the proposed buildings. These projections must be submitted prior to approval so the meter size can be placed on the final site plan. The proposed water meters must be installed in a pit per City of Dover requirements and manufacturer’s recommendations. Also, a dual check valve is required downstream of the meter.
- 5.The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be installed at the tee to isolate combined fire and domestic water service to the building from the water loop. Typically, this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside of the building. The domestic water tap and valve should be as close to the building as possible. Typically, the domestic tap and valve are located within five feet (5’) to ten feet (10’) of the building. A blow up detail of this layout is recommended.
- 6.Provide a construction detail for the proposed restraining system for the fire main located within the buildings. There shall only be one (1) water service per building. The Department of Water & Wastewater will test and inspect all fire mains to a blind flange located inside the buildings. The blind flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the floor to the ninety degree (90°) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through walls and slabs must be Class 52 cement lined ductile iron pipe. Confirm particulars to meet this requirement with mechanical designer.
- 7.Water services shall be either type K copper or SDR-9. 1. All non-metallic water lines (mains and services) shall be installed with a tracer wire and identification tape. The wire shall be a minimum of twelve (12) gauge blue coated solid copper wire, wrapped around the pipe, and extending up into all valve and curb boxes. The identification tape shall be six-inches (6”) wide, laid one foot (1’) above the pipe, with the following text: “Caution: Buried Water Line Below”. 3M marker balls, model 1423-XR, or approved equal shall be installed at every service line connection to the water main and all bends on the service line.
163
Page 164
Item 4.
Winner Subaru Building Addition @ 1387 North DuPont Highway
File #: S-26-13
September 2, 2026
- 8.On October 24, 2022, City of Dover Council approved the new Cross Connection Control Program. This program requires certain backflow prevention assemblies on water service connections to the city’s distribution system. Please provide a specific description of the activities in this building.
WASTEWATER
- 1.All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information.
- 2.The following notes must be added to the plans:
- a.Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
- b.Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff, subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as “…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes, exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no illegal discharges to the sanitary sewer system are created with the site improvements.
- 3.The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines. Rim and invert elevations must be labeled on all sanitary structures.
- 4.Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty cast iron frame and cover to prevent damage to the cleanout and lateral.
- 5.Sizing (flow) calculations must be submitted for all sanitary sewer mains showing that velocity and all other requirements are met.
- 6.The minimum size of all sanitary sewer laterals shall be six-inch (6”).
- 7.If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County ordinance requirements, must be provided. A construction detail for the proposed grease trap, as well as the proposed location, must be provided on the plan.
- 8.Depending on the effluent flow, the downstream pump station may be required to be evaluated by the developer / engineer to verify it can handle the additional effluent flow.
GENERAL
- 1.All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This must be included as a note on the plan.
- 2.No trees may be planted within ten feet (10’) of utility infrastructure.
- 3.No structure may be installed within ten feet (10’) of utility infrastructure, please depict all underground utilities and structures on the utility plan sheet to confirm compliance.
- 4.The final site plan must be submitted in the following compatible digital formats:
- a.AutoCAD 2021 (.dwg format).
- b.Adobe Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES SANITATION / STORMWATER / STREETS / WATER / WASTEWATER / GENERAL 1. As-built plans shall be provided prior to the certificate of occupancy and shall be provided in .dwg and .pdf format. 164
Page 165
Item 4.
Winner Subaru Building Addition @ 1387 North DuPont Highway
File #: S-26-13
September 2, 2026
ADVISORY COMMENTS TO THE APPLICANT
WATER
- 1.The City of Dover water system is available to this site. The developer is responsible for all costs associated with extending and providing service to the proposed development.
- 2.Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking Water for review and approval. The owner/developer will be responsible for providing all completed forms and plan sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the Office of Drinking Water until review has been completed by our office.
- 3.Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of Water & Wastewater directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the site.
- 4.Water impact fees may be required to be paid prior to Certificate of Occupancy for this project.
WASTEWATER
- 1.The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated with extending and providing service and capacity to the proposed development.
- 2.Prior to plan approval, it may be required to submit the sanitary sewer system plans to the DNREC, Division of Water Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible for providing all application fees, completed forms and plan sets directly to DNREC.
- 3.Profiles of the sanitary sewer main must be provided with the construction plans. All water, sanitary sewer and storm sewer crossings must be shown on the profiles.
- 4.Wastewater impact fees may be required to be paid prior to Certificate of Occupancy for this project. GENERAL
- 1.The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be abandoned, flowable fill may be required.
- 2.Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team- logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88. SANITATION / STORMWATER / STREETS
- 1.None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
165
Page 166
C F
S-26-13
Item 4.
I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A APPLICATION REVIEW COMMENTARY R D.A.C. MEETING DATE: 09/02/26 D S O H V A E L R APPLICATION: Winner Subaru Building Additions at 1387 N DuPont Hwy
FILE #: S-26-13 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457 josika@dover.de.us
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
- 1.Proposed occupancy classification is business, mercantile, and industrial.
- 2.Building Access shall be no further than 50 feet from a primary entrance.
Where buildings are provided with an automatic sprinkler system installed in accordance with NFPA 13, access shall be no further than 100 feet from the primary entrance. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.4)
- 3.Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times the width of the door(s) or for 10 feet, whichever is greater. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
- 4.Perimeter access shall be 50% and clearly shown on the plans.
Perimeter Access minimum width shall be10 feet for one-story buildings and 15 feet for buildings of two or more stories, measured from the face of the building at grade with a maximum slope of ten percent (10%). Plantings and utility services (includes condenser units, transformers, etc.) shall be permitted within the perimeter access, and shall not interfere with emergency services fire ground operations.
If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building perimeter shall not be included in the calculation of Percent of Perimeter Access. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5)
166
Page 167
Item 4.
Where parking is located between the building and perimeter access area, parking shall not be located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall for building of two or more stories.
- 5.Fire lanes shall cover 25% of the proposed building. Fire lanes are required to be 24 feet wide and run along the front of the building as determined by the primary entrance(s). In cases where there is more than one primary entrance(s), each shall be served by a fire lane even if this exceeds the percentage as required.
The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and the closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one or two stories in height; 40 feet if three or four stories in height, or 30 feet if over four stories in height. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5)
- 6.Where parking is located between the building and the fire lane, parking shall not be located closer than 15 feet to the exterior wall. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.4.1) Where parking is located between the building and the perimeter access area, parking shall not be located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall for building of two or more stories. 2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5.2
- 7.All Fire Lanes shall be marked as follows:
both the inner and outer edges of the fire lane shall be marked, where curbs are present, the top and face of the curb shall be painted yellow, where no curbs are present, a four inch (4”) solid yellow demarcation line shall mark the edge(s) of the fire lane. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
- 8.The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be suitable for street surfaces
- 9.Fire lane signs shall be located as follows:
see Figure 5-16 – Approved Sign For Marking Fire Lanes, fire lane signs shall be spaced at 150 foot intervals maximum, all fire lane signs shall be located no less than six feet (6’) and no higher than eight feet (8’) above the pavement, signs shall be placed at each end of the fire lane, and signs shall face all oncoming traffic.
Where parking is not restricted roadway markings shall utilize the words "FIRE" and "LANE" in lieu of fire lane signs and shall conform to the specifications of 7.6. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
- 10.Where overhangs, canopies, balconies, or any other building or site features must project over any fire lane, an unobstructed vertical clearance of not less than 13’-6” above the fire lane shall be provided and the portion of the building perimeter which contains overhangs, canopies, balconies, or any other building features shall not apply towards the fire lane accessibility requirements of Section 4.0, Table 5-1 in this chapter. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.8)
167
Page 168
Item 4.
- 11.Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in reference to this process.
- 12.NFPA 72 compliant Fire Alarm System required per occupancy code requirements.
Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an occupancy determined to be a place of assembly by the fire marshal and is capable of receiving an occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with NFPA codes governing the installation of fire alarms and the National Electrical Code.
Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined to be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50 percent of the assessed value of the building and is capable of receiving an occupant load 75 persons or greater or is being enlarged to receive an occupant load of 75 persons or greater, shall be required to install a complete fire alarm system in accordance with NFPA codes governing the installation of fire alarms and the National Electrical Code.
Public mode audible requirements. To ensure that audible public mode signals are clearly heard by occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average ambient sound level or five decibels (dB) above the maximum sound level having a duration of at least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area required to be served by the system using the A-weighted scale dBA. In the event the stated requirement cannot be met a shunt trip relay/switches shall be the approved method of meeting the intent of this section of the Code. (City Code of Ordinances 46-171)
- 13.Sprinkler system required. System is to be monitored by an approved Fire Alarm System.
This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions which are modified by more than 50% after the effective date of these Regulations. The 50% figure shall be calculated utilizing the gross square footage of the building, structure, marine vessel, premises and conditions as to arrive at the correct application.
Any proposal that is presented to the Office of the State Fire Marshal for review and approval for a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of the gross square footage of a non-sprinklered building, may not have another such project for the same building submitted for review and approval any sooner than three (3) years after the date of the final inspection unless sprinkler projection is provided throughout the entire building.
In all buildings exceeding 10,000 square feet of aggregate, gross floor area.
In all buildings in excess of 40 feet in height or more than four (4) stories in height.
168
Page 169
Item 4.
In all buildings or areas thereof used for the storage, fabricating, assembling, manufacturing, processing, display or sale of combustible goods, wares, merchandise, products, or materials when more than two (2) stories or 25 feet in height.
In all basement areas exceeding 2,500 square feet floor area.
In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and exceeding two (2) stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or
Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment buildings storage areas except individual unit closets that are located within individual residential living units.
In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA 101, as adopted and/or modified by these Regulations. In all buildings or areas classified as "high hazard" under the Life Safety Code, NFPA 101, or "extra hazard" under the Standard for the Installation of Sprinkler Systems, NFPA 13, as adopted and/or modified by these Regulations.
All buildings used as dormitories, in whole or in part, to house students at a public or private school or public or private institution of higher education. (16 Del.C. Ch. 88) This applies to all such dormitories regardless if new or existing.
(2015 State of Delaware fire Prevention Regulations, 702, Chapter 4)
Places of assembly shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13 when the following apply:
All new indoor places of assembly with an occupant load of 150 persons or greater.
Any interior renovations of 50 percent or more to an existing place of assembly with an occupant load greater than 150 persons.
Any additions or increase in interior size to an existing place of assembly that would create an occupant load of 150 persons or greater.
Places of assembly where alcohol is served for consumption on the premises shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13 when the following apply:
All new indoor places of assembly with an occupant load of 100 persons or greater and where alcohol will be served for consumption on the premises.
Any interior renovation of 50 percent or more to an existing place of assembly with an occupant load greater than 100 persons and where alcohol will be served for consumption on the premises.
169
Page 170
Item 4.
Any additions or increase in interior size to an existing place of assembly which woul d create an occupant load of 100 persons or greater and where alcohol will be served for consumption on the premises.
New educational occupancies of 5,000 square feet or greater shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13. (City of Dover Code of Ordinances 46-162)
NFPA 101, 12.3.5.1 The following assembly occupancies shall be protected throughout by an approved, supervised automatic sprinkler system in accordance with 9.7.1.1(1): 1. Dance Halls 2. Discotheques 3. Nightclubs 4. Bars 5. Restaurants 6. Assembly occupancies with festival seating
- 14.Fire Department Connection is to be a 5-inch stortz connection on a 30-degree elbow located within 50 feet of main entrance. Access to the Fire Department Connection must be clear unobstructed access as defined by the AHJ.
Fire department connections. Unless otherwise approved by the fire marshal, fire department connections shall be on the street side of the building and shall be located and arranged so that hose lines can be readily and conveniently attached to without interference from any nearby obstructions as defined by the fire marshal's office. Fire department connections shall be a five- inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover Fire Hydrant and within 50 feet of the main entrance of the structure it serves. All fire department connections shall be not less than three feet nor more than five feet in height above finished grade. The fire marshal shall have the authority to require more stringent requirements when deemed necessary. (City of Dover Code of Ordinances 46-162)
- 15.Parking and/or obstructions shall be prohibited in front of fire department connections for a distance measuring from the center line and extending four feet on both sides. (2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
- 16.Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose would come off the fire equipment.
- 17.If there is any type of rack storage, the following will be required: 1) a diagram showing the layout and type of rack system 2) a list and quantity of items being stored 3) a letter from an authorized/licensed fire suppression contractor stating that in rack sprinklers are or are not needed. If in rack sprinklers are not needed, a letter may be requested from an authorized/licensed fire suppression contractor to ensure that the sprinkler system is adequate for the storage presented.
- 18.All standpipe and sprinkler connections shall be marked as prescribed within the appropriate section of this regulation and as illustrated by the appropriate figures of this regulation. All standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow demarcation lines to define specific areas, Solid yellow demarcation lines shall be measured from the center line of the connection and extend for a distance of four feet (4') on both sides, and
170
Page 171
Item 4.
where parking is allow between the building and the street or fire lane the solid yellow demarcation lines shall extend from the end of the sidewalk surface to the street or fire lane (Markings shall not be required on the sidewalk surface).
All fire department connections (standpipe and sprinkler) shall have a minimum 12" x 18" sign that reads FIRE DEPT. CONNECTION, sign lettering shall be a minimum of 3 inches (3") in height with red scotchlite letters on white scotchlite background. The sign shall be clearly visible from the fire lane or roadway, and signs using NFPA international symbols shall be an acceptable alternative. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)
- 19.The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be protected from impact damage by impact protection. Natural gas and LP gas meters, regulators, and valves located inside structures shall have impact protection, except when located in separate protected utility rooms.
Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in concrete at a minimum of 18 inches surrounding the bollard. The bollards must be a least 48 inches (four ft.) in height above the finish grade elevation. Any deviation of the stated requirements must be approved by the fire marshal and/or chief building inspector. The above dimensions shall serve as the requirement for installation; however, the fire marshal and/or chief building inspector shall have the authority to require more stringent dimensions to fit the needs of devices warranting impact protection.
Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors shall be of fluorescent or have a reflective coating. Any deviation of the stated requirements must be approved by the fire marshal and/chief building inspector. (City of Dover Code of Ordinances, 46-4)
- 20.Every house, building or structure used or intended for use as living quarters or as a place for conducting business, and having any wall facing or abutting any public or private street or alley, shall have displayed on that wall, in legible, easily read characters which are of contrasting color to the background, the proper street number for such house, building, or structure in accordance with the following:
One-family and two-family residential structures, height, the number shall measure a minimum of four inches in height, location, the number shall be placed on the house above or to the left or right of the front entrance, color, the number shall be contrasting to the background color, Arabic numerals, all numbers shall be Arabic numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when identifying individual apartments with exterior doors, and 12 inches when identifying buildings with apartment complexes where there are two or more buildings not assigned street addresses. Individual buildings with street addresses shall have numbers measuring six inches, location, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot, color, numbers shall be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic numerals.
171
Page 172
Item 4.
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in height, location generally, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot,
property line or driveway, should the building be located far enough from a public or private road so that the numbers are not clearly visible from the street, then the street address shall also be posted on the property at or near the property line or driveway to said building,
color; each building, numbers shall be contrasting to the background color and shall be placed on each building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite number affixed to the front of the tenant space and on the outside of the rear door which corresponds with that tenant space. Numbers shall measure six inches in height. (City of Dover Code of Ordinances, 98-344)
- 21.A lock box (Knox) containing any and all means necessary for fire department access shall be provided at the following occupancies: any occupancy that contains a fire alarm signaling system that is monitored off-site, or any occupancy that contains an automatic sprinkler system. (2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
Secured key systems. When required; exemption. A secured key system shall be required for any new or existing building where a fire alarm or sprinkler system is being installed. It shall be the responsibility of the owner or occupant to keep a set of keys in the secured key box that are current to the locks of the protected occupancy. Buildings with 24-hour staffing or guard service shall be exempt from this subsection.
Location. The secured key system shall be located as close to the main entrance as possible. Should the building design not allow the secured key system to be located by the main entrance, the fire marshal and fire chief shall come to an agreement as to an alternate location for the key box. A secured key system, once installed, shall not be obstructed from view or obstructed by any means that would delay the fire department access to the box.
Required keys. Keys to be secured in the key box shall include keys to all points of ingress or egress, whether on the interior or exterior of the building, and keys to locked mechanical rooms, electrical rooms, elevator rooms, fire alarm and sprinkler controls and any area protected by automatic fire detection. Keys to individual residential apartment units are not required.
Ordering responsibility. It shall be the responsibility of the general contractor to order the key box for new buildings. It shall be the responsibility of the owner or tenant to order the key box for existing buildings.
172
Page 173
Item 4.
Installation before testing. No acceptance test for sprinklers or fire alarms shall be conducted before the installation of a key box. (City Code of Ordinances 46-127)
Knox Box to be mounted 6 feet above ground level
- 22.All required means of egress shall have an exit discharge consisting of a non-slip surface and leading to and terminating at a public way. NFPA 101
- 23.Project to be completed per approved Site Plan.
- 24.Full building and fire plan review is required.
- 25.Construction or renovations cannot be started until building plans are approved.
- 26.Fire alarm systems, fire suppression systems, hoods, exhaust ducts, and hood suppression systems require a fire permit from the Fire Marshal’s Office. This work cannot be started until the permit is approved.
- 27.Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
- 28.The following is City Ordinance, Appendix B-Zoning, Article 8 Enforcement and Penalties:
Section 1. - Building permits. No building or structure in any district shall be erected or structurally altered without a building permit duly issued upon application to the building inspector. No building permit shall be issued unless the proposed construction or use is in full conformity with all the provisions of this ordinance. Any building permit issued in violation of the provisions of this ordinance shall be null and void and of no effect, without the necessity for any proceedings for revocations or nullification thereof, and any work undertaken or use established pursuant to any such permit shall be unlawful (see section 4 for penalties). 1.1 No building permit shall be issued for the construction or alteration of any building upon a lot without frontage upon, or legal permanent access to, a public street improved to the satisfaction of the planning commission, or without access to a public sewer. 1.2 No building permit shall be issued for any building where the site development plan of such building is subject to approval by the planning commission, except upon approval of such plans approved by the said commission. 1.21 No building permit shall be issued for any building in a subdivision unless the subdivision plot has been approved by the planning commission. 1.3 No building permit shall be issued for a building to be used for any conditional use in any zone where such use is allowed only with approval of the planning commission, unless and until such approval has been duly granted by the said commission. (Ord. of 7-12-1993, § 3)
173
Page 174
Item 4.
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
- 1.Please show the perimeter access as outlined in item # 4 listed above
- 2.Please show the fire lane as outlined in item # 5 listed above
- 3.FDC to be relocated to front of the building as outlined in item #’s 14, 15, and 16 listed above
- 4.Knox Box to be relocated to the front of the building as outlined in item # 21 listed above
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association) 2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association) 2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association) 2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association) 2009 IBC (International Building Code) Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations 2021 Delaware State Fire Prevention Regulations City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above contact person listed.
174
Page 175
Item 4.
From: Jones, Tijah (DelDOT)
To: Melson-Williams, Dawn
Cc: Hickman, Kevin (DelDOT)
Subject: EXTERNAL: DAC Comments
Date: Thursday, September 3, 2026 3:00:04 PM
You don't often get email from tijah.jones@delaware.gov. Learn why this is important
WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Morning Dawn,
Here are the comments from DelDOT for the applications discussed in the DAC Meeting 02 September
S-26-13 Winner Subaru Building Additions at 1387 North DuPont Highway 1. Schedule a pre-submittal meeting with the department. S-26-14 William Henry Campus Improvements at 65 Carver Road, Dover, DE 2. Schedule a pre-submittal meeting with the department. HI-25-01 Revised #2 and S-25-07 Revised #2 The Old Post at 55 Loockerman Plaza 3. Schedule a pre-submittal meeting with the department. HI-25-02 Revised and S-25-11Revised The Governor: Mixed Use Building at 120 S Governors Avenue 4. Schedule a pre-submittal meeting with the department.
TiJah Jones
Subdivision Review Engineer
Economic Development Coordination
Delaware Department of Transportation
(302) 760-2124
tijah.jones@delaware.gov
175
Page 176
Item 4.
CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
ADVISORY BRIEF Planning
D.A.C. MEETING DATE: 9/9/2026 Organization
S-26-13 Winner Subaru Building Additions at 1387 North DuPont Highway
FILE # S-26-13 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030
Attached, please find comments submitted by Dover Kent MPO for each of the current City of Dover Development Advisory Committee (DAC) applications. These comments are a part of the MPO’s ongoing goals of promoting transportation safety and connectivity within the region. They are submitted in accordance with the support given by the MPO Council on November 6, 2024.
Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be waived.
City of Dover Planning Commission
Site Development Plan Review
S-26-13 Winner Subaru Building Additions at 1387 North DuPont Highway
This site plan focuses on internal improvements to the property such as building additions rather than new frontage sidewalks or property entrances. The transportation impacts of the project are expected to be fairly minimal. It should be noted, however, that the subject property is located on US13 (N DuPont Highway), which has been singled out in Dover Kent MPO’s research for its significant safety issues. The entirety of US13 within the City of Dover is included in the High Injury Network as part of the MPO’s Kent County Safety Action Plan. Roads in the High Injury Network have experienced a disproportionately high number of traffic fatalities and serious injuries.1 The full map of the High Injury Network as well as recommended safety improvements for US13 can be found in the “High-Priority Locations” section of the Safety Action Plan.
Due to the safety issues highlighted in the available data, it is recommended that the applicants strongly consider transportation safety when completing the project. The applicants should also 1 Kent County Safety Action Plan. Dover/Kent County MPO (2025). https://doverkentmpo.delaware.gov/files/2025/06/Kent-County-Safety-Action-Plan-FINAL-June- 2025.pdf#page=66.
176
Page 177
Item 4.
coordinate with DelDOT throughout the process to prevent impediments to safety and connectivity on US13, such as temporary sidewalk obstructions during building construction.
Also note that the applicants will need to work with the City of Dover to ensure the requirements for bicycle parking are met. The City of Dover requires a minimum of one (1) bicycle parking space for every twenty (20) vehicle parking spaces.2 The location of these facilities should be included in the site plan. If more information on various types of bike racks is needed, please contact Dover Kent MPO.
If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Department as soon as possible.
2 Dover Code: Appendix B, Article 6, Section 3.10. City of Dover. https://library.municode.com/de/dover/codes/code_of_ordinances?nodeId=PTIICOOR_APXBZO_ART6OREPAD RLOFA_S3REOREPASP.
177
Page 178
Item 4.
WAIVER REQUEST
1387 DUPONT HIGHWAY, L.L.C.
NEW SUBARU BUILDING ADDITIONS
30’ ARTERIAL BUFFER
REQUEST: Relaxation of the 30 foot wide arterial buffer requirements for the site.
EXTENT OF THE REQUEST: By code, a 30 ft wide arterial landscape buffer is required along road frontage that is classified as an arterial road by the Delaware Department of Transportation. The previous plan was approved with a 10’ wide landscape buffer based on the zoning.
The buffer between the existing site pavement and the curb on
Rt. 13 is 9’ at the narrowest point and 15’ at the widest point.
The existing pavement along the frontage is not being modified
from its existing condition and therefore, we feel the reduction is
warranted.
BASIS FOR REQUEST:
- 1.Article 5, section 7.3 of the City of Dover zoning standards states that the Planning Commission may approve a lesser amount of buffering due to physical constraints that may severely limit the development potential of the property. The site is an operating automobile dealership and visibility of their product and building is a major part of drawing customers into the facility. The requirement to set the paved display area and the building back the required thirty feet creates a hardship based on the use of the facility, in addition to the fact that it is an existing condition which is not be modified.
178
Page 179
24x36 24x36
Item 4.
24x36
LANDS N/F 24x36
DOVER MALL, LLC
2-05-05700-01-1400 N N X N: 434706.9726 DEED REF.: 5880-174 . X E: 620302.6816 ZONED: SC3 24x36 X PO BOX 6120 INDIANAPOLIS, IN 46206 N 24x36
FIRC X 400.00' S 47° 35' 10" E
DOVER MALL - NORTH ENTRANCE
FCM
X
24x36 24x36
N 44° 42' 50" E
595.50'
X
SITE
24x36
X
ARCH I T E C TURE 24x36
US
RO
| SITE | US | ||
|---|---|---|---|
| ENG I NE E R I NG | |||
| X | UT | RO | Delaware |
| 24x36 | E | UT | 24x36 |
| 13 | E | 309 South Governors Avenue |
| X | 13 | |
| Dover, DE 19904 | ||
|---|---|---|
| 302.734.7950 | ||
| X | ||
| 24x36 | ||
The Tower at STAR Campus 24x36
100 Discovery Boulevard, Suite 102
X
Newark, DE 19713
24x36
302.369.3700 24x36
X LANDS N/F
DOVER MALL, LLC
Maryland
2-05-05700-01-1400 KENT COUNTY TAX ASSESSMENT MAP KENT COUNTY TAX ASSESSMENT MAP 312 West Main Street, Suite 300 X DEED REF.: 5880-174 24x36 ZONED: SC3 VICINITY MAP SCALE : 1" = 1200' LOCATION MAP SCALE : 1" = 400' Salisbury, MD 21801 24x36
PO BOX 6120 410.546.9100
X INDIANAPOLIS, IN 46206
North Carolina
24x36
X SITE DATA 3333 Jaeckle Drive, Suite 120 24x36
- 1.OWNERS OF RECORD: 1387 DUPONT HIGHWAY, LLC Wilmington, NC 28403 X 1300 N UNION ST 910.341.7600 WILMINGTON, DE 19806 www.beckermorgan.com 24x36
X
302-656-4000 24x36
- 2.ENGINEER / SURVEYOR: BECKER MORGAN GROUP INC. 309 S. GOVERNORS AVENUE X DOVER, DE 19904 24x36
302-734-7950 24x36
X 3. PROPERTY MAP NUMBER: 2-05-05700-01-1500-000
- 4.DEED SUMMARY: DEED BOOK: 6858 PAGE: 336 24x36 X 5. TOTAL SITE AREA: 5.48 ACRES ± 24x36
- 6.ZONING CLASSIFICATION: EXISTING: C4 (HIGHWAY COMMERCIAL) X GENERAL NOTES SWPOZ TIER 3 (SOURCE WATER PROTECTION OVERLAY ZONE)
- 1.THE BOUNDARY DATA SHOWN HEREON WAS COMPILED FROM A FIELD RUN SURVEY PERFORMED BY BECKER MORGAN 7. SETBACKS: C4 (HIGHWAY COMMERCIAL) 24x36
X GROUP, INC., DOVER, DE., IN APRIL 2026. FRONT: 20 FT. 24x36
- 2.THE BOUNDARY LINES PORTRAYED HEREON HAVE BEEN ESTABLISHED BASED SOLELY ON PHYSICAL EVIDENCE SIDE: 15 FT. DISCOVERED IN THE FIELD IN CONJUNCTION WITH DETERMINATIONS DERIVED FROM SOURCE OF TITLE AND REAR: 30 FT. (BUILDING HEIGHT) X ADJACENT DEED RECORD INFORMATION. MAX BLDG HEIGHT: 6 STORIES / 75 FT. 24x36
- 3.PROPERTY SHOWN HEREON IS SUBJECT TO ANY RIGHT-OF-WAY, EASEMENTS, RESTRICTIONS, ETC. AS MAY BE MAX LOT COVERAGE: N/A 24x36
X SHOWN OR NOTED IN ANY RECORD, PUBLIC OR OTHERWISE, OR ANY REQUIREMENT OR REGULATION OF ANY PUBLIC SWPOZ TIER 3 (SOURCE WATER PROTECTION OVERLAY ZONE) AGENCY. MAX LOT COVERAGE: 30% 4. PARCEL IS LOCATED WITHIN ZONE "X", AREA OF MINIMAL FLOOD HAZARD BASED ON FIRM MAP 10001C0158J, 8. PRESENT USE: CAR DEALERSHIP X 24x36
EFFECTIVE DATE JULY 8, 2014. PROPOSED USE: CAR DEALERSHIP
24x36
- 5.ALL ROADS, PARKING AND OTHER PAVED AREAS WILL BE PRIVATELY OWNED AND MAINTAINED AND ARE NOT
- 9.BUILDINGS: EXISTING: 37,491 S.F. INTENDED FOR DEDICATION. X PROPOSED: 12,346 S.F.
- 6.DELAWARE REGULATIONS PROHIBIT THE BURIAL OF CONSTRUCTION DEMOLITION DEBRIS, INCLUDING TREES AND LANDS N/F TOTAL AT COMPLETION: 49,837 S.F. 24x36 STUMPS ON CONSTRUCTION SITES. ANY SOLID WASTE FOUND DURING EXCAVATION MUST BE REMOVED AND 24x36
| STATE OF DELAWARE | X | HEIGHT: | 30 FT. (75 FT. MAX.) |
|---|---|---|---|
| PROPERLY DISCARDED. | |||
| 2-05-05700-01-1300 | FLOOR AREA RATIO: | 0.209 (4.0 MAX.) | |
| DEED REF: Q25-190 7. ALL HANDICAPPED PARKING DEMARCATION, STALLS, AND BUILDING ACCESSIBLE ROUTES SHALL COMPLY WITH THE | |||
| 10. UTILITIES: WATER: CITY OF DOVER | |||
| ZONED: IO X "AMERICAN WITH DISABILITIES ACT" AND ANSI ICC A117.1 - 2017 " ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES" | |||
| PO BOX 778 | SEWER: | CITY OF DOVER | |
| 24x36 8. THIS DRAWING DOES NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. ALL CONSTRUCTION 24x36 | |||
| DOVER, DE 19903 | GAS: | CHESAPEAKE UTILITIES |
|---|---|---|
| MUST BE DONE IN COMPLIANCE WITH THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 AND ALL RULES AND | ||
| X | ||
| EXISTING BUILDING | ELECTRIC: | CITY OF DOVER |
| REGULATIONS THERETO APPURTENANT. | ||
| 2,976 S.F.± FOOTPRINT 9. BEFORE THE CONTRACTOR CAN BEGIN CONSTRUCTION HE MUST OBTAIN THE PROPER PERMITS AND/OR APPROVALS 11. PARKING: REQUIRED: 167 SPACES | ||
| 24x36 | X | |
| F.F. EL.: 41.50' FROM THE CITY OF DOVER (C.O.D.), DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL (DNREC), PROVIDED: 422 SPACES 24x36 | ||
DELAWARE DEPARTMENT OF TRANSPORTATION (DELDOT) , KENT CONSERVATION DISTRICT (KCD) AND ALL (INCL CUST. & EMPLOY. PARKING, DISPLAY, REPAIR & INVENTORY) APPROPRIATE STATE AND COUNTY AGENCIES. HANDICAP PARKING REQUIRED: 6 SPACES, 1 VAN ACC. X 10. ALL CONSTRUCTION METHODS AND MATERIALS SHALL BE ACCORDING TO THE CITY OF DOVER WATER & HANDICAP PARKING PROVIDED: 6 SPACES, 4 VAN ACC. 24x36 WASTEWATER DEPARTMENT AND THE STATE OF DELAWARE (DELDOT) STANDARDS AND CONSTRUCTION BICYCLE PARKING REQUIRED: 167 / 20 = 9 SPACES 24x36
| X | SPECIFICATIONS. | BICYCLE PARKING PROVIDED: | 12 SPACES |
|---|---|---|---|
| 11. ALL FIRE LANE DEMARCATION AND FIRE LANE SIGNS SHALL BE IN ACCORDANCE WITH ALL STATE FIRE PREVENTION 12. LOADING CALCULATIONS: BERTHS REQUIRED: 2 | |||
| X | REGULATIONS. | BERTHS PROVIDED: | 2 |
| 24x36 | |||
| 12. ALL WORK WITHIN CITY/DELDOT MAINTAINED ROAD RIGHT-OF-WAYS SHALL MEET THE REQUIREMENTS AS SET FORTH SPACES ARE NOT STRIPED AS VEHICLE OFFLOADING TAKES PLACE WITHIN | |||
| 24x36 | |||
IN THE CURRENT REVISION OF THE STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION, BY THE THE NON-PUBLIC AREA BEHIND THE BUILDINGS X DELAWARE DEPARTMENT OF TRANSPORTATION AND ALL CITY OF DOVER REQUIREMENTS. 13. DUMPSTERS: REQUIRED: 2 13. TRAFFIC AND SAFETY CONTROL SHALL BE MAINTAINED DURING CONSTRUCTION IN CONFORMANCE WITH THE PROVIDED: 2 X CURRENT VERSION OF THE DELAWARE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. 14. SIGNAGE: FUTURE PERMIT SUBMISSION 24x36 24x36
- 14.STORMWATER MANAGEMENT AND SEDIMENT / EROSION CONTROL SHALL BE IN ACCORDANCE WITH THE CURRENT PROJECT TITLE
- 15.IMPERVIOUS: 5.23 AC. (95.4% LOT COVERAGE) (75% MAX.) VERSION DELAWARE SEDIMENT AND STORMWATER REGULATIONS BY THE DELAWARE DEPARTMENT OF NATURAL X RESOURCES AND ENVIRONMENTAL CONTROL. 16. ROAD CLASSIFICATION: NORTH DUPONT HIGHWAY - MINOR ARTERIAL - 45 MPH
- 15.CONTRACTOR SHALL REFER TO ARCHITECTURAL/STRUCTURAL DRAWINGS OF PROPOSED STRUCTURES FOR ALL 17. ROAD FRONTAGE: 404' ± - VIA US ROUTE 13 24x36
X DIMENSIONS OF BUILDINGS AND FOUNDATIONS. PROPOSED BUILDING FOOTPRINTS, AS SHOWN ON SITE PLAN, SHOULD ONLY BE USED AS A REFERENCE TO THE ABOVE MENTIONED PLANS. 18. MONUMENTATION: 4 FOUND WINNER 24x36
- 19.SURVEY DATUM: NGS MONUMENTS
24x36 X 16. HYDRANT CONNECTIONS BY THE CONTRACTOR ARE PROHIBITED. THIS METHOD MAY NOT BE UTILIZED DURING ANY PHASE OF THE PROJECT. 17. ALL EXISTING SANITARY SEWER LINES, STORM DRAINS, AND WATER LINES NOT USED FOR THE PROPOSED FACILITY VERTICAL: HORIZONTAL: NAVD 88 - CORS NAD 83 (2011) DSP - CORS SUBARU 24x36
X BUILDING MUST BE PROPERLY ABANDONED AT THE MAINS IN ACCORDANCE WITH THE CITY OF DOVER WATER & WASTEWATER DEPARTMENT REQUIREMENTS PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. 20. SURVEY UNIT: LINEAR: US SURVEY FOOT ANGULAR: DEGREES MINUTES SECONDS (DMS) BUILDING ADDITION 18. PART II, CHAPTER 180, ARTICLE III, SECTION 180-10 OF THE CODE OF KENT COUNTY REQUIRES THAT "NO PERSON COORDINATE TYPE: GROUND 24x36 X UE (8,817 S.F.) SHALL DISCHARGE OR CAUSE TO BE DISCHARGED ANY STORMWATER, SURFACE WATER, UNCONTAMINATED GROUNDWATER, ROOF RUNOFF, SUBSURFACE DRAINAGE, UNCONTAMINATED NONCONTACT COOLING WATER, 21. SURVEY CLASSIFICATION: SUBURBAN SURVEY ADDITIONS 24x36
X CONDENSATE, OR UNPOLLUTED INDUSTRIAL PROCESS WATERS TO ANY SANITARY SEWER". THE 22. SOILS ON SITE: HbA - HAMBROOK SANDY LOAM, 0 TO 2 PERCENT SLOPES CONTRACTOR/DEVELOPER SHALL ENSURE DURING CONSTRUCTION THAT NO ILLEGAL DISCHARGES TO THE SANITARY HkB - HAMBROOK-URBAN LAND COMPLEX, 0 TO 5 PERCENT SLOPES 24x36 SEWER SYSTEM ARE CREATED WITH THE SITE IMPROVEMENTS. WocA - WOODSTOWN LOAM, 0 TO 2 PERCENT SLOPES, MID ATLANTIC 24x36
X 19. THE SITE CONTRACTOR SHALL NOTIFY THE CITY OF DOVER DEPARTMENT OF WATER AND WASTEWATER COASTAL PLAIN UE CONSTRUCTION MANAGER AT 302-736-7025 PRIOR TO THE START OF CONSTRUCTION. A REPRESENTATIVE FROM THE X CITY OF DOVER DEPARTMENT OF WATER AND WASTEWATER MUST OBSERVE ALL CITY OWNED WATER AND SANITARY 24x36 SEWER INTERCONNECTIONS AND TESTING. ALL WATER TAPS MUST BE PERFORMED BY A CITY OF DOVER APPROVED 24x36
CONTRACTOR.THE PROPOSED LOCATION FOR THE WATER TAP MAY NEED TO BE ADJUSTED IN THE FIELD DUE TO X CONDITIONS OF THE EXISTING MAIN. POSSIBLE CONDITIONS THAT WOULD REQUIRE TAPPING RELOCATION INCLUDE 1387 N DUPONT HIGHWAY X PROXIMITY TO PIPE JOINTS, OTHER TAPS, CONCRETE ENCASEMENTS, CONFLICT WITH OTHER UTILITIES, AND THE LIKE. TEST HOLES MUST BE PERFORMED BY THE CONTRACTOR TO DETERMINE THE BEST TAPPING LOCATION. THE CITY OF DOVER 24x36 24x36
CITY OF DOVER WILL NOT BE HELD RESPONSIBLE FOR FIELD CONDITIONS REQUIRING ADJUSTMENT OF THE TAPPING SHEET INDEX KENT COUNTY, DE LOCATION OR FOR ANY WORK REQUIRED BY THE CONTRACTOR TO MAKE AN APPROPRIATE AND LAWFUL X EX. BUILDING CONNECTION. C-001 COVER SHEET AND OVERALL SITE PLAN SHEET TITLE 20. IF THE APPROVED PLAN NEEDS TO BE MODIFIED DUE TO ERRORS OR OMISSIONS OR FIELD CONDITIONS, ADDITIONAL C-101 EXISTING CONDITIONS AND DEMOLITION PLAN 24x36
LANDS N/F SEDIMENT AND STORM WATER CONTROL MEASURES MAY BE REQUIRED AS DEEMED NECESSARY BY THE KENT 24x36
COVER SHEET &
X 1387 DUPONT HIGHWAY, LLC C-201 SITE PLAN CONSERVATION DISTRICT (KCD). T.P.: 2-05-05700-01-1500-00001 21. THE KENT CONSERVATION DISTRICT (KCD) RESERVES THE RIGHT TO ENTER PRIVATE PROPERTY FOR PURPOSES OF L-001 LANDSCAPE PLAN GENERAL NOTES X 24x36 DEED REF.: 6858-336 PERIODIC SITE INSPECTION. 24x36
ZONED: C-4 22. ALL WATER AND WASTEWATER UTILITY COMPONENTS MUST MEET THE REQUIREMENTS OF THE CITY OF DOVER OWNERS CERTIFICATION EX. BUILDING (14,134 S.F.) 5.48 ACRES ± WATER & WASTEWATER DEPARTMENT SPECIFICATIONS. ALL EXISTING UTILITIES SHALL BE ADJUSTED TO FINAL GRADE IN ACCORDANCE WITH CURRENT CITY OF DOVER REQUIREMENTS AND PRACTICES. WE, 1387 DUPONT HIGHWAY, LLC, HEREBY CERTIFY THAT WE ARE THE OWNER OF THE PROPERTY DESCRIBED AND SHOWN ON . PROPOSED ADDITIONS (12,346 S.F.) 23. PRIOR TO THE START OF CONSTRUCTION OR ORDERING OF MATERIALS, THE CONTRACTOR SHALL ENGAGE A PRIVATE 24x36
TOTAL (26,480 S.F.) UTILITY LOCATOR TO VERIFY LOCATIONS OF ALL EXISTING UTILITIES WITHIN THE PROJECT EXTENTS AS WELL AS VERIFYING ELEVATIONS OF ALL UTILITIES TO BE CROSSED WITH NEW IMPROVEMENTS. CONTRACTOR SHALL REPORT THIS PLAN, THAT THE PLAN WAS MADE AT OUR DIRECTION, AND THAT WE ACKNOWLEDGE THE SAME TO BE OUR ACT AND DESIRE THE PLAN TO BE DEVELOPED AS SHOWN IN ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS. . 24x36
CONFLICTS/ISSUES TO THE ENGINEER. 24. ALL SUBSURFACE UTILITIES SHOWN HEREON ARE BASED ON BASED ON SURFACE EVIDENCE COLLECTED FROM THE 24x36
FIELD TOPOGRAPHIC SURVEY AND THE BEST AVAILABLE RECORDS. 24x36
- 25.STANDARD CITY OF DOVER SIDEWALK, AS PER CHAPTER 98, ARTICLE IV OF THE DOVER CODE OF ORDINANCES, SHALL MICHAEL HYNANSKI DATE BE REQUIRED TO BE INSTALLED ALONG THE ENTIRE PUBLIC STREET FRONTAGE OF A PROPERTY. WHERE FRONTAGE BUILDING SIDEWALK EXISTS BUT DOES NOT MEET THE STANDARDS OF CHAPTER 98, ARTICLE IV, THE SIDEWALK SHALL BE 24x36 ADDITION RE-LAID TO MEET THE STANDARDS. SIDEWALK SHALL INCLUDE BARRIER-FREE ACCESS RAMPING AT POINTS OF ENGINEERS CERTIFICATION 24x36
(3,336 S.F.) INTERSECTION WITH STREET CROSSINGS AND AT OTHER LOCATIONS SO AS TO AFFORD REASONABLE BARRIER-FREE I, J. MICHAEL RIEMANN, HEREBY CERTIFY THAT I AM A REGISTERED ENGINEER IN THE STATE OF DELAWARE, THAT THE 0 15 30 60 "LOVE ENCORE" PEDESTRIAN MOVEMENT AND SITE ACCESS. INFORMATION SHOWN HEREON HAS BEEN PREPARED UNDER MY SUPERVISION AND TO MY BEST OF MY KNOWLEDGE AND PARKING 26. IN ACCORDANCE WITH APPENDIX A, ARTICLE VI, SECTIONS B.3, ALL SIDEWALKS SHALL ASCEND FROM THE BELIEF REPRESENTS GOOD ENGINEERING PRACTICES AS REQUIRED BY THE APPLICABLE LAWS OF THE STATE OF DELAWARE. LANDS N/F 24x36 CURBSTONE TO THE BUILDING LINE AT THE RATIO OF ONE-QUARTER INCH TO THE FOOT. NOTHING IN THIS SECTION 24x36
DOVER MALL, LLC
BUILDING 2-05-05700-01-1400 SHALL BE CONSTRUED TO AFFECT ANY PAVEMENT PREVIOUSLY LAID BY ORDER OF THE CITY COUNCIL, UNTIL IT IS Do Not Explode - Select Scale
TAKEN UP AND RE-LAID. ADDITION DEED REF.: 5880-174 ZONED: SC3 SCALE: 1" = 30' 24x36 (193 S.F.) PO BOX 6120 J. MICHAEL RIEMANN, P.E. P.E NO. 13772 DATE 24x36
INDIANAPOLIS, IN 46206 EDGE OF EXISTING
ISSUE BLOCK
SWPOZ AREA
LEGEND
CUSTOMER CUSTOMER
CUSTOMER
PARKING PARKING CUSTOMER CUSTOMER
PARKING CUSTOMER CUSTOMER
PARKING PARKING CUSTOMER CUSTOMER
PARKING PARKING CUSTOMER C-1-Notes-Legend-Landscape PARKING PARKING PARKING
24x36
ITEM EXISTING PROPOSED ITEM EXISTING PROPOSED 24x36
CONCRETE CURB & GUTTER SANITARY GRAVITY SEWER LINE (S) EX. 10"S 10" S SIZE & FLOW DIRECTION
S 44° 42' 50" W
CONCRETE SIDEWALK, SLAB / PAVING
SANITARY SEWER FORCE MAIN (F.M.) EX. 10" F.M. 12" F.M.
24x36 24x36
IMPERVIOUS SURFACED ROAD, DRIVE SIZE & FLOW DIRECTION
OR PARKING LOT
SANITARY SEWER MANHOLE (S.S.M.H.)
INDIVIDUAL TREE OR BUSH N/A
EVERGREEN DECIDUOUS
600.00'
SANITARY SEWER CLEANOUT (C.O.)
24x36
WIRE FENCE X X X X X X 24x36
CHAINLINK FENCE WATER MAIN & SIZE EX. 10" W 12" W
| PARKING SUMMARY | STOCKADE FENCE | FIRE HYDRANT (F.H.) | F.H. | F.H. |
|---|---|---|---|---|
| . | ||||
| DESCRIPTION | NO. OF PARKING | 1 | . | . |
| 24x36 | WATER VALVE (W.V.) OR METER (W.M.) | 24x36 | ||
SPACES STRUCTURE (CONCRETE, WOOD, METAL, ETC.) W.M. W.V. W.M. W.V. MARK DATE DESCRIPTION N 47° 35' 10" W 241.15' FIRC LAYER STATE: C-001 FPK CUSTOMER 23 STORM DRAIN MANHOLE (S.D.M.H.) N 47° 35' 10" W 159.03' DRAINAGE DITCH OR SWALE USED CARS DISPLAY/STORAGE 59 STORM DRAIN LINE (CMP, RCP, HDPE) PROJECT NO.: 2026070.00 24x36 WETLAND BOUNDARY LINE V V V N/A 24x36
| SUBARU NEW CAR DISPLAY/STORAGE | 59 | DATE: | 08/07/2026 | |
| S 42° 24' 50" W | CONTOUR | 49 | 55 | CATCH BASIN (C.B.) |
| VOLKSWAGEN NEW CAR DISPLAY/STORAGE | 181 | SCALE: | 1" = 30' | |
| 4.50' | ELEVATION SPOT SHOT | 43.55 | 25.50 T.C. | UTILITY POLE W/ OVERHEAD SERVICE |
| ACTIVE SERVICE | 40 | 25.15 | ||
| 25.00 B.C. | (TELEPHONE (O.T.), ELECTRIC (O.E.) | |||
| DRAWN BY: | A.J.S. PROJ. MGR.: M.J.H. | |||
| 24x36 | 24x36 |
| NORTH DUPONT HWY (U.S. RT 13) | EMPLOYEE PARKING | 50 | ||
| BENCH MARK | ||||
|---|---|---|---|---|
| N/A | UNDERGROUND ELECTRIC (U.E.) | U.E. | U.E. | |
| NORTHBOUND LANES | PROPERTY OR RIGHT-OF-WAY LINE | SHEET | ||
| WHOLESALE | 10 | UNDERGROUND TELEPHONE (U.T.) | U.T. | U.T. |
| EDGE OF EXISTING | RIGHT OF WAY VARIES | CENTERLINE | ||
| 24x36 | ||||
SWPOZ AREA
| TOTAL | 422 | |
| LIGHT POLE | ||
|---|---|---|
| UNDERGROUND GAS MAIN (G) | EX. 2" G | 2" G |
| C-001 | ||
| COPYRIGHT 2023 | ||
| 24x36 | ||
179 F:\Projects\2026\202607000\10_Civil\DWG\2026070-SITE-C3D21.dwg, Aug 04, 2026 - 3:53pm
24x36 24x36
2026-08-04
Page 180
24x36 24x36
UE Item 4.
DEMO LEGEND
24x36 LANDS N/F UT 24x36
DOVER MALL, LLC EXISTING CLUSTER
X 2-05-05700-01-1400 OF TREES
PAVEMENT DEMO . N: 434706.9726 DEED REF.: 5880-174
X
E: 620302.6816 ZONED: SC3
24x36
N X PO BOX 6120
INDIANAPOLIS, IN 46206 G
24x36
FIRC X 400.00' S 47° 35' 10" E UTE STRIPING DEMO U
DOVER MALL - NORTH ENTRANCE
FCM
X
24x36 24x36
40
UT
595.50'
N 44° 42' 50" E
X
UE
24x36
X
UPRIGHT CURB ARCH I T E C TURE 24x36
(TYP.)
30' B.R.L. 30' B.R.L. ENG I NE E R I NG
G
X
Delaware
24x36
UT 24x36
X
309 South Governors Avenue
39
Dover, DE 19904
PAVED 302.734.7950
X PARKING
24x36
The Tower at STAR Campus 24x36
UE 15 15 15 15 15 15 100 Discovery Boulevard, Suite 102 X Newark, DE 19713 UT 302.369.3700 24x36 15 G 24x36
X
15
DOVER MALL, LLC
| LANDS N/F | Maryland | |
|---|---|---|
| 40 | 2-05-05700-01-1400 | 312 West Main Street, Suite 300 |
| 15' B.R.L. | ||
| X | 40 | DEED REF.: 5880-174 |
| 24x36 | ||
| 15 | ||
| ZONED: SC3 | Salisbury, MD 21801 | 24x36 |
PO BOX 6120 410.546.9100 15' B.R.L. 15
X INDIANAPOLIS, IN 46206
North Carolina
C-EX-U-SD-MH-4ID
C-EX-U-SD-MH-4ID
STO STO RM RM
UT
X UE 3333 Jaeckle Drive, Suite 120
24x36 24x36
15 Wilmington, NC 28403
G
X 910.341.7600
24x36
www.beckermorgan.com 24x36
X 15
UT
X
24x36 24x36
15
| X | UNDERGROUND STORM | ||
|---|---|---|---|
| UE | |||
| EX. C.B.: | 40 | WATER INFILTRATION SYSTEM | 39 |
| GRATE: 39.68' | G | ||
| X | 40 | ||
| 24x36 | |||
| INV.: 35.13' | 24x36 | ||
15 15 15 15 15
UT
X EX. S.D. M.H.:
RIM: 40.01' C-EX-U-SD-MH-4ID
C-EX-U-SD-MH-4ID
C-EX-U-SD-MH-4ID
C-EX-U-SD-MH-4ID
C-EX-U-SD-MH-4ID
24x36 INV.: 35.03' STO RM 15 15 15 15 15 15 STO RM STO RM STO RM STO RM 24x36
X
24
X 15
15
24x36
39 UE 24x36
UT G X
15
24
15 UPRIGHT CURB
24x36
OE X (TYP.)
EX. W
24x36
41
X EXISTING EDGE
15
| OF CONCRETE | 24 |
| 15 | |
|---|---|
| UT | |
| 24x36 | |
| LANDS N/F | 24x36 |
| STATE OF DELAWARE | X | ||||
|---|---|---|---|---|---|
| 2-05-05700-01-1300 | PAVED | ||||
| DEED REF: Q25-190 | 41 | 40 | 24 | PARKING | G |
| ZONED: IO | X | 15 | |||
| UE | 41 | 15 | |||
| UE | |||||
| 24x36 | |||||
| PO BOX 778 | 24x36 | ||||
DOVER, DE 19903
| X | 40 | EXISTING BUILDING | G.M. |
| UE | UT | ||
| OE | 15 | ||
| 2,976 S.F.± FOOTPRINT | 24 | ||
| 15 | |||
|---|---|---|---|
24x36 X
F.F. EL.: 41.50'
24x36
38
EX. C.B.:
| 40 | GRATE: 38.56' | R-4 | G | |||
| X | ||||||
|---|---|---|---|---|---|---|
| INV.: 35.58' | 24 | 15 | 15 | 15 | 15 | 15 |
EX. SAN. C.O.:
UE G G G G
24x36
RIM EL.: 40.28' G 24x36
| 39 | INV.: 38.34' | |
| EX. S.S. | ||
|---|---|---|
| X | S.S. | EX. BOLLARD |
EX. 1" W UE
| (TYP.) | UT | ||
|---|---|---|---|
| EX. | |||
| R-5 | X | 40 | 24 |
24x36
PAVED 24x36
PARKING X OE 39
39 EX. C.B.: 24
24x36
X GRATE: 37.44' 24x36
R-2 INV.: 33.87' UT PROJECT TITLE
G
X EX. C.B.:
38
24
GRATE: 37.37'
24x36
| X | UE | ||
|---|---|---|---|
| 15 | 15 | 15 | STO |
| RM | |||
| C-EX-U-SD-MH-4ID | |||
24
INV.: 33.22'
| 24 | 24 | 24 | 24 |
| UE | WINNER | 24x36 |
24x36 R-3 OE X R-1 EX. SAN. C.O.: RIM EL.: 38.51' EX. S.D. M.H.: RIM: 37.74' 38 UT SUBARU 24x36
INV.: 33.37' 24
EXISTING 39 X INV.: 36.66'
G
BUILDING
24x36
PAVEMENT X UE
EX. 4"S
24
ADDITIONS 24x36
X
UE
UT
24x36 24x36
X
24 38
UE
XOE
24x36
R-4 24
24x36
G
R-2
X 1387 N DUPONT HIGHWAY
UT
X
38
CITY OF DOVER
24x36 24x36
KENT COUNTY, DE 24
UE
X
R-4
EX. BUILDING
SHEET TITLE
W.M. W.V.
24x36
LANDS N/F 24
24x36
OEX 1387 DUPONT HIGHWAY, LLC
T.P.: 2-05-05700-01-1500-00001
UT
G
EXISTING
G.M.
24x36
DEMOLITION CONSTRUCTION NOTES X DEED REF.: 6858-336
| ZONED: C-4 | 24 |
| CONDITIONS & | 24x36 |
38 R-1 R-2 REMOVE PAVEMENT, SUBBASE MATERIAL, AND DEPRESSED CURB. SAW CUT PAVEMENT AT LIMITS OF REMOVAL.
| REMOVE EXISTING STRUCTURES. | 38 | |
| EX. BUILDING (14,134 S.F.) | 5.48 ACRES ± | 38 |
| STO | ||
|---|---|---|
| RM | ||
| C-EX-U-SD-MH-4ID | ||
15
DEMOLITION PLAN
24x36
R-3 REMOVE EXISTING DUMPSTER. UE
. 24x36
15' B.R.L. UT R-4 REMOVE EXISTING STRIPING USING A DELDOT APPROVED METHOD (I.E. WATER/SAND BLAST).
15' B.R.L. R-5 EXISTING CURB TO BE REMOVED. G.M. 24x36 R-6 EXISTING SIGN TO BE REMOVED AND REPLACED, SEE SHEET C-201 FOR PROPOSED LOCATION. OE G 24x36
38
R-1
38
24x36
UT 24x36
EX. BOLLARD
NOTES: (TYP.) 0 15 30 60
- 1.PROPERLY DISPOSE OF ALL DEMOLITION MATERIAL IN ACCORDANCE WITH ALL CITY, COUNTY, STATE AND FEDERAL REGULATIONS. 37 UE DELAWARE REGULATIONS PROHIBIT THE BURIAL OF DEMOLITION DEBRIS. G LANDS N/F 24x36 24x36
DOVER MALL, LLC
- 2.CONTRACTOR TO FIELD VERIFY LOCATIONS OF UNDERGROUND UTILITIES. 2-05-05700-01-1400 G Do Not Explode - Select Scale
- 3.ANY EXISTING SANITARY SEWER OR WATER LINES NOT TO BE UTILIZED BY THE PROPOSED FACILITY MUST BE PROPERLY 38 DEED REF.: 5880-174 OE SCALE: 1" = 30' ABANDONED AT THE MAINS IN ACCORDANCE WITH THE CITY OF DOVER DEPARTMENT OF WATER AND WASTEWATER UT ZONED: SC3 SPECIFICATIONS AND REQUIREMENTS. PO BOX 6120 24x36
INDIANAPOLIS, IN 46206 EDGE OF EXISTING 24x36
| 38 | ISSUE BLOCK |
| CUSTOMER CUSTOMER | |
|---|---|
| F.H. | |
| SWPOZ AREA | |
| LEGEND | C-1-Notes-Legend-Landscape |
| PARKING | |
UPRIGHT CURB PARKING CUSTOMER PARKING CUSTOMER CUSTOMER PARKING PARKING CUSTOMER CUSTOMER PARKING PARKING CUSTOMER CUSTOMER PARKING PARKING CUSTOMER PARKING
ITEM EXISTING PROPOSED ITEM EXISTING PROPOSED
EXISTING
24x36
(TYP.) 24x36
EX. 6"S UE
CONCRETE CURB & GUTTER SANITARY GRAVITY SEWER LINE (S) G
EX. 10"S 10" S EX. C.B. W.V.
UT
ENTRANCE EX. 8" W
SIZE & FLOW DIRECTION GRATE: 36.02'
S 44° 42' 50" W
CONCRETE SIDEWALK, SLAB / PAVING INV. OUT: 33.42'
37
EX. 4"S
SANITARY SEWER FORCE MAIN (F.M.) EX. 10" F.M. 12" F.M.
G.V.
C-EX-U-SD-MH-4ID
24x36 STO 24x36
IMPERVIOUS SURFACED ROAD, DRIVE SIZE & FLOW DIRECTION RM
| OR PARKING LOT | OE | R-1 | 37 |
| SANITARY SEWER MANHOLE (S.S.M.H.) | |||
|---|---|---|---|
| EXISTING | |||
| EX. SIGN | |||
| EX. W | |||
| INDIVIDUAL TREE OR BUSH | N/A | R-6 | 37 |
| EVERGREEN | DECIDUOUS | 20' B.R.L. | G |
600.00'
| SANITARY SEWER CLEANOUT (C.O.) | 37 | |||||||
| ENTRANCE | ||||||||
|---|---|---|---|---|---|---|---|---|
| 24x36 | ||||||||
| WIRE FENCE | X | X | X | X | X | X | 20' B.R.L. | 24x36 |
| CHAINLINK FENCE | WATER MAIN & SIZE | EX. 10" W | 12" W | |
|---|---|---|---|---|
| W.V. | ||||
| STOCKADE FENCE | FIRE HYDRANT (F.H.) | F.H. | F.H. | F.H. |
| G | 37 | T | . | |
| 37 | 1 | . | ||
| 24x36 | ||||
STRUCTURE (CONCRETE, WOOD, W.V.OR METER (W.M.) WATER VALVE (W.V.) W.M. F.H. W.V. W.M. W.V. EX. 12" W EX. 10"S EX. 12" W W.V. 15 15 15 EX. 10"S W.V. T EX. 12" W EX. 10"S MARK DATE . DESCRIPTION 24x36
METAL, ETC.) W.V. N 47° 35' 10" W W.V. 241.15' FIRC
EX. 10"S
STORM DRAIN W.V.
MANHOLE (S.D.M.H.) EX. CONCRETE SIDEWALK LAYER STATE: C-101
DRAINAGE DITCH OR SWALE
| 24 | 24 | FPK | N 47° 35' 10" W | 159.03' | 37 | |||||||
| PROJECT NO.: | 2026070.00 | |||||||||||
| 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 |
| 37 | C-EX-U-SD-MH-4ID |
| STORM DRAIN LINE (CMP, RCP, HDPE) | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | STO |
| 24 | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RM | |||||||||||||||
| 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | ||||||||
| 24x36 | |||||||||||||||
| WETLAND BOUNDARY LINE | V | V | V | N/A | EX. 5' BIKE LANE | 37 | |||||||||
| 24x36 | |||||||||||||||
| 37 | EX. C.B. | DATE: | 08/07/2026 | |||||
| CONTOUR | 49 | 55 | CATCH BASIN (C.B.) | EXISTING VARIABLE WIDTH | S 42° 24' 50" W | GRATE: 36.84' | EX. ROW (VARIES) | |
| ELEVATION SPOT SHOT | 43.55 | 25.50 T.C. | UTILITY POLE W/ OVERHEAD SERVICE | |||||
| EX. C.B. | PERMANENT EASEMENT | EX. C.B. | 4.50' | INV. OUT: 32.24' | EX. CURB | EX. C.B. | SCALE: | 1" = 30' |
| 25.15 | GRATE: 36.80' | FOR THE STATE OF DELAWARE | GRATE: 36.00' | EX. SAN. MH. | ||||
| 15 | ||||||||
|---|---|---|---|---|---|---|---|---|
GRATE: 37.05'
± 39.2'
25.00 B.C. (TELEPHONE (O.T.), ELECTRIC (O.E.)
DRAWN BY: A.J.S. PROJ. MGR.: M.J.H.
24x36
INV. OUT: 33.15' 24x36
BENCH MARK
N/A UNDERGROUND ELECTRIC (U.E.) U.E. U.E.
BK: 6858 PG: 336 INV. OUT: 33.90'
NORTH DUPONT HWY (U.S. RT 13) RIM EL.: 36.76'
INV. IN: 29.31'
INV. OUT: 31.53'
| PROPERTY OR RIGHT-OF-WAY LINE | EX. SAN. MH. | NORTHBOUND LANES | INV. OUT: 29.21' | SHEET |
|---|---|---|---|---|
| UNDERGROUND TELEPHONE (U.T.) | U.T. | U.T. | RIM EL.: 36.32' | |
| CENTERLINE | INV. IN: 30.67' | EDGE OF EXISTING | RIGHT OF WAY VARIES | 15 |
24x36
LIGHT POLE
UNDERGROUND GAS MAIN (G) EX. 2" G 2" G INV. OUT: 29.77' SWPOZ AREA
G G
C-101
COPYRIGHT 2023
24x36
180
24x36 24x36
2026-08-04
24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36
Page 181
24x36 24x36
UE Item 4.
24x36 LANDS N/F UT 24x36
DOVER MALL, LLC
X 2-05-05700-01-1400
N: 434706.9726 DEED REF.: 5880-174
X
.
E: 620302.6816 ZONED: SC3
24x36 X PO BOX 6120 24x36
N FIRC X 400.00' INDIANAPOLIS, IN 46206 S 47° 35' 10" E UTE U G
DOVER MALL - NORTH ENTRANCE
FCM
X
24x36 24x36
40
UT
595.50'
N 44° 42' 50" E
X
UE
24x36
X
ARCH I T E C TURE 24x36
30' B.R.L. 30' B.R.L. ENG I NE E R I NG
G
X
Delaware
24x36
UT 24x36
X
309 South Governors Avenue
39
Dover, DE 19904
302.734.7950
X
24x36
The Tower at STAR Campus 24x36
UE 15 15 15 15 15 15 100 Discovery Boulevard, Suite 102 X Newark, DE 19713 UT 302.369.3700 24x36 15 G 24x36
X
15
LANDS N/F
DOVER MALL, LLC
Maryland
| 40 | 2-05-05700-01-1400 | 312 West Main Street, Suite 300 |
| 15' B.R.L. | ||
|---|---|---|
| X | 40 | DEED REF.: 5880-174 |
| 24x36 | ||
| 15 | ||
| ZONED: SC3 | Salisbury, MD 21801 | 24x36 |
PO BOX 6120 410.546.9100 15' B.R.L. 15
X INDIANAPOLIS, IN 46206
North Carolina
C-EX-U-SD-MH-4ID
C-EX-U-SD-MH-4ID
STO STO RM RM
UT
X UE 3333 Jaeckle Drive, Suite 120
24x36 24x36
15 Wilmington, NC 28403
G
X 910.341.7600
24x36
www.beckermorgan.com 24x36
X 15
UT
X
24x36 24x36
15
X
UE
| EX. C.B.: | 40 | 39 |
| GRATE: 39.68' | G | |
| X | 40 | |
| 24x36 | ||
|---|---|---|
| INV.: 35.13' | 24x36 | |
15 15 15 15 15
UT
X EX. S.D. M.H.:
RIM: 40.01' C-EX-U-SD-MH-4ID
C-EX-U-SD-MH-4ID
C-EX-U-SD-MH-4ID
C-EX-U-SD-MH-4ID
C-EX-U-SD-MH-4ID
24x36 INV.: 35.03' STO RM 15 15 15 15 15 15 STO RM STO RM STO RM STO RM 24x36
X
24
X 15
15
24x36
39 UE 24x36
UT G
X
24
15
15
24x36
OE X
EX. W
24x36
41
X
15
| G-4 | 24 |
| 15 | |
|---|---|
| UT | |
| 24x36 | |
| LANDS N/F | 24x36 |
| STATE OF DELAWARE | X | ||
|---|---|---|---|
| 2-05-05700-01-1300 | |||
| DEED REF: Q25-190 | 41 | 40 | 24 |
| G | |||
| ZONED: IO | X | 15 | |
| UE | 41 | 15 | |
| UE | |||
| 24x36 | |||
| PO BOX 778 | 24x36 | ||
DOVER, DE 19903
| X | 40 | EXISTING BUILDING | G.M. |
| UE | UT | ||
| OE | 15 | ||
| 2,976 S.F.± FOOTPRINT | 24 | ||
| 15 | |||
|---|---|---|---|
24x36 X
F.F. EL.: 41.50'
24x36
38
EX. C.B.:
| 40 | GRATE: 38.56' | G | ||||
| X | ||||||
|---|---|---|---|---|---|---|
| INV.: 35.58' | 24 | 15 | 15 | 15 | 15 | 15 |
EX. SAN. C.O.:
UE G G G G
24x36
RIM EL.: 40.28' G 24x36
| G-9 | 39 | INV.: 38.34' |
| EX. S.S. | ||
|---|---|---|
| X | S.S. | |
EX. 1" W UE UT
| EX. | 40 | 24 | ||
| X | ||||
|---|---|---|---|---|
| 24x36 | G-8 | G-10 | 4" S | 24x36 |
X OE 39
T-2 39 EX. C.B.: 24
24x36
X GRATE: 37.44' 24x36
INV.: 33.87' UT PROJECT TITLE
G
G-7 X EX. C.B.:
38
24
GRATE: 37.37'
24x36
X
18'
| TYP. | UE | ||
|---|---|---|---|
| 15 | 15 | 15 | STO |
| C-EX-U-SD-MH-4ID | |||
| INV.: 33.22' | |||
| 24 | 24 | 24 | 24 | 24 |
| UE | WINNER | 24x36 |
9' RM
24x36 OE X
TYP. EX. S.D. M.H.:
RIM: 37.74' 38
UT
SUBARU 24x36
INV.: 33.37' 24
39
T-1
X
| BUILDING | BUILDING | |
|---|---|---|
| 12 | ADDITION | G |
| 24x36 | ||
| X | ||
| (8,817 S.F.) | 24 | |
| ADDITIONS | 24x36 | |
X
UE
UT
24x36 24x36
X
24 38
T-2 XOE
24x36 24x36
24
G
X 1387 N DUPONT HIGHWAY
UT
X
38
CITY OF DOVER
24x36 24x36
KENT COUNTY, DE 24
UE
X EX. BUILDING
SHEET TITLE
W.M. W.V.
T-2
24x36
LANDS N/F 24
24x36
OEX 1387 DUPONT HIGHWAY, LLC
T.P.: 2-05-05700-01-1500-00001
UT
G
SITE AND
G.M.
24x36
X
DEED REF.: 6858-336
| ZONED: C-4 | 24 |
| UTILITY PLAN | 24x36 |
38
38
EX. BUILDING (14,134 S.F.) 5.48 ACRES ± 38
STO
RM
C-EX-U-SD-MH-4ID
15
.
PROPOSED ADDITIONS (12,346 S.F.)
24x36
TOTAL (26,480 S.F.)
UE
. 24x36
15' B.R.L.
UT
OE
G.M. 15' B.R.L. G
24x36 24x36
38
| BUILDING | 38 | |
| 24x36 | ||
|---|---|---|
| ADDITION | UT | 24x36 |
38
(3,336 S.F.)
| "LOVE ENCORE" | 0 | 15 | 30 | 60 |
| PARKING | 37 | UE | ||
| G | LANDS N/F | |||
| 24x36 | 24x36 |
DOVER MALL, LLC
STRIPING & SIGNAGE CONSTRUCTION NOTES BUILDING
38
2-05-05700-01-1400G Do Not Explode - Select Scale
OE DEED REF.: 5880-174
T-1 PROPOSED PAINTED STRIPING - 4" SOLID WHITE LINE (TYP.). ADDITION UT ZONED: SC3 SCALE: 1" = 30' T-2 PROPOSED PAINTED STRIPING - 4" SOLID YELLOW LINES WITH 4" SOLID LINES 45° @ 4' O.C. SPACING. (193 S.F.) PO BOX 6120 24x36
INDIANAPOLIS, IN 46206 EDGE OF EXISTING 24x36
T-3 PROPOSED PROPOSED PAINTED STRIPING 4" SOLID ACCESSIBLE BLUE LINE. 38 ISSUE BLOCK CUSTOMER CUSTOMER CUSTOMER F.H. SWPOZ AREA T-4 PROPOSED PAINTED STRIPING - 4" SOLID ACCESSIBLE BLUE LINES. 45° @ 4' O.C. SPACING. 14' PARKING PARKING PARKING CUSTOMER CUSTOMER PARKING PARKING CUSTOMER CUSTOMER PARKING PARKING CUSTOMER CUSTOMER CUSTOMER
8"W
PARKING PARKING PARKING
T-5 PROPOSED THERMO ACCESSIBLE SYMBOL. PAINTED ACCESSIBLE BLUE. 38 24x36 24x36
38
EX. 6"S
T-6 PROPOSED "ACCESSIBLE HANDICAP PARKING" SIGN. G
W.V. UE
EX. C.B.
UT
EX. 8" W GRATE: 36.02'
S 44° 42' 50" W
37 INV. OUT: 33.42'
EX. 4"S
G-6 G-9 G-2 G-9
G.V.
C-EX-U-SD-MH-4ID
24x36 STO 24x36
RM
| OE | G-1 | G-3 | 37 |
| G-7 | G-10 |
EX. W
| 37 | 37 | ||||||
| G-4 | G-5 | T-3 | T-5 | 37 | 37 | 20' B.R.L. | G |
600.00'
37
24x36
20' B.R.L. T-4 24x36
NOTE: ALL SIGNAGE FOR THE SITE IS SUBJECT TO THE SIGN PROVISIONS OF ZONING ORDINANCE ARTICLE 5, SECTION 4 AND 9' 18' W.V.
| 13 | F.H. | ||
| SUBJECT TO A SEPARATE SIGN PERMIT APPLICATION SUBMISSION. (EXCLUDES ROAD SIGNS) TYP. TYP. G 37 T . | |||
|---|---|---|---|
| 37 | 1 | . | |
| 24x36 | |||
| W.V. | |||
| F.H. | |||
| EX. 10"S | |||
| W.V. | 15 | 15 | 15 |
| EX. 10"S | |||
| T | EX. 12" W | ||
| EX. 10"S | |||
| MARK | DATE | ||
| . | |||
| DESCRIPTION | |||
| 24x36 | |||
GENERAL CONSTRUCTION NOTES W.V. EX. 12" W EX. 12" W N 47° 35' 10" W W.V. W.V. 241.15' FIRC EX. 10"S C-PR-SITE-C-NOTES.DWG LAYER STATE: C-201 W.V. FPK N 47° 35' 10" W 159.03' 37 G-1 24 24
| PROPOSED CONCRETE PAVERS WITH 1'X1' JOINT PATTERN. | PROJECT NO.: | 2026070.00 | |||||||||||
| 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 |
| 37 | C-EX-U-SD-MH-4ID |
24
G-2
| 24 | 24 | STO | ||||||||||||
| 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 |
PROPOSED SIDEWALK WITH RECESSED IN-GRADE LIGHT. SIDEWALK TO BE FLUSH WITH PAVEMENT AT ADA RAMP LOCATION. RM
| 24 | 24 | 24 | 24 |
| 24x36 | 24x36 |
37 37 G-3 PROPOSED PYLON SIGNAGE. SIGN DETAIL TO BE PROVIDED BY OWNER. EX. C.B. DATE: 08/07/2026 EXISTING VARIABLE WIDTH T-6 S 42° 24' 50" W GRATE: 36.84' EX. ROW (VARIES) G-4 PROPOSED ELECTRIC VEHICLE CHARGING STATION. EX. C.B. PERMANENT EASEMENT EX. C.B. 4.50' INV. OUT: 32.24' EX. CURB EX. C.B. SCALE: 1" = 30' G-5 PROPOSED LANDSCAPING. SEE LANDSCAPE PLANS. GRATE: 36.80' FOR THE STATE OF DELAWARE GRATE: 36.00' EX. SAN. MH. 15
GRATE: 37.05'
± 39.2' 51.50'
DRAWN BY: A.J.S. PROJ. MGR.: M.J.H.
24x36
INV. OUT: 33.15' 24x36
G-6 PROPOSED CANOPY LIMITS. BK: 6858 PG: 336 INV. OUT: 33.90'
NORTH DUPONT HWY (U.S. RT 13) RIM EL.: 36.76'
INV. IN: 29.31'
INV. OUT: 31.53'
| G-7 | PROPOSED PARKING BUMPER (TYP.). | EX. SAN. MH. | NORTHBOUND LANES | INV. OUT: 29.21' | SHEET |
|---|---|---|---|---|---|
| RIM EL.: 36.32' | |||||
| G-8 | PROPOSED DUMPSTER ENCLOSURE. | INV. IN: 30.67' | EDGE OF EXISTING | RIGHT OF WAY VARIES | 15 |
24x36
G-9 G-10 PROPOSED P.C.C. CONCRETE CURB (DELDOT TYPE 1-6). PROPOSED BITUMINOUS PAVEMENT. INV. OUT: 29.77' SWPOZ AREA G G C-201 COPYRIGHT 2023 24x36
181 F:\Projects\2026\202607000\10_Civil\DWG\2026070-SITE-C3D21.dwg, Aug 04, 2026 - 3:53pm
24x36 24x36
2026-08-04
Page 182
24x36 24x36
UE Item 4.
SITE DATA SET ROOT BALL 2" ABOVE CANVAS WEBBING OR
24x36
GRADE. REMOVE EXCESS PLASTIC HORTICULTURAL LANDS N/F UT 24x36
- 1.OWNERS OF RECORD: 1387 DUPONT HIGHWAY, LLC SOIL ON TOP OF THE TAPE. DO NOT STRETCH. DOVER MALL, LLC 1300 N UNION ST BALL, JUST EXPOSING X 7 2-05-05700-01-1400 10 10 WILMINGTON, DE 19806 THE ROOT FLARE. DEED REF.: 5880-174 X TO ZONED: SC3 TT TO 24x36 302-656-4000 X PO BOX 6120 24x36
- 2.ENGINEER / SURVEYOR: BECKER MORGAN GROUP INC. INDIANAPOLIS, IN 46206 G X UTE 309 S. GOVERNORS AVENUE U DOVER, DE 19904 24x36 302-734-7950 X 24x36
MULCH - PLACE 3" 2"x2" WOODEN 40 3. PROPERTY MAP NUMBER: 2-05-05700-01-1500-000 UT LAYER OF SPECIFIED STAKES. DRIVE 4. DEED SUMMARY: DEED BOOK: 6858 PAGE: 336 X UE MULCH. DO NOT PLACE SECURELY INTO 24x36 5. TOTAL SITE AREA: 5.48 ACRES ± IN CONTACT WITH TREE GROUND. 3 PER ARCH I T E C TURE 24x36
- 6.ZONING CLASSIFICATION: EXISTING: C4 (HIGHWAY COMMERCIAL) TRUNK. KEEP MULCH TREE. X
SWPOZ TIER 3 (SOURCE WATER PROTECTION OVERLAY ZONE) WEEDED AND REPLACE 30' B.R.L. 30' B.R.L. ENG I NE E R I NG AS NEEDED. G 7. SETBACKS: C4 (HIGHWAY COMMERCIAL) FINISHED FRONT: 20 FT. GRADE X Delaware 24x36
UT 24x36
SIDE: 15 FT. X 309 South Governors Avenue REAR: 30 FT. (BUILDING HEIGHT) 39 Dover, DE 19904 MAX BLDG HEIGHT: 6 STORIES / 75 FT. 302.734.7950 MAX LOT COVERAGE: N/A X 24x36
The Tower at STAR Campus 24x36
| SWPOZ TIER 3 (SOURCE WATER PROTECTION OVERLAY ZONE) | UE | ||||
|---|---|---|---|---|---|
| MAX LOT COVERAGE: 30% | |||||
| 15 | 15 | 15 | 15 | 15 | 15 |
| 100 Discovery Boulevard, Suite 102 | |||||
| X | |||||
| Newark, DE 19713 | |||||
| 8. PRESENT USE: CAR DEALERSHIP UT | |||||
| 24x36 | |||||
| PROPOSED USE: | CAR DEALERSHIP | REMOVE TOP 1/3 OF BURLAP. | SOIL MIXTURE - CONSISTING OF | 15 | |
| G | 302.369.3700 | 24x36 | |||
CUT & REMOVE ALL STRAPPING, 1/4 HUMUS AND 3/4 TOPSOIL X
15 LANDS N/F Maryland ROPES, AND WIRE CAGES. DOVER MALL, LLC 40 2-05-05700-01-1400 312 West Main Street, Suite 300 15' B.R.L. GENERAL LANDSCAPE NOTES : UNDISTURBED SOIL X 40 DEED REF.: 5880-174 Salisbury, MD 21801 24x36 15 ZONED: SC3 24x36
PO BOX 6120 410.546.9100 15' B.R.L. 15
- 1.QUALITY AND SIZE OF PLANTS, SPREAD OF ROOTS, AND SIZE OF BALLS SHALL BE IN ACCORDANCE WITH THE X INDIANAPOLIS, IN 46206 North Carolina C-EX-U-SD-MH-4ID C-EX-U-SD-MH-4ID
STO STO RM RM
CURRENT STANDARDS OF THE AMERICAN ASSOCIATION OF NURSERYMEN "AMERICAN STANDARDS FOR UT 24x36 NURSERY STOCK." EVERGREEN TREE PLANTING DETAIL X UE 3333 Jaeckle Drive, Suite 120 24x36
EVERGREEN TREES SHALL HAVE A FULL, WELL-BRANCHED, CONICAL FORM TYPICAL OF THE SPECIES. 15 Wilmington, NC 28403 NO SCALE BMG NO. : L-02 G X 910.341.7600 24x36 PLANT MATERIALS DELIVERED TO THE SITE IN UNCOVERED TRUCKS WILL BE REJECTED. LEGEND www.beckermorgan.com 24x36
UNACCEPTABLE PLANT MATERIALS: MATERIALS WHICH HAVE DAMAGED OR CROOKED LEADERS, DEFORMED ITEM SYMBOL X 15
UT GROWTH HABIT, ABRASIONS OF THE BARK, SUN SCALD, WINDBURN, DISFIGURING NOT COMPLETELY CALLUSED WILL BE REJECTED. IN ADDITION, TREES HAVING THEIR CENTRAL LEADERS HEADED BACK WILL ALSO BE EXISTING X 24x36
REJECTED. PLANTS WITH LOOSE OR CRACKED ROOT BALL OR CONTAINERS WILL BE REJECTED. TREE TO 24x36
15
REMAIN (53) X
- 2.ALL PLANTS SHALL BE PLANTED IN TOPSOIL THAT IS THOROUGHLY WATERED AND TAMPED AS BACKFILLING UE 40 39 PROGRESSES. NOTHING BUT SUITABLE TOPSOIL, FREE OF DRY SOD, STIFF CLAY, LITTER, STONES IN EXCESS OF G 40 24x36 ONE (1) INCH DIAMETER, ETC. SHALL BE USED FOR PLANTING. X 24x36
15 15 15 15 15 UT MULCH FOR PLANTING BEDS SHALL BE SHREDDED HARDWOOD BARK MULCH UNLESS OTHERWISE SPECIFIED ON X THE PLANS AND SHALL HAVE NO LEAVES, YOUNG GREEN GROWTH, BRANCHES, TWIGS, GREATER IN DIAMETER OF ½", WEEDS, SHAVINGS OR FOREIGN MATERIAL SUCH AS STONES, ETC. SHALL BE MIXED WITH THE MULCH. C-EX-U-SD-MH-4ID C-EX-U-SD-MH-4ID
C-EX-U-SD-MH-4ID
C-EX-U-SD-MH-4ID
C-EX-U-SD-MH-4ID
STO STO RM
24x36 STO 15 15 15 15 15 15 STO
RM RM STO 24x36
RM RM
ALL SHRUB MASSES SHALL BE PLANTED IN CONTINUOUS MULCHED BEDS WITH A LIGHTLY COMPACTED DEPTH X
OF THREE (3) INCHES. ALL CONTAINER PLANTS ARE TO HAVE ROOTS CUT ON FOUR SIDES AND/ OR SPREAD OUT IN NEW SOIL MIXTURE. X 15 24 15
24x36
39 UE 24x36
- 3.ALL AREAS NOT STABILIZED IN PAVING OR PLANT MATERIALS SHOULD BE SEEDED AND MULCHED. (SEE EROSION UT G & SEDIMENT CONTROL PLAN AND NOTES.) X 24 15 15
- 4.LANDSCAPE BEDS NOT DEFINED BY CURBS, SIDEWALKS, WALLS OR OTHER STRUCTURES SHALL BE ENCLOSED 24x36
OE X
EX. W
24x36
41
BY ALUMINUM EDGING UNLESS OTHERWISE INDICATED.
- 5.AREAS DISTURBED BY LANDSCAPE OPERATIONS SHALL BE GRADED TO MATCH EXISTING TOPSOIL AND SEED OR X 24
SOD AS REQUIRED.
15
15
UT
24x36
LANDS N/F 24x36
| STATE OF DELAWARE | X | ||
|---|---|---|---|
| 6. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO UTILITIES AND MAY MAKE MINOR ADJUSTMENTS IN 2-05-05700-01-1300 | |||
| SPACING AND/OR LOCATION OF PLANT MATERIALS. CONTRACTOR TO VERIFY "AS BUILT" LOCATION OF ALL DEED REF: Q25-190 41 40 24 | |||
| G | |||
| UTILITIES. | ZONED: IO | X | 15 |
| UE | 41 | 15 | |
| UE | |||
| 24x36 | |||
| PO BOX 778 | 24x36 | ||
DOVER, DE 19903 7. NO PLANT, EXCEPT GROUNDCOVERS, SHALL BE WITHIN THREE (3) FEET FROM SIDEWALKS. 40
| X | EXISTING BUILDING | ||
|---|---|---|---|
| UT | |||
| . | |||
| OE | UE | 2,976 S.F.± FOOTPRINT | 24 |
- 8.NO TREE SHALL BE PLANTED CLOSER THAN TEN (10) FEET FROM ANY STRUCTURE OR BUILDING. 15 15
24x36 X
F.F. EL.: 41.50'
38
N 24x36
- 9.NO TREE SHALL BE PLANTED WITHIN TEN (10) FEET OF UNDERGROUND UTILITIES OR FIRE HYDRANTS. 40 G X 24 15 15 15 15 15
- 10.ONLY TREES THAT REACH A HEIGHT AND SIZE AT MATURITY OF SMALL TO MEDIUM SHALL BE PLANTED UNDER UE G G G G 24x36
POWER LINES. G 24x36
X 39
EX. 1" W
UE 11. THE CONTRACTOR SHALL WATER ALL PLANTS THOROUGHLY TWICE DURING THE FIRST 24-HOUR PERIOD UT 40 AFTER PLANTING, AND THEN WEEKLY OR MORE OFTEN, IF NECESSARY, DURING THE FIRST GROWING SEASON, 24 X 24x36 UNLESS THE OWNER AGREES TO MAINTAIN AND WATER THEM. 4" S 24x36
X OE 39 12. TREES TO REMAIN ON-SITE SHALL BE PROTECTED WITH SNOW FENCE DURING CONSTRUCTION (SEE DETAIL). SNOW FENCING TO BE MAINTAINED DURING CONSTRUCTION BY CONTRACTOR. 39 24
X
24x36 24x36
- 13.THE PLANTING PLAN SHALL TAKE PRECEDENCE OVER THE PLANT SCHEDULE SHOULD ANY PLANT QUANTITY UT PROJECT TITLE G DISCREPANCIES OCCUR. X 38 24
24x36
14.
15. NO SUBSTITUTIONS SHALL BE MADE WITHOUT APPROVAL OF THE OWNER AND/ OR THE LANDSCAPE ARCHITECT.
ALL NEW TREES SHALL BE GUARANTEED TO SURVIVE FOR ONE FULL YEAR AFTER INSTALLATION (FULL COST).
| X | UE | ||
|---|---|---|---|
| 15 | 15 | 15 | STO |
| RM | |||
| C-EX-U-SD-MH-4ID | |||
| 24 | 24 | 24 | 24 | 24 |
| UE | WINNER | 24x36 |
24x36 ALL STAKES AND GUYS SHALL BE REMOVED FROM TREES AND SITE AS EARLY AS THREE (3) MONTHS, BUT NO LONGER THAN ONE (1) YEAR AFTER PLANTING. OE X 38 24 UT SUBARU 24x36
TREE PRESERVATION & DENSITY REQUIREMENTS
| 39 | X | |
| BUILDING | BUILDING | |
| 12 | ADDITION | G |
| 24x36 | ||
|---|---|---|
- 1.EXISTING WOODLAND AREA : 0 S.F. X (8,817 S.F.) 24 ADDITIONS 24x36
- 2.WOODLANDS TO BE CLEARED : 0 S.F. X UE UT 24x36
- 3.TOTAL WOODLANDS REMAINING : 0 S.F. X 24 38 24x36
- 4.TOTAL NON-WOODLAND AREA : 238,708 S.F. XOE
24x36
5. DENSITY : 1 TREE PER 3,000 S.F. OF LOT AREA 24
24x36
G 238,708 / 3,000 S.F. / TREE = 79.57 80 TREES REQUIRED X 1387 N DUPONT HIGHWAY UT 6. EXISTING TREES TO BE RETAINED : 53 TREES X 38 CITY OF DOVER 24x36 24x36
KENT COUNTY, DE 24
- 7.PROPOSED TREES : 27 TREES UE X EX. BUILDING
- 8.TOTAL TREES : 80 TREES SHEET TITLE W.M. 24x36
LANDS N/F 24
24x36
OEX 1387 DUPONT HIGHWAY, LLC
T.P.: 2-05-05700-01-1500-00001
UT
G
LANDSCAPE PLAN
24x36
X
DEED REF.: 6858-336
| ZONED: C-4 | 24 |
| . | 24x36 |
38
38
EX. BUILDING (14,134 S.F.) 5.48 ACRES ± 38
STO
RM
C-EX-U-SD-MH-4ID
15
.
PROPOSED ADDITIONS (12,346 S.F.)
24x36
TOTAL (26,480 S.F.)
UE
. 24x36
15' B.R.L.
UT
OE 15' B.R.L. G
24x36 24x36
38
| BUILDING | 38 | |
| 24x36 | ||
|---|---|---|
| ADDITION | UT | 24x36 |
38
(3,336 S.F.)
| "LOVE ENCORE" | 0 | 15 | 30 | 60 |
| PARKING | 37 | UE | ||
| G | LANDS N/F | |||
| 24x36 | 24x36 |
DOVER MALL, LLC
BUILDING 2-05-05700-01-1400
G Do Not Explode - Select Scale
38 DEED REF.: 5880-174
OE ADDITION SCALE: 1" = 30'
UT
ZONED: SC3
24x36
(193 S.F.) PO BOX 6120
24x36
INDIANAPOLIS, IN 46206 38 ISSUE BLOCK DELAWARE LANDSCAPE ARCHITECTS CERTIFICATION CUSTOMER CUSTOMER PARKING PARKING CUSTOMER PARKING CUSTOMER CUSTOMER PARKING PARKING CUSTOMER CUSTOMER PARKING PARKING CUSTOMER CUSTOMER CUSTOMER
8"W
| PARKING | PARKING | PARKING | |
|---|---|---|---|
| 38 | |||
| 24x36 | I, CHAD D. CARTER, RLA, ASLA, HEREBY CERTIFY THAT I AM A | 38 | 24x36 |
EX. 6"S LANDSCAPE ARCHITECT IN THE STATE OF DELAWARE, THAT THE G UE LANDSCAPING INFORMATION SHOWN HEREON HAS BEEN PREPARED UT
EX. 8" W UNDER MY SUPERVISION AND TO MY BEST KNOWLEDGE AND BELIEF, 37
EX. 4"S
24x36
REPRESENTS GOOD LANDSCAPING PRACTICES. STO
RM
C-EX-U-SD-MH-4ID
24x36
OE 37
EX. W
| 37 | 37 | ||
| 37 | 37 | 20' B.R.L. | G |
| 37 | |||
|---|---|---|---|
| 24x36 | |||
20' B.R.L. 24x36
13
| G | 37 | T | . |
| 37 | . | . | |
| 24x36 | |||
|---|---|---|---|
EX. 12" W
EX. 10"S
EX. 12" W
15 15 15
EX. 10"S
T EX. 12" W
MARK DATE
.
DESCRIPTION
24x36
| CHAD D. CARTER, RLA, ASLA | S1-499 | DATE | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| EX. 10"S | |||||||||||||
| LAYER STATE: L-101 | |||||||||||||
| 24 | |||||||||||||
| 37 | |||||||||||||
| PROJECT NO.: | 2026070.00 | ||||||||||||
| 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 |
| 37 | C-EX-U-SD-MH-4ID | ||||||||||||
| 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | 24 | STO |
| 24 | 24 | 24 | 24 | 24 | 24 |
PLANT LIST RM
24x36 24x36
| 37 | 37 | |||||||||
| DATE: | 08/06/2026 | |||||||||
| EXISTING VARIABLE WIDTH | EX. ROW (VARIES) | |||||||||
| KEY | QUANTITY | BOTANICAL NAME | COMMON NAME | SIZE | ROOT | REMARKS | PERMANENT EASEMENT | EX. CURB | SCALE: | 1" = 30' |
| FOR THE STATE OF DELAWARE | 15 |
± 39.2'
EVERGREEN TREES
DRAWN BY: A.J.D. PROJ. MGR.: M.J.H.
24x36 24x36
| TO | 17 | THUJA OCCIDENTALIS 'EMERALD GREEN' | EMERALD GREEN ARBORVITAE | 5' - 6' HGT | B&B | FHV | |||
| BK: 6858 PG: 336 | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| NORTH DUPONT HWY (U.S. RT 13) | |||||||||
| NORTHBOUND LANES | SHEET | ||||||||
| TT | 10 | THUJA OCCIDENTALIS 'TECHNY' | TECHNY ARBORVITAE | 5' - 6' HGT | B&B | FHV | EDGE OF EXISTING | RIGHT OF WAY VARIES | 15 |
24x36
TOTAL: 27 EVERGREEN TREES
SWPOZ AREA
G G
L-101
COPYRIGHT 2026
24x36
182 F:\Projects\2026\202607000\10_Civil\DWG\2026070-LSCAPE-C3D21-DE.dwg, Aug 06, 2026 - 9:48am
24x36 24x36
2026-08-06
Page 183
Item 4.
183
Page 184
Item 4.
184
Page 185
Item 4.
185
Page 186
Item 5.
City of Dover
DATA SHEET FOR SITE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF: September 9, 2026
PLANNING COMMISSION MEETING OF: September 21, 2026
Plan Title: William Henry Campus Improvements at 65 Carver Road
S-26-14
Plan Type: Site Development Plan
Location: North of Forest Street, East of Saulsbury Road, and Northeast of Carver Road. Address: 65 Carver Road, Dover, DE, 19904 Tax Parcel: ED-05-076.07-01-55.00-000
Owner: Dover Special School District (Capital School District)
Property Area: 45.46 acres +/- (1,980,675 SF +/-) Project Area: 18.2 acres +/- (802,376 SF +/-)
Zoning: IO (Institutional and Office Zone)
COZ-1 (Corridor Overlay Zone)
Previous Use: Education Campus: Middle School, Community School and Elementary School
Proposed Use: Education Campus: Elementary School and Community School with intensive learning center
Building Area: 73,100 +/- SF – Booker T. Washington Elementary (To Remain) 172,184 +/- SF – William Henry Middle School (To be Removed) 31,802 +/- SF – Kent County Community School (To Remain) 33,778 +/- SF – Kent County Community School (Proposed Addition) 81,362 +/- SF – Kent County Intensive Learning Center (Proposed) 1,350 +/- SF – Geothermal Head House (Proposed) 223,712 +/- SF – Overall Buildings on Site
Off Street Parking: Required – 498 spaces Including – 9 ADA spaces Proposed – 393 spaces Including – 28 ADA spaces
Bicycle Parking Spaces: Required – 25 spaces
Proposed – 4 spaces
Waiver Request: Partial Elimination of Upright Curbing.
Reduction of Parking Requirement
- P.O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 186
Page 187
Item 5.
City of
Dover
CITY OF DOVER Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: September 9, 2026
APPLICATION: William Henry Campus Improvements at 65 Carver Road
FILE #: S-26-14 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Christopher Salzano, AICP, Planner II
PHONE #: (302) 736-7196
- I.PLAN SUMMARY This is a review of a Site Development Plan for the demolition of an existing 140,382 SF school buildings (William Henry) and portion of the Kent County Community School (KCCS) and construction of a new 81,362 SF Kent County Secondary Intensive Learning Center, a 36,098 SF Addition for KCCS and a head house associated with the new geothermal system. The proposal also includes site work consisting of a new bus and parent dropoff/pickup loops, parking lots, vehicular and pedestrian circulation, and a geothermal system field. The property is zoned IO (Institutional and Office Zone) and also partly subject to the COZ-1 (Corridor Overlay Zone). The Owner of record is Dover Special School District (Capital School District). The Property consists of 45.46 Acres. The Property is located on the north side of Forest Street and east of Carver Road. Property Address: 65 Carver Road, Dover, DE. Tax Parcel: ED-05-076.07-01- 55.00-000. Council District 4.
II. PROJECT DESCRIPTION
The subject property is located at 65 Carver Road, on a 45.46 +/- acre parcel (ED-05-076.07-01- 55.00-000) known colloquially as the William Henry Campus. Currently, the project site is home to three school buildings, the Booker T. Washington Elementary School, the William Henry Middle School, and the Kent County Community School (KCCS). The parcel is located north of Forrest Street, east of Saulsbury Road and south of the Clara Street Extension. This project is located on the northern portion of the campus above the existing boulevard drive aisle that spawns from Carver Road to Weston Drive.
The development area for this project consists of an 18.2 +/- acre portion of the campus positioned east of the Regional Bus Lot established by Site Development Plan S-24-17, and north of the boulevard drive aisle established as part of Site Development Plan S-11-23 which also expanded the Booker T. Washington Elementary School. This Site Development Plan will not impact the configuration south of the boulevard drive aisle, or of the Booker T. Washington School Building.
The project proposes the demolition of William Henry Middle School Building, which is currently not serving students. It further proposes the demolition of bus loops and parking associated with the Middle School Building. The Plan proposes the preservation of the existing KCCS school building and constructing a 33,778 SF Addition to the structure. This would bring the total size of the KCCS Building to 67,900 SF. The plan proposes the construction of a new Kent County School Intensive Learning Center (KCS ILC) which is a partial two-story building totaling 81,362 SF. 187
Page 188
Item 5.
S-26-14 William Henry Middle School Campus Improvements
DAC Report of September 2, 2026
Site improvements include: - A new access drive, which is accessed from Carver Road, leads up to a new 106-space parking field, and the bus drop-off/pick-up loops for the KCS ILC and KCCS. - New parent drop-off loops which take access from the existing boulevard drive aisle and terminate north near their respective buildings. - Three new parking fields totaling 283 new parking spaces, two parking fields are located south of the proposed KCS ILC and one is located north of the KCS ILC. - A new geothermal field and associated headhouse. - Improved and enlarged stormwater management ponds. - Site landscaping for the northern portion of the campus. - Sidewalk Network with crosswalks throughout the site, as required by City Code.
Surrounding Land Uses: The adjacent properties to the south are zoned along Forest Street are zoned C-PO (Commercial and Professional Office Zone), RG-1 (General Residence Zone), and IO (Institutional and Office Zone), with their uses ranging from residences to businesses. Along Carver Road to the south and west, the properties are zoned C-2A (Limited Central Commercial Zone), C-1A (Limited Commercial Zone), and C-PO, some of which serve as residences and others as businesses. Along the western side of the property from Carver Road to Clara Street Extension, the properties are zoned C-PO, C-2A, C-3 (Service Commercial Zone) and IO, these properties are either used as businesses, residences, or are part of the Capital School District and used as open space. To the north, the properties are zoned C- PO or IPM (Industrial Park Manufacturing Zone), and all are business uses. To the east the properties are zoned IPM, M (Manufacturing Zone), and C-2A all serving as businesses.
III. ZONING REVIEW
IO Zoning District The property is zoned IO (Institutional and Office Zone) and is subject to the regulations of Zoning Ordinance, Article 3 §10, Article 4 §4.15, and Article 5 §8.1 as a non-residential lot development. Additionally, Site Development Plan approval in accordance with article 10, section 2 shall be required prior to the issuance of Building Permits for the erection or enlargement of all structures and prior to the issuance of Certificates of Occupancy for any change of use in this zone. Permitted uses within this zoning district (Article 3 §10.d) include: Public and institutional uses including hospitals, medical clinics, libraries, police stations, courthouses, transit centers, schools, colleges, universities, places of public assembly, philanthropic and charitable institutions, parks, playgrounds, public indoor recreation centers, athletic fields.
The use of schools is specifically listed in the IO Zone as a permitted use; therefore, the proposed use is consistent with the Zoning Ordinance. COZ-1 (Corridor Overlay Zone 1) The Corridor Overlay Zone 1 is established for the following specific reasons: (a) To promote superior urban corridor development and the highest quality built environment; (b) To foster coordination and linkage among corridor properties and with adjacent lands; (c) To preserve the functionality and efficiency of the roadway for traffic movement; and (d) To achieve a visually balanced streetscape environment which is friendly to the pedestrian and motorist alike.
188
Page 189
Item 5.
S-26-14 William Henry Middle School Campus Improvements
DAC Report of September 2, 2026
The southern and westernmost sides of the property are encumbered by the Corridor Overlay Zone 1, however the portion of the site where this project takes place is not encumbered by it. Therefore, this project does not need to conform to the requirements of the COZ-1. Therefore, this proposal is consistent with the Zoning Ordinance.
IV. PARKING SUMMARY
The Plan submittal shows the demolition of 154 parking spaces currently located in the project area. The project overall proposes a complete parking renovation for the northern area of the campus. Starting from the north, above the KCS ILC and taking access from the new drive from Carver Road, the plan proposes a 106-space parking field, and a smaller 6-space parking area in the KCCS bus loop. Another large parking lot is proposed south of the KCS ILC, and north of the boulevard drive aisle taking access from the parent drop-off loops consisting of 153 parking spaces. An additional smaller parking lot is proposed south of the KCCS Addition, taking access from the KCCS Parent Drop-Off loop, and totaling 18 parking spaces. Between all of the proposed parking, there is a total of 22 ADA spaces, 16 located in the southern two parking lots, and 6 between the two northern areas.
The City of Dover Zoning Ordinance Article 4, Section 4.15 specifies how parking should be calculated in the IO Zone (Institutional and Office Zone). And while educational uses such as high schools, colleges, elementary and middle schools are covered as uses in the Zoning Ordinance under Article 6 Section 3; however, additional information in order to utilize these calculations which could potentially reduce the parking required on site was needed. The Planning Office has calculated the parking requirements based on the more restrictive calculations under Article 4 Section 4.15 which require 1 parking space for every 300 square feet of floor area.
Using the parking calculation specified by the Zoning Ordinance under Article 4, Section 4.15 the parking breakdown that should be shown on site is as follows:
- •KCCS: 67,900 SF – requires 227 parking spaces.
- •KCS ILC: 81,362 SF – requires 272 parking spaces
- •Existing parking for Booker T. Washington has 110 parking spaces
- •Planned Regional Bus Lot is 76 spaces for cars, 76 for buses
- •Total shown should be 761 Parking spaces including the parking at the bus lot
Waiver Request: Reduction of Parking Requirement The Applicant has requested a parking waiver from the required 504 parking spaces to 283 parking spaces which have been provided on the northern portion of the campus. This reduction represents a 221-space, 44% reduction in overall required site parking for the northern area. Their reasoning is that these specialized educational facilities will primarily need to accommodate the parking needs of staff, faculty, and limited visitors. There will be no public rentals, or public use of these buildings outside of students, faculty, staff, and some limited visitors.
189
Page 190
Item 5.
S-26-14 William Henry Middle School Campus Improvements
DAC Report of September 2, 2026
Bicycle Parking Bicycle parking is required by the Zoning Ordinance, Article 6 Section 3.10. The minimum bicycle parking requirement is one (1) for every twenty (20) vehicle parking spaces. Sheet SP- 01 includes a bicycle parking calculation which bases the required bicycle parking on 283 vehicle parking spaces stating a requirement of 15 bicycle spaces. Sheet SP-01 has been revised since DAC to show 16 proposed parking spaces. The Applicant has provided 5 parking spaces between KCCS and its addition, between the Parent and Bus Pick-up/drop-off loops. The Applicant has also provided an additional 11 bicycle spaces adjacent to the main entrance of the KCCS ILC, just north of the Parent drop-off/pick-up loop. The Applicant is providing more bicycle parking spaces than required.
- V.SITE CONSIDERATIONS Access Vehicular access to the KCS ILC building is provided by a drive aisle off Carver Road. There is additional access to the KCS ILC Building and KCCS Addition provided by two drive aisles, taking access from the boulevard drive aisle. The boulevard drive aisle is an interior connector and is not a publicly operated or named street. The 30-foot-wide drive aisles connect to the parent drop off loops and approximately 171 parking spaces south of the KCS ILC Building and KCCS addition. The drive aisle taking access from Carver Road provides access to the two bus drop-off loops, and the 106 parking spaces proposed north of the KCS ILC building. The sidewalk network with crosswalks throughout the site is proposed across the various drive aisles and drop-off loops, equipped with ramps and ADA early warning detection pads providing clear and safe access from all parking fields to buildings throughout the campus.
Sidewalk Sidewalks are required along all private street frontages, between parking areas, building entrances and other site features requiring pedestrian access. The Plan notes a sidewalk network throughout the site, connecting parking lots and buildings to one another along the internal drive aisles. The plan shows sidewalks along the exterior of all proposed major parking lots, leading to the building entrances of both KCCS and the proposed KCS ILC. The Plan also shows an additional sidewalk across the front of the small parking lot in the proposed KCCS bus drop-off loop to the entrances of both the KCCS and ILC, which integrates into the greater site sidewalk network. The proposed sidewalk network has two proposed crossings at the boulevard drive aisle between the project area and Booker T. Washington Elementary School which links the rest of the site together. The site sidewalk network also connects to an existing sidewalk network on Carver Road and Forest Street.
Lighting Article 5 §7.1 stipulates that lighting shall provide no less than 1.5 foot-candles at grade. Light shall also be deflected away from adjacent residential areas and shall not be distracting to traffic on adjacent roads. Information on the lighting scheme was not provided, lighting fixtures are shown however footcandle calculations are not therefore staff cannot determine if these regulations are being met.
Dumpsters The Zoning Ordinance, Article 5 §6.1 stipulates the regulations regarding the required number of dumpsters and the associated placement and screening requirements thereof. Article 5 §6.11 specifically notes the following: 190
Page 191
Item 5.
S-26-14 William Henry Middle School Campus Improvements
DAC Report of September 2, 2026
6.11 Location and screening required. All dumpsters must be located in approved locations on the lot. Dumpsters must be placed on hard, paved, dust-free surfaces and may not be placed in designated parking spaces, fire lanes, or access ways. Outside storage of trash, cardboard, or shipping pallets is prohibited. A dumpster enclosure is required to screen the dumpster from view whenever these units are situated so that they will be visible from any public right-of-way or from an adjacent property.
The Zoning Ordinance goes on in Article 5 §6.12 to note that non-residential uses provide a minimum of two (2) dumpsters per property. The applicant has proposed a dumpster enclosure for the KCS ILC building on the southeastern façade of the building, adjacent to the proposed utility area. There are also 2 dumpsters in an enclosure at the northeast corner of the existing KCCS Building.
Curbing Waiver Request: Partial Elimination of Upright Curbing The use of 6-inch upright curbing for parking lots and drive aisles is a requirement stipulated in Article 6 §3.6(b) of the Zoning Ordinance. The Site Plans submitted note there is 6-inch upright curbing to be provided along the upstream portions of the parking and drive aisles. The applicant has submitted an upright curbing waiver, requesting to replace downstream curbing with flush curbing to allow for sheet flow of water onto grass and into stormwater management areas. The applicant has not clearly indicated on the site plan where they intend this flush curbing to be; however, waivers to allow for sheet flow into stormwater management spaces have been granted before.
Flood Hazard Area The Zoning Ordinance, Article 5 §11.21 requires that Special Flood Hazard Areas (100-year floodplain) remain as open natural areas with no impervious surfaces. None of the William Henry Campus property is within the floodplain. This property is found on the FEMA FIRM Panel of Kent County Delaware Map Number 10001C0166H effective date May 5, 2003.
VI. BUILDING ARCHITECTURE
Conceptual Renderings and Exterior Elevation Drawings were submitted for the proposed Facilities. The buildings are proposed as rectilinear structures, the one-story with mechanical mezzanine KCCS Addition is more rectangular while the 2-story KCS ILC building is proposed in an irregular shape. The exterior of both buildings is proposed to be primarily of masonry work, with metal panel assemblies to accent the masonry work. The brickwork is in a variety of tan and gray tones, while the metal cladding is a combination of horizontal gray and vertical blue panels.
The KCCS Addition is dominated primarily by the darker neutral color brick and glazing on the bottom, while the gray and black metals dominate the upper portion of the structure. The East elevation shows a series of doors, and the west elevation shows the main entrance to the building. The KCS ILC Building is dominated largely by glass, with a mix of gray and tan brickwork for the lower portion of the building with more gray and black metals towards the upper portions of the façade. The ILC northern elevation shows a series of bay doors, with the southeast elevation showing another series of doors and the south elevation showing the main entrance. 191
Page 192
Item 5.
S-26-14 William Henry Middle School Campus Improvements
DAC Report of September 2, 2026
Both buildings’ primary entrances feature a prominent design proposed to be on the brickwork. Of the two, the KCS ILC building is visible from the street, specifically Carver Road. Any signage or logos visible from a public right-of-way must be approved as part of a Sign Permit and cannot be erected or placed prior to receiving one.
VII. TREE PLANTING AND LANDSCAPE PLAN
Woodland The Zoning Ordinance, Article 5 §16.2 defines Woodland as follows: Woodland. An area of contiguous wooded vegetation (7,500 square feet or greater), where trees exist at a density of at least one tree with a caliper dimension of six inches or greater per 375 square feet of land and where the tree branches form a contiguous canopy.
The Landscape Plan provided by the Applicant notes that there is approximately 12,632 SF of woodland in the site development area and to the northeast of the KCCS Building. Therefore, a Tree Preservation and Selective Clearing Plan for any cleared woodlands is required; however, the applicant has indicated they are not intending on disturbing the woodland area.
Tree Planting Article 5 §16.62 of the Zoning Ordinance specifies that new tree plantings should be provided at a rate of density no less than one (1) tree per 3,000 SF of non-woodland area. The total site Development Area has been identified by the Applicant as being 14.6 +/- AC (635,976 +/- SF) the format of this Development Area was discussed and authorized by Planning Staff. The defined area removed the existing KCCS building area and the proposed geothermal field. The required number of newly planted trees would be 212 trees.
The Plan submitted notes that 222 trees are required as part of the project and 222 are being provided as part of the project with 14 of them being street trees located along Carver Road. The Landscape Plan Sheets LP-02 to LP-04 show placement of ornamental deciduous and evergreen trees. Sheed LP-05 is referenced but not included in the set. The tree list, or a planting table is likely on the plan sheet LP-05 so Planning cannot verify what the species the trees are intended to be. The applicant also has multiple trees that are within 10 feet of utility lines which will need to be relocated.
As all required trees are being planted on the campus, in the site development area and immediately surrounding the development site, tree mitigation is not technically required; however, the Planning Commission should consider the tree planting strategy in their review of the plan.
VIII. CITY AND STATE CODE REQUIREMENTS:
The subject proposal has been reviewed for Code compliance, plan conformity, and completeness in accordance with this agency’s authority and area of expertise. The following items have been identified as elements which need to be addressed by the applicant:
- 1)A parking calculation in the form of a narrative was provided and includes a waiver request for the reduction of the parking requirement.
- 2)Provide bicycle parking, based on the new parking calculation and the requirements of the Zoning Ordinance. 192
Page 193
Item 5.
S-26-14 William Henry Middle School Campus Improvements
DAC Report of September 2, 2026
- 3)Overall Site Set (SP-00 series):
- a)Data Column:
- i)Update Parking calculation per information in this Report. ii) Update impervious coverage per comments. iii) Update bicycle parking per the information in this Report.
- b)Highlight the LOD of the proposed development area within the location maps on the Cover Sheet (C300).
- c)Clarify Dumpster enclosure materials and detail.
- d)Provide details sheet.
- e)Provide bicycle parking as required by the Zoning Ordinance and show on site.
- f)Fix inconsistencies in demolition and site plan including items not properly labeled for demolition/moving, inconsistent square footages, and unclear linework.
- g)Provide an easement exhibit or note indicating there are no easements encumbering the property.
- h)Provide a paving key as it has been referenced throughout the plan.
- i)Clearly indicate where flush curbing is being placed.
- 4)Landscape Plan (Sheet L0.00 series):
- a)Provide summary table for tree plantings.
- b)Provide detail tree protection plan for woodland area per this Report.
- c)Tree Planting note should meet City of Dover Note under Article 5.
- d)Move trees away from utility lines in the northern parking lot, and near the bus loop parking area.
- e)Missing sheet LP-05; add to plan set.
- 5)Architectural Submission (Sheet A200 Series)
- a)Signs and logos must be approved as part of a Sign permit.
- 6)The Plan shows the planned locations of light fixtures along drive aisles and in parking areas. Include a lighting scheme/detail sheet to determine if Article 5 §7.1 regulations are being met.
- 7)Any Erosion & Sediment Control Plans and Stormwater Management Plans granted approval by DNREC must reflect the Site Plan layout and design conditionally approved by the Planning Commission and be in compliance with the Zoning Ordinance and technical review requirements of other agencies.
- 8)The Final Plan set must include notes documenting any action taken by the Planning Commission and must list any additional conditions of approval.
IX. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES:
In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in considering and acting upon Site Development Plans may prescribe appropriate conditions and safeguards so that the public health, safety, and welfare, the comfort and convenience of the public in general, and the residents of the immediate neighborhood in particular shall be taken into consideration. These safeguards may to the maximum extent possible further the expressed 193
Page 194
Item 5.
S-26-14 William Henry Middle School Campus Improvements
DAC Report of September 2, 2026
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed in subsections 2.21 to 2.28.
- 1)Bicycle Parking: Staff recommends that bicycle parking be placed at student entry locations to the facility to allow for improved bicycle access and meet the applicant’s bicycle parking requirements.
- 2)Waiver Request: Partial Elimination of Upright Curbing: Planning Staff grants approval of the waiver request to relax curbing requirements on the downstream curbs of the drive aisles and parking areas. The Upright curbing requested to be waived is associated with sheet flow for stormwater; therefore, elimination is appropriate. Please clearly mark on the final submittal what curbs are being changed to flush curbing.
- 3)Waiver Request: PLUS Hearing: The site was previously the subject of a PLUS Hearing #2010-10-06. Planning Staff and the applicant are currently in the process of pursuing a PLUS waiver for this project.
- 4)Waiver Request: Reduction in Required Parking: The site has historically, and continues to be used exclusively as an educational campus. While the addition of the ILC to the site and expansion of the KCCS invites students from differing grade levels who may have vehicles. Planning Staff agrees that the primary users of on-site parking will be faculty and staff. As such, Planning Staff recommends approval of the waiver.
Other agencies may recommend additional conditions and safeguards in accordance with their areas of expertise. The Recommended Additional Considerations to Meet Code Objectives may be accepted or rejected by the Planning Commission.
- X.ADVISORY COMMENTS TO THE APPLICANT:
- 1)If major changes and revisions to the Site Plan occur in the finalization of the Plan, contact the Planning Office. Examples include reorientation of the building, relocation of site components like stormwater management areas, and increases in floor area count. These changes may require resubmittal for review by the Development Advisory Committee, Planning Commission, or other agencies and commissions making recommendations in regard to the plan.
- 2)In the event that there are changes to the architecture, building footprint, layout or square footage of the building contact, the Planning Office. These changes may require review by the Planning Commission.
- 3)Other agencies and departments which participate in the Development Advisory Committee may provide additional comments related to their areas of expertise and code requirements.
- 4)Following Planning Commission approval of the Site Development Plan, the Plan must be revised to document all conditions of approval from the Development Advisory Committee or as otherwise noted. This process involves submission of Check Prints to 194
Page 195
Item 5.
S-26-14 William Henry Middle School Campus Improvements
DAC Report of September 2, 2026
each agency in order to achieve Final Plan approval.
- 5)For building new construction, the requirements of the building code and the fire code must be complied with. Consult with the Building Inspections Staff and City of Dover Fire Marshal regarding these requirements. The resolution of these items may impact the site design including such items as building dimensions and height, building openings, and fire protection needs, etc.
- 6)The applicant/developer shall be aware that prior to any ground disturbing activities on the site the appropriate Site Plan approvals, Pre-Construction meetings, site inspections and permits are required.
- 7)Construction may have an effect on the adjacent roadways, property owners and visitors. Any work requiring the closing or rerouting of residents or visitors should be coordinated to offer the least amount of inconvenience.
- 8)The applicant shall be aware that Plan approval does not represent a Sign Permit, nor does it convey permission to place any sign on the premises. Any proposed site or building identification sign may require a Sign Permit from the City of Dover prior to placement of any such sign in accordance with Zoning Ordinance, Article 5 §4.
- 9)The applicant shall be aware that Plan approval does not represent a Building Permit and associated construction activity permits. A separate application process is required for issuance of a Building Permit from the City of Dover.
- 10)This site could apply for a Comprehensive Sign Plan as an educational campus if the applicant would like to handle signage that way moving forward. This would entail a separate application to the Planning Commission.
If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Department as soon as possible.
195
Page 196
C F
S-26-14
Item 5.
I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A APPLICATION REVIEW COMMENTARY R D.A.C. MEETING DATE: 09/02/26 D S O H V A E L R APPLICATION: William Henry Campus Improvements at 65 Carver Rd
FILE #: S-26-14 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457 josika@dover.de.us
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
- 1.Proposed occupancy classification is educational
- 2.Building Access shall be no further than 50 feet from a primary entrance.
Where buildings are provided with an automatic sprinkler system installed in accordance with NFPA 13, access shall be no further than 100 feet from the primary entrance. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.4)
- 3.Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times the width of the door(s) or for 10 feet, whichever is greater. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
- 4.Perimeter access shall be N/A and clearly shown on the plans.
Perimeter Access minimum width shall be10 feet for one-story buildings and 15 feet for buildings of two or more stories, measured from the face of the building at grade with a maximum slope of ten percent (10%). Plantings and utility services (includes condenser units, transformers, etc.) shall be permitted within the perimeter access, and shall not interfere with emergency services fire ground operations.
If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building perimeter shall not be included in the calculation of Percent of Perimeter Access. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5)
196
Page 197
Item 5.
Where parking is located between the building and perimeter access area, parking shall not be located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall for building of two or more stories.
- 5.Fire lanes shall cover 50% of the single story building and 75% of the two story building of the proposed building. Fire lanes are required to be 24 feet wide and run along the front of the building as determined by the primary entrance(s). In cases where there is more than one primary entrance(s), each shall be served by a fire lane even if this exceeds the percentage as required.
The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and the closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one or two stories in height; 40 feet if three or four stories in height, or 30 feet if over four stories in height. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5)
- 6.Where parking is located between the building and the fire lane, parking shall not be located closer than 15 feet to the exterior wall. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.4.1) Where parking is located between the building and the perimeter access area, parking shall not be located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall for building of two or more stories. 2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5.2
- 7.All Fire Lanes shall be marked as follows:
both the inner and outer edges of the fire lane shall be marked, where curbs are present, the top and face of the curb shall be painted yellow, where no curbs are present, a four inch (4”) solid yellow demarcation line shall mark the edge(s) of the fire lane. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
- 8.The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be suitable for street surfaces
- 9.Fire lane signs shall be located as follows:
see Figure 5-16 – Approved Sign For Marking Fire Lanes, fire lane signs shall be spaced at 150 foot intervals maximum, all fire lane signs shall be located no less than six feet (6’) and no higher than eight feet (8’) above the pavement, signs shall be placed at each end of the fire lane, and signs shall face all oncoming traffic.
Where parking is not restricted roadway markings shall utilize the words "FIRE" and "LANE" in lieu of fire lane signs and shall conform to the specifications of 7.6. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
- 10.Where overhangs, canopies, balconies, or any other building or site features must project over any fire lane, an unobstructed vertical clearance of not less than 13’-6” above the fire lane shall be provided and the portion of the building perimeter which contains overhangs, canopies, balconies, or any other building features shall not apply towards the fire lane accessibility requirements of Section 4.0, Table 5-1 in this chapter. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.8)
197
Page 198
Item 5.
- 11.All access roadways shall be paved and be a minimum of 20 feet clear width for two-way traffic and 14 feet clear width for one-way traffic. The paved width of access roadway shall be measured from edge of parking spaces, or face of curb for vertical curb and back of curb for mountable curb, or edge of pavement if there is no curbing.(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 5.2)
- 12.Multiple Access Roads shall be provided when a fire department access road (fire lane) is determined by the Fire Marshal to be impaired by vehicle congestion, condition of terrain, climatic conditions, or other factors that could limit access such as placement of fire hose from fire equipment.
- 13.Any dead-end road more than 300 feet in length shall be provided with a turnaround or cul-de- sac as outlined in the 2021 Delaware State Fire Prevention Regulations 705, chapter 5, 2.3.
- 14.Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in reference to this process.
- 15.Gated Areas: Fire Department access shall be provided to the property through the use of a system or device approved by the Fire Marshal. The system or device required shall be located in an area accessible to the fire department and approved by the Fire Marshal. All gates shall be either automatic or manual.
An automated system shall consist of one manual and one automated means to open the gate. The owner or their representative shall meet with the Fire Marshal prior to submission to agree on the system. A letter of agreement shall be created and signed by both parties. The letter shall include a detailed description of both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their representative shall meet with the Fire Marshal prior to submission to agree on the means to open. A letter of agreement shall be created and signed by both parties. The letter shall include a detailed description of the manual means to open. To be considered accessible for fire department apparatus the actual clear openings shall be not less than 14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate shall be setback from the perpendicular street by at least 50 feet. Please contact this office to discuss options available to comply with this requirement. (2021Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)
- 16.Fire hydrants shall be installed per the requirements of City of Dover Public Utilities Water/Wastewater Handbook, NFPA requirements (NFPA 1, 18.5.2 and 18.5.3), and Delaware State Fire Prevention Regulations (702, Chapter 6, 5.11) and City Ordinance Sec 46-9 (f).
Hydrants spacing shall be every 600 feet.
- 17.All fire hydrants shall be marked as prescribed within the appropriate section of this regulation and as illustrated by the appropriate figures of this regulation.
All fire hydrants shall have minimum of four-inch (4") solid yellow demarcation lines to define specific areas, where fire hydrants are located along a curb line with permitted parking, the area between the fire hydrant and the street or fire lane shall be stenciled with four inch (4") demarcation lines and the words "NO PARKING", demarcation lines shall be measured from the center line of the fire hydrant and extend for a distance 15 feet on both sides.
198
Page 199
Item 5.
Where fire hydrants are located in parking lots or other areas susceptible to blockage by parked vehicles they shall be treated as follows: fire hydrants shall be protected in all directions for a distance of seven feet (7') with barriers or curbing, Minimum four-inch (4") diameter steel bollards filled with concrete and marked yellow shall be installed at the outermost corners of the fire hydrant demarcation area. The minimum height of the bollard shall be 36 inches above the finished g
This document is too long to show here in full. Read the rest in the PDF.