Historic District Commission Meeting Packet
Historic District Commission. Feb 19, 2026.
This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.
10 pages have little or no readable text here, often scans or drawings. See the PDF for those.
Page 1
CITY OF DOVER, DELAWARE
HISTORIC DISTRICT COMMISSION MEETING
Thursday, February 19, 2026 at 3:30 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
IN-PERSON and VIRTUAL MEETING NOTICE
The Historic District Commission Meeting for Thursday, February 19, 2026 will be held as an In-Person Meeting at the City Council Chambers. The public is welcome to attend in person. The Meeting will also be provided as a Virtual Meeting using Webex, an audio/video conferencing system as an electronic means of communication. See the participation information below to join by phone or computer.
PUBLIC PARTICIPATION INFORMATION
City of Dover Historic District Commission Meeting of February 19, 2026
Join By Phone: Dial 1-650-479-3208
Access Code: 253 151 49187
Password from Phones: 36837432
Join Online: https://bit.ly/HDCMeeting02192026
Webinar Number: 2531 514 9187
Password: DoverHDC
If you are new to Webex, get the app now at https://www.webex.com/ to be ready when the meeting starts. For problems accessing the meeting, please call the Planning Office at (302) 736-7196.
WELCOME
ROLL CALL
APPROVAL OF AGENDA
APPROVAL OF MINUTES
- 1.Adoption of Minutes of November 20, 2025
COMMUNICATIONS & REPORTS
Summary of Activity
1
Page 2
HISTORIC DISTRICT COMMISSION MEETING - February 19, 2026 PAGE 2
- 2.Summary of Applications 2025
- 3.Summary of Architectural Review Certification for 2025 and 2026
Department of Planning & Inspections Updates
NEW APPLICATIONS
Review of Permits Referred to Commission
- 4.HI-26-01 Referral of Door/Window Permit #26-118 at 1 Kings Hwy NE - Review of Architectural Review Certification as Referred by the City Planner to the Historic District Commission for a Door/Window Permit #26-118. The project proposes removal and replacement of four (4) windows and the removal and replacement of the entry door. Property is zoned RG-1 (General Residence Zone) and subject to the H (Historic District Zone). The owner of record is Richard Arnold. Address: 1 Kings Highway NE. Tax Parcel: ED05-077.05- 02-54.00-000. Council District 3.
NEW BUSINESS
OLD BUSINESS
Certified Local Government (CLG) Program
Implementation of 2019 Comprehensive Plan
PUBLIC COMMENTS OPPORTUNITY
ADJOURN
Posted: February 12. 2026
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING
2
Page 3
Item 1.
MINUTES OF
HISTORIC DISTRICT COMMISSION MEETING
OF November 20, 2025
o The Meeting Minutes of November 20, 2025 are still
being prepared. These Meeting Minutes will be
distributed to the Historic District Commission via
email or hand delivered.
o Adoption of the Meeting Minutes will be considered
at the next meeting of the Historic District
Commission.
3
Page 4
City of Dover Historic District Commission
Summary of Applications 2025 Item 2.
Updated thru February 12, 2026
FILE# PLAN NAME LOCATION TYPE ACTION STATUS
HI-25-01 The Old Post at 55 Loockerman Plaza Site Plan for Review for Architectural Review Site Plan reviewed by Historic District and Revised 55 Loockerman (Old Dover Post development of Certification of Site Plan; Public Commission for Recommendation. Site Plan HI-25-01 Plaza Office) mixed-use with Hearing and Review by HDC on Application (S-25-07) filed and granted apartments 2/20/2025 and Recommended conditional approval and ArchRevCert by approval of ArchRevCert for project. Planning Commission on 3/17/2025. Design Revised HI-25-01 filed and scheduled revisions to add additional floor and for HDC Review on 11/20/2025 for architecture requires additional review of consideration of architectural design ArchRevCert by HDC and PC. S-25-07 revisions. recommended for approval of ArchRevCert by HDC and granted by PC 12/15/2025.
HI-25-02 Mixed Use 120 S Governors Site Plan for Revised Application filed June 2025. Application initially filed in March 2025 Building at 120 S Avenue development of Review for Architectural Review then placed on hold by the Applicant for Governors mixed use building Certification of Site Plan; Public continued design work. Application Avenue (The Hearing and Review by HDC on updated and Site Plan reviewed by Historic Governor) 7/17/2025. HDC Recommended District Commission for Recommendation approval of ArchRevCert for project. in July 2025. Site Plan Application (S-25-11) filed and scheduled for Planning Commission Review on 9/15/2025. Conditional Approval of Site Plan and ArchRevCert granted by Planning Commission. HI-25-03 Biggs Museum 15 The Green and 21 Review for Review for Architectural Review HDC completed review of Request to Expansion: The Green Architectural Certification. Public Hearing and remove/demolish portions of the rear Selected Certification for Review for Architectural Review additions at the buildings as associated Removals at 15 Select Certification by HCD on 5/15/2025. with future project for the Biggs Museum of and 21 The Green Removal/Demolition Granted Approval subject to American Art expansion. Granted of Rear Additions conditions. Architectural Review Certification; moving into design phase for project that will be subject to future ArchRevCert.
4
Page 5
City of Dover Historic District Commission
Summary of Applications 2025 Item 2.
Updated thru February 12, 2026
FILE# PLAN NAME LOCATION TYPE ACTION STATUS
HI-25-04 Referral of Fence 55 Kings Hwy SW Fence Permit Permit #25-1463 referred to HDC by Permit Application received 10/8/2025 and Permit #25-1463 City Planner for consultation on Referred to the HDC for consultation. at 55 Kings Hwy Architectural Review Certification; Permit seeks to construct a 6 foot vinyl SW (Merrill Lynch scheduled for review on 11/20/2025. fence. Applicant revised the application to a Office) HDC deferred action seeking more metal picket style fence at height of 4 feet. information.
5
Page 6
Summary of Permit Applications with Architectural Review Certification
Item 3.
2026- Updated Thru 1-31-2026
| DATE | PERMIT # LOCATION | TYPE | ACTION ON ARCHITECTURAL | NOTES |
|---|---|---|---|---|
| REVIEW CERTIFICATE | ||||
| 1/13/2026 25-1668 | 8 W Loockerman Street | Demolition Permit | Staff Approval | Demolition of select interior area and removal |
| of bank drive thru canopy | ||||
| 1/5/2026 25-1767 | 1 Kings Highway NE | Fence Permit | Staff Approval | Installation of black metal picket style fence of |
| 4 foot height | ||||
1/20/2026 26-71 420 S State Street Sign Permit Staff Approval Instllation of hanging wall sign
6
Page 7
Summary of Permit Applications with Architectural Review Certification Item 3. 2025- Updated Thru 12-31-2025 DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES REVIEW CERTIFICATE 1/17/2025 24-1399 21 N American Avenue Building Permit - Interior Staff Approval as per HDC Action on Demolition of rear addition and its rebuild, & Exterior Renovations ArchRevCert HI-24-08. exterior finish renovations to allow vinyl siding, renovations to front porch. Permit was referred to the Historic District Commission for review. 1/13/2025 24-1835 148 S Bradford Street Demolition Permit Staff Approval as per PC Final Action Demolition of existing one-and-half story regarding ArchRevCert (appeal of building for future redevelopment of site. HDC HDC denial of ArchRev Cert) HI-24-02. denied request on 5/16/2024 and Appeal to Planning Commission granted approval 6/17/2024. Demolition complete.
| 2/5/2025 25-132 | 45 The Green, Sykes | Building Permit - Interior | No ArchRevCert Required | Interior Renovations to subfloor in the office |
|---|---|---|---|---|
| Building | Renovations | buildings. | ||
| 2/18/2025 25-136 | 107 S State Street | Sign Permit | Staff Approval | Post Panel sign. |
| 2/20/2025 25-148 | 151 Kings Hwy SW, | Roof Permit | Staff Approval | Roof replacement project with synthetic slate |
| Woodburn | material and associated flashing and gutter | |||
| systems. | ||||
| 3/11/2025 25-209 | 307 S State St | Sign Permit | Staff Approval | installation of Projecting Sign for office |
3/19/2025 25-277 12 Kings Hwy SE, Building at Roof Permit Staff Approval Replacement of EPDM roof system (flat roof) Elizabeth W. Murphy School with the same following repairs.
3/10/2025 25-284 201 W Loockerman St Roof Permit Staff Approval Replacement of flat roof on commercial building. 3/10/2025 25-286 30 S American Ave Roof Permit No Planning Staff Review. Removal and replacement of shingle roof.
4/7/2025 24-1152 26 S State Street, Window Permit Staff Approval Replacement of windows of various sizes & Apartment Building formats on all elevations, repair and repaint of trimwork areas and shutters.
4/2/2025 25-395 214 S State Street Roof Permit Staff Approval Roof Replacement on main block of building with metal roofing system.
7
Page 8
Summary of Permit Applications with Architectural Review Certification Item 3. 2025- Updated Thru 12-31-2025 DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES REVIEW CERTIFICATE 4/15/2025 25-408 150 S. Bradford St Demolition Permit Staff Approval as per PC Final Action Demolition of existing two story building for regarding ArchRevCert (appeal of future redevelopment of site. HDC denied HDC denial of ArchRev Cert) HI-24-03. request on 5/16/2024 and Appeal to Planning Commission granted approval 6/17/2024. Demolition complete.
5/1/2025 24-1510 33 W Loockerman St Sign Permit Staff Approval New Window and Wall Signs for new restaurant tenant
5/29/2025 25-285 500 W Loockerman St Building Permit - Staff Approval Freestanding canopy over a series of parking Accessory Structure (Solar spaces with solar panels and equipment for EV Canopy) changing stations.
5/21/2025 25-515 55 The Green Building Permit - Exterior Staff Approval Replacement of wood columns on rotunda Renovations entry. 5/15/2025 25-599 401 Federal St Building Permit - No Planning Staff Review. Replacement of generator Generator Replacement 5/22/2025 25-693 426 S State St, George & Sign Permit Staff Approval Replacement of signs for new law office Vyas Attorneys tenant. 6/4/2025 25-670 500 W Loockerman St Building Permit - Interior Staff Approval Interior Renovations on third floor for tenant Renovations fit-out. 6/5/2025 25-704 32 W Loockerman St, Siding Permit Staff Approval Replacement of existing siding on side of Loockerman Square building. 6/18/2025 25-738 523 S State St, Christ Church Temporary Sign Permit Staff Approval Temporary Sign Banner installation.
6/13/2025 25-763 145 S State St Building Permit - Exterior Staff Approval Extension of previous Permit to convert & Interior Renovations existing building into 4 apartment units
| 6/12/2025 25-796 | 121 S State St, M&T Bank | Roof Permit | Staff Approval | Replacement of flat roof area |
|---|---|---|---|---|
| Dover Financial Center | ||||
| 7/14/2025 25-990 | 2 Kings Highway, NE | Siding Permit | Staff Approval | Replacement of clapboard style (horizontal) |
| siding on residence with the same. | ||||
| 8/20/2025 25-827 | 300 S State St, Law Office | Building Permit - Window Staff Approval | Replacement of select windows | |
| 8 | ||||
Page 9
Summary of Permit Applications with Architectural Review Certification
Item 3.
2025- Updated Thru 12-31-2025
| DATE | PERMIT # LOCATION | TYPE | ACTION ON ARCHITECTURAL | NOTES |
|---|---|---|---|---|
| REVIEW CERTIFICATE | ||||
| 8/4/2025 25-937 | 201 W Loockerman St | Building Permit - Interior | Staff Approval | Interior renovation for tenant fit-out. Reissue |
| Renovations | of previous permit. | |||
| 8/8/2025 25-1047 | 9 W Loockerman St | Sign Permit | Staff Approval | Window signs for new use. |
| 9/2/2025 25-1219 | 89 Kings Hwy SW, DNREC | Fence Permit | Staff Approval | Chainlink security fence around generator. |
| Location is not visible from the street. | ||||
| 9/24/2025 25-1280 | 30 Loockerman Plaza, | Roof Permit | Staff Approval | Roof replacement with asphalt shingles. |
| Wesley Education Building | ||||
| 9/25/2025 25-1298 | 309 S Governors Avenue, | Building Permit - Interior | Staff Approval | Interior Renovations of office spaces. |
| Becker Morgan Group | Renovations | |||
| Offices | ||||
| 10/1/2025 25-1369 | 21 N American Avenue | Roof Permit | Staff Approval aligned with HDC | Roof replacement with asphalt (solar) shingles. |
| Action on ArchRevCert HI-24-08. | Replaces modern metal roof on building main | |||
| block. | ||||
| 10/21/2-25 25-1373 | 32 W Loockerman St, | Fence Permit | Staff Approval | Decorative Fence as metal public art |
| Loockerman Square | installation on stepped area at building front. | |||
| 10/6/2025 25-1390 | 108 W Loockerman St | Sign Permit | Staff Approval | Installation of wall sign and projecting sign for |
| restaurant. | ||||
| 25-1624 | 21 N American Avenue | Building Permit - Solar | Staff Approval | Installation of solar roof shingles. |
| 11/17/2025 | Panel Installation | |||
| 12/1/2025 25-1734 | 125-B W Loockerman St | Sign Permit | Staff Approval | Installation of wall sign for EDiS Office for |
| Dover Mobility Center project. | ||||
9
Page 10
Item 4.
City of Dover
ARCHITECTURAL REVIEW REPORT
Referral by City Planner to Historic District Commission
Meeting of February 19, 2026
Permit: Door/Window Permit #26-118
Location: 1 Kings Highway NE, Dover
Single Family Detached Dwelling on north side of Kings Hwy/NE
Tax Parcel: ED-05-077.05-02-54.00-000
File Number: HI-26-01
Present Zoning: RG-1 (General Residence Zone) H (Historic District Zone)
Referral of Permit: The following application Fence Permit #26-118 for 1 Kings Highway NE is referred by the City Planner to the Historic District Commission for consultation regarding the issuance of the Architectural Review Certificate for a Door/Window project. Applications for certain types of construction activity within the Historic District Zone (H) are reviewed by the City Planner (or Staff as designated) for Architectural Review Certification as part of the Building Permit application review process. Staff is referring the Permit for review under the provisions of Zoning Ordinance, Article 10 Section 3.22(A) and (B). See below.
Section 3.22 Architectural review certification by the city planner. (A) An architectural review certificate for specific classes of building permits, including Fences, signs, siding, window and door replacement, roofing, the addition or replacement of decorative features, minor demolition, residential additions, and other construction of a minor nature, may be issued by the city planner, after a review and determination that the proposed construction is in general accordance with the standards set forth in subsection 3.25. (B) The city planner may refer any permit application for demolition or construction in the historic district for consultation with commission.
Permit Information: Door/Window Permit #26-118 was filed on January 23, 2026 for a door and window project at 1 Kings Highway NE in Dover, Delaware. This is a three-story single family detached dwelling with a mansard roof, front porch, bay windows, and decorative detailing at cornice and trimwork. The project listed in the Permit submission consists of the removal and replacement of four (4) windows and the removal and replacement of the entry door. The specifics for the windows were not identified as to location and window format. Additional correspondence with the contractor shows the existing double entry doors with transom above are proposed to be replaced with a single panel door with a side light and a transom above.
- P.O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 10
Page 11
Item 4.
HI-26-01 Referral of Door/Window Permit #26-118 at 1 Kings Highway NE
Staff Report to the Historic District Commission
Property Information: The project site is located within the local Historic District Zone (H) and subject to the provisions of the Zoning Ordinance, Article 3 §21 and referenced sections. This building is also located within the boundaries of a National Register Historic District, specifically the Victorian Dover Historic District (K-00396.452). The following is the inventory description from the Victorian Dover Historic District nomination:
K-00396.452 1 Kings Highway East – c. 1875 with back wing c.1825, 3-story, frame dwelling; clapboard siding; convex mansard roof, gable-roofed Renaissance dormers on all sides, double-bracketed cornice; cornice with dentil moulding at top of lower pitch of mansard; bay windows flanking door on 1st floor, paired 1/1 sash with hood molds on 2nd floor; rear wing, 6/9 sash on 1st floor, 6/6 sash on 2nd floor; double door with transom; façade porch, square posts, square balusters.
Staff Review of Permit for Architectural Review Certification: Project activities are reviewed for compliance with the Zoning Ordinance and the Design Standards and Guidelines for the City of Dover Historic District Zone as stated in Zoning Ordinance, Article 10 Section 3.25(A).
Article 10 Section 3.25 Architectural review standards. (A) An architectural review certificate may be issued if it is found that the architectural style, general design, height, bulk and setbacks, arrangement, location and materials and structures affecting the exterior appearance are generally in harmony with neighboring structures and complementary to the traditional architectural standards of the historic district as set forth in the historic district design guidelines and standards adopted by the planning commission and as set forth in the United States Secretary of the Interior's Standards for Rehabilitation.
The element must be in the “public view.” The “public view” is defined in the Zoning Ordinance as “that which can be seen readily from a public street, public building or public property, excluding views from alley rights-of-way.” The location of the windows is not identified, but the entry door is visible from the street (Kings Highway/Division Street).
In reviewing the proposed project for Architectural Review Certification, Staff referenced various sections of Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings of the Design Standards and Guidelines for the City of Dover Historic District Zone which presents the Recommended, Not Recommended, and Inappropriate approaches to construction of various elements in the Historic District.
This Request should be reviewed for conformity with the design criteria and development guidelines found in the Design Standards and Guidelines for the City of Dover Historic District Zone. Chapter 3 presents the information on the appropriate formats and materials for use in the Historic District. Specifically, Chapter 3 pages 3-1 through 3-8 discuss the philosophy of the Design Standards and Guidelines and then discusses the Recommended, Not Recommended, and Inappropriate practices associated with Doors and Windows.
The Design Standards and Guidelines focus on repair of building elements or replacement of the building elements in-kind to match existing conditions. For windows, this generally means windows with the same size, operating function, and light pane format. For doors, this means the
11
2
Page 12
Item 4.
HI-26-01 Referral of Door/Window Permit #26-118 at 1 Kings Highway NE
Staff Report to the Historic District Commission
same size opening, door format (single or double), and light configuration. More information is needed on the window project as to the location and format of the replacement windows. The proposed replacement door as a single door with side light rather than the narrow double doors does not comply with the recommended practices of the Design Standards and Guidelines.
Historic District Commission Action The Historic District Commission should consider the Door and Window project and take action in regard to the Architectural Review Certification for the Door/Window Permit #26-118. The Historic District Commission may add conditions for the Door project and Window project in order to comply with the character of the property within the Historic District.
Staff Findings from Review of Door/Window Permit: Staff findings and recommendations are summarized as follows for the Door and Window project as presented in Permit #26-118 and accompanying documents.
- 1.Window Location and Format: No information was provided on the location of the four windows being replaced or their format. The Permit notes only the window U-Factor and SHGC (Solar Heat Gain Coefficient) and that no structural changes are planned. An email from the contactor notes that the replacement windows (vinyl) will be like in style, color, and grid pattern.
- 2.Door Location: The entry door is proposed for replacement and it’s the primary entry door to the dwelling which faces Kings Highway/Division Street. It is protected by the front porch. It is visible from the public way (sidewalk and street) especially since the removal of vegetation previously found in the front yard.
- 3.Door Format and Material: The current door format is a double door consisting of two narrow paneled doors that appear to be wood with a transom window over the door. The door also includes a separate double storm door set of primarily glass. The existing door format does not have sidelights. This double door format was often utilized in the late 1800s-early 1900s in this architectural style.
Recommendations: 1. Window Location and Format: The applicant/contractor should provide information on the location of the windows being replaced including the current configuration and specifications for the new replacement windows. This will then be evaluated for compliance with the Design Standards and Guidelines.
- 2.Door Format and Material: Staff finds that the single door with sidelight is inappropriate as a replacement for the double doors. Staff recommends repair of the existing doors i.e. repair/improvements to surface, weatherstripping, etc. If full replacement is selected then the door should be the double door (paired doors) format with the separate transom above. The use of additional storm doors in the double door set format and consisting of predominately glass is appropriate.
12
3
Page 13
Item 4.
HI-26-01 Referral of Door/Window Permit #26-118 at 1 Kings Highway NE
Staff Report to the Historic District Commission
Advisory Comments: 1. The applicant shall be aware that issuance of a Door/Window Permit is required prior to the commencement of construction. The Door/Window Permit Application will be subject to the conditions of approval established and may be required to be updated, if necessary, to comply with these conditions established through the Architectural Review Certification process.
Attachments: • Letter of Referral Notice to Applicant dated February 11, 2026. • Door/Window Permit #26-118 Application Form and related emails • Design Standards and Guidelines for the City of Dover Historic District Zone, Chapter 3, page 3-1 to 3-8. • Photo of door by Planning Office
13
4
Page 14
Item 4.
City of Dover
February 11, 2026
Richard Arnold Power Home Remodeling
1 Kings Highway NE 2501 Seaport Dr
Dover DE 19901 Chester PA 19013
Via Email: arnoldindover@gmail.com Via Email: phlno@powerhrg.com
Gregory Madrigale: gmadrigale@powerhrg.com
Michael Klingensmith: mklingensmith@powerhrg.com
Re: Referral of Door/Window Permit #26-118 to Historic District Commission, HI-26-01 Door Project at 1Kings Highway NE, Dover, DE
To Whom It May Concern:
This letter is to inform you that Door/Window Permit Application # 26-118 has been referred to the City of Dover Historic District Commission for consultation. Door/Window Permit #26-118 was filed on January 23, 2026 for a door and window project at 1 Kings Highway NE in Dover, Delaware. This is a two-story single family detached dwelling. The project listed in the Permit submission consists of the removal and replacement of four (4) windows and the removal and replacement of the entry door. The specifics for the windows were not identified as to location and window format. Additional correspondence with the contractor shows the existing double entry doors with transom above are proposed to be replaced with a single panel door with a side light and a transom above.
The location of the subject property within the City of Dover’s Historic District zone requires the review and issuance of an Architectural Review Certificate (ARC) for construction and demolition activities. Doors and Window replacements are eligible for Staff review of the ARC during the Building Permit application process. Project activities are reviewed for compliance with the Zoning Ordinance and the Design Standards and Guidelines for the City of Dover Historic District Zone as stated in Zoning Ordinance, Article 10 Section 3.25(A).
Article 10 Section 3.25 Architectural review standards. (A) An architectural review certificate may be issued if it is found that the architectural style, general design, height, bulk and setbacks, arrangement, location and materials and structures affecting the exterior appearance are generally in harmony with neighboring structures and complementary to the traditional architectural standards of the historic district as set forth in the historic district design guidelines and standards adopted by the planning commission and as set forth in the United States Secretary of the Interior's Standards for Rehabilitation.
In reviewing the proposed project for Architectural Review Certification, Staff referenced Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings of the Design Standards and Guidelines which present the Recommended, Not Recommended, and Inappropriate approaches to activities in the Historic District. The Design Standards and Guidelines focus on repair of building elements or replacement of the building elements in-kind to match existing conditions. For windows, this generally means windows with the same size, operating function, and light pane format. For doors, this means the same size opening, door format (single or double), and light configuration. More information is needed on the window project as to the location and format of the replacement windows. The proposed replacement door as a single door with side light rather than the narrow double doors does not comply with the recommended practices of the Design Standards and Guidelines. Therefore, I am referring the Door/Window Permit application to the Historic District Commission for consultation. See Zoning Ordinance, Article 10 Section 3.22 (A) and (B) listed below.
- P.O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 14
Page 15
Item 4.
Letter Re: Permit #26-118 Fence at 1 Kings Highway NE, Dover DE
February 11, 2026
Article 10 Section 3.22 Architectural review certification by the city planner. (A) An architectural review certificate for specific classes of building permits, including fences, signs, siding, window and door replacement, roofing, the addition or replacement of decorative features, minor demolition, residential additions, and other construction of a minor nature, may be issued by the city planner, after a review and determination that the proposed construction is in general accordance with the standards set forth in subsection 3.25 (B) The city planner may refer any permit application for demolition or construction in the historic district for consultation with commission.
The City of Dover Historic District Commission will review this Permit at their next meeting scheduled for Thursday, February 19, 2026 at 3:30pm. Options for participating in the Meeting include attending In-Person at the City Hall Council Chambers in City Hall at 15 Loockerman Plaza and/or attending the Virtual Meeting presentation using Webex, an audio and video conferencing system. A separate meeting invitation to Join the Meeting virtually will be sent by email to the applicants; where you can click “Join Meeting” to attend that afternoon. This Permit Referral has been assigned Application #HI-26-01. You are encouraged to participate in this meeting in person to discuss the project and provide any additional information on the project. Staff will provide the Historic District Commission with the permit application materials and other background information for their review and action. The Historic District Commission will consider whether Architectural Review Certification can be granted to the project as proposed or if other conditions of approval are required.
Also attached to this Letter are the Design Standards and Guidelines for the City of Dover Historic District Zone pertaining to Doors and Windows (pages 3-1 and 3-8). If you have questions or wish to discuss alternative options, please contact the Planning Office at (302) 736- 7196 or compplan@dover.de.us.
Sincerely,
Department of Planning and Inspections
Dawn Melson-Williams, AICP
Principal Planner
Attachments: Permit #26-188 and related emails
Photo of door by Planning Office
Excerpt of Design Standards & Guidelines
CC: Permit #26-118
HI-26-01
15
Page 16
Item 4.
16
Page 17
Item 4.
From: Townsend, Ann Marie
To: Gregory Madrigale
Cc: Ann Marie Townshend; Melson-Williams, Dawn; Michael Klingensmith
Subject: RE: EXTERNAL: Fw: 1 Kings Highway East - Window Permit
Date: Friday, February 6, 2026 12:16:30 PM
I cannot predetermine what the Historic District Commission will decide. The image provided of the door with the side light is a drastic difference from the double doors currently on the building. The house dates to 1880 and is within the Historic District, so I would expect that there will be questions for the property owner from the Commission at the very least. I have reached out to the property owner and left a message for him to call me to discuss the path forward.
Regards,
Ann Marie Townshend, AICP, CC-P
Planning Consultant
City of Dover
From: Gregory Madrigale <gmadrigale@powerhrg.com> Sent: Thursday, February 5, 2026 9:02 AM To: Townsend, Ann Marie <atownsend@DOVER.DE.US> Cc: Ann Marie Townshend <annmarie.townshend@rossitg.com>; Melson-Williams, Dawn <DMelson@dover.de.us>; Michael Klingensmith <michael.j.klingensmith@powerhrg.com> Subject: Re: EXTERNAL: Fw: 1 Kings Highway East - Window Permit
Some people who received this message don't often get email from gmadrigale@powerhrg.com. Learn why this is important
Good Morning Ann Marie and Dawn
This is all information we can provide. What has the protocol been for this in the past with the historic district commission? Are they truly looking for something that is like for like, or have they been willing to make exceptions in the past? We have yet to order any product here, so if it’s something we would be unlikely to move forward with we are fine with walking away from this job. If we feel like the door is something that would be approved with no problem, let us know and we’ll send over the photos, specs, etc
Thanks!
Gregory Madrigale
Project Services
Power Home Remodeling
O: 610.874.5000 x6665
PowerHRG.com
Join: Fortune Magazine's #1 Workplace For Millennials Socialize: Facebook | Twitter | Instagram
Power Home Remodeling is an equal opportunity employer, committed to hiring a diverse and talented workforce. Confidentiality Notice: Please be advised that no quotes, agreements, or understandings involving Power Home Remodeling, will be binding unless and until codified in a written document signed by an officer of the company. The information transmitted by this email is intended only for the use of the addressee(s) and may contain confidential and/or privileged information. Any interception, review, retransmission, dissemination, or other use of, or taking any action upon this information by persons or entities other than the intended recipient(s) is prohibited by law and may subject them to criminal or civil liability. If you have received this communication in error, please contact us immediately at (610) 874- 5000 and delete the message from any computer or other storage system.
17
Page 18
Item 4.
On Jan 30, 2026, at 3:39 PM, Gregory Madrigale <gmadrigale@powerhrg.com> wrote:
Adding our Project Manager, Mike Klingensmith, who was out at the home to measure to this one to help out.
Gregory Madrigale
Project Services
Power Home Remodeling
O: 610.874.5000 x6665
PowerHRG.com
Join: Fortune Magazine's #1 Workplace For Millennials Socialize: Facebook | Twitter | Instagram
Power Home Remodeling is an equal opportunity employer, committed to hiring a diverse and talented workforce. Confidentiality Notice: Please be advised that no quotes, agreements, or understandings involving Power Home Remodeling, will be binding unless and until codified in a written document signed by an officer of the company. The information transmitted by this email is intended only for the use of the addressee(s) and may contain confidential and/or privileged information. Any interception, review, retransmission, dissemination, or other use of, or taking any action upon this information by persons or entities other than the intended recipient(s) is prohibited by law and may subject them to criminal or civil liability. If you have received this communication in error, please contact us immediately at (610) 874-5000 and delete the message from any computer or other storage system.
On Jan 30, 2026, at 1:47 PM, Townsend, Ann Marie <atownsend@DOVER.DE.US> wrote:
Good afternoon.
The permit for the door will need to be referred to the Historic District Commission. Replacing the historic double doors with a single door and skylight will alter the appearance of the historic building. The next Historic District Commission meeting in on February 19. In order for them to review the permit, we need a photo of what is there now, including measurements of the existing doors and transom, as well as measurements for the proposed door, transom and sidelight.
I have copied Dawn Melson-Williams on this email. She will prepare the submission for the Historic District Commission, so she will need to be included on any emails at this point. We need confirmation of whether the property owner wants to pursue Historic District Commission review of this application by February 9 so that we can prepare the agenda accordingly.
Thank you,
Ann Marie Townshend, AICP, CC-P
Planning Consultant
City of Dover
18
Page 19
Item 4.
From: Ann Marie Townshend <annmarie.townshend@rossitg.com>
Sent: Friday, January 30, 2026 1:40 PM
To: Townsend, Ann Marie <atownsend@DOVER.DE.US>
Subject: EXTERNAL: Fw: 1 Kings Highway East - Window Permit
WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Get Outlook for iOS
From: Gregory Madrigale <gmadrigale@powerhrg.com>
Sent: Friday, January 23, 2026 3:58 PM
To: Ann Marie Townshend <annmarie.townshend@rossitg.com>
Subject: Re: 1 Kings Highway East - Window Permit
Thanks for the quick response
All the windows will be replaced in the exact same style including grids. As far as trim, we typically install a PVC coated aluminum with wood grain texture in order to preserve the integrity of the existing wood. We can match most existing colors as needed. If the original trim needs to remain we have alternate install techniques to keep the existing trim visible.
As for the door, because it was a double door of a non standard opening size we would be matching the color and replacing the transom window above it, as well with our largest single door width offering with a sidelight, to fit properly and to appear as close to the original as possible. Here is a photo of what we would be placing there:
<image001.jpg>
Gregory Madrigale
Project Services
Power Home Remodeling
O: 610.874.5000 x6665
PowerHRG.com
Join: Fortune Magazine's #1 Workplace For Millennials Socialize: Facebook | Twitter | Instagram
Power Home Remodeling is an equal opportunity employer, committed to hiring a diverse and talented workforce. Confidentiality Notice: Please be advised that no quotes, agreements, or understandings involving Power Home Remodeling, will be binding unless and until codified in a written document signed by an officer of the company. The information transmitted by this email is intended only for the use of the addressee(s) and may contain confidential and/or privileged information. Any interception, review, retransmission, dissemination, or other use of, or taking any action upon this information by persons or entities other than the intended recipient(s) is prohibited by law and may subject them to criminal or civil liability. If you have received this communication in error, please contact us immediately at (610) 874-5000 and delete the message from any computer or other storage system.
On Jan 23, 2026, at 3:14 PM, Ann Marie Townshend <annmarie.townshend@rossitg.com> wrote:
19
Page 20
Item 4.
Typically, we allow vinyl as long as they are similar in appearance to the original. For example, if what is there now has grids, the replacements need to have grids as well.
Will the wood trim surrounding the windows remain?
And what details to you have related to the door?
Thank you!
Ann Marie Townshend, AICP, CC-P
Senior Project Manager
(c) 302.242.0381 (o) 302.672.0093
AnnMarie.Townshend@Rossitg.com
Rossi Group
WBE/DBE/SBE Certified
Visit us at rossitg.com | Follow us on LinkedIn
<Outlook-wddv52kd.png> Book time to meet with me
From: Gregory Madrigale <gmadrigale@powerhrg.com>
Sent: Friday, January 23, 2026 1:01 PM
To: Ann Marie Townshend <annmarie.townshend@rossitg.com>
Subject: 1 Kings Highway East - Window Permit
Good afternoon
Following up on our call from a few minutes ago. I’m just looking to find exactly what we’ll need to have the permit/historical society approval. I can confirm all windows will be replaced like for like in style, color, and grid pattern. Replacement windows will be vinyl, so if that is a disqualifying factor we can put a stop to those right away.
Please let me know requirements and what specs and photos I can provide to help move this along.
Thank you!
Gregory Madrigale
Project Services
Power Home Remodeling
O: 610.874.5000 x6665
PowerHRG.com
Join: Fortune Magazine's #1 Workplace For Millennials Socialize: Facebook | Twitter | Instagram
Power Home Remodeling is an equal opportunity employer, committed to hiring a diverse and talented workforce. Confidentiality Notice: Please be advised that no quotes, agreements, or understandings involving Power Home Remodeling, will be binding unless and until codified in a written document signed by an officer of the company. The information transmitted by this email is intended only for the use of the addressee(s) and may contain confidential and/or privileged information. Any interception, review, retransmission, dissemination, or other use of, or taking any action upon this information by persons or entities other than the intended recipient(s) is prohibited by law and may subject them to criminal or civil liability. If you have received this communication in error, please contact us immediately at (610) 874-5000
20
Page 21
Item 4.
and delete the message from any computer or other storage system.
Notice - Information contained in this email message, including all attachments is privileged and confidential and is intended only for the use of the individual or individuals addressed. Any other use, dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please contact the sender immediately and delete it from your system.
Notice - Information contained in this email message, including all attachments is privileged and confidential and is intended only for the use of the individual or individuals addressed. Any other use, dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please contact the sender immediately and delete it from your system.
21
Page 22
Item 4.
From: Ann Marie Townshend
To: Melson-Williams, Dawn
Subject: EXTERNAL: Fw: 1 Kings Highway East - Window Permit
Date: Tuesday, February 10, 2026 4:43:24 PM
WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Get Outlook for iOS
From: Gregory Madrigale <gmadrigale@powerhrg.com>
Sent: Friday, January 23, 2026 3:58 PM
To: Ann Marie Townshend <annmarie.townshend@rossitg.com>
Subject: Re: 1 Kings Highway East - Window Permit
Thanks for the quick response
All the windows will be replaced in the exact same style including grids. As far as trim, we typically install a PVC coated aluminum with wood grain texture in order to preserve the integrity of the existing wood. We can match most existing colors as needed. If the original trim needs to remain we have alternate install techniques to keep the existing trim visible.
As for the door, because it was a double door of a non standard opening size we would be matching the color and replacing the transom window above it, as well with our largest single door width offering with a sidelight, to fit properly and to appear as close to the original as possible. Here is a photo of what we would be placing there:
22
Page 23
Item 4.
Gregory Madrigale
Project Services
Power Home Remodeling
O: 610.874.5000 x6665
PowerHRG.com
Join: Fortune Magazine's #1 Workplace For Millennials Socialize: Facebook | Twitter | Instagram
Power Home Remodeling is an equal opportunity employer, committed to hiring a diverse and talented workforce. Confidentiality Notice: Please be advised that no quotes, agreements, or understandings involving Power Home Remodeling, will be binding unless and until codified in a written document signed by an officer of the company. The information transmitted by this email is intended only for the use of the addressee(s) and may contain confidential and/or privileged information. Any interception, review, retransmission, dissemination, or other use of, or taking any action upon this information by persons or entities other than the intended recipient(s) is prohibited by law and may subject them to criminal or civil liability. If you have received this communication in error, please contact us immediately at (610) 874-5000 and delete the message from any computer or other storage system.
23
Page 24
Item 4.
On Jan 23, 2026, at 3:14 PM, Ann Marie Townshend <annmarie.townshend@rossitg.com> wrote:
Typically, we allow vinyl as long as they are similar in appearance to the original. For example, if what is there now has grids, the replacements need to have grids as well.
Will the wood trim surrounding the windows remain?
And what details to you have related to the door?
Thank you!
Ann Marie Townshend, AICP, CC-P
Senior Project Manager
(c) 302.242.0381 (o) 302.672.0093
AnnMarie.Townshend@Rossitg.com
Rossi Group
WBE/DBE/SBE Certified
Visit us at rossitg.com | Follow us on LinkedIn
<Outlook-wddv52kd.png> Book time to meet with me
From: Gregory Madrigale <gmadrigale@powerhrg.com>
Sent: Friday, January 23, 2026 1:01 PM
To: Ann Marie Townshend <annmarie.townshend@rossitg.com>
Subject: 1 Kings Highway East - Window Permit
Good afternoon
Following up on our call from a few minutes ago. I’m just looking to find exactly what we’ll need to have the permit/historical society approval. I can confirm all windows will be replaced like for like in style, color, and grid pattern. Replacement windows will be vinyl, so if that is a disqualifying factor we can put a stop to those right away.
Please let me know requirements and what specs and photos I can provide to help move this along.
Thank you!
Gregory Madrigale
Project Services
Power Home Remodeling
O: 610.874.5000 x6665
PowerHRG.com
Join: Fortune Magazine's #1 Workplace For Millennials Socialize: Facebook | Twitter | Instagram
Power Home Remodeling is an equal opportunity employer, committed to hiring a diverse and talented workforce. Confidentiality Notice: Please be advised that no quotes, agreements, or understandings involving
24
Page 25
Item 4.
Power Home Remodeling, will be binding unless and until codified in a written document signed by an officer of the company. The information transmitted by this email is intended only for the use of the addressee(s) and may contain confidential and/or privileged information. Any interception, review, retransmission, dissemination, or other use of, or taking any action upon this information by persons or entities other than the intended recipient(s) is prohibited by law and may subject them to criminal or civil liability. If you have received this communication in error, please contact us immediately at (610) 874-5000 and delete the message from any computer or other storage system.
Notice - Information contained in this email message, including all attachments is privileged and confidential and is intended only for the use of the individual or individuals addressed. Any other use, dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please contact the sender immediately and delete it from your system.
Notice - Information contained in this email message, including all attachments is privileged and confidential and is intended only for the use of the individual or individuals addressed. Any other use, dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please contact the sender immediately and delete it from your system.
25
Page 26
Item 4.
26
Page 27
Item 4.
27
Page 28
Item 4.
28
Page 29
Item 4.
29
Page 30
Item 4.
30
Page 31
Item 4.
31
Page 32
Item 4.
32
Page 33
Item 4.
33
Page 34
Item 4.
34