Page 1
CITY OF DOVER, DELAWARE
COUNCIL COMMITTEE OF THE WHOLE MEETING
Tuesday, April 14, 2026 at 6:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
THIS AGENDA AND PACKET HAVE BEEN REVISED BY REMOVING LEGISLATIVE,
FINANCE, AND ADMINISTRATION COMMITTEE MEETING ITEM 2 – PROPOSED
ORDINANCE #2026-04 – AMENDING CHAPTER 22 – BUILDING AND BUILDING
REGULATIONS, ARTICLE XII – VACANT BUILDINGS AND BY ADDING LEGISLATIVE,
FINANCE, AND ADMINISTRATION COMMITTEE MEETING ITEM # 6 – CITY OF DOVER
MUNICIPAL POLICE ACADEMY COST REVIEW
Public comments are welcomed on any item and will be permitted at the appropriate time. When possible, please notify the City Clerk (302-736-7008 or email at cityclerk@dover.de.us) should you wish to be recognized.
VIRTUAL MEETING NOTICE
This meeting will be held in City Hall Council Chambers with electronic access via WebEx. Public participation information is as follows:
Dial: 1-650-479-3208
Link: https://shorturl.at/iFt4v
Event number: 2531 682 9865
Event password: DOVER (if needed)
If you are new to WebEx, get the app now at https://www.webex.com/ to be ready when the meeting starts.
CALL COUNCIL COMMITTEE OF THE WHOLE MEETING TO ORDER
ADOPTION OF AGENDA
COUNCIL REPORTS - March 2026
- 1.First District
- 2.Second District
- 3.Third District
1
Page 2
COUNCIL COMMITTEE OF THE WHOLE MEETING - April 14, 2026 PAGE 2
- 4.Fourth District
- 5.At-Large
- 6.Council President Neil
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE
ADOPTION OF THE AGENDA
- 1.Annual Report from the Silver Lake Commission (Kathy Doyle, Chair)
(Recommendation: Acceptance of the Silver Lake Commission Annual Report)
- 2.Input Discussion on the Future Planning for Silver Lake Park (Councilwoman Arndt and Roger Ridgeway, Director of Parks and Recreation)
(Committee Action Not Required)
- 3.Revisit Request for Review of Cash-in-Lieu Payment for Active Recreation Area Requirement for Cecil Street Townhouses at 207 N, West Street (Dawn Melson-Williams, Principal Planner) – (Properties located at the northeast corner of North West Street and Cecil Street now subdivided into four lots addressed as 527, 525, 523, and 521 Cecil Street, as owned by 4BL, LLC. Planning Reference: Conditional Use/ Subdivision Plan C-25-01.)
(Recommendation: Staff provided an Active Recreation Report for consideration)
- 4.Review of Active Recreation Plan – Lands of Fuller at 7 Nixon Lane (Dawn Melson- Williams, Principal Planner) (Subdivision of 41,526 SF +/- property to be divided into three lots, including an existing single-family detached dwelling located on the east side of Nixon Lane and slightly north of North Little Creek Road, as owned by Lupe N. Fuller. Planning Reference: Minor Subdivision Plan: SB-26-01)
(Recommendation: Staff provided an Active Recreation Report for consideration)
- 5.Review of Active Recreation Plan – Bay Village Residential Planned Neighborhood Design on south side of White Oak Road (Dawn Melson-Williams, Principal Planner) (Property of 79.14 acres +/- located on the south side of White Oak Road and to the south of the Garrison Oak Business and Technology Center, as owned by Bay Village of Dover, LLC. Planning Reference: Conditional Use/Master Plan with Subdivision Plan: C-26-02)
(Staff Recommendation: Approval of the Active Recreation Area Plan for the project, subject to the conditions outlined in the Active Recreation Review Report)
- 6.Silver Lake Dam - Annual Inspection Review (Jason Lyon, Water & Wastewater Director)
(Staff Recommendation: Accept the Silver Lake Dam 2025 Dam Safety Inspection Report and the FY 2026 Silver Lake Dam Inspection Update Memorandum)
2
Page 3
COUNCIL COMMITTEE OF THE WHOLE MEETING - April 14, 2026 PAGE 3
- 7.Community Development Block Grant (CDBG) Proposed Grant Recommendations for 2026 (Debbie Obrien, CDBG Program Manager)
(Staff Recommendation: Approval of the recommended funding amounts)
ADJOURNMENT OF THE PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE MEETING
UTILITY COMMITTEE
ADOPTION OF THE AGENDA
- 1.Evaluation of Proposals – Manganese Removal Systems for Drinking Water (Kate Mills, P.E., Assistant Director of the Department of Water & Wastewater)
(Staff Recommendation: Award contract to Verdantas for the Manganese Removal Systems for Drinking Water, RFP #26-0012WW, for the amount of $449.500.)
- 2.Presentation - Safer Community Campaign HELP Initiatives (Charles Kistler, HELP Initiative)
(Staff Recommendation: Approve the Acting City Manager to sign and submit a letter of authorization)
ADJOURNMENT OF THE UTILITY COMMITTEE MEETING
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
ADOPTION OF THE AGENDA
- 1.Review of Snowstorm Budget Costs (Sharon Duca, Assistant City Manager)
(Committee Action Not Required)
- 2.Consideration of Restoring an Alderman's Court (Council President Neil)
(Committee Action Not Required)
- 3.Consideration of an Alderman's Court - Speed Control (Council President Neil)
(Committee Action Not Required)
- 4.The Mayors' Blue Ribbon Opioid Use Disorder (OUD) Taskforce Committees Recommendations (Councilman Dr. Sudler)
(Committee Action Not Required)
- 5.City of Dover Municipal Police Academy Cost Review (Thomas Johnson, Chief of Police)
(Committee Action Not Required)
3
Page 4
COUNCIL COMMITTEE OF THE WHOLE MEETING - April 14, 2026 PAGE 4
ADJOURNMENT OF THE LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE MEETING
ADJOURNMENT OF THE COUNCIL COMMITTEE OF THE WHOLE
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING
4
Page 5
Item 1.
5
Page 6
Item 1.
6
Page 7
Item 2.
ACTION FORM
PROCEEDING: CCW – Parks, Recreation, and Community Enhancement Committee DEPARTMENT OF ORIGIN: Parks & Recreation DATE SUBMITTED: April 9, 2026 PREPARED BY: Roger Ridgeway, Director of Parks and Recreation SUBJECT: Input Discussion on the Future Planning for Silver Lake Park REFERENCE: Silver Lake Master Plan RELATED PROJECT: n/a REVIEWED BY: Sharon J. Duca, P.E., ICMA-CM, Acting City Manager EXHIBITS: Public Input Survey EXPENDITURE REQUIRED: N/A AMOUNT BUDGETED: N/A FUNDING SOURCE (Dept./Page in CIP & Budget): N/A TIMETABLE: STAFF RECOMMENDATION: No formal staff recommendation is requested.
BACKGROUND AND ANALYSIS
The City of Dover Parks and Recreation Department is preparing to initiate the development of a Silver Lake Master Plan through the issuance of a Request for Proposals (RFP). The purpose of the master plan is to establish a long-term vision for Silver Lake Park and identify priority improvements related to recreation amenities, accessibility, environmental considerations, and infrastructure.
As an initial step in the process, a public input survey has been developed to gather feedback from residents on desired features and enhancements. This survey will help inform staff to ensure the scope of work for the master plan and ensure that future improvements align with community needs and priorities. This survey will be mailed to surrounding residents, as well as posted at City Hall, the Pitts Center and on social media.
7
Page 8
Item 2.
Please share your comments with us.
- 1.Park Usage
How often do you visit Silver Lake Park?
☐ Daily ☐ Weekly ☐ Monthly ☐ Rarely ☐ Never
What activities do you currently use the park for? (Check all that apply) ☐ Walking/Jogging ☐ Fishing ☐ Playground ☐ Picnicking ☐ Events ☐ Wildlife Viewing ☐ Other: __________________________________
- 2.Current Conditions
How would you rate the overall condition of the park?
☐ Excellent ☐ Good ☐ Fair ☐ Poor
What improvements are most needed? (Select up to 3) ☐ Trails ☐ Playground ☐ Restrooms ☐ Lighting ☐ Parking ☐ Landscaping ☐ Safety/Security ☐ Water Quality ☐ Other: ________________________________________________________________
- 3.Desired Amenities
What would you like to see, added or improved? (Check all that apply) ☐ Walking/Biking Trails ☐ Updated Playground ☐ Dog Park ☐ Fitness Equipment ☐ Picnic Shelters ☐ Amphitheater ☐ Kayak/Canoe Launch ☐ Fishing Pier ☐ Gardens/Pollinator Areas ☐ Other: ___________________________________
Top 3 priorities:
1. ________________________________________________________________
2. ________________________________________________________________
3. ________________________________________________________________
- 4.Community Needs
Who do you typically visit the park with?
☐ Alone ☐ Children ☐ Family ☐ Friends ☐ Pets
What age groups should the park better serve? (Check all that apply) ☐ Toddlers ☐ Teens ☐ Adults ☐ Seniors
- 5.Safety & Accessibility
Do you feel safe in the park?
☐ Always ☐ Usually ☐ Sometimes ☐ Rarely
8
Page 9
Item 2.
What would improve safety?
☐ Lighting ☐ Patrols ☐ Signage ☐ Emergency Stations ☐ Other: _________
How can accessibility be improved? ☐ ADA Paths ☐ Parking ☐ Seating ☐ Other: _______________________________
- 6.Environmental Priorities
How important are the following? (Circle one per item)
Water Quality: Very / Somewhat / Not
Habitat Protection: Very / Somewhat / Not
Tree Planting/Shade: Very / Somewhat / Not
Sustainability Features: Very / Somewhat / Not
Please complete and return to City of Dover Parks & Recreation
Parks@dover.de.us
City of Dover Parks & Recreation PO Box 475 Dover, DE 19903
9
Page 10
Item 3.
City of Dover DATA SHEET FOR RECREATION PLAN REVIEW Revisit Request for Review of Cash-in-lieu Payment for Active Recreation Area Requirement PARKS, RECREATION AND COMMUNITY ENHANCEMENT COMMITTEE MEETING OF April 14, 2026
Previous PLANNING COMMISSION MEETING of February 18, 2025 Previous PARKS, RECREATION and COMMUNITY ENHANCEMENT COMMITTEE MEETING of February 11, 2025
Plan Title: Lands of 4BL, LLC: Cecil Street Townhouses at 207 W. North Street, C-25-01
Plan Type: Conditional Use Site Plan and Minor Subdivision Active Recreation Area Plan
Location: Northeast corner of N. West Street and Cecil Street
Address: 207 N. West Street
(Now Addressed as 527, 525, 523, and 521 Cecil Street)
Tax Parcels: ED-05-076.08-02-01.00-000 ED-05-076.08-02-01.01-000 ED-05-076.08-02-01.02-000 ED-05-076.08-02-01.03-000
Owner: 4BL, LLC
Site Area: Total 12,168 SF now subdivided into 4 Lots
Zoning: RG-1 (General Residence Zone)
Current Use: Vacant Land
Proposed Use: Townhouse Lots
Dwelling Units: 4 units
Parking: Required: 2 per dwelling unit
Proposed: 2 per dwelling unit
Water and Sewer: City of Dover
Prior Approval: Active Recreation Plan (Cash-in-Lieu Donation) With Exemption under Zoning Ordinance, Article 5 §10.511
For Consideration: Request for Waiver of Cash in Lieu of Recreation Area Construction • Consideration of Determination of Suitability under Zoning Ordinance, Article 5 §10.171 • Small Development Exemption under Zoning Ordinance, Article 5 §10.511
- P.O. Box 475 Dover, DE 19903 10 Community Excellence Through Quality Service
Page 11
Item 3. C-25-01 Lands of 4BL, LLC: Cecil Street Townhouses at 207 N. West Street – Active Recreation Plan Report to Parks, Recreation & Community Enhancement Committee – April 14, 2026
- I.PROJECT AND REQUEST SUMMARY Conditional Use and Minor Subdivision Plan C-25-01 was reviewed to permit the construction of four (4) townhomes on a 12,168-SF parcel of land located at the northeast corner of Cecil Street and North West Street. It was granted conditional approval by the Planning Commission on February 18, 2025. The Plan achieved Final Plan Approval on March 11, 2026 and the plan has been recorded to create the four (4) lots for development with Building Permits currently under review. As part of the review process, the project received approval from the Parks, Recreation and Community Enhancement Committee and Planning Commission to utilize the Cash in Lieu donation instead of providing areas for Active Recreation in the development area of the four lots.
Determination of Cash-in-Lieu Amount As part of approval of an Active Recreation Area Plan for the project, the Planning Commission accepted that the applicant would make a Cash-in-Lieu payment for the Active Recreation Area. A copy of an appraisal prepared for construction financing was required to be provided to the Planning Office in order to determine the amount of the Cash-in-Lieu payment in accordance with Zoning Ordinance, Article 5 Section 10. The applicant submitted a full copy of the appraisal performed by Dover Consulting Services, Inc. as of April 1, 2025 which relates a market value for the parcel of land. The following is a summary of the calculations for the Cash-in-Lieu payment amount under the Small Development exemptions.
2025 Appraisal of Land Value: $80,700 Cash-in-Lieu Amount = 10% of appraised value of gross land area = $8,070
The Zoning Ordinance requires payment of the Cash-in-Lieu donation prior to issuance of the first Building Permit.
Request for Waiver of Cash in Lieu The Applicant has made a Request to Revisit the Cash in Lieu of Recreation Area Construction; see attached email with Narrative. This Revisit with the Parks, Recreation and Community Enhancement Committee (and Planning Commission) is to allow consideration for Waiver of the Cash in Lieu payment or consideration of accepting a partial (reduced) Cash in Lieu payment.
Attachments for Waiver Request: • Email of March 31, 2026 with narrative Request for Waiver • Aerial Map of Subject Site and Proximity to Dover Park (added by Staff for Reference) • Record Plat of Approved Subdivision C-25-01
Code Citations Dover Code of Ordinances, Appendix B – Zoning, Article 5 – Supplementary Regulations, Section 10 – Open Space, Recreation and Other Public Facilities outlines the provisions for Active Recreation Area requirements. Zoning Ordinance, Article 5 §10.17 describes an option for Cash in lieu of Recreation Area construction and determination of its suitability. This determination of suitability allows for consideration of proximity to existing recreation facilities, land characteristics, and if beneficial to residents. Additionally, Article §10.5 provides the additional guidelines for Exemptions for Small Developments. See the code excerpts that follows: 11
Page 12
Item 3. C-25-01 Lands of 4BL, LLC: Cecil Street Townhouses at 207 N. West Street – Active Recreation Plan Report to Parks, Recreation & Community Enhancement Committee – April 14, 2026
Article 5 §10 10.17 Cash in lieu of recreation area construction. 10.171 Determination of suitability for cash donation. If the commission determines that the construction of recreation is not practical due to close proximity to existing available recreation facilities or infeasible due to natural characteristics of the land or will not benefit the residents of the development, the commission shall require a full or partial cash in lieu of areas of donation to be made by the developer in lieu of a full or partial dedication of land.
10.5 Exemption to recreation area and open space dedication. 10.51 Exemptions for small developments. 10.511 Residential developments with less than five acres of land and less than ten dwelling units. These developments shall be exempt from the land requirements set forth in [sub]sections 10.1 and 10.2, but shall require a full cash donation to be made by the developer in lieu of a dedication of land.
10.52 Amount of cash donation. This cash donation shall be equivalent to ten percent of the appraised value of gross land area. The land area value shall be based on the appraisal prepared for the developer to secure construction financing. This submitted appraisal shall be a copy of the original supplied to the lending institution, with that institution identified, and shall conform in all ways to the Uniform Standard of Professional Appraisal practice and be performed by an appropriately qualified certified appraiser. If an appraisal prepared for construction financing is not available, then the developer shall have an appraisal done in accordance with the procedures set forth in [sub]section 10.174.
II. STAFF RECOMMENDATIONS on Request for Waiver The following are comments and recommendations from staff of the Planning Office following review of the Applicant’s Request for Waiver of the Cash in Lieu payment.
- 1)The Zoning Ordinance allows for a determination of suitability and consideration for a full or partial Cash in Lieu donation. The subject lots are about a block south of Mary Street Park located at the corner of Mary Street and North Kirkwood Street. The Capital City Bike Trail is also nearby.
- 2)Previously, the project was authorized for the Cash in Lieu Payment option and upon receipt of the appraisal information the payment amount was determined. Based on the code provisions for Cash in Lieu under the Small Development Exemption, the Cash in Lieu Payment is $8,070 due to the land value of the property.
- 3)Due to the proximity of the lots to the Mary Street Park and evaluation of the reasonableness of the payment amount versus the project’s development size, Staff recommends that consideration be given to the Applicant’s request for Waiver of the Cash in Lieu payment or to accepting a partial (reduced) Cash-in-lieu payment.
- a.Any Cash in Lieu payment donation is placed in the Parkland Reserve Account which is a separate account to be used for parks, playgrounds, or recreational purposes.
12
Page 13
Item 3. C-25-01 Lands of 4BL, LLC: Cecil Street Townhouses at 207 N. West Street – Active Recreation Plan Report to Parks, Recreation & Community Enhancement Committee – April 14, 2026
The following is the original Review Report prepared for the Council Committee of the Whole: Parks, Recreation and Community Enhancement Committee Meeting of February 11, 2025 and Planning Commission Meeting of February 18, 2025. It is included for reference.
Note: The Review Report of February 2026 was initially prepared by Staff of the Rossi Group (under a Planning Services contract with the City of Dover). The Report was completed with additional review and editing by the City’s Planning Office.
- I.PROJECT SUMMARY: This application is for review of a Conditional Use and Minor Subdivision Plan to permit the construction of four (4) townhomes on a 12,168-SF parcel of land located at the northeast corner of Cecil Street and North West Street. The property is currently a vacant parcel of land, after the prior residential structure was demolished. The property for the proposed development is zoned RG-1 (General Residence Zone). The owner of record is 4BL, LLC. Property Address: 207 North West Street. Tax Parcel Number: ED-05-076.08-02-01.00-000. Council District 4. For Consideration: Active Recreation Plan Review. See Attached Plan Sheets.
II. ACTIVE RECREATION AREA PLAN SUMMARY:
Article 5, Section 10 of the Zoning Ordinance requires the reservation of open space, recreation and other public facilities as a condition of approval for all one-family dwelling, two-family dwelling and multiple-family dwelling residential developments requiring conditional use approval, site development plan approval, or land subdivision approval by the City of Dover Planning Commission.
Exemption to Recreation Area and Open Space Dedication The Zoning Ordinance Article 5, Section 10.511 notes that residential developments with less than five acres of land and less than ten dwelling units are considered a “small development” and as such are exempt from requiring recreation area and open space facilities, but shall require a cash donation to be made by the developer in lieu of a dedication of land.
The Applicant is therefore not required to provide such recreation facilities, but must otherwise pay a cash-in-lieu fee. This fee is determined based off the appraised value of the gross land area. The appraisal document with the appraised value of the gross land area must be submitted to the Planning Office so that the fee calculation (Cash-in-Lieu amount) may be completed. The information is required to be submitted to the Parks, Recreation and Community Enhancement Committee of City Council for review and approval.
III. REVIEW PROCESS
The Planning Office has prepared this Active Recreation Area Report outlining the requirements based on the Zoning Ordinance. The Parks, Recreation and Community Enhancement Committee will make a recommendation. The Planning Commission must act to accept the Recreation Area Plan as part of the Site Plan review process.
The Parks, Recreation and Community Enhancement Committee will review the Recreation Area Plan at their meeting on February 11, 2025. The Planning Commission Public Hearing and Review of the Conditional Use/Minor Subdivision Plan C-25-02 is scheduled for February 18, 2025.
13
Page 14
Item 3. C-25-01 Lands of 4BL, LLC: Cecil Street Townhouses at 207 N. West Street – Active Recreation Plan Report to Parks, Recreation & Community Enhancement Committee – April 14, 2026
IV. CODE CITATIONS:
Dover Code of Ordinances, Appendix B – Zoning, Article 5 – Supplementary Regulations, Section 10 – Open Space, Recreation and Other Public Facilities (select excerpts).
Article 5 Section 10 Section 10. - Open space, recreation, and other public facilities. The City of Dover shall require the reservation of open space, recreation, and other public facilities in accordance with the provisions of this section as a condition of approval for all one-family dwelling, two-family dwelling and multiple-family dwelling residential developments requiring conditional use approval, site development plan approval, or land subdivision approval by the City of Dover Planning Commission.
10.1 Recreation areas. 10.11 Purpose. The purpose of this section is to ensure that active recreation areas are provided as an integral design element within residential developments and that such facilities are of an adequate scale in relation to the size of the residential development and which provide residents with a variety of active recreational pursuits.
10.12 Dedication required. The commission shall require the dedication or reservation of recreation areas, and the subsequent construction of recreation facilities of a character, extent and location suitable to the needs created by a development for recreation facilities as defined and in accordance with the design guidelines set forth.
10.13 Definition. The following are illustrative of the types of recreation areas and subsequent facilities that shall be deemed to serve active recreational needs and therefore to count toward satisfaction of the recreation area requirements of this section: tennis courts, handball courts, racquetball courts, swimming pools, saunas and exercise rooms, meeting or activity rooms within clubhouses, baseball and soccer fields, basketball courts, volleyball courts, swings, slides and play apparatus, and developed walking, jogging or biking trails.
10.5 Exemption to recreation area and open space dedication. 10.51 Exemptions for small developments. 10.511 Residential developments with less than five acres of land and less than ten dwelling units. These developments shall be exempt from the land requirements set forth in [sub]sections 10.1 and 10.2, but shall require a full cash donation to be made by the developer in lieu of a dedication of land.
10.52 Amount of cash donation. This cash donation shall be equivalent to ten percent of the appraised value of gross land area. The land area value shall be based on the appraisal prepared for the developer to secure construction financing. This submitted appraisal shall be a copy of the original supplied to the lending institution, with that institution identified, and shall conform in all ways to the Uniform Standard of Professional Appraisal practice and be performed by an appropriately qualified certified appraiser. If an appraisal prepared for construction financing is not available, then the developer shall have an appraisal done in accordance with the procedures set forth in [sub]section 10.174.
10.53 Separate recreation account. The cash donation shall be deposited in a separate account to be used for parks, playgrounds or recreational purposes.
10.54 Appeal of appraised value. If the city does not accept the land value established by the appraisal detailed in [sub]section 10.52, the city may, at the developer's expense, require another appraisal be performed. This appraisal will be let on a bid basis between at least three qualified, certified and licensed appraisers selected by the city. The appraiser(s) who prepared the original appraisal in [sub]section 10.52 cannot be a party to this appeal appraisal.
14
Page 15
Item 3. C-25-01 Lands of 4BL, LLC: Cecil Street Townhouses at 207 N. West Street – Active Recreation Plan Report to Parks, Recreation & Community Enhancement Committee – April 14, 2026
10.55 Payment of cash donation. One hundred percent cash donation provided under this [sub]section [10.5] shall be collected prior to issuing the first building permit for the development.
10.6 Construction phasing. The recreation and open space areas shall be completed in a proportion equal to or greater than the proportion of residential dwelling units completed, except that 100 percent of the recreation and open space areas shall be completed prior to issuing building permits for the final 20 percent of the dwelling units proposed. Building permits shall not be issued for dwelling units unless the requirements of this section are met.
10.7 Council approval. Prior to acceptance by the planning commission, all areas planned for public dedication, or cash donations provided under this section must be submitted to, and approved by the parks, recreation, and community enhancement committee of the City of Dover, and shall be subject to final review and approval by [the] city council.
Regarding the calculation of the amount of the cash donation, the Zoning Ordinance in Article 5 §10.52 specifies that the “cash donation shall be equivalent to ten percent of the appraised value of gross land area” and this value shall be “based on the appraisal prepared for the developer to secure construction financing.” The Applicant is aware of the need to submit this Appraisal document; upon its submission to the required Cash-in-lieu donation amount will be calculated.
- V.STAFF RECOMMENDATIONS The following are comments and recommendations from staff of the Planning Office following review of the Active Recreation Area Plan (Potential request for Cash-in-Lieu).
- 1)Staff recommends that a Cash-in-lieu donation of an Active Recreation Area be approved for this project. The project is located Downtown, across from the Senator Bikeway, and within walking distance of City parks and recreation amenities.
- a.The Cash-in-lieu amount is yet to be determined as a land appraisal submission is required to be submitted to the Planning Office.
- b.This Request must be reviewed by the Parks, Recreation & Community Enhancement Committee of City Council so that they may provide a recommendation to the Planning Commission.
- c.The payment of the Cash-in-lieu is required prior to the issuance of the Building Permit for this first dwelling unit. The donation amount is deposited in the City’s Parkland Reserve Fund account.
VI. ADVISORY COMMENTS
- 1)In the event that major changes and revisions to the Plan occur in the finalization of the Plan, contact the Planning Office. Examples include reorientation of buildings, relocation of site components, changes in floor area or unit count, or design revisions impacting Active Recreation Areas. These changes may require resubmission for review by the Development Advisory Committee, Planning Commission, or other agencies and commissions making recommendations in regard to the plan.
- 2)The Parks, Recreation, and Community Enhancement Committee shall submit to the Planning Commission a report detailing the recommendations as to the Recreation Area Plan.
Attachments (to Original Report):
• Select pages from the C-25-01 Plan set
15
Page 16
Item 3.
From: Cameron Llewellyn
To: Melson-Williams, Dawn
Cc: Lori Llewellyn
Subject: EXTERNAL: Cecil Street Townhomes
Date: Tuesday, March 31, 2026 3:35:31 PM
Dawn,
Lori and I appreciate the guidance you have provided throughout the Cecil Street Affordable Townhomes project. We value the City’s partnership as we work to deliver four modest, for- sale homes—one of which is intended for our daughter and son-in-law.
That said, the process to date has been challenging. We have experienced extended delays and slow response times, over $45,000 in engineering costs, and significant carrying costs. For a small, four-unit project, these impacts are substantial. If bulk standards were more aligned with the existing lot fabric of downtown Dover, and if administrative flexibility were available at the staff level, these homes would likely already be completed and occupied.
We applaud the SJR8 Housing Reform Program, which seeks to address many of the barriers we have encountered. However, those reforms do not provide relief to the buyers currently waiting for these homes.
Unfortunately, due to these delays, our daughter and son-in-law have been forced to sign a lease for an apartment, as construction has not progressed. As a result, we now face the financial burden of carrying that unit for an additional 6–7 months, or alternatively incurring penalties to terminate their lease early.
From the outset, we made intentional design decisions to improve both safety and livability. Specifically, we elected to install a full sprinkler system, eliminating the need for a rear alley. While this adds cost to each home, it reduces impervious coverage, provides meaningful and usable backyard space, and limits opportunities for undesirable activity. These yards are functional spaces for families—whether for children’s play, small patios, or general outdoor use.
Despite these considerations, each unit is still subject to a $2,000 active recreation fee. While described as a “cash donation,” this functions in practice as a direct cost burden—one that is ultimately borne by first-time and moderate-income homebuyers. In today’s housing market, even modest additional costs can meaningfully impact affordability and access to homeownership.
This requirement also appears inconsistent with the City’s adopted policies. The 2019 Comprehensive Plan prioritizes expanding affordable homeownership opportunities, and recent statewide initiatives emphasize reducing barriers to housing production and affordability. From our perspective, allocating $2,000 toward a buyer’s closing costs would provide a far more direct and meaningful benefit than funding off-site recreation improvements.
Additionally, the Zoning Ordinance provisions for active recreation appear to support relief in this case:
Section 10.514 requires 150 square feet of active recreation area per unit. The Cecil
16
Page 17
Item 3.
Street homes provide approximately 850 square feet of usable, sodded rear yard space for interior units and approximately 1,320 square feet for end units. Section 10.515, applicable to developments within the Downtown Redevelopment Target Area (Appendix C), reduces this requirement to 75 square feet per unit. While we have been unable to confirm whether this parcel falls within that boundary due to limitations accessing the City’s mapping resources, the site is located within the Downtown Development District and functions as part of the broader redevelopment area.
Further, the project is directly connected to meaningful recreational assets. The homes are located along the Capital City Trail, providing access to downtown amenities, First State Heritage Park, and Silver Lake Park. Nearby neighborhood amenities, including Mary Street Park and the Division Street Playground, offer additional accessible recreational opportunities.
Given the significant delays, the substantial costs already incurred, the recreational amenities already provided both on-site and nearby, and the project’s clear alignment with the City’s housing and redevelopment goals, we respectfully request a waiver of the active recreation fee.
We respectfully request to be placed on the agenda for the April 14th City Council of the Whole Parks and Recreation Committee meeting to present this request and provide any additional information that may assist in your consideration.
We appreciate your consideration and would welcome the opportunity to discuss this further.
Sincerely,
Cameron and Lori Llewellyn
17
Page 18
Item 3.
18
Page 19
Item 9.
19
Page 20
Item 9.
20
Page 21
Item 4.
City of Dover DATA SHEET FOR RECREATION PLAN REVIEW Review of Active Recreation Area Plan – Request for Waiver of Cash-in-Lieu
PARKS, RECREATION AND COMMUNITY ENHANCEMENT COMMITTEE
MEETING OF April 14, 2026
PLANNING COMMISSION MEETING of April 20, 2026
Plan Title: Lands of Lupe N. Fuller, 7 Nixon Lane, SB-26-01
Plan Type: Minor Subdivision Plan
Location: East side of Nixon Lane to slightly north of North Little Creek Road
Address: 7 Nixon Lane, Dover, DE 19901
Tax Parcel: Tax Parcel: ED-00- 068.19-01-28.00-000 (New Tax Parcel Number to be assigned)
Owner: Lupe N. Fuller
Site Area: 41,526 SF +/- (0.9533+/- acres)
Zoning: R-8 (One Family Residence Zone)
Current Use: Residential – One Family detached dwelling on existing lot
Proposed Use: Residential – Existing One Family detached dwelling on Lot 1 Lot 2 and Lot3 – Future Residential
Parking: Required: 2 off-street parking spaces per dwelling unit Proposed: 2 off-street parking spaces per dwelling unit
Water and Sewer: City of Dover
Recreation Area Requirement: To be based on new Lots (Lot 2 and Lot 3) which consist of 12,642.85 SF and 12,766.73 SF that are proposed for development. (Development Area size is 25,409.58 SF.)
For Consideration: Request for Waiver of Cash in Lieu of Recreation Area Construction • Consideration of Determination of Suitability under Zoning Ordinance, Article 5 §10.171 • Small Development Exemption under Zoning Ordinance, Article 5 §10.511
- P.O. Box 475 Dover, DE 19903 21 Community Excellence Through Quality Service
Page 22
Item 4. SB-26-01 Active Recreation Plan Report – Lands of Fuller at 7 Nixon Lane Report to Parks, Recreation and Community Enhancement Committee – April 14, 2026
- I.PROJECT SUMMARY: This Application is the review of Minor Subdivision Plan for a parcel of land totaling 41,526 SF+/- (0.9533 acres +/-) located at 7 Nixon Lane to be subdivided into three (3) lots. From south to north, Lot 1 is 0.3700 acres +/-, Lot 2 is 0.2902 acres+/-, and Lot 3 is 0.2931 acres +/-. The property is zoned R-8 (One-Family Residence Zone). Lot 1 is currently developed with a one- story single-family home, and Lots 2 and 3 are undeveloped. The property is located on the east side of Nixon Lane to slightly north of North Little Creek Road. The property was annexed into the City of Dover on March 9, 2026 (Application AX-26- 01). The property owner is Lupe N. Fuller. Property Address: 7 Nixon Lane, Dover, DE 19901. Tax Parcel: ED-00- 068.19-01- 28.00-000 (new tax parcel number to be assigned). Council District 3. For Consideration: Active Recreation Plan Review – Request for Waiver of Cash in Lieu.
II. ACTIVE RECREATION AREA PLAN SUMMARY:
Article 5, Section 10 of the Zoning Ordinance requires the reservation of open space, recreation and other public facilities as a condition of approval for all one-family dwelling, two-family dwelling and multiple-family dwelling residential developments requiring conditional use approval, site development plan approval, or land subdivision approval by the City of Dover Planning Commission.
This is a Minor Subdivision Plan Application that the Planning Commission will review. It proposes the existing parcel be divided into three lots. It does not designate any recreation area but the development of Lot 2 and Lot 3 is expected to have yard areas surrounding each (future) single family detached dwellings as each lot is over 12,000 SF in size. Lot 1 includes an existing single family detached dwelling. The Applicant has requested consideration of a waiver of the Cash in Lieu payment; see Statement.
Exemption to Recreation Area and Open Space Dedication The Zoning Ordinance, Article 5 Section 10.511 notes that residential developments with less than five acres of land and less than ten dwelling units are considered a “small development” and as such are exempt from requiring recreation area/ recreation construction and open space facilities but shall require a cash donation to be made by the developer in lieu of a dedication of land.
III. REVIEW PROCESS
The Planning Office has prepared this Active Recreation Area Report outlining the requirements based on the Zoning Ordinance. The Parks, Recreation and Community Enhancement Committee will make a recommendation. The Planning Commission must act to accept the Recreation Area Plan as part of the review process.
The Parks, Recreation and Community Enhancement Committee will review the Recreation Area Plan at their meeting on April 14, 2026. The Planning Commission Public Hearing and Review of the Minor Subdivision Plan SB-26-01 is scheduled for April 20, 2026.
IV. CODE CITATIONS:
Dover Code of Ordinances, Appendix B – Zoning, Article 5 – Supplementary Regulations, §10 – Open Space, Recreation and Other Public Facilities (select excerpts).
22
Page 23
Item 4. SB-26-01 Active Recreation Plan Report – Lands of Fuller at 7 Nixon Lane Report to Parks, Recreation and Community Enhancement Committee – April 14, 2026
Article 5 §10 describes the requirements and purpose of an active recreation plan. The commission shall require the dedication or reservation of recreation areas, and the subsequent construction of recreation facilities of a character, extent and location suitable to the needs created by a development for recreation facilities as defined and in accordance with the design guidelines set forth:
Article 5 §10.1 Recreation areas. 10.11 Purpose. The purpose of this section is to ensure that active recreation areas are provided as an integral design element within residential developments and that such facilities are of an adequate scale in relation to the size of the residential development and which provide residents with a variety of active recreational pursuits.
10.12 Dedication required. The commission shall require the dedication or reservation of recreation areas, and the subsequent construction of recreation facilities of a character, extent and location suitable to the needs created by a development for recreation facilities as defined and in accordance with the design guidelines set forth.
10.13 Definition. The following are illustrative of the types of recreation areas and subsequent facilities that shall be deemed to serve active recreational needs and therefore to count toward satisfaction of the recreation area requirements of this section: tennis courts, handball courts, racquetball courts, swimming pools, saunas and exercise rooms, meeting or activity rooms within clubhouses, baseball and soccer fields, basketball courts, volleyball courts, swings, slides and play apparatus, and developed walking, jogging or biking trails.
There are currently no recreation facilities identified on the proposed Minor Subdivision Plan. Article 5 §10.17 describes an option for Cash in lieu of Recreation Area construction and determination of its suitability. This determination of suitability allows for consideration of proximity to existing recreation facilities, land characteristics, and if beneficial to residents. Additionally, Article §10.5 provides additional guidelines for Exemptions for Small Developments. See code excerpt below:
10.17 Cash in lieu of recreation area construction. 10.171 Determination of suitability for cash donation. If the commission determines that the construction of recreation is not practical due to close proximity to existing available recreation facilities or infeasible due to natural characteristics of the land or will not benefit the residents of the development, the commission shall require a full or partial cash in lieu of areas of donation to be made by the developer in lieu of a full or partial dedication of land.
10.5 Exemption to recreation area and open space dedication. 10.51 Exemptions for small developments. 10.511 Residential developments with less than five acres of land and less than ten dwelling units. These developments shall be exempt from the land requirements set forth in [sub]sections 10.1 and 10.2, but shall require a full cash donation to be made by the developer in lieu of a dedication of land.
10.52 Amount of cash donation. This cash donation shall be equivalent to ten percent of the appraised value of gross land area. The land area value shall be based on the appraisal prepared for the developer to secure construction financing. This submitted appraisal shall be a copy of the original supplied to the lending institution, with that institution identified, and shall conform in all ways to the Uniform Standard of Professional Appraisal practice and be performed by an appropriately qualified certified appraiser. If an appraisal prepared for construction financing is not available, then the developer shall have an appraisal done in accordance with the procedures set forth in [sub]section 10.174. 23
Page 24
Item 4. SB-26-01 Active Recreation Plan Report – Lands of Fuller at 7 Nixon Lane Report to Parks, Recreation and Community Enhancement Committee – April 14, 2026
10.53 Separate recreation account. The cash donation shall be deposited in a separate account to be used for parks, playgrounds or recreational purposes.
10.54 Appeal of appraised value. If the city does not accept the land value established by the appraisal detailed in [sub]section 10.52, the city may, at the developer's expense, require another appraisal be performed. This appraisal will be let on a bid basis between at least three qualified, certified and licensed appraisers selected by the city. The appraiser(s) who prepared the original appraisal in [sub]section 10.52 cannot be a party to this appeal appraisal.
10.55 Payment of cash donation. One hundred percent cash donation provided under this [sub]section [10.5] shall be collected prior to issuing the first building permit for the development.
- V.STAFF RECOMMENDATIONS The following are comments and recommendations from staff of the Planning Office following review of the Active Recreation Area Plan and the Applicant’s Request for Waiver of the Cash in Lieu payment.
- 1)The Zoning Ordinance allows for a determination of suitability and consideration for a full or partial Cash in Lieu donation. The subject lots are located approximately 500 feet from the boundary of Dover Park while the main park entrance is located off White Oak Road. Dover Park is an approximately 28.2-acre park with tennis courts, pickleball courts, basketball courts, softball field, playgrounds, disc golf course, pavilions shuffleboard courts, and walking paths.
- 2)The subdivision project is located on the east side of Nixon Lane to slightly north of North Little Creek Road as a grouping of three (3) Lots totaling 41,526 SF +/- (currently a one-story single-family home on Lot 1, with Lot 2 and Lot 3 as undeveloped). The Development Area would be the area of Lots 2 and 3 which totals 25,409.58 SF in size.
- 3)Staff notes that a Cash donation in lieu of an Active Recreation Area may be appropriate for this project as allowed under the Small Development exemptions. With the exemption, the construction of Active Recreation Area is not required at the subject site. Instead, a Cash in Lieu donation is made based on a calculation related to the appraised value of the land area.
- a.The Applicant must provide a copy of the land appraisal to the Planning Office.
- b.Under the Small Development exemption, the Cash in Lieu Amount is equal to 10% of the appraised value of gross land area. The gross land area is the development area of 25,409.58 SF (Lots 2 and 3). The Cash in Lieu Amount is unknown.
- 4)Due to the number of lots, size and proximity of the lots to Dover Park, Staff recommends that consideration be given to the Applicant’s request for Waiver of the Cash in Lieu payment or consideration of accepting a partial (reduced) Cash-in-lieu payment.
- a.The Cash in Lieu payment donation is placed in the Parkland Reserve Account which is a separate account to be used for parks, playgrounds, or recreational purposes. It is paid prior to issuance of Building Permits. 24
Page 25
Item 4. SB-26-01 Active Recreation Plan Report – Lands of Fuller at 7 Nixon Lane Report to Parks, Recreation and Community Enhancement Committee – April 14, 2026
VI. ADVISORY COMMENTS
- 1)The Parks, Recreation, and Community Enhancement Committee shall submit to the Planning Commission a report detailing the recommendations as to the Recreation Area requirements.
- 2)In the event, major changes and revisions to the Plan occur in the finalization of the Plan contact the Planning Office. Examples include reorientation of buildings, relocation of site components, changes in lot count, or design revisions impacting Active Recreation Area requirements. These changes may require resubmission for review by the Development Advisory Committee, Planning Commission, or other agencies and commissions making recommendations in regard to the plan.
- 3)The applicant shall be aware that Recreation Area Plan approval does not represent a site development or subdivision approval, a Building Permit, and associated construction activity permits. A separate application process is required for review and approvals for development activity from the City of Dover.
Attachments: • SB-26-01 Minor Subdivision Plan sheet submission • Statement: Request for Waiver of Cash in Lieu of Recreation Requirements
- •Aerial Map of Subject Site and Proximity to Dover Park
Note: The Review Report was initially prepared by Staff of the Rossi Group (under a Planning Services contract with the City of Dover). The Report was completed with additional review and editing by the City’s Planning Office.
25
Page 26
Item 10.
26
Page 27
Item 4.
Request for waiver of Cash In Lieu of Recreation requirements for lands of 7 Nixon Lane Z 26-01
Due to the close proximity of Dover Park we are requesting the Waiver of the Cash in Lieu for parks. This land was originally 3 separate lots. We are simply putting this back to the original lots and providing 2 new residential R-8 zoned homes for Dover residents.
27
Page 28
Planning & Inspections View Map Item 4.
| 4/8/2026, 4:53:11 PM | 1:2,257 | ||
|---|---|---|---|
| 0 | 0.02 | 0.04 | 0.08 mi |
| Dover_Boundary | |||
| 0 | 0.03 | 0.07 | 0.13 km |
| Parcels Outside Dover | |||
| Dover Parcels | VGIN, Microsoft, Vantor | ||
28 City of Dover, Delaware - Planning Department USDA Agricultural Stabilization and Conservation Service | EarthData/PhotoScience Inc. | State of Delaware Department of Transportation and EarthData | EarthData International of Maryland | Sanborn Mapping Company | Digital Aerial Solutions, LLC | Surdex Corp | State of Delaware, Sanborn Map Company, Inc. |
Page 29
Item 5.
City of Dover
DATA SHEET FOR RECREATION PLAN REVIEW
Review of Active Recreation Area Plan
PARKS, RECREATION AND COMMUNITY ENHANCEMENT COMMITTEE MEETING OF APRIL 14, 2026 PLANNING COMMISSION MEETING OF APRIL 20, 2026
Plan Title: Bay Village Residential Planned Neighborhood Design (C-26-02)
Plan Type: Planned Neighborhood Design Option Conceptual Plan (Conditional Use) and Active Recreation Area Plan
Location: South side of White Oak Road across from the Garrison Oak Business and Technology Center (industrial park), east of State Route 1
Address: Unaddressed off White Oak Road
Tax Parcel: LC-04-68.00-01-06.00-000
Owner: Bay Village of Dover, LLC
Equitable Owner/Developer: Bay Village Holdings, LLC
Site Area: 79.14 +/- acres
Zoning: RM-2 (Medium Density Residence)
SWPOZ (Source Water Protection Overlay Zone) Tier 2 – Primary
Wellhead Protection Area
Current Use: Vacant Land (agriculture)
Proposed Use: Planned Neighborhood Design Option Dwelling Units: 250 Townhouse Units (and future Apartment Complex)
Parking: Required: 2 parking spaces per dwelling unit (Townhouse) Proposed: 2 parking spaces per dwelling unit (Townhouse) With on-street parking
Water and Sewer: City of Dover
For Consideration: Active Recreation Area Plan
Recreation Area: Required – 68,750 SF
Provided – 72,310 SF
- P.O. Box 475 Dover, DE 19903 29 Community Excellence Through Quality Service
Page 30
Item 5. C-26-02 Bay Village Residential Planned Neighborhood Design: Active Recreation Area Plan Review for Parks, Recreation and Community Enhancement Committee Meeting - April 14, 2026
- I.PROJECT SUMMARY: This application is for review of a Planned Neighborhood Design Option Plan (Conditional Use/Master Plan Application and Major Subdivision Plan) for the construction of 250 townhouse units and active recreation areas. There is a development area held for an apartment complex. Also proposed are 500 off-street parking spaces, 110 on-street parking spaces, landscaping, and other site improvements. The project area of 79.14 +/- acres is zoned RM-2 (Medium Density Residence Zone) and subject to the SWPOZ (Source Water Protection Overlay Zone) Tier 2 – Wellhead Protection Area. The property is located south side of White Oak Road, east of State Route 1 and across from the Garrison Oak Business and Technology Center (industrial park). The owner of record is Bay Village of Dover, LLC and equitable owner/developer is Bay Village Holdings, LLC. Property is currently unaddressed on White Oak Road. Tax Parcel: LC-04- 68.00-01-06.00-000. Council District 3. For Consideration: Active Recreation Area Plan.
II. ACTIVE RECREATION AREA PLAN SUMMARY:
The Conceptual Plan as submitted by the applicant for the Planned Neighborhood Design development identifies Active Recreation features consisting of a basketball half court, tot lot, pavilion and tables, dog park, and walking path with benches to serve the proposed development of the 250 Townhouse units. The future development of an apartment complex will be subject to additional active recreation requirements.
Per Zoning Ordinance, Article 5, Section 10.16, recreation area for this project is required at a rate of 275 SF per dwelling unit or 0.5 acre of land, whichever is greater. Based on 250 dwelling units, 68,750 SF of recreational area is required. The applicant proposes 72,310 SF, exceeding this minimum requirement. The Active Recreation Areas proposed are shown on the overall Site Plan, Landscape Plan, and the calculations are provided in the Data Column on page C-001. See Summary Table below of Active Recreation Areas for Bay Village Residential PND.
Active Recreation Area (Article 5 §10.16) Required Provided on Plan 275 S.F. per dwelling unit (DU) • Active Open Space area with basketball half court, or 0.5 acre of land, whichever is pavilion and tables, and tot lot (31,798.8 SF) greater to be provided on site. • Active Open Space area with walking path and benches (8,276.4 SF) 250 DU = 68,750 SF (1.58 +/- • Active Open Space area with walking path and ac) benches (8,712 SF) Required = 68,750 SF • Active Open Space with proposed fenced Dog Park (23,522.4 SF) Total of 72,310 SF Other Land Areas This property includes woodland areas with wetlands and the Little River Tax Ditch system with associated wetlands and Special Flood Hazard Areas (floodplain) which have limitations on development. The Active Recreation Areas are not within these areas.
30
Page 31
Item 5. C-26-02 Bay Village Residential Planned Neighborhood Design: Active Recreation Area Plan Review for Parks, Recreation and Community Enhancement Committee Meeting - April 14, 2026
Article 5 Accessible There is sidewalk proposed along the front of the §10.151 townhouse units that connect to all active reaction spaces. There are also crosswalks at all intersections. Amenities within the active recreation spaces that are accessible via sidewalks include the basketball half court, pavilion and tables, and tot lot. The proposed dog park is not connected to the sidewalk network. A sidewalk that connects the frontage sidewalk to the dog park entrance would enhance accessibility. 10.152 Pedestrian oriented In addition to the sidewalks along the front of the townhouse units, there are walkways through three of the active open space areas. There is also a proposed shared-use path along White Oak Road from the east entrance to the proposed development to west of the western entrance. 10.153 Age Oriented The active recreation areas provide activities for a range of ages. The tot lot offers activities specifically to younger children while the other amenities, such as the basketball half court, pavilion with tables, walking path with benches, and dog park appeal to all ages. 10.154 Parking There are 110 on-street parking spaces provided in addition to 500 parking spaces on the individual lots. The parking areas are adjacent to sidewalks which offer access to the active recreation areas. 10.155 Walking, jogging There are no bicycle parking spaces depicted on the plan and biking trails sheet. The individual dwelling units would likely have some opportunity for bicycle storage. Bicycle racks for parking should be added near the key amenity areas of the central open space and at the dog park area. 10.156 Setbacks The basketball half court on these site plans will need to be moved inward to conform to the 25-foot setback from any right-of-way line requirement for game courts. 10.157 Landscaping The site requires 462 trees and the applicant proposes planting 476 trees in addition to preservation of certain woodland areas. Specific tree species will need to be identified on the plans and of a species and size as set forth in the table of trees approved by the Planning Commission and kept on file in the office of the city planner or be of an alternate species found acceptable by the commission. The woodland areas to remain are shown. 10.158 Area The breakdown of the allotted recreation areas is listed on the site plans and they all exceed the minimum area size of 2,000 SF.
31
Page 32
Item 5. C-26-02 Bay Village Residential Planned Neighborhood Design: Active Recreation Area Plan Review for Parks, Recreation and Community Enhancement Committee Meeting - April 14, 2026
III. REVIEW PROCESS
The Planning Office has prepared this Active Recreation Area Report outlining the Recreation Area proposal. The Parks, Recreation and Community Enhancement Committee will need to consider the proposed Active Recreation Area and make a recommendation. The Planning Commission must act to accept the Recreation Area Plan as part of the Planned Neighborhood Design Option Conceptual Plan (Conditional Use/Master Plan with Major Subdivision Plan) review process.
The Parks, Recreation and Community Enhancement Committee will review the Recreation Area Plan at their meeting on April 14, 2026. The Planning Commission Public Hearing and Review of the Planned Neighborhood Design Conceptual Plan C-26-02 is scheduled for April 20, 2026.
IV. CODE CITATIONS:
Dover Code of Ordinances, Appendix B – Zoning, Article 5 – Supplementary Regulations, Section 10 – Open Space, Recreation and Other Public Facilities (select excerpts).
Article 5 Section 10 Section 10. - Open space, recreation, and other public facilities. The City of Dover shall require the reservation of open space, recreation, and other public facilities in accordance with the provisions of this section as a condition of approval for all one-family dwelling, two-family dwelling and multiple-family dwelling residential developments requiring conditional use approval, site development plan approval, or land subdivision approval by the City of Dover Planning Commission.
10.1 Recreation areas. 10.11 Purpose. The purpose of this section is to ensure that active recreation areas are provided as an integral design element within residential developments and that such facilities are of an adequate scale in relation to the size of the residential development and which provide residents with a variety of active recreational pursuits.
10.12 Dedication required. The commission shall require the dedication or reservation of recreation areas, and the subsequent construction of recreation facilities of a character, extent and location suitable to the needs created by a development for recreation facilities as defined and in accordance with the design guidelines set forth.
10.13 Definition. The following are illustrative of the types of recreation areas and subsequent facilities that shall be deemed to serve active recreational needs and therefore to count toward satisfaction of the recreation area requirements of this section: tennis courts, handball courts, racquetball courts, swimming pools, saunas and exercise rooms, meeting or activity rooms within clubhouses, baseball and soccer fields, basketball courts, volleyball courts, swings, slides and play apparatus, and developed walking, jogging or biking trails.
10.14 Recreation area review. 10.141 Presubmission conference. Prior to the submission of a development plan, the applicant or his representative shall meet in person with the city manager or his appointee and the city planner to receive early advice and consultation on the proposed development and the proposed recreation facilities, including the size, type and layout. 10.142 Review with parks, recreation, and community enhancement committee. Upon receipt of the submitted development plan, the city manager or his appointee shall consult with the city council parks, recreation, and community enhancement committee. 10.143 Report to planning commission. Upon consultation with the committee, the city manager or his designee shall submit to the planning commission, through the development advisory committee, a report detailing the recommendations as to the active
32
Page 33
Item 5. C-26-02 Bay Village Residential Planned Neighborhood Design: Active Recreation Area Plan Review for Parks, Recreation and Community Enhancement Committee Meeting - April 14, 2026
recreation facilities to be recommended and their location, related parking areas, and proposed landscaping.
10.15 Design guidelines. 10.151 Accessible. Recreation areas shall be accessible within the development and arranged in a manner which affords reasonable access to all residents within the development. When warranted, recreation areas can be dispersed throughout the development, provided that each remote location is accessible. 10.152 Pedestrian oriented. Recreation areas shall be pedestrian oriented and designed with linkages to existing and planned public walkways and with other existing or planned recreation areas. 10.153 Age oriented. The nature and scope of planned recreation areas shall reflect an awareness of, and sensitivity toward, the anticipated age groups that would reside within the proposed development. 10.154 Parking. Designs consider the need for parking facilities associated with recreation areas. 10.155 Walking, jogging and biking trails. Recreation trails shall only be counted toward the recreation area requirement when constructed as an accessory to central recreation facilities. The developed trail shall be the only area counted toward the area requirement. 10.156 Setbacks. No structure, equipment or game court surface required under this section shall be located nearer than 30 feet to any lot line of a lot to be used for residential purposes, nor nearer than 25 feet from any right-of-way line. 10.157 Landscaping. Such uses shall be landscaped in accordance with provisions of article 5, section 15, and where warranted, visual screening of parking areas, game courts, playground areas and other features as necessary to preserve and protect the interests of adjoining residential properties may be required. 10.158 Area. The minimum area of a remote recreation area shall be 2,000 square feet.
10.16 Area required. All residential developments shall provide recreational areas in a size equal to 275 square feet per dwelling unit or one-half acre of land, whichever is greater. In no case shall the commission require that more than ten percent of the gross area of the development be so dedicated or reserved when the gross area is greater than five acres.
- V.STAFF RECOMMENDATIONS The following are comments and recommendations from staff of the Planning Office following review of the Active Recreation Area Plan.
- 1)Recreation Areas: As a residential development, there is a requirement for Active Recreation area(s). Staff Recommends the following regarding these Recreation Areas for the Bay Village Residential Planned Neighborhood Design Option plan:
- a)Sport Courts:
- i.The recreation areas outlined for specific sports should indicate the materials used for court surfaces. ii. Adjust location of court surfaces to ensure a minimum of 25 feet from any right- of-way line.
- b)Active Recreation Area Amenities:
- i.Add a sidewalk to connect the frontage sidewalk to the proposed dog park. ii. Add bicycle parking (rack) to the central Recreation Area with the tot lot, pavilion, and basketball half court and at the dog park area. iii. Please clearly identify the location of benches. iv. Consider adding benches to the recreation area containing the dog park and recreation area containing the tot lot. 33
Page 34
Item 5. C-26-02 Bay Village Residential Planned Neighborhood Design: Active Recreation Area Plan Review for Parks, Recreation and Community Enhancement Committee Meeting - April 14, 2026
- v.Ensure at least one table in the pavilion allows handicapped accessible seating.
- c)Please indicate the material and width of the sidewalks and walkways.
- 2)Sidewalk Curb Cuts: Accessible curb ramps are required at sidewalk curb cuts. Please clearly identify the location of curb ramps.
- 3)Adequate Lighting for the Site: There should be light fixtures added to sufficiently light the recreation areas.
- 4)Landscaping: Please indicate the species of trees and shrubs proposed for planting. Consideration of the placement of canopy trees for shading of certain amenities should be given. Ensure that the location of street trees do not interfere with utilities, sidewalks, or walkways.
VI. ADVISORY COMMENTS
- 1)This Conceptual Plan (Conditional Use/ Master Plan with Major Subdivision Plan) set depicting the Recreational Areas are to include appropriate improvements, plans, and details of the Active Recreation Area as approved.
- 2)There shall be provisions which ensure that the community open space (all areas under consideration for Active Recreation Areas) shall continue as such and be properly managed and maintained. The developer shall either retain ownership and responsibility for maintenance of the common use areas or provide for and establish one (1) or more organizations for the ownership and maintenance of all common spaces, i.e., a Homeowners Association or other property management entity. The organization shall be responsible for maintenance, insurance, and taxes on the community space.
- 3)In the event, major changes and revisions to the Plan occur in the finalization of the Plan contact the Planning Office. Examples include reorientation of buildings, relocation of site components, changes in floor area or lot/unit count, or design revisions impacting Active Recreation Areas. These changes may require resubmission for review by the Development Advisory Committee, Planning Commission, or other agencies and commissions making recommendations in regard to the plan.
- 4)The Parks, Recreation, and Community Enhancement Committee shall submit to the Planning Commission a report detailing the recommendations as to the Recreation Area Plan.
Attachments: • Conceptual Plan C-26-02 Bay Village Residential PND: Select Sheets C-001, C-201 and Sheet L-101 • Narrative Letter on Bay Village Residential PND
Note: The Review Report was initially prepared by Staff of the Rossi Group (under a Planning Services contract with the City of Dover). The DRAFT Report was completed with additional review and editing by the City’s Planning Office.
34
Page 35
Item 11.
GENERAL NOTES:
- 1.THE PURPOSE OF THIS PLAN IS TO CREATE A PLANNED NEIGHBORHOOD DEVELOPMENT WITH 250 TOWNHOUSES. A PORTION OF THE SITE WILL BE SUBDIVIDED OUT FOR THE POSSIBLE DEVELOPMENT OF A 200 UNIT APARTMENT COMPLEX. THE APARTMENT DEVELOPMENT IS NOT PART OF THIS DEVELOPMENT PLAN. CONDITIONAL USE SITE PLAN N RO A D
ISO E 2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE STATE OCCUPATIONAL SAFETY LAWS AND THE CITY OF DOVER K RR RIV CODE AND STANDARD SPECIFICATIONS, MOST CURRENT EDITION. ALL CONSTRUCTION MUST BE DONE IN COMPLIANCE OA WITH THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 AND ALL RULES AND REGULATIONS THERETO APPURTENANT. 3. EXISTING UTILITIES ARE SHOWN FOR THE CONVENIENCE OF THE CONTRACTOR, BUT THE COMPLETENESS OF ACCURACY OF THE SAME IS NOT GUARANTEED. THE CONTRACTOR SHALL DETERMINE THE LOCATION AND ELEVATION OF EXISTING UTILITIES AT HIS OWN EXPENSE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES AND REPAIRS TO EXISTING UTILITIES DURING CONSTRUCTION. BAY VILLAGE RESIDENTIAL NORTH GAAK D O HI W TE 5400 LIMESTONE ROAD
WILMINGTON, DE 19808
AT WHITE OAK ROAD 4. THE EXISTING UTILITIES SHOWN WERE TAKEN FROM THE BEST AVAILABLE RECORDS. THE CONTRACTOR SHALL CONTACT MISS UTILITY OF DELMARVA (1-800-282-8555) TO VERIFY THEIR EXACT LOCATION PRIOR TO THE START OF ANY CONSTRUCTION. ANY DAMAGE INCURRED TO ANY UTILITIES SHALL BE REPAIRED IMMEDIATELY AT THE CONTRACTORS'
TEL. 302-239-6634 EXPENSE. IF THE CONTRACTOR RELIES ON THE UTILITY LOCATIONS SHOWN HEREON, HE DOES SO AT HIS OWN RISK AND WILL NOT BE ENTITLED TO ADDITIONAL COMPENSATION DUE TO THE DELAYS FROM SAID RELIANCE. 5. A FINAL TRAFFIC IMPACT STUDY LETTER WAS RECEIVED BY VERDANTAS FROM DELDOT ON DECEMBER 18,2025. RO UT SITE 6. DELAWARE REGULATIONS PROHIBIT THE BURIAL OF CONSTRUCTION DEMOLITION DEBRIS, INCLUDING TREES AND STUMPS E ON CONSTRUCTION SITES. ANY SOLID WASTES FOUND DURING EXCAVATION MUST BE REMOVED AND PROPERLY 1 DISPOSED. 7. A WETLAND EVALUATION WAS CONDUCTED BY VERDANTAS IN OCTOBER 2022 AND WETLANDS WERE FOUND ON THE SITE.
STATE: DELAWARE P.E. #14062
L
WETLAND FLAGGING WAS LOCATED AS PART OF THE BOUNDARY SURVEY.
LITT
VERONICA M. DUBE, P.E. 8. FLOODPLAINS ARE PRESENT ON SITE PER FEMA MAP PANEL 10001C0186J LAST REVISED 7/7/2014. THEY ARE SHOWN ON THE PLANS PER THIS MAPPING. E 9. ALL HANDICAPPED PARKING DEMARCATION, STALLS AND BUILDINGS ACCESSIBLE ROUTES SHALL COMPLY WITH THE RI AMERICANS WITH DISABILITIES ACT AND ANSI A117.1-1998 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES. R 10. BEFORE THE CONTRACTOR CAN BEGIN CONSTRUCTION, HE MUST OBTAIN THE PROPER PERMITS AND/OR APPROVALS VE FROM THE CITY OF DOVER, KENT CONSERVATION (KCD), DELAWARE DEPARTMENT OF TRANSPORTATION (DELDOT), AND OTHER APPROPRIATE FEDERAL, STATE, CITY, AND COUNTY AGENCIES. MAP: KENT COUNTY GIS PARCELS LOCATION MAP SCALE: 1" = 1200'' 11. ALL CONSTRUCTION METHODS AND MATERIALS SHALL BE ACCORDING TO THE CITY OF DOVER AND DELDOT STANDARDS AND CONSTRUCTION SPECIFICATIONS. SITE DATA: 12. ALL FIRE LANES, FIRE HYDRANTS, AND FIRE DEPARTMENT CONNECTIONS SHALL BE MARKED IN ACCORDANCE WITH THE STATE FIRE PREVENTION REGULATIONS. 1. TAX PARCEL NO.: 4-05-068.00-01-06.00-00001
CHK'D BY DESIGNED BY
CHECKED BY PROJECT NO. 13. ALL WORK WITHIN STATE MAINTAINED ROAD RIGHT-OF-WAYS SHALL MEET THE REQUIREMENTS AS SET FORTH IN THE 2. SOURCE OF TITLE DEED: D6718 / 242
DRAWN BY
CURRENT REVISION OF THE STANDARD SPECIFICATIONS FOR THE ROAD AND BRIDGE CONSTRUCTION, BY THE DELAWARE PLAT BOOK: 0113 0073 DEPARTMENT OF TRANSPORTATION (DELDOT). 3. OWNER: BAY VILLAGE OF DOVER, LLC
34677 DATE 14. TRAFFIC AND SAFETY CONTROL SHALL BE MAINTAINED DURING CONSTRUCTION IN CONFORMANCE WITH THE CURRENT PO BOX 461 VERSION OF THE DELAWARE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (DE MUTCD) FOR CONSTRUCTION AND DOVER, DE 19903 MC VMD MAINTENANCE OPERATIONS. 4. APPLICANT / BAY VILLAGE HOLDINGS, LLC
AA STREET BRK
- 15.ALL PROPOSED SIGNS (PYLON SIGNS, MONUMENT SIGNS) ARE SUBJECT TO A SEPARATE CITY OF DOVER PERMIT AND IS EQUITABLE OWNER: 179 REHOBOTH AVE. SUITE 1081 REHOBOTH BEACH, DE 19971 ALSO SUBJECT TO A COMPREHENSIVE UNIFIED SIGN PLAN.
- 16.STORMWATER MANAGEMENT SEDIMENT/EROSION CONTROL SHALL BE IN ACCORDANCE WITH THE CURRENT DELAWARE 5. SITE ADDRESS WHITE OAK ROAD D AVENUE DOVER, DE 19901 SEDIMENT AND STORMWATER REGULATIONS BY THE DELAWARE DEPARTMENT OF NATURAL RESOURCES AND
A BOULEVARD ENVIRONMENTAL CONTROL (DNREC).
PRELIMINARY 6. ZONING: EXISTING: RM-2 (RESIDENTIAL MEDIUM DENSITY) 17. CONTRACTOR SHALL REFER TO ARCHITECTURAL/STRUCTURAL DRAWINGS OF PROPOSED BUILDING FOOTPRINTS. THE PROPOSED: PLANNED NEIGHBORHOOD DEVELOPMENT (PND)
B STREET PROPOSED BUILDING FOOTPRINTS, AS SHOWN ON SITE PLAN, SHOULD ONLY BE USED AS A REFERENCE TO THE 7. PROPERTY USE: EXISTING VACANT (FARM LAND) ABOVEMENTIONED PLANS. PROPOSED TOWNHOMES 18. WATER, SANITARY SEWER, AND STORM DRAIN LINES PIPES AND STRUCTURES PROPOSED LOCATED WITHIN DEDICATED
NOT FOR 8. SITE ACREAGE: EXISTING: 79.1364± AC
REVISION PUBLIC RIGHT-OF WAY ARE INTENDED FOR DEDICATION TO THE CITY OF DOVER. E COURT PROPOSED: 79.1364± AC 19. THE SITE CONTRACTOR SHALL NOTIFY THE CITY OF DOVER DEPARTMENT OF PUBLIC WORKS AT 302-736-7025 48 HOURS R.O.W DEDICATION -0.4059± AC TOTAL 78.7305± AC PRIOR TO THE START OF CONSTRUCTION. A REPRESENTATIVE FROM THE CITY OF DOVER DEPARTMENT OF PUBLIC WORKS ACE MUST OBSERVE AND APPROVE ALL CITY OWNED WATER AND SANITARY SEWER INTERCONNECTIONS AND TESTING. ALL C PL 9. DATUM: HORIZONTAL: NAD 83 DE STATE PLANE GRID WATER TAPS MUST BE PERFORMED BY A CITY OF DOVER APPROVED CONTRACTOR. THE PROPOSED LOCATION FOR THE VERTICAL: N.A.V.D. 88
CONSTRUCTION
WATER CONNECTION MAY NEED TO BE ADJUSTED IN THE FIELD DUE TO CONDITIONS OF THE EXISTING MAIN. POSSIBLE F CO URT 10. BENCHMARK: MAG NAIL 20007 MAG NAIL 20008 CONDITIONS THAT WOULD REQUIRE TAPPING RELOCATION INCLUDE PROXIMITY TO PIPE JOINTS, OTHER TAPS, CONCRETE ELEV: 18.94 ELEV: 14.41' F COURT ENCASEMENTS, CONFLICT WITH OTHER UTILITIES, AND THE LIKE. TEST HOLES MUST BE PERFORMED BY THE CONTRACTOR NORTHING: 429821.69 NORTHING: 429352.64 TO DETERMINE THE BEST TAPPING LOCATION OR FOR ANY WORK REQUIRED BY THE CONTRACTOR TO MAKE AN EASTING: 633901.68 EASTING: 633518.48 APPROPRIATE AND LAWFUL CONNECTION. 11. ZONING REQUIREMENTS : 20. PART II, CHAPTER 180, ARTICLE III, SECTION 180-10 OF THE CODE OF KENT COUNTY REQUIRES THAT "NO PERSON SHALL REQUIRED (RM-2) PROPOSED (PND) DISCHARGE OR CAUSE TO BE DISCHARGED ANY STORMWATER, SURFACE WATER, UNCONTAMINATED GROUNDWATER, G AV ENUE MIN. LOT AREA 20 AC 78.7315 No. - ROOF RUNOFF, SUBSURFACE DRAINAGE, UNCONTAMINATED NONCONTACT COOLING WATER OR UNPOLLUTED INDUSTRIAL MAX. DENSITY 8 DU / AC 5.72 DU / AC TOTAL DWELLING UNITS 633.1 DU 250 DU PROCESS WATERS TO ANY SANITARY SEWER", THIS SHALL INCLUDE CONDESATE. SECTION 11-231 OF THE CITY OF DOVER TOWNHOMES 250 DU CODE DEFINES STORM SEWER AS "ANY SYSTEM USED FOR CONVEYING RAIN WATER, SURFACE WATER, CONDENSATE, FUTURE APARTMENT DEVELOPMENT 200 DU COOLING WATER OR SIMILAR LIQUID WASTES, EXCLUSIVE OF SEWAGE." THE CONTRACTOR, DEVELOPER, OWNER AND MIN. OPEN SPACE 25% / 19.8 AC >25% / 35.45 AC DESIGNERS SHALL ENSURE DURING CONSTRUCTION THAT NO ILLEGAL DISCHARGES TO THE SANITARY SEWER SYSTEM 12. PROPOSED TOWNHOME REQUIREMENTS: ARE CREATED WITH THE SITE IMPROVEMENTS. REQUIRED (RM-2) PROPOSED (PND) 21. BOUNDARY AND TOPOGRAPHIC SURVEY DATA SHOWN HERE WAS PREPARED BY TRANSITION ENGINEERING SURVEYING IN TOTAL DWELLING UNITS 250 UNITS OFF-STREET PARKING 500 SPACES 500 SPACES OCTOBER 3, 2022. AERIAL TOPOGRAPHY WAS PROVIDED BY COOPER AERIAL SURVEYS ON AUGUST 27, 2022. 110 OVERFLOW 22. IF THE APPROVED PLAN NEEDS TO BE MODIFIED, ADDITIONAL SEDIMENT AND STORMWATER CONTROL MEASURES MAY BE MIN. LOT AREA 1 AC MIN. LOT AREA / DWELLING UNIT 2,200 SF 1,600 SF REQUIRED AS DEEMED NECESSARY BY THE KENT CONSERVATION DISTRICT. LOT 251 15.8410±AC FOR FUTURE APARTMENT DEVELOPMENT MIN. LOT WIDTH 22 FT 20 FT
BAY VILLAGE RESIDENTIAL
- 23.THE KENT CONSERVATION DISTRICT RESERVES THE RIGHT TO ENTER PRIVATE PROPERTY FOR PURPOSES OF PERIODIC MIN. LOT DEPTH 80 FT 80 FT SITE INSPECTION. MIN. BUILDING SETBACK FROM STREET 20 FT 20 FT MIN. BUILDING SETBACK FROM PROPERTY LINE 10 FT 10 FT
CITY OF DOVER~KENT COUNTY~DELAWARE 24. ALL OPEN SPACES AND STORMWATER MANAGEMENT FACILITIES SHALL BE MAINTAINED BY THE PROPERTY OWNER WITH
CONDITIONAL USE SITE PLAN
| MIN. BUILDING SPACING | 30 FT | 30 FT | |||
|---|---|---|---|---|---|
| THE RESPONSIBILITY OF THE MAINTENANCE TO BEGIN AT THE COMPLETION OF THE PROJECT UPON FINAL ACCEPTANCE BY MAX. DWELLING UNITS / BUILDING 8 DU 5.72 DU | |||||
| MAX. BUILDING HEIGHT/STORIES | 35 FT | 35 FT / 3 STORY | |||
| THE CITY, DELOT, AND KCD. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THE STORMWATER | |||||
| MAX. LOT COVERAGE | 75% | <75% (1,200 SF MAX) | |||
| MANAGEMENT FACILITIES UNTIL THE PROPERTY OWNER TAKES OVER RESPONSIBILITY OF THE MAINTENANCE. | |||||
| 25. ANY GAS FIRED HVAC EQUIPMENT MUST BE EQUIPPED WITH EMERGENCY CUT OFF SWITCHES REMOTELY LOCATED. 13. ACTIVE OPENS SPACE REQUIRED 275 SF PER UNIT = 275 * 250 = 68,750 SF (1.58 ACRES) | |||||
| PROVIDED = 1.66 ACRES | |||||
| 26. ADDRESS NUMBERS OF AT LEAST 12 INCHES IN HEIGHT MUST BE PLACED ON THE STREET SIDE OF THE BUILDING VISIBLE | |||||
| 14. SITE COVERAGE: | |||||
| FROM THE STREET, IS REQUIRED. | EXISTING: | OPEN SPACE | 2,431,928 ± SF | (55.83± AC) | 70.55% |
| 27. ANY NATURAL OR LP GAS BOTTLES, METERS, REGULATORS, ETC. MUST HAVE IMPACT PROTECTION. WOODLAND 1,015,247± SF (23.31± AC) 29.45% | |||||
| BUILDINGS | 0± SF | (0.00± AC) | 0.0% | ||
| GRAVEL | 0± SF | (0.00± AC) | 0.0% | ||
| ASPHALT | 0 ± SF | (0.00± AC) | 0.0% | ||
| TOTAL | 3,447,175± SF | (79.14± AC) | 100.0% | ||
| KENT CONSERVATION DISTRICT NOTES: | |||||
| PROPOSED: | |||||
| OPEN SPACE | 1,168,681± SF | (26.83± AC) | 34.08% | ||
| FUTURE APARTMENT LOT | 690,036± SF | (15.84± AC) | 20.12% | ||
| 1. IF THE APPROVED PLAN NEEDS TO BE MODIFIED DUE TO ERRORS, OMISSIONS, OR FIELD CONDITIONS, ADDITIONAL | |||||
| WOODLAND | 993,168± SF | (22.80± AC) | 28.96% | ||
| SEDIMENT AND STORMWATER CONTROL MEASURES MAY BE REQUIRED AS DEEMED NECESSARY BY THE KENT BUILDING 150,000± SF ( 3.44± AC) 4.37% | |||||
INDEX SHEET CONSERVATION DISTRICT.
AT WHITE OAK ROAD
| OTHER IMPERVIOUS | 427,822± SF | ( 9.82± AC) | 12.47% |
| TOTAL | 3,429,479 ± SF | (78.73± AC) | 100.0% |
| 2. THE KENT CONSERVATION DISTRICT (KCD) RESERVES THE RIGHT TO ENTER PRIVATE PROPERTY FOR PURPOSES OF | |||
|---|---|---|---|
| PERIODIC SITE INSPECTION. | |||
| 15. SOURCE OF WATER: CITY OF DOVER | |||
z:\project files\aa-bz\bvh\34677 - bay village residential development\cad\gd-index-34677.dwg 3/5/2026 2:24 PM 3. THE OWNER IS RESPONSIBLE FOR PROPER OPERATION AND MAINTENANCE OF THE STORMWATER MANAGEMENT 16. SOURCE OF SEWER: CITY OF DOVER 17. SOURCE OF ELECTRIC: CITY OF DOVER FACILITIES ON SITE. 18. SOURCE OF GAS: CHESAPEAKE UTILITIES 19. TRASH COLLECTION: PRIVATE 20. EXISTING WETLAND AREA: 22.02 ACRES±
SHEET LIST TABLE
SHEET No. SHEET TITLE C-001 INDEX SHEET C-101 EXISTING CONDITIONS - DEMO PLAN C-201 OVERALL SITE PLAN CERTIFICATION OF ACCURACY OWNER / DEVELOPER'S PLAN DEVELOPMENT APPROVAL C-202 SITE PLAN I, VERONICA M. DUBE, P.E., HEREBY CERTIFY THAT I AM A REGISTERED I THE UNDERSIGNED, HEREBY CERTIFY THAT BAY VILLAGE OF DOVER, LLC C-301 UTILITY PLAN PROFESSIONAL ENGINEER WITH A BACKGROUND IN CIVIL ENGINEERING IS THE OWNER OF THE PROPERTY DESCRIBED AND SHOWN ON THIS PLAN, THAT THE C-401 GRADING PLAN IN THE STATE OF DELAWARE, THAT THE INFORMATION SHOWN HEREON PLAN WAS MADE AT MY DIRECTION, AND THAT I ACKNOWLEDGE THE SAME TO ME BY ACT HAS BEEN PREPARED UNDER MY SUPERVISION AND TO THE BEST OF MY L-101 OVERALL LANDSCAPE PLAN AND DESIRE THE PLAN TO BE DEVELOPED AS SHOWN AND IN ACCORDANCE WITH ALL KNOWLEDGE AND BELIEF REPRESENTS GOOD ENGINEERING PRACTICES DATE APPLICABLE LAWS AND REGULATIONS. L102 LANDSCAPE PLAN AS REQUIRED BY THE APPLICABLE LAWS OF THE STATE OF DELAWARE. MARCH 6, 2026 L-103 LANDSCAPE NOTES AND DETAILS __________________________________________ SCALE DATE AUTHORIZED REPRESENTATIVE __________________________________ BAY VILLAGE OF DOVER, LLC 1" = 200' DATE VERONICA M. DUBE P.E. REGISTRATION # 14062 SHEET 200 0 200 400
DRAWING SCALE 1" = 200' C-001 35
Page 36
Item 11.
5400 LIMESTONE ROAD
WILMINGTON, DE 19808
TEL. 302-239-6634
Δ
LEGEND (PROPOSED)
PROPERTY LINE
RIGHT-OF-WAY LINE
STATE: DELAWARE P.E. #14062 LOT LINE PCC ON-SITE CURB
VERONICA M. DUBE, P.E.
ROAD CENTERLINE
STORMWATER AREA
TREE LINE
PROPOSED
AA STREET
BUILDING SETBACK BUILDING SETBACK BUILDING SETBACK
FENCE LINE
BUILDING SETBACK
PROPOSED TOWNHOUSES
3 STORY / 5 UNITS
PROPOSED TOWNHOUSES
3 STORY / 5 UNITS
PROPOSED TOWNHOUSES
3 STORY / 5 UNITS
PROPOSED TOWNHOUSES
3 STORY / 5 UNITS
| SUBDIVISION SIGN | 100-YEAR FLOOD PLAIN | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 |
| 20 | 19 | 18 | 17 | 16 | 15 | 14 | 13 |
D AVENUE
A BOULEVARD CHK'D BY DESIGNED BY
CHECKED BY PROJECT NO.
BUILDING SETBACK BUILDING SETBACK
BUILDING SETBACK BUILDING SETBACK
BUILDING SETBACK
21
DRAWN BY
| 118 117 116 115 114 | 113 112 111 110 | 109 108 107 106 105 | 104 103 102 101 |
|---|---|---|---|
| 22 PROP | |||
| 123 122 121 120 119 | PROPOSED TOWNHOUSES | ||
| OSED | |||
| PROPOSED TOWNHOUSES | |||
| ACTIVE OS | PROPOSED TOWNHOUSES | PROPOSED TOWNHOUSES | 3 STORY / 4 UNITS |
| PROPOSED TOWNHOUSES | |||
| 3 STORY / 5 UNITS | |||
| 3 STORY / 4 UNITS | |||
TBAC 3 STOR TOWNH
| 3 STORY / 5 UNITS | 3 STORY / 5 UNITS | |
|---|---|---|
| 23 | K | 0.19 AC |
| OU | ||
| Y/5 | ||
| UNIT SES | ||
| NG SE | ||
34677
B STREET
DATE
VMD
24 S BUILDI
MC
124
| 25 | BUILDING SETBACK | BUILDING SETBACK | BUILDING SETBACK | |
| ACK | 125 | OSED | BUILDING SETBACK | BUILDING SETBACK |
3 STOR TOWNH SETB
BRK OU PROPOSED TOWNHOUSES BUIL 126 Y/5 UNIT SES PROPOSED TOWNHOUSES PROPOSED TOWNHOUSES PROPOSED TOWNHOUSES 3 STORY / 5 UNITS PROPOSED TOWNHOUSES 3 STORY / 4 UNITS DING 3 STORY / 5 UNITS 3 STORY / 4 UNITS 3 STORY / 4 UNITS S 148 149 150 151 152 153 154 155 156 157 158 159 160 26 127 PROP 139 140 141 142 143 144 145 146 147
| 27 | OSED | 128 | 100 |
| 3 STOR TOWNH | |||
|---|---|---|---|
| K | |||
| 28 | OU | TBAC | |
PROPOSED TOWNHOUSES Y/5 UNIT SES
BUILDING SETBACK
ACTIVE OS 99
NG SE
S
0.20 AC
PROP
E COURT
PRELIMINARY
| 29 | BUILDI | |||
| 98 | ||||
|---|---|---|---|---|
| 129 | ||||
| 30 | 3 STORY / 5 UNITS | |||
| ACK | ||||
| OSED | ||||
| 138 | 97 | |||
| SETB | ||||
| 130 | ||||
| 3 STOR TOWNH | PAVILION | |||
| DING | 131 | OU | 137 | OSED |
| 96 | ||||
| Y/5 | ||||
| UNIT SES | ||||
| BUILDING SETBACK | ||||
| TABLES | BUILDING SETBACK | BUILDING SETBACK | ||
3 STOR TOWNH BUIL S
| 132 | PROP | 136 | OU | 164 163 162 161 |
| Y/5 | 173 172 171 170 | 169 168 167 166 165 | ||
| UNIT SES | ||||
|---|---|---|---|---|
| 31 | ACK | |||
ACE
PROPOSED TOWNHOUSES
SETB BASK
S
PROPOSED TOWNHOUSES PROPOSED TOWNHOUSES
E 3 STORY / 4 UNITS
HALF TBALL
3 STORY / 4 UNITS 3 STORY / 5 UNITS
NOT FOR 133 135 PROP
REVISION
| 32 | OSED | BUIL |
| COUR | ||
|---|---|---|
| T | ||
| DING | 95 | |
| 3 STOR TOWNH | ACK | |
| 33 | OU | |
| 134 | ACTIVE OS | |
| C PL | ||
| Y/5 | ||
PROPOSED TOWNHOUSES UNIT SES SETB
BUILDING SETBACK 94
| 34 | S | BUILDI | |
| 0.73 ACRE | |||
|---|---|---|---|
| PROP | |||
| NG | |||
| BUILDING SETBACK | |||
| BUILDING SETBACK | BUILDING SETBACK | ||
| 93 | |||
| 35 | TOT | PROPOSED TOWNHOUSES | 3 STORY / 5 UNITS |
| PROPOSED TOWNHOUSES | 3 STORY / 5 UNITS | ||
| PROPOSED TOWNHOUSES | 92 | ||
| LOT | 3 STORY / 4 UNITS | ||
| 178 179 180 181 182 | |||
| 3 STORY / 4 UNITS | |||
CONSTRUCTION
174 175 176 177 183 184 185 186
91
BUIL
DIN G SE
F CO TBAC 36 K
37
217
216
| 215 | BUIL |
| URT | |
|---|---|
| OSED | |
| PRO | DING |
| PO SED | |
| 3 STO TOWNH | |
| 214 | SETB |
| ACK | |
| 213 | |
| 3 STOR TOWNH | |
| ACK | |
| RY / | O |
| 5 UN USES | 90 |
| ITS | |
| 212 | |
| 38 | Y/5 |
| OU | |
UNIT SES
| SETB | 211 | |
| F COURT | ||
|---|---|---|
| PROPOSED TOWNHOUSES | ||
| PRO | 210 | BUIL |
BUILDING SETBACK
| POSE | DING | |
|---|---|---|
| D | 209 | SETB |
| 89 | ||
| 39 | PROP | |
| S | BUILDI | |
| 3 STO TOWNH | ||
| RY / | O | |
| 4 UN USES | ||
| ITS | ||
| 208 | ||
| ACK | ||
| OS #2 | ||
| NG | 207 206 | |
| PRO | BUIL | |
| DING | 88 | 3.13± AC |
| 3 STORY / 5 UNITS | ||
| 40 | BUIL | |
| DING | ||
| SETB | ||
| POSE | ||
| D | ||
| 3 STO TOWNH | ||
| O | ||
| 205 | SETB | |
| ACK | ||
| RY / | ||
| ACK | 4 UN USES | |
No.
ITS
BUILDING SETBACK
| PRO | 204 203 202 | BUILDING SETBACK | BUILDING SETBACK | 87 |
| POSE | - | |||
| D | ||||
|---|---|---|---|---|
| 3 STO TOWNH | ||||
| O | PROP | 201 | ||
| 218 | RY / | |||
| 5 UN USES | ||||
| ITS | ||||
| BUIL | ||||
| DING | OS | ED | ||
| 3 STOR TOWNHOU | 200 | 199 198 197 196 | 190 189 188 187 | |
| 219 | SETB | |||
| ACK | Y / 5 UN | SES | 195 194 193 192 191 | 86 |
| 220 | ITS | |||
| PROPOSED TOWNHOUSES | ||||
| 221 222 | PROPOSED TOWNHOUSES | |||
| 3 STORY / 4 UNITS | ||||
| PROPOSED TOWNHOUSES | ||||
| 3 STORY / 5 UNITS | ||||
| 3 STORY / 4 UNITS | ||||
| PRO | ||||
| POSE | ||||
| ACTIVE OS | 223 | |||
| D | ||||
| 3 STO TOWNH | ||||
| RY / | O | |||
| 5 UN USES | ||||
| BUIL | ||||
| DING | ||||
| 224 | ITS | SETB | ||
| ACK | ||||
| 0.54 AC | 225 | |||
| 226 | ||||
| 227 | PRO | |||
| POSE | ||||
| D | ||||
| 3 STO TOWNH | 85 | |||
| 228 | RY / | O | ||
| 5 UN USES | ||||
| BUILD | ||||
| ING SE | ||||
| 229 | ITS | TBACK | ||
| 230 | BUILDING SETBACK | |||
PROPOSED TOWNHOUSES BUILDING SETBACK BUILDING SETBACK
BUILDING SETBACK
| PROPOSED | 231 | 84 |
| 232 | PROPOS |
DOG PARK G AV ED TOWN 3 STOR HO Y / 5 UN USES
3,900 SF ENUE 233 234 235 236 ITS
237
PROPOSED TOWNHOUSES
PROPOSED TOWNHOUSES
3 STORY / 5 UNITS
PROPOSED TOWNHOUSES
3 STORY / 4 UNITS
83
3 STORY / 5 UNITS 3 STORY / 4 UNITS
(60' X 65') 238 239 240 241 242 243 244 245 246 247 248 249 250
BUIL
DING
82
SETB
ACK
81
41
42
| PRO | 43 | BUIL |
| DING | ||
|---|---|---|
| POSE | ||
| D | 44 | SETB |
| ACK | ||
| 3 STO TOWNH | ||
| RY / | O | |
| 5 UN USES | ||
| 45 | ||
| ITS | ||
| 46 | ||
| 47 | ||
| 48 | BUIL | |
BAY VILLAGE RESIDENTIAL
| PROPO | DING | |
|---|---|---|
| SED | 49 | SETB |
| ACK | 80 | |
| 3 STO TOWNH | ||
| RY / | O | |
| 5 UN USES | ||
| 50 | ||
| ITS | 51 | |
| 52 | ||
| PROPOSED TOWNHOUSES | ||
BUILDING SETBACK
| 53 | 79 | |
| PRO | 54 | |
| POSE | ||
|---|---|---|
| D | ||
| 3 STO TOWNH | ||
| 55 | BUILDING | |
| SETBAC | ||
| K | BUILDING SETBACK | |
| RY / | O | BUILDING SETBACK |
| 5 UN USES | ||
CITY OF DOVER~KENT COUNTY~DELAWARE
BUILDING SETBACK
ITS
78
3 STORY / 5 UNITS
CONDITIONAL USE SITE PLAN
| 56 | 57 | 58 | 59 | 60 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | 73 | 74 | 75 |
| PROPOSED | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| TOWNHOUSE | ||||||||||||||||||
| 3 STORY / | S | |||||||||||||||||
| 61 | PROPOSED TOWNHOUSES | 77 | ||||||||||||||||
| 6 UNITS | PROPOSED TOWNHOUSES | PROPOSED TOWNHOUSES | ||||||||||||||||
| 3 STORY / 4 UNITS | 3 STORY / 5 UNITS | |||||||||||||||||
| 3 STORY / 5 UNITS | ||||||||||||||||||
76
OS #1
12.50± AC
LOT 251 15.8410±AC FOR FUTURE APARTMENT DEVELOPMENT
\\verdantas.com\dfs\project files\aa-bz\bvh\34677 - bay village residential development\cad\gd-site-34677.dwg 3/5/2026 1:44 PM OVERALL SITE PLAN AT WHITE OAK ROAD
DATE
MARCH 6, 2026
SCALE
1" = 100'
100 0 100 200 SHEET
DRAWING SCALE 1" = 100' C-201 36
Page 37
Item 11.
5400 LIMESTONE ROAD
WILMINGTON, DE 19808
TEL. 302-239-6634
AA STREET
PROPOSED TOWNHOUSES PROPOSED TOWNHOUSES
PROPOSED TOWNHOUSES PROPOSED TOWNHOUSES
3 STORY / 5 UNITS 3 STORY / 5 UNITS
3 STORY / 5 UNITS 3 STORY / 5 UNITS
5 4 3 2 1
STATE:DELAWARE RLA #: S1-0010671 19 18 17 16 15 14 13 12 11 10 9 8 7 6 20
INGRID KOHLER, RLA D AVENUE
A BOULEVARD 21 118 117 116 115 114 113 112 111 110 109 108 107 106 105 104 103 102 101
CHK'D BY DESIGNED BY 123 122 121 120 119
PROJECT NO.
PROP
22
CHECKED BY
PROPOSED TOWNHOUSES
OSED
PROPOSED TOWNHOUSES
ACTIVE OS PROPOSED TOWNHOUSES 3 STORY / 4 UNITS
DRAWN BY PROPOSED TOWNHOUSES PROPOSED TOWNHOUSES 3 STORY / 4 UNITS 3 STORY / 5 UNITS
3 STO TOWNH
3 STORY / 5 UNITS 3 STORY / 5 UNITS
23 0.19 AC
RY / O
5 UN USES
B STREET ITS
34677
24
DATE
124 JJL IK
25
125 OSED
JJL 3 STO TOWNH RY / 5 OU PROPOSED TOWNHOUSES 126 UNIT SES PROPOSED TOWNHOUSES PROPOSED TOWNHOUSES PROPOSED TOWNHOUSES 3 STORY / 5 UNITS PROPOSED TOWNHOUSES 3 STORY / 5 UNITS 3 STORY / 4 UNITS 3 STORY / 4 UNITS 3 STORY / 4 UNITS S 148 149 150 151 152 153 154 155 156 157 158 159 160 26 127 PROP 139 140 141 142 143 144 145 146 147
PRELIMINARY
| 27 OSED | 128 | 100 |
| 3 STO TOWNH | ||
|---|---|---|
| 28 | RY / | O |
PROPOSED TOWNHOUSES
| 5 UN USES | ACTIVE OS | 99 |
| ITS | ||
|---|---|---|
| 0.20 AC | ||
| 29 | PROP | |
| E COURT | 98 | |
| REVISION | NOT FOR |
|---|---|
| 129 | |
| 30 | 3 STORY / 5 UNITS |
| PROP | |
| 138 | 97 |
| 130 | |
| OSED | |
3 STO TOWNH PAVILION
| 131 | 137 | OSED | TABLES |
| 96 | |||
|---|---|---|---|
| RY / 5 | OU | ||
| 3 STO TOWNH | |||
| UNIT SES | |||
CONSTRUCTION
| 136 | RY / | O | 164 163 162 161 | |
| 5 UN USES | ||||
|---|---|---|---|---|
| 31 | 132 | S | 173 172 171 170 | 169 168 167 166 165 |
| ITS | ||||
ACE PROPOSED TOWNHOUSES
| BASK | PROPOSED TOWNHOUSES | PROPOSED TOWNHOUSES |
|---|---|---|
| E | 3 STORY / 4 UNITS | |
| HALF TBALL | ||
| 3 STORY / 4 UNITS | 3 STORY / 5 UNITS | |
| 133 | PROP | |
| 32 | 135 | COUR |
| OSED | T | 95 |
| 3 STO TOWNH | ||
| 33 | OU | |
| 134 | ACTIVE OS | |
| RY / 5 | ||
| 34 | PROP | ||
| UNIT SES | |||
|---|---|---|---|
| S | C PL | 0.73 ACRE | PROPOSED TOWNHOUSES |
| 94 | |||
| No. | - | ||
| 93 | |||
| 35 | TOT | 3 STORY / 5 UNITS | |
| MAILBOX | LOT | PROPOSED TOWNHOUSES | |
| PROPOSED TOWNHOUSES | |||
| 3 STORY / 5 UNITS | |||
| PROPOSED TOWNHOUSES | 92 | ||
| 3 STORY / 4 UNITS | |||
| CLUSTER | 3 STORY / 4 UNITS | ||
| 178 179 180 181 182 | |||
| 174 175 176 177 | 183 184 185 186 | ||
| 91 | |||
| 36 | F CO | |
| 37 | ||
|---|---|---|
| 217 | ||
| 216 | ||
| 215 | ||
| URT | ||
| OSED | ||
| PRO | ||
| POSE | ||
| D | ||
| 3 STO TOWNH | ||
| 214 | ||
| 213 | ||
| 3 STO TOWNH | ||
| RY / | O | |
| 5 UN USES | 90 | |
| ITS | ||
| 212 | ||
| 38 | RY / | O |
| 5 UN USES | ||
| 211 | ||
| F COURT | ||
| PROPOSED TOWNHOUSES | ||
| PRO | 210 | |
BAY VILLAGE RESIDENTIAL POSE
| D | 209 | 89 |
| ITS | ||
|---|---|---|
| 3 STO TOWNH | ||
| RY / | O | |
| 4 UN USES | ||
| OS #2 | ||
| 39 | PROP | |
| ITS | ||
| 208 | 3.13± AC | |
| PRO | ||
| 207 206 | 88 | |
CITY OF DOVER~KENT COUNTY~DELAWARE
3 STORY / 5 UNITS
40
POSE
D 205
CONDITIONAL USE SITE PLAN
3 STO TOWNH
RY / O
4 UN USES
ITS
| PRO | 204 203 202 | 87 | |
| POSE | |||
|---|---|---|---|
| D | |||
| 3 STO TOWNH | |||
| O | PROP | 201 | |
| 218 | RY / | ||
| 5 UN USES | |||
| ITS | |||
| OS ED | |||
| 3 STO TOWNHO | 200 | 199 198 197 196 | 190 189 188 187 |
| 219 | RY / 5 | US | |
| UNITS ES | 195 194 193 192 191 | 86 | |
| 220 | PROPOSED TOWNHOUSES | ||
| 221 222 | PROPOSED TOWNHOUSES | ||
| 3 STORY / 4 UNITS | |||
| PROPOSED TOWNHOUSES | |||
| 3 STORY / 5 UNITS | |||
| 3 STORY / 4 UNITS | |||
| PROP | |||
| O | SED | ||
| ACTIVE OS | 223 | ||
| 3 STO TOWNH | |||
| RY / | O | ||
| 5 UN USES | |||
| 224 | ITS | ||
| 0.54 AC | 225 | |
| 226 | ||
|---|---|---|
| 227 | PRO | |
| POSE | ||
| D | ||
| 3 STO TOWNH | 85 | |
| 228 | RY / | O |
| 5 UN USES | ||
| 229 | ITS | |
| 230 | ||
| PROPOSED TOWNHOUSES | ||
| PROPOSED | 231 | 84 |
| 232 | PROPO | |
DOG PARK G AV SED TO 3 STOR WNHO Y / 5 UN USES
3,900 SF ENUE 233 234 235 236 ITS
237
PROPOSED TOWNHOUSES
PROPOSED TOWNHOUSES
3 STORY / 5 UNITS
PROPOSED TOWNHOUSES
3 STORY / 4 UNITS
83
3 STORY / 5 UNITS 3 STORY / 4 UNITS
(60' X 65') 238 239 240 241 242 243 244 245 246 247 248 249 250 82
LANDSCAPE PLAN 81
AT WHITE OAK ROAD 41 42
| PRO | 43 |
| POSE | |
|---|---|
| D | 44 |
| 3 STO TOWNH | |
| RY / | O |
| 5 UN USES | |
| 45 | |
| ITS | |
| 46 | |
| 47 | |
z:\project files\aa-bz\bvh\34677 - bay village residential development\cad\gd-land-34677.dwg 3/5/2026 2:10 PM
| PRO | 48 | |||||||||||||||||
| POSE | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D | 49 | 80 | ||||||||||||||||
| 3 STO TOWNH | ||||||||||||||||||
| RY / | O | |||||||||||||||||
| 5 UN USES | ||||||||||||||||||
| 50 | ||||||||||||||||||
| ITS | 51 | |||||||||||||||||
| 52 | ||||||||||||||||||
| PROPOSED TOWNHOUSES | ||||||||||||||||||
| 53 | 79 | |||||||||||||||||
| PRO | 54 | |||||||||||||||||
| POSE | ||||||||||||||||||
| D | ||||||||||||||||||
| 3 STO TOWNH | ||||||||||||||||||
| 55 | ||||||||||||||||||
| RY / | O | |||||||||||||||||
| 5 UN USES | ||||||||||||||||||
| ITS | ||||||||||||||||||
| 78 | ||||||||||||||||||
| 3 STORY / 5 UNITS | ||||||||||||||||||
| 56 | 57 | 58 | 59 | 60 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | 73 | 74 | 75 |
| PROPOSED | ||||||||||||||||||
| TOWNHOUS | ||||||||||||||||||
| 3 STORY / | ES | |||||||||||||||||
| 61 | PROPOSED TOWNHOUSES | |||||||||||||||||
| 77 | ||||||||||||||||||
| 6 UNITS | PROPOSED TOWNHOUSES | PROPOSED TOWNHOUSES | ||||||||||||||||
| 3 STORY / 4 UNITS | 3 STORY / 5 UNITS | |||||||||||||||||
| 3 STORY / 5 UNITS | ||||||||||||||||||
76
OS #1
12.50± AC
DATE
FEBRUARY 3, 2026
SCALE
LOT 251 15.8410±AC 1" = 60'
FOR FUTURE APARTMENT
DEVELOPMENT SHEET
60 0 60 120
DRAWING SCALE 1" = 60' L-102 37
Page 38
5400 Limestone Road
Item 5.
Wilmington, DE 19808
302.239.6634
March 5, 2026
City Of Dover
Department of Planning & Inspections
15 Loockerman Plaza
Dover DE 19903
302.736.7196
Attn: Dawn Melson-Williams
Re: Bay Village - Conceptual Planned Neighborhood Development Narrative S.White Oak Road Dover , DE 19903 Tax Parcel -04-05-06800-01-0600-00001 Verdantas Project Number 34677
Dear Ms. Melson-Williams:
The purpose of this correspondence is to present the development of the existing farmland at the above referenced site into a Planned Neighborhood Development. The project envisions the construction of 250 townhouse units, as well as a dedicated parcel reserved for the future development of an approximately 250-unit apartment complex. The current site primarily consists of row crops and is surrounded by meadows and woodlands. The property is bordered to the west and south by an existing tax ditch and stream, which include associated floodplain and wetland areas. The proposed site plan incorporates townhomes, a sport court area, playground and dog park, and other active open space areas, all of which will be interconnected by public roads and alleys situated behind the townhouse units.
An earlier version of this development plan was submitted for review through the Office of State Planning Preliminary Land Use Service (PLUS) and featured a different layout, with apartments and townhouses intermixed throughout the site. In response to feedback from the PLUS process and in coordination with the City of Dover’s initial recommendations, the updated sketch plan now designates the apartment parcel for future development, concentrates all townhouse units in the northeastern section, and relocates the playground and community space for a better community fit. Additionally, alleys have been added to improve townhouse access. These revisions reflect our collaborative efforts to address planning priorities and enhance the overall design of the neighborhood. In addition, the number of units brought before PLUS has not changed.
Architectural design of the townhomes is still in development, however a similar unit that was recently approved and in construction in the City of Dover is the basis for this unit. We have included these plans in this submission and will supplement them in future submissions as the design progresses.
38
Page 39
Bay Village PND Narrative: 34677 Item 5.
March 5, 2026
- 1.Location The subject property encompasses approximately 79.14 acres and is located east of Route 1 within the City of Dover, Kent County, Delaware. More specifically, the site is situated on the southern side of White Oak Road, approximately 1,600 feet east of Route 1. The property is identified as Tax Parcel Number 4-05-068.00-01-06.00-00001 and is zoned RM-2 (Residential Medium Density). The site is part of the Little Creek Watershed, which is within the broader Delaware Bay Watershed.
- 2.Existing Site Information The land cover consists of approximately 51.05 acres of row crops and 28.08 acres of woodland and vegetation, with no existing impervious surfaces. The Little River defines the southwestern boundary of the property, featuring a channel approximately twenty feet wide with steep, vegetated slopes. The river connects to the site via three large concrete culverts running beneath White Oak Road. Additionally, a drainage ditch runs along the southeastern boundary of the property, measuring approximately five feet wide at its base, and is similarly lined with mature vegetation. This ditch ultimately discharges into the Little River through a corrugated metal culvert.
The northeast corner of the property contains dense, flat wetlands that, while lacking a traceable discharge location, are presumed to flow toward the ditch. These wetlands are contiguous with those along Little River and will be preserved in their natural state throughout the development process. Portions of the site are located within a FEMA-designated floodplain with mapped elevations.
- 3.Proposed Development This development is being pursued under the Planned Neighborhood Development (PND) option in accordance with the City of Dover’s zoning code. The plan proposes 250 townhome units, each served by 16-foot-wide alleys providing access to parking areas at the rear of each lot. The internal road network will feature 60-foot rights-of-way with a 24-foot cartway and parallel parking on one side to accommodate overflow parking needs. Townhomes will be grouped in clusters of five or fewer, with reduced lot widths of 20 feet, consistent with the PND application for this site. In addition, the minimum lot size is requested to be 1,600 sf. A centrally located community space will provide convenient access for residents, while smaller, interconnected active open spaces are distributed throughout the development via sidewalk connections.
Concurrently with this application, a Conditional Letter of Map Revision (CLOMR) will be submitted to FEMA for review and approval to adjust the current floodplain boundaries on the site. Utilizing detailed survey data and calculations, the adjusted floodplain will allow for the development to be situated outside of floodplain areas. Significant portions of the property, including wooded wetlands and stream corridors, will be preserved, with substantial buffers
Verdantas.com | 2 39
Page 40
Bay Village PND Narrative: 34677 Item 5.
March 5, 2026
maintained between developed areas and existing natural features, consistent with PND objectives to minimize site disturbance.
The site will be serviced by City of Dover water and gravity sewer systems, eliminating the need for a pump station. Utilities will be extended to Lot 251, which has been designated for future apartment development. The Delaware Department of Transportation (DelDOT) has reviewed and approved the Traffic Impact Study for the site, which requires the installation of turn lanes and frontage improvements, as well as two site entrances. Stormwater management plans will be submitted to and reviewed by the Kent Conservation District for approval.
We appreciate your time and consideration of this proposal and the associated Planned Neighborhood Development application. We look forward to your response and the opportunity to collaborate on a project that will contribute positively to the growth and development of the City of Dover.
Sincerely,
Verdantas LLC
Benjamin Kulp Veronica Dube, PE
Project Manager Civil Group Leader
bkulp@verdantas.com
vdube@verdantas.com
Verdantas.com | 3 40
Page 41
Item 6.
CITY OF DOVER, DELAWARE
ACTION FORM
PROCEEDING: Council Committee of the Whole (Parks, Recreation & Community Enhancement) DEPARTMENT OF ORIGIN: Water & Wastewater SUBMITTED ON: March 31, 2026 PREPARED BY: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services REVIEWED BY: Sharon J. Duca, P.E., ICMA-CM, Acting City Manager and Patricia M. Marney, Controller / Treasurer
SUBJECT: Silver Lake Dam – Annual Inspection Review TIMETABLE: In accordance with the 2025 Silver Lake Dam Inspection Update Memorandum RELATED PROJECT: n/a REFERENCE: n/a
EXPENDITURE REQUIRED: n/a
AMOUNT BUDGETED: n/a
FUNDING SOURCE (Dept./Page in CIP & Budget): n/a
STAFF RECOMMENDATION:
To accept the Silver Lake Dam 2025 Dam Safety Inspection Report and the FY 2026 Silver Lake Dam Inspection Update Memorandum.
BACKGROUND AND ANALYSIS:
The Department of Water & Wastewater (DWW) utilizes a consultant to perform an annual inspection of the Silver Lake Dam. The annual inspection is required by the State of Delaware’s Department of Natural Resources and Environmental Control (DNREC) as well as our insurance carrier. The 2025 above-water inspection and underwater inspection was performed on November 17, 2025. The final report was fully executed on December 30, 2024. The next inspection will occur prior to the end of the 2026 calendar year. Silver Lake Dam 2025 Dam Safety Inspection Report provides the results of the field observations of the embankment dam, concrete spillway and drop inlet including the sluice gate. The report also includes recommendations for repair and maintenance. The 2025 Silver Lake Dam Inspection Update Memorandum provides a summary of the recommendations provided in the report. Action items are assigned to either the Parks & Recreation (P&R) Department’s Ground Division or the DWW Engineering Division. The plan of action and/or status for the recommendations are included within the memorandum. The breakdown of the twenty-two (22) action items contained in the report is as follows: • P&R Grounds Division – Annual Maintenance Checklist – 12 • P&R Grounds Division – Evaluate / Monitor – 2 • DWW Engineering Division – Future CIP Proposal –7 • DPW Streets Division – Maintenance Action - 1
41
Page 42
Item 6.
MEMORANDUM
Department of Water & Wastewater
P.O. Box 475
Dover, Delaware 19903
Phone: (302) 736-7025
Fax: (302) 736-7092
E-mail: jlyon@dover.de.us
TO: Sharon J. Duca, P.E., ICMA-CM, Acting City Manager
CC: Roger Ridgeway, Parks & Recreation Director Mark Nowak, GISP, Public Works Director
FROM: Jason A Lyon, P.E., Director of Water & Wastewater / Engineering Services
DATE: March 31, 2026
SUBJECT: 2025 Silver Lake Dam Inspection Update
The Silver Lake Dam Inspection Report was finalized on December 30, 2025, and contains various recommendations necessary to maintain the dam in good working order. The tables below provide a summary of the recommendations as well as a status update of each. It should be noted that the report did not provide any repairs that needed to be immediately addressed.
A Silver Lake Dam Annual Maintenance Checklist for the Parks & Recreation Department Grounds Division was developed in January 2020. Since that time, annual maintenance activities have been performed and will continue to be performed. Some of the recommendations below added additional activities to the Annual Maintenance Checklist.
CATEGORY DESCRIPTION ASSIGNMENT STATUS
Earth Continue to control the vegetative growth in the Grounds Annual Maintenance Embankment rip rap with herbicide. Checklist – 3x Per Year Upstream Continue to remove trash and debris that Grounds Annual Maintenance Slope accumulates at the waterline. Checklist – 1x Per Year Seed the areas of bare ground on the east and Grounds Annual Maintenance west embankments. (10,000 SF) Checklist – 2x Per Year Fill the depression forming at the stump noted Grounds One Time Repair above the rip rap on the right upstream slope and seed to prevent surface erosion (2 CY). Monitor. Dam Crest The crest appears to be in good condition. As Grounds Monitor indicated in previous inspections, it should continue to be monitored for depressions. Consideration should be given to repaving the Streets Evaluate asphalt roadway on the dam crest.
1|Page
42
Page 43
Item 6.
2025 Silver Lake Dam Inspection Update
March 31, 2026
CATEGORY DESCRIPTION ASSIGNMENT STATUS
Earth Continue controlling the rip rap’s vegetative Grounds Annual Maintenance Embankment growth with herbicide. Checklist – 3x Per Year Downstream Any bare spots, including eroded areas, areas Grounds Annual Maintenance Slope disturbed by mowing operations, or areas around Checklist – 2x Per Year bollards, should be seeded and covered with new grass. Continue to monitor the areas adjacent to Grounds Annual Maintenance bituminous pavement driveways for surface Checklist – 2x Per Year erosion Continue to monitor the area along the fenceline Grounds Annual Maintenance at the bottom of the fish ladder and beneath the Checklist – 2x Per Year fish ladder for woody vegetation and weeds Continue to monitor the area inside the fence Grounds Annual Maintenance adjacent to the fish ladder for weeds and wood Checklist – 2x Per Year vegetation, and remove and control weeds with herbicide as needed. To minimize the potential for weed growth, consider replacing the No. 57 stone with grass seed or rip rap. The riprap appears sparse or may have been filled Engineering Future CIP Proposal in the areas adjacent to the fish ladder on the left downstream slope. Additionally, rip rap has been placed only along a portion of the right downstream wing wall and appears to be sparse at the toe of the right downstream wing wall. It is recommended to perform an evaluation to consider the addition of rip rap
2|Page
43
Page 44
2025 Silver Lake Dam Inspection Update
March 31, 2026 Item 6.
CATEGORY DESCRIPTION ASSIGNMENT STATUS
Concrete Repair cracked and spalled area on the Engineering Future CIP proposal. Spillway – downstream end of the left wingwall Downstream Face and Wing Walls
Fish Ladder Seal Interior Joints with marine grade sealant or Engineering Future CIP proposal epoxy Continue to remove the growing vegetation Grounds Monitor Consider a total replacement suited for needs or a Engineering Future CIP proposal. replacement with minimum maintenance Spillway Monitor seep on the downstream side. Engineering Future CIP proposal. Evaluate a resurfacing program for the apron as Engineering Future CIP proposal. aggregates are getting more exposed and will eventually progress to complete aggregate loss. Pedestrian Monitor walkway for cracks, and repair as Engineering Future CIP proposal. Walkway needed.
Outlet Works Operate sluice gate monthly to monitor Grounds Annual Maintenance performance and keep mechanical components in Checklist – Monthly. working shape. Exit Channel Bushes and woody weeds in the rip rap should be Grounds Annual Maintenance removed and controlled with herbicide. Checklist – Quarterly. Any bare spots along the exit channel should be Grounds Annual Maintenance remediated with rip rap or seeded. Checklist – 2x Per Year
| TASK TOTALS | 22 |
| P&R Grounds Division – Annual Maintenance Checklist | 12 |
| P&R Grounds Division – Evaluate / Monitor | 2 |
| DWW Engineering Division – Future CIP proposal | 7 |
| DPW Streets Division – Maintenance Action | 1 |
3|Page
44
Page 45
Item 6.
Dam Inspection Report
Silver Lake Dam, City of Dover, DE
Prepared for:
City of Dover
Department of Water and Wastewater
P.O. Box 475
Dover, DE 19903
Prepared by:
Verdantas LLC
5400 Limestone Road
Wilmington, Delaware 19808
Verdantas Project No: 39807
December 2025
45
Page 46
Item 6.
This page intentionally left blank.
46
Page 47
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
Table of Contents
- 1.Executive Summary 1
- 2.Introduction 4 2.1 Background 4 2.2 Dam Design 5
- 3.Observations 7 3.1 Main Dam 8 3.2 Fish Ladder 9 3.3 Left (East) Abutment and Earth Embankment 10 3.4 Pedestrian Walkway Bridge 10 3.5 Right (West) Abutment and Earth Embankment 10 3.6 Downstream Channel 11 3.7 Boat Ramp and Pier 11 3.8 Miscellaneous 11 3.9 Sluice Gate Exercise and Operator Comments 11
- 4.Underwater Inspection Summary 12 4.1 Outlet Works 12 4.2 Left (East) Spillway Wing Wall 12 4.3 Fish Ladder 13 4.4 Spillway Upstream Face and Crest 13 4.5 Right (West) Spillway Wing Wall 13
- 5.Recommendations 15
47
Verdantas.com | i
Page 48
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
Appendices
Appendix A Site Photographs
Appendix B Underwater Photographs – Walker Diving
Appendix C DNREC Inspection Checklist
48
Verdantas.com | ii
Page 49
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
- 1.Executive Summary The following report provides a summary of Verdantas LLC’s (Verdantas’) observations obtained during the annual inspection of Silver Lake Dam performed on November 17, 2025. The Silver Lake Dam was originally constructed in 1944 and is classified as a high-hazard dam. This classification is based on the impact of dam failure, which has a high probability of causing loss of human life. As such, the dam is subject to annual inspections to ensure it conforms to the state’s guidelines and standards.
The dam consists of an earthen embankment approximately 630 feet long with a concrete gravity spillway that is approximately 150 feet long and 15 feet high. Verdantas performed the above- water inspection while the underwater inspection was subcontracted to Waker Diving, a commercial diving contractor. The following non-immediate repairs and improvements are recommended:
Upstream Slope:
- 1.Continue to control the vegetative growth in the rip rap with herbicide.
- 2.Continue to remove trash and debris that accumulates at the waterline.
- 3.Seed the areas of bare ground on the left and right embankments (10,000 SF).
- 4.Repair the crack on the boat ramp's right side (10 LF). This crack was previously repaired but has cracked again.
- 5.Fill the depression forming at the stump noted above the rip rap on the right upstream slope and seed to prevent surface erosion (2 CY). Continue to monitor embankments for further settlement.
- 6.Add rip rap (1,600 SF) on the east embankment upstream slope at the waterline to protect from wave action erosion during low lake level seasons.
Dam Crest:
- 1.Although the crest appears to be in good condition, continue to monitor for depressions as indicated in previous inspections.
- 2.Consideration should be given to repaving the asphalt roadway on the dam crest.
Downstream Slope:
- 1.Continue to control the vegetative growth in the rip rap with herbicide.
- 2.Seed and stabilize any bare spots, including eroded areas, areas disturbed by mowing operations, or around bollards.
49
Verdantas.com | 1
Page 50
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
- 3.Backfill the undermined sidewalk near the fence adjacent to the fish ladder to reduce the tripping hazard (2 CY).
- 4.Continue to monitor the area along the fenceline at the bottom of the fish ladder and beneath the fish ladder for woody vegetation and weeds.
- 5.Continue to monitor the area inside the fence adjacent to the fish ladder for weeds and woody vegetation, and remove and control weeds with herbicide as needed. To minimize the potential for weed growth, consider replacing the No. 57 stone with grass seed or rip rap.
- 6.The riprap appears sparse or may have been filled in the areas adjacent to the fish ladder on the left downstream slope. Additionally, rip rap has been placed only along a portion of the right downstream wing wall and appears to be sparse at the toe of the right downstream wing wall. It is recommended to perform an evaluation to consider the addition of rip rap.
- 7.Continue to monitor the areas adjacent to bituminous pavement driveways for surface erosion.
Upstream Face and Wing Walls:
- 1.Repair the cracks below waterline with pressure injected epoxy (7 LF).
- 2.Field measure, cut and re-adjust rotated fence extension on all wingwalls, and secure to prevent rotation. (7 LF)
- 3.Check, tighten, and replace bolts if missing on the railing system.
Downstream Face and Wing Walls:
- 1.There are three seeps on the east wing wall, under the fish ladder. The seeps appear to be below areas that were previously patched and repaired (15 LF). The 2023 inspection report also noted these seeps. It is recommended to conduct a resistivity geophysics study to aid in determining the water elevation behind the wall (nondestructive method) before looking into destructive methods of investigation.
- 2.Repair cracked and spalled area on the downstream end of the left wingwall. (5 SF)
Fish Ladder:
- 1.Repair the broken weld at the third steel brace from the north (0.17 LF).
- 2.Replace missing bolts and nuts with stainless steel hardware.
- 3.Seal interior joints with marine grade sealant or epoxy.
- 4.Tighten all loose bolts.
50
Verdantas.com | 2
Page 51
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
- 5.Continue to remove vegetation as needed.
- 6.Consider complete replacement of the fish ladder suited for fish passage needs and for reduced maintenance.
Spillway:
- 1.Monitor seep on the downstream side.
- 2.Evaluate a resurfacing program for the apron as exposure of the concrete aggregate appears to be continuing. Continued deterioration of the concrete surface may eventually progress to complete aggregate loss.
Pedestrian Walkway:
- 1.Monitor walkway for cracks, and repair as needed.
Outlet Works:
- 1.Repair the opening between the two trash rack panels (5 LF).
- 2.Operate sluice gate monthly to monitor performance and keep mechanical components in working shape.
- 3.Repair outlet works platform and ladder and install new railing for added operator safety (32 LF).
Exit Channel:
- 1.Place approximately 2,000 square feet of rip rap downstream of the downstream apron
- 2.Remove bushes and woody weeds in the rip rap and control weeds with herbicide as needed.
- 3.Stabilize bare spots along the exit channel with rip rap or seeding.
51
Verdantas.com | 3
Page 52
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
- 2.Introduction This report presents Verdantas LLC’s (Verdantas’) observations and recommendations obtained from the 2025 annual inspection of the Silver Lake Dam. The dam is classified as a high-hazard dam. This classification is based on the impact of dam failure, which has a high probability of causing loss of human life. As such, the dam is subject to annual inspections to ensure that it conforms with the state’s guidelines and standards. On November 17, 2025, Verdantas personnel performed the dam safety inspection and subcontracted Walker Diving Underwater Construction, LLC (Walker Diving) for underwater inspection services.
The following documents were available to aid in the inspection and in developing this report:
- •A set of drawings titled “Silver Lake Dam, Dover – Delaware, prepared by 1944 Set of Plans prepared by Albright & Friel, Inc.
- •An undated set of drawings titled “City of Dover, Silver Lake Dam Rehabilitation, Structural Repair Plan,” prepared by EMJ/McFarland-Johnson Engineers, Inc.
- •A dam inspection report prepared by Verdantas, dated December 2024, revised June 2025.
The following section provides a background on the dam and a brief description of the dam design. Afterward, the above-water field observations of the dam conditions are outlined, followed by a summary of the underwater observations made by Walker Diving. Photographs taken by Verdantas during the inspection are included in Appendix A. Photographs taken by Walker Diving during the underwater inspection are included in Appendix B. Appendix C includes the Delaware Department of Natural Resources and Environmental Control (DNREC) Dam Safety Program Visual Inspection Checklist.
2.1 Background
The Silver Lake Dam, constructed in 1944, is located within Silver Lake Park at the end of Lewis Mill Drive, City of Dover, Delaware. The location of the dam is shown in Figure 1. The dam is along the Saint Jones River and impounds Silver Lake, an approximately 167-acre manmade Lake. The City of Dover owns the dam, Silver Lake Park, and Silver Lake Beach recreational areas. Silver Lake Beach is located to the west side of the dam, while residential houses are located to the east.
52
Verdantas.com | 4
Page 53
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
Figure 1: Silver Lake Dam Location
2.2 Dam Design
Based on our review of the drawings prepared by Albright & Friel Inc. of Philadelphia, Pennsylvania, the dam upstream face was designed to be 22 feet in height. The foundation of the dam was composed of sheet steel piling on both upstream and downstream ends (north and south). The spillway apron was designed to have a 12-inch thick bituminous joint seal on the surface. The dam core was made of a class “C” concrete. The width of the dam from the upstream foundation to the downstream foundation limits was 28 feet. The toe of the dam was designed to be a 24-inch wide and 6 feet deep concrete footing wall. The wing walls were made of class “B” concrete. The design called for a 24-inch diameter cast iron pipe as the main outlet. Figure 2 shows the cross-section drawings used in this section.
53
Verdantas.com | 5
Page 54
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
Figure 2: Cross Section of Design (Plan Number 44023-5, Albright & Friel Inc. July 7, 1944)
54
Verdantas.com | 6
Page 55
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
- 3.Observations The observations and general assessment made during the dam inspection are outlined in the section herein. These observations are accompanied by photographs taken across the site and presented in Appendix A. The observations listed below address the main dam structure, fish ladder, walkway bridge, east and west abutments, downstream channel and boat ramp and pier separately. In addition, miscellaneous observations that do not pertain to the previously mentioned sections were addressed in a standalone section. Refer to Figures 3 and 4 below for the general location of the identified features.
Right
Embankment
Principal Spillway
and Pedestrian
Bridge
Outlet Works
Platform
Left
Embankment
Boat Ramp
Figure 3: 2024 Aerial Photograph of Main Dam Features
55
Verdantas.com | 7
Page 56
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
Low Level
Outlet Works
Outlet
Platform
Fish Ladder
Left Wingwall
Figure 4: 2024 Aerial Photograph of Spillway and Fish Ladder
3.1 Main Dam
- •The low level outlet consists of a 24” cast iron pipe discharging through the concrete principal spillway. The outlet works is controlled by a sluice gate operated from the outlet works platform located within the reservoir.
- •The outlet works platform can only be accessed by boat and needs to be operated by two operators.
- •The 24-inch diameter cast iron pipe (part of the outlet works) did not have visible cracks or evidence of deformation.
- •Normal flow is channeled over the principal spillway by two concrete wingwalls that retain the earth embankments on both the west and east sides of the dam.
- •The left (east) wingwall had a staff gage and fish ladder adjacent to the wingwall. There is a concrete chute adjacent to the fish ladder. The chute was flowing at the time of inspection, but the fish ladder was not in operation. The left wingwall was observed to be previously repaired and in good shape above the water line on the upstream side.
- •The right (west) wingwall was observed to have previous repairs and was in good condition above water.
56
Verdantas.com | 8
Page 57
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
- •Slots for flashboards were noted on the upstream face of the principal spillway, but no flashboards were installed at the time of inspection. The reservoir level was just above the spillway crest elevation during the inspection. No debris was accumulated along the spillway crest and flow over the spillway appeared to be uniform.
- •The downstream face of the concrete spillway is significantly abraded by flow, with exposed aggregate over more than 75% of the face. Some pockets of deeper abrasion and aggregate loss are sporadically located across the spillway face. There is evidence of prior patch and joint repairs that appear to be in fair condition.
- •The 2024 inspection report noted a hole (2 inches deep and ¼ inch in diameter) and a potential seep (moist spot) (0.5 inches by 10 inches in area) on the downstream face of the spillway. These were not able to be observed during this inspection due to flow over the spillway. It is recommended that these areas continue to be monitored during low flow periods.
- •Verdantas conducted a hammer test using a geologic hammer on the concrete surface of the spillway to identify hollow sounds (potentially indicating voids below the concrete surface). Some hollow sounds were observed in areas of prior patch repairs.
- •The riprap within the stilling basin originally placed downstream of the spillway apron has been displaced by higher flow over the spillway. There is an estimated 10 feet (width) by 140 feet (length) by 18 inches (depth) of rip rap that has been displaced.
- •There were three seeps observed on the left wingwall the fish ladder elevation. One seep was noted to be under a metal bracket that supports the fish ladder. The second seep was on the lower part of a previously patched/repaired concrete spot. The third seep was near the bottom of the spillway, north of a metal bracket with iron oxidation staining. Seeps were generally characterized by damp concrete and water staining. Active flow at the seeps was negligible at the time of inspection.
- •The downstream side of the right west wingwall was in good condition. Prior crack repairs were noted to be in good condition with no evidence of seepage or movement of the wall.
3.2 Fish Ladder
- •The fish ladder was not in operation during the inspection.
- •The fish ladder was in fair to poor condition. Numerous missing bolts and nuts were noted throughout the structure. Also, loose nuts may become undone during operation-induced vibrations. All loose or missing nuts and bolts should be tightened or replaced periodically, especially immediately before and after operating the fish ladder.
57
Verdantas.com | 9
Page 58
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
- •Prior inspection reports indicate that the fish ladder leaks significantly through failed welds during operations. This could not be verified as the fish ladder was not operating at the time of inspection.
- •The bracket supports for the fish ladder are rusted and should continue to be monitored for section loss.
3.3 Left (East) Abutment and Earth Embankment
- •Varying sizes of riprap on the upstream slope of the left abutment and earth embankment were noted. The rip rap closest to the spillway and left wingwall appears to be an average 12-inch diameter. A smaller 6-inch diameter riprap was observed east of the concrete boat ramp. Both areas of riprap were in good condition with no signs of displacement or erosion due to wave action.
- •The embankment slope above the rip rap is bare earth with no vegetative cover and shows signs of surface erosion.
- •Riprap armoring terminated shortly below the waterline and was not extended to protect against erosion during low reservoir levels.
- •Approximately 7 feet of railing required adjustment between the railing on the upstream side of the wingwall and the north/east corner of the walkway bridge.
3.4 Pedestrian Walkway Bridge
- •Pedestrians are able to cross the principal spillway by means of a concrete pedestrian bridge supported by nine concrete piers cast integrally with the spillway.
- •The walkway bridge was observed to be in good to fair condition.
- •The concrete deck top and bottom surfaces have been previously repaired and appear to be in fair condition. Some efflorescence was observed on the bottom of the deck.
- •The concrete piers supporting the deck appear to be in good condition. No significant damage due to debris impacts were observed.
- •The railing consists of steel pipe railing with chain link fence fabric. The railing was securely attached.
3.5 Right (West) Abutment and Earth Embankment
- •Riprap armoring is present along approximately half of the length of the right embankment. This riprap appears to be in good condition.
- •The area above the riprap armor is bare (no vegetation cover) and shows minor surface erosion.
58
Verdantas.com | 10
Page 59
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
- •There is a depression and erosion forming at a dead stump located above the rip rap on the right upstream slope near the spillway training wall.
- •Numerous small trees are present along the right embankment slope adjacent to the beach area where there is no riprap armor. Roots are exposed on the surface of the embankment slope.
3.6 Downstream Channel
- •The receiving channel downstream of the principal spillway was generally wide and unobstructed.
- •The downstream banks appeared to be well vegetated. Continue to monitor downstream banks for signs of erosion, particularly after large flood events.
3.7 Boat Ramp and Pier
- •The concrete boat ramp is in fair condition with prior crack repairs. One ¼-inch crack was noted at a previous repair.
- •The timber “convenience” pier appears to be in good condition.
3.8 Miscellaneous
- •The street lamp located on the left embankment crest has an open access panel and exposed wiring at the base
- •The sidewalk on the east abutment has undermining and erosion that should be repaired to prevent a trip hazard.
- •Asphalt pavement on the dam crest and downstream embankment slope has alligator cracks. There was rutting along the edge of pavement that should be repaired.
- •Several trees were noted within the earth embankments, including one tree less than 25 feet from the west wing wall.
- •Bare spots on the embankment slopes were noted throughout likely due to foot traffic.
- •No dam warning signs or buoys were present.
3.9 Sluice Gate Exercise and Operator Comments
The sluice gate was operated by the City of Dover on November 24, 2025, witnessed by Verdantas. The operator reported no issues opening and closing the gate. No leakage was observed after gate operation. The sluice gate can only be operated from a wooden platform that can only be accessed by a boat. Replacing the existing ladder and installing railings on the platform would allow for safer operation.
59
Verdantas.com | 11
Page 60
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
- 4.Underwater Inspection Summary The following are observations from Walker Diving Underwater Construction, LLC during the underwater inspection. Photographs are included in Appendix B.
4.1 Outlet Works
- •The stem guides were in good condition. All hardware appeared present and tightly fastened.
- •The sluice gate stem was in good condition. No damage was observed.
- •The gate stem coupler (at the transition from smooth stem to threaded) appears to be missing one of the four set screws. Coupler appeared to be sufficiently connected.
- •The guide bracket/gate stop below the coupler is heavily corroded, is broken and spins freely around the stem.
- •The gate frame extensions are in good condition. All fasteners were in place and tight.
- •The side gate wedges (2 on each side) were in place. Each wedge was secured with 3 bolts, all tight.
- •Two top wedges were in place and in good condition. All hardware was present and tight.
- •The pipe flange behind the gate was secured with 18 bolts total, all tight and in place. The outlet pipe is flanged up to the thimble/transition to the gate frame.
- •The gate frame is in good condition. All mounting hardware appeared to be in place and tight.
- •The gate disc is approximately 3’ wide by 3’ high, with two horizontal ribs and one vertical rib. The disc appears to be in good condition with some light marine growth in some areas.
- •The timber cribbing around the outlet works structure was in fair condition.
- •There were gaps in the chain link fence used as a trash rack on the north side of the structure, approximately 30” high by 18” wide. This opening was used by the diver to access the interior of the outlet works to inspect the gate.
4.2 Left (East) Spillway Wing Wall
- •Abrasion was observed at the waterline across the left wingwall, approximately 2’ above the bottom. Abrasion was generally estimated not to exceed ½-inch depth. o An area of abrasion was located approximately 2’ upstream of the fish ladder, approximately 18” long by 3” wide by 3/8” deep. o An area of abrasion was located approximately 6” upstream of the fish ladder, oriented vertically, approximately 5” wide by 2’ high by ½” deep.
60
Verdantas.com | 12
Page 61
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
- •There was a crack that runs horizontally with a width of ¼ inch to ½ inch and a length of 27 inches. The crack was located approximately 5 feet north of the fish ladder and 1 foot above the mudline.
- •There are six prior repairs appearing to be hand packed concrete or mortar within former attachment points. The repairs appear to be in good condition.
- •Prior concrete repair upstream of a construction joint, approximately 3’ wide by 2’ high, was in good condition.
4.3 Fish Ladder
- •Hardware securing the upstream frame of the fish ladder was stainless steel and appears to be in place and tight.
- •The stop log guides appear to be in good condition. Welds appear to be in good condition where visible (top 16” of the guides). The stop logs prevent inspection of all welds.
- •The stop logs appear in generally good condition. The second stop log from the top has a 5” long gouge, approximately ¾” deep.
- •The frame of the fish ladder exhibited heavy corrosion with an estimated 40% section loss.
- •The two vertical trash rack bars across the fish ladder opening are heavily corroded, with hourglass deterioration. 85% section loss was estimated on one bar and 60% on the other.
4.4 Spillway Upstream Face and Crest
- •Riprap was present and piled to approximately 1’ to 2’ below the spillway crest/water surface.
- •Abrasion was noted along the crest of the spillway, approximately 25’ from the left spillway wing wall.
4.5 Right (West) Spillway Wing Wall
- •Riprap was present and piled to approximately 1’ below the water surface along the wing wall.
- •A delamination was observed running horizontally along the wingwall, approximately 5’ long, beginning approximately 6” above the riprap and extending down below the riprap line.
- •Prior concrete repair was noted running horizontally along the waterline for the entire length of the wing wall. The repair appeared to be in good condition.
61
Verdantas.com | 13
Page 62
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
- •There are 3 holes, approximately 2-inch diameter that appear to be former attachments to the concrete face.
- •Prior concrete repairs just below the waterline appear in fair condition. Cracks noted in previous inspection report remain to be addressed.
62
Verdantas.com | 14
Page 63
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
- 5.Recommendations Verdantas recommends that the condition of Silver Lake Dam should be classified as FAIR, according to the criteria outlined on the DNREC Dam Safety Visual Inspection Checklist, contained in Appendix C.
The following non-immediate repairs and improvements are recommended:
Upstream Slope:
- 1.Continue to control the vegetative growth in the rip rap with herbicide.
- 2.Continue to remove trash and debris that accumulates at the waterline.
- 3.Seed the areas of bare ground on the left and right embankments (10,000 SF).
- 4.Repair the crack on the boat ramp's right side (10 LF). This crack was previously repaired but has cracked again.
- 5.Fill the depression forming at the stump noted above the rip rap on the right upstream slope and seed to prevent surface erosion (2 CY). Continue to monitor embankments for further settlement.
- 6.Add rip rap (1,600 SF) on the east embankment upstream slope at the waterline to protect from wave action erosion during low lake level seasons.
Dam Crest:
- 1.Although the crest appears to be in good condition, continue to monitor for depressions as indicated in previous inspections.
- 2.Consideration should be given to repaving the asphalt roadway on the dam crest.
Downstream Slope:
- 1.Continue to control the vegetative growth in the rip rap with herbicide.
- 2.Seed and stabilize any bare spots, including eroded areas, areas disturbed by mowing operations, or around bollards.
- 3.Backfill the undermined sidewalk near the fence adjacent to the fish ladder to reduce the tripping hazard (2 CY).
- 4.Continue to monitor the area along the fenceline at the bottom of the fish ladder and beneath the fish ladder for woody vegetation and weeds.
- 5.Continue to monitor the area inside the fence adjacent to the fish ladder for weeds and woody vegetation, and remove and control weeds with herbicide as needed. To minimize the potential for weed growth, consider replacing the No. 57 stone with grass seed or rip rap.
63
Verdantas.com | 15
Page 64
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
- 6.The riprap appears sparse or may have been filled in the areas adjacent to the fish ladder on the left downstream slope. Additionally, rip rap has been placed only along a portion of the right downstream wing wall and appears to be sparse at the toe of the right downstream wing wall. It is recommended to perform an evaluation to consider the addition of rip rap.
- 7.Continue to monitor the areas adjacent to bituminous pavement driveways for surface erosion.
Upstream Face and Wing Walls:
- 1.Repair the cracks below waterline with pressure injected epoxy (7 LF).
- 2.Field measure, cut and re-adjust rotated fence extension on all wingwalls, and secure to prevent rotation. (7 LF)
- 3.Check, tighten, and replace bolts if missing on the railing system.
Downstream Face and Wing Walls:
- 1.There are three seeps on the east wing wall, under the fish ladder. The seeps appear to be below areas that were previously patched and repaired (15 LF). The 2023 inspection report also noted these seeps. It is recommended to conduct a resistivity geophysics study to aid in determining the water elevation behind the wall (nondestructive method) before looking into destructive methods of investigation.
- 2.Repair cracked and spalled area on the downstream end of the left wingwall. (5 SF)
Fish Ladder:
- 1.Repair the broken weld at the third steel brace from the north (0.17 LF).
- 2.Replace missing bolts and nuts with stainless steel hardware.
- 3.Seal interior joints with marine grade sealant or epoxy.
- 4.Tighten all loose bolts.
- 5.Continue to remove vegetation as needed.
- 6.Consider complete replacement of the fish ladder suited for fish passage needs and for reduced maintenance.
Spillway:
- 1.Monitor seep on the downstream side.
- 2.Evaluate a resurfacing program for the apron as exposure of the concrete aggregate appears to be continuing. Continued deterioration of the concrete surface may eventually progress to complete aggregate loss.
64
Verdantas.com | 16
Page 65
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
Pedestrian Walkway:
- 1.Monitor walkway for cracks, and repair as needed.
Outlet Works:
- 1.Repair the opening between the two trash rack panels (5 LF).
- 2.Operate sluice gate monthly to monitor performance and keep mechanical components in working shape.
- 3.Repair outlet works platform and ladder and install new railing for added operator safety (32 LF).
Exit Channel:
- 1.Place approximately 2,000 square feet of rip rap downstream of the downstream apron
- 2.Remove bushes and woody weeds in the rip rap and control weeds with herbicide as needed.
- 3.Stabilize bare spots along the exit channel with rip rap or seeding.
Boat Dock:
- 1.No repairs are required at this time.
Concrete Slab on Grade Pad:
- 1.No repairs are required.
Additional Maintenance Items:
- 1.Monitor growth of areas where new grass seed has been planted.
- 2.Remove weeds growing from the joints between the rip rap and maintain area to prevent future vegetation growth.
65
Verdantas.com | 17
Page 66
Item 6.
Project No. 39807
Silver Lake Dam Inspection
December 2025
Appendix A
Site Photographs
66
Verdantas.com
Page 67
Item 6.
insert photo here insert photo here
PHOTO 1: Left embankment upstream slope, looking PHOTO 2: Left embankment upstream slope. Bare area west toward boat ramp and spillway above riprap armor.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 67
Page 68
Item 6.
insert photo here insert photo here
PHOTO 3: Typical riprap gradation along upstream slope PHOTO 4: Open access panel and exposed wiring at light east of boat ramp. in embankment. Bare earth above riprap
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 68
Page 69
Item 6.
insert photo here insert photo here
PHOTO 5: Bare earth and minor erosion along upstream PHOTO 6: Crest of left embankment, looking east. Some bare earth, slope of left embankment approaching boat minor erosion along pavement edge. ramp. Silver Lake Dam Dam Inspection Report NOVEMBER 2025 Site Photographs Project Number: 39807 Lewis Mill Drive Dover, Delaware Site_Photos-39807-11172025.xlsx 69
Page 70
Item 6.
insert photo here insert photo here
PHOTO 7: Crest of left embankment, looking west PHOTO 8: Downstream slope of left embankment. approaching spillway and pedestrian bridge.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 70
Page 71
Item 6.
insert photo here insert photo here
PHOTO 9: Downstream slope of left embankment. PHOTO 10: Downstream slope of left embankment above paved parking lot.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 71
Page 72
Item 6.
insert photo here insert photo here
PHOTO 11: Downstream slope of left embankment above PHOTO 12: Right embankment upstream slope, looking paved parking lot. west.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 72
Page 73
Item 6.
insert photo here insert photo here
PHOTO 13: Right embankment upstream slope, riprap at PHOTO 14: Bare earth and minor erosion on upstream right spillway wingwall/training wall. embankment slope at right spillway wingwall.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 73
Page 74
Item 6.
insert photo here insert photo here
PHOTO 15: Right embankment upstream slope. PHOTO 16: Right embankment upstream slope. Erosion/settlement at dead stump.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 74
Page 75
Item 6.
insert photo here insert photo here
PHOTO 17: Right embankment upstream slope, west of PHOTO 18: Right embankment end at public beach area. riprap armoring
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 75
Page 76
Item 6.
insert photo here insert photo here
PHOTO 19: Right embankment crest, looking east. PHOTO 20: Right embankment crest and reservoir beyond.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 76
Page 77
Item 6.
insert photo here insert photo here
PHOTO 21: Right embankment downstream slope. Note PHOTO 22: Right embankment downstream slope at right tree adjacent to right spillway wingwall/training wingwall/training wall. wall. Silver Lake Dam Dam Inspection Report NOVEMBER 2025 Site Photographs Project Number: 39807 Lewis Mill Drive Dover, Delaware Site_Photos-39807-11172025.xlsx 77
Page 78
Item 6.
insert photo here insert photo here
PHOTO 23: Right embankment downstream slope and PHOTO 24: Outlet works platform located in reservoir riprap armoring at stilling basin and upstream of principal spillway. downstream channel. Silver Lake Dam Dam Inspection Report NOVEMBER 2025 Site Photographs Project Number: 39807 Lewis Mill Drive Dover, Delaware Site_Photos-39807-11172025.xlsx 78
Page 79
Item 6.
insert photo here insert photo here
PHOTO 25: Left spillway wingwall/training wall, upstream of PHOTO 26: Left spillway training wall, fish ladder and low- spillway. flow chute downstream of spillway.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 79
Page 80
Item 6.
insert photo here insert photo here
PHOTO 27: Left spillway training wall, fish ladder and low- PHOTO 28: Downstream end of fish ladder on left side of flow chute downstream of spillway. spillway.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 80
Page 81
Item 6.
insert photo here insert photo here
PHOTO 29: Damage at downstream end of left spillway PHOTO 30: Damage at downstream end of left spillway wingwall, adacent to fish ladder. wingwall, adacent to fish ladder.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 81
Page 82
Item 6.
insert photo here insert photo here
PHOTO 31: Spillway entrance channel and crest; right PHOTO 32: Right spillway wingwall/training wall, upstream spillway wingwall/training wall upstream of of spillway. spillway. Silver Lake Dam Dam Inspection Report NOVEMBER 2025 Site Photographs Project Number: 39807 Lewis Mill Drive Dover, Delaware Site_Photos-39807-11172025.xlsx 82
Page 83
Item 6.
insert photo here insert photo here
PHOTO 33: Right spillway wingwall/training wall PHOTO 34: Right spillway wingwall/training wall downstream of spillway crest. downstream of spillway crest.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 83
Page 84
Item 6.
insert photo here insert photo here
PHOTO 35: Stilling basin and receiving channel left bank. PHOTO 36: Stilling basin and receiving channel.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 84
Page 85
Item 6.
insert photo here insert photo here
PHOTO 37: Stilling basin right bank. PHOTO 38: Downstream spillway face, stilling basin and right spillway wingwall/training wall.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 85
Page 86
Item 6.
insert photo here insert photo here
PHOTO 39: Overall downstream face of spillway. PHOTO 40: Downstream face of spillway from right side.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 86
Page 87
Item 6.
insert photo here insert photo here
PHOTO 41: Overhead view of low level outlet works PHOTO 42: Downstream spillway face. discharge through spillway.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 87
Page 88
Item 6.
insert photo here insert photo here
PHOTO 43: Downstream spillway apron. PHOTO 44: Typical condition, underside of pedestrian access bridge deck.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 88
Page 89
Item 6.
insert photo here insert photo here
PHOTO 45: Downstream face of spillway at construction PHOTO 46: Sounding downstream face of spillway. joint and prior repair.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 89
Page 90
Item 6.
insert photo here insert photo here
PHOTO 47: End of concrete apron, beginning of displaced PHOTO 48: Abrasion of concrete and exposed aggregate, riprap within stilling basin. typical over entire downstream face of spillway.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 90
Page 91
Item 6.
insert photo here insert photo here
PHOTO 49: Abrasion of concrete, deeper areas of eroded PHOTO 50: Downstream face of spillway and transition to aggregate sporadic along downstream face. apron. Low level outlet works discharges through spillway face. Silver Lake Dam Dam Inspection Report NOVEMBER 2025 Site Photographs Project Number: 39807 Lewis Mill Drive Dover, Delaware Site_Photos-39807-11172025.xlsx 91
Page 92
Item 6.
insert photo here insert photo here
PHOTO 51: Outlet end of low level outlet works. PHOTO 52: Interior of low level outlet culvert from downstream end.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 92
Page 93
Item 6.
insert photo here insert photo here
PHOTO 53: Low flow chute on downstream face of spillway PHOTO 54: Location of seeps on face of left training wall. at left training wall.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 93
Page 94
Item 6.
insert photo here insert photo here
PHOTO 55: Closeup of left training wall at upstream most PHOTO 56: Prior crack repair used flexible sealant on top seep (at steel brace) of concrete/mortar patch indicated by arrow.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 94
Page 95
Item 6.
insert photo here insert photo here
PHOTO 57: Closeup of third seep at crack/former PHOTO 58: Face of left spillway training wall below fish attachment point. Rust staining noted. ladder.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Site Photographs
Project Number: 39807
Lewis Mill Drive
Dover, Delaware Site_Photos-39807-11172025.xlsx 95
Page 96
Item 6.
Project No. 39807
Silver Lake Dam Inspection
January 2026
Appendix B
Underwater Photographs – Walker Diving
96
Verdantas.com
Page 97
Item 6.
insert photo here
PHOTO 1: Sluice gate stem guide at water surface level
insert photo here
PHOTO 2: Timber cribbing around outlet works structure
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Underwater Photographs -
Walker Diving Project Number: 39807
Lewis Mill Drive
Dover, Delaware Walker_Photos-39807-11172025.xlsx
97
Page 98
Item 6.
insert photo here
PHOTO 3: Sluice gate stem, typical condition
insert photo here
PHOTO 4: Gate stem and thrust nut
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Underwater Photographs -
Walker Diving Project Number: 39807
Lewis Mill Drive
Dover, Delaware Walker_Photos-39807-11172025.xlsx
98
Page 99
Item 6.
insert photo here
PHOTO 5: Gate stem coupler and gate stop
insert photo here
PHOTO 6: Gate stem coupler and gate stop
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Underwater Photographs -
Walker Diving Project Number: 39807
Lewis Mill Drive
Dover, Delaware Walker_Photos-39807-11172025.xlsx
99
Page 100
Item 6.
insert photo here
PHOTO 7: Gate stem coupler and gate stop
insert photo here
PHOTO 8: Gate frame connection
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Underwater Photographs -
Walker Diving Project Number: 39807
Lewis Mill Drive
Dover, Delaware Walker_Photos-39807-11172025.xlsx
100
Page 101
Item 6.
insert photo here
PHOTO 9: Gate frame connection
insert photo here
PHOTO 10: Side wedge, typical condition
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Underwater Photographs -
Walker Diving Project Number: 39807
Lewis Mill Drive
Dover, Delaware Walker_Photos-39807-11172025.xlsx
101
Page 102
Item 6.
insert photo here
PHOTO 11: Side wedge, typical condition
insert photo here
PHOTO 12: Top wedge, right side of gate
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Underwater Photographs -
Walker Diving Project Number: 39807
Lewis Mill Drive
Dover, Delaware Walker_Photos-39807-11172025.xlsx
102
Page 103
Item 6.
insert photo here
PHOTO 13: Top wedge, left side of gate
insert photo here
PHOTO 14: Stem connection to gate disc and thrust nut
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Underwater Photographs -
Walker Diving Project Number: 39807
Lewis Mill Drive
Dover, Delaware Walker_Photos-39807-11172025.xlsx
103
Page 104
Item 6.
insert photo here
PHOTO 15: Left training wall upstream of fish ladder and spillway
insert photo here
PHOTO 16: Left training wall upstream of fish ladder
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Underwater Photographs -
Walker Diving Project Number: 39807
Lewis Mill Drive
Dover, Delaware Walker_Photos-39807-11172025.xlsx
104
Page 105
Item 6.
insert photo here
PHOTO 17: Left training wall upstream of fish ladder
insert photo here
PHOTO 18: Upstream entrance to fish ladder
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Underwater Photographs -
Walker Diving Project Number: 39807
Lewis Mill Drive
Dover, Delaware Walker_Photos-39807-11172025.xlsx
105
Page 106
Item 6.
insert photo here
PHOTO 19: Vertical trash rack rod below waterline
insert photo here
PHOTO 20: Fish ladder exterior framing
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Underwater Photographs -
Walker Diving Project Number: 39807
Lewis Mill Drive
Dover, Delaware Walker_Photos-39807-11172025.xlsx
106
Page 107
Item 6.
insert photo here
PHOTO 21: Fish ladder stop log guide below waterline
insert photo here
PHOTO 22: Right training wall upstream of spillway.
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Underwater Photographs -
Walker Diving Project Number: 39807
Lewis Mill Drive
Dover, Delaware Walker_Photos-39807-11172025.xlsx
107
Page 108
Item 6.
insert photo here
PHOTO 23: Prior concrete repair at right training wall
insert photo here
PHOTO 24: Prior concrete repair at right training wall
Silver Lake Dam
Dam Inspection Report
NOVEMBER 2025
Underwater Photographs -
Walker Diving Project Number: 39807
Lewis Mill Drive
Dover, Delaware Walker_Photos-39807-11172025.xlsx
108
Page 109
Item 6.
Project No. 39807
Silver Lake Dam Inspection
January 2026
Appendix C
DNREC Inspection Checklist
109
Verdantas.com
Page 110
Item 6.
Delaware Dam Safety Program Visual Inspection Checklist This general checklist should be used as an aid when examining all dams. This checklist may not, however, include all features or conditions found at a specific dam that are relevant to the safety of that dam. All features integral to the safety of the dam being examined should be inspected and their condition reported.
TYPE OF INSPECTION: (Regular, Formal or Informal): REGULAR
DE INSPECTION YEAR: 2025
DAM NAME: Silver Lake Dam
NID ID: S137
STATE ID: DE00031
LOCATION: St. Jones River, Dover, DE
OWNER: The City of Dover, DE
OPERATOR: The City of Dover, DE
DATE OF INSPECTION: November 17, 2025
RESERVOIR INFORMATION
Normal Reservoir Elevation (ft): N/A
Reservoir Elevation at time of inspection (ft): At spillway crest
WEATHER CONDITIONS (including recent rainfall): Mostly Clear, 45 degrees F
110
Page 111
Item 6.
INSPECTION PERSONNEL
Delaware Licensed Professional Engineer(s):
Name Affiliation
Stephen Szewczak, P.E. Verdantas, LLC
Assisted By:
Name Affiliation
Laura Lutes, E.I.T. Verdantas, LLC
William Thompson, P.E. Verdantas, LLC
Michael Lambert Walker Diving
Harry Duffield Walker Diving
Angel Ramos Walker Diving
DNREC Dam Safety Program Representative(s):
Name Affiliation
Janice Shute, P.E. DNREC Division of Watershed Stewardship
Dam Owner Representative(s):
Name Affiliation
Others:
Name Affiliation
111
Page 112
Item 6.
2008 DELAWARE DAM INVENTORY INFORMATION (provided by DNREC if available):
112
Page 113
Item 6.
HISTORY
Date Constructed: 1944 Date(s) Reconstructed: N/A
Designer: Albright & Friel, Inc. Consulting Engineers Constructed By: N/A
Owner & Address: The City of Dover, DE, 19903
Owner/ Operator present during inspection (yes or no): No
PREVIOUS INSPECTIONS
Last Inspection: November 7, 2024 Last Regular Inspection:
Phase I Inspection: January, 1978 Last Formal Inspection:
List all recommendations from previous inspection reports and note whether those items have been completed:
Recommendations from 2024 Inspection Report: Upstream Slope: 1. All weeds noted within the rip rap should be controlled with herbicide and removed. Continue to monitor— weeds were removed or dead due to the season. 2. The trash accumulated along the water line at the west end of the left embankment. Continue to monitor – some trash and debris was present during the inspection. 3. Seed areas on the ground on the left and right embankment. Not completed. 4. Repair the crack noted on the right side of the boat ramp. Previous repair has cracked again. 5. Depressions on the crest should be monitored periodically. Continue to monitor. 6. The stump noted above the rip rap on the right upstream slope can remain provided it is no longer alive and should be monitored periodically. A depression was noted around the stump. This area should be filled and seeded, continue to monitor. Dam Crest: 1. Depressions that were noted in previous inspections were not noted. Continue to monitor. 2. Consideration should be given to repair the cracks and depressed asphalt pavement. Not completed.
Downstream Slope: 1. All weeds noted within the rip rap should be removed and controlled with herbicide so future weeds do not grow. Continue to monitor. 2. Any bare spots should be seeded and covered with new grass, including any eroded areas, areas disturbed by mowing operations, or around bollards. Not completed. 3. The undermined sidewalk near the fence adjacent to the fish ladder should be remediated/backfilled. Not completed. 4. The woody bushes/weeds that were noted growing in the fence that cordons off the bottom of the fish ladder and near the fish ladder sign can be left in place provided they are no longer alive and should be monitored periodically. Continue to monitor. 5. The No. 57 stone that is being used as ground cover inside the fence adjacent to the fish ladder is allowing weeds to grow. The weeds should be removed and controlled with herbicide. Consideration should be given to replacing the No. 57 stone with grass seed or rip rap to minimize the potential for weed growth. Continue to monitor. 6. The undermined fence post at the southern end of the chain link fence adjacent to the fish ladder should be remediated. The eroded areas noted in the area of the fence post and the eroded area south of the fence that extends to the exit channel should be remediated. Not completed.
113
Page 114
Item 6.
- 7.Continue to monitor the eroded area adjacent to the upper parking lot that has been remediated for further signs of erosion. Repair the soil reinforcement netting in this location. Continue to monitor/not completed.
Upstream Face and Wing Walls 1. Repair the cracks throughout, above and below water, with pressure injected epoxy (27 LF). Completed above water but not completed below water line. 2. Field measure, cut and re-adjust the rotated fence extension on all wingwalls (195 LF). (7 LF was not completed on east abutment). Fish Ladder: 1. Repair the leaking joints. Not completed. 2. Repair the broken weld at the third steel brace from the north (0.17 LF) Not completed. 3. Replace the missing bolts and nuts with stainless steel hardware (2 EA) Not completed (additional bolts and nuts are becoming loose and need tightening). 4. Remove the growing vegetation. Not Completed
Spillway:
1. None of the defects noted warrant repair. Continue to monitor.
Pedestrian Walkway:
- 1.Bolts should be checked, tightened, and replaced if missing on the railing system. Continue monitoring.
Outlet Works: 1. Repair the opening between the two trash rack panels (5 LF). Not completed. 2. Continue to monitor the condition of the timbers & hardware for further deterioration or lack of function which would warrant repair. Continue monitoring.
Exit Channel:
- 1.The rip rap, other smaller stones, and the two bushes just downstream of the spillway and adjacent to the fish ladder should be removed. Not completed.
- 2.Bushes and woody weeds should be removed and controlled with herbicide. Not completed.
- 3.Any bare spots along the exit channel should be remediated with rip rap or seeded. Not completed.
EMERGENCY ACTION PLAN (Required for all High and Significant Hazard dams)
Date of Approved Plan: N/A (Not Provided)
Date of Plan Revision: N/A (Not Provided)
Is the notification flowchart complete and current? (If the notification flow chart is not complete and current, all modifications, corrections, and additions must be made and replacement pages submitted with this report)
Is inundation mapping or a description included? N/A
Are emergency materials and equipment identified? N/A
When was the plan last tested? N/A
DOWNSTREAM HAZARD CLASSIFICATIONS
114
Page 115
Item 6.
Present Hazard Classification: High
Changes in Downstream Land Use and Habitation: No
Is present classification appropriate? Yes
OPERATION AND MAINTENANCE
Date of Operation and Maintenance Plan: N/A
Are instructions adequate? N/A
Do operating personnel follow instructions? N/A
What are operating personnel capabilities? N/A
115
Page 116
Item 6.
EXAMINATION OF EMBANKMENT DAMS
DESCRIPTION OF STRUCTURE
Embankment Material: Earth
Cutoff Type: Unknown
Impervious Core: Unknown
Internal Drainage System: Drainage system outlets were not observed which may indicate one is not present
Movement (Horizontal and Vertical Alignment): None observed
Junctions with Abutments or Embankments: Good condition, no cracks or separation observed.
Miscellaneous: N/A
CREST
Vertical Alignment: Good
Horizontal Alignment: Good
Surface Cracks: None observed
Settlement: None observed
Unusual Conditions: None observed
UPSTREAM SLOPE
Slope (Estimate) (H:V): 3H:1V
Trees, Undesirable Growth or Debris, Animal Burrows: The Upstream Slope is in good condition except as noted below. No animal burrows were observed.
- 1.The riprap on both left and right slopes appeared in good condition, with some small to medium dead weeds noted. Monitoring should continue.
- 2.Minor trash and debris accumulation was noted in the water at the end of the east upstream embankment.
- 3.There is a 1,200 SF area on the west slope (upper side of slope) that needs reseeding since the area is bare from erosion and foot traffic.
- 4.There is 310 SF of area on the east slope (upper side of slope, west of the boat ramp) that needs reseeding since the area is bare from erosion and foot traffic.
- 5.There is 600 SF of area on the east slope (upper side of slope, east of boat ramp) that needs reseeding since the area is bare from erosion and foot traffic.
- 6.Additional 1,500 SF of rip rap is needed on the north side of the east slope for lower water elevations – noted in 2024 inspection and not completed.
- 7.One tree is present at the left abutment of the earth embankment on private property behind a fenceline. Continue to monitor for signs of erosion or settlement.
- 8.There is a depression forming at a dead stump located above the rip rap on the right upstream slope near the spillway training wall. This should be filled with earth material and seeded to prevent surface erosion. Continue to monitor for further settlement.
- 9.Numerous small trees are present along the right embankment slope adjacent to the beach area. Roots are exposed on the surface of the embankment slope. Continue to monitor for signs of erosion
116
Page 117
Item 6.
or settlement.
Sloughing, Subsidence or Depressions: Small depression observed at the location of a dead stump – see above.
Slope Protection: Rip rap is missing along the waterline on the left (east) embankment slope. Rip rap is in good condition on the right (west) slope.
Surface Cracks or Movement at Toe: None Observed.
Unusual Conditions: None Observed.
DOWNSTREAM SLOPE
Slope (Estimate) (H:V): Varies from 2H:1V to flatter than 5H:1V
Trees, Undesirable Growth or Debris, Animal Burrows: Downstream Slope in good condition except as noted below. No animal burrows observed.
- 1.All weeds noted within the riprap and No. 57 stone ground cover should be controlled with herbicide and removed.
- 2.Any bare spots on either side should be covered with new grass.
- 3.A tree is present approximately 20 feet west of the downstream right spillway training wall. State of Delaware Dam Regulation 5103 Section 10.1.2.3 states, “Trees and other woody vegetation shall be prevented from growing on the dam unless waived by the Department”. Continue to monitor the wing wall for cracks or signs of deflection as the tree continues to mature and grow. Tree roots can cause damage to concrete structures and create seepage paths.
Sloughing, Subsidence or Depressions: None Observed.
Surface Cracks or Movement at Toe: None Observed.
Seepage: None Observed.
External Drainage System (Ditches, Trenches, Blanket): None Observed.
Condition Around Outlet Structure: No separate outlet works. Low level outlet discharges through the spillway to the apron. See comments on spillway apron.
Unusual Conditions: None Observed.
ABUTMENTS AND TOE AREA
Erosion at Contract: None Observed.
Seepage or Wet Area Along Contract: None Observed.
Signs of Movement: None Observed.
Depressions, Sinkholes: None Observed.
Unusual Conditions: None Observed.
SEEPAGE OR TOE DRAIN FLOW MEASUREMENTS
Location Estimated Flow Color (Turbidity)
OTHER CONDITIONS/OBSERVATIONS: None.
117
Page 118
Item 6.
EXAMINATION OF SPILLWAYS AND OUTLET WORKS
TYPE(S) AND DESCRIPTION OF SPILLWAY(S)
Primary: Concrete ogee-shaped spillway with base flow chute with flash boards on left side of spillway
Secondary (auxiliary): None
Emergency: Combined with Primary Spillway
Low Level Outlet (flashboards, operable gates, etc.): Sluice gate operated from wood platform upstream of spillway with 24-inch diameter cast iron pipe outletting through spillway downstream face
Other:
FOR EACH SPILLWAY THE FOLLOWING ASPECTS MUST BE EXAMINED WHERE APPROPRIATE
ENTRANCE CHANNEL
Description: Cast in place concrete wingwalls, riprap piled within the reservoir.
Vegetation (Trees, Bushes): None observed.
Debris: Small wooded debris on the spillway crest (west side).
Channel Side-Slope Stability: Concrete training walls were observed to be vertical and in generally good condition. Prior concrete repairs appear to be in generally good condition. Rip rap was observed piled within the entrance channel along the walls, terminating approximately 1 foot below the water surface.
Slope Protection/Erosion: Unusual Conditions: Minor surface erosion around existing rip rap along left and right walls.
Unusual Conditions: None observed.
SPILLWAY CREST
Description: Concrete
Condition of Material:
- 1.Water was flowing over the crest of the spillway, but the general condition was visible. Crest appeared to be level, uniform and in generally good condition.
- 2.Rip rap was observed piled along the upstream face of the spillway, terminating between 1 foot and 2 feet below the crest of the spillway.
Signs of Movement: None observed.
Joints: Good condition.
Unusual Conditions: None observed.
118
Page 119
Item 6.
DROP BOX
Description: N/A
Condition of Material: N/A
Signs of Movement: Joints: N/A
Floor: N/A
Unusual Conditions: N/A
SPILLWAY WING WALLS
Description: Concrete
Condition of Material:
Left Wingwall (East Side)
- 1.Areas of abrasion and spalling were noted along the length of the upstream wingwall. Abrasion depth was estimated at 1/2” to 3/8”. This was noted in the 2024 inspection and remains to be repaired.
- 2.Handpacked concrete repairs to prior hardware attachments within the concrete were noted at 6 locations along the upstream wingwall. Repairs appear to be in good condition.
- 3.Prior concrete repair on the upstream wingwall approximately 3’L x 2’H appears to be in good condition.
- 4.There was a crack that runs horizontally with a width of 1/4" inches to 0.5 inches, with a length of 27 inches. The crack was located 5 feet north of the fish ladder and 1 feet above the mudline. This was noted in the 2024 inspection and remains to be repaired.
- 5.Minor seepage was noted at three locations along the wingwall downstream of the spillway, below the fish ladder. The first seepage was located under the metal bracket that holds the fish ladder, approximately 27 feet north of the south end of the east wall. The second was located on the bottom of recent patch repairs approximately 25 feet north of the south end of the east wing wall. The third seep was located approximately 15 feet north of the south end of the east wing wall. These seeps were noted in the 2024 inspection and remain to be addressed.
- 6.There is cracking at the corner of the downstream end of the wingwall. Concrete repair should be performed (approximately 2’L x 1.5”H). This is new damage since the 2024 inspection.
Right Wingwall (West Side)
- 7.Right wingwall has abrasions along its length at the water line to 1 foot in depth. There was spalling throughout. This was noted in the 2024 inspection and remains to be repaired.
- 8.Previous crack repairs appear to be to hand packed concrete placement and are in fair condition.
- 9.Crack observed approximately 29 inches long, 1/8 inches wide, approximately 6 feet south from the upstream end of the wingwall. This was noted in the 2024 inspection and remains to be repaired.
- 10.Cracks observed approximately 8 feet from the upstream end of the wingwall that were 8 inches in length, ¼ inches in width and also a crack that was 12 inches in length with ¼ inches in width. This was noted in the 2024 inspection and remains to be repaired.
- 11.Prior repair patches on downstream side of spillway appear to be in good condition.
Signs of Movement: None observed.
Joints: Good condition.
Drains: None observed.
119
Page 120
Item 6.
Unusual Conditions: None observed.
DOWNSTREAM APRON
Description: Concrete
Condition of Material: Fair.
- 1.Exposed aggregate was observed throughout the downstream face of the spillway and apron. The entire downstream face has sporadic pockets of deeper abrasion where up to 75% of the aggregate grains are exposed.
- 2.2024 inspection report indicated a possible seep located 57 feet west from the east abutment wing wall. This was not observed during this inspection as flow over the spillway obscured the area. This should continue to be monitored during low flow periods and on a quarterly basis.
- 3.2024 inspection report indicated a hole, 2 inches deep, less than 0.5 inches in diameter located 41 feet east from the west abutment wing wall. This was not able to be located during this inspection, as flow over the spillway obscured the area. No repair was observed.
- 4.Construction joints appear to be sealed and in fair condition. No evidence of seepage through joints was observed.
- 5.A rock hammer was used to sound the concrete spillway and apron face. Prior patched areas indicated a slightly hollow sound but were not of significant severity to warrant immediate action. Continue to monitor concrete spillway and apron for potential undermining.
Signs of Movement: None observed.
Unusual Conditions: None
CULVERTS
Description: 24-inch diameter cast iron pipe from low level outlet works penetrates downstream apron.
Condition of Material: Observable portions appear to be in good condition.
Joints: Pipe interior was observed from the downstream outlet and not all joints could be observed directly. No signs of misalignment were present. A camera inspection of the culvert is recommended for the next regulatory inspection.
Signs of Movement: None observed.
Seepage: None observed.
Location Estimated Flow Turbidity
Unusual Conditions: Light scaling was noted at the interface between pipe and concrete spillway. Some rust staining was present on the downstream apron. No trash rack or animal guard is present on the outlet end of the culvert.
TRASH RACKS
Description: N/A
Condition of Material: N/A
Unusual Conditions: N/A
120
Page 121
Item 6.
CHUTES
Description: Base flow concrete chute located on west side of downstream apron with wood flash boards. Chute was actively flowing at the time of inspection.
Condition of Material: The chute appears to be in good condition. The side walls appear well aligned and vertical. There were no cracks or missing components observed. The condition of the chute floor could not be observed due to flow within the chute.
Signs of Movement: None observed.
Unusual Conditions: The exterior of the chute walls exhibited abrasion/scaling with exposed aggregate, similar to the condition of the downstream apron. The condition of the chute floor could not be observed due to flow within the chute.
121
Page 122
Item 6.
STILLING BASIN
Description: 6 to 18-inch size stone riprap
Condition of Material: Fair, with no signs of seepage and boils observed. Rip rap has been displaced from the downstream end of the apron approximately 12 feet downstream creating a small rip rap berm downstream. There is an approximately 18 to 24 inch drop from the top of the apron slab to the bottom of the stilling basin. An estimated 1,900 to 2,000 square feet of rip rap should be placed to prevent scour and undermining of the apron.
Signs of Movement: None observed.
Erosion: Yes, as described on the “Condition of Material” description.
Unusual Conditions: None observed.
EXIT CHANNEL
Vegetation (Trees, Bushes): Some minor vegetation was observed to be growing in riprap that lined the entrance channel at the end of the wing walls for the downstream apron.
Debris: None observed.
Channel Side-Slope Stability: Good Condition. No signs of stability problems.
Erosion: Some shear erosion and bare spots were noted. Larger areas of erosion were observed on the right bank.
Unusual Conditions: None observed.
LOW LEVEL OUTLET
Description: Wood riser structure with sluice gate.
Condition:
Riser Structure and Operating Platform:
- 1.Personnel with the City of Dover successfully opened and closed the sluice gate on November 24, 2025.
- 2.The wooden riser operating platform is in poor condition. The boards that serve as a platform for the operators are cracked and warped. Platform does not have a handrail.
- 3.The timber structure’s galvanized hardware is in poor condition below the waterline with up to 30% section loss.
- 4.The timber piles exhibit 1/8”W checking. The diver was unable to verify the previously noted 50% section loss at the right downstream pile due to lack of access, but some evidence of pile section loss was observed through the gaps in the trash rack fencing.
- 5.The outlet works is armored with riprap piled around the perimeter.
Sluice Gate:
- 1.The diver was able to access the interior of the outlet structure and inspect the gate through an opening (hole) in the trash rack.
- 2.Sluice gate stem and stem guides above the thrust nut are in good condition.
- 3.Thrust nut – one set screw missing on bottom of southwest side of the thrust nut.
122
Page 123
Item 6.
- 4.Stem guide below the thrust nut is corroded, broken and freely spinning.
- 5.Gate frame is in good condition, stainless steel bolts are in place and tight.
- 6.Gate wedges are in good condition, all wedges appear to be tight.
- 7.Pipe flange behind the gate is secured with 18 bolts. All appear to be in place and secure.
- 8.Gate disc is approximately 3’W x 3’H. Disc is in good condition with light marine growth in some areas.
Trash Rack: The outlet works trash rack on the north face exhibits an opening between the two panels of approximately 30”H x 18” W. The trash rack consists of chain link fence mesh secured to the timber structure.
Leakage: None observed.
Location Estimated Flow
Unusual Conditions: None observed.
Was the low level outlet operated during the inspection? Sluice gate was opened and closed by the City of Dover subsequent to the inspection on November 24, 2025, observed by Verdantas.
Were there difficulties operating the low level outlet? No, operator indicated that the gate opened and closed smoothly with normal effort. After closing the gate, no leakage was observed from the downstream outlet.
When was the low level outlet last operated and did this conform with the Operation and Maintenance procedures? Operator indicated that the outlet was last operated during the 2024 inspection. It is recommended to operate the low level outlet monthly to keep the mechanical components in working shape.
Miscellaneous: None.
STILLING BASIN FOR LOW LEVEL OUTLET
Description: Combined with stilling basin for combined principal and emergency spillways. See description above.
Condition of Material: See description above.
Signs of Movement: None observed.
Erosion: None observed.
Unusual Conditions: None observed.
EXIT CHANNEL FOR LOW LEVEL OUTLET
Description (Trees, Bushes): N/A
Debris: N/A
Channel Side-Slope Stability: N/A
Slope Protection Erosion: N/A
Unusual Conditions: N/A
123
Page 124
Item 6.
EXAMINATION OF CONCRETE AND MASONRY DAMS
DESCRIPTION OF STRUCTURE
Type of Dam (Gravity, Arch, etc.):
Internal Drainage System:
Movement (Horizontal and Vertical Alignment):
Miscellaneous:
UPSTREAM FACE
Condition of Concrete or Masonry:
Cracking:
Location Orientation Length Width Type
DOWNSTREAM FACE
Condition of Concrete or Masonry:
Cracking:
Location Orientation Length Width Type
Leakage through Dam (Location and Estimated Flow):
CREST
Condition of Concrete or Masonry:
Cracking
Location Orientation Length Width Type
Signs of Movement:
Differential Movement (Joint or Crack Separation or Offset):
GALLERIES
Cracking
Location Orientation Length Width Type
Differential Movement (Joint or Crack Separation):
Leakage into Galleries (Location and Estimated Flow):
124
Page 125
Item 6.
Condition of Gallery Drains:
FOUNDATION
Condition of Rock or Concrete Lining:
Cracking:
Signs of Movement:
Seepage (Location and Estimated Flow):
ABUTMENTS AND TOE AREA
Seepage or Wet Areas:
Signs of Movement:
Cracking:
Erosion:
Unusual Conditions:
125
Page 126
Item 6.
EXAMINATION OF OTHER FEATURES
INSTRUMENTATION (Monumentation/Surveys, Observation Wells, Weirs, Piezometers, etc.) location, condition: A reservoir staff gauge is attached to the left spillway wingwall. No other instrumentation is present.
(A separate report including instrument readings, condition of instruments, observations, and conclusions based upon the collected data should be attached.)
RESERVOIR
Slopes: Good condition.
Sedimentation: Could not be observed.
Unusual Conditions Which Affect Dam: None observed.
Other Unusual Conditions: Consider installation of dam warning buoys in reservoir upstream of the spillway due to the proximity of the boat ramp.
APPURTENANT STRUCTURES
Description and Condition of Each:
Fish Ladder:
- 1.The stainless-steel fish ladder was in poor condition. The top and side seem to be starting to rust.
- 2.The fish ladder steel support members and hardware exhibit moderate corrosion with up to 10% section loss.
- 3.Previous inspection reports indicated that the fish ladder leaks significantly. No leaking was observed in this inspection since the fish ladder was not operating.
- 4.The trash rack at the upstream end of the fish ladder is significantly corroded, with up to 85% section loss on the component bars.
- 5.Stop log guides at upstream end appear to be in fair condition.
- 6.Second stop log from the top has a 5”L x ¾” deep gouge running horizontally. Other stop logs appear to be in good condition.
- 7.The upstream frame of the fish ladder entrance is heavily corroded with 40% section loss.
- 8.The third fish ladder steel brace from north exhibits a 2.0”L x ¼”W broken weld splice.
- 9.The horizontal beams at the bottom of the ladder are in good condition and painted. There is algae on the bottom vertical columns.
- 10.There was one bolt and nut missing on the fish ladder upper area, west side.
- 11.There were two bolts missing nuts on the fish ladder west side.
- 12.There were two bolts missing nuts on the fish ladder east side.
- 13.There were three bolts with loose nuts (about to detach from bolts) on the fish ladder west side.
- 14.Missing bolts, nuts should be replaced. Loose nuts should be retightened.
Pedestrian Walkway:
- 1.The concrete surfaces between spillway and bottom of piers exhibit abrasion up to ½” D with exposed aggregate on all piers.
- 2.Prior repairs to the concrete deck appear to be in good condition. Some efflorescence is present on the underside of the deck and should continue to be monitored.
- 3.Walkway railing is in fair condition. Width of walkway is narrower than desirable for pedestrian access.
126
Page 127
Item 6.
RECOMMENDATIONS THE FOLLOWING REPAIRS SHOULD BE MADE IMMEDIATELY:
No immediate repairs required.
THE FOLLOWING NON-IMMEDIATE REPAIRS/IMPROVEMENTS SHOULD BE MADE:
Upstream Slope:
- 1.Continue to control the vegetative growth in the rip rap with herbicide.
- 2.Continue to remove trash and debris that accumulates at the waterline.
- 3.Seed the areas of bare ground on the left and right embankments (10,000 SF).
- 4.Repair the crack on the boat ramp's right side. This crack was previously repaired but has cracked again.
- 5.There is a depression forming at the stump noted above the rip rap on the right upstream slope. This should be filled with compacted earth material and seeded to prevent surface erosion. Continue to monitor embankments for further settlement.
- 6.Rip rap (1,600 SF) should be added on the east embankment upstream slope at the waterline to help with wave action erosion during low lake level seasons. Dam Crest:
- 1.The crest appears to be in good condition. As indicated in previous inspections, it should continue to be monitored for depressions.
- 2.Consideration should be given to repaving the asphalt roadway on the dam crest. Downstream Slope:
- 1.Continue controlling the rip rap's vegetative growth with herbicide.
- 2.Any bare spots, including eroded areas, areas disturbed by mowing operations, or around bollards, should be seeded and covered with new grass.
- 3.The undermined sidewalk near the fence adjacent to the fish ladder should be remediated/backfilled, as it will be a tripping hazard.
- 4.Continue to monitor the area along the fenceline cordoning off the bottom of the fish ladder and beneath the fish ladder for woody vegetation and weeds.
- 5.Continue to monitor the area inside the fence adjacent to the fish ladder for weeds and woody vegetation. Weeds should be removed and controlled with herbicide as needed. To minimize the potential for weed growth, consider replacing the No. 57 stone with grass seed or rip rap.
- 6.The riprap appears sparse or may have been filled in the areas adjacent to the fish ladder on the left downstream slope. Additionally, rip rap has been placed only along a portion of the right downstream wing wall and appears to be sparse at the toe of the right downstream wing wall. A study should be performed to determine if additional rip rap should be added and/or replaced.
- 7.Continue to monitor the areas adjacent to bituminous pavement driveways for surface erosion.
127
Page 128
Item 6.
Upstream Face and Wing Walls:
- 1.Repair the cracks below waterline with pressure injected epoxy (7 LF).
- 2.Field measure, cut and re-adjust rotated fence extension on all wingwalls, and secure to prevent rotation. (7 LF)
- 3.Bolts should be checked, tightened, and replaced if missing on the railing system.
Downstream Face and Wing Walls:
- 1.There are three seeps on the east wing wall, under the fish ladder. The seeps appear to be below areas that were previously patched and repaired. The 2023 inspection report also noted these seeps. It is recommended to conduct a resistivity geophysics study to aid in determining the water elevation behind the wall (nondestructive method) before looking into destructive methods of investigation.
- 2.Repair cracked and spalled area on the downstream end of the left wingwall. (2’L x 1.5’H)
Fish Ladder:
- 1.Repair the broken weld at the third steel brace from the north (0.17 LF).
- 2.Replace missing bolts and nuts with stainless steel hardware.
- 3.Tighten loose bolts.
- 4.Continue to remove vegetation as needed.
- 5.Consider complete replacement of the fish ladder suited for fish passage needs and for reduced maintenance.
Spillway:
- 1.Monitor seep on the downstream side.
- 2.Evaluate a resurfacing program for the apron as aggregates is becoming more exposed and will eventually progress to complete aggregate loss.
Pedestrian Walkway:
- 1.Repair the small indent on the west side of the walkway to avoid potential tripping hazard.
- 2.Monitor walkway for cracks, and repair as needed.
Outlet Works:
- 1.Repair the opening between the two trash rack panels (5 LF).
- 2.Operate sluice gate monthly to monitor performance and keep mechanical components in working shape.
- 3.Repair outlet works platform and ladder and install new railing for added operator safety.
128
Page 129
Item 6.
Exit Channel:
- 1.Approximately 1,900 to 2,000 square feet of rip rap needs to be repaired downstream of the downstream apron
- 2.Bushes and woody weeds in the rip rap should be removed and controlled with herbicide.
- 3.Any bare spots along the exit channel should be remediated with rip rap or seeded.
Boat Dock:
- 1.No repairs are required at this time.
Concrete Slab on Grade Pad:
- 1.No repairs are required.
THE FOLLOWING MAINTENANCE ITEMS SHOULD BE COMPLETED:
- 1.Areas where new grass seed is planted should be monitored for growth.
- 2.Weeds growing from the joints between the rip rap stones should be removed and maintained to prevent further growth
THE FOLLOWING ENGINEERING ANALYSIS/STUDIES SHOULD BE PERFORMED:
X Hydrologic and Hydraulic Analysis
Embankment Stability Analysis
X Dam Failure Analysis/Inundation Mapping
X Other: Electrical resistivity geophysics on the east wing wall to determine potential water path that is causing the three seeps on the downstream side of the wing wall (under the fish ladder)
None
129
Page 130
Item 6.
CONDITION ASSESSMENT
Silver Lake Dam was personally inspected by me and was found to be in the following condition (select one only):
SATISFACTORY
No existing or potential dam safety deficiencies are recognized. Acceptable performance is expected under all loading conditions (static, hydrologic, seismic) in accordance with the applicable regulatory criteria or tolerable risk guidelines.
X FAIR
No existing dam safety deficiencies are recognized for normal loading conditions. Rare or extreme hydrologic and/or seismic events may result in a dam safety deficiency. Risk may be in the range to take further action.
POOR
A dam safety deficiency is recognized for loading conditions which may realistically occur. Remedial action is necessary. POOR may also be used when uncertainties exist as to critical analysis parameters which identify a potential dam safety deficiency. Further investigations and studies are necessary.
UNSATISFACTORY
A dam safety deficiency is recognized that requires immediate or emergency remedial action for problem resolution.
Delaware Registered Professional Engineer Performing Condition Assessment:
Name Stephen M. Szewczak DE PE License Number 29611
Affiliation (Agency/Company) Verdantas LLC
Signature Date 2/10/2026
Delaware Dam Safety Program Concurrence with Condition Assessment:
Name DE PE License Number
Signature Date
Dam Owner Acknowledgement of Condition Assessment:
Name Title _________________________
Signature Date _____________________
130
Page 131
Item 7.
ACTION FORM
PROCEEDING: Council Committee of The Whole (Parks, Recreation, and Community Enhancement) DEPARTMENT OF ORIGIN: Planning, Inspections & Community Development DATE SUBMITTED: 4/2/26 PREPARED BY: Debbie O’Brien SUBJECT: Community Development Block Grant (CDBG) proposed grant recommendations for multi-year approved CDBG projects REFERENCE: N/A RELATED PROJECT: N/A
| REVIEWED BY: | Sharon J. Duca, P.E., ICMA-CM, Acting City Manager | |
|---|---|---|
| EXHIBITS: 2026 Draft Annual Action Plan | ||
| EXPENDITURE REQUIRED: | $300,000 | AMOUNT BUDGETED: $300,000 |
FUNDING SOURCE (Dept./Page in CIP & Budget): CDBG Entitlement Grant TIME TIMETABLE: Pending Council approval, CDBG grant agreements will be prepared for execution and initiation of projects effective 7/1/26. RECOMMENDED ACTION: Approve the City of Dover’s FY 2026 Annual Action Plan, including the proposed contingency provision, and authorize its submission to the U.S. Department of Housing and Urban Development (HUD).
BACKGROUND AND ANALYSIS
The City of Dover receives annual funding through the U.S. Department of Housing and Urban Development’s (HUD) Community Development Block Grant (CDBG) program to support housing and community development activities that benefit low- and moderate-income residents. As a requirement of participation in the CDBG program, the City must prepare and submit an Annual Action Plan (AAP) that outlines the proposed use of funds for the upcoming program year. The 2026 Annual Action Plan represents the second year of the City’s FY 2025–2029 Consolidated Plan and identifies specific projects and funding allocations designed to address priority needs, including housing rehabilitation, homeownership assistance, and services for individuals experiencing homelessness or housing instability.
The City anticipates receiving approximately $300,000 in CDBG funding; however, the final allocation amount has not yet been confirmed by HUD at the time of plan preparation. To ensure timely submission of the Annual Action Plan to HUD by the May 15, 2026 deadline, staff recommends inclusion of a contingency provision allowing for adjustments to the final funding amounts upon receipt of the actual allocation. Any necessary adjustments will be made proportionally to align with the final award amount, with primary adjustments applied to the Homeownership Assistance Program. Adjustments to public service funding will only be made if required to remain within the 15% regulatory cap.
This approach allows the City to maintain compliance with HUD requirements while avoiding delays associated with amending the plan and repeating the citizen participation process. Approval of the Annual Action Plan will authorize submission to HUD and enable the City to continue administering CDBG-funded programs in a timely and effective manner. 131
Page 132
Item 7.
The following activities are projects to be funded with proposed recommended funding allocations:
Homeownership Assistance Program The city will provide settlement assistance up to $20,000.00 to assist up to 4 low to moderate income households that are first time homebuyers purchase affordable housing in the City of Dover. Grant Request: $80,000 Recommended funded amount: $80,000
Program Administration CDBG funds will be used to oversee management, monitor and coordinate the CDBG program. Twenty percent 20% of the total grant allocation will be used to fund program administration. Recommended funded amount: $60,000
Milford Housing Development Corporation (Homeowner Rehabilitation) CDBG funds will be used to rehabilitate single-family owner-occupied housing units that are found to be in violation of the City’s Housing Code. This project will service between 3 low-income households. Grant Request: $55,000 Recommended funded amount: $55,000
Milford Housing Development Corporation (Emergency Home Repairs) CDBG funds will be used to complete emergency home repairs for single family residential owner-occupied housing units that are found to be in violation of the City’s Housing Code. This project will serve between 5-15 low-income households. Grant Request: $40,000 Recommended funded amount: $40,000
Central Delaware Housing Collaborative CDBG funds will be used for operations costs for a women’s shelter. This project is a public service activity and subject to the 15% cap requirement. Grant Request: $50,000 Recommended funded amount: $40,000
Central Delaware Habitat for Humanity CDBG funds will be used for the construction of affordable housing in the Downtown Revitalization Area. Grant Request: $25,000 Recommended funded amount: $25,000
132
Page 133
Item 7.
CITY OF DOVER, DELAWARE
2026 DRAFT ANNUAL ACTION PLAN
Community Development Block Grant (CDBG) Program
Program Year: July 1, 2026 – June 30, 2027
Prepared by:
City of Dover
Department of Planning, Inspections & Community Development
Community Development Office
Date: March 27, 2026
Prepared in accordance with the U.S. Department of Housing and Urban Development (HUD) requirements under 24 CFR Part 91.
133
Page 134
Item 7.
Executive Summary
AP-05 Executive Summary - 24 CFR 91.200(c), 91.220(b) 1. Introduction
Dover, the capital of Delaware, is centrally located within the state and lies in the Mid-Atlantic region of the United States. The city is approximately 90 miles from both Philadelphia and Washington, D.C., providing convenient access to two major metropolitan areas. With a population second only to Wilmington, Dover is one of the largest municipalities in Delaware. Dover also serves as the county seat of Kent County and is home to several key state government institutions, including the Delaware Supreme Court and Legislative Hall.
Delaware, together with the Eastern Shore counties of Maryland and Virginia, forms the Delmarva Peninsula. Within this region, Dover is the largest city by land area, encompassing more than 23 square miles.
As a recipient of Community Development Block Grant (CDBG) funding from the U.S. Department of Housing and Urban Development (HUD), the City is required to prepare a five-year Consolidated Plan and an Annual Action Plan (AAP) in accordance with 24 CFR Part 91.
This 2026 Annual Action Plan outlines how the City will utilize approximately $300,000 in CDBG funding during the City’s Fiscal Year 2027 (July 1, 2026 – June 30, 2027), funded through HUD’s Program Year 2026 allocation, to address priority housing and community development needs identified in the 2025– 2029 Consolidated Plan.
The Consolidated Plan is guided by four primary goals, listed in order of priority:
- 1.Provide aid for persons with special needs.
- 2.Preserve the existing housing stock.
- 3.Encourage owner-occupied housing in low- and moderate-income areas.
- 4.Promote safe and livable neighborhoods.
- 2.Summarize the objectives and outcomes identified in the Plan
The City of Dover’s 2026 Annual Action Plan implements the priority goals established in the FY 2025– 2029 Consolidated Plan, with a focus on housing preservation, expansion of homeownership opportunities, and support for vulnerable populations.
Rather than restating these goals, this plan identifies the specific actions and measurable outcomes that will advance them during the program year.
Action Plan 1
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
134
Page 135
Item 7.
Planned activities include housing rehabilitation, emergency home repairs, homeownership assistance, and public service programs for individuals experiencing homelessness or housing instability. These investments are designed to improve housing conditions, increase access to affordable homeownership, and enhance housing stability for low- and moderate-income residents.
Consistent with HUD’s performance measurement framework, these activities are expected to produce measurable outcomes aligned with the objectives of Decent Housing and Suitable Living Environments. Anticipated results include the preservation of existing housing units, assistance to first-time homebuyers, and expanded access to essential services for vulnerable populations.
- 3.Evaluation of past performance
The City of Dover made measurable progress in advancing the goals outlined in the FY 2025–2029 Consolidated Plan during the most recent program year. CDBG-funded activities supported housing stability, expanded access to homeownership, and provided essential services to low- and moderate- income residents, while maintaining compliance with HUD timeliness and expenditure requirements.
The City prioritized housing preservation and affordability through its housing rehabilitation programs, completing critical repairs to 15 owner-occupied homes. These improvements addressed health and safety concerns, allowing residents to remain safely housed while preserving the City’s existing housing stock.
Efforts to expand homeownership opportunities also yielded positive results, with nine first-time homebuyers receiving financial assistance. These activities promote long-term neighborhood stability and create wealth-building opportunities for low- and moderate-income households.
In addition, the City supported programs serving vulnerable populations through partnerships with local service providers. More than 250 individuals received emergency shelter, case management, and supportive services, contributing to efforts to reduce homelessness and improve housing stability.
Overall, the City’s past performance demonstrates effective use of limited resources to address priority needs. While housing affordability and service demands remain ongoing challenges, the City continues to make meaningful progress toward its community development goals.
- 4.Summary of Citizen Participation Process and consultation process
The City of Dover follows its adopted Citizen Participation Plan to ensure that residents—particularly low- and moderate-income individuals—have meaningful opportunities to participate in the development of the Annual Action Plan.
A minimum of two public hearings will be held to gather input on community needs and proposed funding priorities. The draft plan will be made available for a 30-day public comment period. Public Action Plan 2 2026 OMB Control No: 2506-0117 (exp. 09/30/2021) 135
Page 136
Item 7.
notices will be published in local media and on the City’s website, and outreach will be conducted to organizations serving low- and moderate-income populations.
In addition to public engagement, the City consults with housing providers, social service agencies, and regional partners to inform funding decisions and align resources with identified needs. Public and stakeholder input plays a key role in shaping the City’s priorities and program design.
- 5.Summary of public comments
To be determined
- 6.Summary of comments or views not accepted and the reasons for not accepting them
To be determined
- 7.Summary
The City of Dover has undertaken good faith efforts to engage all segments of the community that may benefit from the CDBG program. Through strategic investments, strong partnerships, and ongoing community engagement, the City remains committed to addressing critical housing needs, supporting vulnerable populations, and promoting sustainable community development.
Action Plan 3
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
136
Page 137
Item 7.
PR-05 Lead & Responsible Agencies – 91.200(b) 1. Agency/entity responsible for preparing/administering the Consolidated Plan
Describe the agency/entity responsible for preparing the Consolidated Plan and those responsible for administration of each grant program and funding source.
Agency Role Name Department/Agency
CDBG Administrator DOVER Planning/ City of Dover Table 1 – Responsible Agencies
Narrative (optional)
The Community Development Office is a part of the Department of Planning, Inspections & Community Development. The Community Development Office has one full-time employee, the Community Development Manager who administers the Community Development Block Grant and is the Fair Housing Coordinator. The City leverages cross-departmental support and experienced subrecipients to ensure effective program delivery and compliance. Clerical, planning and inspection assistance is provided by the Planning and Inspections Departments. The Building Inspections Office also provides housing and life safety inspections throughout the City, including property maintenance. The Dover Housing Authority provides responsibility for the public housing needs within the City and is a separate entity from the City. The Delaware State Housing Authority operates both Section 8 vouchers and public housing units also caters to the housing needs of low- and moderate-income households.
Consolidated Plan Public Contact Information
City of Dover Department of Planning, Inspections & Community Development 15 Loockerman Plaza, Dover, DE 19901 Phone (302) 736-7175 Fax: (302) 736-4217 Website: www.cityofdover.com Debbie O’Brien, Community Development Manager Email: dobrien@dover.de.us
Action Plan 4
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
137
Page 138
Item 7
AP-10 Consultation – 91.100, 91.200(b), 91.215(l) 1. Introduction
The City of Dover consults with a range of public, private, and nonprofit organizations to identify housing and community development needs and to guide the allocation of Community Development Block Grant (CDBG) funds. These consultations support a coordinated approach to addressing the needs of low- and moderate-income residents, including those experiencing homelessness, housing instability, and other challenges.
The City works collaboratively with housing providers, social service agencies, state and local government partners, and organizations participating in the Continuum of Care to ensure that programs and services are aligned with community priorities. Through these efforts, the City seeks to leverage available resources, reduce duplication of services, and improve the overall effectiveness of its housing and community development activities.
Provide a concise summary of the jurisdiction’s activities to enhance coordination between public and assisted housing providers and private and governmental health, mental health and service agencies (91.215(l))
The City of Dover enhances coordination among public and assisted housing providers, and private and governmental health and service agencies, through ongoing collaboration with local, state, and nonprofit partners. The City engages these stakeholders in identifying housing and community development needs, particularly for vulnerable populations including persons experiencing homelessness, individuals with disabilities, the elderly, and low- and moderate-income households.
The City works closely with housing providers such as the Delaware State Housing Authority and Dover Housing Authority, as well as nonprofit housing and service organizations including Dover Interfaith Mission for Housing, Central Delaware Housing Collaborative, Central Delaware Habitat for Humanity, and Milford Housing Development Corporation. In addition, coordination with the State of Delaware Department of Health and Social Services and internal departments such as the City of Dover Planning Department helps align housing activities with health, supportive services, and broader community development efforts.
Through these partnerships, the City promotes a coordinated service delivery system, reduces duplication of efforts, and leverages resources to improve housing stability and access to supportive services for residents in need.
Describe coordination with the Continuum of Care and efforts to address the needs of homeless persons (particularly chronically homeless individuals and families, families with children, veterans, and unaccompanied youth) and persons at risk of homelessness.
Action Plan 5
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
138
Page 139
Item 7.
The City of Dover coordinates with the Housing Alliance of Delaware, which serves as the Continuum of Care (CoC) for the State of Delaware, to address the needs of individuals and families experiencing homelessness or at risk of homelessness. City staff participate in ongoing communication and collaboration with CoC partners to better understand local homeless needs and align funding priorities with statewide strategies.
Through partnerships with local service providers that are part of the Continuum of Care network, including emergency shelter and transitional housing providers, the City supports programs that provide shelter, case management, and supportive services to individuals experiencing housing instability. These efforts contribute to a coordinated approach to reducing homelessness and improving access to housing resources.
The City’s coordination with the Continuum of Care helps ensure that available resources are used effectively, services are not duplicated, and individuals experiencing homelessness are connected to appropriate housing and support services through an integrated system of care.
Describe consultation with the Continuum(s) of Care that serves the jurisdiction's area in determining how to allocate ESG funds, develop performance standards for and evaluate outcomes of projects and activities assisted by ESG funds, and develop funding, policies and procedures for the operation and administration of HMIS
Not applicable, the City of Dover does not receive ESG funds.
- 2.Describe Agencies, groups, organizations and others who participated in the process and describe the jurisdiction’s consultations with housing, social service agencies and other entities
See Table 2 on next page
Action Plan 6
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
139
Page 140
Item 7.
Table 2 – Agencies, groups, organizations who participated 1 Agency/Group/Organization Housing Alliance Delaware Agency/Group/Organization Type Services - Homeless What section of the Plan was addressed by Homeless Needs and Homelessness Strategy Consultation? Briefly describe how the Agency/Group/Organization The City coordinates with the Housing Alliance of Delaware as the Continuum of was consulted. What are the anticipated outcomes of Care (CoC) for the State of Delaware. City staff participate in ongoing the consultation or areas for improved coordination? collaboration and utilize data and input from the CoC to better understand local homelessness trends and service needs. This coordination supports alignment of funding priorities and strengthens efforts to reduce homelessness and improve access to housing and supportive services. 2 Agency/Group/Organization NeighborGood Partners Agency/Group/Organization Type Services - Housing What section of the Plan was addressed by Housing Needs and Homeownership Assistance Consultation? Briefly describe how the Agency/Group/Organization The City partners with NeighborGood Partners to administer housing counseling was consulted. What are the anticipated outcomes of services for first-time homebuyers participating in the Homeownership the consultation or areas for improved coordination? Assistance Program. Consultation with this organization helps ensure that eligible households are prepared for homeownership and supports the City’s efforts to expand access to affordable housing opportunities. 3 Agency/Group/Organization DELAWARE STATE HOUSING AUTHORITY Agency/Group/Organization Type PHA / Other Government – State What section of the Plan was addressed by Housing Needs and Public Housing Consultation?
Action Plan 7
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
140
Page 141
Item 7.
Briefly describe how the Agency/Group/Organization The City consults with the Delaware State Housing Authority to assess affordable was consulted. What are the anticipated outcomes of housing needs, including rental housing demand and housing assistance the consultation or areas for improved coordination? programs. Information from DSHA helps inform planning decisions related to housing priorities and supports coordination of resources to address housing affordability challenges within the City.
Identify any Agency Types not consulted and provide rationale for not consulting
The City of Dover made a good-faith effort to consult with a broad range of agencies and organizations involved in housing, homelessness, and community development activities. Outreach efforts included public notices, direct communication with local and state agencies, and engagement with nonprofit service providers.
Due to the City’s size and the limited number of agencies operating within the jurisdiction, not all potential agency types were represented during the consultation process. However, many of the organizations consulted provide overlapping services and represent the needs of multiple populations, including low- and moderate-income residents, persons experiencing homelessness, and individuals with special needs.
The City will continue to expand outreach efforts and strengthen coordination with additional partners as opportunities arise to further support the goals and priorities identified in the Consolidated Plan.
Other local/regional/state/federal planning efforts considered when preparing the Plan
Name of Plan Lead Organization How do the goals of your Strategic Plan overlap with the goals of each plan? The City of Dover prioritizes funding for homeless services and housing stability activities that align Continuum of Housing Alliance of with the goals and priorities identified by the Continuum of Care. Coordination with the CoC Care Delaware supports efforts to reduce homelessness and improve access to housing and supportive services. Table 3 – Other local / regional / federal planning efforts
Narrative (optional)
Action Plan 8
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
141
Page 142
Item 7.
AP-12 Participation – 91.105, 91.200(c) 1. Summary of citizen participation process/Efforts made to broaden citizen participation Summarize citizen participation process and how it impacted goal setting
The City of Dover follows its adopted Citizen Participation Plan to ensure that residents, particularly low- and moderate-income persons, have meaningful opportunities to participate in the development of the Annual Action Plan.
To encourage public input, the City will conduct outreach through public hearings, public notices, and online engagement. A minimum of two public hearings will be held to gather feedback on housing and community development needs and to present proposed funding priorities. Notices of these hearings will be advertised in local media and on the City’s website, and information will be shared with service providers and organizations that serve low- and moderate-income populations.
In addition to public hearings, the City consults with housing providers, social service agencies, and community organizations to identify priority needs, including housing affordability, homelessness services, and housing rehabilitation.
Public input received during the participation process will play a key role in shaping the City’s funding priorities and program design. Feedback from residents and stakeholders will inform the selection of activities included in the Annual Action Plan, ensuring that resources are directed toward the most critical community needs.
The draft Annual Action Plan will be made available for public review for a 30-day period, during which comments will be accepted. All comments received will be considered in the preparation of the final plan.
Action Plan 9
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
142
Page 143
Item 7
Citizen Participation Outreach
Sort Order Mode of Outreach Target of Outreach Summary of Summary of Summary of comments URL (If response/attendance comments received not accepted applicable) and reasons Comments will be Public hearings will Non- accepted during be held to solicit 1 Public Meeting targeted/broad hearings and the To be determined input from residents community public comment and stakeholders period Public notices will be Comments will be Non- published in a local accepted during 2 Newspaper Ad targeted/broad newspaper to inform To be determined the public community residents of hearings comment period and plan availability Information will be Comments will be posted on the City’s Non- accepted online website to provide 3 Internet Outreach targeted/broad and during the To be determined access to the draft community public comment plan and hearing period notices Table 4 – Citizen Participation Outreach
Action Plan 10
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
143
Page 144
Item 7.
Expected Resources
AP-15 Expected Resources – 91.220(c)(1,2) Introduction The City of Dover receives Community Development Block Grant (CDBG) funding from the U.S. Department of Housing and Urban Development (HUD) to support housing and community development activities that benefit low- and moderate-income residents.
Given the limited availability of CDBG resources, the City prioritizes funding for activities that address the most critical needs identified in the Consolidated Plan, including housing preservation, homeownership assistance, and public service programs. The City also leverages partnerships with local nonprofit organizations, housing providers, and state agencies to maximize the impact of available funding.
Anticipated Resources
Program Source Uses of Funds Expected Amount Available Year 2 Narrative Description of Annual Program Prior Year Total: Funds Allocation: Income: Resources: $ $ $ $ CDBG Federal Administration, Approximately 20 percent ($60,000) of the total Housing, Public allocation will be used for program administration. Services Public service activities will receive approximately 13.3 percent ($40,000) of the allocation, supporting programs that serve low- and moderate-income residents, including individuals experiencing homelessness. The remaining funds will be dedicated to housing-related activities, including homeownership assistance and housing rehabilitation programs.
$300,000 $0 $0 $300,000
Table 5 - Expected Resources – Priority Table.
Action Plan 11
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
144
Page 145
Item 7.
The funding amounts reflected in this Action Plan are based on the City’s estimated CDBG allocation at the time of preparation. Upon receipt of the final allocation from HUD, the City may adjust funding amounts proportionally to align with the actual award. Any such adjustments will be made in a manner consistent with program requirements, with primary adjustments applied to the Homeownership Assistance Program, and adjustments to public service funding made only as necessary to remain within the 15 percent regulatory cap.
Explain how federal funds will leverage those additional resources (private, state and local funds), including a description of how matching requirements will be satisfied
Although there is no matching requirement for CDBG funds, the City of Dover leverages additional resources through partnerships with nonprofit organizations and housing providers. Subrecipients such as Milford Housing Development Corporation, Central Delaware Housing Collaborative, and Habitat for Humanity utilize additional funding sources, including private and state funds, to expand the impact of CDBG-funded activities.
These partnerships enable the City to address housing rehabilitation, homeownership, and supportive service needs more effectively while maximizing the use of limited federal resources. The City further supports housing development through local incentives, including tax abatements and fee waivers, which complement federal funding sources.
If appropriate, describe publicly owned land or property located within the jurisdiction that may be used to address the needs identified in the plan
The City of Dover supports the use of publicly owned and strategically acquired properties to address affordable housing needs. Through partnerships with organizations such as Habitat for Humanity and NeighborGood Partners, available properties may be utilized for the development or rehabilitation of affordable housing, particularly within targeted neighborhoods.
Action Plan 12
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
145
Page 146
Item 7.
Annual Goals and Objectives
AP-20 Annual Goals and Objectives
Goals Summary Information
Sort Goal Name Start End Category Geographic Needs Addressed Funding Goal Outcome Indicator Order Year Year Area 1 Homeownership 2026 2027 Affordable Citywide Homeownership CDBG: Direct Financial Assistance to Assistance Housing Assistance $80,000 Homebuyers: 4 Households Assisted 2 Preserve Housing 2026 2027 Affordable Citywide Improve CDBG: Housing Units Rehabilitated: Stock – Owner- Housing Housing $55,000 3 Units occupied Conditions Rehabilitation 3 Preserve Housing 2026 2027 Affordable Citywide Maintain Safe CDBG: Housing Units Rehabilitated: Stock -Emergency Housing and Habitable $40,000 6 Units Repairs Housing 4 Providing Public 2026 2027 Public Citywide Support CDBG: Persons assisted: 150 Services to Vulnerable Services Homeless and $40,000 persons Populations At-risk Individuals 5 Affordable Housing 2026 2027 Affordable Downtown Expanding CDBG: Housing Units Constructed: 1 Development Housing Target Area Affordable $25,000 Unit Housing Supply Table 6 – Goals Summary
Action Plan 13
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
146
Page 147
Item 7.
These goals directly support the priority needs identified in the 2025–2029 Consolidated Plan. The City of Dover’s annual goals are based on available funding, prior program performance, and identified community needs. The City prioritizes activities that preserve housing, expand homeownership opportunities, and support vulnerable populations. The goals established for the program year are designed to be achievable and reflect the City’s commitment to making measurable progress toward the objectives outlined in the Consolidated Plan. Administrative activities are not included in the goals table, as they do not directly produce measurable outcomes.
Goal Descriptions
1 Goal Name Homeownership Assistance
Goal Description The City will provide financial assistance to eligible first-time homebuyers to support the purchase of affordable housing. This activity increases access to homeownership opportunities and promotes long-term housing stability for low- and moderate-income households. 2 Goal Name Preserve Housing Stock – Owner-occupied Rehabilitation Goal Description The City will support rehabilitation activities that improve housing conditions and extend the life of existing housing units. This program focuses on maintaining safe, decent, and affordable housing for low- and moderate- income homeowners. 3 Goal Name Preserve Housing Stock -Emergency Repairs Goal Description The City will fund emergency repair programs to address urgent health and safety issues in owner-occupied homes. These efforts help prevent displacement and ensure that residents can remain safe in their homes. 4 Goal Name Providing Public Services to Vulnerable Populations Goal Description The City will fund public service programs that provide shelter, case management, and supportive services to individuals experiencing homelessness or housing instability. These services improve stability and access to essential resources for vulnerable residents. 5 Goal Name Affordable Housing Development Goal Description Funding will support the development of affordable housing units through partnerships with nonprofit housing organizations. These efforts increase the availability of safe and affordable housing within the City.
Action Plan 14
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
147
Page 148
Item 7.
Projects
AP-35 Projects – 91.220(d) Introduction The projects included in the 2026 Annual Action Plan are designed to implement the goals and priorities identified in the City of Dover’s 2025–2029 Consolidated Plan. These projects focus on addressing the most critical housing and community development needs of low- and moderate-income residents, including housing preservation, homeownership assistance, and support for vulnerable populations.
Funding allocations were determined based on community input, identified needs, and the availability of CDBG resources. Projects were selected based on demonstrated capacity, prior performance, and alignment with identified community needs. The selected projects represent a coordinated approach to improving housing conditions, expanding access to affordable housing, and providing essential services to residents in need.
Projects
| # | Project Name |
|---|---|
| 1 | Homeownership Assistance Program |
| 2 | Program Administration |
| 3 | MHDC Homeowner Rehabilitation Program |
| 4 | MHDC Emergency Home Repair Program |
| 5 | CDHC House of Hope Operations |
| 6 | CD Habitat for Humanity |
| Table 7 - Project Information | |
Describe the reasons for allocation priorities and any obstacles to addressing underserved needs
The City of Dover’s allocation priorities are based on the goals and objectives identified in the 2025– 2029 Consolidated Plan, as well as input received through the citizen participation process and consultation with local housing and service providers. Priority is given to activities that address the most critical needs of low- and moderate-income residents, including preserving the existing housing stock, expanding access to homeownership, and supporting individuals experiencing homelessness or housing instability.
Funding decisions reflect a focus on programs that have demonstrated effectiveness and the capacity to deliver measurable outcomes, such as housing rehabilitation, homeownership assistance, and public service programs administered by local nonprofit partners. The City also prioritizes activities that leverage additional resources and partnerships to maximize the impact of limited CDBG funding.
The primary obstacle to addressing underserved needs is the limited availability of funding relative to the demand for housing and services. The need for affordable housing, particularly for low- and very Action Plan 15 2026 OMB Control No: 2506-0117 (exp. 09/30/2021) 148
Page 149
Item 7.
low-income households, continues to exceed available resources. In addition, rising construction and rehabilitation costs have reduced the number of households that can be served with available funding.
Despite these challenges, the City continues to coordinate with local and regional partners to leverage additional resources and improve service delivery, while prioritizing investments that provide the greatest benefit to low- and moderate-income residents.
AP-38 Project Summary Activities will meet national objectives through low- and moderate-income area benefit and limited clientele criteria.
Project Summary Information
1 Project Name Homeownership Assistance Program Target Area Citywide Goals Supported Affordable Housing Needs Addressed Homeownership Assistance Funding CDBG: $80,000 Description CDBG funds will be used to provide down payment and closing cost assistance to eligible low- and moderate-income first- time homebuyers purchasing homes within the City of Dover. Target Date 6/30/2027 Estimate the number and type Approximately 4 low- and moderate-income households. of families that will benefit from the proposed activities Location Description Citywide Planned Activities Financial assistance will be provided to eligible households to support the purchase of affordable housing. 2 Project Name Program Administration Target Area Citywide Goals Supported N/A Needs Addressed Planning and Administration Funding CDBG: $60,000 Description CDBG funds will be used for the administration and management of the City’s CDBG program, including oversight, reporting, and compliance. Action Plan 16 2026 OMB Control No: 2506-0117 (exp. 09/30/2021) 149
Page 150
Item 7.
Target Date 6/30/2027 Estimate the number and type Not applicable of families that will benefit from the proposed activities Location Description Citywide Planned Activities Program management, environmental review, reporting, and coordination. 3 Project Name MHDC Homeowner Rehabilitation Program Target Area Citywide Goals Supported Preserve Housing Stock – Owner-Occupied Rehabilitation Needs Addressed Housing Rehabilitation Funding CDBG: $55,000 Description CDBG funds will be used to rehabilitate owner-occupied homes to address code violations and improve housing conditions. Target Date 6/30/2027 Estimate the number and type Approximately 3 low- and moderate-income households of families that will benefit from the proposed activities Location Description Citywide Planned Activities Rehabilitation including structural repairs, system upgrades, and code compliance. 4 Project Name MHDC Emergency Home Repair Program Target Area Citywide Goals Supported Preserve Housing Stock – Emergency Repairs Needs Addressed Emergency Home Repairs Funding CDBG: $40,000 Description CDBG funds will be used to provide emergency repairs to owner-occupied homes to address urgent health and safety issues. Target Date 6/30/2027
Action Plan 17
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
150
Page 151
Item 7.
Estimate the number and type Approximately 6 households. of families that will benefit from the proposed activities Location Description Citywide Planned Activities Emergency repairs including roofing, plumbing, electrical, and other critical systems. 5 Project Name CDHC House of Hope Operations Target Area Citywide Goals Supported Providing Public Services to Vulnerable Populations Needs Addressed Homelessness Funding CDBG: $40,000 Description CDBG funds will support operational costs for programs serving individuals experiencing homelessness, including shelter services and case management. Target Date 6/30/2027 Estimate the number and type Approximately 150 individuals of families that will benefit from the proposed activities Location Description Citywide Planned Activities Provision of shelter, case management, and supportive services. 6 Project Name Habitat for Humanity Affordable Housing Target Area Downtown Target Area Goals Supported Support Affordable Housing Development Needs Addressed Affordable Housing Funding CDBG: $25,000 Description CDBG funds will support the development of affordable housing units in partnership with Habitat for Humanity. Target Date 6/30/2027
Action Plan 18
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
151
Page 152
Item 7.
Estimate the number and type Approximately 1 household
of families that will benefit from
the proposed activities
Location Description Downtown Target Area
Planned Activities Construction of new affordable housing.
Action Plan 19
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
152
Page 153
Item 7.
AP-50 Geographic Distribution – 91.220(f) Description of the geographic areas of the entitlement (including areas of low-income and minority concentration) where assistance will be directed
The City of Dover will carry out most Community Development Block Grant (CDBG) activities on a citywide basis, with the primary objective of benefiting low- and moderate-income residents. Housing rehabilitation, homeownership assistance, and public service activities will be available throughout the City to eligible households.
A portion of funding will be directed to the Downtown Target Area to support the development of affordable housing. This targeted investment aligns with the City’s ongoing efforts to revitalize areas with a higher concentration of low- and moderate-income households, as identified through HUD LMI data and local analysis.
Geographic Distribution
| Target Area | Percentage of Funds |
|---|---|
| Downtown Target Area | 8 |
| Citywide | 92 |
| Table 8 - Geographic Distribution | |
Rationale for the priorities for allocating investments geographically
The City’s geographic distribution strategy balances the need for flexible, citywide programs with targeted investments in areas of greatest need. While many programs are demand-based and must be available citywide, targeted funding in the Downtown area supports neighborhood revitalization and expands affordable housing opportunities in areas with higher concentrations of low- and moderate- income residents.
Discussion The City of Dover continues to focus revitalization efforts within the Downtown Target Area, which includes one of the City’s older neighborhoods with a higher concentration of low- and moderate- income households. This area contains an aging housing stock and has historically experienced a greater need for housing rehabilitation and investment.
Targeted investments in this area are intended to complement broader citywide programs by concentrating resources where they can have a visible and lasting impact. The development of affordable housing within the Downtown Target Area supports neighborhood stabilization, increases access to quality housing, and aligns with the City’s long-term revitalization goals.
While many CDBG-funded activities are made available citywide to ensure accessibility, the City continues to prioritize strategic investments in areas where needs are most significant and where coordinated efforts can produce meaningful community improvements. Action Plan 20 2026 OMB Control No: 2506-0117 (exp. 09/30/2021) 153
Page 154
Item 7.
Affordable Housing
AP-55 Affordable Housing – 91.220(g)
Introduction
The City of Dover recognizes the ongoing need for affordable housing for low- and moderate-income residents. Through the use of CDBG funds, the City supports a range of housing activities, including homeownership assistance, housing rehabilitation, and the development of new affordable housing units. These efforts are designed to improve housing conditions, increase access to homeownership, and expand the availability of safe and affordable housing.
One Year Goals for the Number of Households to be Supported
| Homeless | 150 |
| Non-Homeless | 16 |
| Special-Needs | 0 |
| Total | 166 |
| Table 9 - One Year Goals for Affordable Housing by Support Requirement | |
|---|---|
One Year Goals for the Number of Households Supported Through
| Rental Assistance | 0 |
| The Production of New Units | 1 |
| Rehab of Existing Units | 9 |
| Acquisition of Existing Units | 0 |
| Total | 10 |
| Table 10 - One Year Goals for Affordable Housing by Support Type | |
|---|---|
Discussion Special needs populations are served through public service activities rather than housing production or direct housing assistance goals.
Action Plan 21
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
154
Page 155
Item 7.
AP-60 Public Housing – 91.220(h)
Introduction
The Dover Housing Authority (DHA) is the primary public housing agency serving the City of Dover. DHA provides affordable housing opportunities to low-income families, elderly residents, and individuals with disabilities through a variety of federally funded programs.
Actions planned during the next year to address the needs for public housing
The City of Dover will continue to coordinate with the Dover Housing Authority to support the provision of safe, decent, and affordable housing for low-income residents. DHA administers public housing and housing assistance programs designed to meet the needs of eligible households, including families, seniors, and persons with disabilities.
The City supports these efforts through collaboration with housing providers and by funding activities that complement public housing programs, including housing rehabilitation, homeownership assistance, and services for vulnerable populations.
Actions to encourage public housing residents to become more involved in management and participate in homeownership
The Dover Housing Authority offers programs and services that encourage residents to achieve greater economic self-sufficiency. These efforts include access to supportive services, housing counseling, and programs that assist residents in transitioning to homeownership opportunities.
The City of Dover complements these efforts by providing homeownership assistance programs that are available to eligible residents, including those transitioning from rental housing.
If the PHA is designated as troubled, describe the manner in which financial assistance will be provided or other assistance
The Dover Housing Authority is not currently designated as a troubled public housing agency. Therefore, no additional actions are required at this time.
Discussion These activities are consistent with the goals of the Consolidated Plan and reflect ongoing efforts to address identified community needs.
Action Plan 22
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
155
Page 156
Item 7.
AP-65 Homeless and Other Special Needs Activities – 91.220(i) Introduction
The City of Dover is committed to addressing the needs of individuals and families experiencing homelessness and those at risk of homelessness. Through coordination with local service providers and the Continuum of Care, the City supports programs that provide shelter, supportive services, and pathways to stable housing.
Describe the jurisdictions one-year goals and actions for reducing and ending homelessness including
Reaching out to homeless persons (especially unsheltered persons) and assessing their individual needs
The City supports outreach efforts through partnerships with local service providers, including the Central Delaware Housing Collaborative (CDHC), which provides shelter and supportive services to individuals experiencing homelessness. These programs help identify individuals in need and connect them to appropriate housing and services.
Addressing the emergency shelter and transitional housing needs of homeless persons
The City will provide CDBG funding to support the operation of emergency shelter programs, including CDHC House of Hope. These programs provide safe shelter, case management, and supportive services to individuals experiencing homelessness.
Helping homeless persons (especially chronically homeless individuals and families, families with children, veterans and their families, and unaccompanied youth) make the transition to permanent housing and independent living, including shortening the period of time that individuals and families experience homelessness, facilitating access for homeless individuals and families to affordable housing units, and preventing individuals and families who were recently homeless from becoming homeless again
The City supports programs that assist individuals in transitioning from homelessness to permanent housing through case management, housing placement assistance, and coordination with housing providers. These efforts are aligned with the goals of the Continuum of Care to reduce the length of time individuals experience homelessness.
Helping low-income individuals and families avoid becoming homeless, especially extremely low-income individuals and families and those who are: being discharged from publicly funded institutions and systems of care (such as health care facilities, mental health facilities, foster care and other youth facilities, and corrections programs and institutions); or, receiving Action Plan 23 2026 OMB Control No: 2506-0117 (exp. 09/30/2021) 156
Page 157
Item 7.
assistance from public or private agencies that address housing, health, social services, employment, education, or youth needs.
The City works with local and state partners to support individuals and families at risk of homelessness by providing access to housing resources, supportive services, and housing stability programs. These efforts help prevent displacement and reduce the risk of homelessness among vulnerable populations.
Discussion These activities are consistent with the goals of the Consolidated Plan and reflect ongoing efforts to address identified community needs.
Action Plan 24
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
157
Page 158
Item 7.
AP-75 Barriers to affordable housing – 91.220(j) Introduction:
The City of Dover recognizes that barriers to affordable housing can limit access to safe and affordable housing for low- and moderate-income residents.
Actions it planned to remove or ameliorate the negative effects of public policies that serve as barriers to affordable housing such as land use controls, tax policies affecting land, zoning ordinances, building codes, fees and charges, growth limitations, and policies affecting the return on residential investment
The primary barriers to affordable housing in the City include limited housing supply, rising construction and rehabilitation costs, and increasing demand for affordable units. These factors contribute to housing affordability challenges for low- and very low-income households.
The City continues to support policies and programs that promote affordable housing, including flexible zoning, partnerships with nonprofit housing developers, and incentives to encourage the development of affordable housing. The City also supports housing rehabilitation programs to preserve existing housing stock and maintain affordability.
Through coordination with local and state partners, the City will continue to explore strategies to reduce barriers and expand access to affordable housing opportunities.
Action Plan 25
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
158
Page 159
Item 7.
Discussion: To help address barriers to affordable housing, the City of Dover offers a range of development and homeownership incentives designed to encourage investment and reduce the cost of housing production and purchase. These incentives include financial assistance, fee waivers, and tax abatements that support both developers and homebuyers.
Available incentives include: • Up to 20 percent cash rebate for qualifying construction projects (capped at $1,000,000 per property) • Transfer tax rebate for the buyer’s portion upon issuance of a Certificate of Occupancy • Waiver of building, plumbing, mechanical, and fire protection permit fees • Waiver of City sewer and water impact fees • 10-year abatement of property taxes on the value of improvements • Up to $20,000 in down payment assistance for the purchase of affordable housing
These incentives support the development of affordable housing, reduce financial barriers for developers and homebuyers, and complement the City’s use of CDBG funds to expand housing opportunities. The City is actively working to address regulatory barriers through participation in the DSHA Zoning and Land Use Reform Pilot Program.
Action Plan 26
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
159
Page 160
Item 7.
AP-85 Other Actions – 91.220(k)
Introduction:
The City of Dover will continue to take actions to address the needs of low- and moderate-income residents and to support the goals of the Consolidated Plan.
Actions planned to address obstacles to meeting underserved needs
The primary obstacle to meeting underserved needs is the limited availability of funding relative to the demand for housing and services. The City will continue to prioritize funding for programs that address the most critical needs and leverage partnerships to maximize available resources.
Actions planned to foster and maintain affordable housing
The City of Dover will continue to support affordable housing through a combination of financial assistance programs, strategic partnerships, and local policy initiatives. Key activities include homeownership assistance, housing rehabilitation programs, and support for the development of new affordable housing units.
In addition to direct funding, the City promotes affordable housing through local incentives, including tax abatements, fee waivers, and financial assistance programs that support both housing development and homeownership.
The City is also participating in the Delaware State Housing Authority’s Zoning and Land Use Reform Pilot Program. Through this initiative, Dover will receive technical assistance to evaluate and modernize its zoning and land use regulations to better support the development of affordable housing. The program is intended to increase the variety of housing types, encourage compact and mixed-use development, and reduce regulatory barriers that limit housing supply.
These combined efforts position the City to address both immediate housing needs and long-term affordability challenges by increasing housing opportunities and supporting sustainable community development.
Actions planned to reduce lead-based paint hazards
The City will comply with all federal requirements related to lead-based paint in housing rehabilitation activities. The City works in coordination with state agencies to ensure that lead hazards are properly identified and addressed in accordance with applicable regulations.
Actions planned to reduce the number of poverty-level families
The City supports programs that assist low-income households by providing access to safe and
Action Plan 27
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
160
Page 161
Item 7.
affordable housing, supportive services, and opportunities for homeownership. These efforts help improve economic stability and reduce the number of households living in poverty.
Actions planned to develop institutional structure
The City will continue to strengthen coordination among public and private housing providers, social service agencies, and community organizations. These partnerships enhance the delivery of services and improve the effectiveness of housing and community development programs.
Actions planned to enhance coordination between public and private housing and social service agencies
The City will continue to collaborate with local and regional partners, including housing providers, nonprofit organizations, and state agencies, to improve coordination of housing and supportive services. These efforts help ensure that resources are used efficiently and that residents receive the services they need.
Discussion: These activities are consistent with the goals of the Consolidated Plan and reflect ongoing efforts to address identified community needs.
Action Plan 28
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
161
Page 162
Item 7.
Program Specific Requirements
AP-90 Program Specific Requirements – 91.220(l)(1,2,4)
Introduction:
Projects planned with all Community Development Block Grant (CDBG) funds expected to be available during the program year are identified in the Projects Table. The following information outlines program income, if any, and other CDBG-specific requirements applicable to the City of Dover.
Community Development Block Grant Program (CDBG)
- 1.Program Income
The City of Dover does not anticipate receiving program income during the program year.
Amounts:
• Program Income: $0
• Section 108 Loan Proceeds: $0
• Urban Renewal Funds: $0
• Float-Funded Income: $0
- 2.Other CDBG Requirements Urgent Need Activities
The City of Dover does not anticipate undertaking any activities that meet the urgent need national objective during the program year.
Amount: $0
Overall Benefit Requirement
The City of Dover will ensure that at least 70 percent of CDBG funds are used for activities that benefit low- and moderate-income persons over a one-, two-, or three-year period, in accordance with HUD requirements. For the current program year, it is anticipated that approximately 100 percent of CDBG funds, excluding administration and planning activities, will benefit low- and moderate-income persons.
Action Plan 29
2026
OMB Control No: 2506-0117 (exp. 09/30/2021)
162
Page 163
Item 1.
CITY OF DOVER, DELAWARE
ACTION FORM
PROCEEDING: Council Committee of the Whole (Utility Committee) DEPARTMENT OF ORIGIN: Water & Wastewater SUBMITTED ON: April 1, 2026 PREPARED BY: Kate L. Mills, Assistant Director of Water & Wastewater REVIEWED BY: Sharon J. Duca, P.E., ICMA-CM, Acting City Manager and Patricia M. Marney, Controller / Treasurer
SUBJECT: Evaluation of Proposals – Manganese Removal Systems for Drinking Water TIMETABLE: Notice to proceed to be issued within thirty (30) days of Council approval. Project anticipated to be completed in three hundred sixty-five (365) calendar days. RELATED PROJECT: X REFERENCE: X
EXPENDITURE REQUIRED: $449,500
AMOUNT BUDGETED: $400,000
FUNDING SOURCE (Dept./Page in CIP & Budget): Department of Water & Wastewater – Water Treatment Plant – Manganese Removal Systems for Drinking Water, Account No.: 401-40-76- 99-000-54031, Project Number WD2602. Shortfall to be covered by surplus funds from project WD2505, Account No.: 401-40-68-99- 000-54031.
STAFF RECOMMENDATION:
Award contract to Verdantas for the Manganese Removal Systems for Drinking Water, RFP #26- 0012WW, for the amount of $449,500.
BACKGROUND AND ANALYSIS:
This project, identified by the Delaware Office of Drinking Water, is for the design of treatment systems for the removal of manganese from five (5) of the city’s deep production wells. This project will be completed within three hundred sixty-five (365) calendar days and will deliver the design for each of the five (5) wells.
The proposal was advertised to the public as a Request for Proposals in accordance with the City’s purchasing policy, by the City’s Purchasing Agent under RFP #26-0012WW. Proposals were opened on February 25, 2026. The City of Dover received two (2) proposals. Each proposal was rated in six (6) categories and evaluated by four (4) staff members. The proposal evaluations are as follows:
163
Page 164
Item 1.
| AVERAGE | TOTAL | |||
|---|---|---|---|---|
| COST | EVALUATED | |||
| CONTRACTOR | LOCATION | EVALUATED | ||
| COST | ||||
| SCORE | ||||
| DAVIS BOWEN & FRIEDEL, INC. | MILFORD, DE | 66 | $900,000.00 | $900,000.00 |
| VERDANTAS | DOVER, DE | 96 | $449,500.00 $436,015.00* | |
| *Verdantas claimed local vendor preference which provided a 3% reduction on their evaluated cost. | ||||
The shortfall is proposed to be supplemented by the following:
Funding Description Current Spent / Savings / Requested Proposed Source Budget Encumbered Remaining Change Budget Remaining Water WD2602 – $400,000 $0 $400,000 $49,500 $449,500 Fund Manganese Removal Systems for Drinking Water Water WD2505 – $975,000 $480,613 $494,387 ($49,500) $444,887 Fund SCADA Equipment Upgrade
City staff reviewed the submissions and found that the Verdantas proposal met all requirements for the qualifications of this project. Staff recommends awarding the contract to Verdantas in the amount of $449,500.00 for the Manganese Removal Systems for Drinking Water project.
164
Page 165
Item 2.
165
Page 166
Item 2.
166
Page 167
Item 2.
167
Page 168
Item 2.
168
Page 169
Item 2.
169
Page 170
Item 2.
170
Page 171
Item 2.
171
Page 172
Item 2.
172
Page 173
Item 2.
173
Page 174
Item 1.
Snowstorm Costs
January and February
2026
174
Page 175
Item 1.
Facts • Total Miles To Clear = 132.85 miles • Emergency Routes = 8.76 miles (Typically brine treated 12 hours before the snow event, January storm they salted 12 hours prior.) • Critical routes and parking lots = 22.14 miles ( This includes Dover Police Department and the two fire stations to keep emergency services accessible. These are salt treated within 12 hours prior to the start of snow events.) • Other roads = 101.95 all other • Equipment • 1 Brine Truck 4 - V Boxes Tailgate Spreader for 1 Ton • 9 - 6 Wheel Dump Trucks with plows 3 – 1 Ton trucks with plows • “Floating” blades • Primarily due to infrastructure projections, plows sit 1-2” above pavement which allows the space to create a packed layer.
175
Page 176
Item 1.
January Storm – Key Points • Primary Response January 24, 2026 - January 27, 2026 • Conditions - Not just Snow - ice, snow, freezing rain and finally sleet • 6.5 inches of snow, freezing rain, sleet (created a solid base of ice) • State of Emergency Issued (Level 1 and 2 statewide) • Dealt with ice for extended period due to ongoing low temps (below zero with windchills) which reduces the efficacy of salt. • Slower clean up, refreezing, and prolonged hazardous conditions. • Relocated EMS to Station 1 and to a hotel in North Dover for faster response. 176
Page 177
Item 1.
February Storm – Key Points • Primary Response February 22, 2026 - February 25, 2026 • Conditions - heavy snow, blizzard conditions, whiteout and drifting snow • 16.5 inches of snow • State of Emergency Issued (Level 3 Kent and Sussex) • National Guard brought in for assistance. • Shelter opened at Dover High School. • Electrical outages increased. • Temps far less extreme than January, still some overnight refreezing but much easier recovery than in January. • Relocated EMS to Station 1 and to a hotel in North Dover for faster response.
177
Page 178
Item 1.
Approximate Overall costs (January) • Staff = $112,380 • Meal Allowances = $790 • Hotel costs = $1,590 • Salaries = $110,000 • Contractors = $110,080 • Teal Construction = $107,000 • Kent Construction = $3,080 • Materials = $13,120 • Salt (136 tons) = $11,300 • Brine (1,000 gallons – staff makes own) = $100 • Sand (43 tons) = $1,720 Total: $235,580 178
Page 179
Item 1.
Approximate Overall costs (February) • Staff = $112,755 • Meal Allowances = $770 • Hotel costs = $2,350 • Salaries = $109,635 • Contractors = $33,944 • Teal Construction and Asplundh • Materials = $23,979 • Salt (57.5 tons) = $4,420 • Electric Equipment = $19,559 Total: $170,678 179
Page 180
Item 1.
Approximate Total Cost for
January and February Storms
$406,258
Questions?
180
Page 181
Item 2. Statement by Fred Neil, President, Dover City Council Proposal for Alderman’s Court To my colleagues on the Dover City Council, I present the case for re-establishing the Dover Alderman’s Court to end the continuing chaos caused by people breaking the law. These are people who are unable to act rationally and refuse help when offered to them who have addiction, mental health or other problems.
At the Council as a Whole city councilman, I asked staff to study and bring back the cost of re- establishing the court. Today, I am making that a formal request.
The goal of bringing back the Alderman’s Court is to strengthening local accountability tools lessening the burden on the state systems. A municipal level court would allow Dover to:
! Address low-level nuisance offenses locally and efficiently ! Provide faster adjudication and consistent follow-through ! Impose enforceable penalties when warranted including medical intervention when appropriate ! Offer structured diversion options such as community service, mandatory treatment programs, and substance abuse counseling, ! Reduce repeated cycling through higher courts ! Ease the burden on state prosecutorial and judicial resources ! A Traffic court component to help control speeding and other violations
This approach aligns accountability with rehabilitation and would allow the City to handle quality-of-life offenses more effectively without escalating strain on state systems.
The City will seek a partnership with the State as solution. The court would strengthen local capacity so the State is not solely responsible for managing chronic low-level disorder in its capital city. Citizen complaints of speeding in neighbors will receive a quicker and higher profile response.
Step-by-Step approach to Institute an Alderman’s Court in Dover, Delaware
This approach provides a start-to-finish roadmap to initiate, advance, and implement the establishment of an Alderman’s Court, given Dover’s current charter structure and Delaware law.
Phase 1 — Define the Court Concept (Weeks 0–2) 1. Draft a one-page concept brief defining the court’s jurisdiction, authority, and scope, with the assumption that the court would operate out of Council Chambers without new construction. 2. Identify the most common recurring ordinance and misdemeanor issues the court is intended to address, using police, code enforcement, and downtown complaint data.
Phase 2 — Legal Pathway & Charter Analysis (Weeks 2–6) 3. Direct the City Solicitor to prepare a legal memorandum addressing required charter amendments, appointment authority, jurisdictional limits, appeals, and consistency with Delaware’s judicial structure. 4. Engage Delaware Court Administration to confirm requirements for Alderman’s Courts operating under the Chief Justice’s jurisdiction. 5.Confirm facility requirements and judicial-independence standards if the court operates from Council Chambers.
Page 1 of 2 181
Page 182
Item 2. Phase 3 — Operational & Financial Modeling (Weeks 4–8) 6. Develop an operating model covering court schedule, staffing, case flow, records management, and enforcement mechanisms. 7. Prepare a conservative budget including alderman stipend, clerical support, and minimal facility or security costs, offset where possible by retained fines, fees, and reduced repeat enforcement demands.
Phase 4 — Council Action & Public Process (W eeks 8–12) 8. Place the proposal on a Council committee or Committee of the Whole agenda for formal review. 9. Adopt a Council resolution advancing a charter amendment request to the Delaware General Assembly. 10. Conduct a targeted public hearing to gather input and address public safety, civil liberties, and operational concerns.
Phase 5 — State Legislative Approval (Months 3–9) 11. Coordinate with Dover-area state legislators to sponsor the charter amendment bill. 12. Support the bill through committee hearings with testimony from City officials, legal counsel, and court administration.
Phase 6 — Court Implementation & Launch (Months 9–12) 13. Complete the appointment or confirmation process for the Alderman as specified in the amended charter. 14. Adopt implementing ordinances, court rules, fee schedules, and enforcement protocols. 15. Configure Council Chambers for court use with minimal capital expenditure. 16. Execute memoranda of understanding with police, prosecutors, and detention facilities as required. 17. Launch the court with a limited-scope pilot and publish performance metrics for the first 90 days.
Key Early Decision Point
Appointment authority is a critical threshold issue. While traditional Delaware models rely on gubernatorial nomination and Senate confirmation, we may pursue a Council President appointment with full Council confirmation if permitted by state law and clearly reflected in the charter amendment.
Page 2 of 2 182
Page 183
Item 3.
Speeding and the Alderman’s Court
Proposal by Fred Neil, Council, 3rd District
Speeding complaints come from every corner of our city, and residents expect meaningful action. I am proposing that we add to the budget a Mobile Camera Speed Unit staffed by sworn civilian traffic personnel within the Police Department. This gives us a flexible, citywide tool that does not depend on permanent infrastructure or disruptive street redesigns.
Traditional Traffic-Calming Tools Considered
- •Physical barriers such as chicanes or bump-outs are expensive and cannot be installed everywhere.
- •Speed bumps and humps damage city and private vehicles and can delay fire, EMS, and police response.
- •Closing off streets or neighborhoods pushes traffic into other areas and creates new safety risks, including slower emergency access.
- •Speed studies conducted by staff consistently show that the level of speeding in many areas does not justify extreme measures like street closures. But that does not mean we should ignore the problem.
What We Know
- •Enforcement has a cost, and there is a time limit for taking legal action.
- •We cannot afford delays created by the state system.
- •The Alderman’s Court eliminates state-level bottlenecks, allowing Dover to act quickly and consistently on speeding violations.
- •The court is not designed as a revenue generator, but fines will help offset the cost of the Mobile Camera Speed Unit and the court itself.
- •This approach keeps our sworn police officers focused on their primary duties rather than routine traffic enforcement. A Flexible Enforcement Model
We already have streets marked with Strictly Enforced speed signs. A mobile “flying squad” camera team can appear anywhere, at any time, creating a strong deterrent without disrupting neighborhoods or emergency response routes. It can be advertised in advance initially and then randomly show-up.
This model gives Dover the ability to respond to residents’ concerns, enforce our laws promptly through the Alderman’s Court, and improve safety without resorting to costly or counterproductive measures.
I am requesting staff to work with the police department to determine the cost for personnel equipment and software budget consideration.
183
Page 184
Item 4.
M AY O R
CHRISTIANSEN’S
BLUE RIBBON
(OUD)
TA S K F O R C E
COMMITTEE
184
Page 185
Item 4.
PHASE 1.0
10-29-2025
6 : 3 0 P. M .
185
Page 186
Item 4.
THE PURPOSE
186
Page 187
T H E M AYO R ’ S O P I O I D U S E D I S O R D E R ( O U D ) Item 4.
B L U E R I B B O N TA S K F O R C E
187
Page 188
C O M M I T T E E ’ S F I D U C I A RY D U T I E S Item 4.
- A.Allocate opioid settlement funds solely for evidence-based interventions that directly target the ongoing opioid crisis.
- B.Implement robust planning, oversight, accountability, and transparency mechanisms to categorically reject any attempts to divert these vital resources towards unrelated expenses, offsetting government debts, or investing in ineffective strategies and tools.
- C.Establish strong planning, oversight, accountability, and transparency measures to guarantee that these funds are utilized effectively in combating opioid use disorder, while preventing any misappropriation or underutilization of these critical resources.
- D.Focus on identifying and promoting optimal harm reduction practices, such as Fentanyl Test Strips (FTS), while crafting robust, evidence-driven policy recommendations that will markedly enhance the Capital of Delaware's response to Opioid Use Disorders and the effectiveness of Treatment Facilities in Kent County. 188
Page 189
T H E M AY O R ’ S Item 4.
O U D TA S K F O R C E C O M M I T T E E M E M B E R S C O N S I S T O F T H E F O L L OW I N G :
- 1.The Honorable Dr. Roy Sudler, Jr. (Chairman of the Opioids Use Disorder (OUD) Committee/District 4 City Councilman in the Capital of Delaware)
- 2.The Honorable Eric L. Buckson (16 Senate District in the Delaware General Assembly).
- 3.Mr. Benard Pratt (Associate Vice-President of Facilities Management/Planning & Construction for Delaware State University).
- 4.Mr. James Oxford Sr. (Former Teacher, Athletic Director, and Head Football Coach for Dover High School).
- 5.Mr. Joseph H. Bedford III (Para-Professional-The Capital School District).
- 6.Mrs. Toni Jordan (NorthNode Group Counseling LLC.)
- 7.Mrs. Chelle Paul (Founder of the Criminal Justice Advocacy Organization Divided We Fall of Delaware). 189
Page 190
AD-HOC COMMITTEE CHAIRS Item 4.
2025-2027
OUD
Legislative & Finance Issue OUD OUD Eric Buckson Workforce Team Dover Development Coach & James Oxford Safety Issues Sr. OUD Chelle Paul Researcher Chairman Dr. Roy Sudler, Jr. OUD OUD Youth & Optimal Health Advisor Community Engagement Toni Jordan Joseph H. OUD Bedford III Research Data Collection Benard Pratt 190
Page 191
Item 4.
EXHIBIT E. LIST OF OPIOID R E M E D I AT I O N U S E S PLEASE
191
Page 192
Item 4.
BIOPSYCHOSOCIAL MODEL
192
Page 193
BIOPSYCHOSOCIAL FRAMEWORK
Item 4.
(Continued)
193
Page 194
BIOPSYCHOSOCIAL Item 4.
HOLISTIC MULTIFACETED APPROACH
Proposed Recommendations for the Abatement of OUD in the Capital of Delaware:
194
Page 195
BIOPSYCHOSOCIAL Item 4.
HOLISTIC MULTIFACETED APPROACH
(Continued) :
195
Page 196
Item 4.
INFRASTRUCTURE:
- J.LEADERSHIP, PLANNING AND COORDINATION
3.
196
Page 197
E N H A N C E D B E H AV I O R A L H E A LT H Item 4.
I N T E R G R AT I O N S
197
Page 198
E N H A N C E D B E H AV I O R A L H E A LT H I N T E R G R AT I O N S Item 4.
(Continued) :
198
Page 199
E N H A N C E D B E H AV I O R A L H E A LT H Item 4.
I N T E R G R AT I O N S
(Continued):
. Support greater access to mental health services and support for young people
199
Page 200
E X S PA N D T E L E H E A L T H :
Item 4.
200
Page 201
D ATA A N D R E S E A R C H Item 4.
201
Page 202
D ATA A N D R E S E A R C H Item 4.
(Continued):
202
Page 203
Item 4.
M O B I L E I N T E RV E N T I O N U N I T S
203
Page 204
Y O U T H R E A L C O S T C A M PA I G N S Item 4.
204
Page 205
Item 4.
Y O U T H R E A L C O S T C A M PA I G N S
(Continued):
205
Page 206
T R A F F I C S A F E T Y L AW S
Item 4.
(CONTINUED)
In 2019, the city of Newark, New Jersey, implemented a controversial policy targeting drivers who give money to individuals soliciting donations from the medians.
City officials argued that this practice not only poses a significant safety risk but also contributes to traffic delays, thereby creating a public safety hazard. As a result, violations of this new regulation were classified as offenses, aimed at maintaining the flow of traffic and ensuring the safety of both drivers and pedestrians.
206
Page 207
DANGERS OF VISUAL DISTRACTION
Item 4.
1.
2.
3.
207
Page 208
Item 4.
TEAM DOVER’S
208
Page 209
Item 4.
KEY REFERENCES
1.
2.
3.
209
Page 210
Item 4.
PHASE 1.1
11 - 1 7 - 2 0 2 5
6 : 3 0 P. M .
210
Page 211
D R . N A N C Y W. B O O K H A R T Item 4.
G R A N T W R I T E R A N D A D J U N C T P R O F E S S O R O F A RT AT D E L AWA R E S T A T E U N I V E R S I T Y ( D S U ) .
1 ) . P R E PA R I N G T O W R I T E A H I G H - Q U A L I T Y G R A N T PROPOSAL (COMMITTEE ACTION NOT REQUIRED)
| 01 | 02 | 03 |
| GRANT | BUDGET AND | IMPACT AND |
| SPECIFICATION | PLANNING | SUSTAINABILITY |
| ALIGNMENT | ||
|---|---|---|
211
Page 212
MR. BRAD OWENS
Item 4.
EXECUTIVE DIRECTOR OF THE
D E L AWA R E P R E S C R I P T I O N O P I O I D
SETTLEMENT DISTRIBUTION
COMMISSION (POSDC).
212
Page 213
TEAM DOVER’S Item 4.
3). O U D TA S K F O R C E A N D P E E R T O P E E R O R G A N I Z AT I O N S O U T R E AC H I N I T I AT I V E
(COMMITTEE ACTION REQUIRED)
1.
213
Page 214
- 2.OPTIMAL WELL-BEING SOURCES FOR OUD AND Item 4.
C O M O R B I D I T Y E N V I R O N M E N TA L D E T E R M I N A N T S
214
Page 215
- 3.CONSTITUENT’S/COMMITTEE Item 4.
R E C O M M E N D AT I O N ’ S ( D O U B L E C L I C K F O R A U D I O )
215
Page 216
Item 4.
PHASE 1.2
1-28-2026
6 : 0 0 P. M .
216
Page 217
Item 4.
217
Page 218
Item 4.
PHASE 1.3
2-12-2026
6 : 3 0 P. M .
218
Page 219
Item 4.
DISCUSSION REGARDING
OCA'S ROLE IN MANAGING
OPIOID USE DISORDER
(OUD) FUNDS TO PROTECT
I M PA C T E D C H I L D R E N .
D E L AWA R E S TAT E U N I V E R S I T Y ’ S
LIAISON
TO THE OFFICE OF THE CHILD
A DVO C AT E ( O C A ) W H I C H I S A
N O N - J U D I C I A L S TAT E AG E N C Y
CHARGED WITH SAFEGUARDING
T H E W E L FA R E O F D E L AWA R E ' S 219
CHILDREN.
Page 220
Item 4.
220
Page 221
Item 4.
221
Page 222
Item 4.
222